ML20067C183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:P I
b)        C F BR AU N & CO engineering ano construction suoseary or santa r. int.manonai corporauon Novetber 24, 1982 B R Shelton Comoumalth Edison Co                                  BL-26 SNED-35 ENB P O Box 767 Chicago, IL 60690
 
==Dear Mr. Shelton                                                                          ,==
 
ADDITIONAL MATERIAL TESTS                    I IA SALLE STATION ADVANCE PURCHASE ORDER 805-023 BRAUN PROBrr 6356-N                          i On November 19, we received additional material sampling data frcm the Nuclear Regulatory Ccmnission Region III office to supplement the material addressed in Section 5.3 MATERIAL of the October 27, 1982, Independent HVAC Review Final Report. The data has been reviewed by our welding and material
  ,_.x        specialists. His oatments, and a copy of the information received frcm the
()          NBC Region III office, are attached.
Our specialist agrees with, or has no coment on, the NRC data.                  I For attachments 4, 5 & 6 "No substantive coments" means that the information in the letters is technically correct but there are sate editorial corrections.
For example, 163* pyramid indenter should be 136* per ASTM E92.
Sincerely yours                          i I,
i AJK df                                            Andrew J Kempiak Project Manager Dr. A Bournia Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comtission Washington, D.C. 20555 NR C Docket Nos. 50-373/374 James G Keppler, Regional Administrator -3 copies U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road                                  G R Boddeker -w/o attachment Glen Ellyn, IL 60137                                Manager Nuclear Projects C F Braun & Co Daniel L Shamblin -2 copies                        1000 So Franont 77          Camenwealth Edison Canpany                          Alhambra,,Ca 91802 C/          La Salle County Station Section 1 through 5 only 8212080662 821124 DR ADOCK 05000373 PDR              . Amarnbra. Cahtomia 91802 . (213) 570-1000 . Telex 67-4888
 
O  C F BR AU N & CO engin ring .no con.iruction suosioiary ot s nta r. int.m tion.i corpor. tion Project 6356-N BL-26 B R Shelton                        Page 2                                          Novenber 24, 1982 Harold R Denton, Director -40 copies                      Charles W Schroedar Office of Nuclear Reactor Regulation                      Nuclear Licensing Administrator - 34 EN E U.S. Nuclear Regulatory Ccumission                        Ccamenwealth Edison Capany Washington, D.C. 20555                                    1 First National Plaza 01icago, E 60690 Richard Pollock -6 copies SARGENT AND LUNDY                                        Walter J Shewski                              ,
55 East Monroe                                            Manager, Quality Assurance (Marquette 6th fl) ,
Chicago, E 60690                                          Cczmonwealth Edison Cmpany                      '
140 South
 
==Dearborn Street                      ,==
 
Isonard J I<och                                          diicago, E 60690 Vice President                                                                                          l Illinois Power Ccmpany                                    Gerald J Diederich                              ,
500 South 27th Street                                    Superintendent Decatur, E 62525                                          La Salle County Station R.R. #1 O
v Walt Bird Consumers Power Cmpany Marseilles, E 61341 1945 West Ponnell Boad                                                                                  ;
Jackson, Michigan                                                                                        I i
Cordell Reed, Vice President                                                                              !
Nuclear Operations - 37D M Cmmonwealth Edison Capany 1 First National Plaza Chicago, E 60690 i
O 1000 so. Fremont Ave. . Alhambra, C hfome 91802 . (213) 570-1000 . Telex 674888
 
Page ,1 C F BR AUN & CO Asomewywseni sr.w.n.imecomene
()                                                    D'** NOVEMBER 23, 1982 f        To  ANDY KEMPIAK                          N LEONARD BOYD POWER DIVISION                              RESEARCH Ca  6356-N, COMMONWEALTH EDISON, LA SALLE 1, MATERIAL PROPERTIES                          .
                                                                                                      . V On November 19 the U S Nuclear Regulatory Commission's (USNRC)
Region III office telecopied data from their material sampling program that was not included in their transmittal to C F Braun on October 7. Copies of the six documents are attached.        The
(        identification of the documents and my comments are listed below.
ATTACHMENT 1    Letter dated November 19 from US NRC, C E Cornelius, 1 Page          to C F Braun, W L Stiebe, transmittal letter for other attachments.
No comment.
ATTACHMENT 2    Sargent and Lundy Responses to NRC Region III " Questions 6 pages          on EVAC System" Question 1    I agree with S & L's discussion of the
(])                        effects of increased hardness of bolting material.
Although the reported hardness of 287'Brinell is well above the maximum of 241 allowed for A307 Grade A bolts, it is near the middle of the range of 248 to 331 Brinell for A325, High-Strength Bolts for Structural Steel Joints. A325 is a commonly specified bolting material when higher strength is required.
Questions 2 and 3. No comments.
ATTACHMENT 3      Results of Sample Analysis (56 samples) 4 pages My comments on the first 48 samples are contained in
{                        my pink letter to you dated October 13.*
Samples 49 and 50 conform to the chemical requirements i                              for A575, Grade M1015, and are acceptable for use in accordance with ASTM A29, paragraph 4.3.1, because no misapplication is indicated.
Samples 51 through 56 are for A307 bolts and A563 nuts.
The results shown are within the specification    "
;                              requirements.
(      *The first 48 samples are discussed in Section 5.3 MATERIAL and Appendix L of the final report.
(:)                                                                                                  i lo n.
tmM
                                                                                                    . -- t}}

Latest revision as of 13:06, 6 September 2020

Forwards Addl Matl Tests Received on 821119 from Region 3 Supplementing Matl Addressed in Independent HVAC Review Final Rept, Oct 1982.Data Reviewed by Welding & Matl Specialists.Comments Encl
ML20067C183
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/24/1982
From: Kempiak A
C.F. BRAUN & CO.
To: Shelton B
COMMONWEALTH EDISON CO.
Shared Package
ML20067C185 List:
References
BL-26, NUDOCS 8212080662
Download: ML20067C183 (3)


Text

P I

b) C F BR AU N & CO engineering ano construction suoseary or santa r. int.manonai corporauon Novetber 24, 1982 B R Shelton Comoumalth Edison Co BL-26 SNED-35 ENB P O Box 767 Chicago, IL 60690

Dear Mr. Shelton ,

ADDITIONAL MATERIAL TESTS I IA SALLE STATION ADVANCE PURCHASE ORDER 805-023 BRAUN PROBrr 6356-N i On November 19, we received additional material sampling data frcm the Nuclear Regulatory Ccmnission Region III office to supplement the material addressed in Section 5.3 MATERIAL of the October 27, 1982, Independent HVAC Review Final Report. The data has been reviewed by our welding and material

,_.x specialists. His oatments, and a copy of the information received frcm the

() NBC Region III office, are attached.

Our specialist agrees with, or has no coment on, the NRC data. I For attachments 4, 5 & 6 "No substantive coments" means that the information in the letters is technically correct but there are sate editorial corrections.

For example, 163* pyramid indenter should be 136* per ASTM E92.

Sincerely yours i I,

i AJK df Andrew J Kempiak Project Manager Dr. A Bournia Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comtission Washington, D.C. 20555 NR C Docket Nos. 50-373/374 James G Keppler, Regional Administrator -3 copies U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road G R Boddeker -w/o attachment Glen Ellyn, IL 60137 Manager Nuclear Projects C F Braun & Co Daniel L Shamblin -2 copies 1000 So Franont 77 Camenwealth Edison Canpany Alhambra,,Ca 91802 C/ La Salle County Station Section 1 through 5 only 8212080662 821124 DR ADOCK 05000373 PDR . Amarnbra. Cahtomia 91802 . (213) 570-1000 . Telex 67-4888

O C F BR AU N & CO engin ring .no con.iruction suosioiary ot s nta r. int.m tion.i corpor. tion Project 6356-N BL-26 B R Shelton Page 2 Novenber 24, 1982 Harold R Denton, Director -40 copies Charles W Schroedar Office of Nuclear Reactor Regulation Nuclear Licensing Administrator - 34 EN E U.S. Nuclear Regulatory Ccumission Ccamenwealth Edison Capany Washington, D.C. 20555 1 First National Plaza 01icago, E 60690 Richard Pollock -6 copies SARGENT AND LUNDY Walter J Shewski ,

55 East Monroe Manager, Quality Assurance (Marquette 6th fl) ,

Chicago, E 60690 Cczmonwealth Edison Cmpany '

140 South

Dearborn Street ,

Isonard J I<och diicago, E 60690 Vice President l Illinois Power Ccmpany Gerald J Diederich ,

500 South 27th Street Superintendent Decatur, E 62525 La Salle County Station R.R. #1 O

v Walt Bird Consumers Power Cmpany Marseilles, E 61341 1945 West Ponnell Boad  ;

Jackson, Michigan I i

Cordell Reed, Vice President  !

Nuclear Operations - 37D M Cmmonwealth Edison Capany 1 First National Plaza Chicago, E 60690 i

O 1000 so. Fremont Ave. . Alhambra, C hfome 91802 . (213) 570-1000 . Telex 674888

Page ,1 C F BR AUN & CO Asomewywseni sr.w.n.imecomene

() D'** NOVEMBER 23, 1982 f To ANDY KEMPIAK N LEONARD BOYD POWER DIVISION RESEARCH Ca 6356-N, COMMONWEALTH EDISON, LA SALLE 1, MATERIAL PROPERTIES .

. V On November 19 the U S Nuclear Regulatory Commission's (USNRC)

Region III office telecopied data from their material sampling program that was not included in their transmittal to C F Braun on October 7. Copies of the six documents are attached. The

( identification of the documents and my comments are listed below.

ATTACHMENT 1 Letter dated November 19 from US NRC, C E Cornelius, 1 Page to C F Braun, W L Stiebe, transmittal letter for other attachments.

No comment.

ATTACHMENT 2 Sargent and Lundy Responses to NRC Region III " Questions 6 pages on EVAC System" Question 1 I agree with S & L's discussion of the

(]) effects of increased hardness of bolting material.

Although the reported hardness of 287'Brinell is well above the maximum of 241 allowed for A307 Grade A bolts, it is near the middle of the range of 248 to 331 Brinell for A325, High-Strength Bolts for Structural Steel Joints. A325 is a commonly specified bolting material when higher strength is required.

Questions 2 and 3. No comments.

ATTACHMENT 3 Results of Sample Analysis (56 samples) 4 pages My comments on the first 48 samples are contained in

{ my pink letter to you dated October 13.*

Samples 49 and 50 conform to the chemical requirements i for A575, Grade M1015, and are acceptable for use in accordance with ASTM A29, paragraph 4.3.1, because no misapplication is indicated.

Samples 51 through 56 are for A307 bolts and A563 nuts.

The results shown are within the specification "

requirements.

( *The first 48 samples are discussed in Section 5.3 MATERIAL and Appendix L of the final report.

(:) i lo n.

tmM

. -- t