Forwards Addendum to Independent Design Review,La Salle County Nuclear Station Unit 1, Final Rept.Distribution List Submitted
ML20054H549
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 06/18/1982
From: Flaherty J
TELEDYNE ENGINEERING SERVICES
To: Shelton B
COMMONWEALTH EDISON CO.
Shared Package
ML20054H550 List:
References
5539-13, NUDOCS 8206240191
Download: ML20054H549 (3)


Text

'RTELEDYNE ENGINEERING SERVICES 130!ECOND AVENUE W ALTH AM, IJ A$$ACHUSETTS 02?54 (61 h BM 3350 TW

  • 1710) 328 750 June 18, 1982 5539-13 fd- 37337f Mr. B. R. Shelton Project Engineering Manager U4 DESIGNATED ORIGINAL for LaSalle County Station .4 14 ;c,.I UP Sectified d.6WN4, % .. . . ,

W_, .

Comonwealth Edison One First National Plaza Chicago, Illinois 60690

Subject:

Addendum to " Technical Report No. TR-5539-2, Independent Design Review - LaSalle County Nuclear Station, Unit 1, May 28, 1982",

dated June 18, 1982

Dear Mr. Shelton:

Enclosed are five copies of the above subject Addendum. Additional copics will be sent under separate cover. Teledyne Engineering Services, at your request, has transmitted two copies to Dr. Anthony Bournia at NitR in Washington, and one copy to Mr. Isa T. Yin, Senior Mechanical Engineer, Region III of the NRC.

Distribution of the Addendum is as follows:

Copy 1 Record copy - TES Document Control Copy 2 J. A. Flaherty - TES Project Manager Copies 3-4 Dr. Anthony Bournia, NRC/NRR l Copy 5 Mr. Isa T. Yin - NRC, Region III 1

Copies 6-10 B. R. Shelton - Commonwealth Edison Company Copy 11 L. J. Diluna - TES Assistant Project Manager i Copy 12 N. S. Celia - TES Project Review Internal Comittec l Chairman

! Copy 13 D. Messinger - TES Project Quality Assurance Engineer Copies 14-50 TES Document Control 8206240191 820618 A

//g,- [. [pssrvD4.

PDR ADOCK 05000373 ,

P PDR

! ENGINEERS AND METALLURGISTS t _ _ _ , _ _ .

%'TELEDYNE ENGINEERING SERVICES Mr. B. R. Shelton June 18, 1982 5539-13 Page Two If you require additional copies, please let us know.

TES did not use the Project Review Internal Committee technique for Error / Deviation Report No. 21. Since this deviation was obvious and did not involve any safety significance, this approach was not used.

This report was prepared by James A. Flaherty as Project Manager.

Sincerely yours, TELEDYNE ENGINEERING SERVICES 0.FAlnC Aw

,JamesA.Flaherty,Ph.

Manager, Engineering Design and Testing Project Manager l

JAF:jej cc: w/o enclosures D. F. Landers (TES)

F. C. Bailey (TES) i

(

l l

l l

l l

@ Transmittal - Please Sign and Return Acknowledgement TE M O Request for Information (RFI)

When Requested Assign Control Number Page _!__of /

O Receipt (TES Use Only) Control No.

Originator J. A. Flaherty Transmit To: Dr. Anthony Bournia Project No. 5539 Office of Nuclear Reactor Regulation June 18, 1982 U.S. Nuclear Regulatory Commission D:te 7920 Norfolk Avenue Client PO Bethesda, MD 20114 Transmitted Under Separate Cover To:

NOTE: Furnish complete identification for items transmitted (below).

U QTY TYPE ITEM IDENT NO. REV DESCRIPTION - Title and Number of Sheets /Paoes 2 Repts Addendum to - Addendum to " Technical Report No. TR-5539-2, TR-5539-2 Independent Design Review - LaSalle County Nuclear Station Unit 1, Ma_y 28, 1982",

Dated June 18, 1982 Copies 3-4 ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS O Return to TES O Mark Void ODestroy D uncontroited NOTE TO ADDRESSEE: Unless stated otherwise the listed items are furnished to you as Controlled Documents. Please sign and return the number 2 copy to:

TELEDYNE ENGINEERING SERVICES 130 Second Avenue -

Waltham, Massachusetts 02254 Attention: Document Control, Project 5539 DISTRIBUTION: 1 and 2-Addressee 3-Document Control 4-Originator / Project Manager

( 4/81