|
|
(12 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17297A713 | | | number = ML17297A713 |
| | issue date = 10/25/2017 | | | issue date = 10/25/2017 |
| | title = Fermi Nuclear Power Plant, Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Elimate Main Steam Line Radiation Monitor Reactor Trip and Primary (CAC No. MG0228, EPID L-2017-LLA | | | title = Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Elimate Main Steam Line Radiation Monitor Reactor Trip and Primary |
| | author name = Goetz S | | | author name = Goetz S |
| | author affiliation = NRC/NRR/DORL/LPLIII | | | author affiliation = NRC/NRR/DORL/LPLIII |
| | addressee name = Polson K J | | | addressee name = Polson K |
| | addressee affiliation = DTE Electric Company | | | addressee affiliation = DTE Electric Company |
| | docket = 05000341 | | | docket = 05000341 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Mr. Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 -260 TAC 6400 North Dixie Highway Newport, Ml 48166 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2017 SUBJECT FERMI 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS (CAC NO. MG0228, EPID L-2017-LLA-0274) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2017 Mr. Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, Ml 48166 SUBJECT FERMI 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: |
| | LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS (CAC NO. MG0228, EPID L-2017-LLA-0274) |
|
| |
|
| ==Dear Mr. Polson:== | | ==Dear Mr. Polson:== |
| By letter dated August 24, 2017, DTE Electric Company (DTE) submitted a license amendment request for Fermi 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17237A176). The proposed amendment would eliminate the main steam line radiation monitor (MSLRM) functions for initiating: (1) a reactor protection system automatic reactor trip and 2) the associated (Group 1) primary containment isolation system (PCIS) automatic closure of the main steam isolation valves and main steam line drain valves. Specifically, the proposed technical specification (TS) changes remove requirements for the MSLRM trip function from TS Table 3.3.1.1-1, "Reactor Protection System Instrumentation." The proposed changes also remove requirements for PCIS Group 1 isolation from TS Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation." By letter dated October 10, 2017 (ADAMS Accession No. ML 17271A220), the U.S. Nuclear Regulatory Commission (NRG) staff notified you that we would not be able to begin our detailed review until additional information requested in the enclosure to the letter was provided. You responded to the NRC staff's request by letter dated October 18, 2017 (ML 17298A 185). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request following your submittal of additional information. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRG staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the K. Polson -2 -environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 1, 100 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. If you have any questions, please contact the David J. Wrona, at (301) 415-2292. Sincere! Project nager g Branch Ill Division of erating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv K. Polson -3 -
| |
|
| |
|
| ==SUBJECT:==
| | By letter dated August 24, 2017, DTE Electric Company (DTE) submitted a license amendment request for Fermi 2 (Agencywide Documents Access and Management System (ADAMS) |
| FERMI 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS (CAC NO. MG0228, EPID L-2017-LLA-0274) DATED OCTOBER 25, 2017. DISTRIBUTION: PUBLIC Branch Reading File RidsNrrDorl Resource RidsNrrDorllpl3 Resource RidsNrrLASRohrer Resource RidsNrrPMSgoetz Resource RidsRgn3MailCenter Resource ADAMS Accession No, ML 17297A713 OFFICE NRR/DORL/LP3/PM NRR/DORULPL3/LA NRR/DORL/LPL3/BC NAME SGoetz SRohrer DWrona DATE 10/24/2017 10/24/2017 10/24/2017 OFFICIAL RECORD COPY NRR/DORL/LPL3/PM Sgoetz 10/25/17
| | Accession No. ML17237A176). The proposed amendment would eliminate the main steam line radiation monitor (MSLRM) functions for initiating: (1) a reactor protection system automatic reactor trip and 2) the associated (Group 1) primary containment isolation system (PCIS) automatic closure of the main steam isolation valves and main steam line drain valves. |
| }} | | Specifically, the proposed technical specification (TS) changes remove requirements for the MSLRM trip function from TS Table 3.3.1.1-1, "Reactor Protection System Instrumentation." |
| | The proposed changes also remove requirements for PCIS Group 1 isolation from TS Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation." |
| | By letter dated October 10, 2017 (ADAMS Accession No. ML17271A220), the U.S. Nuclear Regulatory Commission (NRG) staff notified you that we would not be able to begin our detailed review until additional information requested in the enclosure to the letter was provided. You responded to the NRC staff's request by letter dated October 18, 2017 (ML17298A185). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request following your submittal of additional information. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. |
| | This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | The NRG staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the |
| | |
| | K. Polson environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| | Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 1, [[estimated NRC review hours::100 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. |
| | These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. |
| | If you have any questions, please contact the David J. Wrona, at (301) 415-2292. |
| | Sincere! |
| | Project nager g Branch Ill Division of erating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv |
| | |
| | , ML17297A713 OFFICE NRR/DORL/LP3/PM NRR/DORULPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME SGoetz SRohrer DWrona Sgoetz DATE 10/24/2017 10/24/2017 10/24/2017 10/25/17}} |
Letter Sequence Acceptance Review |
---|
|
|
|
Similar Documents at Fermi |
---|
Category:Acceptance Review Letter
MONTHYEARML23199A2472023-07-14014 July 2023 – Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML17297A7132017-10-25025 October 2017 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Elimate Main Steam Line Radiation Monitor Reactor Trip and Primary ML13329A4522013-11-15015 November 2013 Acceptance Review of IST Program Relief Request PVRR-001 ML13099A2312013-04-12012 April 2013 LIC-109 Acceptance of License Amendment Request for Measurement Uncertainty Recapture ML12335A0802012-11-29029 November 2012 E-mail - LIC-109 Acceptance Review - Fermi 2 - LAR to Revise TS to Adopt TSTF-522 (Tac No. ME9906) ML1203404452012-02-0303 February 2012 LIC-109 Acceptance Review - Fermi 2 - LAR - Modify TS SRs for Safety Relief Valves - ME7829 ML1203404332012-02-0303 February 2012 LIC-109 Acceptance Review - Fermi 2 - LAR - Revise the RHR Suppression Pool Cooling Flow Rate in TS - SR 3.6.2.3.2 - ME7828 ML1124402372011-08-31031 August 2011 LIC-109 Acceptance Review - Fermi 2- LAR for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML1006213282010-03-0303 March 2010 Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-Year Interval - TAC ME3116 - TAC ME3119 ML0934900022009-12-14014 December 2009 E-mail to A. Hassoun and R. W. Johnson - Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves - Third Ten-year Interval (TAC Nos. ME2548 - ME2559) 2023-07-14
[Table view] Category:Letter
MONTHYEARIR 05000341/20240122024-11-0101 November 2024 Commercial Grade Dedication Inspection Report 05000341/2024012 IR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20244042024-08-21021 August 2024 Public-Fermi Power Plant, Unit 2 - Material Control and Accounting Program Inspection Report 05000341/2024404 IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 – Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2017 Mr. Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, Ml 48166 SUBJECT FERMI 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE:
LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS (CAC NO. MG0228, EPID L-2017-LLA-0274)
Dear Mr. Polson:
By letter dated August 24, 2017, DTE Electric Company (DTE) submitted a license amendment request for Fermi 2 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17237A176). The proposed amendment would eliminate the main steam line radiation monitor (MSLRM) functions for initiating: (1) a reactor protection system automatic reactor trip and 2) the associated (Group 1) primary containment isolation system (PCIS) automatic closure of the main steam isolation valves and main steam line drain valves.
Specifically, the proposed technical specification (TS) changes remove requirements for the MSLRM trip function from TS Table 3.3.1.1-1, "Reactor Protection System Instrumentation."
The proposed changes also remove requirements for PCIS Group 1 isolation from TS Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation."
By letter dated October 10, 2017 (ADAMS Accession No. ML17271A220), the U.S. Nuclear Regulatory Commission (NRG) staff notified you that we would not be able to begin our detailed review until additional information requested in the enclosure to the letter was provided. You responded to the NRC staff's request by letter dated October 18, 2017 (ML17298A185). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request following your submittal of additional information.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRG staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the
K. Polson environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 1, 100 hours4.167 days <br />0.595 weeks <br />0.137 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact the David J. Wrona, at (301) 415-2292.
Sincere!
Project nager g Branch Ill Division of erating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv
, ML17297A713 OFFICE NRR/DORL/LP3/PM NRR/DORULPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME SGoetz SRohrer DWrona Sgoetz DATE 10/24/2017 10/24/2017 10/24/2017 10/25/17