ML100621328
| ML100621328 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/03/2010 |
| From: | Mahesh Chawla Plant Licensing Branch III |
| To: | Hassoun A DTE Energy |
| Chawla M, NRR/DORL, 415-8371 | |
| References | |
| TAC ME3116, TAC ME3119 | |
| Download: ML100621328 (2) | |
Text
From:
Chawla, Mahesh Sent:
Wednesday, March 03, 2010 10:59 AM To:
Alan I Hassoun Cc:
Pascarelli, Robert; Taylor, Robert; Patnaik, Prakash; Dinsmore, Stephen; Nove, Carol; Andruszkiewicz, Edward; Mitchell, Matthew
Subject:
Fermi 2 - Submittal of the Inservice Inspection /Nondestructive Examination Program Relief Requests for the Third Ten-year Interval - ME 3116 - ME 3119 By letter dated January 20, 2010 (ADAMS Accession No. ML100220171), DTE Energy (the licensee) submitted the above relief requests for Fermi 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these relief requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief requests in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Mahesh Chawla Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Fermi 2 - Submittal of the Inservice Inspection /Nondestructive Examination Program Relief Requests for the Third Ten-year Interval - ME 3116 - ME 3119 Sent Date: 2/25/2010 11:01:38 AM Received Date: 3/3/2010 10:58:00 AM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov
Recipients:
hassouna@dteenergy.com (Alan I Hassoun)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Robert.Taylor@nrc.gov (Taylor, Robert)
Tracking Status: None Prakash.Patnaik@nrc.gov (Patnaik, Prakash)
Tracking Status: None Stephen.Dinsmore@nrc.gov (Dinsmore, Stephen)
Tracking Status: None Carol.Nove@nrc.gov (Nove, Carol)
Tracking Status: None Edward.Andruszkiewicz@nrc.gov (Andruszkiewicz, Edward)
Tracking Status: None Matthew.Mitchell@nrc.gov (Mitchell, Matthew)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 14153 2/25/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: