ML120340445

From kanterella
Jump to navigation Jump to search

LIC-109 Acceptance Review - Fermi 2 - LAR - Modify TS SRs for Safety Relief Valves - ME7829
ML120340445
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/03/2012
From: Mahesh Chawla
Plant Licensing Branch III
To: Hassoun A
Detroit Edison
Chawla M, NRR/DORL, 415-8371
References
TAC ME7829
Download: ML120340445 (1)


Text

From: Chawla, Mahesh Sent: Friday, February 03, 2012 2:00 PM To: Alan I Hassoun Cc: Billerbeck, John; Hamm, Matthew; McMurtray, Anthony; Elliott, Robert; Williams, Shawn; Lingam, Siva; Boyle, Patrick

Subject:

LIC-109 Acceptance Review - Fermi 2 - LAR - Modify TS SRs for Safety Relief Valves - ME7829 By letter dated January 10, 2012 (ADAMS Accession No. ML120110140), DTE Energy submitted a license amendment request for Fermi 2. The proposed amendment will modify SR 3.4.3.2 and SR 3.6.1.6. in Fermi 2 TSs. The proposed amendment replaces the current requirement in these TS SRs to verify the SRV opens when manually actuated with an alternate requirement that verifies the SRV is capable of being opened.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me

@(301) 415-8371 or Mahesh.chawla@nrc.gov. Thanks Mahesh Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation