ML081500780: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML081500780
| number = ML081500780
| issue date = 05/29/2008
| issue date = 05/29/2008
| title = 07/02/2008 Annual Assessment Meeting with Entergy to Discuss the Nrc'S Assessment of Safety Performance of Indian Point, Units 2 and 3 for Calendar Year 2007
| title = Annual Assessment Meeting with Entergy to Discuss the Nrc'S Assessment of Safety Performance of Indian Point, Units 2 and 3 for Calendar Year 2007
| author name = Cobey E
| author name = Cobey E
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:MN No. 08-027 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING May 29, 2008 Licensee: Entergy Nuclear Operations, Inc.  
{{#Wiki_filter:MN No. 08-027 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING May 29, 2008 Licensee:             Entergy Nuclear Operations, Inc.
Facility:              Indian Point Nuclear Generating Unit 2 and Unit 3 Docket No.            50-247 and 50-286 Date and Time:        July 2, 2008 4:00 p.m. to 6:00 p.m. - Informational Session (Anteroom) 6:30 p.m. to 9:30 p.m. - Annual Assessment Meeting Location:              Colonial Terrace 119 Oregon Road Cortlandt Manor, NY 10567


Facility:  Indian Point Nuclear Generating Unit 2 and Unit 3 Docket No. 50-247 and 50-286 Date and Time:  July 2, 2008 4:00 p.m. to 6:00 p.m. - Informational Session (Anteroom)    6:30 p.m. to 9:30 p.m. - Annual Assessment Meeting
==Purpose:==
 
The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of Indian Point Nuclear Generating Units 2 and 3 for calendar year 2007. The NRCs assessment is documented in a letter dated March 3, 2008.
Location:  Colonial Terrace    119 Oregon Road    Cortlandt Manor, NY  10567
 
Purpose: The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRC's assessment of the safety performance of Indian Point Nuclear Generating Units 2 and 3 for calendar year 2007. The NRC's assessment is documented in a letter dated March 3, 2008.
Attendees*:
Attendees*:
NRC:   S. Collins, Regional Administrator, Region I   E. Cobey, Chief, Projects Branch 2, DRP, Region I M. Marshfield, Senior Resident Inspector, Indian Point 2   P. Cataldo, Senior Resident Inspector, Indian Point 3 Entergy:   J. Pollock, Site Vice President A. Vitale, General Manager Plant Operations T. Orlando, Director of Engineering P. Conroy, Director of Nuclear Safety Assurance     Public Participation: The Indian Point Annual Assessment Meeting is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, before the meeting is adjourned. Several NRC representatives will also be available for an extended information session both prior to and during the Annual Assessment Meeting with Entergy. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.
NRC:                   S. Collins, Regional Administrator, Region I E. Cobey, Chief, Projects Branch 2, DRP, Region I M. Marshfield, Senior Resident Inspector, Indian Point 2 P. Cataldo, Senior Resident Inspector, Indian Point 3 Entergy:               J. Pollock, Site Vice President A. Vitale, General Manager Plant Operations T. Orlando, Director of Engineering P. Conroy, Director of Nuclear Safety Assurance Public Participation: The Indian Point Annual Assessment Meeting is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, before the meeting is adjourned. Several NRC representatives will also be available for an extended information session both prior to and during the Annual Assessment Meeting with Entergy. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov, and contains information regarding visitors and security.
 
The NRC's Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be located in ADAMS (Accession Number ML080610015). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Indian Point Nuclear Generating Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Eugene W. Cobey, Chief, Projects Branch 2    610-337-5171    E-mail: eugene.cobey@nrc.gov
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by June 20, 2008, via telephone to the NRC meeting contact.  


Approved by: ____ /RA/_______________
2 The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov, and contains information regarding visitors and security.
Eugene W. Cobey, Chief Projects Branch 2        Division of Reactor Projects
The NRCs Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be located in ADAMS (Accession Number ML080610015). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Indian Point Nuclear Generating Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Meeting


3 Agenda  NRC's Annual Assessment Meeting
==Contact:==
& Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m. July 2, 2008  
Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: eugene.cobey@nrc.gov
 
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by June 20, 2008, via telephone to the NRC meeting contact.
Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)
Approved by: ____ /RA/_______________
Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . .  (6:30 p.m. - 9:30 p.m.)
Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)


3 Agenda NRCs Annual Assessment Meeting Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m.
July 2, 2008 Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)
Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . . (6:30 p.m. - 9:30 p.m.)
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)  
Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)
 
Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)
Entergy's Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)  
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
 
NRC to address public questions . . . . .NRC/Members of the Public (as needed)
NRC to address public questions . . . . .NRC/Members of the Public (as needed) 3 Agenda  NRC's Annual Assessment Meeting
& Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m. July 2, 2008
 
Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)
Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . .  (6:30 p.m. - 9:30 p.m.)
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)  


3 Agenda NRCs Annual Assessment Meeting Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m.
July 2, 2008 Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)
Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . . (6:30 p.m. - 9:30 p.m.)
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)
Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)
Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)
Entergy's Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)
Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)  
Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)
 
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)
NRC to address public questions . . . . .NRC/Members of the Public (as needed)
NRC to address public questions . . . . .NRC/Members of the Public (as needed)
Distribution See next page  
Distribution See next page DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\IP\Indian Point Meeting Notice.doc SUNSI Review Complete:         DEJ           (Reviewers Initials)
 
After declaring this document An Official Agency Record it will be released to the Public.
DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\IP\Indian Point Meeting Notice.doc  
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy                                                                     ML081500780 OFFICE               RI/DRP                       RI/DRP                           RI/PAO NAME                 DJackson/DEJ                 ECobey/EWC                       DScrenci/DPS DATE                05/29/08                    05/29/08                        05/29/08 OFFICIAL RECORD COPY
 
SUNSI Review Complete:       DEJ                 (Reviewer's Initials) After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copy                                                                                             ML081500780 OFFICE RI/DRP   RI/DRP   RI/PAO   NAME DJackson/DEJ ECobey/EWC DScrenci/DPS  


DATE  05/29/08 05/29/08 05/29/08  OFFICIAL RECORD COPY 4 Distribution w/encl: (VIA E-MAIL) Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES) Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
4 Distribution w/encl: (VIA E-MAIL)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD) RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER) S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP E. Cobey, DRP D. Jackson, DRP S. McCarver, DRP T. Wingfield, DRP S. Williams, OEDO, RI R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, PM, NRR M. Marshfield, SRI, IP2 (Acting) H. Jones, RI, IP2 (Acting) P. Cataldo, SRI, IP3 A. Koonce, RI, IP3 K. Kolek, Resident OA D. Roberts, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences) Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist}}
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP E. Cobey, DRP D. Jackson, DRP S. McCarver, DRP T. Wingfield, DRP S. Williams, OEDO, RI R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, PM, NRR M. Marshfield, SRI, IP2 (Acting)
H. Jones, RI, IP2 (Acting)
P. Cataldo, SRI, IP3 A. Koonce, RI, IP3 K. Kolek, Resident OA D. Roberts, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)
Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist}}

Latest revision as of 02:28, 13 March 2020

Annual Assessment Meeting with Entergy to Discuss the Nrc'S Assessment of Safety Performance of Indian Point, Units 2 and 3 for Calendar Year 2007
ML081500780
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/29/2008
From: Cobey E
Reactor Projects Branch 2
To:
Cobey, Eugene W. RI/DRP/PB2/610-337-5171
References
Download: ML081500780 (4)


Text

MN No.08-027 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING May 29, 2008 Licensee: Entergy Nuclear Operations, Inc.

Facility: Indian Point Nuclear Generating Unit 2 and Unit 3 Docket No. 50-247 and 50-286 Date and Time: July 2, 2008 4:00 p.m. to 6:00 p.m. - Informational Session (Anteroom) 6:30 p.m. to 9:30 p.m. - Annual Assessment Meeting Location: Colonial Terrace 119 Oregon Road Cortlandt Manor, NY 10567

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of Indian Point Nuclear Generating Units 2 and 3 for calendar year 2007. The NRCs assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: S. Collins, Regional Administrator, Region I E. Cobey, Chief, Projects Branch 2, DRP, Region I M. Marshfield, Senior Resident Inspector, Indian Point 2 P. Cataldo, Senior Resident Inspector, Indian Point 3 Entergy: J. Pollock, Site Vice President A. Vitale, General Manager Plant Operations T. Orlando, Director of Engineering P. Conroy, Director of Nuclear Safety Assurance Public Participation: The Indian Point Annual Assessment Meeting is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, before the meeting is adjourned. Several NRC representatives will also be available for an extended information session both prior to and during the Annual Assessment Meeting with Entergy. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.

2 The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov, and contains information regarding visitors and security.

The NRCs Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be located in ADAMS (Accession Number ML080610015). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Indian Point Nuclear Generating Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: eugene.cobey@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by June 20, 2008, via telephone to the NRC meeting contact.

Approved by: ____ /RA/_______________

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects

3 Agenda NRCs Annual Assessment Meeting Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m.

July 2, 2008 Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)

Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . . (6:30 p.m. - 9:30 p.m.)

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . .NRC/Members of the Public (as needed)

3 Agenda NRCs Annual Assessment Meeting Information Session Indian Point Nuclear Generating Unit 2 and Unit 3 4:00 p.m. - 9:30 p.m.

July 2, 2008 Information Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4:00 p.m. - 6:00 p.m.)

Annual Assessment Meeting . . . . . . . .. . . . . . . . . . . . . . . . . . . . (6:30 p.m. - 9:30 p.m.)

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Discussion of Indian Point Unit 2 and Unit 3 Performance . . . NRC (20 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . Entergy (45 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . .NRC/Members of the Public (as needed)

Distribution See next page DOCUMENT NAME: T:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\IP\Indian Point Meeting Notice.doc SUNSI Review Complete: DEJ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML081500780 OFFICE RI/DRP RI/DRP RI/PAO NAME DJackson/DEJ ECobey/EWC DScrenci/DPS DATE 05/29/08 05/29/08 05/29/08 OFFICIAL RECORD COPY

4 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP E. Cobey, DRP D. Jackson, DRP S. McCarver, DRP T. Wingfield, DRP S. Williams, OEDO, RI R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, PM, NRR M. Marshfield, SRI, IP2 (Acting)

H. Jones, RI, IP2 (Acting)

P. Cataldo, SRI, IP3 A. Koonce, RI, IP3 K. Kolek, Resident OA D. Roberts, DRS M. Gamberoni, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Region I Docket Room (w/concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist