MN No.06-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING March 10, 2005 Licensee:
Entergy Nuclear Northeast Facility:
Indian Point Nuclear Generating Unit 2 and Unit 3 Docket Nos.
50-247 and 50-286 Time and Date:
6:30 p.m. - 10:30 p.m., March 28, 2006 Location:
Crystal Bay on the Hudson - Charles Point Marina 5 John Walsh Boulevard Peekskill, New York 10566
Purpose:
The NRC Special Inspection Team, established on September 21, 2005 to assess Entergys efforts to evaluate the Unit 2 Spent Fuel Pool leakage and the subsequently identified on-site tritium contamination of ground water, has completed its preliminary review. In view of ongoing public interest, the NRC has scheduled this meeting is to provide information based on the NRC inspection effort, Entergys investigation and assessment of the on-site conditions, and the State of New Yorks independent monitoring of the groundwater in and around the Indian Point Energy Center. Representatives of NRC, the State of New York, and Entergy will present current assessment information based on activities completed to-date, including radiological assessment of public health and safety and the environment, characterization of the groundwater, and the results from radioanalysis of groundwater samples taken at various on-site and off-site locations. Following the presentations, representatives from the NRC, Entergy, and the State of New York Department of Environmental Conservation will respond to questions.
Attendees*:
NRC:
A. R. Blough, Director, Division of Reactor Safety, Region I M. Gamberoni, Deputy Director, Division of Reactor Safety, Region I J. White, Chief, Plant Support Branch 2, Region I J. Noggle, Sr. Health Physics Inspector, Region I B. McDermott, Chief, Projects Branch 2, Region I D. Screnci, Senior Public Affairs Officer, Region I
2 N.Y. State:
Department of Health Department of Environmental Conservation Entergy:
F. Dacimo, Site Vice President P. Reuben, General Manager Plant Operations D. Mayer, Director of Special Projects J. Ventosa, Director of Engineering J. Comiotes, Director of Nuclear Safety Assurance Public Participation:
The Indian Point Special Inspection public meeting is a Category 3 Meeting. Public participation is actively sought. There will be substantial opportunities during the meeting where public comment and questions will be invited.
Information and correspondence regarding the Indian Point tritium contamination and tritium contamination in general can be found on the NRC web site at the following locations:
www.nrc.gov/reactors/plant-specific-items/indian-point-issues.html www.nrc.gov/reactors/operating/ops-experience/grndwtr-contam-tritium.html As indicated on the NRCs web site update dated March 3, 2006, NRC review and radiological assessments thus far indicate that public health and safety has not been adversely affected; and any dose to the public that can be attributed to current onsite conditions is negligible with respect to conservatively established NRC limits. Although licensee activities, NRC oversight, and New York State involvement are continuing, the completion of the NRC Special Inspection is an appropriate milestone for updating the public in a forum near the site. The NRC Special Inspection Team report will be available via the NRC web site prior to the meeting.
Meeting
Contact:
John R. White, Chief, Plant Support Branch 2 (610) 337-5114 E-mail: jrw1@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 24, 2006, via telephone to the NRC meeting contact.
Approved by: __/RA/_________________
John R. White, Chief Plant Support Branch 2 Division of Reactor Safety
3 Distribution (via E-mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)
Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
Director, Division of Regulatory Improvement Programs, NRR Project Manager, NRR S. Collins, RA M. Dapas, DRA K. Farrar, Regional Counsel B. Sosa, RI EDO Coordinator D. Screnci, Sr. Public Affairs Officer, RI N. Sheehan, Public Affairs Officer, RI R. Blough, Director, DRS B. Holian, Director, DRP M. Gamberoni, Deputy Director, DRS D. Lew, Deputy Director, DRP R. Laufer, NRR J. Boska, NRR P. Milano, NRR R. Bores, State Liaison Officer, RI J. Wray, State Liaison Officer, RI R. Marziale, DRP Division Secretary, RI K. Gallagher, DRS Division Secretary, RI R. Barkley, Technical Communications Assistant, RI C. ODaniell, Deputy Regional Administrators Secretary PMNS ADAMS ACCESSION NO.: ML060660434 SISP Review Complete: CML (Reviewers initials)
DOCUMENT NAME:E:\\Filenet\\ML060660434.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRS NAME CLong/CML BMcDermott/BJM JWhite/JRW DATE 03/09/06 03/09/06 03/10/06 OFFICIAL RECORD COPY
Agenda NRC Informational Meeting On Spent Fuel Pool and Tritium Issues Indian Point Energy Center Category 3 6:30 p.m. - 10:30 p.m.
March 28, 2006 Introduction.......................................................................................................NRC (5 minutes)
Special Inspection Discussion.........................................................................NRC (15 minutes)
Spent Fuel Pool and Tritium Issues Discussion..........................................Entergy (45 minutes)
Short Break................................................................................................................(5 minutes)
New York State Evaluation and Assessment................................. New York State (15 minutes)
Short Break................................................................................................................(5 minutes)
NRC, New York State, and Entergy to address public questions on Spent Fuel Pool and Tritium Issues..........................................................NRC (120 minutes)