ML13120A087

From kanterella
Jump to navigation Jump to search
5/14/2013 - Notice of Public Meeting - Indian Point Units 2 and 3
ML13120A087
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/30/2013
From: Arthur Burritt
Reactor Projects Branch 2
To:
Entergy Nuclear Operations
Burritt A
References
MN 13-015
Download: ML13120A087 (3)


Text

MN No.13-015 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 30, 2013 Licensee: Entergy Nuclear Operations, Inc.

Facility: Indian Point Units 2 and 3 Docket Nos: 50-247 and 50-286 Date/Time: May 14, 2013 Open House (Westchester Ballroom Reception), 6:00 p.m. to 8:00 p.m.

Public Meeting (Westchester Ballroom), 7:00 p.m. to 9:00 p.m.

Location: DoubleTree by Hilton 455 South Broadway Tarrytown, NY 10591

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will host an open house and public meeting to discuss the NRCs assessment of safety performance at Indian Point Units 2 and 3 for 2012, as described in the NRC annual assessment letter dated March 4, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: William Dean, Regional Administrator, Region I Darrell Roberts, Director, Division of Reactor Projects James Clifford, Deputy Director, Division of Reactor Safety Arthur Burritt, Chief, Division of Reactor Projects, Projects Branch 2 James Trapp, Chief, Division of Reactor Safety, Engineering Branch 1 Douglas Pickett, Senior Project Manager, Licensing Branch I-1 Scott Stewart, Senior Resident Inspector, Indian Point Unit 2 Paul Cataldo, Senior Resident Inspector, Indian Point Unit 3 Katrina Dunham, Resident Inspector, Indian Point Unit 2 Ami Patel, Resident Inspector, Indian Point Unit 3 Public Participation: This is a Category 3 Meeting. During the open house, NRC staff will be available to answer questions from individuals and discuss issues or concerns related to Indian Point. In addition, the NRC will host a public question and answer session in an adjacent area, during which members of the public will be able to ask questions.

Meeting

Contact:

Arthur Burritt, Chief, Projects Branch 2 610-337-5069 E-mail: Arthur.Burritt@nrc.gov For the security of everyone attending this meeting, local law enforcement officers may be conducting searches of bags (briefcases, purses, backpacks, equipment cases, etc.) outside the entry into the meeting room. Additionally, signs, banners, posters and displays affixed to any sticks, poles or other similar devices will not be permitted in the meeting room.

2 The NRCs annual assessment letter regarding Indian Point Units 2 and 3 performance during 2012 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A402. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Indian Point Units 2 and 3 can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 3, 2013, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Arthur Burritt, Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

ML13120A087 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB Date 4/29/13 4/30/13