ML060660412

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Entergy Nuclear Northeast (Indian Point 2 & 3) to Discuss Annual Assessment for Cy 2005
ML060660412
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/10/2006
From: Brian Mcdermott
Reactor Projects Branch 2
To:
Entergy Nuclear Northeast
McDermott, B J, RGN-I/DRP/610-337-5233
Shared Package
ML060660402 List:
References
MN 06-004
Download: ML060660412 (4)


Text

MN No.06-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Match 10, 2006 Licensee: Entergy Nuclear Northeast Facility: Indian Point Nuclear Generating Unit 2 and Unit 3 Docket Nos. 50-247 and 50-286 Time and Date: 2:30 p.m. - 4:30 p.m., March 28, 2006 Location: Crystal Bay on the Hudson - Charles Point Marina 5 John Walsh Boulevard Peekskill, New York 10566

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the Indian Point Nuclear Generating Units for the calendar year 2005. The NRCs assessment is documented in a letter dated March 2, 2006.

Representatives from the NRC and Entergy will provide short presentations on the subject, and following the business portion of the meeting, the NRC will address questions from the public.

Attendees*:

NRC: S. Collins, Regional Administrator, Region I B. McDermott, Chief, Projects Branch 2, DRP, Region I J. Boska, Licensing Project Manager, NRR M. Cox, Senior Resident Inspector, Indian Point 2 T. Hipschman, Senior Resident Inspector, Indian Point 3 D. Screnci, Senior Public Affairs Officer, Region I P. Milligan, Senior Advisor on Emergency Preparedness, NSIR Entergy: F. Dacimo, Site Vice President P. Reuben, General Manager Plant Operations D. Mayer, Director of Special Projects J. Ventosa, Director of Engineering J. Comiotos, Director of Nuclear Safety Assurance

2 Public Participation: The Indian Point Annual Assessment Meeting is a Category 1 Meeting.

The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be found in ADAMS (Accession Number ML060620107). This Meeting Notice and its enclosed agenda can be found in ADAMS (Accession Number ML060660412). The NRC slides for the meeting can be accessed with the accession number ML060830370. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Information relative to the NRC Annual Assessment process and the input to the NRC assessment of Indian Point Nuclear Generation Station can be found on the NRC web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Brian McDermott, Chief, Projects Branch 2 (610) 337-5233 E-mail: bjm@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 24, 2006, via telephone to the NRC meeting contact.

Approved by: ___/RA/_______________

Brian J. McDermott, Chief Projects Branch 2 Division of Reactor Projects

3 Distribution (via E-mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

Project Manager, NRR K. Farrar, Regional Counsel B. Sosa, RI EDO Coordinator D. Screnci, Sr. Public Affairs Officer, RI N. Sheehan, Public Affairs Officer, RI B. Holian, DRP D. Lew, DRP R. Blough, Director, DRS M. Gamberoni, Deputy Director, DRS B. McDermott, DRP E. Cobey, DRP M. Cox, DRP T. Hipschman, DRP R. Bores, State Liaison Officer, RI J. Wray, State Liaison Officer, RI R. Marziale, DRP Division Secretary, RI K. Gallagher, DRS Division Secretary, RI R. Barkley, Technical Communications Assistant, RI C. ODaniell, Deputy Regional Administrators Secretary PMNS ADAMS ACCESSION NO.: ML060660412 SISP Review Complete: CML (Reviewers initials)

DOCUMENT NAME:C:\MyFiles\Copies\DRAFT IPEC 2006 Annual Assessment Meeting Notice Rev 1.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME CLong/CML BMcDermott/BJM DATE 03/09/06 03/09/06 OFFICIAL RECORD COPY

Agenda NRC Annual Assessment Meeting On Indian Point Energy Center Category 1 2:30 p.m. - 4:30 p.m.

March 28, 2006 Introduction........................................................................................................NRC (5 minutes)

Review of Reactor Oversight Process................................................................NRC (5 minutes)

Discussion of Indian Point Unit 2 and Unit 3 Performance...............................NRC (10 minutes)

Entergys Response and Remarks..............................................................Entergy (25 minutes)

Closing Remarks...............................................................................................NRC (5 minutes)

Short Break..............................................................................................................(10 minutes)

NRC to address public questions on Annual Assessment Results...................NRC (60 minutes)