ML111220200

From kanterella
Jump to navigation Jump to search

Notice of Public Meeting with Indian Point Nuclear Generating, Units 2 and 3, to Discuss NRCs Assessment of Safety Performance
ML111220200
Person / Time
Site: Indian Point  
Issue date: 05/02/2011
From: Mel Gray
Reactor Projects Branch 2
To:
Shared Package
ML110610687 List:
References
Download: ML111220200 (5)


Text

Licensee:

Facilities:

Docket Nos:

Date/ Time:

Location:

Purpose:

NRC Attendees:

Public Participation:

Meeting

Contact:

MN No.11-016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 2, 20II Entergy Nuclear Operations, Inc.

f ndian Point Nuclear Generating Unit 2 and Unit 3 50-247 and 50-286 June 2, 2011 6:30 pm - 9:30 pm Colonial Terrace, 119 Oregon Road Cortlandt Manor, NY 10567 The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Indian Point for 2010, as described in the annual assessment letter dated March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

David Lew, Deputy RegionalAdministrator, Region I Mel Gray, Chief, Division of Reactor Projects, Branch 2 Michelle Catts, Senior Resident Inspector, Indian Point Unit 2 Ayo Ayegbusi, Resident lnspector, lndian Point Unit 2 Paul Cataldo, Senior Resident Inspector, Indian Point Unit 3 Mandy Halter, Resident lnspector, Indian Point Unit 3 This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Mel Gray, Chief, Projects Branch 2 610-337-5209 E-mail: mel.gray@nrc.gov The NRC's annual assessment letter regarding the performance of lndian Point Units 2 and 3 during 2010 can be found in ADAMS with Accession Number M1110620464. ADAMS is accessible from the NRC website at: http://nrc.qov/readinq-rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of lndian Point Units 2 and 3 can be found on the NRC's website at:

http://www. nrc.oov/NRR/OVERSIGHT/ASSESS/lndex. html.

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 31,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved,, rt{t( t( t Mel Gray, Chief Projects Branch DivLion of Readtor Projects Distribution via ListServ

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.oov/reading-rm/doc-collectionslcommissionlpolicy/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 25,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/

MelGray, Chief Projects Branch 2 Division of Reactor Projects Distribution: (via email)

W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Witson, DRS S. Bush-Goddard, Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP M. Catts, SRI P. Cataldo, SRI A. Ayegbusi, Rl M. Halter, Rl D. Hochmuth, DRP RidsNrrPMlndian Point Resource RidsNrrDorlLpll -1 Resource ROPreport Resource@nrc DOCUMENT NAME: \\\\nrc.gov\\nrc\\R1\\Office\\DRP\\BRANCH2\\Meetings\\201 1 Annual Assessment Meetings\\IPEC\\lP 201 1 Annual Assessment Meeting Category 3.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenUenclosure "E" = Copy with attachmenUenclosure "N" = No copy M1l11220200 OFFICIAL RECORD COPY

3 Aqenda NRC's Annual Assessment Meeting f ndian Point Units 2 and 3 June 2,2011 6:30 pm - 9:30 pm Colonial Manor 119 Oregon Road Cortlandt Manor, NY 10567 Formal Meetinq Introduction Discussion of Indian Point Units 2 and 3 performance in 2010.........

(10 minutes)

Discussion of U.S. plant safe operation in light of Japan event

...... (15 minutes)

NRC to address questions from the public

....(as needed)

Closing Remarks

....... (5 minutes)