MN 12-019, Notice of Public Meeting with Entergy Nuclear Operations to Discuss the NRCs Assessment of Safety Performance at Indian Point Units 2 and 3 for 2011

From kanterella
(Redirected from ML12108A042)
Jump to navigation Jump to search
Notice of Public Meeting with Entergy Nuclear Operations to Discuss the NRCs Assessment of Safety Performance at Indian Point Units 2 and 3 for 2011
ML12108A042
Person / Time
Site: Indian Point  
(DPR-026, DPR-064)
Issue date: 04/17/2012
From: Mel Gray
Reactor Projects Branch 2
To:
Entergy Nuclear Operations
References
MN 12-019
Download: ML12108A042 (4)


Text

MN No.12-019 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 17, 2012 Licensee:

Entergy Nuclear Operations, Inc.

Facilities:

Indian Point Units 2 and 3 Docket Nos:

50-247 and 50-286 Date/Time:

May 17, 2012 Open House (Westchester Ballroom Reception), 6:00 p.m. to 8:00 p.m.

Public Meeting (Westchester Ballroom), 7:00 p.m. to 9:00 p.m.

Location:

DoubleTree Hotel 455 South Broadway Tarrytown, NY

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will host an open house and public meeting to discuss the NRCs assessment of safety performance at Indian Point Units 2 & 3 for 2011, as described in the NRC annual assessment letter dated March 5, 2012. NRC staff will be available to answer questions on our role in ensuring safe plant operation.

NRC Attendees:

William M. Dean, Regional Administrator, Region I James W. Clifford, Director, Division of Reactor Projects Mel Gray, Chief, Division of Reactor Projects, Branch 2 Michelle P. Catts, Senior Resident Inspector, Unit 2 Paul C. Cataldo, Senior Resident Inspector, Unit 3 Public Participation: This is a Category 3 Meeting. The NRC staff will host an open house to discuss Entergys performance at Indian Point Units 2 & 3 during calendar year 2011. NRC staff will be available, in an informal setting, to answer questions from individuals and discuss issues or concerns related to Indian Point. In addition, the NRC will host a question and answer session in an adjacent area, during which members of the public will be able to ask questions or make statements in a public meeting. There will not be a formal NRC presentation during the public meeting.

Meeting

Contact:

Mel Gray, Chief, Projects Branch 2 610-337-5209 E-mail: mel.gray@nrc.gov For the security of everyone attending this meeting, local law enforcement officers will be conducting searches of bags (briefcases, purses, backpacks, equipment cases, etc.) outside the entry into the meeting room. Additionally, signs, banners, posters and displays affixed to any sticks, poles or other similar devices will not be permitted in the meeting room.

2 The NRCs annual assessment letter regarding Indian Point Units 2 & 3 performance during 2011 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML12061A159. The slides summarizing the NRCs assessment will be available during the poster board session and can also be found in ADAMS with Accession Number ML12130A131. ADAMS is accessible from the NRC website at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Indian Point Units 2 &3 can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 14, 2012, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

ML12108A042 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME M Jennerich M Gray DATE 04/16/12 04/16/12

3 Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OED (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation NRR (RIDSNRROD)

Director, Division of Inspection & Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)

W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS M. McCoppin, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP M. Catts, SRI, Unit2 P. Cataldo, SRI, Unit 3 A. Ayegbusi, RI, Unit 2 M. Halter, RI, Unit 3 D. Hochmuth, Admin N. Sheehan, PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. ODaniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist ROPreportsResource@nrc.gov PMNS