Notice of Annual Assessment Meeting with Entergy to Discuss the Nrc'S Assessment of the Safety Performance of Indian Point Units 2 and 3 for Calendar Year 2006
ML071000060
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/10/2007
From: Cobey E
Reactor Projects Branch 2
To:
Cobey, Eugene W. RI/DRP/PB2/610-337-5171
References
MN 07-018
Download: ML071000060 (5)


Text

MN No.07-018 April 10, 2007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Northeast Facility: Indian Point Nuclear Generating Unit 2 and Unit 3 Docket Nos. 50-247 and 50-286 Time and Date: Information Session: 2:30 p.m. - 9:30 p.m., April 26, 2007 Annual Assessment Meeting: 6:30 p.m. - 9:30 p.m., April 26, 2007 Location: Colonial Terrace 119 Oregon Road Cortlandt Manor, New York 10567

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the Indian Point Nuclear Generating Units for calendar year 2006. The NRCs assessment is documented in a letter dated March 2, 2007.

Attendees*:

NRC: S. Collins, Regional Administrator, Region I E. Cobey, Chief, Projects Branch 2, DRP, Region I J. Lubinski, Deputy Director, DORL, NRR M. Cox, Senior Resident Inspector, Indian Point 2 D. Jackson, Senior Resident Inspector, Indian Point 3 Entergy: F. Dacimo, Site Vice President K. Polson, General Manager Plant Operations D. Mayer, Director of Special Projects J. Ventosa, Director of Engineering J. Comiotes, Director of Nuclear Safety Assurance Public Participation: The Indian Point Annual Assessment Meeting is a Category 1 Meeting.

The public is invited to observe this meeting and will have opportunities to communicate with the NRC attendees after the business portion, but before the meeting is adjourned. Several NRC representatives will also be available for an extended information session both prior to and during the Annual Assessment Meeting with Entergy. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.

2 The NRCs Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be found in ADAMS under Accession Number ML0706106030. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Indian Point Energy Center can be found on the NRC web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Eugene Cobey, Chief, Projects Branch 2 (610) 337-5171 E-mail: ewc@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 20, 2007, via telephone to the NRC meeting contact.

Approved by: ______/RA Daniel Orr For/______________

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President for Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations W. Campbell, Senior Vice President of Engineering and Technical Services C. Schwarz, Vice President, Operations Support (ENO)

K. Polson, General Manager Operations O. Limpias, Vice President, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. D. Faison, Manager, Licensing (ENO)

R. Patch, Director of Oversight (ENO)

J. Comiotes, Director, Nuclear Safety Assurance P. Conroy, Manager, Licensing T. C. McCullough, Assistant General Counsel, Entergy Nuclear Operations, Inc.

P. R. Smith, President, New York State Energy, Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law D. ONeill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc.

Chairman, Standing Committee on Energy, NYS Assembly

3 Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel Assemblywoman Sandra Galef, NYS Assembly County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congressman John Hall Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer G. Shapiro, Senator Clinton's Staff J. Riccio, Greenpeace P. Musegaas, Riverkeeper, Inc.

M. Kaplowitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Leventhal, The Nuclear Control Institute K. Coplan, Pace Environmental Litigation Clinic M. Jacobs, IPSEC D. C. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant W. Little, Associate Attorney, NYSDEC R. Christman, Manager Training and Development

4 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO J. Lubinski, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, NRR E. Cobey, DRP D. Orr, DRP C. Hott, DRP B. Welling, DRP M. Cox, DRP, Senior Resident Inspector - Indian Point 2 G. Bowman, DRP, Resident Inspector - Indian Point 2 Donald Jackson, Acting Senior Resident Inspector - Indian Point 3 Brian Wittick, Resident Inspector - Indian Point 3 R. Martin, DRP, Resident OA Region I Docket Room (w/concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist SUNSI Review Complete: JDO (Reviewers initials)

DOCUMENT NAME:C:\FileNet\ML071000060.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME DOrr ECobey/JDO FOR DATE 04/09/07 04/09/07 OFFICIAL RECORD COPY ML071000060

Agenda NRC Annual Assessment Meeting AND Information Session Indian Point Energy Center 2:30 p.m. - 9:30 p.m.

April 26, 2007 Information Session...................................................................................(2:30 - 9:30 pm)

Annual Assessment Meeting.....................................................................(6:30 - 9:30 pm)

Introduction....................................................................................NRC (5 minutes)

Review of Reactor Oversight Process............................................NRC (10 minutes)

Discussion of Indian Point Unit 2 and Unit 3 Performance.............NRC (20 minutes)

Entergys Response and Remarks.................................................Entergy (45 minutes)

Closing Remarks............................................................................NRC (5 minutes)

Short Break....................................................................................All (5 minutes)

NRC to Address Public Questions on Annual Assessment.............NRC