Notice of Meeting with Indian Point 2 & 3 Annual Assessment
ML051090564
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/20/2005
From: Brian Mcdermott
Reactor Projects Branch 2
To:
Shared Package
ML051100006 List:
References
MN 05-024
Download: ML051090564 (6)


Text

April 20, 2005 MN No.05-024 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: Entergy Nuclear Northeast Facility: Indian Point Nuclear Generating Unit 2 and Unit 3 Docket Nos. 50-247 and 50-286 Time and Date: 6:00 p.m. - 10:00 p.m., May 10, 2005 Location: Crystal Bay on the Hudson - Charles Point Marina 5 John Walsh Boulevard Peekskill, New York 10566

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the Indian Point Nuclear Generating Units for calendar year 2004. The NRCs assessment is documented in a letter dated March 2, 2005. From 6:00 p.m. to 7:00 p.m. the NRC staff and Entergy representatives will discuss the NRC's assessment of Indian Point. Beginning at 7:00 p.m., in response to requests from some local officials, the staff will provide general information about the NRC's process for reviewing license renewal applications. The staff will also address security, and then provide over two hours for questions from members of the public.

Attendees*:

NRC: S. Collins, Regional Administrator, Region I B. Holian, Deputy Director, Division of Reactor Projects (DRP), Region I B. McDermott, Chief, Projects Branch 2, DRP, Region I P. Milano, Licensing Project Manager, NRR P. Habighorst, Senior Resident Inspector, Indian Point 2 T. Hipshman, Senior Resident Inspector, Indian Point 3 M. Cox, Resident Inspector, Indian Point 2 R. Berryman, Resident Inspector, Indian Point 3 D. Screnci, Senior Public Affairs Officer, Region I Et. Al.

Entergy: C. Schwarz, Acting Site Vice President P. Reuben, Acting General Manager Plant Operations

2 Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3, can be found in the ADAMS (Accession Number ML051090564). The meeting slides can be located in ADAMS with accession number of ML051100011. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Information relative to the NRC Annual Assessment process and the input to the NRC assessment of Indian Point Nuclear Generation Station can be found on the NRC web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Brian McDermott, Chief, Projects Branch 2 610-337-5233 E-mail: bjm@nrc.gov.

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 20, 2005, via telephone to the NRC meeting contact.

Approved by: _/RA/ original signed by Paul G. Krohn Brian J. McDermott, Chief Projects Branch 2 Division of Reactor Projects

3 Agenda NRCs Annual Assessment Meeting Indian Point Energy Center May 10, 2005 Introduction........................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process................................................................NRC (5 minutes)

National Summary of Plant Performance...........................................................NRC (7 minutes)

Discussion of Indian Point Unit 2 and Unit 3 Performance................................NRC (15 minutes)

Entergys Response and Remarks...............................................................Entergy (25 minutes)

Closing Remarks...............................................................................................NRC (5 minutes)

Short Break................................................................................................................(5 minutes)

NRC to address public questions..................................NRC/Members of the Public (as needed)

4 Distribution:

F. Dacimo, Site Vice President G. J. Taylor, Chief Executive Officer, Entergy Operations M. R. Kansler, President - Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, General Manager - Plant Operations D. Pace, Vice President, Engineering R. Edington, Vice President, Operations Support J. McCann, Director, Licensing C. Faison, Manager, Licensing H. Salmon, Jr., Director of Oversight J. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

P. R. Smith, President, New York State Energy, Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law T. Walsh, Secretary, NFSC, Entergy Nuclear Operations, Inc.

D. ONeill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Executive Chair, Four County Nuclear Safety Committee S. Lousteau, Treasury Department, Entergy Services, Inc.

Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel P. Rubin, Manager of Planning, Scheduling & Outage Services Assemblywoman Sandra Galef, NYS Assembly County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congresswoman Sue W. Kelly Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer J. Riccio, Greenpeace A. Matthiessen, Executive Director, Riverkeepers, Inc.

5 M. Kapolwitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Gunter, Nuclear Information & Resource Service P. Leventhal, The Nuclear Control Institute K. Coplan, Pace Environmental Litigation Clinic R. Witherspoon, The Journal News W. DiProfio, PWR SRC Consultant W. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant W. Little, Associate Attorney, NYSDEC A. Gillespie State of New York Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

6 Distribution (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

P. Milano, Project Manager, NRR R. Laufer, NRR, (Backup)

W. Lanning, DRS D Skay, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

K. Farrar, Regional Counsel S. Lee, RI EDO Coordinator D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA B. McDermott, DRP D. Jackson, DRP P. Habighorst, SRI - Indian Point 2 T. Hipschman, SRI - Indian Point 3 M. Cox, RI - Indian Point 2 R. Berryman, RI - Indian Point 3 G. Matakas, ORA PMNS WEBWORK SISP Review Complete: CML (Reviewers initials)

DOCUMENT NAME:E:\Filenet\ML051090564.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME CLong/CML BMcDermott/P GK DATE 04/20/05 04/20/05 04/ /05 04/ /05 04/ /05 OFFICIAL RECORD COPY