ML19325F185: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I
{{#Wiki_filter:I c  \/
                            ,.
c  \/
              .
                         -                                                                                                                1
                         -                                                                                                                1
        ''
                                                                                                                                         .)
                                                                                                                                         .)
       ,    . MICHIGAN STATE UNIVERSITY                                                                                                    l
       ,    . MICHIGAN STATE UNIVERSITY                                                                                                    l
                                                                                                                                           'l
                                                                                                                                           'l VICE PRESIDENT POR FINANCE AND OPERATIONS AND TREA$URFJt                        EAST LAN51NG
    '
VICE PRESIDENT POR FINANCE AND OPERATIONS AND TREA$URFJt                        EAST LAN51NG
* MICillGAN . 4M24            )
* MICillGAN . 4M24            )
412 ADhtNISTRAT10N BUllDING l
412 ADhtNISTRAT10N BUllDING l
Line 39: Line 33:


In accordance with the above referenced order, the decommissioning of the y                      MSU Trega Rector has been completed. A report summarizing that activity and the resultant radiation survey is attached.
In accordance with the above referenced order, the decommissioning of the y                      MSU Trega Rector has been completed. A report summarizing that activity and the resultant radiation survey is attached.
Your assistance in reviewing this report and scheduling an inspection of the
Your assistance in reviewing this report and scheduling an inspection of the facility so that the site can be released would be appreciated. Please                                          '
  .
facility so that the site can be released would be appreciated. Please                                          '
l nQ 1
l nQ 1
schedule the inspection with Bruce W. Wilkinson, (517) 355-3444.
schedule the inspection with Bruce W. Wilkinson, (517) 355-3444.
Sincerely,
Sincerely, o
                                                                                                                                        ;
o
                                 %    b-Wilkinson                                                                  '
                                 %    b-Wilkinson                                                                  '
                                                                                                                                        .
Vice President for Finance & Operations Y cc: USNRC                                                                                                                i s                      Document Control
Vice President for Finance & Operations Y cc: USNRC                                                                                                                i s                      Document Control
* Washington, DC 20555
* Washington, DC 20555 USNRC    rtegion 3 699 Roosevelt Rd.
                                                                                                                                          .
USNRC    rtegion 3 699 Roosevelt Rd.
Glen Ellyn, Illinois 60137 ATTN:    R. Hague d#                                                    '
Glen Ellyn, Illinois 60137 ATTN:    R. Hague d#                                                    '
                                                                                           ' \
                                                                                           ' \

Latest revision as of 18:50, 18 February 2020

Forwards Termination Radiation Survey Summary & Final Rept, Per Order.Scheduling of Insp of Facility Requested
ML19325F185
Person / Time
Site: 05000294
Issue date: 11/06/1989
From: Wilkinson R
MICHIGAN STATE UNIV., EAST LANSING, MI
To: Michaels T
Office of Nuclear Reactor Regulation
Shared Package
ML19325F186 List:
References
NUDOCS 8911160045
Download: ML19325F185 (1)


Text

I c \/

- 1

.)

, . MICHIGAN STATE UNIVERSITY l

'l VICE PRESIDENT POR FINANCE AND OPERATIONS AND TREA$URFJt EAST LAN51NG

  • MICillGAN . 4M24 )

412 ADhtNISTRAT10N BUllDING l

November 6, 1989 f

L Mr. Theodore S. Michaels, Project Manager  !

Standardization & Non-Power Reactor Project Directorate . '

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 ,

Ref. Docket 50-294, Order Authorizing Dismantling of Facility and Disposition of Component Parts-Results and Final Radiation Survey. .

Dear Mr. Michaels:

In accordance with the above referenced order, the decommissioning of the y MSU Trega Rector has been completed. A report summarizing that activity and the resultant radiation survey is attached.

Your assistance in reviewing this report and scheduling an inspection of the facility so that the site can be released would be appreciated. Please '

l nQ 1

schedule the inspection with Bruce W. Wilkinson, (517) 355-3444.

Sincerely, o

% b-Wilkinson '

Vice President for Finance & Operations Y cc: USNRC i s Document Control

Glen Ellyn, Illinois 60137 ATTN: R. Hague d# '

' \

h g"$88$0 Sbhy P ,

l uwa w ...aa .a, w...ean .... u.

_ . . - __ _ __ -- _ _ _ . . _ _ ._ , _ . . . _ _ . _ _