Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20073B990 | 18 June 1991 | Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors | |
ML20045A789 | 8 March 1990 | Forwards Final Rept Orau 90/A-69, Confirmatory Radiological Survey of Triga Reactor Facility,Michigan State Univ,East Lansing,Mi. | |
ML20045A784 | 29 January 1990 | Advises That Actions Taken to Resolve Concern Re Elevated Gamma Level,Detected on Clean Waste Dumpster,Adequate to Resolve Concern & Documentation Accurately Describes Final Radiological Status of Remaining Waste as Acceptable | |
ML19332C876 | 21 November 1989 | Forwards Revised Summary Page to Termination Radiation Survey Summary & Final Rept.Results of Survey for Loose Surface Contamination at Max Point in Room 192 Incorrect | |
ML19325F185 | 6 November 1989 | Forwards Termination Radiation Survey Summary & Final Rept, Per Order.Scheduling of Insp of Facility Requested | |
ML20246F341 | 4 May 1989 | Forwards Response to Request for Addl Info Re Decommissioning of Triga Reactor | High Radiation Area |
ML20214P027 | 21 November 1986 | Advises That Addl Investigations & Tests Since Have Been Carried Out,Per 1983-84 Area Monitor Results. Anomalies Discovered That Were Not Readily Apparent During 1983-84 Calibr Tests.Instrument Returned to Mfg for Repair | |
ML20211K019 | 31 October 1986 | Responds to 861003 Request for Further Info Re Discrepancies in Calibr of Radiation Monitoring Instrumentation for Triga Nuclear Reactor.Prior to 1985,calibr Carried Out by Moving Portable Source Into Reactor Room & Conducting Tests | |
ML20214N595 | 5 August 1986 | Responds to Questions Re Radiation Calibr of Area Radiation Monitor Raised in Insp Rept 50-294/86-01 on 860619-26.Ion Chamber Calibr Results Encl | |
ML20198T201 | 3 June 1986 | Requests Listed Addl Info Re Decommissioning of Research Reactor,Including Possibility of Sealing Off Reactor Tank Top & Releasing Remainder of Room for Nonresearch Activities.Meeting to Discuss Concerns Requested | |
ML20199L040 | 31 March 1986 | Advises That Rev 4 to Emergency Plan Will Be Implemented as of 860401,per NRC 860318 Request | |
ML20138G080 | 10 November 1985 | FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor | |
ML20129J402 | 10 July 1985 | Forwards Rev 3 to Emergency Plan,In Response to Co Thomas 850613 Request for More Detailed Description of Annual Onsite Emergency Drills | |
ML20205A722 | 22 April 1985 | Forwards Rev 2 to Emergency Plan.Plan Became Detached in Processing of Author | |
ML20099D564 | 20 February 1985 | Forwards ,Revised Pages to Rev 2 & Revised Pages 17,18 & 22 to Rev 1 to Emergency Plan.W/O Revised Pages to Rev 2 | |
ML20094E286 | 24 July 1984 | Forwards Rev 4 to Requalification Program for Licensed Operators, in Response to 840711 Generic Ltr 83-12A | |
ML20093A123 | 26 June 1984 | Forwards Rev 1 to SAR for Triga Reactor,In Connection W/ Application for Renewal of License R-114 | |
ML20091R600 | 11 June 1984 | Forwards Replies to Questions Re Relicensing of Michigan State Univ Reactor,License R-114 | Shutdown Margin Earthquake Fuel cladding |
ML20091M869 | 4 June 1984 | Forwards Rev 3 to Requalification Program for Licensed Operators | |
ML20099D583 | 21 May 1984 | Forwards Pages 17,18 & 22 to Rev 1 to Emergency Plan | |
ML20078A430 | 19 September 1983 | Advises of Delay in Transferring Triga Reactor to Air Force. Univ Will Continue to Operate Reactor for at Least 1 Yr.If Transfer Authorized,Operation Will Be Continued No Longer than 2 Yrs | |
ML20079S103 | 15 June 1983 | Forwards Public Version of Request for Extension Until 831101 to Submit Required Changes to Emergency Plan,Per .Changes Unnecessary If Reactor Transfer to Mcclellan Air Force Base Authorized | |
ML20071A834 | 18 February 1983 | Requests Exam for Reactor Operator License | |
ML20071A829 | 18 February 1983 | Requests Licensing Exams Be Administered to MW Mitchell & M Heinzmann.Exams Should Be Conducted During Wk of 830320 or 26 | |
ML20071A831 | 18 February 1983 | Requests Exam for Senior Reactor Operator License | |
ML20065U371 | 6 October 1982 | Forwards Public Version of Revised Emergency Plan,Per NRC 820616 Generic Ltr | |
ML20062D187 | 29 July 1982 | Forwards Response to IE Bulletin 82-02 Re Bolted Connections.Visual or Surface Exams Not Typically Performed on Bolting in RCS Unless Requested.No Trend of Leakage Recurrence Detected | |
ML20055A540 | 12 July 1982 | Submits Annual Operating Rept for 1981 | |
ML20010H550 | 21 September 1981 | Forwards Updated Safety Analysis Matl & Requalification Program,In Support of Renewal of License R-114 | Earthquake |
ML19347F827 | 14 May 1981 | Forwards Annual Financial Rept 1980.Estimate Costs of Shutdown Per Reg Guide 1.86 Requirements Provided | |
ML19347E178 | 15 April 1981 | Submits Reactor Operating Rept for 1980 | |
ML19347D606 | 13 March 1981 | Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) | |
ML19347C990 | 4 March 1981 | Requests Copy of NRC 780713 Ltr Requesting Financial Considerations About Continuing Operations of Facility | |
ML19347C151 | 22 September 1980 | Responds to NRC 800829 Ltr Re Violations Noted in IE Insp on 800811-13.Corrective Actions:Reactor Safety Committee Will Audit Maint Records to Ensure That Testing & Surveillance Procedures Are Performed in Timely Manner | |
ML19312E770 | 1 May 1980 | Responds to Item of Noncompliance Noted in NRC 800426 Ltr. Corrective Actions:Reactor Safety Committee Meetings Have Been Timely Since 791119 | |
ML19309A742 | 11 March 1980 | Forwards Tech Specs,Amended to Comply W/New Format Requirements,For Renewal of License R-114 | |
ML19290C243 | 2 January 1980 | Forwards Revision 3 to Physical Security Plan. Plan Withheld (Ref 10CFR2.790) | |
ML19291B927 | 10 December 1979 | Forwards Executed Amend 10 to Indemnity Agreement E-51 Defining in Course of Transportation. | |
ML19210C018 | 19 October 1979 | Responds to IE Bulletin 79-19.No Liquid Low Level Waste Is Generated.From Jan 1978-June 1979,three Radwaste Shipments Made,Consisting Mainly of Plastic Gloves,Bags & Vials | |
ML19269E669 | 22 June 1979 | Advises of Incident on 790613:fuel Temp Indication Dropped to Zero During Full Power Operation.Caused by Failure of Thermocouples in B5 Serial Number 7833 Fuel Element.Meter Connected to Other Fuel Element | |
ML19246C335 | 18 May 1979 | Responds to NRC 790430 Ltr Re Violation Noted in IE Insp Rept.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML19247A469 | 1 May 1979 | Ack Receipt of NRC 790404 Ltr Re Univ of Mi Pilot Testing Program of Personnel Dosimeters.Reviews Results of Nbs Insp of Irradation Facilities,Irradation Geometries Examinations, Calibr Procedures & Recordkeeping Plans | |
ML19247A471 | 6 April 1979 | Discusses Interagency Policy Committee of Personnel Radiation Monitoring Activities Re Univ of Mi Test Program of Personnel Dosimetry Which Shows Large Numbers of Dosimetry Processors Are Not Able to Meet New Std | |
ML19263D063 | 2 March 1979 | Advises That Log N Channel of Control Console Strip Recorder Is Repaired.Due to Subsequent Start Up Channel & Linear Channel Problems,Reactor Was Not Pulsed Until 790216 |