ML19347E178

From kanterella
Jump to navigation Jump to search
Submits Reactor Operating Rept for 1980
ML19347E178
Person / Time
Site: 05000294
Issue date: 04/15/1981
From: Carrick J
MICHIGAN STATE UNIV., EAST LANSING, MI
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
801231, NUDOCS 8104240188
Download: ML19347E178 (2)


Text

e hilCillG AN STATE UNIVERSITY Colt tGF OF 1NGINItHING

  • DI41510N OF ENGl*.itRING RLSEARCil EAST LAN5ING
  • SilCillGAN
  • 4AM24 April 15, 1981 Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission 8'

4

\\

Washington, D.C.

20555

&g 10-

.53 4

Docket No. 50-294 i

D 4

m

[*

Michigan State University TRIGA Reactor p ['7 License R-114 6k Annual Report

Dear Sir:

Pursuant to 10CFR50-59 the following report is submitted:

1.

During the operating period of January 1 to December 31, 1980 the following experiments were perfonned:

a.

29 central thimble irradiations b.

2294 rotary specimen rack irradiations c.

total operation of 1.29 megawatt-days 2.

Ar releases totaled 1194.2 pCi or an average release rate of 1.01 X 10-10 41 pCi/ml.

3.

There have been no apparent change or trends in the tank bottom.

4.

Unscheduled scrams during the reporting period were:

DATE SCRAM CAUSE 1/4/80 Racorder Noise transient in linear recorder.

Static charge build-up l

on calibration switch.

1/21/80 Recorder Noise transient in linear recorder.

1/22/80 Recorder Noise transient in linear recorder.

1/22/80 Recorder Noise transient in linear recorder.

1/24/80 Recorder Faulty ground in linear circuit.

2/21/80 Recorder Operator error-ranged switch downscale.

2/27/80 Recorder Noise transient in linear recorder.

4/1/80 Recorder Operator error-ranged switch downscale.

4/8/80 Recorder Operator error-ranged switch downscale.

5/22/80 Recorder Noise transient in linear recorder.

5/22/80 Recorder Noise transient in linear recorder.

6/10/80 Recorder Noise transient in linear recorder.

6/11/80 Recorder Noise transient in linear recorder.

6/11/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

y}80 M1Uns en Afinnnaens Acteon/1 malOfjwsonuss lostustoon 4

Page 2 DATE SCRAM CAUSE 6/20/80 Recorder Noise transient in linear recorder.

6/20/80 Recorder Noise transient in linear recorder.

7/15/80 Recorder Noise transient in linear recorder.

8/7/80 Recorder Operator error-ranged switch downscale.

8/14/80 Recorder Noise transient in linear recorder.

9/25/80 Recorder Operator error-ranged switch downscale.

9/30/80 Period Operator error-excessive reactivity insertion.

10/13/80 Recorder Noise transient in linear recorder.

10/20/80 Recorder Noise transient in linear recorder.

10/20/80 Recorder Noise trar.sient in linear recorder.

10/28/80 Recorder Noise transient in linear recorder.

10/30/80 Recorder Noise transient in linear recorder.

11/19/80 Recorder Noise transient in linear recorder.

5.

There are currently six students being trained as operators.

6.

A new area monitor system was installed, an Eberline RMSII, utilizing a Geiger-Mueller tube and having a 5 decade range.

t Sincerely,

/

James Carrick i

Reactor Supervisor i

I ls l

l

+