ML19347E178

From kanterella
Jump to navigation Jump to search
Submits Reactor Operating Rept for 1980
ML19347E178
Person / Time
Site: 05000294
Issue date: 04/15/1981
From: Carrick J
MICHIGAN STATE UNIV., EAST LANSING, MI
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
801231, NUDOCS 8104240188
Download: ML19347E178 (2)


Text

e hilCillG AN STATE UNIVERSITY Colt tGF OF 1NGINItHING

  • DI41510N OF ENGl*.itRING RLSEARCil EAST LAN5ING
  • SilCillGAN
  • 4AM24 April 15, 1981 Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission 8' 4

\

Washington, D.C. 20555 ,,,.

10-

&g

.53 4 Docket No. 50-294 i 4 D $

m Michigan State University TRIGA Reactor License R-114 6 [*

Annual Report k p ['7

Dear Sir:

Pursuant to 10CFR50-59 the following report is submitted:

1. During the operating period of January 1 to December 31, 1980 the following experiments were perfonned:
a. 29 central thimble irradiations
b. 2294 rotary specimen rack irradiations
c. total operation of 1.29 megawatt-days 41 Ar releases totaled 1194.2 pCi or an average release rate of 1.01 X 10-10 2.

pCi/ml.

3. There have been no apparent change or trends in the tank bottom.
4. Unscheduled scrams during the reporting period were:

DATE SCRAM CAUSE 1/4/80 Racorder Noise transient in linear recorder. Static charge build-up l on calibration switch.

1/21/80 Recorder Noise transient in linear recorder.

1/22/80 Recorder Noise transient in linear recorder.

1/22/80 Recorder Noise transient in linear recorder.

1/24/80 Recorder Faulty ground in linear circuit.

2/21/80 Recorder Operator error-ranged switch downscale.

2/27/80 Recorder Noise transient in linear recorder.

4/1/80 Recorder Operator error-ranged switch downscale.

4/8/80 Recorder Operator error-ranged switch downscale.

5/22/80 Recorder Noise transient in linear recorder.

5/22/80 Recorder Noise transient in linear recorder.

6/10/80 Recorder Noise transient in linear recorder.

6/11/80 Recorder Noise transient in linear recorder.

6/11/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

6/16/80 Recorder Noise transient in linear recorder.

y}80 M1Uns en Afinnnaens Acteon/14 malOfjwsonuss lostustoon

Page 2 DATE SCRAM CAUSE 6/20/80 Recorder Noise transient in linear recorder.

6/20/80 Recorder Noise transient in linear recorder.

7/15/80 Recorder Noise transient in linear recorder.

8/7/80 Recorder Operator error-ranged switch downscale.

8/14/80 Recorder Noise transient in linear recorder.

9/25/80 Recorder Operator error-ranged switch downscale.

9/30/80 Period Operator error-excessive reactivity insertion.

10/13/80 Recorder Noise transient in linear recorder.

10/20/80 Recorder Noise transient in linear recorder.

10/20/80 Recorder Noise trar.sient in linear recorder.

10/28/80 Recorder Noise transient in linear recorder.

10/30/80 Recorder Noise transient in linear recorder.

11/19/80 Recorder Noise transient in linear recorder.

5. There are currently six students being trained as operators.
6. A new area monitor system was installed, an Eberline RMSII, utilizing a Geiger-Mueller tube and having a 5 decade range.

t Sincerely, -

/

James Carrick i Reactor Supervisor i

I ls l

l