ML19347F827
| ML19347F827 | |
| Person / Time | |
|---|---|
| Site: | 05000294 |
| Issue date: | 05/14/1981 |
| From: | Wilkinson R MICHIGAN STATE UNIV., EAST LANSING, MI |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19347F828 | List: |
| References | |
| RTR-REGGD-01.086, RTR-REGGD-1.086 NUDOCS 8105260413 | |
| Download: ML19347F827 (1) | |
Text
SIICHIGAN STATE UNIVERSITY VICE PRESIDENT FOR FINANCE AND OPERAT1oNS AND TREASL1tER EAS
.4
- 488h
\\
</
p pFH May 14,1981 MAY 2 21981 >-
?"we=5 U.S. Nuclear Regulatory Commission Division of Licensing 9
Washington, DC 20555 S k.
St 'BJ ECT:
Docket 50-294, License Renewal, Financial Considerations Geqtlemen:
This is to certify that Michigan State University meets the financial require-ments of 10-CFR 50.33 (f). Specific details are given below:
a.
The operating cost of the reactor is a portion of the General Fund Expenditures, College of Engineering, Dean of Cng;sie= ring listed on page 6 of the " Schedules" section of the MSU Financial Report 1979-80 which is enclosed. Some portion of the operating costs may be borne by the Auxiliary Activities Funds listed on page 30 of the same document under " Internal Service Operations -
Engineering Research Machine Shop and Nuclear Reactor."
b.
The estimated annual operating costs are $28,000 (1981 dol-l lars). These costs will be included in future budgets, c.
The estimated cost of shutting down the reactor including i
the removal of all radioactive material t meet the guide-lines of the Reg Guide 1.86 is $165,000. These funds will be derived from State of Michigan General Funds.
d.
Under the assumed conditions in (c) above, there will be no annual costs involved in maintaining the decommissioned facility.
We trust this will adequately comply with the requirements.
Sincerely, k
o Wilkinson Vice President I\\
RW: co l
Enclosure 8105260N34 M5U ss an Nfrematose Actmesqual Opportuossy Inststmenon
~
_