Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19332C876 | 21 November 1989 | Forwards Revised Summary Page to Termination Radiation Survey Summary & Final Rept.Results of Survey for Loose Surface Contamination at Max Point in Room 192 Incorrect | |
ML19325F185 | 6 November 1989 | Forwards Termination Radiation Survey Summary & Final Rept, Per Order.Scheduling of Insp of Facility Requested | |
ML20246F341 | 4 May 1989 | Forwards Response to Request for Addl Info Re Decommissioning of Triga Reactor | High Radiation Area |
ML20214P027 | 21 November 1986 | Advises That Addl Investigations & Tests Since Have Been Carried Out,Per 1983-84 Area Monitor Results. Anomalies Discovered That Were Not Readily Apparent During 1983-84 Calibr Tests.Instrument Returned to Mfg for Repair | |
ML20211K019 | 31 October 1986 | Responds to 861003 Request for Further Info Re Discrepancies in Calibr of Radiation Monitoring Instrumentation for Triga Nuclear Reactor.Prior to 1985,calibr Carried Out by Moving Portable Source Into Reactor Room & Conducting Tests | |
ML20214N595 | 5 August 1986 | Responds to Questions Re Radiation Calibr of Area Radiation Monitor Raised in Insp Rept 50-294/86-01 on 860619-26.Ion Chamber Calibr Results Encl | |
ML20198T201 | 3 June 1986 | Requests Listed Addl Info Re Decommissioning of Research Reactor,Including Possibility of Sealing Off Reactor Tank Top & Releasing Remainder of Room for Nonresearch Activities.Meeting to Discuss Concerns Requested | |
ML20199L040 | 31 March 1986 | Advises That Rev 4 to Emergency Plan Will Be Implemented as of 860401,per NRC 860318 Request | |
ML20129J402 | 10 July 1985 | Forwards Rev 3 to Emergency Plan,In Response to Co Thomas 850613 Request for More Detailed Description of Annual Onsite Emergency Drills | |
ML20205A722 | 22 April 1985 | Forwards Rev 2 to Emergency Plan.Plan Became Detached in Processing of Author | |
ML20099D564 | 20 February 1985 | Forwards ,Revised Pages to Rev 2 & Revised Pages 17,18 & 22 to Rev 1 to Emergency Plan.W/O Revised Pages to Rev 2 | |
ML20094E286 | 24 July 1984 | Forwards Rev 4 to Requalification Program for Licensed Operators, in Response to 840711 Generic Ltr 83-12A | |
ML20093A123 | 26 June 1984 | Forwards Rev 1 to SAR for Triga Reactor,In Connection W/ Application for Renewal of License R-114 | |
ML20091R600 | 11 June 1984 | Forwards Replies to Questions Re Relicensing of Michigan State Univ Reactor,License R-114 | Shutdown Margin Earthquake Fuel cladding |
ML20091M869 | 4 June 1984 | Forwards Rev 3 to Requalification Program for Licensed Operators | |
ML20099D583 | 21 May 1984 | Forwards Pages 17,18 & 22 to Rev 1 to Emergency Plan | |
ML20078A430 | 19 September 1983 | Advises of Delay in Transferring Triga Reactor to Air Force. Univ Will Continue to Operate Reactor for at Least 1 Yr.If Transfer Authorized,Operation Will Be Continued No Longer than 2 Yrs | |
ML20079S103 | 15 June 1983 | Forwards Public Version of Request for Extension Until 831101 to Submit Required Changes to Emergency Plan,Per .Changes Unnecessary If Reactor Transfer to Mcclellan Air Force Base Authorized | |
ML20071A834 | 18 February 1983 | Requests Exam for Reactor Operator License | |
ML20071A831 | 18 February 1983 | Requests Exam for Senior Reactor Operator License | |
ML20071A829 | 18 February 1983 | Requests Licensing Exams Be Administered to MW Mitchell & M Heinzmann.Exams Should Be Conducted During Wk of 830320 or 26 | |
ML20065U371 | 6 October 1982 | Forwards Public Version of Revised Emergency Plan,Per NRC 820616 Generic Ltr | |
ML20055A540 | 12 July 1982 | Submits Annual Operating Rept for 1981 | |
ML20010H550 | 21 September 1981 | Forwards Updated Safety Analysis Matl & Requalification Program,In Support of Renewal of License R-114 | Earthquake |
ML19347F827 | 14 May 1981 | Forwards Annual Financial Rept 1980.Estimate Costs of Shutdown Per Reg Guide 1.86 Requirements Provided | |
ML19347E178 | 15 April 1981 | Submits Reactor Operating Rept for 1980 | |
ML19347D606 | 13 March 1981 | Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) | |
ML19347C990 | 4 March 1981 | Requests Copy of NRC 780713 Ltr Requesting Financial Considerations About Continuing Operations of Facility | |
ML19347C151 | 22 September 1980 | Responds to NRC 800829 Ltr Re Violations Noted in IE Insp on 800811-13.Corrective Actions:Reactor Safety Committee Will Audit Maint Records to Ensure That Testing & Surveillance Procedures Are Performed in Timely Manner | |
ML19312E770 | 1 May 1980 | Responds to Item of Noncompliance Noted in NRC 800426 Ltr. Corrective Actions:Reactor Safety Committee Meetings Have Been Timely Since 791119 | |
ML19309A742 | 11 March 1980 | Forwards Tech Specs,Amended to Comply W/New Format Requirements,For Renewal of License R-114 | |
ML19290C243 | 2 January 1980 | Forwards Revision 3 to Physical Security Plan. Plan Withheld (Ref 10CFR2.790) | |
ML19291B927 | 10 December 1979 | Forwards Executed Amend 10 to Indemnity Agreement E-51 Defining in Course of Transportation. | |
ML19210C018 | 19 October 1979 | Responds to IE Bulletin 79-19.No Liquid Low Level Waste Is Generated.From Jan 1978-June 1979,three Radwaste Shipments Made,Consisting Mainly of Plastic Gloves,Bags & Vials | |
ML19269E669 | 22 June 1979 | Advises of Incident on 790613:fuel Temp Indication Dropped to Zero During Full Power Operation.Caused by Failure of Thermocouples in B5 Serial Number 7833 Fuel Element.Meter Connected to Other Fuel Element | |
ML19246C335 | 18 May 1979 | Responds to NRC 790430 Ltr Re Violation Noted in IE Insp Rept.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML19263D063 | 2 March 1979 | Advises That Log N Channel of Control Console Strip Recorder Is Repaired.Due to Subsequent Start Up Channel & Linear Channel Problems,Reactor Was Not Pulsed Until 790216 |