ML20138G080
ML20138G080 | |
Person / Time | |
---|---|
Site: | 05000294 |
Issue date: | 11/10/1985 |
From: | Thoms S AFFILIATION NOT ASSIGNED |
To: | NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
FOIA-85-754 NUDOCS 8512160230 | |
Download: ML20138G080 (1) | |
Similar Documents at 05000294 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20045A7891990-03-0808 March 1990 Forwards Final Rept Orau 90/A-69, Confirmatory Radiological Survey of Triga Reactor Facility,Michigan State Univ,East Lansing,Mi. ML20045A7841990-01-29029 January 1990 Advises That Actions Taken to Resolve Concern Re Elevated Gamma Level,Detected on Clean Waste Dumpster,Adequate to Resolve Concern & Documentation Accurately Describes Final Radiological Status of Remaining Waste as Acceptable ML19332C8761989-11-21021 November 1989 Forwards Revised Summary Page to Termination Radiation Survey Summary & Final Rept.Results of Survey for Loose Surface Contamination at Max Point in Room 192 Incorrect ML19325F1851989-11-0606 November 1989 Forwards Termination Radiation Survey Summary & Final Rept, Per Order.Scheduling of Insp of Facility Requested ML20245H5601989-08-11011 August 1989 Forwards Safety Insp 50-294/89-01 on 890719-21.No Violations Noted ML20246G3581989-07-11011 July 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-114,per 890120 Application.Environ Assessment & Finding of No Significant Impact & Safety Evaluation Also Encl ML20244D2431989-06-0707 June 1989 Forwards Amend 7 to License R-114 & Safety Evaluation. Amend Converts License to Possession Only Status ML20246F3411989-05-0404 May 1989 Forwards Response to Request for Addl Info Re Decommissioning of Triga Reactor ML20247M8271989-03-30030 March 1989 Discusses Licensee Requests for Changes to Requalification Program.Requests Include Extension of Max Time Period of 24 Months for Requalification Cycle to Account for Changes in Outage Schedules & Reorganization of Training Programs ML20247B5371989-03-21021 March 1989 Forwards Request for Addl Info to Complete Review of Decommissioning Plan for Michigan State Univ ML20235N6251989-02-23023 February 1989 Forwards Fr Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Terminating License R-114 ML20154R0451988-09-12012 September 1988 Responds to 880616 Request for Approval of Route to Be Used for Transport of Spent Reactor Fuel.Route from East Lansing, Mi to Idaho Falls,Id Judged to Meet Requirements of 10CFR73.37.Data Re Arrangements & Approved Route Encl ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20147B6991988-02-25025 February 1988 Forwards Amend 6 to License R-114 & Safety Evaluation.Amend Changes Tech Specs to Delete Semiannual Pulse & Annual Power Calibrs & to Restrict Licensee to Subcritical Mode ML20215C3491987-06-11011 June 1987 Informs of Recent NRR Reorganization.Designates T Michaels Project Manager for Facility ML20214U9841987-06-0303 June 1987 Forwards Revised NRC Form 398,personal Qualifications statement-licensee & NRC Form 396,certification of Medical Exam by Facility Licensee.Forms Revised to Reflect Changes to 10CFR55 Effective on 870526.W/o Encls ML20212E2011986-12-29029 December 1986 Forwards Notice of Violation from Insp on 860619-26.Notice Result of NRC Review of Listed Responses to Unresolved Item Re Discrepancies in Area Radiation Monitor Calibr Records. Corrective Actions Will Be Reviewed.No Reply Necessary ML20214P0271986-11-21021 November 1986 Advises That Addl Investigations & Tests Since Have Been Carried Out,Per 1983-84 Area Monitor Results. Anomalies Discovered That Were Not Readily Apparent During 1983-84 Calibr Tests.Instrument Returned to Mfg for Repair ML20211K0191986-10-31031 October 1986 Responds to 861003 Request for Further Info Re Discrepancies in Calibr of Radiation Monitoring Instrumentation for Triga Nuclear Reactor.Prior to 1985,calibr Carried Out by Moving Portable Source Into Reactor Room & Conducting Tests ML20215E5931986-10-0303 October 1986 Requests Addl Info Re 860805 & 0908 Responses to Discrepancies Noted in Insp of License R-114 on 860619-20, Including Assurance That Radiation Monitor Calibr Calculations Performed within 30 Days of Ltr Date ML20214N5951986-08-0505 August 1986 Responds to Questions Re Radiation Calibr of Area Radiation Monitor Raised in Insp Rept 50-294/86-01 on 860619-26.Ion Chamber Calibr Results Encl ML20207F2471986-07-15015 July 1986 Forwards Safety Insp Rept 50-294/86-01 on 860619-26.No Violations Noted.Unresolved Item Identified in Section 12 of Rept Will Be Reviewed for Potential Enforcement Action ML20198T2011986-06-0303 June 1986 Requests Listed Addl Info Re Decommissioning of Research Reactor,Including Possibility of Sealing Off Reactor Tank Top & Releasing Remainder of Room for Nonresearch Activities.Meeting to Discuss Concerns Requested ML20203J2481986-04-24024 April 1986 Forwards Rev 1 to Guidance & Discussion of Requirements for Application to Terminate Nonpower Reactor Facility OL & Reg Guide 1.86, Termination of OLs for Nuclear Reactors, Per 860414 Telcon Re Decommissioning of Facility.W/O Encls ML20199L0401986-03-31031 March 1986 Advises That Rev 4 to Emergency Plan Will Be Implemented as of 860401,per NRC 860318 Request ML20140F3381986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20137S5081986-02-11011 February 1986 Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls IA-85-754, Responds to FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor.Licensee Not Required to Submit Procedures to Nrc.Complete Set of Current Procedures Available at Univ of Michigan for Insp1985-11-27027 November 1985 Responds to FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor.Licensee Not Required to Submit Procedures to Nrc.Complete Set of Current Procedures Available at Univ of Michigan for Insp ML20138G0651985-11-27027 November 1985 Responds to FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor.Licensee Not Required to Submit Procedures to Nrc.Complete Set of Current Procedures Available at Univ of Michigan for Insp ML20138S0711985-11-13013 November 1985 Informs That 851017 Proposed Changes to Emergency Plan Do Not Meet Requirements for Annual Onsite Emergency Drills. Plan Should Be Revised within 60 Days of Ltr Date ML20138G0801985-11-10010 November 1985 FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor ML20129J4021985-07-10010 July 1985 Forwards Rev 3 to Emergency Plan,In Response to Co Thomas 850613 Request for More Detailed Description of Annual Onsite Emergency Drills ML20127D4371985-06-13013 June 1985 Forwards Emergency Plan Evaluation Rept. Plan Meets Requirements Except That Onsite Emergency Drills Should Be Conducted as Action Drills.Requests Mod of Plan to Reflect Change within 120 Days.Plan Should Be Implemented ML20205A7221985-04-22022 April 1985 Forwards Rev 2 to Emergency Plan.Plan Became Detached in Processing of Author ML20099D5641985-02-20020 February 1985 Forwards ,Revised Pages to Rev 2 & Revised Pages 17,18 & 22 to Rev 1 to Emergency Plan.W/O Revised Pages to Rev 2 ML20094E2861984-07-24024 July 1984 Forwards Rev 4 to Requalification Program for Licensed Operators, in Response to 840711 Generic Ltr 83-12A ML20093A1231984-06-26026 June 1984 Forwards Rev 1 to SAR for Triga Reactor,In Connection W/ Application for Renewal of License R-114 ML20091R6001984-06-11011 June 1984 Forwards Replies to Questions Re Relicensing of Michigan State Univ Reactor,License R-114 ML20091M8691984-06-0404 June 1984 Forwards Rev 3 to Requalification Program for Licensed Operators ML20099D5831984-05-21021 May 1984 Forwards Pages 17,18 & 22 to Rev 1 to Emergency Plan ML20078A4301983-09-19019 September 1983 Advises of Delay in Transferring Triga Reactor to Air Force. Univ Will Continue to Operate Reactor for at Least 1 Yr.If Transfer Authorized,Operation Will Be Continued No Longer than 2 Yrs ML20079S1031983-06-15015 June 1983 Forwards Public Version of Request for Extension Until 831101 to Submit Required Changes to Emergency Plan,Per .Changes Unnecessary If Reactor Transfer to Mcclellan Air Force Base Authorized ML20071A8291983-02-18018 February 1983 Requests Licensing Exams Be Administered to MW Mitchell & M Heinzmann.Exams Should Be Conducted During Wk of 830320 or 26 ML20071A8311983-02-18018 February 1983 Requests Exam for Senior Reactor Operator License ML20071A8341983-02-18018 February 1983 Requests Exam for Reactor Operator License ML20065U3711982-10-0606 October 1982 Forwards Public Version of Revised Emergency Plan,Per NRC 820616 Generic Ltr ML20062D1871982-07-29029 July 1982 Forwards Response to IE Bulletin 82-02 Re Bolted Connections.Visual or Surface Exams Not Typically Performed on Bolting in RCS Unless Requested.No Trend of Leakage Recurrence Detected ML20055A5401982-07-12012 July 1982 Submits Annual Operating Rept for 1981 ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl 1991-06-18 Category:INCOMING CORRESPONDENCE MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20045A7891990-03-0808 March 1990 Forwards Final Rept Orau 90/A-69, Confirmatory Radiological Survey of Triga Reactor Facility,Michigan State Univ,East Lansing,Mi. ML20045A7841990-01-29029 January 1990 Advises That Actions Taken to Resolve Concern Re Elevated Gamma Level,Detected on Clean Waste Dumpster,Adequate to Resolve Concern & Documentation Accurately Describes Final Radiological Status of Remaining Waste as Acceptable ML19332C8761989-11-21021 November 1989 Forwards Revised Summary Page to Termination Radiation Survey Summary & Final Rept.Results of Survey for Loose Surface Contamination at Max Point in Room 192 Incorrect ML19325F1851989-11-0606 November 1989 Forwards Termination Radiation Survey Summary & Final Rept, Per Order.Scheduling of Insp of Facility Requested ML20246F3411989-05-0404 May 1989 Forwards Response to Request for Addl Info Re Decommissioning of Triga Reactor ML20214P0271986-11-21021 November 1986 Advises That Addl Investigations & Tests Since Have Been Carried Out,Per 1983-84 Area Monitor Results. Anomalies Discovered That Were Not Readily Apparent During 1983-84 Calibr Tests.Instrument Returned to Mfg for Repair ML20211K0191986-10-31031 October 1986 Responds to 861003 Request for Further Info Re Discrepancies in Calibr of Radiation Monitoring Instrumentation for Triga Nuclear Reactor.Prior to 1985,calibr Carried Out by Moving Portable Source Into Reactor Room & Conducting Tests ML20214N5951986-08-0505 August 1986 Responds to Questions Re Radiation Calibr of Area Radiation Monitor Raised in Insp Rept 50-294/86-01 on 860619-26.Ion Chamber Calibr Results Encl ML20198T2011986-06-0303 June 1986 Requests Listed Addl Info Re Decommissioning of Research Reactor,Including Possibility of Sealing Off Reactor Tank Top & Releasing Remainder of Room for Nonresearch Activities.Meeting to Discuss Concerns Requested ML20199L0401986-03-31031 March 1986 Advises That Rev 4 to Emergency Plan Will Be Implemented as of 860401,per NRC 860318 Request ML20138G0801985-11-10010 November 1985 FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor ML20129J4021985-07-10010 July 1985 Forwards Rev 3 to Emergency Plan,In Response to Co Thomas 850613 Request for More Detailed Description of Annual Onsite Emergency Drills ML20205A7221985-04-22022 April 1985 Forwards Rev 2 to Emergency Plan.Plan Became Detached in Processing of Author ML20099D5641985-02-20020 February 1985 Forwards ,Revised Pages to Rev 2 & Revised Pages 17,18 & 22 to Rev 1 to Emergency Plan.W/O Revised Pages to Rev 2 ML20094E2861984-07-24024 July 1984 Forwards Rev 4 to Requalification Program for Licensed Operators, in Response to 840711 Generic Ltr 83-12A ML20093A1231984-06-26026 June 1984 Forwards Rev 1 to SAR for Triga Reactor,In Connection W/ Application for Renewal of License R-114 ML20091R6001984-06-11011 June 1984 Forwards Replies to Questions Re Relicensing of Michigan State Univ Reactor,License R-114 ML20091M8691984-06-0404 June 1984 Forwards Rev 3 to Requalification Program for Licensed Operators ML20099D5831984-05-21021 May 1984 Forwards Pages 17,18 & 22 to Rev 1 to Emergency Plan ML20078A4301983-09-19019 September 1983 Advises of Delay in Transferring Triga Reactor to Air Force. Univ Will Continue to Operate Reactor for at Least 1 Yr.If Transfer Authorized,Operation Will Be Continued No Longer than 2 Yrs ML20079S1031983-06-15015 June 1983 Forwards Public Version of Request for Extension Until 831101 to Submit Required Changes to Emergency Plan,Per .Changes Unnecessary If Reactor Transfer to Mcclellan Air Force Base Authorized ML20071A8341983-02-18018 February 1983 Requests Exam for Reactor Operator License ML20071A8291983-02-18018 February 1983 Requests Licensing Exams Be Administered to MW Mitchell & M Heinzmann.Exams Should Be Conducted During Wk of 830320 or 26 ML20071A8311983-02-18018 February 1983 Requests Exam for Senior Reactor Operator License ML20065U3711982-10-0606 October 1982 Forwards Public Version of Revised Emergency Plan,Per NRC 820616 Generic Ltr ML20062D1871982-07-29029 July 1982 Forwards Response to IE Bulletin 82-02 Re Bolted Connections.Visual or Surface Exams Not Typically Performed on Bolting in RCS Unless Requested.No Trend of Leakage Recurrence Detected ML20055A5401982-07-12012 July 1982 Submits Annual Operating Rept for 1981 ML20010H5501981-09-21021 September 1981 Forwards Updated Safety Analysis Matl & Requalification Program,In Support of Renewal of License R-114 ML19347F8271981-05-14014 May 1981 Forwards Annual Financial Rept 1980.Estimate Costs of Shutdown Per Reg Guide 1.86 Requirements Provided ML19347E1781981-04-15015 April 1981 Submits Reactor Operating Rept for 1980 ML19347D6061981-03-13013 March 1981 Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML19347C9901981-03-0404 March 1981 Requests Copy of NRC 780713 Ltr Requesting Financial Considerations About Continuing Operations of Facility ML19347C1511980-09-22022 September 1980 Responds to NRC 800829 Ltr Re Violations Noted in IE Insp on 800811-13.Corrective Actions:Reactor Safety Committee Will Audit Maint Records to Ensure That Testing & Surveillance Procedures Are Performed in Timely Manner ML19312E7701980-05-0101 May 1980 Responds to Item of Noncompliance Noted in NRC 800426 Ltr. Corrective Actions:Reactor Safety Committee Meetings Have Been Timely Since 791119 ML19309A7421980-03-11011 March 1980 Forwards Tech Specs,Amended to Comply W/New Format Requirements,For Renewal of License R-114 ML19290C2431980-01-0202 January 1980 Forwards Revision 3 to Physical Security Plan. Plan Withheld (Ref 10CFR2.790) ML19291B9271979-12-10010 December 1979 Forwards Executed Amend 10 to Indemnity Agreement E-51 Defining in Course of Transportation. ML19210C0181979-10-19019 October 1979 Responds to IE Bulletin 79-19.No Liquid Low Level Waste Is Generated.From Jan 1978-June 1979,three Radwaste Shipments Made,Consisting Mainly of Plastic Gloves,Bags & Vials ML19269E6691979-06-22022 June 1979 Advises of Incident on 790613:fuel Temp Indication Dropped to Zero During Full Power Operation.Caused by Failure of Thermocouples in B5 Serial Number 7833 Fuel Element.Meter Connected to Other Fuel Element ML19246C3351979-05-18018 May 1979 Responds to NRC 790430 Ltr Re Violation Noted in IE Insp Rept.Corrective Actions Withheld (Ref 10CFR2.790) ML19247A4691979-05-0101 May 1979 Ack Receipt of NRC 790404 Ltr Re Univ of Mi Pilot Testing Program of Personnel Dosimeters.Reviews Results of Nbs Insp of Irradation Facilities,Irradation Geometries Examinations, Calibr Procedures & Recordkeeping Plans ML19247A4711979-04-0606 April 1979 Discusses Interagency Policy Committee of Personnel Radiation Monitoring Activities Re Univ of Mi Test Program of Personnel Dosimetry Which Shows Large Numbers of Dosimetry Processors Are Not Able to Meet New Std ML19263D0631979-03-0202 March 1979 Advises That Log N Channel of Control Console Strip Recorder Is Repaired.Due to Subsequent Start Up Channel & Linear Channel Problems,Reactor Was Not Pulsed Until 790216 1991-06-18 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20138G0801985-11-10010 November 1985
[Table view]FOIA Request for Procedures Re Univ of Michigan Nuclear Reactor 1985-11-10 |
Text
l' A
( S. E. Thoms
, 12157 Shenandoah Circle South Lyon, MI 48178
} November 10, 1985 l
1 I US Nucicar Regulatory Commission j ATTN: Director. Of fice of Administration Washington, DC 20555 FRELOOW OF INFORMAlt0N ACT RE THTS IS A FREEDOM OF INFORMATTON ACT RFDIIFST Fora-QUEST!S-1S V
- l.
C2a 'd //- /Y-/.S 2
Dear Sir:
3 Under the Freedom of Information Act and 10 CFR 9, please furnish me with the following documents related to the University of Michigan's nuclear reactor j (I believe the license is License #R-28 or JR-29):
All Health Physics procedures.
]. All other procedures, such as operating or administrative
! procedures, relating to the testing, calibrhtion, etc. of j portable radiation detection instrumentation such as survey j meters, pocket dosimeters, etc.
) 1 am not interested in direct reactor operating procedures, only those
] directly related to health physics / radiation safety /ef fluent control.
1 understand reduction or waiver of the usual fees may be allowed and do so
!. request on the basis of limited ability to pay. I am currently living on a j reduced, fixed income and feeding my family through partial assistance of i
the federal food stamp program. Hence, copying costs over $10 - $15 would j place a strain on our budget.
] Thank you for your consideration.
Sincerely, X / c~-5 S. E. Thoms 1
J j
j I