ML19343B691: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 35: Line 35:
         '~*
         '~*
DRC. @r.rt D Tc*r          Go-W-Ocm
DRC. @r.rt D Tc*r          Go-W-Ocm
                          , ;; :.
       -              te                                                '
       -              te                                                '
li~    r    U  '
li~    r    U  '
Line 60: Line 59:
These installation documents lack design detail to adequately define size and location of welds or fasteners. The potential exists, therefore, that seismic requirements may not have been
These installation documents lack design detail to adequately define size and location of welds or fasteners. The potential exists, therefore, that seismic requirements may not have been
:                                                met in installing the fire dampers.
:                                                met in installing the fire dampers.
;
i                                  II.          Approach to Resolution i
i                                  II.          Approach to Resolution i
;
Mississippi Power & Light Company is working with the construc-i                                                  tor to resolve this deficiency by:
Mississippi Power & Light Company is working with the construc-i                                                  tor to resolve this deficiency by:
: 1.        Issuing a Stop Work until corrective actions have been de-t                                                            termined,
: 1.        Issuing a Stop Work until corrective actions have been de-t                                                            termined,

Latest revision as of 08:08, 18 February 2020

Part 21 Rept Re Installation of Fire Dampers in Ventilation Sys W/O Sufficient Drawings or Procedures,Initially Reported on 801103.Stop Work Notice Issued on 801030.Safety Evaluation Underway
ML19343B691
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/03/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-80-321-000 10CFR-050.55E, 10CFR-50.55E, AECM-80-301, NUDOCS 8012300098
Download: ML19343B691 (3)


Text

, ,_---m _ gaw___a _.--- - - - - - - - - -

%D$l*PP.fTet-PART 21 IDENTIFICATION NO. %~Wu-oco C0 IPA lif IWE_4 Us4 Csanoeg M m Q DATE OF LETIFA rdsbro D00(ET NO. E-%\i4n W

DAE DISTRIBUTED rddbo p m. ORIGIRAL PEPORTiSUPPlBENTARY  %

.j DISTRIBlHI0th ij h, o .

PEACTOR (R) 1 FUELCYCLE& SAFEGUARDS (O T (FD

  • iE FIES " ['ATERIALS IEFILES EES IEFILES AD/SG AD/FFFSI AD/ROI EGI0iG I,II,III,IV,V PEGIONSI,II,III,IV,V PEGIONS I,II,III,IV,V VSE)DR BR. R-IV VBEOR BR, R-IV VaiDOR BR, R IV LDB / FPA FIG 5715 teSS / FCPS SS-395 NRR/D3L AEOD FIG 76m LOEB/FPA f,435715 M*SS / SG SS-881 NRP/ DOE EOD FIG 7602 LDEB / FPA f4G 5715 NRR/DSI ASLE? E/W 450 AEOD I4G 7602 NMT -

SA /SP tiB-7210A ASBP E/W 450 NRR/ DOL -

CENTPALFILES 016 CaiTRALFILES 016 ASBP W 450 CSfiRAL FILES ( GRON) CENTRAL FILES (GR0iG CSfiRAL FILES 016 PDR ,

CENTRAL FILES SS-395 CSiiRAL FILES (CHRODD LPDR PDR PDR TEPA LPDR LPDR IEPA TEPA _

ACTION:

PRELIMItMRY EVALUATION OF THE ATTACHED REPORT ItOICATES LEAD RESPONSIBILITY FOR FOLLOWJP AS SH0hN BELOW:

IE K NRR IESS _ OTHER _

EES Eo123000% 5 . Pa', 8/1/80

<dn\ez

. , . , itJ tj te

'~*

DRC. @r.rt D Tc*r Go-W-Ocm

- te '

li~ r U '

MISSISSIPPI POWER & LIGHT COMPANY h '-=3 Helping Build Mississippi P. O. B O X 1 S 4 0. J A C K S O N. MISSIS SIPPI 3 9205

  1. 2sfs*EOcINs"d'f December 3, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station i Units 1 and 2 Docket Nos. 50-41,6/417 File 0260/15525/15526 PRD-80/67, Installation of Venti-lation Fire Dampers, Status Report AECM-SO/301 On November 3, 1980, Mississippi Power & Light Company noti-fied Mr. J. Rausch of your office of a Potentially Reportable De-ficiency (PFS) at the Grand Gulf Nuclear Station (GGNS) construc-tion site regarding the installation of fire dampers in ventilation systems.

We are continuing to investigate the safety implications and reportability of this matter under 10CFR50.55(e) and 10CFRg. Our status report is attached. Bechtel Quality Assurance Request QAR F-257 has been assigned to track this item. We expect to provide z our final determination of reportability and proposed corrective actions by April 30, 1981.

Yours truly,

~

  • f

. P. McGaughy, Jr.

WDH:mt Attachment l

cc: Mr. N. L. Stampley Mr. Victor Stello, Director '-i iHis COM M Mr. R. B. McGehee Division of Inspection & Enforcement Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D.C. 20555

! Member Middle South Ui;ilities System 4-

i

~

Attachment to AECM-80/301 4 Page 1 of 1 STATUS REPORT FOR PRD-80/67 I. Description of the Deficiency An NRC inspection of the Grand Gulf Nuclear Statio'n (416/80-25, 417/80-15) revealed that fire dampers in HVAC systems are being installed on Unit I without sufficient drawings or procedures.

These installation documents lack design detail to adequately define size and location of welds or fasteners. The potential exists, therefore, that seismic requirements may not have been

met in installing the fire dampers.

i II. Approach to Resolution i

Mississippi Power & Light Company is working with the construc-i tor to resolve this deficiency by:

1. Issuing a Stop Work until corrective actions have been de-t termined,
2. Determining the extent of the deficiency,
3. Eialuating impact on safety of plant operations, and
4. Determining and ibplementins corrective actions and actions' to preclude occurrence.
III. Status of Proposed Resolution i

Stop Work Notice 24 was issued on October 30, 1980 for installa-tion of fire dcmpers. This 5 top Ucrk will remain in effect until corrective actions have been determined. Additio'nally, Bechtel Power Corporation is'. identifying and documenting the locations where this deficiency may exist at GGNS. An evaluation of the impact on safety of plant operations is in progress.

These actions are being tracked on Bechtel Quality Assurance Request QAR F-257.

IV. Reason For Delav of Final Report Investigative actions have not been completed.

V. Final Report Date .

April 30, 1981 O

e 1

, _ , , , , . . ..._ r . ,. , , . - - . , . , . . . , , . , - , , _ . . . , . , , , , . , ,,,,~,,,-_4 y.m.,, y y%_,. .,,,,__..,_..._..,my. , , . . . _ , , , . , , , . . .