ML12101A102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12101A102
| number = ML12101A102
| issue date = 03/27/2012
| issue date = 03/27/2012
| title = Susquehanna, Unit 1 - Technical Specification Bases Manual
| title = Technical Specification Bases Manual
| author name = Gerlach R M
| author name = Gerlach R
| author affiliation = PPL Susquehanna, LLC
| author affiliation = PPL Susquehanna, LLC
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 40
| page count = 40
}}
}}
=Text=
{{#Wiki_filter:M-ii. 2), 2012 Page      1    of  2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-16434 USER INFORMATION:
GERLACH*ROSE M          EMPL#:028401    CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
TO:    GERLACH*ROSE M      03/27/2012 LOCATION:  USNRC FROM:  NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.      TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents,  Therefore no TOC will be issued with the updated material.
TSBI - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS    DATE: 01/18/2012 ADD    MANUAL TABLE OF CONTENTS    DATE: 03/26/2012 CATEGORY:  DOCUMENTS  TYPE: TSBl ko ý 0,ja
                                                                          ,I      Mar. 2'7, 2L£2 Page      2      of  2 ID:  TEXT 3.6.4.1 REMOVE:    REV:7 ADD:    REV:  8 CATEGORY:  DOCUMENTS    TYPE: TSBl ID:  TEXT 3.6.4.2 ADD:    REV:  4 REMOVE:    REV:3 CATEGORY:  DOCUMENTS    TYPE: TSBl ID:  TEXT LOES ADD:    REV:  104 REMOVE:    REV:103 ANY DISCREPANCIES    WITH THE MATERIAL PROVIDED,  CONTACT DCS  @ X3107 OR X3136 FOR ASSISTANCE.      UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3    DAYS IN ACCORDANCE WITH DEPARTMENT    PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE  IN  YOUR NIMS INBOX UPON COMPLETION    OF UPDATES. FOR ELECTRONIC MANUAL USERS,  ELECTRONICALLY    REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE    COMPLETE  IN YOUR NIMS  INBOX.
SSES MANUAL Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date:        03/26 /2012 Procedure Name                      Rev  Issue Date        Change ID      Change Number TEXT LOES                            104  03/26/2012
==Title:==
LIST OF EFFECTIVE SECTIONS TEXT TOC                              20    09/01/2010
==Title:==
TABLE OF CONTENTS TEXT 2.1.1                            5    05/06/2009
==Title:==
SAFETY LIMITS  (SLS)    REACTOR CORE SLS TEXT 2.1.2                            1    10/04/2007<  "
==Title:==
SAFETY LIMITS  (SLS)    REACTOR COOLANT SYSTEM (RCS)  PRESSURE S TEXT 3.0                              3  ,  08/20/2009
==Title:==
LIMITING CONDITION FOR/0PERATION      (LCO) APPLICABILITY TEXT 3. 1. 1                          1 . 04/18/2006
==Title:==
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3.1.2                      ,    0    11/15/2002
==Title:==
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3                            2    01/19/2009
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4                            4    01/30/2009
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5                            1    07/06/2005
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6                          2      04/18/2006
==Title:==
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL I
Page 1      of  8                                                            Report Date: 03/27/12
SSES MANUAL Manual Name:  TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.1.7                      3    04/23/2008
==Title:==
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL      (SLC) SYSTEM TEXT 3.1.8                      3    05/06/2009
==Title:==
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME      (SDV) VENT AND DRAIN VALVES TEXT 3.2.1                      2    04/23/2008
==Title:==
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE        (APLHGR)
TEXT 3.2.2                      3    05/06/2009
==Title:==
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3                      2    04/23/2008
==Title:==
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.3.1.1                    4    04/23/2008
==Title:==
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS)      INSTRUMENTATION TEXT 3.3.1.2                    2    01/19/2009
==Title:==
INSTRUMENTATION SOURCE RANGE MONITOR  (SRM)    INSTRUMENTATION TEXT 3.3.2.1                    3    04/23/2008
==Title:==
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2                    2    04/05/2010
==Title:==
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1                    8    10/27/2008
==Title:==
INSTRUMENTATION POST ACCIDENT MONITORING    (PAM)  INSTRUMENTATION TEXT 3.3.3.2                    1    04/18/2005
==Title:==
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1                    1    04/23/2008
==Title:==
INSTRUMENTATION END OF CYCLE RECIRCULATION    PUMP TRIP (EOC-RPT)  INSTRUMENTATION Page 2      of  8                                                              Report Date:  03/27/12
SSES M~dANUJAL Manual Name:      TSB1.
Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.2                          0        11/15/2002
==Title:==
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT)  INSTRUMENTATION TEXT 3.3.5.1                          3        08/20/2009
==Title:==
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS)        INSTRUMENTATION TEXT 3.3.5.2                          0        11/15/2002
==Title:==
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC)        SYSTEM INSTRUMENTATION TEXT 3.3.6.1                          4        04/23/2008
==Title:==
INSTRUMENTATION    PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2                          4        09/01/2010
==Title:==
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1                          2        10/27/2008
==Title:==
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY          (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1                          2        12/17/2007
==Title:==
- INSTRI&#xfd;=FNTATION LOSS OF POWER      (LOP) INSTRUMENTATION TEXT 3.3.8.2                          0        11/15/2002
==Title:==
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS)        ELECTRIC POWER MONITORING TEXT 3.4.1                            4        04/27/2010
==Title:==
REACTOR COOLANT SYSTEM (RCS)        RECIRCULATION LOOPS OPERATING TEXT 3.4.2                            2        04/27/2010
==Title:==
REACTOR COOLANT SYSTEM      (RCS)  JET PUMPS TEXT 3.4.3                            3        01/13/2012
==Title:==
REACTOR COOLANT SYSTEM RCS SAFETY RELIEF VALVES S/RVS TEXT 3.4.4                            0        11/15/2002
==Title:==
REACTOR COOLANT SYSTEM (RCS)        RCS OPERATIONAL LEAKAGE Report Date: 03/27/12 Page 33    -of
            -of    88                                                              Report Date: 03/27/12
SSES MANU1TAL Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.5                          1        01/16/2006
==Title:==
REACTOR COOLANT SYSTEM (RCS)      RCS PRESSURE ISOLATION VALVE    (PIV) LEAKAGE TEXT 3.4.6                        3        01/25/2011
==Title:==
REACTOR COOLANT SYSTEM (RCS)      RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7                        2        10/04/2007
==Title:==
REACTOR COOLANT SYSTEM      (RCS)  RCS SPECIFIC ACTIVITY TEXT 3.4.8                        1        04/18/2005
==Title:==
REACTOR COOLANT SYSTEM      (RCS)  RESIDUAL HEAT REMOVAL  (RHR) SHUTDOWN COOLING SYSTEM
              - HOT SHUTDOWN TEXT 3.4.9                        0        11/15/2002
==Title:==
REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.10
              - COLD SHUTDOWN 3
RESIDUAL HEAT REMOVAL 04/23/2008 (RHR) 0 SHUTDOWN COOLING SYSTEM
==Title:==
REACTOR COOLANT SYSTEM      (RCS)  RCS PRESSURE AND TEMPERATURE  (P/T) LIMITS TEXT 3.4.11                        0        11/15/2002
==Title:==
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1                        2        01/16/2006
==Title:==
EMERGENCY CORE COOLING SYSTEMS        (ECCS) AND REACTOR CORE ISOLATION COOLING  (RCIC)
SYSTEM ECCS -  OPERATING TEXT 3.5.2                        0        11/15/2002
==Title:==
EMERGENCY CORE COOLING SYSTEMS        (ECCS) AND REACTOR CORE ISOLATION COOLING  (RCIC)
SYSTEM ECCS -  SHUTDOWN TEXT 3.5.3                        2        07/09/2010
==Title:==
EMERGENCY CORE COOLING SYSTEMS        (ECCS) AND REACTOR CORE ISOLATION COOLING  (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1                      4        11/09/2011
==Title:==
PRIMARY CONTAINMENT TEXT 3.6.1.2                      1        04/23/2008
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date:  03/27/12 4
Page 4      of of  88                                                              Report Date:  03/27/12
SSES MANUAL~
Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.3                    9    04/14/2010
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES    (PCIVS)
LDCN            3092 TEXT 3.6.1.4                    1    04/23/2008
==Title:==
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5                    1    10/05/2005
==Title:==
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6                    0    11/15/2002
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1                    2    04/23/2008
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2                    0    11/15/2002
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3                    1    01/16/2006
==Title:==
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL  (RHR) SUPPRESSIoON POOL COOLING TEXT 3.6.2.4                    0    11/15/2002
==Title:==
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL  (RHR)  SUPPRESSION POOL SPRAY TEXT 3.6.3.1                    2    06/13/2006
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2                    1    04/18/2005
==Title:==
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3                    0    11/15/2002
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1                    8    03/26/2012
==Title:==
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Report Date: 03/27/12 Page~
Page 5      of of  .88                                                          Report Date:'03/27/12
SSES MANUAL Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.4.2                      4    03/26/2012
==Title:==
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT    ISOLATION VALVES    (SCIVS)
TEXT 3.6.4.3                      4    09/21/2006
==Title:==
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT    (SGT) SYSTEM TEXT 3.7. 1                        4    04/05/2010
==Title:==
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER      (RHRSW)  SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2                        2    02/11/2009
==Title:==
PLANT SYSTEMS EMERGENCY SERVICE WATER  (ESW)  SYSTEM TEXT 3.7.3                        1    01/08/2010
==Title:==
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY        (CREOAS)  SYSTEM TEXT 3.7.4                        0    11/15/2002
==Title:==
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5                        1    10/04/2007
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFPGkS TEXT 3.7.6                        .2    04/23/2008
==Title:==
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7                        1    10/04/2007
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8                        0    04/23/2008
==Title:==
PLANT SYSTEMS TEXT 3.8.1                        6    05/06/2009
==Title:==
ELECTRICAL POWER SYSTEMS AC SOURCES -  OPERATING TEXT 3.8.2                        0    11/15/2002
==Title:==
ELECTRICAL POWER SYSTEMS AC SOURCES -  SHUTDOWN Report Date:  03/27/12 Pagei Page  6      of of  88                                                              Report Date:  03/27/12
SSES MANUAL Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.3                        2      04/14/2010
==Title:==
ELECTRICAL POWER SYSTPEMS DIESEL FUEL OIL,    LUBE OIL,  AND STARTING AIR TEXT 3.8.4                        3      01/19/2009
==Title:==
ELECTRICAL POWER SYST'EMS DC SOURCES -    OPERATING TEXT 3.8.5                        1      12/14/2006
==Title:==
ELECTRICAL POWER SYS= PEMS DC SOURCES -  SHUTDOWN TEXT 3.8.6                        1      12/14/2006
==Title:==
ELECTRICAL POWER SYS= FEMS BATTERY CELL PARAMETERS TEXT 3.8.7                        1      10/05/2005
==Title:==
ELECTRICAL POWER SYSTFEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8                        0      11/15/2002
==Title:==
ELECTRICAL POWER SYS=PEMS DISTRIBUTION SYSTEMS -    SHUTDOWN TEXT 3.9.1                        0      11/15/2002
==Title:==
REFUELING )PERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2                        1      09/01/2010
==Title:==
REFUELING C)PERATIONS REFUEL POSITION ONE-ROD-OUT      INTERLOCK TEXT 3.9.3                        0      11/15/2002
==Title:==
REFUELING C)PERATIONS CONTROL ROD POSITION TEXT 3.9.4                        0      11/15/2002
==Title:==
REFUELING )PERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5                        0      11/15/2002
==Title:==
REFUELING C)PERATIONS CONTROL ROD 'OPERABILITY -    REFUELING TEXT 3.9.6                        1      10/04/2007
==Title:==
REFUELING C)PERATIONS REACTOR PRESSURE VESSEL    (RPV)  WATER LEVEL Pae          f8RprtDt:0/71 Page 7      of  8                                                            Report Date: 03/27/12
SSES MANUAL Manual Name:    TSB1 Manual
==Title:==
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.7                          0      11/15/2002
==Title:==
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL      (RHR) -  HIGH WATER LEVEL TEXT 3.9.8                          0      11/15/2002
==Title:==
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL      (RHR)  -  LOW WATER LEVEL TEXT 3.10.1                        1      01/23/2008
==Title:==
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2                        0      11/15/2002
==Title:==
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3                        0      11/15/2002
==Title:==
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL        -  HOT SHUTDOWN TEXT 3.10.4                        0      11/15/2002
==Title:==
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL        -  COLD SHUTDOWN TEXT 3.10.5                        0      11/15/2002
==Title:==
SPECIAL OPE1RATIONS  SINGLE CONTROL ROD DRIVE (CRD)        REMOVAL -  REFUELING TEXT 3.10.6                        0      11/15/2002
==Title:==
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL -. REFUELING TEXT 3.10.7                        1      04/18/2006,
==Title:==
SPECIAL OPERATIONS CONTROL ROD TESTING        - OPERATING TEXT 3.10.8                        1  '04/12/2006
==Title:==
SPECIAL OPERATIONS SHUTDOWN MARGIN  (SDM)  TEST - REFUELING Report Date: 03/27/12 Pages Page 8        of of  8 8                                                                Report Date: 03/27/12
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                      Revision TOC      Table of Contents                                              20 B 2.0    SAFETY LIMITS BASES Page B 2.0-1                                                0 Page TS / B 2.0-2                                            3 Page TS / B 2.0-3                                            5 Page TS / B 2.0-4                                            3 Page TS / B 2.0-5                                            5 Page TS / B 2.0-6                                            1 Pages TS / B 2.0-7 through TS / B 2.0-9                      1 B 3.0    LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 Pages TS / B 3.0-2 through TS / B 3.0-4                      0 I21 Pages TS / B 3.0-5 through TS / B 3.0-7 3,
Page TS / B 3.0-8 Pages TS / B 3.0-9 through TS / B 3.0-11                    2 Page TS / B 3.0-11 a                                        0 Page TS / B 3.0-12                                -,          1 3.0,415*>-
Pages TS / B 3.0-13 through TS / B                          2 Pages TS / B 3.0-16 and TS / B 3.0-i1,7 \-.)                  0 B 3.1    PFAf-TI\/ITY r.nKITPrnI    PA':Fq P.-
Pages B 3.1-1 through B3--,1.-4                                0 Page TS / B 131-5'                                              1 Pages TSi/IBN37116-and TS / B 3.1-7                          2 Pages B,3.1-8'through B 3.1-13                                0 Page\ST)/ B 3.1-14                                            1 Page B 3.1-15                                                  0 Page TS / B 3.1-16 Pages B 3.1-17 through B 3.1-19                                1 Pages TS / B 3.1-20 and TS / B 3.1-21 Page TS / B 3.1-22                                            0 01 Page TS / B 3.1-23 Page TS / B 3.1-24                                              1 2
Pages TS / B 3.1-25 through TS / B 3.1-27                      0 2
Page TS / B 3.1-28 Page TS / B 3.1-29                                              1 0
Pages B 3.1-30 through B 3.1-33 1
Pages TS / B 3.3-34 through TS / B 3.3-36 Pages TS / B 3.1-37 and TS / B 3.1-38                          2 Pages TS / B 3.1-39 and TS / B 3.1-40                          2 0
Page TS / B 3.1-40a Pages TS / B 3.1-41 and TS / B 3.1-42                          2 TSIBLOES-1                Revision 104 SUSQUEHANNA-UNITi SUSQUEHANNA      - UNIT 1              TS    / B LOES-1 '        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Page TS / B 3.1.43                                    1 Page TS / B 3.1-44                                    0 Page TS / B 3.1-45                                    3 Pages TS / B 3.1-46 through TS / B 3.1-49            1 Page TS / B 3.1-50                                    0 Page TS / B 3.1-51                                    3 B 3.2    POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1                                    2 Pages TS / B 3.2-2 and TS / B 3.2-3                  3 Pages TS / B 3.2-4 and TS / B 3.2-5                  2 Page TS / B 3.2-6                                    3 Page B 3.2-7                                          1 Pages TS / B 3.2-8 and TS / B 3.2-9                  3 Page TS / B 3.2.10                                    2 Page TS / B 3.2-11                                    3 Page TS / B 3.2-12                                    1 Page TS / B 3.2-13                                    2 B 3.3    INSTRUMENTATION Pages TS / B 3.3-1 through TS /B 3.3-4                1 Page TS / B 3.3-5                                    2 Page TS / B 3.3-6                                    1 Page TS / B 3.3-7                                    3 Page TS / B 3.3-7a                                    1 Page TS / B 3.3-8                                    4 Pages TS / B 3.3-9 through TS /B 3.3-12              3 Pages TS / B 3.3-12a                                  1 Pages TS / B 3.3-12b and TS / B 3.3-12c              0 Page TS / B 3.3-13                                    1 Page TS / B 3.3-14                                    3 Pages TS / B 3.3-15 and TS / B 3.3-16                1 Pages TS / B 3.3-17 and TS / B 3.3-18                4 Page TS / B 3.3-19                                    1 Pages TS / B 3.3-20 through TS / B 3.3-22            2 Page TS / B 3.3-22a                                  0 Pages TS / B 3.3-23 and TS / B 3.3-24                2 Pages TS / B 3.3-24a and TS / B 3.3-24b              0 Page TS / B 3.3-25                                    3 Page TS / B 3.3-26                                    2 Page TS / B 3.3-27                                    1 Pages TS / B 3.3-28 through TS IB 3.3-30              3 Page TS / B 3.3-30a                                  0 TS/BLOES-2            Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA      -
UNIT 1 1          TS / B LOES-2          Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Page TS / B 3.3-31                                    4 Page TS / B 3.3-32                                    5 Pages TS / B 3.3-32a                                  0 Page TS / B 3.3-32b                                  1
            .Page TS / B 3.3-33                                    5 Page TS / B 3.3-33a                                  0 Page TS / B 3.3-34                                    1 Pages TS / B 3.3-35 and TS / B 3.3-36                2 Pages TS / B 3.3-37 and TS / B 3.3-38                1 Page TS / B 3.3-39                                    2 Pages TS / B 3.3-40 through TS / B 3.3-43            1 Page TS / B 3.3-44                                    4 Pages TS / B 3.3-44a and TS / B 3.3-44b              0 Page TS / B 3.3-45                                    3 Pages TS / B 3.3-45a and TS / B 3.3-45b              0 Page TS / B 3.3-46                                    3 Pages TS / B 3.3-47                      o          2 Pages TS / B 3.3-48 through TS / B 3.3-51            3 Pages TS / B 3.3-52 and TS / B 3.3-53                2 Page TS / B 3-3-53a                                  0 Page TS / B 3.3-54                                    4 Page TS / B 3.3-55                                    2 Pages TS / B3.3-56 and TS / B 3.3-57                  1 Page TS / B 3.3-58                                    0 Page TS / B 3.3-59                                    1 Page TS / B 3.3-60                                    0 Page TS / B 3.3-61                                    1 Pages TS / B 3.3-62 and TS / B 3.3-63                0 Pages TS / B 3.3-64 and TS / B 3.3-65                2 Page TS / B 3.3-66                                    4 Page TS / B 3.3-67                                    3 Page TS / B 3.3-68                                    4 Page TS / B 3.3-69                                    5 Pages TS / B 3.3-70                                  4 Page TS / B 3.3-71                                    3 Pages TS / B 3.3-72 and TS / B 3.3-73                2 Page TS / B 3.3-74                                    3 Page TS / B 3.3-75                                    2 Page TS / B 3.3-75a                                  6 Page TS / B 3.3-75b                                  7 Page TS / B 3.3-75c                                  5 SUSQUEHANNA - UNIT 1                TS I B LOES-3          Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Pages B 3.3-76 through 3.3-77                        0 Page TS / B 3.3-78                                    1 Pages B3.3-79 through B 3.3-81                        0 Page B 3.3-82                                        1 Page B 3.3-83                                        0 Pages B 3.3-84 and B 3.3-85                          1 Page B 3.3-86                                        0 Page B 3.3-87                                        1 Page B 3.3-88                                        0 Page B 3.3-89                                        1 Page TS / B 3.3-90                                    1 Page B 3.3-91                                        0 Pages TS / B 3.3-92 through TS / B 3.3-100            1 Pages TS / B 3.3-101 through TS / B 3.3-103          0 Page TS / B 3.3-104                                  2 Pages TS / B 3.3-105 and TS / B 3.3-106              0 Page TS / B 3.3-107                                  1 Page TS / B 3.3-108                                  0 Page TS / B 3.3-109                                  1 Pages TS / B 3.3-110 and TS / B 3.3-111              0 Pages TS / B 3.3-112 and TS / B 3.3-112a              1 Pages TS / B 3.3-113 through TS / B 3.3-115          1 Page TS / B 3.3-116                                  3 Page TS / B 3.3-117                                  1 Pages TS / B 3.3-118 through TS / B 3.3-122          0 Pages TS / B 3.3-123 and TS / B 3.3-124              1 Page TS / B 3.3-124a                                  0 Page TS / B 3.3-125                                  0 Pages TS / B 3.3-126 and TS / B 3.3-127              1 Pages TS / B 3.3-128 through TS/ B 3.3-130            0 Page TS / B 3.3-131                                  1 Pages TS / B 3.3-132 through TS / B 3.3-134          0 Pages B 3.3-135 through B 3.3-137                    0 Page TS / B 3.3-138                                  1 Pages B 3.3-139 through B 3.3-149                    0 Pages TS / B 3.3-150 and TS / B 3.3-151              1 Pages TS / B 3.3-152 through TS / B 3.3-154          2 Page TS / B 3.3-155                                  1 Pages TS / B 3.3-156 through TS / B 3.3-158          2 Pages TS / B 3.3-159 through TS / B 3.3-162          1 Page TS / B 3.3-163                                  2 Pages TS / B 3.3-164 and TS / B 3.3-165              1 Pages TS / B 3.3-166 and TS / B 3.3-167              2 TS/BLOES-4            Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA      - UNIT 11          TS / B LOES-4          Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                              Revision Pages TS / B 3.3-168 and TS / B 3.3-169              1 Page TS / B 3.3-170                                2 Pages TS / B 3.3-171 through TS / B 3.3-177          1 Pages TS / B 3.3-178 through TS / B 3.3-179a        2 Pages TS / B 3.3-179b and TS / B 3.3-179c          0 Page TS / B 3.3-180                                  1 Page TS / B 3.3-181                                3 Page TS / B 3.3-182                                  1 Page TS / B 3.3-183                                2 Page TS / B 3.3-184                                1 Page TS / B 3.3-185                                4 Page TS / B 3.3-186                                  1 Pages TS / B 3.3-187 and TS / B 3.3-188            2 Pages TS / B 3.3-189 through TS / B 3.3-191        1 Page TS / B 3.3-192                                0 Page TS / B 3.3-193                                1 Pages TS / B 3.3-194 and TS / B 3.3-195            0 Page TS / B 3.3-196                                2 Pages TS / B 3.3-197 through TS / B 3.3-204        0 Page TS / B 3.3-205                                1 Pages B 3.3-206 through B 3.3-209                  0 Page TS / B 3.3-210                                1 Pages B 3.3-211 through B 3.3-219                  0 B 3.4    REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2                          0 Pages TS / B 3.4-3 and Page TS / B 3.4-4            4 Page TS / B 3.4-5                                  3 Pages TS / B 3.4-6 through TS / B 3.4-9              2 Page TS / B 3.4-10                                  1 Pages TS / 3.4-11 and TS / B 3.4-12                  0 Page TS / B 3.4-13                                  1 Page TS / B 3.4-14                                  0 Page TS / B 3.4-15                                  2 Pages TS / B 3.4-16 and TS / B 3.4-17                4 Page TS / B 3.4-18                                  2 Pages B 3.4-19 through B 3.4-27                      0 Pages TS / B 3.4-28 through TS / B 3.4-30            1 Page TS / B 3.4-31                                  0 Pages TS / B 3.4-32 and TS / B 3.4-33                1 Page TS / B 3.4-34                                  0 Pages TS / B 3.4-35 and TS / B 3.4-36                1 Page TS / B 3.4-37                                  2 Page TS / B 3.4-38                                  1 SUSQUEHANNA      - UNIT 1            TS / B LOES-5        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Pages B 3.4-39 and B 3.4-40                          0 Page TS / B 3.4-41                                  1 Pages B 3.4-42 through B 3.4-48                      0 Page TS / B 3.4-49                                  3 Page TS / B 3.4-50                                  1 Page TS / B 3.4-51                                  3 Page TS / B 3.4-52                                  2 Page TS / B 3.4-53                                  1 Pages TS / B 3.4-54 through TS / B 3.4-56            2 Page TS / B 3.4-57                                  3 Pages TS / B 3.4-58 through TS / B 3.4-60            1 B 3.5    ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2                            0 Page TS / B 3.5-3                                    2 Page TS / B 3.5-4                                    1 Page TS / B 3.5-5                                    2 Page TS / B 3.5-6                                    1 Pages B 3.5-7 through B 3.5-10                      0 Page TS / B 3.5-11                                  1 Page TS / B 3.5-12                                  0 Page TS / B 3.5-13                                  1 Pages TS / B 3.5-14 and TS / B 3.5-15                0 Pages TS / B 3.5-16 through TS / B 3.5-18            1 Pages B 3.5-19 through B 3.5-24                      0 Page TS / B 3.5-25 through TS / B 3.5-27            1 Page TS / B 3.5-28                                  0 Page TS / B 3.5-29                                  1 Pages TS / B 3.5-30 and TS / B 3.5-31                0 B 3.6    CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1                                    2 Page TS / B 3.6-1a                                  3 Page TS / B 3.6-2                                    4 Page TS / B 3.6-3                                    3 Page TS / B 3.6-4                                    4 Pages TS / B 3.6-5 and TS / B 3.6-6                  3 Page TS / B 3.6-6a                                  2 Page TS / B 3.6-6b                                  3 Page TS / B 3.6-6c                                  0 Page B 3.6-7                                        0 Page B 3.6-8                                        1 Pages B 3.6-9 through B 3.6-14                      0 Page TS / B 3.6-15                                  2 Page TS / B 3.6-15a                                  0 Page TS / B 3.6-15b                                  2 1          Revision 104 TS /UNIT SUSQUEHANNA - UNIT 1SUSQUEHANNATS/BLOES-6 B LOES-6        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Pages TS / B 3.6-16 and TS / B 3.6-17                1 Page TS / B 3.6-17a                                  0 Pages TS / B 3.6-18 and TS / B 3.6-19                0 Page TS / B 3.6-20                                  1 Page TS / B 3.6-21                                  2 Page TS / B 3.6-22                                  1 Page TS / B 3.6-22a                                  0 Page TS / B 3.6-23                                  1 Pages TS I B 3.6-24 and TS / B 3.6-25                0 Pages TS / B 3.6-26 and TS / B 3.6-27                2 Page TS / B 3.6-28                                  7 Page TS / B 3.6-29                                  2 Page TS / B 3.6-30                                  1 Page TS / B 3.6-31                                  3 Pages TS / B 3.6-32 and TS / B 3.6-33                1 Pages TS / B 3.6-34 and TS / B 3.6-35                0 Page TS / B 3.6-36                                  1 Page TS / B 3.6-37                                  0 Page TS / B 3.6-38                                  3 Page TS / B 3.6-39                                  2 Page TS / B 3.6-40                                  6 Page B 3.6-41                                        1 Pages B 3.6-42 and B 3.6-43                          3 Pages TS / B 3.6-44 and TS / B 3.6-45                1 Page TS / B 3.6-46                                  2 Pages TS / B 3.6-47 through TS / B 3.6-51            1 Page TS / B 3.6-52                                  2 Pages TS / B 3.6-53 through TS / B 3.6-56            0 Page TS / B 3.6-57                                  1 Page TS / 3.6-58                                    2 Pages B 3.6-59 through B 3.6-63                      0 Pages TS / B 3.6-64 and TS / B 3.6-65                1 Pages B 3.6-66 through B 3.6-69                      0 Pages TS / B 3.6-70 through TS / B 3.6-72            1 Page TS / B 3.6-73                                  2 Pages TS / B 3.6-74 and TS / B 3.6-75                1 Pages B 3.6-76 and B 3.6-77                          0 Page TS / B 3.6-78                                  1 Pages B 3.6-79 through B 3.3.6-83                    0 Page TS / B 3.6-84                                  4 Page TS / B 3.6-85                                  2 Page TS / B 3.6-86                                  4 TSIB  LOES-7        Revision 104 SUSQUEHANNA - UNIT UNIT 11          TS / B LOES-7        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Pages TS / B 3.6-87 through TS I B 3.6-88a            2 Page TS / B 3.6-89                                    4 Page TS / B 3.6-90                                    2 Page TS / B 3.6-91                                    3 Pages TS / B 3.6-92 and TS / B 3.6-93                2 Pages TS / B 3.6-94 through TS / B 3.6-96            1 Page TS / B 3.6-97                                    2 Pages TS / B 3.6-98 and TS / B 3.6-99                1 Page TS / B 3.6-100                                  4 Page TS / B 3.6-100a                                  1 Page TS / B 3.6-100b                                  0 Pages TS / B 3.6-101 and TS / B 3.6-102              1 Pages TS / B 3.6-103 and TS / B 3.6-104              2 Page TS / B 3.6-105                                  3 Page TS / B 3.6-106                                  2 Page TS / B 3.6-107                                  3 B 3.7    PLANT SYSTEMS BASES Pages TS I B 3.7-1                                    3 Page TS / B 3.7-2                                    4 Pages TS / B 3.7-3 through TS / B 3.7-5              3 Page TS / B 3.7-5a                                    1 Page TS / B 3.7-6                                    3 Page TS / B 3.7-6a                                    2 Page TS / B 3.7-6b                                    1 Page TS /B 3.7-6c                                    2 Page TS / B 3.7-7                                    3 Page TS B3.7-8                                        2 Pages TS / B 3.7-9 through TS / B 3.7-11              1 Pages TS / B 3.7-12 and TS / B 3.7-13                2 Pages TS / B 3.7-14 through TS / B 3.7-18            3 Page TS / B 3.7-18a                                  1 Pages TS I B 3.7-18b through TS / B 3.7-18e          0 Pages TS / B 3.7-19 through TS / B 3.7-23            1 Page TS / B 3.7-24                                    1 Pages TS / B 3.7-25 and TS / B 3.7-26                0 Pages TS / B 3.7-27 through TS I B 3.7-29            5 Page TS / B 3.7-30                                    2 Page TS / B 3.7-31                                    1 Page TS / B 3.7-32                                    0 Page TS / B 3.7-33                                    1 Pages TS / B 3.7-34 through TS I B 3.7-37            0 TS/BLOES-8            Revision 104 SUSQUEHANNA SUSQUEHANNA - UNIT
                - UNIT 11          TS / B LOES-8        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision B 3.8    ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1                                    3 Pages TS / B 3.8-2 and TS / B 3.8-3                  2 Page TS / B 3.8-4                                    3 Pages TS I B 3.8-4a and TS / B 3.8-4b                0 Page TS / B 3.8-5                                    5 Page TS / B 3.8-6                                    3 Pages TS / B 3.8-7 through TS/B 3.8-8                2 Page TS / B 3.8-9                                    4 Page TS / B 3.8-10                                    3 Pages TS / B 3.8-11 and TS / B 3.8-17                2 Page TS/ B 3.8-18                                    3 Pages TS / B 3.8-19 through TS / B 3.8-21            2 Pages TS / B 3.8-22 and TS / B 3.8-23                3 Pages TS / B 3.8-24 through TS / B 3.8-37            2 Pages B 3.8-38 through B 3.8-44                      0 Page TS / B 3.8-45                                    1 Pages TS / B 3.8-46 through TS / B 3.8-48            0 Pages TS / B 3.8-49 through TS / B 3.8-51            1 Page TS / B 3.8-52                                    0 Page TS / B 3.8-53                                    1 Pages TS / B 3.8-54 through TS / B 3.8-57            2 Pages TS / B 3.8-58 through TS / B 3.8-61            3 Pages TS / B 3.8-62 and TS / B 3.8-63                5 Page TS / B 3.8-64                                    4 Page TS / B 3.8-65                                    5 Pages TS / B 3.8-66 through TS / B 3.8-77            1 Pages TS / B 3.8-77A through TS / B 3.8-77C          0 Pages B 3.8-78 through B 3.8-80                      0 Page TS / B 3.8-81                                    1 Pages B 3.8-82 through B 3.8-90                      0 B 3.9    REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-1a                  1 Pages TS / B 3.9-2 through TS / B 3.9-5              1 Pages TS / B 3.9-6 through TS / B 3.9-8              0 Pages B 3.9-9 through B 3.9-18                        0 Pages TS / B 3.9-19 through TS / B 3.9-21            1 Pages B 3.9-22 through B 3.9-30                      0 TS/BLOES-9            Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA      - UNIT 11          TS / B LOES-9        Revision 104
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section        Title                                            Revision B 3.10          SPECIAL OPERATIONS BASES Page TS / B 3.10-1                              2 Pages TS / B 3.10-2 through TS / B 3.10-5        1 Pages B 3.10-6 through B.3.10-31                0 Page TS / B 3.10-32                              2 Page B 3.10-33                                  0 Page TS / B 3.10-34                              1 Pages B 3.10-35 and B 3.10-36                    0 Page TS / B 3.10-37                              1 Page TS / B 3.10-38                              2 TSBI Text LOES.doc 3/16/2012 SUSQUEHANNA - UNIT 1                        TS / B LOES-10    Revision 104
PPL Rev. 8 Secondary Containment B 3.6.4.1 B 3.6    CONTAINMENT SYSTEMS B 3.6.4.1  Secondary Containment BASES BACKGROUND        The secondary containment structure completely encloses the primary containment structure such that a dual-containment design is utilized to limit the spread of radioactivity to the environment to within limits. The function of the secondary containment is to contain, dilute, and hold up fission products that may leak from primary containment into secondary containment following a Design Basis Accident (DBA). In conjunction with operation of the Standby Gas Treatment (SGT) System and closure of certain valves whose lines penetrate the secondary containment, the secondary containment is designed to reduce the activity level of the fission products prior to release to the environment and to isolate and contain fission products that are released during certain operations that take place inside primary containment, when primary containment is not required to be OPERABLE, or that take place outside primary containment (Ref. 1).
The secondary containment is a structure that completely encloses the primary containment and reactor coolant pressure boundary components.
This structure forms a control volume that serves to hold up and dilute the fission products. It is possible for the pressure in the control volume to rise relative to the environmental pressure (e.g., due to pump and motor heat load additions).
The secondary containment boundary consists of the reactor building structure and associated removable walls and panels, hatches, doors, dampers, sealed penetrations and valves. Certain plant piping systems (e.g., Service Water, RHR Service Water, Emergency Service Water, Feedwater, etc.) penetrate the secondary containment boundary. The intact piping within secondary containment provides a passive barrier which maintains secondary containment requirements. Breaches of these piping systems within secondary containment will be controlled to maintain secondary containment requirements. The secondary containment is divided into Zone I, Zone II and Zone Ill, each of which must be OPERABLE depending on plant status and the alignment of the secondary containment boundary. Specifically, the Unit 1 secondary containment boundary can be modified to exclude Zone I1. Similarly, the Unit 2 secondary containment boundary can be modified to exclude Zone I. Secondary containment may consist of only Zone III when in MODE 4 or 5 during CORE ALTERATIONS, or during handling of irradiated fuel within the Zone III secondary containment boundary.
(continued)
SUSQUEHANNA-UNIT 1                        TS / B 3.6-84                                Revision 4
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES BACKGROUND    To prevent ground level exfiltration while allowing the secondary (continued)  containment to be designed as a conventional structure, the secondary containment requires support systems to maintain the control volume pressure at less than the external pressure. Requirements for the safety related systems are specified separately in LCO 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)," and LCO 3.6.4.3, "Standby Gas Treatment (SGT) System." When one or more zones are excluded from secondary containment, the specific requirements for support systems will also change (e.g., required secondary containment isolation valves).
APPLICABLE    There are two principal accidents for which credit is taken for secondary SAFETY        containment OPERABILITY. These are a loss of coolant accident (LOCA)
ANALYSES      (Ref. 2) and a fuel handling accident inside secondary containment (Ref. 3). The secondary containment performs no active function in response to either of these limiting events; however, its leak tightness is required to ensure that the release of radioactive materials from the primary containment is restricted to those leakage paths and associated leakage rates assumed in the accident analysis and that fission products entrapped within the secondary containment structure will be treated by the SGT System prior to discharge to the environment.
Secondary containment satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).
LCO            An OPERABLE secondary containment provides a control volume into which fission products that bypass or leak from primary containment, or are released from the reactor coolant pressure boundary components located in secondary containment, can be diluted and processed prior to release to the environment. For the secondary containment to be considered OPERABLE, it must have adequate leak tightness to ensure that the required vacuum can be established and maintained. The leak tightness of secondary containment must also ensure that the release of radioactive materials to the environment is restricted to those leakage paths and associated leakage rates assumed in the accident analysis. For example, secondary containment bypass leakage must be restricted to the leakage rate required by LCO 3.6.1.3. The secondary containment boundary required to be OPERABLE is dependent on the operating status of both units, as well as the configuration of walls, doors, hatches, SCIVs, and available flow paths to the SGT System.
(continued)
SUSQUEHANNA - UNIT 1                TS / B 3.6-85                                Revision 2
PPL Rev. 8 Secondary  Containment B 3.6.4.1 BASES (continued)
APPLICABILITY      In MODES 1, 2, and 3, a LOCA could lead to a fission product release to primary containment that leaks to secondary containment. Therefore, secondary containment OPERABILITY is required during the same operating conditions that require primary containment OPERABILITY.
In MODES 4 and 5, the probability and consequences of the LOCA are reduced due to the pressure and temperature limitations in these MODES.
Therefore, maintaining secondary containment OPERABLE is not required in MODE 4 or 5 to ensure a control volume, except for other situations for which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during CORE ALTERATIONS, or during movement of irradiated fuel assemblies in the secondary containment.
ACTIONS            A.1 If secondary containment is inoperable, it must be restored to OPERABLE status within 4 hours. The 4 hour Completion Time provides a period of time to correct the problem that is commensurate with the importance of maintaining secondary containment during MODES 1, 2, and 3. This time period also ensures that the probability of an accident (requiring secondary containment OPERABILITY) occurring during periods where secondary containment is inoperable is minimal.
A temporary (one-time) Completion Time is connected to the Completion Time Requirements above (4 hours) with an "OR" connector. The Temporary Completion Time is 48 hours and applies to the replacement of the Reactor Building Recirculating Fan Damper Motors. The Temporary Completion Time of 48 hours may only be used once, and expires on December 31, 2005.
B.1 and B.2 If secondary containment cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
(continued)
SUSQUEHANNA - UNIT 1                    TS / B 3.6-86                                  Revision 4
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES ACTIONS        C.1, C.2, and C.3 (continued)
Movement of irradiated fuel assemblies in the secondary containment, CORE ALTERATIONS, and OPDRVs can be postulated to cause fission product release to the secondary containment. In such cases, the secondary containment is the only barrier to release of fission products to the environment. CORE ALTERATIONS and movement of irradiated fuel assemblies must be immediately suspended if the secondary containment is inoperable.
Suspension of these activities shall not preclude completing an action that involves moving a component to a safe position. Also, action must be immediately initiated to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release.
Actions must continue until OPDRVs are suspended.
Required Action C.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.
SURVEILLANCE    SR 3.6.4.1.1 REQUIREMENTS This SR ensures that the secondary containment boundary is sufficiently leak tight to preclude exfiltration under expected wind conditions. Expected wind conditions are defined as sustained wind speeds of less than or equal to 16 mph at the 60m meteorological tower or less than or equal to 11 mph at the 1Om meteorological tower if the 60m tower wind speed is not available. Changes in indicated reactor building differential pressure observed during periods of short-term wind speed gusts above these sustained speeds do not by themselves impact secondary containment integrity. However, if secondary containment integrity is known to be compromised, the LCO must be entered regardless of wind speed.
(continued)
SUSQUEHANNA  - UNIT 1                  TS / B 3.6-87                                Revision 2
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE    SR 3.6.4.1.1 (continued)
REQUIREMENTS The 24 hour Frequency of this SR was developed based on operating experience related to secondary containment vacuum variations during the applicable MODES and the low probability of a DBA occurring between surveillances.
Furthermore, the 24 hour Frequency is considered adequate in view of other indications available in the control room, including alarms, to alert the operator to an abnormal secondary containment vacuum condition.
SR 3.6.4.1.2 and SR 3.6.4.1.3 Verifying that secondary containment equipment hatches, removable walls and one access door in each access opening required to be closed are closed ensures that the infiltration of outside air of such a magnitude as to prevent maintaining the desired negative pressure does not occur.
Verifying that all such openings are closed also provides adequate assurance that exfiltration from the secondary containment will not occur.
In this application, the term "sealed" has no connotation of leak tightness.
An access opening typically contains one inner and one outer door.
Maintaining secondary containment OPERABILITY requires verifying one door in each access opening to secondary containment zones is closed.
In some cases (e.g., railroad bay), secondary containment access openings are shared such that a secondary containment barrier may have multiple inner or multiple outer doors. The intent is to maintain the secondary containment barrier intact, which is achieved by maintaining the inner or outer portion of the barrier closed at all times. However, all secondary containment access doors are normally kept closed, except when the access opening is being used for entry and exit or when maintenance is being performed on an access opening.
When the railroad bay door (No. 101) is closed; all Zone I and III hatches, removable walls, dampers, and one door in each access opening connected to the railroad access bay are closed; or, only Zone I removable walls and/or doors are open to the railroad access shaft; or, only Zone III hatches and/or dampers are open to the railroad access shaft. When the railroad bay door (No. 101) is open; all Zone I and III hatches, removable walls, dampers, and one door in each access opening connected to the railroad access bay are closed. The truck bay hatch is closed and the truck bay door (No. 102) is closed unless Zone II is isolated from Zones I and III.
(continued)
SUSQUEHANNA  - UNIT 1                  TS /B 3.6-88                                Revision 2
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE  SR 3.6.4.1.2 and SR 3.6.4.1.3 (continued)
REQUIREMENTS When an access opening between required secondary containment zones is being used for exit and entry, then at least one door (where two doors are provided) must remain closed. The access openings between secondary containment zones which are not provided with two doors are administratively controlled to maintain secondary containment integrity during exit and entry. This Surveillance is modified by a Note that allows access openings with a single door (i.e., no airlock) within the secondary containment boundary (i.e., between required secondary containment zones) to be opened for entry and exit. Opening of an access door for entry and exit allows sufficient administrative control by individual personnel making the entries and exits to assure the secondary containment function is not degraded. When one of the zones is not a zone required for secondary containment OPERABILITY, the Note allowance would not apply.
The 31 day Frequency for these SRs has been shown to be adequate, based on operating experience, and is considered adequate in view of the other indications of door and hatch status that are available to the operator.
(continued)
SUSQUEHANNA - UNIT 1                TS / B 3.6-88a                                Revision 2
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE        SR 3.6.4.1.4 and SR 3.6.4.1.5 REQUIREMENTS (continued)        The SGT System exhausts the secondary containment atmosphere to the environment through appropriate treatment equipment. To ensure that all fission products are treated, SR 3.6.4.1.4 verifies that the SGT System will rapidly establish and maintain a pressure in the secondary containment that is less than the pressure external to the secondary containment boundary. This is confirmed by demonstrating that one SGT subsystem will draw down the secondary containment to _>0.25 inches of vacuum water gauge in less than or equal to the maximum time allowed. This cannot be accomplished if the secondary containment boundary is not intact. SR 3.6.4.1.5 demonstrates that one SGT subsystem can maintain
                      > 0.25 inches of vacuum water gauge for at least 1 hour at less than or equal to the maximum flow rate permitted for the secondary containment configuration that is operable. The 1 hour test period allows secondary containment to be in thermal equilibrium at steady state conditions. As noted, both SR 3.6.4.1.4 and SR 3.6.4.1.5 acceptance limits are dependent upon the secondary containment configuration when testing is being performed. The acceptance criteria for the SRs based on secondary containment configuration is defined as follows:
SECONDARY              MAXIMUM DRAWDOWN TIME(SEC)            MAXIMUM FLOW RATE (CFM)
CONTAINMENT                        (SR 3.6.4.1.4                      (SR 3.6.4.1.5 TEST CONFIGURATION              ACCEPTANCE CRITERIA)                ACCEPTANCE CRITERIA)
Zones 1,11and III.                < 300 Seconds                *4000 CFM (Zones 1,11,and III)        (From Zones 1,11,and III)
Zones I and III.                  < 300 Seconds
* 2885 CFM (Zones I and III)            (From Zones I and 11)
(continued)
SUSQUEHANNA - UNIT 1                        TS / B 3.6-89                                  Revision 4
PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE  SR 3.6.4.1.4 and SR 3.6.4.1.5 (continued)
REQUIREMENTS Only one of the above listed configurations needs to be tested to confirm secondary containment OPERABILITY.
A Note also modifies the Frequency for each SR. This Note identifies that each configuration is to be tested every 60 months. Testing each configuration every 60 months assures that the most limiting configuration is tested every 60 months. The 60 month Frequency is acceptable because operating experience has shown that these components usually pass the Surveillance and all active components are tested more frequently. Therefore, these tests are used to ensure secondary containment boundary integrity.
Since these SRs are secondary containment tests, they need not be performed with each SGT subsystem. The SGT subsystems are tested on a STAGGERED TEST BASIS, however, to ensure that in addition to the requirements of LCO 3.6.4.3, either SGT subsystem will perform SR 3.6.4.1.4 and SR 3.6.4.1.5. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES    1. FSAR, Section 6.2.3.
: 2. FSAR, Section 15.6.
: 3. FSAR, Section 15.7.4.
: 4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 1                TS / B 3.6-90                              Revision 2
PPL Rev..4 SCIVs B 3.6.4.2 3.6      CONTAINMENT SYSTEMS B 3.6.4.2  Secondary Containment Isolation Valves (SCIVs)
BASES BACKGROUND      The function of the SCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Ref. 1). Secondary containment isolation within the time limits specified for those isolation valves designed to close automatically ensures that fission products that leak from primary containment into secondary containment following a DBA, or that are released during certain operations when primary containment is not required to be OPERABLE or take place outside primary containment, are maintained within the secondary containment boundary.
The OPERABILITY requirements for SCIVs help ensure that an adequate secondary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. These isolation devices consist of either passive devices or active (automatic) devices. Manual valves or dampers, de-activated automatic valves or dampers secured in their closed position (including check valves with flow through the valve secured), and blind flanges are considered passive devices.
Automatic SCIVs close on a secondary containment isolation signal to establish a boundary for untreated radioactive material within secondary containment following a DBA or other accidents.
Other non-sealed penetrations which cross a secondary containment boundary are isolated by the use of valves in the closed position or blind flanges.
APPLICABLE      The SCIVs must be OPERABLE to ensure the secondary containment SAFETY          barrier to fission product releases is established. The principal accidents for ANALYSES        which the secondary containment boundary is required are a loss of coolant accident (Ref. 1) and a fuel handling accident inside secondary containment (Ref. 2). The secondary containment performs no active function in response to either of these limiting events, but the boundary (continued)
SUSQUEHANNA - UNIT 1                    TS / B 3.6-91                              Revision 3
PPL Rev. 4 SCIVs B 3.6.4.2 BASES APPLICABLE    established by SCIVs is required to ensure that leakage from the primary SAFETY        containment is processed by the Standby Gas Treatment (SGT) System ANALYSES      before being released to the environment.
(continued)
Maintaining SCIVs OPERABLE with isolation times within limits ensures that fission products will remain trapped inside secondary containment so that they can be treated by the SGT System prior to discharge to the environment.
SCIVs satisfy Criterion 3 of the NRC Policy Statement (Ref. 3).
LCO            SCIVs that form a part of the secondary containment boundary are required to be OPERABLE. Depending on the configuration of the secondary containment only specific SCIVs are required. The SCIV safety function is related to control of offsite radiation releases resulting from DBAs.
The automatic isolation valves are considered OPERABLE when their isolation times are within. limits and the valves actuate on an automatic isolation signal. The valves covered by this LCO, along with their associated stroke times, are listed in Table B 3.6.4.2-1.
The normally closed isolation valves or blind flanges are considered OPERABLE when manual valves are closed or open in accordance with appropriate administrative controls, automatic SCIVs are deactivated and secured in their closed position, or blind flanges are in place. These passive isolation valves or devices are listed in Table B3.6.4.2-2. Penetrations closed with sealants are considered part of the secondary containment boundary and are not considered penetration flow paths.
Certain plant piping systems (e.g., Service Water, RHR Service Water, Emergency Service Water, Feedwater, etc.) penetrate the secondary containment boundary. The intact piping within secondary containment provides a passive barrier which maintains secondary containment requirements. During certain plant evolutions, these piping systems may be drained and breached within secondary containment. During the pipe breach, system isolation valves will be used to provide secondary containment isolation. The isolation valve alignment will be controlled when the piping system is breached. The appropriate SCIV LCO shall be entered.
(continued)
SUSQUEHANNA  -  UNIT 1                TS / B 3.6-92                                Revision 2
PPL Rev. 4 SCIVs B 3.6.4.2 BASES (continued)
APPLICABILITY    In MODES 1, 2, and 3, a DBA could lead to a fission product release to the primary containment that leaks to the secondary containment. Therefore, the OPERABILITY of SCIVs is required.
In MODES 4 and 5, the probability and consequences of these events are reduced due to pressure and temperature limitations in these MODES.
Therefore, maintaining SCIVs OPERABLE is not required in MODE 4 or 5, except for other situations under which significant radioactive releases can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during CORE ALTERATIONS, or during movement of irradiated fuel assemblies in the secondary containment.
Moving irradiated fuel assemblies in the secondary containment may also occur in MODES 1, 2, and 3.
ACTIONS        The ACTIONS are modified by three Notes. The first Note allows penetration flow paths to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator, who is in continuous communication with the control room, at the controls of the isolation device. In this way, the penetration can be rapidly isolated when a need for secondary containment isolation is indicated.
The second Note provides clarification that for the purpose of this LCO separate Condition entry is allowed for each penetration flow path. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable SCIV. Complying with the Required Actions may allow for continued operation, and subsequent inoperable SCIVs are governed by subsequent Condition entry and application of associated Required Actions.
The third Note ensures appropriate remedial actions are taken, if necessary, if the affected system(s) are rendered inoperable by an inoperable SCIV.
A.1 and A.2 In the event that there are one or more required penetration flow paths with one required SCIV inoperable, the affected penetration flow path(s) must be isolated. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic SCIV, a closed manual valve, and a blind flange. For penetrations isolated in (continued)
SUSQUEHANNA    -  UNIT 1                TS / B 3.6-93                                  Revision 2
PPL Rev., 4 SCIVs B 3.6.4.2 BASES ACTIONS    A.1 and A.2 (continued) accordance with Required Action A. 1, the device used to isolate the penetration should be the closest available device to secondary containment. The Required Action must be completed within the 8 hour Completion Time. The specified time period is reasonable considering the time required to isolate the penetration, and the probability of a DBA, which requires the SCIVs to close, occurring during this short time is very low.
For affected penetrations that have been isolated in accordance with Required Action A.1, the affected penetration must be verified to be isolated on a periodic basis. This is necessary to ensure that secondary containment penetrations required to be isolated following an accident, but no longer capable of being automatically isolated, will be in the isolation position should an event occur. The Completion Time of once per 31 days is appropriate because the valves are operated under administrative controls and the probability of their misalignment is low. This Required Action does not require any testing or device manipulation. Rather, it involves verification that the affected penetration remains isolated.
Condition A is modified by a Note indicating that this Condition is only applicable to those penetration flow paths with two SCIVs. For penetration flow paths with one SCIV, Condition C provides the appropriate Required Actions.
Required Action A.2 is modified by a Note that applies to devices located in high radiation areas and allows them to be verified closed by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted.
Therefore, the probability of misalignment, once they have been verified to be in the proper position, is low.
B.1 With two SCIVs in one or more penetration flow paths inoperable, the affected penetration flow path must be isolated within 4 hours. The method of isolation must (continued)
SUSQUEHANNA-UNIT 1                  TS / B 3.6-94                                Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS    B.1 (continued) include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. The 4 hour Completion Time is reasonable considering the time required to isolate the penetration and the probability of a DBA, which requires the SCIVs to close, occurring during this short time, is very low.
The Condition has been modified by a Note stating that Condition B is only applicable to penetration flow paths with two.isolation valves. For penetration flow paths with one SCIV, Condition C provides the appropriate Required Actions.
C.1 and C.2 With one or more required penetration flow paths with one required SCIV inoperable, the inoperable valve must be restored to OPERABLE status or the affected penetration flow path must be isolated. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. A check valve may not be used to isolate the affected penetration. Required Action C.1 must be completed within the 4 hour Completion Time. The Completion Time of 4 hours is reasonable considering the relative stability of the system (hence, reliability) to act as a penetration isolation boundary and the relative importance of supporting secondary containment OPERABILITY during MODES 1, 2, and 3.
In the event the affected penetration flow path is isolated in accordance with Required Action C.1, the affected penetration must be verified to be isolated on a periodic basis. This is necessary to ensure that secondary containment penetrations required to be isolated following an accident are isolated.
The Completion Time of once per 31 days for verifying each affected penetration is isolated is appropriate because the (continued)
SUSQUEHANNA-UNIT 1                TS / B 3.6-95                                    Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS      C.1 and C.2 (continued) valves are operated under administrative controls and the probability of their misalignment is low.
Condition C is modified by a Note indicating that this Condition is only applicable to penetration flow paths with only one SCIV. For penetration flow paths with two SCIVs, Conditions A and B provide the appropriate Required Actions.
Required Action C.2 is modified by a Note that applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted.
Therefore, the probability of misalignment of these valves, once they have been verified to be in the proper position, is low.
D.1 and D.2 If any Required Action and associated Completion Time cannot be met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
E.1, E.2, and E.3 If any Required Action and associated Completion Time are not met, the plant must be placed in a condition in which the LCO does not apply. If applicable, CORE ALTERATIONS and the movement of irradiated fuel assemblies in the secondary containment must be immediately suspended.
Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, actions must be immediately initiated to suspend OPDRVs in order to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until OPDRVs are suspended.
(continued)
SUSQUEHANNA -  UNIT 1                TS / B 3.6-96                                Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS          E.1, E.2, and E.3 (continued)
Required Action E.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving fuel while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.
SURVEILLANCE    SR 3.6.4.2.1 REQUIREMENTS This SR verifies that each secondary containment manual isolation valve and blind flange that is required to be closed during accident conditions is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the secondary containment boundary is within design limits. This SR does not require any testing or valve manipulation.
Rather, it involves verification (typically visual) that those required SCIVs in secondary containment that are capable of being mispositioned are in the correct position.
Since these SCIVs are readily accessible to personnel during normal operation and verification of their position is relatively easy, the 31 day Frequency was chosen to provide added assurance that the SCIVs are in the correct positions.
Two Notes have been added to this SR. The first Note applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these SCIVs, once they have been verified to be in the proper position, is low.
A second Note has been included to clarify that SCIVs that are open under administrative controls are not required to meet the SR during the time the SCIVs are open.
(continued)
SUSQUEHANNA  - UNIT 1                TS / B 3.6-97                                  Revision 2
PPL Rev. 4 SCIVs B 3.6.4.2 BASES SURVEILLANCE  SR 3.6.4.2.2 REQUIREMENTS (continued)  SCIVs with maximum isolation times specified in Table B 3.6.2.4-1 are tested every 92 days to verify that the isolation time is within limits to demonstrate OPERABILITY. Automatic SCIVs without maximum isolation times specified in Table B 3.6.4.2-1 are tested under the requirements of SR 3.6.4.2.3. The isolation time test ensures that the SCIV will isolate in a time period less than or equal to that assumed in the safety analyses.
SR 3.6.4.2.3 Verifying that each automatic required SCIV closes on a secondary containment isolation signal is required to prevent leakage of radioactive material from secondary containment following a DBA or other accidents.
This SR ensures that each automatic SCIV will actuate to the isolation position on a secondary containment isolation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.2.5 overlaps this SR to provide complete testing of the safety function. The 24 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if
  -(                the Surveillance were performed with the reactor at power. Operating 10                  experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES    1. FSAR, Section 6.2.
: 2. FSAR, Section 15.
: 3. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
0 SUSQUEHANNA - UNIT 1                TS / B 3.6-98                                  Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-1 Secondary Containment Ventilation System Automatic Isolation Dampers (Page 1 of 1)
Reactor                                                                              Maximum Reactor  Valve Number            Valve Description            Type of Valve          Isolation Building                                                                                Time Zone                                                                                (Seconds)
I    HD-17586 A&B    Supply System Dampers          Automatic Isolation Damper      10.0 I    HD-17524 A&B    Filtered Exhaust System Dampers Automatic Isolation Damper      10.0 I    HD-17576A&B    Unfiltered Exhaust System      Automatic Isolation Damper      10.0 HD-27586 A&B    Supply System Dampers          Automatic Isolation Damper      10.0 II  HD-27524 A&B    Filtered Exhaust System Dampers Automatic Isolation Damper      10.0 II  HD-27576 A&B    Unfiltered Exhaust System      Automatic Isolation Damper      10.0 III  HD-17564 A&B    Supply System Dampers          Automatic Isolation Damper      14.0 III  HD-1 7514 A&B  Filtered Exhaust System Dampers Automatic Isolation Damper      6.5 III  HD-17502 A&B    Unfiltered Exhaust System      Automatic Isolation Damper      6.0 Ill  HD-27564 A&B    Supply System Dampers          Automatic Isolation Damper      14.0 III  HD-27514 A&B    Filtered Exhaust System Dampers Automatic Isolation Damper      6.5 III  HD-27502 A&B    Unfiltered Exhaust System      Automatic Isolation Damper      6.0 N/A    HD-17534A      Zone 3 Airlock 1-606            Automatic Isolation Damper      N/A N/A    HD-17534B      Zone 3 Airlock 1-611            Automatic Isolation Damper      N/A N/A    HD-17534C      Zone 3 Airlock 1-707            Automatic Isolation Damper      N/A N/A    HD-17534D      Zone 3 Airlock 1-803            Automatic Isolation Damper      N/A N/A    HD-17534E      Zone 3 Airlock 1-805            Automatic Isolation Damper      N/A N/A    HD-17534F      Zone 3 Airlock 1-617            Automatic Isolation Damper      N/A N/A    HD-17534H    Zone 3 Airlock 1-618            Automatic Isolation Damper      N/A N/A    HD-27534A      Zone 3 Airlock 11-606          Automatic Isolation Damper      N/A N/A    HD-27534C      Zone 3 Airlock 11-707          Automatic Isolation Damper      N/A N/A    HD-27534D    Zone 3 Airlock 11-803            Automatic Isolation Damper      N/A N/A    HD-27534E      Zone 3 Airlock 11-805          Automatic Isolation Damper      N/A N/A    HD-27534G    Zone 3 Airlock C-806            Automatic Isolation Damper      N/A N/A    HD-27534H      Zone 3 Airlock 11-618          Automatic Isolation Damper      N/A N/A    HD-275341    Zone 3 Airlock 11-609            Automatic Isolation Damper      N/A SUSQUEHANNA - UNIT 1                      TS / B 3.6-99                              Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 1 of 3)
Device Number    IArea/ElevI            Device Description                  1 .1      Required Position        Notes X-29-2-44    SDHR System to Fuel Pool Cooling                            Yard/670  Blind Flanged / Note 1 X-29-2-45    SDHR System to Fuel Pool Cooling                            Yard/670  Blind Flanged / Note 1 110176      SDHR Supply Drain Vlv                                        29/670 Closed Manual Iso Valve/ Note 1I 110186,      SDHR Discharge Drain VIv                                      29/670 Closed Manual iso Valve / Note 1 110180      SDHR Supply Vent VIv                                          29/749 Closed Manual Iso Valve / Note 1I 110181      SDHR Discharge Fill VIv                                      27/749 Closed Manual Iso Valve/ Note 1 110182      SDHR Discharge Vent VIv                                      27/749 Closed Manaul Iso Valve / Note 1 110187      SDHR Supply Fill VIv                                          29/749 Closed Manual Iso Valve / Note 1 210186      SDHR Supply Drain VIv                                        33/749 Closed Manual Iso Valve / Note 1 210187      SDHR Supply Vent Vlv                                        33/749  Closed Manual Iso Valve / Note I 210191      SDHR Discharge Vent Vlv                                      30/749  Closed Manual Iso Valve / Note 1 210192      SDHR Discharge Drain VIv                                    30/749  Closed Manual Iso Valve / Note 1 210193      SDHR Discharge Vent VIv                                      33/749  Closed Manual Iso Valve / Note 1 X-29-2-46    Temporary Chiller to RBCW                                  Yard/670 Blind Flanged / Note 2 X-29-2-47    Temporary Chiller to RBCW                                  Yard/670 Blind Flanged / Note 2 X-29-5-95    Temporary Chiller to Unit 1 RBCW                            29/749  Blind Flanged / Note 2 X-29-5-96    Temporary Chiller to Unit 1 RBCW                            29/749  Blind Flanged / Note 2 X-29-5-91    Temporary Chiller to Unit 2 RBCW                            33/749  Blind Flanged / Note 2 X-29-5-92    Temporary Chiller to Unit 2 RBCW                            33/749  Blind Flanged / Note 2 187388      RBCW Temp Chiller Discharge Iso Vlv                          29/670  Closed Manual iso Valve / Note 2 187389      RBCW Temp Chiller Supply Iso VIv                            29/670  Closed Manual Iso Valve / Note 2 187390      RBCW Temp Chiller Supply Drain Vlv                          29/670  Closed Manual iso Valve / Note 2 187391      RBCW Temp Chiller Discharge Drain Vlv                        29/670  Closed Manual Iso Valve / Note 2 X-28-2-3000  Utility Penetration to Unit 1 East Stairwell                Yard/670 Blind Flanged X-29-2-48    Utility Penetration to Unit 1 RR Bay                        Yard/670 Capped X-33-2-3000  Utility Penetration to Unit 2 East Stairwell                Yard/670 Blind Flanged X-28-2-3000  Utility Penetration to Unit 1 East Stairwell                28/670  Blind Flanged X-29-2-48    Utility Penetration to Unit 1 RR Bay                        29/670  Capped X-33-2-3000  Utility Penetration to Unit 2 East Stairwell                33/670  Blind Flanged X-29-3-54    Utility Penetration to Unit 1 RBCCW Hx Area                  27/683  Blind Flanged X-29-3-55    Utility Penetration to Unit 1 RBCCW Hx Area                  27/683  Blind Flanged X-29-5-97    Utility Penetration from Unit I RR Bay to Unit 2 Elev. 749  33/749  Capped X-27-6-42    Diamond Plate Cover over Floor Penetration                  27/779' Installed X-27-6-92    Instrument Tubing Stubs                                      27/779' Capped X-29-7-4    1" Spare Conduit Threaded Plug                              29/818' Installed X-30-6-72    Instrument Tubing Stubs                                      30/779' Capped X-30-6-1002  Stairwell #214 Rupture Disc                                  30/779' Installed Intact X-30-6-1003  Airlock 11-609 Rupture Disc                                  30/779' Installed Intact SUSQUEHANNA        -  UNIT 1                        TS / B 3.6-100                                    Revision 4
PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 2 of 3)
Device Numbe NubrDevice                          Description              Area/Elev iRequired Position / Notes X-25-6-1008  Airlock 1-606 Rupture Disc                              25/779'    Installed Intact X-29-4-102    Penetration at Door 433                                29/719'    Blind Flange Installed X-29-4-103    Penetration at Door 433                                29/719'    Blind Flange Installed X-29-4-102    Penetration at Door 433                                33/719'    Blind Flange Installed X-29-4-103    Penetration at Door 433                                33/719'    Blind Flange Installed 1S2104        N2 Purge Line to U1 Containment Spectacle Flange        29/683'    Blind Side Installed 2S2104        N2 Purge Line to U2 Containment Spectacle Flange        34/672'    Blind Side Installed XD-1 7513    Isolation damper for Railroad Bay Zone Ill HVAC Supply  29/799'    Position is dependent on Railroad Bay alignment XD-1 7514    Isolation damper for Railroad Bay Zone IIIHVAC Exhaust  29/719'    Position is dependent on Railroad Bay alignment XD-1 2301    PASS Air Flow Damper                                    11/729'  Closed Damper XD-22301      PASS Air Flow Damper                                    22/729'    Closed Damper 161827        HPCI Blowout Steam Vent Drain Valve                    25/645'    Closed Manual Isolation Valve 161828      RCIC Blowout Steam Vent Drain Valve                      28/645'    Closed Manual Isolation Valve 161829      'A' RHR Blowout Steam Vent Drain Valve                  29/645'    Closed Manual Isolation Valve 161830      'B' RHR Blowout Steam Vent Drain Valve                  28/645'    Closed Manual Isolation Valve 261820        RCIC Blowout Steam Vent Drain Valve                    33/645'    Closed Manual Isolation Valve 261821      'A' RHR Blowout Steam Vent Drain Valve                  34/645'    Closed Manual Isolation Valve 261822      'B' RHR Blowout Steam Vent Drain Valve                  33/645'    Closed Manual Isolation Valve SUSQUEHANNA - UNIT 1                              TS / B 3.6-1 00a                                    Revision 1
PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 3 of 3)
Device.                              Device Description                          Area/Elev          Required Position I Number                                                                                                        Notes
                      .1                                                              1              I.
f                                                              i              i.
Note 1: The two blind flanges on the SDHR penetrations (blind flanges for device number X-29-2-44 and X-29-2-45) and all the closed manual valves for the SDHR system (110176,110186, 110180,110181, 110182,110187, 210186, 210187, 210191, 210192, 210193) can each be considered as a separate secondary containment isolation device for the SDHR penetrations. If one or both of the blind flanges is removed and all the above identified manual valves for the SDHR system are closed, the appropriate LCO should be entered for one inoperable SCIV in a penetration flow path with two SCIVs. With the blind flange removed, the manual valves could be opened intermittently under administrative controls per the Technical Specification Note. When both SDHR blind flanges are installed, opening of the manual valves for the SDHR system will be controlled to prevent cross connecting ventilation zones. When the manual valves for the SDHR system are open in this condition, the appropriate LCO should be entered for one inoperable SCIV in a penetration flow path with two SCIVs.
Note 2: Due to the multiple alignments of the RBCW temporary chiller, different devices will perform the SCIV function depending on the RBCW configuration. There are three devices/equipment that can perform the SCIV function for the RBCW temporary chiller supply penetration. The first SCIV for the RBCW temporary chiller supply penetration is the installed blind flange on penetration X-29-2-47. The second SCIV for the RBCW temporary chiller supply penetration is isolation valve 187389. The third SCIV for the temporary RBCW chiller supply penetration is closed vent valve 187391 and either an installed blind flange on penetrations X-29-5-92 and/or X-29-5-96, or an installed temporary RBCW hose between flange X-29-5-92 and the permanent RBCW piping; and/or and installed temporary RBCW hose between flange X-29-5-96 and the permanent RBCW piping. Removal of one of the above SCIVs requires entry into the appropriate LCO for one inoperable SCIV in a penetration flow path with two SCIVs. Opening of vent valve 187391 and operation of blank flanges X-29-5-96 and X-29-5-92 will be controlled to prevent cross connecting ventilation zones.
There are three devices/equipment that can perform the SCIV function for the RBCW temporary chiller return penetration. The first SCIV for the RBCW temporary chiller return penetration is the installed blind flange on penetration X-29-2-46. The second SCIV for the RBCW temporary chiller return penetration is isolation valve 187388. The third SCIV for the temporary RBCW chiller return penetration is closed vent valve 187390 and either an installed blind flange on penetrations X-29-5-91 and/or X-29-5-95, or an installed temporary RBCW hose between flange X-29-5-91 and the permanent RBCW piping; and/or and installed temporary RBCW hose between flange X-29-5-95 and the permanent RBCW piping. Removal of one of the above SCIVs requires entry into the appropriate LCO for one inoperable SCIV in a penetration flow path with two SCIVs. Opening of vent valve 187390 and operation of blank flanges X-29-5-91 and X-29-5-95 will be controlled to prevent cross connecting ventilation zones.
SUSQUEHANNA                - UNIT 1                      TS / B 3.6-1 00b                                                Revision 0}}

Latest revision as of 16:21, 6 February 2020

Technical Specification Bases Manual
ML12101A102
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/27/2012
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2012-16434
Download: ML12101A102 (40)


Text

M-ii. 2), 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-16434 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 03/27/2012 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSBI - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 01/18/2012 ADD MANUAL TABLE OF CONTENTS DATE: 03/26/2012 CATEGORY: DOCUMENTS TYPE: TSBl ko ý 0,ja

,I Mar. 2'7, 2L£2 Page 2 of 2 ID: TEXT 3.6.4.1 REMOVE: REV:7 ADD: REV: 8 CATEGORY: DOCUMENTS TYPE: TSBl ID: TEXT 3.6.4.2 ADD: REV: 4 REMOVE: REV:3 CATEGORY: DOCUMENTS TYPE: TSBl ID: TEXT LOES ADD: REV: 104 REMOVE: REV:103 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date: 03/26 /2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 104 03/26/2012

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 20 09/01/2010

Title:

TABLE OF CONTENTS TEXT 2.1.1 5 05/06/2009

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 1 10/04/2007< "

Title:

SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE S TEXT 3.0 3 , 08/20/2009

Title:

LIMITING CONDITION FOR/0PERATION (LCO) APPLICABILITY TEXT 3. 1. 1 1 . 04/18/2006

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)

TEXT 3.1.2 , 0 11/15/2002

Title:

REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 04/18/2006

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL I

Page 1 of 8 Report Date: 03/27/12

SSES MANUAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.1.7 3 04/23/2008

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 04/23/2008

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 3 05/06/2009

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 2 04/23/2008

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)

TEXT 3.3.1.1 4 04/23/2008

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 2 01/19/2009

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 3 04/23/2008

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 04/05/2010

Title:

INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 8 10/27/2008

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 04/23/2008

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION Page 2 of 8 Report Date: 03/27/12

SSES M~dANUJAL Manual Name: TSB1.

Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.2 0 11/15/2002

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 3 08/20/2009

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/15/2002

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 04/23/2008

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 2 12/17/2007

Title:

- INSTRIý=FNTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/15/2002

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 04/27/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 04/27/2010

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012

Title:

REACTOR COOLANT SYSTEM RCS SAFETY RELIEF VALVES S/RVS TEXT 3.4.4 0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 03/27/12 Page 33 -of

-of 88 Report Date: 03/27/12

SSES MANU1TAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.5 1 01/16/2006

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 01/25/2011

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.10

- COLD SHUTDOWN 3

RESIDUAL HEAT REMOVAL 04/23/2008 (RHR) 0 SHUTDOWN COOLING SYSTEM

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/15/2002

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 2 01/16/2006

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/15/2002

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 2 07/09/2010

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 4 11/09/2011

Title:

PRIMARY CONTAINMENT TEXT 3.6.1.2 1 04/23/2008

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date: 03/27/12 4

Page 4 of of 88 Report Date: 03/27/12

SSES MANUAL~

Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.3 9 04/14/2010

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

LDCN 3092 TEXT 3.6.1.4 1 04/23/2008

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/15/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 04/23/2008

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/15/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSIoON POOL COOLING TEXT 3.6.2.4 0 11/15/2002

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/15/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 8 03/26/2012

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Report Date: 03/27/12 Page~

Page 5 of of .88 Report Date:'03/27/12

SSES MANUAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.4.2 4 03/26/2012

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 4 09/21/2006

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7. 1 4 04/05/2010

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 2 02/11/2009

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/15/2002

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 10/04/2007

Title:

PLANT SYSTEMS MAIN CONDENSER OFPGkS TEXT 3.7.6 .2 04/23/2008

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 0 04/23/2008

Title:

PLANT SYSTEMS TEXT 3.8.1 6 05/06/2009

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 0 11/15/2002

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN Report Date: 03/27/12 Pagei Page 6 of of 88 Report Date: 03/27/12

SSES MANUAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.3 2 04/14/2010

Title:

ELECTRICAL POWER SYSTPEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 3 01/19/2009

Title:

ELECTRICAL POWER SYST'EMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006

Title:

ELECTRICAL POWER SYS= PEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006

Title:

ELECTRICAL POWER SYS= FEMS BATTERY CELL PARAMETERS TEXT 3.8.7 1 10/05/2005

Title:

ELECTRICAL POWER SYSTFEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/15/2002

Title:

ELECTRICAL POWER SYS=PEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/15/2002

Title:

REFUELING )PERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 09/01/2010

Title:

REFUELING C)PERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/15/2002

Title:

REFUELING C)PERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/15/2002

Title:

REFUELING )PERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/15/2002

Title:

REFUELING C)PERATIONS CONTROL ROD 'OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007

Title:

REFUELING C)PERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Pae f8RprtDt:0/71 Page 7 of 8 Report Date: 03/27/12

SSES MANUAL Manual Name: TSB1 Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.7 0 11/15/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/15/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/15/2002

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/15/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/15/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/15/2002

Title:

SPECIAL OPE1RATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/15/2002

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL -. REFUELING TEXT 3.10.7 1 04/18/2006,

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 1 '04/12/2006

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 03/27/12 Pages Page 8 of of 8 8 Report Date: 03/27/12

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision TOC Table of Contents 20 B 2.0 SAFETY LIMITS BASES Page B 2.0-1 0 Page TS / B 2.0-2 3 Page TS / B 2.0-3 5 Page TS / B 2.0-4 3 Page TS / B 2.0-5 5 Page TS / B 2.0-6 1 Pages TS / B 2.0-7 through TS / B 2.0-9 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 I21 Pages TS / B 3.0-5 through TS / B 3.0-7 3,

Page TS / B 3.0-8 Pages TS / B 3.0-9 through TS / B 3.0-11 2 Page TS / B 3.0-11 a 0 Page TS / B 3.0-12 -, 1 3.0,415*>-

Pages TS / B 3.0-13 through TS / B 2 Pages TS / B 3.0-16 and TS / B 3.0-i1,7 \-.) 0 B 3.1 PFAf-TI\/ITY r.nKITPrnI PA':Fq P.-

Pages B 3.1-1 through B3--,1.-4 0 Page TS / B 131-5' 1 Pages TSi/IBN37116-and TS / B 3.1-7 2 Pages B,3.1-8'through B 3.1-13 0 Page\ST)/ B 3.1-14 1 Page B 3.1-15 0 Page TS / B 3.1-16 Pages B 3.1-17 through B 3.1-19 1 Pages TS / B 3.1-20 and TS / B 3.1-21 Page TS / B 3.1-22 0 01 Page TS / B 3.1-23 Page TS / B 3.1-24 1 2

Pages TS / B 3.1-25 through TS / B 3.1-27 0 2

Page TS / B 3.1-28 Page TS / B 3.1-29 1 0

Pages B 3.1-30 through B 3.1-33 1

Pages TS / B 3.3-34 through TS / B 3.3-36 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 0

Page TS / B 3.1-40a Pages TS / B 3.1-41 and TS / B 3.1-42 2 TSIBLOES-1 Revision 104 SUSQUEHANNA-UNITi SUSQUEHANNA - UNIT 1 TS / B LOES-1 ' Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.1.43 1 Page TS / B 3.1-44 0 Page TS / B 3.1-45 3 Pages TS / B 3.1-46 through TS / B 3.1-49 1 Page TS / B 3.1-50 0 Page TS / B 3.1-51 3 B 3.2 POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 2 Pages TS / B 3.2-2 and TS / B 3.2-3 3 Pages TS / B 3.2-4 and TS / B 3.2-5 2 Page TS / B 3.2-6 3 Page B 3.2-7 1 Pages TS / B 3.2-8 and TS / B 3.2-9 3 Page TS / B 3.2.10 2 Page TS / B 3.2-11 3 Page TS / B 3.2-12 1 Page TS / B 3.2-13 2 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS /B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-7a 1 Page TS / B 3.3-8 4 Pages TS / B 3.3-9 through TS /B 3.3-12 3 Pages TS / B 3.3-12a 1 Pages TS / B 3.3-12b and TS / B 3.3-12c 0 Page TS / B 3.3-13 1 Page TS / B 3.3-14 3 Pages TS / B 3.3-15 and TS / B 3.3-16 1 Pages TS / B 3.3-17 and TS / B 3.3-18 4 Page TS / B 3.3-19 1 Pages TS / B 3.3-20 through TS / B 3.3-22 2 Page TS / B 3.3-22a 0 Pages TS / B 3.3-23 and TS / B 3.3-24 2 Pages TS / B 3.3-24a and TS / B 3.3-24b 0 Page TS / B 3.3-25 3 Page TS / B 3.3-26 2 Page TS / B 3.3-27 1 Pages TS / B 3.3-28 through TS IB 3.3-30 3 Page TS / B 3.3-30a 0 TS/BLOES-2 Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 1 1 TS / B LOES-2 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-31 4 Page TS / B 3.3-32 5 Pages TS / B 3.3-32a 0 Page TS / B 3.3-32b 1

.Page TS / B 3.3-33 5 Page TS / B 3.3-33a 0 Page TS / B 3.3-34 1 Pages TS / B 3.3-35 and TS / B 3.3-36 2 Pages TS / B 3.3-37 and TS / B 3.3-38 1 Page TS / B 3.3-39 2 Pages TS / B 3.3-40 through TS / B 3.3-43 1 Page TS / B 3.3-44 4 Pages TS / B 3.3-44a and TS / B 3.3-44b 0 Page TS / B 3.3-45 3 Pages TS / B 3.3-45a and TS / B 3.3-45b 0 Page TS / B 3.3-46 3 Pages TS / B 3.3-47 o 2 Pages TS / B 3.3-48 through TS / B 3.3-51 3 Pages TS / B 3.3-52 and TS / B 3.3-53 2 Page TS / B 3-3-53a 0 Page TS / B 3.3-54 4 Page TS / B 3.3-55 2 Pages TS / B3.3-56 and TS / B 3.3-57 1 Page TS / B 3.3-58 0 Page TS / B 3.3-59 1 Page TS / B 3.3-60 0 Page TS / B 3.3-61 1 Pages TS / B 3.3-62 and TS / B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS / B 3.3-69 5 Pages TS / B 3.3-70 4 Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Page TS / B 3.3-75a 6 Page TS / B 3.3-75b 7 Page TS / B 3.3-75c 5 SUSQUEHANNA - UNIT 1 TS I B LOES-3 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages B 3.3-76 through 3.3-77 0 Page TS / B 3.3-78 1 Pages B3.3-79 through B 3.3-81 0 Page B 3.3-82 1 Page B 3.3-83 0 Pages B 3.3-84 and B 3.3-85 1 Page B 3.3-86 0 Page B 3.3-87 1 Page B 3.3-88 0 Page B 3.3-89 1 Page TS / B 3.3-90 1 Page B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-100 1 Pages TS / B 3.3-101 through TS / B 3.3-103 0 Page TS / B 3.3-104 2 Pages TS / B 3.3-105 and TS / B 3.3-106 0 Page TS / B 3.3-107 1 Page TS / B 3.3-108 0 Page TS / B 3.3-109 1 Pages TS / B 3.3-110 and TS / B 3.3-111 0 Pages TS / B 3.3-112 and TS / B 3.3-112a 1 Pages TS / B 3.3-113 through TS / B 3.3-115 1 Page TS / B 3.3-116 3 Page TS / B 3.3-117 1 Pages TS / B 3.3-118 through TS / B 3.3-122 0 Pages TS / B 3.3-123 and TS / B 3.3-124 1 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 0 Pages TS / B 3.3-126 and TS / B 3.3-127 1 Pages TS / B 3.3-128 through TS/ B 3.3-130 0 Page TS / B 3.3-131 1 Pages TS / B 3.3-132 through TS / B 3.3-134 0 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS / B 3.3-150 and TS / B 3.3-151 1 Pages TS / B 3.3-152 through TS / B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS / B 3.3-162 1 Page TS / B 3.3-163 2 Pages TS / B 3.3-164 and TS / B 3.3-165 1 Pages TS / B 3.3-166 and TS / B 3.3-167 2 TS/BLOES-4 Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 11 TS / B LOES-4 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.3-168 and TS / B 3.3-169 1 Page TS / B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Pages TS / B 3.3-178 through TS / B 3.3-179a 2 Pages TS / B 3.3-179b and TS / B 3.3-179c 0 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 4 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS / B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 2 Pages TS / B 3.3-197 through TS / B 3.3-204 0 Page TS / B 3.3-205 1 Pages B 3.3-206 through B 3.3-209 0 Page TS / B 3.3-210 1 Pages B 3.3-211 through B 3.3-219 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0 Pages TS / B 3.4-3 and Page TS / B 3.4-4 4 Page TS / B 3.4-5 3 Pages TS / B 3.4-6 through TS / B 3.4-9 2 Page TS / B 3.4-10 1 Pages TS / 3.4-11 and TS / B 3.4-12 0 Page TS / B 3.4-13 1 Page TS / B 3.4-14 0 Page TS / B 3.4-15 2 Pages TS / B 3.4-16 and TS / B 3.4-17 4 Page TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-27 0 Pages TS / B 3.4-28 through TS / B 3.4-30 1 Page TS / B 3.4-31 0 Pages TS / B 3.4-32 and TS / B 3.4-33 1 Page TS / B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page TS / B 3.4-38 1 SUSQUEHANNA - UNIT 1 TS / B LOES-5 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Page TS / B 3.4-50 1 Page TS / B 3.4-51 3 Page TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 through TS / B 3.4-56 2 Page TS / B 3.4-57 3 Pages TS / B 3.4-58 through TS / B 3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0 Page TS / B 3.5-3 2 Page TS / B 3.5-4 1 Page TS / B 3.5-5 2 Page TS / B 3.5-6 1 Pages B 3.5-7 through B 3.5-10 0 Page TS / B 3.5-11 1 Page TS / B 3.5-12 0 Page TS / B 3.5-13 1 Pages TS / B 3.5-14 and TS / B 3.5-15 0 Pages TS / B 3.5-16 through TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Page TS / B 3.5-25 through TS / B 3.5-27 1 Page TS / B 3.5-28 0 Page TS / B 3.5-29 1 Pages TS / B 3.5-30 and TS / B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Page TS / B 3.6-2 4 Page TS / B 3.6-3 3 Page TS / B 3.6-4 4 Pages TS / B 3.6-5 and TS / B 3.6-6 3 Page TS / B 3.6-6a 2 Page TS / B 3.6-6b 3 Page TS / B 3.6-6c 0 Page B 3.6-7 0 Page B 3.6-8 1 Pages B 3.6-9 through B 3.6-14 0 Page TS / B 3.6-15 2 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 2 1 Revision 104 TS /UNIT SUSQUEHANNA - UNIT 1SUSQUEHANNATS/BLOES-6 B LOES-6 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.6-16 and TS / B 3.6-17 1 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 0 Page TS / B 3.6-20 1 Page TS / B 3.6-21 2 Page TS / B 3.6-22 1 Page TS / B 3.6-22a 0 Page TS / B 3.6-23 1 Pages TS I B 3.6-24 and TS / B 3.6-25 0 Pages TS / B 3.6-26 and TS / B 3.6-27 2 Page TS / B 3.6-28 7 Page TS / B 3.6-29 2 Page TS / B 3.6-30 1 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 and TS / B 3.6-33 1 Pages TS / B 3.6-34 and TS / B 3.6-35 0 Page TS / B 3.6-36 1 Page TS / B 3.6-37 0 Page TS / B 3.6-38 3 Page TS / B 3.6-39 2 Page TS / B 3.6-40 6 Page B 3.6-41 1 Pages B 3.6-42 and B 3.6-43 3 Pages TS / B 3.6-44 and TS / B 3.6-45 1 Page TS / B 3.6-46 2 Pages TS / B 3.6-47 through TS / B 3.6-51 1 Page TS / B 3.6-52 2 Pages TS / B 3.6-53 through TS / B 3.6-56 0 Page TS / B 3.6-57 1 Page TS / 3.6-58 2 Pages B 3.6-59 through B 3.6-63 0 Pages TS / B 3.6-64 and TS / B 3.6-65 1 Pages B 3.6-66 through B 3.6-69 0 Pages TS / B 3.6-70 through TS / B 3.6-72 1 Page TS / B 3.6-73 2 Pages TS / B 3.6-74 and TS / B 3.6-75 1 Pages B 3.6-76 and B 3.6-77 0 Page TS / B 3.6-78 1 Pages B 3.6-79 through B 3.3.6-83 0 Page TS / B 3.6-84 4 Page TS / B 3.6-85 2 Page TS / B 3.6-86 4 TSIB LOES-7 Revision 104 SUSQUEHANNA - UNIT UNIT 11 TS / B LOES-7 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.6-87 through TS I B 3.6-88a 2 Page TS / B 3.6-89 4 Page TS / B 3.6-90 2 Page TS / B 3.6-91 3 Pages TS / B 3.6-92 and TS / B 3.6-93 2 Pages TS / B 3.6-94 through TS / B 3.6-96 1 Page TS / B 3.6-97 2 Pages TS / B 3.6-98 and TS / B 3.6-99 1 Page TS / B 3.6-100 4 Page TS / B 3.6-100a 1 Page TS / B 3.6-100b 0 Pages TS / B 3.6-101 and TS / B 3.6-102 1 Pages TS / B 3.6-103 and TS / B 3.6-104 2 Page TS / B 3.6-105 3 Page TS / B 3.6-106 2 Page TS / B 3.6-107 3 B 3.7 PLANT SYSTEMS BASES Pages TS I B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 1 Page TS / B 3.7-6 3 Page TS / B 3.7-6a 2 Page TS / B 3.7-6b 1 Page TS /B 3.7-6c 2 Page TS / B 3.7-7 3 Page TS B3.7-8 2 Pages TS / B 3.7-9 through TS / B 3.7-11 1 Pages TS / B 3.7-12 and TS / B 3.7-13 2 Pages TS / B 3.7-14 through TS / B 3.7-18 3 Page TS / B 3.7-18a 1 Pages TS I B 3.7-18b through TS / B 3.7-18e 0 Pages TS / B 3.7-19 through TS / B 3.7-23 1 Page TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Pages TS / B 3.7-27 through TS I B 3.7-29 5 Page TS / B 3.7-30 2 Page TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 Pages TS / B 3.7-34 through TS I B 3.7-37 0 TS/BLOES-8 Revision 104 SUSQUEHANNA SUSQUEHANNA - UNIT

- UNIT 11 TS / B LOES-8 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 3 Pages TS / B 3.8-2 and TS / B 3.8-3 2 Page TS / B 3.8-4 3 Pages TS I B 3.8-4a and TS / B 3.8-4b 0 Page TS / B 3.8-5 5 Page TS / B 3.8-6 3 Pages TS / B 3.8-7 through TS/B 3.8-8 2 Page TS / B 3.8-9 4 Page TS / B 3.8-10 3 Pages TS / B 3.8-11 and TS / B 3.8-17 2 Page TS/ B 3.8-18 3 Pages TS / B 3.8-19 through TS / B 3.8-21 2 Pages TS / B 3.8-22 and TS / B 3.8-23 3 Pages TS / B 3.8-24 through TS / B 3.8-37 2 Pages B 3.8-38 through B 3.8-44 0 Page TS / B 3.8-45 1 Pages TS / B 3.8-46 through TS / B 3.8-48 0 Pages TS / B 3.8-49 through TS / B 3.8-51 1 Page TS / B 3.8-52 0 Page TS / B 3.8-53 1 Pages TS / B 3.8-54 through TS / B 3.8-57 2 Pages TS / B 3.8-58 through TS / B 3.8-61 3 Pages TS / B 3.8-62 and TS / B 3.8-63 5 Page TS / B 3.8-64 4 Page TS / B 3.8-65 5 Pages TS / B 3.8-66 through TS / B 3.8-77 1 Pages TS / B 3.8-77A through TS / B 3.8-77C 0 Pages B 3.8-78 through B 3.8-80 0 Page TS / B 3.8-81 1 Pages B 3.8-82 through B 3.8-90 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-1a 1 Pages TS / B 3.9-2 through TS / B 3.9-5 1 Pages TS / B 3.9-6 through TS / B 3.9-8 0 Pages B 3.9-9 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 TS/BLOES-9 Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 11 TS / B LOES-9 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2 Pages TS / B 3.10-2 through TS / B 3.10-5 1 Pages B 3.10-6 through B.3.10-31 0 Page TS / B 3.10-32 2 Page B 3.10-33 0 Page TS / B 3.10-34 1 Pages B 3.10-35 and B 3.10-36 0 Page TS / B 3.10-37 1 Page TS / B 3.10-38 2 TSBI Text LOES.doc 3/16/2012 SUSQUEHANNA - UNIT 1 TS / B LOES-10 Revision 104

PPL Rev. 8 Secondary Containment B 3.6.4.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.4.1 Secondary Containment BASES BACKGROUND The secondary containment structure completely encloses the primary containment structure such that a dual-containment design is utilized to limit the spread of radioactivity to the environment to within limits. The function of the secondary containment is to contain, dilute, and hold up fission products that may leak from primary containment into secondary containment following a Design Basis Accident (DBA). In conjunction with operation of the Standby Gas Treatment (SGT) System and closure of certain valves whose lines penetrate the secondary containment, the secondary containment is designed to reduce the activity level of the fission products prior to release to the environment and to isolate and contain fission products that are released during certain operations that take place inside primary containment, when primary containment is not required to be OPERABLE, or that take place outside primary containment (Ref. 1).

The secondary containment is a structure that completely encloses the primary containment and reactor coolant pressure boundary components.

This structure forms a control volume that serves to hold up and dilute the fission products. It is possible for the pressure in the control volume to rise relative to the environmental pressure (e.g., due to pump and motor heat load additions).

The secondary containment boundary consists of the reactor building structure and associated removable walls and panels, hatches, doors, dampers, sealed penetrations and valves. Certain plant piping systems (e.g., Service Water, RHR Service Water, Emergency Service Water, Feedwater, etc.) penetrate the secondary containment boundary. The intact piping within secondary containment provides a passive barrier which maintains secondary containment requirements. Breaches of these piping systems within secondary containment will be controlled to maintain secondary containment requirements. The secondary containment is divided into Zone I, Zone II and Zone Ill, each of which must be OPERABLE depending on plant status and the alignment of the secondary containment boundary. Specifically, the Unit 1 secondary containment boundary can be modified to exclude Zone I1. Similarly, the Unit 2 secondary containment boundary can be modified to exclude Zone I. Secondary containment may consist of only Zone III when in MODE 4 or 5 during CORE ALTERATIONS, or during handling of irradiated fuel within the Zone III secondary containment boundary.

(continued)

SUSQUEHANNA-UNIT 1 TS / B 3.6-84 Revision 4

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES BACKGROUND To prevent ground level exfiltration while allowing the secondary (continued) containment to be designed as a conventional structure, the secondary containment requires support systems to maintain the control volume pressure at less than the external pressure. Requirements for the safety related systems are specified separately in LCO 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)," and LCO 3.6.4.3, "Standby Gas Treatment (SGT) System." When one or more zones are excluded from secondary containment, the specific requirements for support systems will also change (e.g., required secondary containment isolation valves).

APPLICABLE There are two principal accidents for which credit is taken for secondary SAFETY containment OPERABILITY. These are a loss of coolant accident (LOCA)

ANALYSES (Ref. 2) and a fuel handling accident inside secondary containment (Ref. 3). The secondary containment performs no active function in response to either of these limiting events; however, its leak tightness is required to ensure that the release of radioactive materials from the primary containment is restricted to those leakage paths and associated leakage rates assumed in the accident analysis and that fission products entrapped within the secondary containment structure will be treated by the SGT System prior to discharge to the environment.

Secondary containment satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LCO An OPERABLE secondary containment provides a control volume into which fission products that bypass or leak from primary containment, or are released from the reactor coolant pressure boundary components located in secondary containment, can be diluted and processed prior to release to the environment. For the secondary containment to be considered OPERABLE, it must have adequate leak tightness to ensure that the required vacuum can be established and maintained. The leak tightness of secondary containment must also ensure that the release of radioactive materials to the environment is restricted to those leakage paths and associated leakage rates assumed in the accident analysis. For example, secondary containment bypass leakage must be restricted to the leakage rate required by LCO 3.6.1.3. The secondary containment boundary required to be OPERABLE is dependent on the operating status of both units, as well as the configuration of walls, doors, hatches, SCIVs, and available flow paths to the SGT System.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-85 Revision 2

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES (continued)

APPLICABILITY In MODES 1, 2, and 3, a LOCA could lead to a fission product release to primary containment that leaks to secondary containment. Therefore, secondary containment OPERABILITY is required during the same operating conditions that require primary containment OPERABILITY.

In MODES 4 and 5, the probability and consequences of the LOCA are reduced due to the pressure and temperature limitations in these MODES.

Therefore, maintaining secondary containment OPERABLE is not required in MODE 4 or 5 to ensure a control volume, except for other situations for which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during CORE ALTERATIONS, or during movement of irradiated fuel assemblies in the secondary containment.

ACTIONS A.1 If secondary containment is inoperable, it must be restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time provides a period of time to correct the problem that is commensurate with the importance of maintaining secondary containment during MODES 1, 2, and 3. This time period also ensures that the probability of an accident (requiring secondary containment OPERABILITY) occurring during periods where secondary containment is inoperable is minimal.

A temporary (one-time) Completion Time is connected to the Completion Time Requirements above (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) with an "OR" connector. The Temporary Completion Time is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and applies to the replacement of the Reactor Building Recirculating Fan Damper Motors. The Temporary Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> may only be used once, and expires on December 31, 2005.

B.1 and B.2 If secondary containment cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-86 Revision 4

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES ACTIONS C.1, C.2, and C.3 (continued)

Movement of irradiated fuel assemblies in the secondary containment, CORE ALTERATIONS, and OPDRVs can be postulated to cause fission product release to the secondary containment. In such cases, the secondary containment is the only barrier to release of fission products to the environment. CORE ALTERATIONS and movement of irradiated fuel assemblies must be immediately suspended if the secondary containment is inoperable.

Suspension of these activities shall not preclude completing an action that involves moving a component to a safe position. Also, action must be immediately initiated to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release.

Actions must continue until OPDRVs are suspended.

Required Action C.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

SURVEILLANCE SR 3.6.4.1.1 REQUIREMENTS This SR ensures that the secondary containment boundary is sufficiently leak tight to preclude exfiltration under expected wind conditions. Expected wind conditions are defined as sustained wind speeds of less than or equal to 16 mph at the 60m meteorological tower or less than or equal to 11 mph at the 1Om meteorological tower if the 60m tower wind speed is not available. Changes in indicated reactor building differential pressure observed during periods of short-term wind speed gusts above these sustained speeds do not by themselves impact secondary containment integrity. However, if secondary containment integrity is known to be compromised, the LCO must be entered regardless of wind speed.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-87 Revision 2

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.1 (continued)

REQUIREMENTS The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency of this SR was developed based on operating experience related to secondary containment vacuum variations during the applicable MODES and the low probability of a DBA occurring between surveillances.

Furthermore, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room, including alarms, to alert the operator to an abnormal secondary containment vacuum condition.

SR 3.6.4.1.2 and SR 3.6.4.1.3 Verifying that secondary containment equipment hatches, removable walls and one access door in each access opening required to be closed are closed ensures that the infiltration of outside air of such a magnitude as to prevent maintaining the desired negative pressure does not occur.

Verifying that all such openings are closed also provides adequate assurance that exfiltration from the secondary containment will not occur.

In this application, the term "sealed" has no connotation of leak tightness.

An access opening typically contains one inner and one outer door.

Maintaining secondary containment OPERABILITY requires verifying one door in each access opening to secondary containment zones is closed.

In some cases (e.g., railroad bay), secondary containment access openings are shared such that a secondary containment barrier may have multiple inner or multiple outer doors. The intent is to maintain the secondary containment barrier intact, which is achieved by maintaining the inner or outer portion of the barrier closed at all times. However, all secondary containment access doors are normally kept closed, except when the access opening is being used for entry and exit or when maintenance is being performed on an access opening.

When the railroad bay door (No. 101) is closed; all Zone I and III hatches, removable walls, dampers, and one door in each access opening connected to the railroad access bay are closed; or, only Zone I removable walls and/or doors are open to the railroad access shaft; or, only Zone III hatches and/or dampers are open to the railroad access shaft. When the railroad bay door (No. 101) is open; all Zone I and III hatches, removable walls, dampers, and one door in each access opening connected to the railroad access bay are closed. The truck bay hatch is closed and the truck bay door (No. 102) is closed unless Zone II is isolated from Zones I and III.

(continued)

SUSQUEHANNA - UNIT 1 TS /B 3.6-88 Revision 2

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.2 and SR 3.6.4.1.3 (continued)

REQUIREMENTS When an access opening between required secondary containment zones is being used for exit and entry, then at least one door (where two doors are provided) must remain closed. The access openings between secondary containment zones which are not provided with two doors are administratively controlled to maintain secondary containment integrity during exit and entry. This Surveillance is modified by a Note that allows access openings with a single door (i.e., no airlock) within the secondary containment boundary (i.e., between required secondary containment zones) to be opened for entry and exit. Opening of an access door for entry and exit allows sufficient administrative control by individual personnel making the entries and exits to assure the secondary containment function is not degraded. When one of the zones is not a zone required for secondary containment OPERABILITY, the Note allowance would not apply.

The 31 day Frequency for these SRs has been shown to be adequate, based on operating experience, and is considered adequate in view of the other indications of door and hatch status that are available to the operator.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-88a Revision 2

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.4 and SR 3.6.4.1.5 REQUIREMENTS (continued) The SGT System exhausts the secondary containment atmosphere to the environment through appropriate treatment equipment. To ensure that all fission products are treated, SR 3.6.4.1.4 verifies that the SGT System will rapidly establish and maintain a pressure in the secondary containment that is less than the pressure external to the secondary containment boundary. This is confirmed by demonstrating that one SGT subsystem will draw down the secondary containment to _>0.25 inches of vacuum water gauge in less than or equal to the maximum time allowed. This cannot be accomplished if the secondary containment boundary is not intact. SR 3.6.4.1.5 demonstrates that one SGT subsystem can maintain

> 0.25 inches of vacuum water gauge for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at less than or equal to the maximum flow rate permitted for the secondary containment configuration that is operable. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> test period allows secondary containment to be in thermal equilibrium at steady state conditions. As noted, both SR 3.6.4.1.4 and SR 3.6.4.1.5 acceptance limits are dependent upon the secondary containment configuration when testing is being performed. The acceptance criteria for the SRs based on secondary containment configuration is defined as follows:

SECONDARY MAXIMUM DRAWDOWN TIME(SEC) MAXIMUM FLOW RATE (CFM)

CONTAINMENT (SR 3.6.4.1.4 (SR 3.6.4.1.5 TEST CONFIGURATION ACCEPTANCE CRITERIA) ACCEPTANCE CRITERIA)

Zones 1,11and III. < 300 Seconds *4000 CFM (Zones 1,11,and III) (From Zones 1,11,and III)

Zones I and III. < 300 Seconds

  • 2885 CFM (Zones I and III) (From Zones I and 11)

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-89 Revision 4

PPL Rev. 8 Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.4 and SR 3.6.4.1.5 (continued)

REQUIREMENTS Only one of the above listed configurations needs to be tested to confirm secondary containment OPERABILITY.

A Note also modifies the Frequency for each SR. This Note identifies that each configuration is to be tested every 60 months. Testing each configuration every 60 months assures that the most limiting configuration is tested every 60 months. The 60 month Frequency is acceptable because operating experience has shown that these components usually pass the Surveillance and all active components are tested more frequently. Therefore, these tests are used to ensure secondary containment boundary integrity.

Since these SRs are secondary containment tests, they need not be performed with each SGT subsystem. The SGT subsystems are tested on a STAGGERED TEST BASIS, however, to ensure that in addition to the requirements of LCO 3.6.4.3, either SGT subsystem will perform SR 3.6.4.1.4 and SR 3.6.4.1.5. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.

REFERENCES 1. FSAR, Section 6.2.3.

2. FSAR, Section 15.6.
3. FSAR, Section 15.7.4.
4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).

SUSQUEHANNA - UNIT 1 TS / B 3.6-90 Revision 2

PPL Rev..4 SCIVs B 3.6.4.2 3.6 CONTAINMENT SYSTEMS B 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)

BASES BACKGROUND The function of the SCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Ref. 1). Secondary containment isolation within the time limits specified for those isolation valves designed to close automatically ensures that fission products that leak from primary containment into secondary containment following a DBA, or that are released during certain operations when primary containment is not required to be OPERABLE or take place outside primary containment, are maintained within the secondary containment boundary.

The OPERABILITY requirements for SCIVs help ensure that an adequate secondary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. These isolation devices consist of either passive devices or active (automatic) devices. Manual valves or dampers, de-activated automatic valves or dampers secured in their closed position (including check valves with flow through the valve secured), and blind flanges are considered passive devices.

Automatic SCIVs close on a secondary containment isolation signal to establish a boundary for untreated radioactive material within secondary containment following a DBA or other accidents.

Other non-sealed penetrations which cross a secondary containment boundary are isolated by the use of valves in the closed position or blind flanges.

APPLICABLE The SCIVs must be OPERABLE to ensure the secondary containment SAFETY barrier to fission product releases is established. The principal accidents for ANALYSES which the secondary containment boundary is required are a loss of coolant accident (Ref. 1) and a fuel handling accident inside secondary containment (Ref. 2). The secondary containment performs no active function in response to either of these limiting events, but the boundary (continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-91 Revision 3

PPL Rev. 4 SCIVs B 3.6.4.2 BASES APPLICABLE established by SCIVs is required to ensure that leakage from the primary SAFETY containment is processed by the Standby Gas Treatment (SGT) System ANALYSES before being released to the environment.

(continued)

Maintaining SCIVs OPERABLE with isolation times within limits ensures that fission products will remain trapped inside secondary containment so that they can be treated by the SGT System prior to discharge to the environment.

SCIVs satisfy Criterion 3 of the NRC Policy Statement (Ref. 3).

LCO SCIVs that form a part of the secondary containment boundary are required to be OPERABLE. Depending on the configuration of the secondary containment only specific SCIVs are required. The SCIV safety function is related to control of offsite radiation releases resulting from DBAs.

The automatic isolation valves are considered OPERABLE when their isolation times are within. limits and the valves actuate on an automatic isolation signal. The valves covered by this LCO, along with their associated stroke times, are listed in Table B 3.6.4.2-1.

The normally closed isolation valves or blind flanges are considered OPERABLE when manual valves are closed or open in accordance with appropriate administrative controls, automatic SCIVs are deactivated and secured in their closed position, or blind flanges are in place. These passive isolation valves or devices are listed in Table B3.6.4.2-2. Penetrations closed with sealants are considered part of the secondary containment boundary and are not considered penetration flow paths.

Certain plant piping systems (e.g., Service Water, RHR Service Water, Emergency Service Water, Feedwater, etc.) penetrate the secondary containment boundary. The intact piping within secondary containment provides a passive barrier which maintains secondary containment requirements. During certain plant evolutions, these piping systems may be drained and breached within secondary containment. During the pipe breach, system isolation valves will be used to provide secondary containment isolation. The isolation valve alignment will be controlled when the piping system is breached. The appropriate SCIV LCO shall be entered.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-92 Revision 2

PPL Rev. 4 SCIVs B 3.6.4.2 BASES (continued)

APPLICABILITY In MODES 1, 2, and 3, a DBA could lead to a fission product release to the primary containment that leaks to the secondary containment. Therefore, the OPERABILITY of SCIVs is required.

In MODES 4 and 5, the probability and consequences of these events are reduced due to pressure and temperature limitations in these MODES.

Therefore, maintaining SCIVs OPERABLE is not required in MODE 4 or 5, except for other situations under which significant radioactive releases can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during CORE ALTERATIONS, or during movement of irradiated fuel assemblies in the secondary containment.

Moving irradiated fuel assemblies in the secondary containment may also occur in MODES 1, 2, and 3.

ACTIONS The ACTIONS are modified by three Notes. The first Note allows penetration flow paths to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator, who is in continuous communication with the control room, at the controls of the isolation device. In this way, the penetration can be rapidly isolated when a need for secondary containment isolation is indicated.

The second Note provides clarification that for the purpose of this LCO separate Condition entry is allowed for each penetration flow path. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable SCIV. Complying with the Required Actions may allow for continued operation, and subsequent inoperable SCIVs are governed by subsequent Condition entry and application of associated Required Actions.

The third Note ensures appropriate remedial actions are taken, if necessary, if the affected system(s) are rendered inoperable by an inoperable SCIV.

A.1 and A.2 In the event that there are one or more required penetration flow paths with one required SCIV inoperable, the affected penetration flow path(s) must be isolated. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic SCIV, a closed manual valve, and a blind flange. For penetrations isolated in (continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-93 Revision 2

PPL Rev., 4 SCIVs B 3.6.4.2 BASES ACTIONS A.1 and A.2 (continued) accordance with Required Action A. 1, the device used to isolate the penetration should be the closest available device to secondary containment. The Required Action must be completed within the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time. The specified time period is reasonable considering the time required to isolate the penetration, and the probability of a DBA, which requires the SCIVs to close, occurring during this short time is very low.

For affected penetrations that have been isolated in accordance with Required Action A.1, the affected penetration must be verified to be isolated on a periodic basis. This is necessary to ensure that secondary containment penetrations required to be isolated following an accident, but no longer capable of being automatically isolated, will be in the isolation position should an event occur. The Completion Time of once per 31 days is appropriate because the valves are operated under administrative controls and the probability of their misalignment is low. This Required Action does not require any testing or device manipulation. Rather, it involves verification that the affected penetration remains isolated.

Condition A is modified by a Note indicating that this Condition is only applicable to those penetration flow paths with two SCIVs. For penetration flow paths with one SCIV, Condition C provides the appropriate Required Actions.

Required Action A.2 is modified by a Note that applies to devices located in high radiation areas and allows them to be verified closed by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted.

Therefore, the probability of misalignment, once they have been verified to be in the proper position, is low.

B.1 With two SCIVs in one or more penetration flow paths inoperable, the affected penetration flow path must be isolated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The method of isolation must (continued)

SUSQUEHANNA-UNIT 1 TS / B 3.6-94 Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS B.1 (continued) include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time is reasonable considering the time required to isolate the penetration and the probability of a DBA, which requires the SCIVs to close, occurring during this short time, is very low.

The Condition has been modified by a Note stating that Condition B is only applicable to penetration flow paths with two.isolation valves. For penetration flow paths with one SCIV, Condition C provides the appropriate Required Actions.

C.1 and C.2 With one or more required penetration flow paths with one required SCIV inoperable, the inoperable valve must be restored to OPERABLE status or the affected penetration flow path must be isolated. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. A check valve may not be used to isolate the affected penetration. Required Action C.1 must be completed within the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time. The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable considering the relative stability of the system (hence, reliability) to act as a penetration isolation boundary and the relative importance of supporting secondary containment OPERABILITY during MODES 1, 2, and 3.

In the event the affected penetration flow path is isolated in accordance with Required Action C.1, the affected penetration must be verified to be isolated on a periodic basis. This is necessary to ensure that secondary containment penetrations required to be isolated following an accident are isolated.

The Completion Time of once per 31 days for verifying each affected penetration is isolated is appropriate because the (continued)

SUSQUEHANNA-UNIT 1 TS / B 3.6-95 Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS C.1 and C.2 (continued) valves are operated under administrative controls and the probability of their misalignment is low.

Condition C is modified by a Note indicating that this Condition is only applicable to penetration flow paths with only one SCIV. For penetration flow paths with two SCIVs, Conditions A and B provide the appropriate Required Actions.

Required Action C.2 is modified by a Note that applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted.

Therefore, the probability of misalignment of these valves, once they have been verified to be in the proper position, is low.

D.1 and D.2 If any Required Action and associated Completion Time cannot be met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

E.1, E.2, and E.3 If any Required Action and associated Completion Time are not met, the plant must be placed in a condition in which the LCO does not apply. If applicable, CORE ALTERATIONS and the movement of irradiated fuel assemblies in the secondary containment must be immediately suspended.

Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, actions must be immediately initiated to suspend OPDRVs in order to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until OPDRVs are suspended.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-96 Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 BASES ACTIONS E.1, E.2, and E.3 (continued)

Required Action E.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving fuel while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.

Therefore, in either case, inability to suspend movement of irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

SURVEILLANCE SR 3.6.4.2.1 REQUIREMENTS This SR verifies that each secondary containment manual isolation valve and blind flange that is required to be closed during accident conditions is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the secondary containment boundary is within design limits. This SR does not require any testing or valve manipulation.

Rather, it involves verification (typically visual) that those required SCIVs in secondary containment that are capable of being mispositioned are in the correct position.

Since these SCIVs are readily accessible to personnel during normal operation and verification of their position is relatively easy, the 31 day Frequency was chosen to provide added assurance that the SCIVs are in the correct positions.

Two Notes have been added to this SR. The first Note applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these SCIVs, once they have been verified to be in the proper position, is low.

A second Note has been included to clarify that SCIVs that are open under administrative controls are not required to meet the SR during the time the SCIVs are open.

(continued)

SUSQUEHANNA - UNIT 1 TS / B 3.6-97 Revision 2

PPL Rev. 4 SCIVs B 3.6.4.2 BASES SURVEILLANCE SR 3.6.4.2.2 REQUIREMENTS (continued) SCIVs with maximum isolation times specified in Table B 3.6.2.4-1 are tested every 92 days to verify that the isolation time is within limits to demonstrate OPERABILITY. Automatic SCIVs without maximum isolation times specified in Table B 3.6.4.2-1 are tested under the requirements of SR 3.6.4.2.3. The isolation time test ensures that the SCIV will isolate in a time period less than or equal to that assumed in the safety analyses.

SR 3.6.4.2.3 Verifying that each automatic required SCIV closes on a secondary containment isolation signal is required to prevent leakage of radioactive material from secondary containment following a DBA or other accidents.

This SR ensures that each automatic SCIV will actuate to the isolation position on a secondary containment isolation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.2.5 overlaps this SR to provide complete testing of the safety function. The 24 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if

-( the Surveillance were performed with the reactor at power. Operating 10 experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.

REFERENCES 1. FSAR, Section 6.2.

2. FSAR, Section 15.
3. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).

0 SUSQUEHANNA - UNIT 1 TS / B 3.6-98 Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-1 Secondary Containment Ventilation System Automatic Isolation Dampers (Page 1 of 1)

Reactor Maximum Reactor Valve Number Valve Description Type of Valve Isolation Building Time Zone (Seconds)

I HD-17586 A&B Supply System Dampers Automatic Isolation Damper 10.0 I HD-17524 A&B Filtered Exhaust System Dampers Automatic Isolation Damper 10.0 I HD-17576A&B Unfiltered Exhaust System Automatic Isolation Damper 10.0 HD-27586 A&B Supply System Dampers Automatic Isolation Damper 10.0 II HD-27524 A&B Filtered Exhaust System Dampers Automatic Isolation Damper 10.0 II HD-27576 A&B Unfiltered Exhaust System Automatic Isolation Damper 10.0 III HD-17564 A&B Supply System Dampers Automatic Isolation Damper 14.0 III HD-1 7514 A&B Filtered Exhaust System Dampers Automatic Isolation Damper 6.5 III HD-17502 A&B Unfiltered Exhaust System Automatic Isolation Damper 6.0 Ill HD-27564 A&B Supply System Dampers Automatic Isolation Damper 14.0 III HD-27514 A&B Filtered Exhaust System Dampers Automatic Isolation Damper 6.5 III HD-27502 A&B Unfiltered Exhaust System Automatic Isolation Damper 6.0 N/A HD-17534A Zone 3 Airlock 1-606 Automatic Isolation Damper N/A N/A HD-17534B Zone 3 Airlock 1-611 Automatic Isolation Damper N/A N/A HD-17534C Zone 3 Airlock 1-707 Automatic Isolation Damper N/A N/A HD-17534D Zone 3 Airlock 1-803 Automatic Isolation Damper N/A N/A HD-17534E Zone 3 Airlock 1-805 Automatic Isolation Damper N/A N/A HD-17534F Zone 3 Airlock 1-617 Automatic Isolation Damper N/A N/A HD-17534H Zone 3 Airlock 1-618 Automatic Isolation Damper N/A N/A HD-27534A Zone 3 Airlock 11-606 Automatic Isolation Damper N/A N/A HD-27534C Zone 3 Airlock 11-707 Automatic Isolation Damper N/A N/A HD-27534D Zone 3 Airlock 11-803 Automatic Isolation Damper N/A N/A HD-27534E Zone 3 Airlock 11-805 Automatic Isolation Damper N/A N/A HD-27534G Zone 3 Airlock C-806 Automatic Isolation Damper N/A N/A HD-27534H Zone 3 Airlock 11-618 Automatic Isolation Damper N/A N/A HD-275341 Zone 3 Airlock 11-609 Automatic Isolation Damper N/A SUSQUEHANNA - UNIT 1 TS / B 3.6-99 Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 1 of 3)

Device Number IArea/ElevI Device Description 1 .1 Required Position Notes X-29-2-44 SDHR System to Fuel Pool Cooling Yard/670 Blind Flanged / Note 1 X-29-2-45 SDHR System to Fuel Pool Cooling Yard/670 Blind Flanged / Note 1 110176 SDHR Supply Drain Vlv 29/670 Closed Manual Iso Valve/ Note 1I 110186, SDHR Discharge Drain VIv 29/670 Closed Manual iso Valve / Note 1 110180 SDHR Supply Vent VIv 29/749 Closed Manual Iso Valve / Note 1I 110181 SDHR Discharge Fill VIv 27/749 Closed Manual Iso Valve/ Note 1 110182 SDHR Discharge Vent VIv 27/749 Closed Manaul Iso Valve / Note 1 110187 SDHR Supply Fill VIv 29/749 Closed Manual Iso Valve / Note 1 210186 SDHR Supply Drain VIv 33/749 Closed Manual Iso Valve / Note 1 210187 SDHR Supply Vent Vlv 33/749 Closed Manual Iso Valve / Note I 210191 SDHR Discharge Vent Vlv 30/749 Closed Manual Iso Valve / Note 1 210192 SDHR Discharge Drain VIv 30/749 Closed Manual Iso Valve / Note 1 210193 SDHR Discharge Vent VIv 33/749 Closed Manual Iso Valve / Note 1 X-29-2-46 Temporary Chiller to RBCW Yard/670 Blind Flanged / Note 2 X-29-2-47 Temporary Chiller to RBCW Yard/670 Blind Flanged / Note 2 X-29-5-95 Temporary Chiller to Unit 1 RBCW 29/749 Blind Flanged / Note 2 X-29-5-96 Temporary Chiller to Unit 1 RBCW 29/749 Blind Flanged / Note 2 X-29-5-91 Temporary Chiller to Unit 2 RBCW 33/749 Blind Flanged / Note 2 X-29-5-92 Temporary Chiller to Unit 2 RBCW 33/749 Blind Flanged / Note 2 187388 RBCW Temp Chiller Discharge Iso Vlv 29/670 Closed Manual iso Valve / Note 2 187389 RBCW Temp Chiller Supply Iso VIv 29/670 Closed Manual Iso Valve / Note 2 187390 RBCW Temp Chiller Supply Drain Vlv 29/670 Closed Manual iso Valve / Note 2 187391 RBCW Temp Chiller Discharge Drain Vlv 29/670 Closed Manual Iso Valve / Note 2 X-28-2-3000 Utility Penetration to Unit 1 East Stairwell Yard/670 Blind Flanged X-29-2-48 Utility Penetration to Unit 1 RR Bay Yard/670 Capped X-33-2-3000 Utility Penetration to Unit 2 East Stairwell Yard/670 Blind Flanged X-28-2-3000 Utility Penetration to Unit 1 East Stairwell 28/670 Blind Flanged X-29-2-48 Utility Penetration to Unit 1 RR Bay 29/670 Capped X-33-2-3000 Utility Penetration to Unit 2 East Stairwell 33/670 Blind Flanged X-29-3-54 Utility Penetration to Unit 1 RBCCW Hx Area 27/683 Blind Flanged X-29-3-55 Utility Penetration to Unit 1 RBCCW Hx Area 27/683 Blind Flanged X-29-5-97 Utility Penetration from Unit I RR Bay to Unit 2 Elev. 749 33/749 Capped X-27-6-42 Diamond Plate Cover over Floor Penetration 27/779' Installed X-27-6-92 Instrument Tubing Stubs 27/779' Capped X-29-7-4 1" Spare Conduit Threaded Plug 29/818' Installed X-30-6-72 Instrument Tubing Stubs 30/779' Capped X-30-6-1002 Stairwell #214 Rupture Disc 30/779' Installed Intact X-30-6-1003 Airlock 11-609 Rupture Disc 30/779' Installed Intact SUSQUEHANNA - UNIT 1 TS / B 3.6-100 Revision 4

PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 2 of 3)

Device Numbe NubrDevice Description Area/Elev iRequired Position / Notes X-25-6-1008 Airlock 1-606 Rupture Disc 25/779' Installed Intact X-29-4-102 Penetration at Door 433 29/719' Blind Flange Installed X-29-4-103 Penetration at Door 433 29/719' Blind Flange Installed X-29-4-102 Penetration at Door 433 33/719' Blind Flange Installed X-29-4-103 Penetration at Door 433 33/719' Blind Flange Installed 1S2104 N2 Purge Line to U1 Containment Spectacle Flange 29/683' Blind Side Installed 2S2104 N2 Purge Line to U2 Containment Spectacle Flange 34/672' Blind Side Installed XD-1 7513 Isolation damper for Railroad Bay Zone Ill HVAC Supply 29/799' Position is dependent on Railroad Bay alignment XD-1 7514 Isolation damper for Railroad Bay Zone IIIHVAC Exhaust 29/719' Position is dependent on Railroad Bay alignment XD-1 2301 PASS Air Flow Damper 11/729' Closed Damper XD-22301 PASS Air Flow Damper 22/729' Closed Damper 161827 HPCI Blowout Steam Vent Drain Valve 25/645' Closed Manual Isolation Valve 161828 RCIC Blowout Steam Vent Drain Valve 28/645' Closed Manual Isolation Valve 161829 'A' RHR Blowout Steam Vent Drain Valve 29/645' Closed Manual Isolation Valve 161830 'B' RHR Blowout Steam Vent Drain Valve 28/645' Closed Manual Isolation Valve 261820 RCIC Blowout Steam Vent Drain Valve 33/645' Closed Manual Isolation Valve 261821 'A' RHR Blowout Steam Vent Drain Valve 34/645' Closed Manual Isolation Valve 261822 'B' RHR Blowout Steam Vent Drain Valve 33/645' Closed Manual Isolation Valve SUSQUEHANNA - UNIT 1 TS / B 3.6-1 00a Revision 1

PPL Rev. 4 SCIVs B 3.6.4.2 Table B 3.6.4.2-2 Secondary Containment Ventilation System Passive Isolation Valves or Devices (Page 3 of 3)

Device. Device Description Area/Elev Required Position I Number Notes

.1 1 I.

f i i.

Note 1: The two blind flanges on the SDHR penetrations (blind flanges for device number X-29-2-44 and X-29-2-45) and all the closed manual valves for the SDHR system (110176,110186, 110180,110181, 110182,110187, 210186, 210187, 210191, 210192, 210193) can each be considered as a separate secondary containment isolation device for the SDHR penetrations. If one or both of the blind flanges is removed and all the above identified manual valves for the SDHR system are closed, the appropriate LCO should be entered for one inoperable SCIV in a penetration flow path with two SCIVs. With the blind flange removed, the manual valves could be opened intermittently under administrative controls per the Technical Specification Note. When both SDHR blind flanges are installed, opening of the manual valves for the SDHR system will be controlled to prevent cross connecting ventilation zones. When the manual valves for the SDHR system are open in this condition, the appropriate LCO should be entered for one inoperable SCIV in a penetration flow path with two SCIVs.

Note 2: Due to the multiple alignments of the RBCW temporary chiller, different devices will perform the SCIV function depending on the RBCW configuration. There are three devices/equipment that can perform the SCIV function for the RBCW temporary chiller supply penetration. The first SCIV for the RBCW temporary chiller supply penetration is the installed blind flange on penetration X-29-2-47. The second SCIV for the RBCW temporary chiller supply penetration is isolation valve 187389. The third SCIV for the temporary RBCW chiller supply penetration is closed vent valve 187391 and either an installed blind flange on penetrations X-29-5-92 and/or X-29-5-96, or an installed temporary RBCW hose between flange X-29-5-92 and the permanent RBCW piping; and/or and installed temporary RBCW hose between flange X-29-5-96 and the permanent RBCW piping. Removal of one of the above SCIVs requires entry into the appropriate LCO for one inoperable SCIV in a penetration flow path with two SCIVs. Opening of vent valve 187391 and operation of blank flanges X-29-5-96 and X-29-5-92 will be controlled to prevent cross connecting ventilation zones.

There are three devices/equipment that can perform the SCIV function for the RBCW temporary chiller return penetration. The first SCIV for the RBCW temporary chiller return penetration is the installed blind flange on penetration X-29-2-46. The second SCIV for the RBCW temporary chiller return penetration is isolation valve 187388. The third SCIV for the temporary RBCW chiller return penetration is closed vent valve 187390 and either an installed blind flange on penetrations X-29-5-91 and/or X-29-5-95, or an installed temporary RBCW hose between flange X-29-5-91 and the permanent RBCW piping; and/or and installed temporary RBCW hose between flange X-29-5-95 and the permanent RBCW piping. Removal of one of the above SCIVs requires entry into the appropriate LCO for one inoperable SCIV in a penetration flow path with two SCIVs. Opening of vent valve 187390 and operation of blank flanges X-29-5-91 and X-29-5-95 will be controlled to prevent cross connecting ventilation zones.

SUSQUEHANNA - UNIT 1 TS / B 3.6-1 00b Revision 0