| | issue date = 06/06/2012 | | | issue date = 06/06/2012 |
| | title = May 31, 2012, Summary of Senior Management Meeting with Tennessee Valley Authority on the Licensing Basis for Flooding/Hydrology | | | title = May 31, 2012, Summary of Senior Management Meeting with Tennessee Valley Authority on the Licensing Basis for Flooding/Hydrology |
| | author name = Lyon C F | | | author name = Lyon C |
| | author affiliation = NRC/NRR/DORL/LPWB | | | author affiliation = NRC/NRR/DORL/LPWB |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000327, 05000328, 05000390 | | | docket = 05000327, 05000328, 05000390 |
| | license number = | | | license number = |
| | contact person = Lyon C F | | | contact person = Lyon C |
| | document type = Meeting Summary | | | document type = Meeting Summary |
| | page count = 4 | | | page count = 4 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:REGUNITED STATES | | {{#Wiki_filter:\.~p..1\ REG uZq UNITED STATES |
| "'0." NUCLEAR REGULATORY COMMISSION | | ~~r;;, "'0." NUCLEAR REGULATORY COMMISSION |
| ! WASHINGTON, D.C. 20555-0001 0 : June 6, 2012 ****... | | ! ~ WASHINGTON, D.C. 20555-0001 |
| Tennessee Valley Authority Watts Bar Nuclear Plant, Unit Sequoyah Nuclear Plant, Units 1 and | | ~ |
| | ~ |
| | ~ ~ |
| | : 0 June 6, 2012 |
| | ~ ~ |
| | ~? ~o LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Unit 1 Sequoyah Nuclear Plant, Units 1 and 2 |
| | |
| | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF MAY 31,2012, SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODI NG/HYDROLOGY On May 31, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. | | OF MAY 31,2012, SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODI NG/HYDROLOGY On May 31, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1) the current licensing basis for flooding at Watts Bar Nuclear Plant, Unit 1 (WBN) and Sequoyah Nuclear Plant, Units 1 and 2 (SON), (2) the status of TVA's current licensing basis reanalysis, (3) flood protection and flood mode operation at WBN and SON, (4) modular flood barriers (sand baskets) at TVA dams, and (5) TVA's flooding reevaluation plan regarding the NRC's Fukushima 50.54(f) letter dated March 12, 2012. |
| The purpose of the meeting was to discuss (1) the current licensing basis for flooding at Watts Bar Nuclear Plant, Unit 1 (WBN) and Sequoyah Nuclear Plant, Units 1 and 2 (SON), (2) the status of TVA's current licensing basis reanalysis, (3) flood protection and flood mode operation at WBN and SON, (4) modular flood barriers (sand baskets) at TVA dams, and (5) TVA's flooding reevaluation plan regarding the NRC's Fukushima 50.54(f) letter dated March 12, 2012. An agenda for the meeting was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12150A044). | | An agenda for the meeting was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12150A044). A list of attendees is enclosed. |
| A list of attendees is enclosed. | | The licensee's slide presentation is provided in ADAMS Accession No. ML12156A076. TVA discussed the challenges that they are facing with the complexities of the revised hydrology modeling they are using for their licensing basis re-analysis and acknowledged their lack of timeliness in resolving the flooding issue. Mr. Jernigan discussed that TVA is committed to regaining safety margin for flooding and updating the current licensing basis through a high quality analysis, ensuring plant operability, and improved timeliness. Mr. Shea discussed TVA's slide presentation with support from the TVA staff present and on the audio conference, and answered questions from the NRC staff. TVA noted that, based on their draft re-analysis results, the probable maximum flood level at WBN will raise an additional 0.4 feet to 739.2 feet. |
| The licensee's slide presentation is provided in ADAMS Accession No. ML 12156A076. | | At that level, some safety-related flood mitigation equipment will be flooded without compensatory measures. TVA stated that their current operability determinations will be re evaluated once the re-analysis is completed. |
| TVA discussed the challenges that they are facing with the complexities of the revised hydrology modeling they are using for their licensing basis re-analysis and acknowledged their lack of timeliness in resolving the flooding issue. Mr. Jernigan discussed that TVA is committed to regaining safety margin for flooding and updating the current licensing basis through a high quality analysis, ensuring plant operability, and improved timeliness. | | TVA made a number of commitments at the end of their presentation, as noted on page 61 of the TVA presentation. TVA also discussed implementing a procedure to inspect the sand baskets; maintaining necessary compensatory measures; and a date to send their commitment letter the NRC. NRC discussed that it is considering options, such as a Confirmatory Action Letter, for regulatory follow up to TVA's commitment letter. TVA and the NRC staff expected to discuss and finalize TVA's commitments within 2 weeks. |
| Mr. Shea discussed TVA's slide presentation with support from the TVA staff present and on the audio conference, and answered questions from the NRC staff. TVA noted that, based on their draft re-analysis results, the probable maximum flood level at WBN will raise an additional 0.4 feet to 739.2 feet. At that level, some safety-related flood mitigation equipment will be flooded without compensatory measures. | | |
| TVA stated that their current operability determinations will be evaluated once the re-analysis is completed. | | - 2 No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received. |
| TVA made a number of commitments at the end of their presentation, as noted on page 61 of the TVA presentation. | |
| TVA also discussed implementing a procedure to inspect the sand baskets; maintaining necessary compensatory measures; and a date to send their commitment letter the NRC. NRC discussed that it is considering options, such as a Confirmatory Action Letter, for regulatory follow up to TVA's commitment letter. TVA and the NRC staff expected to discuss and finalize TVA's commitments within 2 weeks. | |
| -No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. | |
| No public meeting feedback forms were received. | |
| Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. | | Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. |
| Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, List of cc w/encl: Distribution via LIST OF SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON G. Arent J.Shea R. Whalen R. Cole P. Selman F. Mashburn* | | Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, 50-328 |
| D. Harrell* LICENSING BASIS FOR FLOODING/HYDROLOGY WATTS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 MAY 31,2012 S. Day E. Cobey D. Jernigan D. Gwin* W. Sprinkle*
| | |
| B. Wetzel* R. Golden NRC (from NRR unless otherwise noted) P. Milano S. Campbell J. Poole M. Murphy J.Gwo S. Shaeffer, RII R. Monk, RII* R. Haag, RII* F. Lyon D. Broaddus B. Boger K. See, NRO D.Skeen J. Hamman, RII* PUBLIC J. Johnson* *by telephone G. Wilson C. Kanatas, OGC D. Roth, OGC E. Leeds N. Chokshi, NRO C. Cook, NRO P. Hiland A. Howe M. Cheok K. Manoly R. Taylor J. Caverly, NRO M. Evans V. McCree, RII Enclosure | | ==Enclosure:== |
| -2 No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. | | |
| No public meeting feedback forms were received. | | List of Attendees cc w/encl: Distribution via Listserv |
| | |
| | LIST OF ATTENDEES SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODING/HYDROLOGY WATTS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 MAY 31,2012 G. Arent S. Day J.Shea E. Cobey R. Whalen D. Jernigan R. Cole D. Gwin* |
| | P. Selman W. Sprinkle* |
| | F. Mashburn* B. Wetzel* |
| | D. Harrell* R. Golden NRC (from NRR unless otherwise noted) |
| | P. Milano G. Wilson S. Campbell C. Kanatas, OGC J. Poole D. Roth, OGC M. Murphy E. Leeds J.Gwo N. Chokshi, NRO S. Shaeffer, RII C. Cook, NRO R. Monk, RII* P. Hiland R. Haag, RII* A. Howe F. Lyon M. Cheok D. Broaddus K. Manoly B. Boger R. Taylor K. See, NRO J. Caverly, NRO D.Skeen M. Evans J. Hamman, RII* V. McCree, RII PUBLIC J. Johnson* |
| | *by telephone Enclosure |
| | |
| | -2 No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received. |
| Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. | | Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. |
| IRA! Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, List of cc w/encl: Distribution via DISTRIBUTION: | | IRA! |
| PUBLIC RidsNrrPMWatts Bar1 Resource MKotzalas, EDO Region 2 LP-WB Branch Reading RidsNrrLABClayton Resource RidsNrrOd Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlLpl2-2 RidsNrrDorlLp-Wb Resource RidsRgn2MailCenler Resource NRC Attendees SLingam, NRR TWe rtz , NRR . ML12150A044 H an d outs ML12156A076 ADAMS Accession Nos.: Meeting 2 5 M eetmg N ollce S ML 1 1 7A 4 57 DORULPWB/PM DORULPWB/LA DORULPWB/BC OFFICE DORULPWB/PM BClayton SCampbell FLyon NAME FLyon 6/6/12 6/6/12 DATE 6/6/12 6/6/12 OFFICIAL RECORD COpy}} | | Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, 50-328 |
| | |
| | ==Enclosure:== |
| | |
| | List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: |
| | PUBLIC RidsNrrPMWatts Bar1 Resource MKotzalas, EDO Region 2 LP-WB Branch Reading RidsNrrLABClayton Resource RidsNrrOd Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlLpl2-2 RidsNrrDorlLp-Wb Resource RidsRgn2MailCenler Resource NRC Attendees SLingam, NRR TWertz , NRR ADAMS Accession Nos.: Meeting S umma~ ML12157A457 Meetmg Nollce |
| | . ML12150A044 Handouts ML12156A076 OFFICE DORULPWB/PM DORULPWB/LA DORULPWB/BC DORULPWB/PM NAME FLyon BClayton SCampbell FLyon DATE 6/6/12 6/6/12 6/6/12 6/6/12 OFFICIAL RECORD COpy}} |
Letter Sequence Request |
---|
|
Results
Other: ML13067A244, ML13123A175, ML13282A585, ML13289A095, ML13289A096, ML13289A097, ML13289A098, ML13289A099, ML13289A100, ML13289A101, ML13289A108, ML13289A111, ML13289A112, ML13289A113, ML13289A114, ML13289A115, ML13289A116, ML13289A117, ML13289A118, ML13289A119, ML13289A120, ML13289A121, ML13289A122, ML13289A123, ML13289A124, ML13289A125, ML13289A126, ML13289A127, ML13289A129, ML13289A130, ML13289A132, ML13289A133, ML13289A134, ML13289A136, ML14198A610, ML15051A453, ML15051A473
|
MONTHYEARML13289A1342009-01-31031 January 2009 WR2009-1-45-151, Ambient Temperature and Mixing Zone Studies for Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of September 2005. Project stage: Other ML13289A0982009-11-30030 November 2009 Potential Impact of Climate Change on Natural Resources in the Tennessee Valley Authority Region Project stage: Other ML13289A0972011-02-0202 February 2011 NPDES Permit No. TN0026450 Soddy Daisy, Hamilton County, Tennessee Project stage: Other ML12150A0442012-05-17017 May 2012 Location Change for Forthcoming Meeting with Tennessee Valley Authority Regarding Flooding/Hydrology Licensing Basis at Watts Bar, Unit 1 and Sequoyah Nuclear Plant Project stage: Request ML12157A4572012-06-0606 June 2012 May 31, 2012, Summary of Senior Management Meeting with Tennessee Valley Authority on the Licensing Basis for Flooding/Hydrology Project stage: Request ML12244A0182012-08-23023 August 2012 Transmittal of Final Safety Analysis Report (Fsar), Amendment 109 Project stage: Request ML13025A2622013-01-18018 January 2013 Potential for Breaches of Hesco Modular Flood Barriers and Earthen Embankments Affecting the Updated Hydrologic Analysis Results Project stage: Request ML13067A2442013-03-26026 March 2013 Lr Environmental Site Audit Regarding Sequoyah Nuclear Plant Project stage: Other ML13108A1072013-04-16016 April 2013 Commitment to Install Improved Flood Mitigation Systems Project stage: Request ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. Project stage: Other ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. Project stage: Other ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal Project stage: Request ML13123A1752013-05-22022 May 2013 PM Change for the Lr of Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13227A0032013-07-17017 July 2013 Response to NRC Request for Additional Information Regarding the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML13206A3852013-07-23023 July 2013 Response to NRC Request for Additional Information Regarding the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0057 and MF0058) Project stage: Response to RAI ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 Project stage: Other ML13282A5852013-09-20020 September 2013 Submittal of Sensitive Documents for the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application - Env 2.A (TAC Nos. MF0057 and MF0058) Project stage: Other ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 Project stage: Other ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 Project stage: Other ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 Project stage: Other ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 Project stage: Other ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 Project stage: Other ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 Project stage: Other ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 Project stage: Other ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 Project stage: Other ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 Project stage: Other ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 Project stage: Other ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 Project stage: Other ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) Project stage: Other ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr Project stage: Other ML13289A1082013-09-20020 September 2013 Documents for the Environmental Review of the License Renewal Application - Env 2.B Project stage: Other ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 Project stage: Other ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 Project stage: Other ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 Project stage: Other ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 Project stage: Other ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 Project stage: Other ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 Project stage: Other ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 Project stage: Other ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 Project stage: Other ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 Project stage: Other ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 Project stage: Other ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 Project stage: Other ML14064A4842014-04-24024 April 2014 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Tennessee Valley Authority for Sequoyah Nuclear Plant, Units 1 and 2 - Page 26 Through End Project stage: Approval ML14041A1182014-04-24024 April 2014 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of Application by Tennessee Valley Authority for Sequoyah Nuclear Plant, Units 1 and 2 (Tac Nos. MF0057 and MF0058)- Page Continue Project stage: Approval ML14211A4542014-07-31031 July 2014 NUREG-1437 Supp 53 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Sequoyah Nuclear Plant, Units 1 and 2, (Draft Report for Comment) Project stage: Draft Other ML14198A6102014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN Project stage: Other ML14198A6192014-08-0707 August 2014 Notice of Availability of the Draft Plant-Specific Supplement 53 to the Generic Environmental Impact Statement for License Renewal of the Nuclear Plants Regarding Sequoyah Nuclear Plant, Units 1 and 2 (TAC Nos. MF0057 and MF0058) Project stage: Draft Other ML14225A1572014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Downtown Branch of the Chattanooga-Hamilton County Library in Regards to the Review of the Sequoyah Nuclear Plant, License Renewal Application (Tac. MF0057 and MF0058) Project stage: Draft Approval ML14225A1582014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Signal Mountain Library in Regards to the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC MF0057 and MF0058) Project stage: Draft Approval ML14225A1592014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Northgate Branch of the Chattanooga-Hamilton County Library in Regards to the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC MF0057 and MF0058) Project stage: Draft Approval 2013-04-30
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24228A2652024-08-20020 August 2024 Summary of Public Pre-Submittal Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR Related to TS 3.5.2. ECCS - Operating ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24218A2182024-08-15015 August 2024 Summary of July 16, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant LAR Related to Containment Penetrations and Fuel Handling ML24173A2122024-06-27027 June 2024 Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing ML24158A3002024-06-11011 June 2024 Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term ML24136A2242024-05-15015 May 2024 1B EDG NRC Regulatory Conference Meeting Summary May 2, 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24082A2532024-03-26026 March 2024 Summary of March 18, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24057A3792024-03-0808 March 2024 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24065A0262024-03-0101 March 2024 LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics ML24057A0582024-02-27027 February 2024 Summary of February 15, 2024, Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML24044A0372024-02-15015 February 2024 February 8, 2024, Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Technical Specification Surveillance Requirement 3.1.1.8 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement 2024-09-23
[Table view] |
Text
\.~p..1\ REG uZq UNITED STATES
~~r;;, "'0." NUCLEAR REGULATORY COMMISSION
! ~ WASHINGTON, D.C. 20555-0001
~
~
~ ~
- 0 June 6, 2012
~ ~
~? ~o LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Unit 1 Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 31,2012, SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODI NG/HYDROLOGY On May 31, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1) the current licensing basis for flooding at Watts Bar Nuclear Plant, Unit 1 (WBN) and Sequoyah Nuclear Plant, Units 1 and 2 (SON), (2) the status of TVA's current licensing basis reanalysis, (3) flood protection and flood mode operation at WBN and SON, (4) modular flood barriers (sand baskets) at TVA dams, and (5) TVA's flooding reevaluation plan regarding the NRC's Fukushima 50.54(f) letter dated March 12, 2012.
An agenda for the meeting was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12150A044). A list of attendees is enclosed.
The licensee's slide presentation is provided in ADAMS Accession No. ML12156A076. TVA discussed the challenges that they are facing with the complexities of the revised hydrology modeling they are using for their licensing basis re-analysis and acknowledged their lack of timeliness in resolving the flooding issue. Mr. Jernigan discussed that TVA is committed to regaining safety margin for flooding and updating the current licensing basis through a high quality analysis, ensuring plant operability, and improved timeliness. Mr. Shea discussed TVA's slide presentation with support from the TVA staff present and on the audio conference, and answered questions from the NRC staff. TVA noted that, based on their draft re-analysis results, the probable maximum flood level at WBN will raise an additional 0.4 feet to 739.2 feet.
At that level, some safety-related flood mitigation equipment will be flooded without compensatory measures. TVA stated that their current operability determinations will be re evaluated once the re-analysis is completed.
TVA made a number of commitments at the end of their presentation, as noted on page 61 of the TVA presentation. TVA also discussed implementing a procedure to inspect the sand baskets; maintaining necessary compensatory measures; and a date to send their commitment letter the NRC. NRC discussed that it is considering options, such as a Confirmatory Action Letter, for regulatory follow up to TVA's commitment letter. TVA and the NRC staff expected to discuss and finalize TVA's commitments within 2 weeks.
- 2 No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.
Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, 50-328
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES SENIOR MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODING/HYDROLOGY WATTS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 MAY 31,2012 G. Arent S. Day J.Shea E. Cobey R. Whalen D. Jernigan R. Cole D. Gwin*
P. Selman W. Sprinkle*
F. Mashburn* B. Wetzel*
D. Harrell* R. Golden NRC (from NRR unless otherwise noted)
P. Milano G. Wilson S. Campbell C. Kanatas, OGC J. Poole D. Roth, OGC M. Murphy E. Leeds J.Gwo N. Chokshi, NRO S. Shaeffer, RII C. Cook, NRO R. Monk, RII* P. Hiland R. Haag, RII* A. Howe F. Lyon M. Cheok D. Broaddus K. Manoly B. Boger R. Taylor K. See, NRO J. Caverly, NRO D.Skeen M. Evans J. Hamman, RII* V. McCree, RII PUBLIC J. Johnson*
-2 No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.
IRA!
Carl F. Lyon, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, 50-328
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMWatts Bar1 Resource MKotzalas, EDO Region 2 LP-WB Branch Reading RidsNrrLABClayton Resource RidsNrrOd Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlLpl2-2 RidsNrrDorlLp-Wb Resource RidsRgn2MailCenler Resource NRC Attendees SLingam, NRR TWertz , NRR ADAMS Accession Nos.: Meeting S umma~ ML12157A457 Meetmg Nollce
. ML12150A044 Handouts ML12156A076 OFFICE DORULPWB/PM DORULPWB/LA DORULPWB/BC DORULPWB/PM NAME FLyon BClayton SCampbell FLyon DATE 6/6/12 6/6/12 6/6/12 6/6/12 OFFICIAL RECORD COpy