Letter Sequence Other |
---|
|
Results
Other: ML13067A244, ML13123A175, ML13282A585, ML13289A095, ML13289A096, ML13289A097, ML13289A098, ML13289A099, ML13289A100, ML13289A101, ML13289A108, ML13289A111, ML13289A112, ML13289A113, ML13289A114, ML13289A115, ML13289A116, ML13289A117, ML13289A118, ML13289A119, ML13289A120, ML13289A121, ML13289A122, ML13289A123, ML13289A124, ML13289A125, ML13289A126, ML13289A127, ML13289A129, ML13289A130, ML13289A132, ML13289A133, ML13289A134, ML13289A136, ML14198A610, ML15051A453, ML15051A473
|
MONTHYEARML13289A1342009-01-31031 January 2009 WR2009-1-45-151, Ambient Temperature and Mixing Zone Studies for Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of September 2005. Project stage: Other ML13289A0982009-11-30030 November 2009 Potential Impact of Climate Change on Natural Resources in the Tennessee Valley Authority Region Project stage: Other ML13289A0972011-02-0202 February 2011 NPDES Permit No. TN0026450 Soddy Daisy, Hamilton County, Tennessee Project stage: Other ML12150A0442012-05-17017 May 2012 Location Change for Forthcoming Meeting with Tennessee Valley Authority Regarding Flooding/Hydrology Licensing Basis at Watts Bar, Unit 1 and Sequoyah Nuclear Plant Project stage: Request ML12157A4572012-06-0606 June 2012 May 31, 2012, Summary of Senior Management Meeting with Tennessee Valley Authority on the Licensing Basis for Flooding/Hydrology Project stage: Request ML12244A0182012-08-23023 August 2012 Transmittal of Final Safety Analysis Report (Fsar), Amendment 109 Project stage: Request ML13025A2622013-01-18018 January 2013 Potential for Breaches of Hesco Modular Flood Barriers and Earthen Embankments Affecting the Updated Hydrologic Analysis Results Project stage: Request ML13067A2442013-03-26026 March 2013 Lr Environmental Site Audit Regarding Sequoyah Nuclear Plant Project stage: Other ML13108A1072013-04-16016 April 2013 Commitment to Install Improved Flood Mitigation Systems Project stage: Request ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. Project stage: Other ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. Project stage: Other ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal Project stage: Request ML13123A1752013-05-22022 May 2013 PM Change for the Lr of Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13227A0032013-07-17017 July 2013 Response to NRC Request for Additional Information Regarding the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML13206A3852013-07-23023 July 2013 Response to NRC Request for Additional Information Regarding the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0057 and MF0058) Project stage: Response to RAI ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 Project stage: Other ML13282A5852013-09-20020 September 2013 Submittal of Sensitive Documents for the Environmental Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application - Env 2.A (TAC Nos. MF0057 and MF0058) Project stage: Other ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 Project stage: Other ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 Project stage: Other ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 Project stage: Other ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 Project stage: Other ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 Project stage: Other ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 Project stage: Other ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 Project stage: Other ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 Project stage: Other ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 Project stage: Other ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 Project stage: Other ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 Project stage: Other ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) Project stage: Other ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr Project stage: Other ML13289A1082013-09-20020 September 2013 Documents for the Environmental Review of the License Renewal Application - Env 2.B Project stage: Other ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 Project stage: Other ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 Project stage: Other ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 Project stage: Other ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 Project stage: Other ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 Project stage: Other ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 Project stage: Other ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 Project stage: Other ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 Project stage: Other ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 Project stage: Other ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 Project stage: Other ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 Project stage: Other ML14064A4842014-04-24024 April 2014 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Tennessee Valley Authority for Sequoyah Nuclear Plant, Units 1 and 2 - Page 26 Through End Project stage: Approval ML14041A1182014-04-24024 April 2014 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of Application by Tennessee Valley Authority for Sequoyah Nuclear Plant, Units 1 and 2 (Tac Nos. MF0057 and MF0058)- Page Continue Project stage: Approval ML14211A4542014-07-31031 July 2014 NUREG-1437 Supp 53 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Sequoyah Nuclear Plant, Units 1 and 2, (Draft Report for Comment) Project stage: Draft Other ML14198A6102014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN Project stage: Other ML14198A6192014-08-0707 August 2014 Notice of Availability of the Draft Plant-Specific Supplement 53 to the Generic Environmental Impact Statement for License Renewal of the Nuclear Plants Regarding Sequoyah Nuclear Plant, Units 1 and 2 (TAC Nos. MF0057 and MF0058) Project stage: Draft Other ML14225A1572014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Downtown Branch of the Chattanooga-Hamilton County Library in Regards to the Review of the Sequoyah Nuclear Plant, License Renewal Application (Tac. MF0057 and MF0058) Project stage: Draft Approval ML14225A1582014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Signal Mountain Library in Regards to the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC MF0057 and MF0058) Project stage: Draft Approval ML14225A1592014-08-12012 August 2014 Maintenance of Draft Supplemental Environmental Impact Statement at the Northgate Branch of the Chattanooga-Hamilton County Library in Regards to the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC MF0057 and MF0058) Project stage: Draft Approval 2013-04-30
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24172A1392024-07-16016 July 2024 Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN ML24089A1132024-06-21021 June 2024 Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24086A4312024-04-0505 April 2024 Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: April 16, 2024 ML21166A1142021-10-28028 October 2021 Federal Register Notice for Exemption from 10 CFR 50.46 and Appendix K ML21299A0102021-10-26026 October 2021 Public Notice - Exigent Amendment (EPID LL-2021-LLA-0194) ML21299A0092021-10-26026 October 2021 Notice Letter to TVA - Exigent Amendment ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20143A2722020-05-28028 May 2020 Resolution of Issues Pertaining to Boric Acid Precipitation Related to the Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML20098D3312020-05-0505 May 2020 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: May 5, ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18200A1922018-08-21021 August 2018 Withdrawal of Amd Request to Change Implementation Date for Emergency Action Level Scheme ML18200A2142018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 NRC-2014-0045, FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 22018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18173A0532018-06-22022 June 2018 Ind. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards ... ML18172A3042018-06-22022 June 2018 Tennessee Valley Authority - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML16208A5692016-09-0909 September 2016 Exemption from the Requirements of 10 CFR Part 50, Section 50.75(h)(2) and 10 CFR 50382(a)(8) NRC-2016-0199, FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 22016-09-0909 September 2016 FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 ML16208A5902016-09-0909 September 2016 FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 ML16154A0852016-07-0101 July 2016 Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio NRC-2016-0130, Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implemen2016-07-0101 July 2016 Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio ML16154A0812016-06-24024 June 2016 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing ML15098A0162015-09-28028 September 2015 Notice of Issuace of Renewed Facility Operating Licenses Nos.Dpr-77 and Dpr-79 for an Additional 20-year Period ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15051A4892015-03-19019 March 2015 FRN for Sequoyah Nuclear Plant, Units 1 & 2, FSEIS Rev. 1 ML14281A5842014-10-24024 October 2014 Federal Register Notice Regarding the ACRS Plant License Renewal (Sequoyah), November 5, 2014 ML14198A6102014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN NRC-2013-0003, License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN2014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN ML14051A6712014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20142014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13035A2142013-02-26026 February 2013 Determination of Accepting & Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Tennessee Valley Authority for Renewal of the Operating Licenses for Sequoyah Nuclear Plant, Unit ML13043A2032013-02-25025 February 2013 Acceptability of LRA for Sequoyah Units 1 and 2 - FRN (Enclosure 2) ML13016A4892013-02-0808 February 2013 Letter - Receipt and Availability of the LRA for the Sequoyah Nuclear Plant Units 1 and 2 ML12194A5012012-07-13013 July 2012 7-24 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML12165A6932012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment NRC-2012-0160, Federal Register Notice - Notice of Withdrawal of an Amendment2012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11339A0802011-12-27027 December 2011 G20110262/EDATS: OEDO-2011-0269 - Federal Register Notice - Receipt of Request for Action Under 10 CFR 2.206 2024-07-16
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-327 and 50-328; NRC-2013-0037]
License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 AGENCY: Nuclear Regulatory Commission.
ACTION: Draft supplemental generic environmental impact statement; issuance; public meetings; request for comment.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft plant-specific supplement 53 to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the renewal of operating license DPR-77 and DPR-79 for an additional 20 years of operation for Sequoyah Nuclear Plant (SQN),
Units 1 and 2. SQN is located in Soddy-Daisy, Tennessee. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources.
The NRC staff plans to hold two public meetings during the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comments on the document.
DATES: Submit comments by September 29, 2014. Comments received after this date will be considered, if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.
ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):
Docket ID NRC-2013-0037. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- Mail comments to: Cindy Bladey, Office of Administration, Mail Stop: 3WFN A44M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: David Drucker, Office of Nuclear Reactor Regulation, telephone: 301-415-6223, e-mail to David.Drucker@nrc.gov; U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments.
A. Obtaining Information Please refer to Docket ID NRC-2013-0037 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document by any of the following methods:
- NRCs Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS
Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. The draft plant-specific supplement 53 to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS under Accession No. ML14211A454.
- NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments Please include Docket ID NRC-2013-0037 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS, and the NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Discussion.
The NRC is issuing for public comment a draft plant-specific supplement 53 to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, regarding the renewal of operating license DPR-77 and DPR-79 for an additional 20 years of operation for SQN. Supplement 53 to the GEIS includes the preliminary analysis that evaluates the environmental impacts of the proposed action and alternatives to the proposed action. The NRCs preliminary recommendation is that the adverse environmental impacts of license renewal for SQN are not great enough to deny the option of license renewal for energy-planning decisionmakers.
III. Public Meetings.
The NRC staff will hold public meetings prior to the close of the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comment on the document. Two meetings will be held at the Soddy-Daisy City Hall, 9835 Dayton Pike, Soddy-Daisy, Tennessee, 37379, on Wednesday, September 17, 2014. The first session will convene at 2:00 p.m. and will continue until 4:00 p.m., as necessary. The second session will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. The meetings will be transcribed and will include: (1) a presentation of the contents of the draft plant-specific supplement to the GEIS; and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft report. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No comments on the draft supplement to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meeting or in writing. Persons may pre-register to attend or present oral comments at the meeting by contacting Mr. David Drucker, the NRC environmental project manager, at
1-800-368-5642, extension 6223, or by e-mail at David.Drucker@nrc.gov no later than Wednesday, September 3, 2014. Members of the public may also register to provide oral comments within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Mr. Druckers attention no later than Wednesday, September 3, 2014, to provide the NRC staff adequate notice to determine whether the request can be accommodated.
Dated at Rockville, Maryland, this 1st day of August, 2014.
For The Nuclear Regulatory Commission.
/RA/
Brian D. Wittick, Chief, Projects Branch 2, Division of License Renewal, Office of Nuclear Reactor Regulation.