{{#Wiki_filter:UNITED STATES                         NUCLEAR REGULATORY COMMISSION                                                           REGION I                                                 2100 Renaissance Boulevard                           KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 4, 2012 Mr. Michael Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 Renaissance Boulevard KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 4, 2012 Mr. Michael Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2012006)  
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2012006)


==Dear Mr. Colomb:==
==Dear Mr. Colomb:==


On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, "Operating Reactor Assessment Program."
On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC
The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-188, "Inspection of Near-Term Task Force Recommendation 2.3  
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. Furthermore, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
Seismic Walkdowns.Furthermore, the NRC will perform Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal" and IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants.The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability is sues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
M. Colomb  2 On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulness. Therefore, the NRC plans to conduct IP 92702, "Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order. 
 
From June 2011 to April 2012, the NRC also issued three severity level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct IP 92723, "Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to follow-up on
 
these violations.
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
 
Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.  


Sincerely,       /RA/
M. Colomb                                      2 On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulness. Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.
Mel Gray, Chief Projects Branch 2       Division of Reactor Projects  
From June 2011 to April 2012, the NRC also issued three severity level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations.
 
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket No. 50-333 License No. DPR-59  
Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                                /RA/
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No.     50-333 License No. DPR-59


==Enclosure:==
==Enclosure:==
James A. FitzPatrick Inspection/Activity Plan  
James A. FitzPatrick Inspection/Activity Plan cc w/encl:      Distribution via ListServ


cc w/encl: Distribution via ListServ
ML12244A341 Non-Sensitive                                  Publicly Available SUNSI Review Sensitive                                      Non-Publicly Available OFFICE          RI/DRP                RI/DRP NAME            BBickett              MGray DATE            08/28/12              09/04/12 Page 1 of 2                                                                                FitzPatrick 08/31/2012    07:18:41                                                        Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit          Planned Dates                                                                                                                                    No. of Staff Number        Start      End      Inspection Activity                                                              Title                                          on Site 9/10 EXM      - FITZPATRICK 2ND INITIAL OL EXAM                                                                                        3 1          08/06/2012  08/10/2012      U01879              FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND) 1          09/10/2012  09/14/2012      U01879              FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND) 71124.05      - RAD INSTRUMENTS INSPECTION                                                                                            1 1          07/09/2012  07/13/2012  IP 71124.05            Radiation Monitoring Instrumentation 60855        - ISFSI OPERATIONAL INSPECTION                                                                                          1 1          07/23/2012  07/23/2012  IP 60855                Operation Of An ISFSI 1          07/23/2012  07/23/2012  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124.06      - RETS INSPECTION                                                                                                        1 1          08/06/2012  08/10/2012  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/06/2012  08/10/2012  IP 71151-PR01          RETS/ODCM Radiological Effluent TI-185        - VOLUNTARY GROUND WATER INITIATIVE FOLLOW                                                                              1 1          08/06/2012  08/10/2012  IP 2515/185            Follow-up on the Industry's Ground Water Protection Initiative TI-187        - TI-187 FLOODING WALKDOWNS                                                                                              1 1          09/01/2012  11/30/2012  IP 2515/187            Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188        - TI -188 SEISMIC WALKDOWNS                                                                                              1 1          09/01/2012  11/30/2012  IP 2515/188            Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 7111108G      - INSERVICE INSPECTION                                                                                                  1 1          09/24/2012  09/28/2012  IP 7111108G            Inservice Inspection Activities - BWR 71124        - HP-EXPOSURE CONTROLS & DOSE ASSESSMENT                                                                                1 1          09/24/2012  09/28/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          09/24/2012  09/28/2012  IP 71124.02            Occupational ALARA Planning and Controls 1          09/24/2012  09/28/2012  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          09/24/2012  09/28/2012  IP 71124.04            Occupational Dose Assessment 1          09/24/2012  09/28/2012  IP 71151-OR01          Occupational Exposure Control Effectiveness 71003        - LR COMMITMENTS INSP - PHASE I                                                                                          2 1          10/01/2012  10/05/2012  IP 71003                Post-Approval Site Inspection for License Renewal 92702        - CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC                                                                              1 1          10/01/2012  12/31/2012  IP 92702                Followup On Corrective Actions For Violations And Deviations 92702        - CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D                                                                              1 1          10/01/2012  12/31/2012  IP 92702                Followup On Corrective Actions For Violations And Deviations 92723        - FOLLOWUP FOR THREE SL IV TE VIOLATIONS                                                                                2 1          10/01/2012  12/31/2012  IP 92723                Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.


ML12244A341 SUNSI Review Non-Sensitive  Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME BBickett MGray    DATE 08/28/12 09/04/12   
Page 2 of 2                                                                             FitzPatrick 08/31/2012     07:18:41                                                       Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit          Planned Dates                                                                                                                No. of Staff Number         Start     End     Inspection Activity                                                             Title                     on Site 92702         - CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F                                                         1 1         01/01/2013   03/31/2013   IP 92702                Followup On Corrective Actions For Violations And Deviations 60855         - ISFSI LOADING INSPECTION                                                                         2 1         03/01/2013  06/30/2013  IP 60855                Operation Of An ISFSI 1          03/01/2013   06/30/2013   IP 60855.1             Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124        - RADIATION SAFETY INSPECTION                                                                      1 1         03/25/2013   03/29/2013   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          03/25/2013   03/29/2013   IP 71124.02            Occupational ALARA Planning and Controls 1          03/25/2013   03/29/2013   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          03/25/2013   03/29/2013   IP 71124.04            Occupational Dose Assessment EX INSP       - EP EXERCISE INSPECTION                                                                           1 1         05/13/2013   05/17/2013   IP 7111401              Exercise Evaluation 9/16 EXM     - FITZPATRICK INITIAL EXAM                                                                         4 1         08/19/2013   08/23/2013     U01873              FY13-FITZ INITIAL OPERATOR LICENSING EXAM 1          09/16/2013   09/27/2013     U01873              FY13-FITZ INITIAL OPERATOR LICENSING EXAM 7111121       - CDBI                                                                                             6 1         06/10/2013   06/14/2013   IP 7111121              Component Design Bases Inspection 1          06/24/2013   06/28/2013   IP 7111121              Component Design Bases Inspection 1          07/08/2013   07/12/2013   IP 7111121              Component Design Bases Inspection 71124         - RADIATION SAFETY INSPECTION                                                                       1 1         06/03/2013   06/07/2013   IP 71124.07            Radiological Environmental Monitoring Program 1         06/03/2013   06/07/2013   IP 71151                Performance Indicator Verification 71124         - RADIATION SAFETY INSPECTION                                                                       1 1         08/12/2013  08/16/2013  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          08/12/2013   08/16/2013   IP 71124.04            Occupational Dose Assessment 71124         - RADIATION SAFETY INSPECTION                                                                      1 1          10/21/2013   10/25/2013   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          10/21/2013   10/25/2013   IP 71124.02            Occupational ALARA Planning and Controls 1          10/21/2013   10/25/2013   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          10/21/2013   10/25/2013   IP 71124.04            Occupational Dose Assessment 1          10/21/2013   10/25/2013   IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.
 
Page 1 of 2 08/31/2012 07:18:41 Report 22 Unit Number Planned Dates Start          End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2012
-12/31/2013 9/10 EXM-FITZPATRICK 2ND INITIAL OL EXAM 3 1    FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 08/06/2012 08/10/2012 1    FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 09/10/2012 09/14/2012 71124.05-RAD INSTRUMENTS INSPECTION 1 1    IP Radiation Monitoring Instrumentation 71124.05 07/09/2012 07/13/2012 60855-ISFSI OPERATIONAL INSPECTION 1 1    IP Operation Of An ISFSI 60855 07/23/2012 07/23/2012 1    IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/23/2012 07/23/2012 71124.06-RETS INSPECTION 1 1    IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/06/2012 08/10/2012 1    IP RETS/ODCM Radiological Effluent 71151-PR01 08/06/2012 08/10/2012 TI-185-VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1 1    IP Follow-up on the Industry's Ground Water Protection Initiative 2515/185 08/06/2012 08/10/2012 TI-187-TI-187 FLOODING WALKDOWNS 1 1    IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 09/01/2012 11/30/2012 TI-188-TI -188 SEISMIC WALKDOWNS 1 1    IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 09/01/2012 11/30/2012 7111108G-INSERVICE INSPECTION 1 1    IP Inservice Inspection Activities - BWR 7111108G 09/24/2012 09/28/2012 71124-HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2012 09/28/2012 1    IP Occupational ALARA Planning and Controls 71124.02 09/24/2012 09/28/2012 1    IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 1    IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 1    IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2012 09/28/2012 71003-LR COMMITMENTS INSP - PHASE I 2 1    IP Post-Approval Site Inspection for License Renewal 71003 10/01/2012 10/05/2012 92702-CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1    IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1 1    IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92723-FOLLOWUP FOR THREE SL IV TE VIOLATIONS 2 1    IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 10/01/2012 12/31/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/31/2012 07:18:41 Report 22 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2012
-12/31/2013 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1     IP Followup On Corrective Actions For Violations And Deviations 92702 01/01/2013 03/31/2013 60855-ISFSI LOADING INSPECTION 2 1     IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 1     IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2013 06/30/2013 71124-RADIATION SAFETY INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013 1    IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 1    IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/25/2013 03/29/2013 1    IP Occupational Dose Assessment 71124.04 03/25/2013 03/29/2013 EX INSP-EP EXERCISE INSPECTION 1 1     IP Exercise Evaluation 7111401 05/13/2013 05/17/2013 9/16 EXM-FITZPATRICK INITIAL EXAM 4 1     FY13-FITZ INITIAL OPERATOR LICENSING EXAM U01873 08/19/2013 08/23/2013 1    FY13-FITZ INITIAL OPERATOR LICENSING EXAM U01873 09/16/2013 09/27/2013 7111121-CDBI 6 1     IP Component Design Bases Inspection 7111121 06/10/2013 06/14/2013 1    IP Component Design Bases Inspection 7111121 06/24/2013 06/28/2013 1    IP Component Design Bases Inspection 7111121 07/08/2013 07/12/2013 71124-RADIATION SAFETY INSPECTION 1 1     IP Radiological Environmental Monitoring Program 71124.07 06/03/2013 06/07/2013 1     IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 71124-RADIATION SAFETY INSPECTION 1 1     IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/12/2013 08/16/2013 1    IP Occupational Dose Assessment 71124.04 08/12/2013 08/16/2013 71124-RADIATION SAFETY INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013 1    IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013 1    IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013 1    IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013 1    IP Performance Indicator Verification 71151 10/21/2013 10/25/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 13:25, 6 February 2020

Mid-Cycle Performance Review and Inspection Plan - 2013 James A. FitzPatrick Nuclear Power Plant
ML12244A341
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/04/2012
From: Mel Gray
Reactor Projects Branch 2
To: Michael Colomb
Entergy Nuclear Northeast
Gray M
References
IR-12-006
Download: ML12244A341 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 Renaissance Boulevard KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 4, 2012 Mr. Michael Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2012006)

Dear Mr. Colomb:

On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.

The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. Furthermore, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

M. Colomb 2 On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulness. Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.

From June 2011 to April 2012, the NRC also issued three severity level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59

Enclosure:

James A. FitzPatrick Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML12244A341 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME BBickett MGray DATE 08/28/12 09/04/12 Page 1 of 2 FitzPatrick 08/31/2012 07:18:41 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 9/10 EXM - FITZPATRICK 2ND INITIAL OL EXAM 3 1 08/06/2012 08/10/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND) 1 09/10/2012 09/14/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND) 71124.05 - RAD INSTRUMENTS INSPECTION 1 1 07/09/2012 07/13/2012 IP 71124.05 Radiation Monitoring Instrumentation 60855 - ISFSI OPERATIONAL INSPECTION 1 1 07/23/2012 07/23/2012 IP 60855 Operation Of An ISFSI 1 07/23/2012 07/23/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124.06 - RETS INSPECTION 1 1 08/06/2012 08/10/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/06/2012 08/10/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent TI-185 - VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1 1 08/06/2012 08/10/2012 IP 2515/185 Follow-up on the Industry's Ground Water Protection Initiative TI-187 - TI-187 FLOODING WALKDOWNS 1 1 09/01/2012 11/30/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188 - TI -188 SEISMIC WALKDOWNS 1 1 09/01/2012 11/30/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 7111108G - INSERVICE INSPECTION 1 1 09/24/2012 09/28/2012 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1 1 09/24/2012 09/28/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/24/2012 09/28/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 09/24/2012 09/28/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/24/2012 09/28/2012 IP 71124.04 Occupational Dose Assessment 1 09/24/2012 09/28/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 71003 - LR COMMITMENTS INSP - PHASE I 2 1 10/01/2012 10/05/2012 IP 71003 Post-Approval Site Inspection for License Renewal 92702 - CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 92723 - FOLLOWUP FOR THREE SL IV TE VIOLATIONS 2 1 10/01/2012 12/31/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 FitzPatrick 08/31/2012 07:18:41 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1 01/01/2013 03/31/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations 60855 - ISFSI LOADING INSPECTION 2 1 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 1 03/01/2013 06/30/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - RADIATION SAFETY INSPECTION 1 1 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/25/2013 03/29/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/25/2013 03/29/2013 IP 71124.04 Occupational Dose Assessment EX INSP - EP EXERCISE INSPECTION 1 1 05/13/2013 05/17/2013 IP 7111401 Exercise Evaluation 9/16 EXM - FITZPATRICK INITIAL EXAM 4 1 08/19/2013 08/23/2013 U01873 FY13-FITZ INITIAL OPERATOR LICENSING EXAM 1 09/16/2013 09/27/2013 U01873 FY13-FITZ INITIAL OPERATOR LICENSING EXAM 7111121 - CDBI 6 1 06/10/2013 06/14/2013 IP 7111121 Component Design Bases Inspection 1 06/24/2013 06/28/2013 IP 7111121 Component Design Bases Inspection 1 07/08/2013 07/12/2013 IP 7111121 Component Design Bases Inspection 71124 - RADIATION SAFETY INSPECTION 1 1 06/03/2013 06/07/2013 IP 71124.07 Radiological Environmental Monitoring Program 1 06/03/2013 06/07/2013 IP 71151 Performance Indicator Verification 71124 - RADIATION SAFETY INSPECTION 1 1 08/12/2013 08/16/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/12/2013 08/16/2013 IP 71124.04 Occupational Dose Assessment 71124 - RADIATION SAFETY INSPECTION 1 1 10/21/2013 10/25/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/21/2013 10/25/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 10/21/2013 10/25/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/21/2013 10/25/2013 IP 71124.04 Occupational Dose Assessment 1 10/21/2013 10/25/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.