| Limerick Generating Station Inspection/Activity Plan cc w/encl: Distribution via ListServ | | Limerick Generating Station Inspection/Activity Plan cc w/encl: Distribution via ListServ |
|
| |
|
| ML12248A025 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver/SM PKrohn/PGK DRoberts/DJR DATE 08/ 27 /12 08/27 /12 08/30 /12 | | ML12248A025 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver/SM PKrohn/PGK DRoberts/DJR DATE 08/ 27 /12 08/27 /12 08/30 /12 M. Pacilio 3 Distribution w/encl: |
| | |
| M. Pacilio 3 Distribution w/encl: | |
| W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRP P. Wilson, DRS P. Krohn, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP E. DiPaolo, DRP, SRI J. Hawkins, DRP, RI N. Esch, DRP, AA S. Kennedy, RI, OEDO DRS Branch Chiefs (6) | | W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRP P. Wilson, DRS P. Krohn, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP E. DiPaolo, DRP, SRI J. Hawkins, DRP, RI N. Esch, DRP, AA S. Kennedy, RI, OEDO DRS Branch Chiefs (6) |
| N. McNamara, RI, SLO D. Tifft, RI. SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrPMLimerick Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource | | N. McNamara, RI, SLO D. Tifft, RI. SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrPMLimerick Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20234012023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) ML20293A1712020-10-19019 October 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000352/2020005 and 05000353/2020005) ML20183A3192020-07-0101 July 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000352/2020014 and 05000353/2020014 IR 05000352/20190062020-03-0303 March 2020 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006) ML19254A6312019-09-0909 September 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000352/2020401 and 05000353/2020401 IR 05000352/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000352/2019005 and 05000353/2019005) IR 05000352/20180062019-03-0404 March 2019 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2018006 and 05000353/2018006) IR 05000352/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000352/2018005 and 05000353/2018005) IR 05000352/20170062018-02-28028 February 2018 Annual Assessment Letter for Limerick Generating Station-Units 1 and 2 (Report 05000352-2017006 and 05000353-2017006-Report 05000352-2017402 and 05000353-2017402-Report 05000352-2017501 and 05000353-2017501) IR 05000352/20170052017-08-28028 August 2017 Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005) IR 05000352/20160062017-03-0101 March 2017 Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 IR 05000352/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Limerick Generating Station Units 1 and 2 (Report 05000352/2016005 and 05000353/2016005) IR 05000352/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Limerick Generating Station, Units 1 & 2 (Inspection Report 05000352/2015006 & 05000353/2015006) IR 05000352/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2015005 and 05000353/2015005) IR 05000352/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001) IR 05000352/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2014006 and 05000353/2014006 IR 05000352/20130012014-03-0404 March 2014 ROP-14 2013 Limerick Generating Station Annual Assessment Letter for Report 05000352/2013001 and 05000353/2013001, and Inspection Plan IR 05000352/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2013006 and 05000353/2013006 IR 05000352/20120012013-03-0404 March 2013 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2012001 and 05000353/2012001) ML13031A4462013-01-31031 January 2013 Notification of Conduct of Triennial Fire Protection Baseline Inspection ML12248A0252012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station IR 05000352/20110012012-03-0505 March 2012 Annual Assessment Letter for Limerick Generating Station (Report 05000352-11-001 and 05000353-11-001) ML1124113542011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Limerick Generating Station IR 05000352/20100012011-03-0404 March 2011 Annual Assessment Letter for Limerick Generating Station, EOC-11 (05000352/2010001 and 05000353/2010001) ML1024405552010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 ML1006210902010-03-0303 March 2010 EOC Letter and Report 22 ML0924402372009-09-0101 September 2009 Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009) IR 05000352/20090012009-03-0404 March 2009 Annual Assessment Letter - Limerick Generating Station (05000352-09-001 and 05000353-09-001) ML0824704412008-09-0202 September 2008 2008 Mid-Cycle Assessment Letter and Inspection Plan - Limerick ML0806004312008-03-0303 March 2008 Annual Assessment Letter ML0724305792007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000352/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001) IR 05000352/20060012006-03-0202 March 2006 Annual Assessment Letter - Limerick Generating Station (Report 05000352/2006001 and 05000353/2006001) ML0524207032005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Limerick ML0506106412005-03-0202 March 2005 Annual Assessment Letter 2005001 - Limerick ML0406301852004-03-0202 March 2004 2003-04 Annual Assessment Letter - Limerick IR 05000352/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Limerick Generating Station (Report 50-352/03-01, 50-353/03-01) IR 05000352/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Limerick Generating Station (Report 50-352/02-01, 50-353/02-01) 2024-08-29
[Table view] Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, lL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LIMERICK GENERATING STATION (REPORT 05000352/2012006 and 05000353/2012006)
Dear Mr. Pacilio:
On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Limerick Generating station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Limerick Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). There-fore, the NRC plans to conduct ROP baseline inspections at Unit 1.
The NRC determined the performance at Limerick Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRC=s ROP Action Matrix because of a self-revealing finding of low to moderate safety significance (White) involving a failure by Exelon to ensure sufficient technical guidance was contained in operating procedures to: (1) ensure that a feedwater (FW) motor-operated valve (MOV) could close against expected system differential pressures; and (2) prevent operators from attempting to close FW MOVs out of sequence resulting in differential pressures for which they are not designed. As a result, two FW valves failed to fully shut resulting in a primary containment isolation valve and the reactor core isolation cooling system being inoperable for greater than their Technical Specification allowed outage time. This finding was assigned to the third quarter of 2011 (ML113410132).
On August 2, 2012, the NRC issued a supplemental inspection report and assessment follow-up letter (ML12215A272) documenting an inspection performed in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, to review the performance of Limerick Unit 2 in addressing the White finding discussed above. The NRC concluded your actions met the objectives of IP 95001. Therefore, in accordance with the guidance in IMC 0305, the White finding will only be considered in
M. Pacilio 2 assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Limerick Unit 2 to be in the Licensee Response Column of the ROP Action Matrix beginning with the third calendar quarter of 2012.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. We also plan to conduct independent spent fuel storage installation inspections (lSFSl) using Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants, and an infrequently performed inspection using IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow up on three traditional enforcement violations in the area of impeding the regulatory process that occurred between the 3rd quarter 2011 and the 2nd quarter 2012 (ML112550468, ML12128A373, and ML12215A272). The NRC will schedule and conduct IP 92723 when your staff has notified us of your readiness for this inspection. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Paul Krohn at 610-337-5120 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts Division of Reactor Projects Docket Nos. 50-532, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Generating Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML12248A025 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver/SM PKrohn/PGK DRoberts/DJR DATE 08/ 27 /12 08/27 /12 08/30 /12 M. Pacilio 3 Distribution w/encl:
W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRP P. Wilson, DRS P. Krohn, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP E. DiPaolo, DRP, SRI J. Hawkins, DRP, RI N. Esch, DRP, AA S. Kennedy, RI, OEDO DRS Branch Chiefs (6)
N. McNamara, RI, SLO D. Tifft, RI. SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrPMLimerick Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource
Page 1 of 3 Limerick 08/22/2012 13:29:41 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 10/08EXM - LIMERICK INITIAL OL EXAM 4 1 09/10/2012 09/14/2012 U01858 FY13-LIMERICK INITIAL OPERATOR LICENSING EXAM 1 10/08/2012 10/19/2012 U01858 FY13-LIMERICK INITIAL OPERATOR LICENSING EXAM HP - RADIATION SAFETY INSPECTIONS 1 1, 2 07/09/2012 07/13/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/09/2012 07/13/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/09/2012 07/13/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent TI-188 - SEISMIC WALKDOWNS 1 1, 2 07/30/2012 08/03/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns TI 182 - DEGRADATION UNDERGROUNG PIPING - PHASE 1 1 1, 2 08/06/2012 08/10/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping TI-187 - TI-187 FLOODING WALKDOWNS 1 1, 2 08/03/2012 08/20/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 7111121 - CDBI 7 1, 2 08/27/2012 08/31/2012 IP 7111121 Component Design Bases Inspection 1, 2 09/10/2012 09/14/2012 IP 7111121 Component Design Bases Inspection 1, 2 09/24/2012 09/28/2012 IP 7111121 Component Design Bases Inspection 7111111B - LIMERICK ON-SITE RQL INSP W/ P/F RESULTS 3 1, 2 11/05/2012 11/09/2012 IP 7111111B Licensed Operator Requalification Program 71152B - PI&R 5 1, 2 10/22/2012 10/26/2012 IP 71152B Problem Identification and Resolution 1, 2 11/05/2012 11/09/2012 IP 71152B Problem Identification and Resolution HP - RADIATION SAFETY INSPECTIONS 1 1, 2 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/05/2012 11/09/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/05/2012 11/09/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent EP PROGR - EP PROGRAM INSPECTION 1 1, 2 12/03/2012 12/07/2012 IP 7111402 Alert and Notification System Testing 1, 2 12/03/2012 12/07/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 12/03/2012 12/07/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 12/03/2012 12/07/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 92723 - FOLLOWUP FOR 3 SLIV TE VIOS IN 12 MONTHS 1 1, 2 01/01/2013 03/31/2013 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Limerick 08/22/2012 13:29:41 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7/15 EXM - LIMERICK LSRO INITIAL EXAM 2 1 06/24/2013 06/28/2013 U01869 FY13-LIMERICK LSRO INITIAL OPERATOR LICENSING EXAM 1 07/15/2013 07/19/2013 U01869 FY13-LIMERICK LSRO INITIAL OPERATOR LICENSING EXAM HP - RADIATION SAFETY INSPECTIONS 1 1, 2 03/04/2013 03/08/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/04/2013 03/08/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/04/2013 03/08/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/04/2013 03/08/2013 IP 71124.04 Occupational Dose Assessment 1, 2 03/04/2013 03/08/2013 IP 71124.05 Radiation Monitoring Instrumentation 60855 - ISFSI LOADING INSPECTION 2 1, 2 03/13/2013 06/30/2013 IP 60855 Operation Of An ISFSI 1, 2 03/13/2013 06/30/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 7111108G - U2 INSERVICE INSPECTION 1 2 04/01/2013 04/05/2013 IP 7111108G Inservice Inspection Activities - BWR HP - RADIATION SAFETY INSPECTIONS 1 1, 2 04/01/2013 04/05/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/01/2013 04/05/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/01/2013 04/05/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/01/2013 04/05/2013 IP 71124.04 Occupational Dose Assessment 1, 2 04/01/2013 04/05/2013 IP 71124.05 Radiation Monitoring Instrumentation TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 05/06/2013 05/10/2013 IP 7111105T Fire Protection [Triennial]
1, 2 05/20/2013 05/24/2013 IP 7111105T Fire Protection [Triennial]
HP - RADIATION SAFETY INSPECTIONS 1 1, 2 07/08/2013 07/12/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program HP - RADIATION SAFETY INSPECTIONS 1 1, 2 11/04/2013 11/08/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/04/2013 11/08/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/04/2013 11/08/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent TI 182 - DEGRAD IATION UNDERGROUND PIPING-PHASE 2 1 1, 2 11/12/2013 11/15/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping EP EX - EP EXERCISE EVALUATION 5 1, 2 11/18/2013 11/22/2013 IP 7111401 Exercise Evaluation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Limerick 08/22/2012 13:29:41 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP EX - EP EXERCISE EVALUATION 5 1, 2 11/18/2013 11/22/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.