ML13109A436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 51: Line 51:


==SUMMARY==
==SUMMARY==
PILGRIM.DOCX ADAMS Accession No.: ML13109A436 SUNSI Review Non-Sensitive                            Publicly Available Sensitive                                Non-Publicly Available OFFICE klm      RI/DRP            RI/DRP NAME            EKeighley/EMK    RBellamy/RRB DATE            4 /19 /13          4/19 /13
PILGRIM.DOCX ADAMS Accession No.: ML13109A436 SUNSI Review Non-Sensitive                            Publicly Available Sensitive                                Non-Publicly Available OFFICE klm      RI/DRP            RI/DRP NAME            EKeighley/EMK    RBellamy/RRB DATE            4 /19 /13          4/19 /13 April 2, 2013 2012 Annual Assessment Meeting Pilgrim Nuclear Power Station Public Meeting Sign-In Sheet Page _ _ of :2)
 
April 2, 2013 2012 Annual Assessment Meeting Pilgrim Nuclear Power Station Public Meeting Sign-In Sheet Page _ _ of :2)
Name Organization (if applicable)
Name Organization (if applicable)



Latest revision as of 05:37, 6 February 2020

4/2/2013 - Pilgrim - Annual Assessment Meeting Summary
ML13109A436
Person / Time
Site: Pilgrim
Issue date: 04/19/2013
From: Bellamy R
NRC/RGN-I/DRP/PB5
To:
Entergy Nuclear Operations
Bellamy R
References
MN 13-005
Download: ML13109A436 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 April 19, 2013 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PILGRIM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 2, 2013, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Plymouth Town Hall in Plymouth, Massachusetts. The NRC conducted the open house to discuss its assessment of the safety performance at Pilgrim Nuclear Power Station for 2012.

A notice of the open house was issued on March 27, 2013, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML13086A590.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards, fact sheets and reading material and was available to discuss its assessment of the safety performance of Pilgrim Nuclear Power Station for the period of January 1 through December 31, 2012, as documented in our letter dated March 4, 2013 (ADAMS Accession No. ML13060A340). The NRC poster boards, fact sheets and reading material presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, local officials, State officials, and members of the media attended the open house and were offered the opportunity to question the NRC regarding Pilgrims performance and the role of the agency in ensuring safe plant operations.

/RA/

Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects

Enclosures:

Attendee List (ML)

ML13060A340). The NRC poster boards, fact sheets and reading material presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, local officials, State officials, and members of the media attended the open house and were offered the opportunity to question the NRC regarding Pilgrims performance and the role of the agency in ensuring safe plant operations.

Enclosures:

Attendee List (ML)

/RA/

Ronald R. Bellamy, PhD, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email)

R. Bellamy, DRP M. Schneider, DRP, SRI S. Shaffer, DRP B. Smith, DRP, RI E. Keighley, DRP S. Campbell, DRP, AA J. DeBoer, DRP RidsNRRPMPilgrim Resource DOC NAME: G:\DRP\BRANCH5\ANNUAL ASSESSMENT MEETINGS\2012 EOC\ANNUAL ASSESSMENT MEETING

SUMMARY

PILGRIM.DOCX ADAMS Accession No.: ML13109A436 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP NAME EKeighley/EMK RBellamy/RRB DATE 4 /19 /13 4/19 /13 April 2, 2013 2012 Annual Assessment Meeting Pilgrim Nuclear Power Station Public Meeting Sign-In Sheet Page _ _ of :2)

Name Organization (if applicable)

April 2, 2013 2012 Annual Assessment Meeting Pilgrim Nuclear Power Station Public Meeting Sign-In Sheet Page Name Organization (if applicable)

April 2, 2013 2012 Annual Assessment Meeting Pilgrim Nuclear Power Station Public Meeting Sign-In Sheet Name Organization (if applicable)