AEP-NRC-2016-22, Transmittal of Revision to Emergency Plan Implementing Procedures, Including Revision 32 to PMP-2080-EPP-100, Revision 33 to PMP-2080-EPP-100, and Revision 14 to EPP-2080-ERO-001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/19/2016
| issue date = 02/19/2016
| title = Transmittal of Revision to Emergency Plan Implementing Procedures, Including Revision 32 to PMP-2080-EPP-100, Revision 33 to PMP-2080-EPP-100, and Revision 14 to EPP-2080-ERO-001
| title = Transmittal of Revision to Emergency Plan Implementing Procedures, Including Revision 32 to PMP-2080-EPP-100, Revision 33 to PMP-2080-EPP-100, and Revision 14 to EPP-2080-ERO-001
| author name = Scarpello M K
| author name = Scarpello M
| author affiliation = Indiana Michigan Power Co
| author affiliation = Indiana Michigan Power Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:INDIA NA MICHIGAN POWER A unit of American Electric Power February 19, 2016 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 lndianaMichiganPower.com AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
{{#Wiki_filter:INDIA NA MICHIGAN                                                                               Indiana Michigan Power Cook Nuclear Plant POWER                                                                                One Cook Place Bridgrnan, Ml 49106 A unit ofAmerican Electric Power                                                        lndianaMichiganPower.com February 19, 2016                                                                  AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.:         50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001


==SUBJECT:==
==SUBJECT:==
Line 22: Line 22:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:
Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:
Procedure Number Title Revision Effective Date PMP-2080-EPP-i100 -Emergency Response 32 1/28/2016 PMP-2080-EPP-100 Emergency Response 33 2/12/2016 EPP-2080-ERO--001 -Emergency Response Resource Readiness 14 2/3/2016 There are no new or revised commitments in this letter. Should you have any contact me at (269) 466-2649.Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l questions, please
Procedure Number                                 Title                   Revision   Effective Date PMP-2080-EPP-i100               -Emergency   Response                         32           1/28/2016 PMP-2080-EPP-100                 Emergency Response                           33           2/12/2016 EPP-2080-ERO--001               -Emergency   Response Resource Readiness       14           2/3/2016 There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.
Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l


==Enclosure:==
==Enclosure:==
Encloure:
Encloure:
Emergency Plan Implementing Procedures
Emergency Plan Implementing Procedures
./I U. S. Nuclear Regulatory Commission AEP-NRC-201 6-22 Page 2 c: R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich -NRC Washington, DC, w/o enclosure MDEQ -RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson -NRC Region Ill (CD)A. J. Williamson  
                                                                                                                . /I
-AEP Ft. Wayne, w/o enclosure Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14 IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32 Doc No.: Title: Alteration Cat.: CDI/50.59:1 PORC Mtg. No.: CARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: Effective Date: PMP-2080-EPP-1 00 EMERGENCY RESPONSE Major Editorial Correction
 
-Full Review 50.54(q) #15-46 4666 N/A 1/28/2016 12:00:00 AM Rev03 No.: Approvals NaImeIReview/Approval Type/Capacity Date]Hart, William E 1 (i376639) 1l Validation Review 112/16/2015 12:12 J Hart, William E ~ 1 Cross-Discipline Review: EMERGENCY 1 12/16/2015_12:1 Thompson, Alisa I (s0841 jlSpecial Review : E-PLAN GROUP 12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536 1 Hat( illiam9 E l3 Technical Review 101/08/2016 10:15 j M s065 5_Management Review 101/14/2016 07:32 ]Wendzel, Regan 7ApoaAuhrt01/1/01 32 (s007887)
U. S. Nuclear Regulatory Commission                       AEP-NRC-201 6-22 Page 2 c:     R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich - NRC Washington, DC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson - NRC Region Ill (CD)
Apoa uhrt 0/421 32 Signature Comments=Validation Review performed by Simpson, EP]Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]
A. J. Williamson - AEP Ft. Wayne, w/o enclosure
]-he technical review was performed by Jerry Peterson]IPORC approval obtained at meeting 4666 Approved at PORC per Plant Manager, Jim Ross.
PMP-2080-EPP-100 Rev. 32 Page 1 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AND SCOPE ............................................................
3 2 DEFINITIONS AN]) ABBREVIATIONS
............................................
3 3 DETAILS............................................................................
6 3.1 General Information
..........................................................
6 3.2 SM-SEC Checklist
............................................................
7 3.3 Unaffected CR Checklist....................9


===3.4 Shift===
Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14
Technical Advisor (STA) ................................................
10 3.5 Contingency Director ............
............................................
10 4 FINAL CONDITIONS..............................................................
11 5 REFERENCES..
...................................................................
12 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Attachment 6: Attachment 7: Attachment 8: Attachment 9: Attachment 10: Attachment 11: Protective Action Recommendations
..................................
13 Activation of ERONS..................................................17 Dismissal of Non-Essential Personnel
...................................
19 Accountability
.........................................................
21 Evacuation............................................................
26 Terminating a IJE....:.................................................
30 Notification of On-Site Personnel......................................
31 Notification of Off-Site Agencies ......................................
35 MSP Notification.......................................................40 Berrien County Sheriff Notification
...................................
43 NRC Notification
..........................
............................
46 PMP-2080-EPP-100 Rev. 32 Page 2 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency PreparednesS Writer Document Owner Cognizant Organization Attachment 12: Attachment 13: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Manual Completion of EM!) Forms ...................................
48 Activation of FLEX Phase 3...........................................
51 PPC or PSS Control Room Data ......................................
52 Emergency Turnover Checklist
........................................
54 Plant Status.............................................................
58 Request For Additional Information
..................................
60 Contingency Team Tracking Form ....................................
61 Reference PMP-2080-EPP-100 Rev. 32 Page 3 of 61 Emergency Response 1 PURPOSE AND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.


===1.2 Terminating===
IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32


an event if the conditions for the UE no longer exist, and no escalation of classification is expected.2 DEFINITIONS AND ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AEO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources.
Rev03 Doc No.:                PMP-2080-EPP-1 00                                No.:
Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.Control Room An available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.*CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to*Status Trees restore safety functions that are challenged.
 
DAP Dose Assessment Program EAL Emergency Action Level Reference PMiP-2080-EPP-100 Rev. 32 Page 4 of 61 Emergency Response Term Meaning ED Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency ResPonse Auxiliary Equipment Operators.
==Title:==
ERDS Emergency Response Data System ERE Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency flAB Hostile Action Based IC Initiating Conditions IIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation responsible for placing the unit in a safe condition, during emergency Team conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
EMERGENCY RESPONSE Major Editorial Correction - Full Alteration Cat.:
MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.
Review CDI/50.59:1              50.54(q) #15-46 PORC Mtg. No.:          4666 CARB Mtg. No.:
OSC Operations Support Center PA Public Address Reference  
Admin Hold AR No.:
[ PMLP-2080-EPP-100  
Superceding Proc(s):
[ Rev. 32 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Containment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data.RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager -Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building TIE Unusual Event US .Unit Supervisor WCC-SRO Work Control Center -Senior Reactor Operator Reference PM~P-2080-EPP-100 Rev. 32 Page 6 of 61 Emergency Response 3 DETAILS NOTE: eSteps in this procedure that do not apply to the current classification may be marked N/A.e The steps in this procedure are listed in the preferred order of performance.
Temp Proc Exp Date:
Steps may be performed in a different sequence.3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.3.1.3 The following actions shall not be delegated by the SEC (Command &Control Function):
Temp Change Exp Date:
Temp Proc/Change N/A End:
Effective Date:          1/28/2016 12:00:00 AM Approvals NaImeIReview/Approval Type/Capacity                            Date]
Hart, William E (i376639) 1 1lValidation Review                  112/16/2015 12:12 J Hart, William E ~        1 Cross-Discipline Review: EMERGENCY1 12/16/2015_12:1 Thompson, Alisa        I (s0841          jlSpecial Review : E-PLAN GROUP        12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536                                            1 Hat(illiam9    E        l3 Technical Review                  101/08/2016 10:15  j M s065            5_Management Review                  101/14/2016 07:32  ]
Wendzel, Regan          7ApoaAuhrt01/1/01                                  32 (s007887)                  Apoa uhrt                            0/421      32 Signature Comments
=Validation Review performed by Simpson, EP]
Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]
]-he technical review was performed by Jerry Peterson]
IPORC approval obtained at meeting 4666
 
Approved at PORC per Plant Manager, Jim Ross.
              *'            PMP-2080-EPP-100                Rev. 32                  Page 1 of 61 Emergency Response Reference Bill Hart            Emergency Preparedness            Emergency Preparedness Writer                    Document Owner                  Cognizant Organization TABLE OF CONTENTS 1  PURPOSE AND SCOPE ............................................................ 3 2  DEFINITIONS AN]) ABBREVIATIONS ............................................ 3 3  DETAILS............................................................................ 6 3.1  General Information .......................................................... 6 3.2  SM-SEC Checklist ............................................................ 7 3.3  Unaffected CR Checklist....................9 3.4  Shift Technical Advisor (STA) ................................................ 10 3.5  Contingency Director ............            ............................................ 10 4  FINAL CONDITIONS.............................................................. 11 5  REFERENCES.. ...................................................................                12 :    Protective Action Recommendations .................................. 13 :    Activation of ERONS..................................................17 :    Dismissal of Non-Essential Personnel ...................................19 :    Accountability ......................................................... 21 :    Evacuation............................................................ 26 :    Terminating a IJE....:................................................. 30 :    Notification of On-Site Personnel...................................... 31 :    Notification of Off-Site Agencies ...................................... 35 :    MSP Notification.......................................................40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification .......................... ............................            46
 
PMP-2080-EPP-100              Rev. 32              Page 2 of 61 Emergency Response Reference Bill Hart            Emergency Preparedness          Emergency PreparednesS Writer                  Document Owner                Cognizant Organization 2: Manual Completion of EM!) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1:    PPC or PSS Control Room Data ...................................... 52 Data Sheet 2:    Emergency Turnover Checklist ........................................ 54 Data Sheet 3:    Plant Status............................................................. 58 Data Sheet 4:    Request For Additional Information .................................. 60 Data Sheet 5:    Contingency Team Tracking Form .................................... 61
 
Reference                PMP-2080-EPP-100                Rev. 32            Page 3 of 61 Emergency Response 1      PURPOSE AND SCOPE 1.1    This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.
1.2    Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.
2       DEFINITIONS AND ABBREVIATIONS Term               Meaning AOP               Abnormal Operating Procedure AEO               Auxiliary Equipment Operator BCSD               Berrien County Sheriff Department BOP               Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency     accountability at the beginning of the event to ensure persons are Coningency         accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.
Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency         Equipment, Utility, Makeup Plant) from the shift not assigned to other Team               duties who are responsible for responding to the operations needs of the affected unit.
Control Room       Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.
Control Room       An available extra SRO or RO who acts as a single point contact for the Liaison           Unit Supervisor to the Contingency Director, and the SM/SEC.
*CR                 Control Room Critical Safety     A set of flowchart diagnostic aids used to monitor the condition of critical Function           safety functions and select appropriate Function Restoration Procedures to
*Status Trees       restore safety functions that are challenged.
DAP                 Dose Assessment Program EAL                 Emergency Action Level
 
Reference             PMiP-2080-EPP-100               Rev. 32             Page 4 of 61 Emergency Response Term           Meaning ED             Emergency Director EMD-32         Nuclear Plant Accident Notification form ENC           Emergency News Center EOC           Emergency Operation Center EOF           Emergency Operations Facility EOP           Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO         Security are designated as Emergency ResPonse Auxiliary Equipment Operators.
ERDS           Emergency Response Data System ERE           Emergency Response Facility ERONS         Emergency Response Organization Notification System ERO           Emergency Response Organization GE             General Emergency flAB           Hostile Action Based IC             Initiating Conditions IIC           Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation     responsible for placing the unit in a safe condition, during emergency Team       conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
MSP           Michigan State Police NEA           Nuclear Emergency Alarm NRC           Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.
Off-site Response Organization refers to Berrien County Sheriff's ORO       Department, Michigan State Police or local fire departments.
OSC           Operations Support Center PA             Public Address
 
Reference       [     PMLP-2080-EPP-100         [   Rev. 32         Page 5 of 61 Emergency Response Term           Meaning PACHMT         Post-Accident Containment Hydrogen Monitoring team PAR           Protective Action Recommendation PPC           Plant Process Computer PSP           Plant Status PAR PSS           Plant System Server Local Area Network application for PPC data
.RAC           Radiological Assessment Coordinator RO             Reactor Operator RP             Radiation Protection SAE             Site Area Emergency SAS             Secondary Alarm Station SEC             Site Emergency Coordinator SIP             Shelter In Place SM             Shift Manager SM-SEC         Shift Manager - Site Emergency Coordinator SRO             Senior Reactor Operator STA             Shift Technical Advisor TSC             Technical Support Center TSC-SEC         Technical Support Center   - Site Emergency Coordinator NEST           Nuclear Engineering Services & Technology Building TIE             Unusual Event US             .Unit Supervisor WCC-SRO         Work Control Center   - Senior Reactor Operator
 
Reference               PM~P-2080-EPP-100               Rev. 32             Page 6 of 61 Emergency Response 3   DETAILS NOTE:       eSteps     in this procedure that do not apply to the current classification may be marked N/A.
e   The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.
3.1 General Information 3.1.1   SM-SEC implements this procedure until relieved of SEC duties.
3.1.2   Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.
3.1.3   The following actions shall not be delegated by the SEC (Command &
Control Function):
* Classification of the emergency.
* Classification of the emergency.
o Directing the notification of offsite officials.
o Directing the notification of offsite officials.
o Approval of PAR to offsite emergency management agencies.3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications.
o Approval of PAR to offsite emergency management agencies.
This should be supported, as resources become available.
3.1.4   Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.
3.1.5   The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.
3.1.6   PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)
3.1.7   Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.
The use of Operations Department staff is recommended.
The use of Operations Department staff is recommended.
Reference PMP-2080-EPP-100  
 
[ Rev. 32 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:
Reference                 PMP-2080-EPP-100           [     Rev. 32           Page 7 of 61 Emergency Response 3.2   SM-SEC Checklist NOTE:
* The following steps are repeated for each classification upgrade.*A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
* The following steps are repeated for each classification upgrade.
3.2.3 IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers'Bridge.NOTE: Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).
                *A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.
3.2.1     Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.
3.2.2     Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
3.2.3     IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers' Bridge.
NOTE:     Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).
Activation of the ERONS includes activating the Emergency Response Facilities.
Activation of the ERONS includes activating the Emergency Response Facilities.
3.2.4 IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel.
3.2.4     IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).
SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g., hostile force, radiation release, toxic spill, etc.).3.2.5 IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
NOTE:         Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,
Reference I PMP-2080-EPP-100
hostile force, radiation release, toxic spill, etc.).
[ Rev. 32 Page 8 of 61 Emergency Response 3.2.6 IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.
3.2.5     IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12 Upon completion of turnover, inform both control rooms that the Command& Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.3.2.14 IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.3.2.15 WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.
Reference PMP-2080-EPP-100 Rev. 32 Page 9 of 61 Emergency Response 3.3 Unaffected CR Checklist 3.3.1 WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.
___3.3.3 Assign an individual to start the Dose Assessment Program (DAP). ___IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP-108, Initial Dose Assessment.___
3.3.4 TSC Ventilation
: a. IF any of the following conditions are present: ___* The emergency involves a loss of coolant accident* The Control Room Pressurization System has been activated o A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode. ___b. Record the Emergency Mode start time on the placard located below the switch.NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.
3.3.5 if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.
___* Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).3.3.6 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration S Reference
[ PMP-2080-EPP-100 I Rev. 32 Page 10 of 61 Emergency Response 3.4 Shift Technical Advisor (STA)3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.3.4.2 Provides an independent assessment of conditions present and actions taken.3.4.3 Reports to the SM and acts in an advisory capacity.3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.


====3.4.5 Ensures====
Reference      I    PMP-2080-EPP-100          [    Rev. 32            Page 8 of 61 Emergency Response 3.2.6    IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.
that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.3.5 Contingency Director 3.5.1 The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.3.5.2 The Contingency Director performs the following tasks.o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
3.2.7    IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).
a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.* Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.* Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
3.2.8    IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).
Reference  
3.2.9    IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
] Rev. 32 Page 11 of 61 Emergency Response NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.* WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.* Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.a Coordinate the move of personnel to the OSC when directed by the SM.o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
3.2.10  Assign an individual to complete Data Sheet 3, Plant Status.
4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.Record any comments below (include document numbers for corrective actions): Verified Complete By: Performer Independently Verified By:-Date: ___ I/Date : __/ _Date: I/ __Performer Reviewed By: Operations Shift Manager I designee Reference I PMP-2080-EPP-100 I Rev. 32 I Page 12 of 61 Emergency Response 5 5.1 REEERENCES Use  
3.2.11  WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12  Upon completion of turnover, inform both control rooms that the Command
          & Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13  IF in a UIE and conditions warrant AND the SM-SEC has Command &
Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.
3.2.14  IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.
3.2.15  WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.
 
Reference                PMP-2080-EPP-100                Rev. 32            Page 9 of 61 Emergency Response 3.3  Unaffected CR Checklist 3.3.1    WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event).        ___
3.3.2    Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.                                              ___
3.3.3    Assign an individual to start the Dose Assessment Program (DAP).                ___
IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP- 108, Initial Dose Assessment.___
3.3.4     TSC Ventilation
: a. IF any of the following conditions are present:                          ___
* The emergency involves a loss of coolant accident
* The Control Room Pressurization System has been activated o    A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.                                                          ___
: b. Record the Emergency Mode start time on the placard located below the switch.
NOTE:      Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.
3.3.5   if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.                                                                      ___
* Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
3.3.6    Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration
 
S Reference        [      PMP-2080-EPP-100 Emergency Response I    Rev. 32            Page 10 of 61 3.4  Shift Technical Advisor (STA) 3.4.1    Reports to the Control Room in the event of an emergency or off-normal event.
3.4.2    Provides an independent assessment of conditions present and actions taken.
3.4.3    Reports to the SM and acts in an advisory capacity.
3.4.4    Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4.5    Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.
NOTE:       The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.
3.5   Contingency Director 3.5.1   The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.
3.5.2   The Contingency Director performs the following tasks.
o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.
* Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.
o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.
* Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
 
Reference             PM*P-2080-EPP-100            ]   Rev. 32             Page 11 of 61 Emergency Response NOTE:       Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.
a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.
o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
* WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.
* Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.
a Coordinate the move of personnel to the OSC when directed by the SM.
o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
4     FINAL CONDITIONS 4.1   The emergency has been terminated and the plant has entered the recovery phase.
Record any comments below (include document numbers for corrective actions):
Verified Complete By:                                               Date: ___      I/
Performer Independently Verified By:-                                         Date : __/       _
Performer Reviewed By:                                                        Date:     I/   __
Operations Shift Manager I designee
 
Reference     I     PMP-2080-EPP-100       I   Rev. 32     I Page 12 of 61 Emergency Response 5   REEERENCES 5.1 Use  


==References:==
==References:==


5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-00 1, Activation and Operation of the EOF.5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1i.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing  
5.1.1   PMP-2080-EPP-101, Emergency Classification 5.1.2   PMP-2080-EPP-108, Initial Dose Assessment 5.1.3   RMT-2080-EOF-00 1, Activation and Operation of the EOF.
5.1.4   RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5   SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6   RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7   PMP-7030-001-001, Prompt NRC Notification 5.1i.8   EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing  


==References:==
==References:==


====5.2.1 Source====
5.2.1   Source  


==References:==
==References:==
: a. Cook Nuclear Plant Emergency Plan b. SPP-2060-SFI-203, Security Actions During Emergency Conditions
: a. Cook Nuclear Plant Emergency Plan
: b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2    General References
: a. Michigan Emergency Management Plan
: b. NRC Regulatory Issue Summary, RIS-2002-21
: c. NRC Regulatory Issue Summary, RIS-2004-13
: d. NRC Bulletin 2005-02
 
Reference                PMiP-2080-EPP-100              Rev. 32            Page 13 of 61 Emergency Response Attachment 1              Protective Action Recommendations                    Pages:
NOTE:          In selecting a PAR, consider the radiological release characteristic
              *(continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped - e.g., containment pressure relief).
NOTE:          DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.
1      PAR Development 1.1    Proceed through a flowchart in this attachment to develop a PAR.
S    The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
            ,    All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.
2      Issuing a PAR 2.1    After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
2.2    Ensure that the appropriate PAR boxes are checked on the EMD-32a form.
2.3    Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
 
Reference                    PMP-2080-EPP-100                            Rev. 32              Page 14 of 61 I                                    Emergency Response I    Attachment 1                    Protective Action Recommendations                                  Pages:6 Initial - Protective Action Recommendations Yes bsthis a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?
(!f the conditions for a Rapidly ProgressingSevere Accident cannot be immediately confirmed, then A.NSWER .. ,No.)
: 1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?
OR
: 2. The conditions for EAt. R-1 have been met?
Yes HAB        "\
                                                      .HELTER Recommend HOSTILE ACTION                    Recommend INITIAL SHELTER IN PLACE. {Column 2 on              EVACUATION. (Column 3 on PAR PAR Table labeled "HAB SHELTERI*            Table labeled 'INITIAL")it, z1 (L1}
                                                          . SHELTER INPLACE (SIP) 2 miles
* Evacuate 2 mile radius, radius,
* Evacuate areas 2-S miles
* Clear lake area to 5 miles,                downwind,
* All other areas MONITOR &
* All other areas MONITOR &
PREPARE                                    PREPARE END of Initial PAR Flowchart    N
                                                    \    Go to the Follow Up, PAR Flowchart s
Area 1, 2 and clear lake area 6 213.75to      236.25 Areal, 2, 3, 4anddlear lake areas 6& 7                                Area 1, 2, 3, and~clear lake area 6 236.25 to      303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6                        and    Areal, 2, 3 andclear lake area 6 303.75 to      348.75 Area 1, 3, 5antd cear lake area 6                                clear Areal1, 3 aaddcear lake area 6 348.75to      56.25      Areal1, 3, 5 anddcear lake areas 6& 7                              Area 1, 3 and clear lake area 6 Areca 6 Area 1 and clear lake area 6 56.25 to 168.75            Area 1, and dlear lake areas 6 & 7 Notes:    1. Lake areas are =cleared" for eithter evacuation or sheltering.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.
: 3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.
1~
 
I    Reference                                PMIP-2080-EPP-100                                      Rev. 32                    Page 15 of 61 I                                                Emergency Response Atahet1PotcieAto                                                              RcmedtosPages:
Attahmet 1Protctie              Atio Recmmedatons13                                                  -  16 Follow Up - Protective Action Recommendations Has aaL -NITIAL PAR t*e        m-ade?
          ~AZIIZ,
                                                                                                                                    ~o to iii+/-~1 PAR
                                                                                      ]
45                                                        4                        r~J H
Was a RAPiDLY PROCRESSING tlore ctooI~e ~ ~tabIi~edAND Co~iai~~
SEVERE ACCIDENT 8~dax~d                        ~                                                                  ~ra1st          rImi20~ R~'BR?
d~xEt~ Iu~s1 PAR e~slmrj~'
W              i                                    SHELTER RnnnHOSTIL~E ACTION                                R    *omesdOLLOW UP EVACIATIO.N.
SHHEIER IN ILACE.
      .4      axea2 Epamdyx lst dovoreirA areasarEspiad .tn at ti.
eiwas re-cs nmdatima t* add a~dii, sl                      SHELTER') <x:
m x-a (ADD cohamx 1 onPA5 TaUl*
* SHELTER INILACE *SO' 2                          *ColmmS on oPAR Table la1bh--d '*OLLOW
* All otte area MONITOR &
* Eseroat 2 mie rains PREP.ARE
* catem aresas 2-10 miles do*.n, imd
* Alloh. areas M )N*ITOR &
          *All oth* areas    O*N'I-OR &                                                                                    PREPARE PREPARE beo    It~ar~ith d~ Sates
                                                                  ~        4S~~t ~stetm ee~lre~ r~    to do so mcdi~ PARs of all a~aei arms
                                                                                                                                                                'S 4,
exssaedPAC's.
* E~xpaad PAE'a bated at DOSE A*~*SSESS -E"to armsx be~nd 10 tuTIms maedPA(Ia (Atrealasn 1*0mil.s          ~vi~l Ibed*ed*ad hoc*in mrlais dea I.'
                                                  *shd th Sate of Mrr*mniasrar-).
4, and dear ]ake areas 6 & 7                                        Area 1, 2 anddcear lake area 6 213.75 t0 236.25              Area 1, 2, 3, 4artddear lake: areas 6 & 7                                          Ara1Area 1, 2, 3, and dearlake area 6 aauid  IAreal1, 2, 3 and clear lake area 6 303.751 o348.75              Areal, 3,5 andclear lake area 6                                              clear    Areal1, :3and clear lake area 6 lake    Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75              Area 1, anddcear lake areas 6& 7 Notes:    1. Lake areas are 'cleared - fbia either evacuation or sheltering.
: 2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.
: 3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.
 
I      Reference                    ,,,,            PMP-2080-EPP-100                                        Rev. 32                      Page 16 of 61 I                                                    Emergency Response I        tahet1PotcieAto                                                                    Rcm edtosPages:
Attahmet 1Protctie              Atio Recmmedatons13-                                                      16
______________          ______________                          Reference 3 EPA PAG TABLE*
Protective Action                      PAG (projected dose)                                      Comments                                          Michigan Application


====5.2.2 General====
===Response===
References
Theleerin2-in-place or                  1 to S relmt                              Evacuation~lir, for snm<e situations,                    racility operator~s will recommeno ev~acuation of the                      (11 rv&#xa2;iv t~o 53q m.Sv)                  shecering* in~place) should; be initiat=ed              evacuation at 1 remn sheltering in public*                                over four day*                            whern projectcd dose is 1 remn (13 rosy)                place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy                        S en'e(S3 rr5,                            KI is' r:ost effectcive if taken prior t:o              The stateco Michigan will irmplem~ent administ:ration or                      projected dto.'c to                      e*:posure. Ma? resiuire approval of st.ate              irs 1(I plan; facility operator's prophylactic drugs* -                  child thyroid E~rr                        medical officials ior in actordance with                recommen~datrion is implicit in dose KI:                                  expos'ure t.o iocinc                        es*tablished en' eraencv plans).                        estidmation data.
: a. Michigan Emergency Management Plan b. NRC Regulatory Issue Summary, RIS-2002-21
        *t.+Tw*,~l.**o,*'D,+++    -                          I c'r ife~~v,+t++*:e    =:J&* j
: c. NRC Regulatory Issue Summary, RIS-2004-13
                                                                    -+..+t*t+-;te          t+nD
: d. NRC Bulletin 2005-02 Reference PMiP-2080-EPP-100 Rev. 32 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages: NOTE: In selecting a PAR, consider the radiological release characteristic
                                                                                            +I+                fI b.tp:,!'i,J+***
*(continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped
flt i~rle
-e.g., containment pressure relief).NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.1 PAR Development
:v++                      +e  ie+;        h~'
                                                                                                                                          *._*J+.,:  ait+n :* ~t+:.i*+m  .. ,+/+,*.
th'4 r,++            tnJ++.+ :i-m; +++ *-&#xf7;          tt* n
                                              +t*ft"1t3.+n+.5                                                                      i di+'
* m,.t n
    "+a+              the
                        .      t**+++1 e f,+'Jm +t~      ii
                                                        'Tb    - J&#x17d; ti . I ,*r+ +'I r,t~ +-.ix[rt+++=, + +,'Li.                    .* .+
i++*.+ +*,                        ifl r +-J+ *,' +,' u'"int~
                                                                                                                                                          *.*,    :b+-frt
                                                                                                                                                                    *      +;+r*+i 1,
 
Reference                 PMIP-2080-EPP-100               Rev. 32           Page 17 of 61 Emergency Response Attachment 2                        Activation of ERONS                          Pages:
NOTE:       SEC jugetis used todetermine which scenario will be used.
1      IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.
1.1    To activate ERONS:
* Click the Everbridge icon on the desk top.
OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.2    Enter User Name (erons) 1.3    Enter Password (located in ERO brief case) and Click Sign In.
NOTE:     1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.
: 2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.
1.4    To start a scenario, click on the Notifications tab at the top of the page.
1.5    Click on the Templates header to bring up a list of pteprogrammed scenarios.


===1.1 Proceed===
Reference                    PMP-2080-EPP-100                                      Rev. 32            Page 18 of 61 Emergency Response Attachment 2                                    Activation of ERONS                                        Pages:
through a flowchart in this attachment to develop a PAR.S The first PAR is developed using the "Initial Protective Action Recommendation" flowchart., All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.
17 - 18 INOTE:                                ........      ..............              .s ii&deg;t t 1.7 Click Send (loca          ptedB clos to    e te      tpofte          cee) 1.C    mesag      wi      opup askin          ifyuwatt                ddYthisto an evet.t Cick"N,            en Afe      a N  ntification        isrt senat thet  srenauomatiitEcall            goner sbacktr NoiictosrTab                where      thei last  ntfcation            sentCut~is~E Cshonwthtetie 1.7      Click Send (located close to the botop                  of the screen).            Noicaonhaebnsnt NOTE:            Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.
2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.


===2.2 Ensure===
Reference               PMP-2080-EPP-100               Rev. 32       I    Page 19 of 61
that the appropriate PAR boxes are checked on the EMD-32a form.2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
[  Attachment 3 Emergency Response Dismissal of Non-Essential Personnel              PaeI NOTE:           SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
Reference PMP-2080-EPP-100 Rev. 32 Page 14 of 61 I Emergency Response I Attachment 1 Protective Action Recommendations Pages:6 Initial -Protective Action Recommendations Yes bs this a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?(!f the conditions for a Rapidly Progressing Severe Accident cannot be immediately confirmed, then A.NSWER ..,No.)1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?OR 2. The conditions for EAt. R-1 have been met?Yes HAB "\.HELTER Recommend HOSTILE ACTION SHELTER IN PLACE. {Column 2 on PAR Table labeled "HAB SHELTERI*(L1}.SHELTER IN PLACE (SIP) 2 miles radius,* Clear lake area to 5 miles,* All other areas MONITOR &PREPARE Recommend INITIAL EVACUATION. (Column 3 on PAR Table labeled 'INITIAL")it, z1* Evacuate 2 mile radius,* Evacuate areas 2-S miles downwind,* All other areas MONITOR &PREPARE\N END of Initial PAR Flowchart Go to the Follow Up, PAR Flowchart s Area 1, 2 and clear lake area 6 213.75to 236.25 Areal, 2, 3, 4anddlear lake areas 6& 7 236.25 to 303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6 303.75 to 348.75 Area 1, 3, 5antd cear lake area 6 348.75to 56.25 Areal1, 3, 5 anddcear lake areas 6& 7 and clear Areca 6 Area 1, 2, 3, and~clear lake area 6 Areal, 2, 3 andclear lake area 6 Areal1, 3 aaddcear lake area 6 Area 1, 3 and clear lake area 6 Area 1 and clear lake area 6 56.25 to 168.75 Area 1, and dlear lake areas 6 & 7 Notes: 1. Lake areas are =cleared" for eithter evacuation or sheltering.
1   IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.1~
NOTE:           Personnel assisting the ERO (such as a Failure Investigation Process (FTP)
I Reference PMIP-2080-EPP-100 Rev. 32 Page 15 of 61 I Emergency Response Atahet1PotcieAto RcmedtosPages:
Team) should be Radworker qualified (i.e., have a TLD).
Attahmet 1Protctie Atio Recmmedatons13
1.1      IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.
-16 Follow Up -Protective Action Recommendations
1.2     IF radiological conditions may impact dismissal of non-essential personnel (e.g.,
~AZIIZ, Has aaL -NITIAL PAR m-ade?~o to iii+/-~1 PAR]45 4 Was a RAPiDLY PROCRESSING r~J SEVERE ACCIDENT 8~dax~d ~d~xEt~ Iu~s1 PAR e~slmrj~'W i SHELTER tlore ctooI~e ~ ~tabIi~edAND Co~iai~~~ra1st rImi20~ R~'BR?H.4 axea2 Epamdyx lst eiwas re-cs nmdatima add a~dii, sl m x-a (ADD cohamx 1 onPA5
radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* catem aresas 2-10 miles imd*All areas &PREPARE RnnnHOSTIL~E ACTION SHHEIER IN ILACE.SHELTER')  
1.3      Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:
<x :* SHELTER IN ILACE 2* All otte area MONITOR &PREP.ARE R UP EVACIATIO.N.
* Whether or not rapid egress is required (e.g., airborne attack)
dovoreirA areasa rEspiad .tn at ti.on oPAR Table la1bh--d
* Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
* Eseroat 2 mie rains* Alloh. areas M &PREPARE be o It~ar~ith d~ Sates~ 4S~~t ~stetm ee~lre~ r~ to do so mcdi~ PARs of all a~aei arms'S 4, e xssaedPAC's.
o    IF using the Livingston Road route, THEN contact Security to unlock the gates.
* E~xpaad PAE'a bated at DOSE ESS -E " to armsx be~nd 10 tuTIms dea maedPA(Ia (Atrea lasn 1*0 mil.s ~vi~l Ibe in mrlaisth Sate of I.'4, and dear ]ake areas 6 & 7 213.75 t0 236.25 Area 1, 2, 3, 4artddear lake: areas 6 & 7 303.751 o348.75 Areal, 3, 5 andclear lake area 6 Area 1, 2 anddcear lake area 6 Ara1Area 1, 2, 3, and dearlake area 6 aauid IAreal1, 2, 3 and clear lake area 6 clear Areal1, :3and clear lake area 6 lake Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75 Area 1, anddcear lake areas 6& 7 Notes: 1. Lake areas are 'cleared -fbia either evacuation or sheltering.
1.3.1   Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.
: 2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.
I Reference
,,,, PMP-2080-EPP-100 Rev. 32 Page 16 of 61 I Emergency Response I tahet1PotcieAto Rcm edtosPages:
Attahmet 1Protctie Atio Recmmedatons13-16______________
______________
Reference 3 EPA PAG Protective Action PAG (projected dose) Comments Michigan Application Response Theleerin2-in-place or 1 to S relmt Evacuation~
lir, for snm<e situations, racility operator~s will recommeno ev~acuation of the (11 rv&#xa2;iv t~o 53q m.Sv) in~place) should; be initiat=ed evacuation at 1 remn sheltering inover four whern projectcd dose is 1 remn (13 rosy) place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy S en'e (S3 rr5, KI is' r:ost effectcive if taken prior t:o The stateco Michigan will irmplem~ent administ:ration or projected dto.'c to Ma? resiuire approval of st.ate irs 1(I plan; facility operator's prophylactic -child thyroid E~r r medical officials ior in actordance with recommen~datrion is implicit in dose KI: expos'ure t.o iocinc en' eraencv plans). estidmation data.
-
I c'r j t+nD +I+ :v++ flt i~rle fI b.tp:,!' +e ie+ ; *._J+.,:
' h~ ait+n
..th'4 r,++ tnJ++.+ :i-m; +++ n i di+'"+a+
* m,.t n .the 1 e f,+'Jm +t~ 'Tb -ii .ti J I r+ +'I r,t~ +-.ix[rt++
+= , + +,'Li. r +*, .+ + -J + +,' u'"int~ ifl :b+-frt ;+ r*+ i + 1, Reference PMIP-2080-EPP-100 Rev. 32 Page 17 of 61 Emergency Response Attachment 2 Activation of ERONS Pages: NOTE: SEC jugetis used todetermine which scenario will be used.1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.1.1 To activate ERONS:* Click the Everbridge icon on the desk top.OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911.
A person will answer. Explain why you are calling and the actions the Everbridge person should take.1.2 Enter User Name (erons)1.3 Enter Password (located in ERO brief case) and Click Sign In.NOTE: 1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.1.4 To start a scenario, click on the Notifications tab at the top of the page.1.5 Click on the Templates header to bring up a list of pteprogrammed scenarios.
Reference PMP-2080-EPP-100 Rev. 32 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS Pages: 17 -18 INOTE: ........ .............. .s ii&deg; t t 1.7 Click Send (loca ptedB clos e to te tpofte cee)1.C mesag wi opup askin ifyuwatt ddY thisto an evet.t Cick"N, en Afe a n N tification isrt senat thet srenauomati itEcall goner s backtr NoiictosrTab where thei last ntfcation sent Cut ~is~E Cshonwthtetie


===1.7 Click===
1.3.2    Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
Send (located close to the botop of the screen). Noicaonhaebnsnt NOTE: Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911.
1.4 Inform both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).
Person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.
[ Reference PMP-2080-EPP-100 Rev. 32 I Page 19 of 61 Emergency Response[ Attachment 3 Dismissal of Non-Essential Personnel PaeI NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1.5.1    Sound the Containment Evacuation Alarm(s), if required.
1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.NOTE: Personnel assisting the ERO (such as a Failure Investigation Process (FTP)Team) should be Radworker qualified (i.e., have a TLD).1.1 IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel.
1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two tunes.
SEC judgment should be used in determining the type and amount of non-essential help that is needed.1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
1.6.1   IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:
            "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential_ personnel are requested to leave the plant site at this time using the main plant access road."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
1.6.2   if rapid egress is to be used, THEN make the following announcement two times:
            "Attention all personnel. Attention all personnel. Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,
            "vehicle portal near the North Access Building") and exiting the site using (State the route)."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.


===1.3 Contact===
Reference                PMP-2080-EPP-100              Rev. 32            Page 21 of 61 Emergency Response Attachment 4                          Accountability                        2Pages NOTE:          During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:* Whether or not rapid egress is required (e.g., airborne attack)* Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.  
1  Review the three methods of Accountability below:
1.1    Primary Method - using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.
* Personnel will remain in the Assembly Areas until evacuated per SEC direction.
* A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).
1.2    Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.
This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.
* In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
* This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.


====1.3.2 Instruct====
Reference                PMP-2080-EPP-100                Rev. 32            Page 22 of 61 Emergency Response Attachment 4                          Accountability                            2Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* IF using the Livingston Road route, ThEN contact Security to unlock the gates.
1.3   No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).
2     Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.
2.1    Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1    IF using the Primary Method of accountability, TthEN request that Security:
o Prepare for accountability.
o    Commence evacuation of the Owner Controlled Area outside of the Protected Area.
: a. GO TO Step 3.


===1.4 Inform===
Reference               PMP-2080-EPP-100                 Rev. 32         Page 23 of 61 Emergency Response
both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.1.5.1 Sound the Containment Evacuation Alarm(s), if required.1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel.
    *Attachment 4                           Accountability                       Pages:
Make the same announcement two tunes.1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used: "Attention all personnel.
NOTE:           RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.
Attention all personnel.
2.1.2     IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.
Due to the current plant conditions, all non-essential_
personnel are requested to leave the plant site at this time using the main plant access road." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.1.6.2 if rapid egress is to be used, THEN make the following announcement two times: "Attention all personnel.
Attention all personnel.
Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,"vehicle portal near the North Access Building")
and exiting the site using (State the route)." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the"using Security portal" statement.
Reference PMP-2080-EPP-100 Rev. 32 Page 21 of 61 Emergency Response Attachment 4 Accountability 2 Pages NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
1 Review the three methods of Accountability below: 1.1 Primary Method -using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.* Personnel will remain in the Assembly Areas until evacuated per SEC direction.
* A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).1.2 Alternate Method -using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.* In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.* This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
Reference PMP-2080-EPP-100 Rev. 32 Page 22 of 61 Emergency Response Attachment 4 Accountability 2 Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* IF using the Livingston Road route, ThEN contact Security to unlock the gates.1.3 No Accountability
-under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area -intrusion by a hostile force).2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1 IF using the Primary Method of accountability, TthEN request that Security: o Prepare for accountability.
o Commence evacuation of the Owner Controlled Area outside of the Protected Area.a. GO TO Step 3.
Reference PMP-2080-EPP-100 Rev. 32 Page 23 of 61 Emergency Response*Attachment 4 Accountability Pages: NOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.
2.1.2 IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: b. Request that the Owner-Controlled area also be evacuated.
: b. Request that the Owner-Controlled area also be evacuated.
3 Contact Personnel Inside the Protected Area.3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
3       Contact Personnel Inside the Protected Area.
Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.Sound the Nuclear Emergency Alarm.Make a Public Address announcement for personnel to report for accountability.
3.1     IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
Make the announcement two times. An example of this announcement is: "Attention all personnel.
Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
Attention all personnel.
Sound the Nuclear Emergency Alarm.
A (State the current classification  
Make a Public Address announcement for personnel to report for accountability. Make the announcement two times. An example of this announcement is:
-usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements." IF the ER~s have not already been activated, THEN make the following announcement two times: "Attention all personnel.
                  "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."
Attention all personnel.
IF the ER~s have not already been activated, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
                  "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."
Reference PMP-2080-EPP-l00O Rev. 32 Page 24 of 61 Emergency Response Attachment 4 Accountability Pages.3.2 IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.o Sound the Nuclear Emergency Alarm.Make a Public Address announcement for personnel to use the alternate method of accountability.
 
Make the same announcement two times. Anl example of this announcement is: "Attention all personnel.
Reference               PMP-2080-EPP-l00O               Rev. 32         Page 24 of 61 Emergency Response Attachment 4                         Accountability                         Pages.
Attention all personnel.
3.2     IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:
A (State the current classification  
o   Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building")
o   Sound the Nuclear Emergency Alarm.
and exiting the site using (State the route) ." 3.2.1 IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times: "Attention all personnel.
Make a Public Address announcement for personnel to use the alternate method of accountability. Make the same announcement two times. Anl example of this announcement is:
Attention all personnel.
                "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times: "Attention all personnel.
3.2.1   IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:
Attention all personnel.
                "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.
ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.2.2   IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times:
                "Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.
3.2.3   Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
3.3     IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.3.1    Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.


====3.3.1 Direct====
Reference               PMP-2080-EPP-100               Rev. 32           Page 25 of 61 Emergency Response Attachment 4                         Accountability                           Pages 4     Perform follow-up actions.
any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.
4.1   IF the Primary Method of Accountability was used, THtEN o       Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.
Reference PMP-2080-EPP-100 Rev. 32 Page 25 of 61 Emergency Response Attachment 4 Accountability Pages 4 Perform follow-up actions.4.1 IF the Primary Method of Accountability was used, THtEN o Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.* Coordinate with Security to locate any missing individuals.
* Coordinate with Security to locate any missing individuals.
4.2 IF the Alternate Method of Accountability was used, THEN a Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).* Coordinate with Security to locate any missing individuals.
4.2   IF the Alternate Method of Accountability was used, THEN a       Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).
4.3 IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include: a After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).o Coordinate with Security to locate any missing personnel.
* Coordinate with Security to locate any missing individuals.
4.3   IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:
a       After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).
o       Coordinate with Security to locate any missing personnel.
* Public Address announcements as necessary.
* Public Address announcements as necessary.
S Dismissal or evacuation of personnel as necessary.
S   Dismissal or evacuation of personnel as necessary.
I-Reference PMP-2080-EPP-100 Rev. 32 Page 26 of 611 Emergency Response Pages: Attachment 5 Evacuation 26 -29 NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings.
Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
1 Determine If Evacuation Should Be Performed.
Evacuation is performed at a SAE (or GE, if SAE was not entered).*1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.


====1.1.1 Coordinate====
I-Reference                PMP-2080-EPP-100                Rev. 32            Page 26 of  611 Emergency Response Pages:
Attachment 5                              Evacuation                            26 - 29 NOTE:            During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
1  Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE was not entered).
*1.1     IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.
1.1.1    Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary 'for plant personnel.
: 1. 1.2    WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.
1.2    IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.
1.3    IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.
1.4    IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.
* Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.


with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary
Reference               PMP-2080-EPP-100                 Rev. 32           Page 27 of 61 Emergency Response Attachment 5                             Evacuation                             Pages29 NOTE:         Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.
'for plant personnel.
2     Site Evacuation 2.1    Rapid Egress 2.1.1    IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.
: 1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.1.2 IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.1.3 IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.* Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.
: a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.
Reference PMP-2080-EPP-100 Rev. 32 Page 27 of 61 Emergency Response Attachment 5 Evacuation Pages29 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.2 Site Evacuation
Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
IF using the Livingston Road route, THEN contact Security to unlock the gates.
* Request that the Owner Controlled Area also be evacuated.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.


===2.1 Rapid===
Reference               PMP-2080-EPP-100               Rev. 32           Page 28 of 61 Emergency Response Attachment 5                           Evacuation                             Pages:9
Egress 2.1.1 IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.
IF using the Livingston Road route, THEN contact Security to unlock the gates.* Request that the Owner Controlled Area also be evacuated.
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
: c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant.
Reference PMP-2080-EPP-100 Rev. 32 Page 28 of 61 Emergency Response Attachment 5 Evacuation Pages:9 b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s).
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."
Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times."Attention all personnel.
2.2   Normal Egress 2.2.1   IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.                                         ___
Attention all personnel.
* Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,
A (State the current classification  
                  *vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.           ___
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building')
* Request that the Owner Controlled Area also be evacuated.
and leave the site using (State the route) ." c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant."Attention all personnel.
Attention all personnel.
A (State the current classification  
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ." 2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
___* Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,*vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
___* Request that the Owner Controlled Area also be evacuated.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____
RfrnePMI?-2080-EPP-100 Rev. 32 Page 29 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.2.3 Take any necessary follow-up actions.2.3.1 IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.2.3.2 IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.
I Reference PMP-2080-EPIP-100 Rev. 32 Page 30 of 61 I Emergency Response I Attachment 6 Terminating a UJE Pages: 1 IJE Termination 1.1 IF the conditions for the UBE no longer exist, and no escalation of classification is expected, perform the following:


====1.1.1 Instruct====
RfrnePMI?-2080-EPP-100                            Rev. 32          Page 29 of 61 RefeenceEmergency Response Attachment 5                          Evacuation                            Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
operators to inform the MSP and BCSD that the event is terminated.
2.3    Take any necessary follow-up actions.
2.3.1   IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.
2.3.2  IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.


====1.1.2 Instruct====
I  Reference                  PMP-2080-EPIP-100              Rev. 32            Page 30 of 61 I                            Emergency Response I  Attachment 6                          Terminating a UJE                        Pages:
operators to:* Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.* Verify that the form was received by the State and County.* Notify the NRC (Red Phone -NRC Operations Center) that the emergency is terminated.
1        IJE Termination 1.1      IF the conditions for the UBE no longer exist, and no escalation of classification is expected, THE*N perform the following:
1.1.1      Instruct operators to inform the MSP and BCSD that the event is terminated.
1.1.2     Instruct operators to:
* Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
* Verify that the form was received by the State and County.
* Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.
1.2      Inform both Control Rooms that the event is terminated.
1.3      Inform Security that the event is terminated (1118, 1119, 2005 or 2731).
1.4      Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.
2        Collection of Data 2.1      Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.


===1.2 Inform===
I Reference             PMP-2080-EPP-100                 Rev. 32             Page 31 of 61 I                           Emergency Response I   Attachment 7               Notification of On-Site Personnel                   Pages:
both Control Rooms that the event is terminated.
1                                                               31 -34 1 Notify Security
 
: 1. 1   Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.
===1.3 Inform===
1:1.1   if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
Security that the event is terminated (1118, 1119, 2005 or 2731).1.4 Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.
: a. Contact Time         _     _______
I Reference PMP-2080-EPP-100 Rev. 32 Page 31 of 61 I Emergency Response I Attachment 7 Notification of On-Site Personnel Pages: 1 31 -34 1 Notify Security 1. 1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.1:1.1 if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
1.1.2   if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
: a. Contact Time _ _______1.1.2 if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
: a. Contact Time     __________
: a. Contact Time __________
1.1.3   IF a SAL, THEN instruct Security to:
1.1.3 IF a SAL, THEN instruct Security to: a Ready the Security Computer for accountability and prepare for subsequent evacuation.
a   Ready the Security Computer for accountability and prepare for subsequent evacuation.
* Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
* Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
: a. Contact Time _ _______1.1.4 IF a GE, THEN instruct Security to: a Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
: a. Contact Time         _     _______
1.1.4   IF a GE, THEN instruct Security to:
a   Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
* Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
* Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
: a. Contact Time Reference PMP-2080-EPP-100 Rev. 32 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages: 31 -34 1.1.5 IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.a. Contact Time _________2 Notify Chemistry and RP Technicians of the initial emergency classification.
: a. Contact Time


===2.1 Chemistry===
Reference                  PMP-2080-EPP-100                Rev. 32            Page 32 of 61 Emergency Response Attachment 7                    Notification of On-Site Personnel                Pages:
31 -34 1.1.5      IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.
: a. Contact Time        _________
2      Notify Chemistry and RP Technicians of the initial emergency classification.
2.1   Chemistry Contact Time____________
2.2    RP Contact Time__                __________                  ______                ___
3      Make Public Address Announcements                                                  ___
CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.
[ NOTE:            PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.
3.1    Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.
3.1.1      IF in a LUE, THEN make the following announcement two times:
                    "Attention all personnel. Attention all personnel. An Unusual Event has been declared due to            (brief description)      . Continue with your work and be prepared for future announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed      __________
3.1.2 fI? in an Alert, THEN make the following announcement two times:
      "Attention all personnel. Attention all personnel. An Alert has been declared due to        (brief description)    .'
IF emergency facilities are not already activated, THEN continue the announcement with:
            "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed


Contact Time____________
Reference               PMIP-2080-EPP-100             Rev. 32         Page 34 of 61 Emergency ResponseI Attachment 7               Notification of On-Site Personnel               Pages:
2.2 RP Contact Time__ __________
31 -34 NOTE:       Aconaiiyis promderAttachment 4, Accountability.
______ ___3 Make Public Address Announcements
3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes:
___CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.[ NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.3.1 Direct an operator to make a PA announcement for the current classification.
                      "Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."         ___
Make the announcement two times. Modify announcements below as conditions warrant.3.1.1 IF in a LUE, THEN make the following announcement two times: "Attention all personnel.
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.                   _ _
Attention all personnel.
: 2. Time announcements completed_____________
An Unusual Event has been declared due to (brief description)
3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.             ___
.Continue with your work and be prepared for future announcements."
3.1.5   IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed
                      "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."         ___
__________
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___
3.1.2 fI? in an Alert, THEN make the following announcement two times: "Attention all personnel.
: 2. Time announcements completed_____________
Attention all personnel.
3.1.6   IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.           ___
An Alert has been declared due to (brief description)
.'IF emergency facilities are not already activated, THEN continue the announcement with: "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed Reference PMIP-2080-EPP-100 Rev. 32 Page 34 of 61 Emergency ResponseI Attachment 7 Notification of On-Site Personnel Pages: 31 -34 NOTE: Aconaiiyis promderAttachment 4, Accountability.
3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes: "Attention all personnel.
Attention all personnel.
A Site Area Emergency has been declared due to (brief description)." ___1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646. _ _2. Time announcements completed_____________
3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
___3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____"Attention all personnel.
Attention all personnel.
A General Emergency has been declared due to (brief description)." ___1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___2. Time announcements completed_____________
3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
___
RfrnePMP-2080-EPP-100 Rev. 32 Page 35 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages.1 Accelerated Notifications to the NRC for Security Events.1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN: 1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.


====1.1.2 Provide====
RfrnePMP-2080-EPP-100                            Rev. 32            Page 35 of 61 RefeenceEmergency Response Attachment 8                Notification of Off-Site Agencies                Pages.
an accelerated verbal notification, without hard copy, to the NRC with the following information:
1  Accelerated Notifications to the NRC for Security Events.
1.1    IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:
1.1.1  Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
1.1.2   Provide an accelerated verbal notification, without hard copy, to the NRC with the following information:
* Site Name Emergency Classification, if determined.
* Site Name Emergency Classification, if determined.
* Nature of the threat (briefly describe)Type of attack (e.g., armed assault by land, water, or aircraft)Attack status (i.e., imminent, in progress, or repelled)
* Nature of the threat (briefly describe)
RfrnePMP-2080-EPP-100 Rev. 32 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:9 INOTE: Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.
Type of attack (e.g., armed assault by land, water, or aircraft)
2 Completing ENMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.SNOTE: PARsardeeodusg Attachment 1, Protective Action Recommendations.
Attack status (i.e., imminent, in progress, or repelled)
SCaution:
Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using~Attachment 12, "Manual Completion of EMD Forms".2.1.1 IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).NOTE: An EMD-32a is required within 15 minutes of:*An initial event classification, or*A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".
RfrnePMiP-2080-EPP-100 Rev. 32 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: An EMD-32b is required to be transmitted with the EMD32a if: SA General Emergency has been declared, or o There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.
Reference PMP-2080-EPP-100 Rev. 32 Page 38 of 61 Emergency Response Attahmet 8Notiicaionof ff-Ste geniesPages:
Atahet8Ntfcto f f-ieAece 5-3 SNOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.3 Phone Contacts and Faxes (usually performed by AE~s)3.1i Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed).
___3.2 Direct contact with the MSP using Attachment 9, MSP Notification.
___3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.
___SNOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.


===3.4 Direct===
RfrnePMP-2080-EPP-100                              Rev. 32          Page 36 of 61 RefeenceEmergency Response Attachment 8                  Notification of Off-Site Agencies              Pages:9 INOTE:          Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.
that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification
2      Completing ENMD-32 Form 2.1    Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.
___3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___
SNOTE:        PARsardeeodusg Attachment 1, Protective Action Recommendations.
SCaution:      Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using
    ~Attachment 12, "Manual Completion of EMD Forms".
2.1.1    IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).
NOTE:          An EMD-32a is required within 15 minutes of:
                    *An    initial event classification, or
                    *A    change of classification, or SA change of PAR 2.1.2    IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".


===3.6 Direct===
RfrnePMiP-2080-EPP-100                          Rev. 32            Page 37 of 61 RefeenceEmergency Response Attachment 8              Notification of Off-Site Agencies                Pages:
that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____
NOTE:      An EMD-32b is required to be transmitted with the EMD32a if:
4 Follow Up Notifications
SA General Emergency has been declared, or o  There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3  IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms".                                            ___
2.1.4  Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.
2.1.5  IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.
2.1.6    Obtain the SM/SECs "Plant Approval" signature on the form(s).       ___
2.1.7  Make copies of the form(s) as necessary for offsite notification phone communicators.


===4.1 UNLESS===
Reference                PMP-2080-EPP-100              Rev. 32            Page 38 of 61 Emergency Response Attahmet 8Notiicaionof  ff-Ste  geniesPages:
the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.
Atahet8Ntfcto                            f f-ieAece                          5-3 SNOTE:          Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.
RfrnePMP-2080-EPP-i00 Rev. 32 Page 39 of 61 ReferenceEmergency Response]Attachment 8 Notification of Off-Site Agencies Pages: 35 -39 4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment  
3      Phone Contacts and Faxes (usually performed by AE~s) 3.1i  Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed).                      ___
: 12. ___The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
3.2    Direct contact with the MSP using Attachment 9, MSP Notification.              ___
3.3    Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.                                                                  ___
SNOTE:          Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
3.4    Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification                                                  ___
3.5    Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___
3.6    Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____
4      Follow Up Notifications 4.1   UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.
 
RfrnePMP-2080-EPP-i00                               Rev. 32           Page 39 of 61 ReferenceEmergency Response]
Attachment 8                 Notification of Off-Site Agencies                 Pages:
35 -39 4.2   IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12.                                               ___
The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
4.3 IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
4.3   IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.
Reference PMP-2080-EPP-100 Rev. 32 Page 40 of 61 Emergency Response Attachment 9 MSP Notification Pages: 40 -42 NOTE: Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
4.4   Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
1 Contact: MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.NOTE: The phone is the primary means for communicating the EMD-32 information.
 
NOTE: An EMD-32a is required within 15 minutes of: ,,The initial classification, or* A change of classification, or* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.An EMD-32b is required to accompany an EMD-32a:* if the declaration of a General Emergency is due to dose, or* if a PAR change is due to dose 2 Provide the following to the MSP: o Provide the information from the EMD-32 form.o Obtain the officers/dispatcher's name and record on table.* Inform the agency that the EMD-32 will be faxed.*0 Request a callback (for authentication) and then hang up.
Reference                 PMP-2080-EPP-100             Rev. 32           Page 40 of 61 Emergency Response Attachment 9                         MSP Notification                       Pages:
RfrnePMP-2080-EPP-100 Rev. 32 Page 41 of 61 RefeenceEmergency Response a For callback:
40 -42 NOTE:           Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.
MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000  
Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
/____I____
1
___ /_____Initials Time Initials Time Person Contacted MSP Person Contacted:___________________
 
Call Back Call Back I Bridge established:____________________
==Contact:==
MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.
NOTE:       The phone is the primary means for communicating the EMD-32 information.
NOTE:       An EMD-32a is required within 15 minutes of:
                  ,,The initial classification, or
* A change of classification, or
* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.
An EMD-32b is required to accompany an EMD-32a:
* if the declaration of a General Emergency is due to dose, or
* if a PAR change is due to dose 2     Provide the following to the MSP:
o   Provide the information from the EMD-32 form.
o       Obtain the officers/dispatcher's name and record on table.
* Inform the agency that the EMD-32 will be faxed.
      *0     Request a callback (for authentication) and then hang up.
 
RfrnePMP-2080-EPP-100                                 Rev. 32           Page 41 of 61 RefeenceEmergency Response a   For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.
0FF-SITE           PHONE NUMBER                   CONTACT                   EVENT NOTIFICATION                                       ESTABLISHED               CLOSEOUT Michigan State Police                 8-1-517-241-8000                     /____I____   ___       /_____
Initials    Time     Initials     Time Person Contacted       MSP Person Contacted:___________________
Call Back               Call Back I Bridge established:____________________
_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
o Write the question aObtain the response and get approval aProvide the response to the MSP.SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
o Write the question aObtain     the response and get approval aProvide     the response to the MSP.
3 Fax the signed EMD-32 form(s): ___a Make sure that the form is signed by the Shift Manager. ___Orient the form(s), as shown on the fax machine, in either Control Room a IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
Reference PMiP-2080-EPP-100 Rev. 32 Page 42 of 61 Emergency Response Attachment 9 MSP Notification Pages: Push the start button___a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023
3     Fax the signed EMD-32 form(s):                                                     ___
: b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion), THEN also send EMD-32 form(s) to the following:
a    Make sure that the form is signed by the Shift Manager.                 ___
___,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
Orient the form(s), as shown on the fax machine, in either Control Room a   IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.
RfrnePMP-2080-EPP-100 Rev. 32 Page 43 of 61 RefeenceEmergency Response 43-45: Attachment 10 Berrien County Sheriff Notification Pages:5 NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
 
*The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.Contact:* BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.
Reference             PMiP-2080-EPP-100             Rev. 32           Page 42 of 61 Emergency Response                       MSP Notification                         Pages:
___* IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.o For callback:
Push the start button___
dial extension 2316 and wait for the deputy to call into the phone bridge.[NOTE: The phone is the primary means for communicating the EMD-32 information.
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                   ___
2 Provide the following to the BCSD: Provide the information from the EMD-32 form.* Obtain the officers/dispatcher's name and record on table.Inform the agency that the EMD-32 will be faxed.
o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023
Reference PMP-2080-EPP-100 Rev. 32 Page 44 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:5 OFF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. _____/_____
: b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
_____/_____
THEN also send EMD-32 form(s) to the following:                 ___
Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-983-7141)Person Contacted BCSD Person Contacted:___________________
                  ,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4   WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
Call Back Call Back / Bridge established:__________________
 
RfrnePMP-2080-EPP-100                             Rev. 32           Page 43 of 61 RefeenceEmergency Response Attachment 10               Berrien County Sheriff Notification               43-45:
Pages:5 NOTE:             Declaration of an emergency requires the notification of the BCSD within 15 minutes.
oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
                  *The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.
 
==Contact:==
* BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher. ___
* IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.
o   IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.
o       For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.
[NOTE:       The phone is the primary means for communicating the EMD-32 information.
2     Provide the following to the BCSD:
Provide the information from the EMD-32 form.
* Obtain the officers/dispatcher's name and record on table.
Inform the agency that the EMD-32 will be faxed.
 
Reference             PMP-2080-EPP-100               Rev. 32               Page 44 of 61 Emergency Response Attachment 10               Berrien County Sheriff Notification                   Pages:5 OFF-SITE         PHONE NUMBER                   CONTACT                     EVENT NOTIFICATION                                   ESTABLISHED                   CLOSEOUT Berrien County       Dedicated phone Sheriff's             line.                 _____/_____               _____/_____
Department           (IF there is no       Initials     Time       Initials       Time response on the dedicated line, THEN dial 8-1-269-983-7141)
Person Contacted     BCSD Person Contacted:___________________
Call Back             Call Back / Bridge established:__________________
Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.
Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.
SWrite the question e Obtain the response and get approval Provide the response to the BCSD. ___SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
SWrite the question e Obtain the response and get approval Provide the response to the BCSD.                             ___
3 Fax the signed EMD-32 form(s): o Make sure that the form is signed by the Shift Manager. ___* Orient the form(s), as shown on the fax machine, in either Control Room* IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
RfrnePMP-2080-EPP-100 Rev. 32 Page 45 of 61 RefeenceEmergency Response 43-45: Attachment 10 Berrien County Sheriff Notification Pages:5 Push the start button ___a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
3       Fax the signed EMD-32 form(s):
,, BC EOC: 8-1-269-934-9023
o   Make sure that the form is signed by the Shift Manager.                   ___
: b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion), THEN also send EMD-32 form(s) to the following:
* Orient the form(s), as shown on the fax machine, in either Control Room
___a EOF: 8-284-2942 o TSC: 2431 ,o ENC/JIC: 8-284-5892 a, OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____
* IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.
Reference PMP-2080-EPP-100 Rev. 32 Page 46 of 61 Emergency Response Attachment 11 NRC Notification Pages: 46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.1 Contact: a IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.
 
o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
RfrnePMP-2080-EPP-100                             Rev. 32           Page 45 of 61 RefeenceEmergency Response 43-45:
Alternate numbers are listed on the table below.* Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
Attachment 10             Berrien County Sheriff Notification               Pages:5 Push the start button                                                 ___
* Write the question* Obtain the response and get approval* Provide the response to the NRC.Ask the N-RC for the Event Notification Number (EN).
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                   ___
RfrnePMP-2080-EPP-100 Rev. 32 Page 47 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:7 0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION
o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
_______ ESTABLISHElD CLOSEOUT NRC Operations 1-301t-816-5100 Center 1-301-951-0550  
                  ,,   BC EOC: 8-1-269-934-9023
/_____ _____I___1-301-415-0553 Initials Time Initials Time 8-1-301-816-5151 (FAX) ______________
: b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
Person Contacted NRC Person Contacted:___________________
THEN also send EMD-32 form(s) to the following:                   ___
a    EOF: 8-284-2942 o   TSC: 2431
                  ,o   ENC/JIC: 8-284-5892 a,   OSC: 2522 4     WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____
 
Reference               PMP-2080-EPP-100               Rev. 32         Page 46 of 61 Emergency Response Attachment 11                       NRC Notification                         Pages:
46 - 47 NOTE:       The Operations NRC Communicator is normally stationed in the affected unit's Control Room.
NOTE:       Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.
1
 
==Contact:==
a   IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.
o   Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.
* Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a   IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
* Write the question
* Obtain the response and get approval
* Provide the response to the NRC.
Ask the N-RC for the Event Notification Number (EN).
 
RfrnePMP-2080-EPP-100                           Rev. 32           Page 47 of 61 RefeenceEmergency Response Attachment 11                     NRC Notification                         Pages:7 0FF-SITE         PHONE NUMBER               CONTACT                     EVENT NOTIFICATION       _______                 ESTABLISHElD               CLOSEOUT NRC Operations       1-301t-816-5100 Center               1-301-951-0550                     /_____     _____I___
1-301-415-0553       Initials       Time     Initials     Time 8-1-301-816-5151 (FAX)                 ______________
Person Contacted   NRC Person Contacted:___________________
Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.
Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.
Event Notification Ask NRC for the EN:________________
Event Notification Ask NRC for the EN:________________
Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 .WHEN the BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
Number               (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2       .WHENthe BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
RfrnePMP-2080-EPP-100 Rev. 32 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages: Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.NOTE: An EMD-32a is required within 15 minutes of:*An initial event classification, or* A change of classification, or* A change of PAR 1 Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
 
* Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant* Record name of Plant Communicator(s) o Indicate location where this form is being generated (Calling From)* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number"* Indicate "Current Classification" S Indicate date and time of current classification was declared* Indicate "Reason for Classification"* Record the IC Number* Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a Indicate any current "Protective Action Recommendations" RfrnePMP-2080-EPP-100 Rev. 32 Page 49 of 61 RefeenceEmergency Response Pages: Attachment 12 Manual Completion of EMD Forms 48 -50 a Record PAR basis* Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.a Forward completed form to Approver* Complete "Approved By", date and time* Forward completed approved form -for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:* A General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":* Indicate whether this is an "Actual Event" or a "Drill"* Record "Nuclear Power Plant" as Cook Nuclear Plant* Record name of "Plant Communicator"(s)
RfrnePMP-2080-EPP-100                           Rev. 32           Page 48 of 61 RefeenceEmergency Response Attachment 12               Manual Completion of EMD Forms                   Pages:
* Indicate location where this form is being generated (Calling From)* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088* a. Record "Plant Message Number"* *Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.o Record "Reactor Information"* Record "Plant Status/Additional Information" efrnePMJ'-2080-EPP-100 Rev. 32 Page 50 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms 48 -50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas* IF there is NOT a release in progress due to the event THEN mark the"Release/Offsite Dose Data" areas as Not Applicable, N/A.o Forward completed form to Approver* Complete "Approved By", date and time* Forward completed approved form for transmission RfrnePMP-2080-EPP-100 Rev. 32 Page 51 of 61 RefeenceEmergency Response IAttachment 13 Activation of FLEX Phase 3 Page: NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Caution:     Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (S CC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).WHEN communication is established THEN provide the following information:
NOTE:         An EMD-32a is required within 15 minutes of:
* Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units* Your name and position/title
                  *An   initial event classification, or
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated.
* A change of classification, or
Examples of coordination include, but are not limited to: Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".5 From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
* A change of PAR 1     Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
S Reference PMP-2080-EPP-100 Rev. 32 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:~52 -53 Unit No: Date: Time: Data Taken By: Data Reviewed By: SNOTE: When redundant  
* Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant
:indication exists, record most severe condition.
* Record name of Plant Communicator(s) o     Indicate location where this form is being generated (Calling From)
1.2.3.4.Containment Temp.Cont. 112 Concentration RWST Level Source Range_______CPM 5.6.7.8.9.Intermediate Range Containment Pressure Containment Sump Level Containment Level Containment High Range Radiation Level Upper/Lower
* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o     Record "Plant Message Number"
_____AMPS_______PSIG
* Indicate "Current Classification" S Indicate date and time of current classification was declared
/R/HR 10.11.12.13.14.15.16.CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum Pressure RHR Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.PZR Steam Temp.PZR Level PRT Temp.East ON / OFF East ____ GPM North ___GPM LP 1 ___GPM LP1 ____PSIG East ____GPM LP1 ON /OFF LP2 LP2 LP2 West ON / OFF West____ _South _______GPM LP3 ______PSIG LP3 ____West____ _ON /OFF LP3 ON/IOFF GPM GPM GPM PSIG GPM 17.18.19.20.21.22.______PSIG
* Indicate "Reason for Classification"
______GPM__ __ _ 0 F 23..24.25.26.27.28.PRT Level PRT Pressure PZR Cycling Htrs PZR Backup Htrs Letdown Flow Saturation Margin LP4 ____GPM LP4 ____PSIG LP4 ON /OFF________PSIG ON / OFF ON / OFF____ ___GPM oF Reference PMP-2080-EPP-100 Rev. 32 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:3 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4 29.30.31.32.33.34.35.36.37.38.39.Wide Range T Hot Wide Range T Cold S / G Pressure S /0G N. R. Level S I G W .R. Level Steam Flow (pph x 106)" Feed Flow (pph x 106)Aux. Feed Flow (pph x 103)MSIV Status CST Level Steam Dump________PSIG OPEN ICLOSE ATMOS / COND_______PSIG OPEN / CLOSE Ft_____ ___ F OPEN / CLOSE________PSIG OPEN / CLOSE 40.41.42.43.44.45.46.47.48.49.East ESW West ESW East CCW West CCW East CTS West CTS North SI South SI East RHR West RHR AVAILABLE
* Record the IC Number
/ UNAVAILABLE
* Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a     Indicate any current "Protective Action Recommendations"
___ I _/_________
 
/ ______________
RfrnePMP-2080-EPP-100                           Rev. 32         Page 49 of 61 RefeenceEmergency Response Pages:
/ _____________ I ______/_______ _____/_________  
Attachment 12                 Manual Completion of EMD Forms                   48 -50 a     Record PAR basis
/ ______________
* Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP- 108, Initial Dose Assessment, Attachment 1.
/ _______________
a     Forward completed form to Approver
/ ______________
* Complete "Approved By", date and time
/ ____/EQUIPMENT STATUS 50. East CCP 51. West CCP 52. TDAFP 53. EMDAFP 54. WMDAFP 55. AB Diesel 56. CD Diesel 57. Normal Res.58. 12 EP AVAILABLE
* Forward completed approved form -for transmission NOTE:           An EMD-32b is required to be transmitted with the EMD32a if:
/ UNAVAILABLE
* A General Emergency has been declared, or
_________
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2       Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":
/ ____/ ____________ I ______/________ ______/_________
* Indicate whether this is an "Actual Event" or a "Drill"
/ _____________
* Record "Nuclear Power Plant" as Cook Nuclear Plant
/ _____________
* Record name of "Plant Communicator"(s)
/ ______________
* Indicate location where this form is being generated (Calling From)
/ _____/
* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088
RfrnePMP-2080-EPP-100 Rev. 32 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 Unit No: _____Date:
* a.       Record "Plant Message Number"
________1. Emergency Classification Time: Time Declared______Unusual Event_______Alert
    * *Record     "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
________Site Area Emergency______General Emergency 2. Have notifications been completed?
o     Record "Reactor Information"
: a. Michigan:
* Record "Plant Status/Additional Information"
yes / no /in progress b. Berrien County: yes I no Iin progress c. NRC: yes I no Iin progress d. DC Cook Personnel:
 
yes I no / in progress 3. Protective Actions: a. Local area evacuation yes I no b. Site evacuation yes / no c. Accountability yes / no d. Site closed to visitors yes I no 4. Offsite protective action recommended:Evacuation:
efrnePMJ'-2080-EPP-100                           Rev. 32         Page 50 of 61 RefeenceEmergency Response 2              Manual Completion of EMD Forms               48 - 50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas
yes / no areas: _____.Shelter:
* IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.
yes I no areas: _____Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time:
o   Forward completed form to Approver
RfrnePMP-2080-EPP-100 Rev. 32 Page 55 of 61 RefeenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages: 54 5 5. Plant Operational Status a. Reactor trip: yes i no time: ____ Trip signal: ______________
* Complete "Approved By", date and time
: b. ESF Status: c. EOP Status: 6. Plant Status a. Chronology of Events Time Event b. Current Plant Conditions Reference PMVP-2080-EPP-100 Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2 Emergency Turnover Checklist Pages:7 c. Potential for Plant Degradation
* Forward completed approved form for transmission
: d. Mitigating Actions Taken or Underway 7. Plant Radiological Conditions
 
: a. Jn-plant/Onsite Radiological Conditions  
RfrnePMP-2080-EPP-100                             Rev. 32           Page 51 of 61 RefeenceEmergency Response IAttachment   13                 Activation of FLEX Phase 3                       Page:
: b. Potential for Offsite Release of Radioactivity Airborne Water 8. Injured or Contaminated Personnel:
NOTE:             The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Name Employer Status 9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)Name Team #Task DescriptionlTime Dispatched
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).
//////
WHEN communication is established THEN provide the following information:
Reference PMP-2080-EPP-100 Rev. 32 Page 58 of 61 Emergency Response Data Sheet 3 Plant Status Pages:9 NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.Reactivity Control*, All Control rods inserted?
* Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units
Yes No ____# of rods out* Reactor Subcritical?
* Your name and position/title
Yes No o, Emergency Boration initiated?
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2     The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).
Yes No* Adequate Shutdown Margin? Yes No RCS Inventory Control -check all that apply for the current plant conditions
3   The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:
*Inventory makeup controlled by: (Identify all pumps injecting into RCS)CVCS -Normal Charging Charging Pumps via BIT (High Head SI)Safety injection pumps (Intermediate Head SI)RUR Pumps (Low Head SI)Other: ____________
Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.
RCS Pressure Control* Pressurizer PORVs Closed? Yes No ,, Pressurizer Safeties Closed? *Yes No Reference PMP-2080-EPP-100 Rev. 32 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages:*RCS Heat Transport Control -check all that apply for the current plant conditions Forced Circulation by RCP ________Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)RCS Heat Sink (Available or In Operation)  
Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".
-check all that apply for the current plant conditions S/G -Condenser Dump Valves ________S/G -Atmospheric Dump Valves SIG -Safety Valves RCS -Feed/Bleed Decay Heat Removal System (RUR)SIG' Inventory Control -check all that apply for the current plant conditions Main Feed Water _________Auix. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _Containment Control*, Ice Condenser Doors OPEN? Yes No* Containment Sprays ON? Yes No ,, Hydrogen Recombiners/Igniters ON? Yes No* Containment Isolation Valves fail to CLOSE? Yes No o, Phase A Actuation?
4     From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
Yes No Additional Information Reference PMP-2080-EPP-100 Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages: Request for additional information Source of request: El MSP[21 BCSD El NRC El Other_______
5     From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
___Date ____ __Time ____Question: Response: Response approved by: _________________________
 
S Reference               PMP-2080-EPP-100                 Rev. 32         Page 52 of 61 Emergency Response Data Sheet 1               PPC or PSS Control Room Data                     Pages:
                                                ~52                                 - 53 Unit No:             Date:                             Time:
Data Taken By:                                         Data Reviewed By:
SNOTE:         When redundant :indication exists, record most severe condition.
: 1. Containment Temp.                                                5. Intermediate Range                                    _____AMPS
: 2. Cont. 112 Concentration                                         6. Containment Pressure                                  _______PSIG
: 3. RWST Level                                                       7. Containment Sump Level
: 4. Source Range                        _______CPM                  8. Containment Level
: 9. Containment High Range Radiation Level Upper/Lower                                                       /R/HR
: 10. CTS Pumps                East ON / OFF                                    West ON / OFF
: 11. RHR Spray Flow           East ____            GPM                        West____      _
GPM
: 12. SI Flow                   North  ___GPM                                  South ____        GPM
: 13. BIT Flow                 LP 1 ___GPM                  LP2    ___GPM    LP3 ___          GPM      LP4  ____GPM
: 14. Accum Pressure           LP1 ____PSIG                  LP2    ___PSIG    LP3 ____          PSIG    LP4  ____PSIG
: 15. RHR Injection Flow       East ____GPM                                    West____        _ GPM
: 16. RCP Status                LP1 ON /OFF                  LP2 ON /OFF       LP3  ON/IOFF              LP4 ON /OFF
: 17. RCS Pressure                          ______PSIG                  23. PRT Level
: 18. Charging Flow                          ______GPM                  .24. PRT Pressure                        ________PSIG
: 19. PZR Liquid Temp.                         __ ___
0F                25. PZR Cycling Htrs                ON / OFF
: 20. PZR Steam Temp.                                                   26. PZR Backup Htrs                 ON / OFF
: 21. PZR Level                                                          27. Letdown Flow                        ____  ___GPM
: 22. PRT Temp.                                                          28. Saturation Margin                                 oF
 
Reference               PMP-2080-EPP-100               Rev. 32             Page 53 of 61 Emergency Response Data Sheet 1                 PPC or PSS Control Room Data                       Pages:3 NSSS LOOP PARAMETERS                         Loop 1                 Loop 2                 Loop 3             Loop 4
: 29. Wide Range T Hot                                                                         _____ ___ F
: 30. Wide Range T Cold
: 31. S / G Pressure                             ________PSIG          _______PSIG                                  ________PSIG
: 32. S /0G N. R. Level
: 33. S I G W .R. Level
: 34. Steam Flow (pph x 106)"
: 35. Feed Flow (pph x 106)
: 36. Aux. Feed Flow (pph x 103)
: 37. MSIV Status                           OPEN ICLOSE             OPEN / CLOSE           OPEN / CLOSE        OPEN / CLOSE
: 38. CST Level                                                                  Ft
: 39. Steam Dump                            ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE                                                          AVAILABLE / UNAVAILABLE
: 40. East ESW                  ___        I  _/                      50.       East CCP                  _________ /    ____
: 41. West ESW                 _________  /  ____                    51.      West CCP                            /    ____
: 42. East CCW                   __________ / _____                    52.      TDAFP                      ________  I   ______/
: 43. West CCW                  ________  I  ______/                 53.      EMDAFP                    ________      ______/
: 44. East CTS                  _______     _____/                   54.      WMDAFP                    _________ /   ____
: 45. West CTS                  _________  / ____                    55.      AB Diesel                  _________ /   ____
: 46. North SI                  __________/ _____                    56.      CD Diesel                  _________ /    ____
: 47. South SI                  __________/ _____                    57.       Normal Res.               __________/  _____
: 48. East RHR                  _________ /  ____                    58.       12 EP                                /
: 49. West RHR                              /
 
RfrnePMP-2080-EPP-100                              Rev. 32        Page 54 of 61 RefeenceEmergency Response Data Sheet 2                    Emergency Turnover Checklist                  Pages:7 Unit No:  _____Date:        ________                Time:
: 1. Emergency Classification Time Declared
______Unusual    Event
_______Alert
________Site Area Emergency
______General    Emergency
: 2. Have notifications been completed?
: a. Michigan:                        yes / no /in progress      Time: ___
: b. Berrien County:                  yes I no Iin progress      Time: ___
: c. NRC:                             yes I no Iin progress     Time: ___
: d. DC Cook Personnel:               yes I no / in progress     Time: ___
: 3. Protective Actions:
: a. Local area evacuation                 yes I no             Time: ___
: b. Site evacuation                       yes / no             Time: ___
: c. Accountability                         yes / no             Time: ___
: d. Site closed to visitors               yes I no             Time: ___
: 4. Offsite protective action recommended:
      *, Evacuation:             yes / no areas: _____             Time: ___
      .Shelter:                 yes I no areas: _____              Time:
 
RfrnePMP-2080-EPP-100                         Rev. 32       Page 55 of 61 RefeenceEmergency Response I Data Sheet 2               Emergency Turnover Checklist             Pages:
54 5
: 5. Plant Operational Status
: a. Reactor trip: yes i no time: ____ Trip signal: ______________
: b. ESF Status:
: c. EOP Status:
: 6. Plant Status
: a. Chronology of Events Time                                   Event
: b. Current Plant Conditions
 
Reference             PMVP-2080-EPP-100           Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2               Emergency Turnover Checklist     Pages:7
: c. Potential for Plant Degradation
: d. Mitigating Actions Taken or Underway
: 7. Plant Radiological Conditions
: a. Jn-plant/Onsite Radiological Conditions
: b. Potential for Offsite Release of Radioactivity Airborne                 Water
: 8. Injured or Contaminated Personnel:
Name                     Employer                   Status
: 9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)
Name                   Team #         Task DescriptionlTime Dispatched
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
 
Reference             PMP-2080-EPP-100                 Rev. 32         Page 58 of 61 Emergency Response Data Sheet 3                           Plant Status                           Pages:9 NOTE:         This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.
Reactivity Control
*, All Control rods inserted?               Yes     No     ____#     of rods out
* Reactor Subcritical?                     Yes     No o, Emergency Boration initiated?           Yes     No
* Adequate Shutdown Margin?                 Yes     No RCS Inventory Control           - check all that apply for the current plant conditions
*Inventory makeup controlled by: (Identify all pumps injecting into RCS)
CVCS - Normal Charging Charging Pumps via BIT (High Head SI)
Safety injection pumps (Intermediate Head SI)
RUR Pumps (Low Head SI)
Other: ____________
RCS Pressure Control
* Pressurizer PORVs Closed?                 Yes   No
,, Pressurizer Safeties Closed? *Yes               No
 
Reference           PMP-2080-EPP-100             Rev. 32           Page 59 of 61 Emergency Response Data Sheet 3                         Plant Status                     Pages:
*RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP                                   ________
Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)
RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G - Condenser Dump Valves                                     ________
S/G - Atmospheric Dump Valves SIG - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RUR)
SIG' Inventory Control - check all that apply for the current plant conditions Main Feed Water                                             _________
Auix. Feed Water Other: _ _   _ _ _ _   _   _ _ _
Containment Control
*, Ice Condenser Doors OPEN?                         Yes   No
* Containment Sprays ON?                             Yes   No
,, Hydrogen Recombiners/Igniters ON?                 Yes   No
* Containment Isolation Valves fail to CLOSE?       Yes   No o, Phase A Actuation?                                 Yes   No Additional Information
 
Reference               PMP-2080-EPP-100               Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4              Request For Additional Information    Pages:
Request for additional information Source of request:    El MSP
[21 BCSD El NRC El Other_______                    ___
Date ____          __Time    ____
Question:
 
===Response===
Response approved by: _________________________
SEC or designee Response delivered to requesting organization:
SEC or designee Response delivered to requesting organization:
Date Time ____ __by Whom Reference PMP-2080-EPP-100 Rev. 32 Page 61 of 61 Emergency Response DataShet 5 ontngecy Tam rackng ormPage DataShet 5 ontngecy Tam rackng orm61 PERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED
Date                       Time ____         __by   Whom
__________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED# Turbine Building.
 
ERAEO REVISION  
Reference         PMP-2080-EPP-100               Rev. 32 Page 61 of 61 Emergency Response DataShet ontngecy 5   Tam   rackng ormPage DataShet ontngecy  5 Tam   rackng orm61 PERSONNEL     TEAM       TASK DESCRIPTION                 TIME TIME TCS     TIME EOF TIME TASK   TIME DISPATCHED           __________DISPATCHED                       NOTIFIED     NOTIFIED COMPLETED RETURNED
                #     Turbine Building. ERAEO
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Alteration  
 
!,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
As such, a 10 CFR 72.48 review- is not required for this procedure.
 
10 CFR 50.54(q) review was performed and documented.
==Title:==
The number for .the 50.54(q) is annotated inl the workflow for this revision.The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
Emergency Response Alteration                       !,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.
Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.Replaced TSOC with NEST throughout The TSOC has been replaced by the NEST. The the procedure.
This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review- is not required for this procedure.
TSOC has been removed from site.This change was not margin marked.GT 2015-15895 Step 1.1 was reworded.
10 CFR 50.54(q) review was performed and documented. The number for .the 50.54(q) is annotated inl the workflow for this revision.
Removed unnecessary information and Removed "(under the direction of the abbreviations.
The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.
The term "an emergency" SEC)" and "Unusual Event (U-E), Alert, encompasses all Emergency Classifications.
Replaced TSOC with NEST throughout                   The TSOC has been replaced by the NEST. The the procedure.                                       TSOC has been removed from site.
Site Area Emergency (SAE) and General The meaning of the step is unchanged.
This change was not margin marked.
Emergency (GE) after an emergency has been declared." One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT 2015-15895 Step 1.1 was reworded.                               Removed unnecessary information and Removed "(under the direction of the                 abbreviations. The term "an emergency" SEC)" and "Unusual Event (U-E), Alert,               encompasses all Emergency Classifications.
Reviewer comments.Purpose and Scope step (1.2 previously)
Site Area Emergency (SAE) and General                 The meaning of the step is unchanged.
Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "Once turnover of SEC procedure.
Emergency (GE) after an emergency has been declared."                                       One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
duties has been completed, the SM retains the overall responsibility of One of the purposes of this revision is to remove directing and implementing emergency unnecessary wording that can distract the users and abnormal procedures to bring the from taking necessary actions or making required unit(s) to a safe condition." communications.
Reviewer comments.
Reviewer comments.Office Information for Form Tracking Only -Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.
Purpose and Scope step (1.2 previously)               Unnecessary statement that is not a purpose or was removed. This step made the                       scope statement and adds nothing to this statement that "Once turnover of SEC                 procedure.
Page 1 of 5 REVISION  
duties has been completed, the SM retains the overall responsibility of                 One of the purposes of this revision is to remove directing and implementing emergency                 unnecessary wording that can distract the users and abnormal procedures to bring the                 from taking necessary actions or making required unit(s) to a safe condition."                         communications.
Reviewer comments.
Office Information for Form Tracking Only - Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 1 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Purpose and Scope step (1.3 previously) was removed. This step made the statement that "The CR will retain responsibility for Public Address (PA)announcements and Nuclear Emergency Alarm (NEA) activation throughout the emergency." Unnecessary statement that is not a purpose or scope statement and adds nothing to this procedure.
 
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
Reviewer comments.Purpose and Scope step (1.3.1 Unnecessary statement that is not a purpose or previously) stating, "Others may use the scope statement and adds nothing to this PA as directed by procedure (Security, procedure.
 
RAG, etc.)." was removed.Reviewer comments.Step 1.4 stating; "The steps in this The step is not a Purpose and Scope.procedure are listed in the preferred order of performance for maximum Reviewer comments.efficiency.
==Title:==
However, the steps may be performed in a different order." was No margin markings were used for these changes.moved to the beginning of the "Details" section, prior to step 3.1, as a Note.Previous Purpose and Scope step 1.5 is Step renumbering due to removal of steps.now step 1.2 due to removing steps 1.2, 1.3 and 1.4. No margin markings were used.Added ORO and SEC-TSC to definitions Not previously defined.section. -Reviewer comment.Operations Training Comments.
Emergency Response Purpose and Scope step (1.3 previously)             Unnecessary statement that is not a purpose or was removed. This step made the                     scope statement and adds nothing to this statement that "The CR will retain                 procedure.
This section was The Details section was completely reorganized to provide clearer direction of actions.reorganized.
responsibility for Public Address (PA) announcements and Nuclear Emergency                 One of the purposes of this revision is to remove Alarm (NEA) activation throughout the              unnecessary wording that can distract the users emergency."                                        from taking necessary actions or making required communications.
The subsections (3.1, 3.2, The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of would normally be performed.
Reviewer comments.
Incorporated Contents.
Purpose and Scope step (1.3.1                       Unnecessary statement that is not a purpose or previously) stating, "Others may use the           scope statement and adds nothing to this PA as directed by procedure (Security,             procedure.
applicable steps from OHI-2080.No actions were removed from the procedure.
RAG, etc.)." was removed.
No margin markings were used for these changes.GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Reviewer comments.
Page 2 of 5 REVISION  
Step 1.4 stating; "The steps in this               The step is not a Purpose and Scope.
procedure are listed in the preferred order of performance for maximum                   Reviewer comments.
efficiency. However, the steps may be performed in a different order." was               No margin markings were used for these changes.
moved to the beginning of the "Details" section, prior to step 3.1, as a Note.
Previous Purpose and Scope step 1.5 is             Step renumbering due to removal of steps.
now step 1.2 due to removing steps 1.2, 1.3 and 1.4.                                       No margin markings were used.
Added ORO and SEC-TSC to definitions               Not previously defined.
section.                     -Reviewer                       comment.
Operations Training Comments. This section was The Details section was completely                 reorganized to provide clearer direction of actions.
reorganized. The subsections (3.1, 3.2,             The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of           would normally be performed. Incorporated Contents.                                           applicable steps from OHI-2080.No actions were removed from the procedure.
No margin markings were used for these changes.
GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 2 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Step 4, Final Conditions, added These changes align this procedure with the comments section, and signature and date requirements of PRC-001.blanks for Verified Complete, Independently Verified and Reviewed Reviewer comment.By.Attachment 5, Evacuation:
 
* Added signoff blanks to action steps and removed blanks from message Reviewer comment.steps.Removed Attachment 9, Drills and- This procedure provides guidance for actual Exercise.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.
 
Deleted step 3.3 which referred to PA Drill and exercise guidance is contained in RMT-announcements during drills and 2080-EPP-500.
==Title:==
Emergency Response Step 4, Final Conditions, added                     These changes align this procedure with the comments section, and signature and date           requirements of PRC-001.
blanks for Verified Complete, Independently Verified and Reviewed                 Reviewer comment.
By. , Evacuation:
* Added signoff blanks to action steps and removed blanks from message                 Reviewer comment.
steps.
Removed Attachment 9, Drills and-                   This procedure provides guidance for actual Exercise.                                           emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.
Deleted step 3.3 which referred to PA               Drill and exercise guidance is contained in RMT-announcements during drills and                     2080-EPP-500.
*exercises.
*exercises.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT 2014-15961-1 Attachment 11 (REV 31 Att 12), This action for the STA is not necessary as the Removed note and step, stating that the control room will be in direct phone contact with STA should perform the 1 hour the NRC and will provide necessary and requested notification to the NRC and should fill information.
GT 2014-15961-1 1 (REV 31 Att 12),                     This action for the STA is not necessary as the Removed note and step, stating that the             control room will be in direct phone contact with STA should perform the 1 hour                       the NRC and will provide necessary and requested notification to the NRC and should fill             information. PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet,                   datasheet can be done as "time permit".
PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet, datasheet can be done as "time permit".Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.
Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT-20 14-8280-1 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval.
GT-20 14-8280-1 Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 3 of 5
Page 3 of 5 REVISION  
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Added the following to the Definitions and Abbreviations:
 
AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM, CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.Incorporated from OHI1-2080, Conduct of Operations (Emergency Organization)
Procedure No.:             PMP-2080-EPP- 100                                     Rev. No.:         32
AR 2014-14572-5 Added DS 5, Contingency Team Tracking Form.Incorporated from OHI1-2080, Conduct of Operations (Emergency Organization)
 
AR 2014-14572-5 Attachment 7, Added "main body of Clarifying information for user.procedure" to steps 3.1.3 and 3.1.5.Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology*
==Title:==
or intent of the steps.)____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of This attachment provides guidance for requesting FLEX Phase 3. phase 3 equipment per the SAFER Plan.____________________________No Marginal Markings were used.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Emergency Response Added the following to the Definitions             Incorporated from OHI1-2080, Conduct of and Abbreviations:                                 Operations (Emergency Organization)
Page 4 of 5 REVISION  
AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM,                       AR 2014-14572-5 CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.
Added DS 5, Contingency Team                       Incorporated from OHI1-2080, Conduct of Tracking Form.                                    Operations (Emergency Organization)
AR 2014-14572-5 , Added "main body of                 Clarifying information for user.
procedure" to steps 3.1.3 and 3.1.5.
Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology or intent of the steps.)
____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of                 This attachment provides guidance for requesting FLEX Phase 3.                                     phase 3 equipment per the SAFER Plan.
____________________________No             Marginal Markings were used.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                         Page 4 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev..No.: 32 IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions Office Information for Form Tracking Only -Not Part of Form'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Page 5 of 5 IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33 Doc No.: PMP-2080-EPP-100 Title: EMERGENCY RESPONSE Alteration Cat.: Minor Revision CD 1/50.59: PORC Mtg. No.: CARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: N/A Effective Date: 2/12/2016 12:00:00 AM Rev No.: 033 Approvals Na 111 ReviewlApproval Type/Capacity
[1111 Becvar, Robert J i (s228955) 1l Validation Review ~02/03/2016 09:48 Etheridge, William 1110/9261:7 (1266712) 1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9 WilamE 1 Special Review: E-PLAN GROUP 102/10/2016 09:35 1[Peterson, Gerald T11 j(i689988) il3 Technical Review 102/10/2016 10:31 Schrubba, Jennifer 11 (s245259)
J7 Approval Authority 102/11/2016 09:51 Signature Comments~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.[Minor change![Approved per Plant Manager, Jim Ross.I
---W-'R PMLP-2080-EPP-100 Rev. 33 Page 1 of 61 Emergency Response Bife ll 1 Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 2 3 4 5 PURPOSE AM) SCOPE.............................................................3 DEFINITIONS AM) ABBREVIATIONS............................................
3 DETAILS ...........................................
.................................
6 3.1 General Information..........................................................
6 3.2 SM-SEC Checklist.............................................................7


===3.3 Unaffected===
Procedure No.:          PMP-2080-EPP-100                                      Rev..No.:  32
 
==Title:==
Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions Office Information for Form Tracking Only - Not Partof Form
'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                Page 5 of 5
 
IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33
 
Doc No.:                  PMP-2080-EPP-100                              Rev No.: 033
 
==Title:==
EMERGENCY RESPONSE Alteration Cat.:          Minor Revision CD 1/50.59:
PORC Mtg. No.:
CARB Mtg. No.:
Admin Hold AR No.:
Superceding Proc(s):
Temp Proc Exp Date:
Temp Change Exp Date:
Temp Proc/Change End: N/A Effective Date:            2/12/2016 12:00:00 AM Approvals Na        111        ReviewlApproval Type/Capacity            [1111 Becvar, Robert J                                                i (s228955)              1lValidation Review          ~02/03/2016            09:48 Etheridge, William  1110/9261:7 (1266712)              1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9WilamE          1 Special Review: E-PLAN GROUP          102/10/2016 09:35    1
[Peterson, Gerald T11 j(i689988)          il3  Technical Review                      102/10/2016 10:31 Schrubba, Jennifer                                              11 (s245259)            J7 Approval Authority                    102/11/2016 09:51 Signature Comments
~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.
[Minor change!
[Approved per Plant Manager, Jim Ross.I
 
        --- W-'R                PMLP-2080-EPP-100              Rev. 33                  Page 1 of 61 Emergency Response Bife 1ll Hart            Emergency Preparedness            Emergency Preparedness Writer                    Document Owner                  Cognizant Organization TABLE OF CONTENTS 1  PURPOSE AM) SCOPE.............................................................3 2  DEFINITIONS AM) ABBREVIATIONS............................................ 3 3  DETAILS ........................................... .................................            6 3.1    General Information.......................................................... 6 3.2    SM-SEC Checklist.............................................................7 3.3    Unaffected CR Checklist...................................................... 9 3.4    Shift Technical Advisor (STA) ..........          ............................. ........ 10 3.5    Contingency Director......................................................... 10 4  FINAL CONDITIONS .............................................................. 11 5  REFERENCES ..................................................................... 12 :        Protective Action Recommendations................................... 13 :        Activation of ERONS..................................................17 :        Dismissal of Non-Essential Personnel .................................. 19 :        Accountability......................................................... 21 :        Evacuation............................................................ 26 :        Terminating a UiE..................................................... 30 :        Notification of On-Site Personnel...................................... 31 :        Notification of Off-Site Agencies ...................................... 35 :        MSP Notification...................................................... 40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification...................................................... 46
 
      --- EtR*                PMIP-2080-EPP-100              Rev. 33              Page 2 of 61 Emergency Response Reference IBill Hart            Emergency Preparedness          Emergency Preparedness Writer                    Document Owner              Cognaizant Organization 2:      Manual Completion of EMD) Forms ................................... 48 3:      Activation of FLEX Phase 3........................................... 51 Data Sheet 1:      PPC or PSS Control Room Data ...................................... 52 Data Sheet 2:      *Emergency Turnover Checklist......................................... 54 Data Sheet 3:      Plant Status ........................................................... 58 Data Sheet 4:      Request For Additional Information...................................60 Data Sheet 5:        Contingency Team Tracking Form .................................... 61


CR Checklist......................................................
Reference                 PMiP-2080-EPP-100           ]     Rev.33           Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1     This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP- 101, Emergency Classification.
9 3.4 Shift Technical Advisor (STA) ..........
1.2    Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.
.............................
2      DEFINITIONS AMD ABBREVIATIONS Term                Meaning AOP                Abnormal Operating Procedure AFO                Auxiliary Equipment Operator BCSD                Berrien County Sheriff Department BOP                Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency    accountability at the beginning of the event to ensure persons are Coningency          accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.
........ 10 3.5 Contingency Director.........................................................
Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency        Equipment, Utility, Makeup Plant) from the shift not assigned to other Team                duties who are responsible for responding to the operations needs of the affected unit.
10 FINAL CONDITIONS
Control Room        Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.
..............................................................
Control Room        Ant available extra SRO or RO who acts as a single point contact for the Liaison            Unit Supervisor to the Contingency Director, and the SM/SEC.
11 REFERENCES
CR                  Control Room Critical Safety    A set of flowchart diagnostic aids used to monitor the condition of critical Function            safety functions and select appropriate Function Restoration Procedures to Status Trees        restore safety functions that are challenged.
.....................................................................
DAP                Dose Assessment Program EAL                Emergency Action Level
12 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Attachment 6: Attachment 7: Attachment 8: Attachment 9: Attachment 10: Attachment 11: Protective Action Recommendations...................................
13 Activation of ERONS..................................................17 Dismissal of Non-Essential Personnel
..................................
19 Accountability.........................................................
21 Evacuation............................................................
26 Terminating a UiE.....................................................
30 Notification of On-Site Personnel......................................
31 Notification of Off-Site Agencies ......................................
35 MSP Notification......................................................
40 Berrien County Sheriff Notification
...................................
43 NRC Notification......................................................
46
---PMIP-2080-EPP-100 Rev. 33 Page 2 of 61 Emergency Response Reference IBill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognaizant Organization Attachment 12: Attachment 13: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Manual Completion of EMD) Forms ...................................
48 Activation of FLEX Phase 3...........................................
51 PPC or PSS Control Room Data ......................................
52*Emergency Turnover Checklist.........................................
54 Plant Status ...........................................................
58 Request For Additional Information...................................60 Contingency Team Tracking Form ....................................
61 Reference PMiP-2080-EPP-100  
] Rev.33 Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP-101, Emergency Classification.


===1.2 Terminating===
Reference              PMP-2080-EPP-100                Rev.33              Page 4 of 61 Emergency Response Term          Meaning ED)            Emergency Director EMD-32        Nuclear Plant Accident Notification form ENC            Emergency News Center EOC            Emergency Operation Center EOF            Emergency Operations Facility EOP            Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO          Security are designated as Emergency Response Auxiliary Equipment Operators.
ERDS          Emergency Response Data System ERF            Emergency Response Facility ERONS          Emergency Response Organization Notification System ERO            Emergency Response Organization GE            General Emergency HAB            Hostile Action Based IC            Initiating Conditions TIC            Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion  addition of an RO from the unaffected unit or an. extra RO who is Mtegamio      responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
MSP            Michigan State Police NEA            Nuclear Emergency Alarm NRC            Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole        at the S/E's    discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.
Off-site Response Organization refers to Berrien County Sheriff's ORO        Department, Michigan State Police or local fire departments.
OSC            Operations Support Center PA            Public Address


an event if the conditions for the UE no longer exist, and no escalation of classification is expected.2 DEFINITIONS AMD ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AFO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources.
Reference             PMiP-2080-EPP-100               Rev.33         Page 5 of 61 Emergency Response Term           Meaning PACHMT         Post-Accident Contaixnment Hydrogen Monitoring team PAR           Protective Action Recommendation PPC           Plant Process Computer PSP           Plant Status PAR PSS           Plant System Server Local Area Network application for PPC data RAC           Radiological Assessment Coordinator RO             Reactor Operator RP             Radiation Protection SAE           Site Area Emergency SAS           Secondary Alarm Station SEC           Site Emergency Coordinator SIP           Shelter In Place SM             Shift Manager SM-SEC         Shift Manager   - Site Emergency Coordinator SRO           Senior Reactor Operator STA           Shift Technical Advisor TSC           Technical Support Center TSC-SEC       Technical Support Center -Site Emergency Coordinator NEST           Nuclear Engineering Services & Technology Building IJE           Unusual Event US             Unit Supervisor WCC-SRO       Work Control Center     - Senior Reactor Operator
Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.Control Room Ant available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to Status Trees restore safety functions that are challenged.
 
DAP Dose Assessment Program EAL Emergency Action Level Reference PMP-2080-EPP-100 Rev.33 Page 4 of 61 Emergency Response Term Meaning ED) Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency Response Auxiliary Equipment Operators.
Reference       [       PMP-2080-EPP-100                   Rev.33             page 6 of 61 Emergency Response 3   DETAILS NOTE:       *Steps     in this procedure that do not apply to the current classification may be marked N/A.
ERDS Emergency Response Data System ERF Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency HAB Hostile Action Based IC Initiating Conditions TIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion addition of an RO from the unaffected unit or an. extra RO who is Mtegamio responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
              *The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.
MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole at the S/E's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.
3.1 General Information 3.1.1   SM-SEC implements this procedure until relieved of SEC duties.
OSC Operations Support Center PA Public Address Reference PMiP-2080-EPP-100 Rev.33 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Contaixnment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager -Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building IJE Unusual Event US Unit Supervisor WCC-SRO Work Control Center -Senior Reactor Operator Reference  
3.1.2   Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.
[ PMP-2080-EPP-100 Rev.33 page 6 of 61 Emergency Response 3 DETAILS NOTE: *Steps in this procedure that do not apply to the current classification may be marked N/A.*The steps in this procedure are listed in the preferred order of performance.
3.1.3   The following actions shall not be delegated by the SEC (Command &
Steps may be performed in a different sequence.3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.3.1.3 The following actions shall not be delegated by the SEC (Command &Control Function):
Control Function):
* Classification of the emergency.
* Classification of the emergency.
* Directing the notification of offsite officials.
* Directing the notification of offsite officials.
* Approval of PAR to offsite emergency management agencies.3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications.
* Approval of PAR to offsite emergency management agencies.
This should be supported, as resources become available.
3.1.4   Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.
3.1.5   The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.
3.1.6   PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)
3.1.7   Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.
The use of Operations Department staff is recommended.
The use of Operations Department staff is recommended.
Reference PMP-2080-EPP-100 Rev.33 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:
 
* The following steps are repeated for each classification upgrade.* A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
Reference                 PMP-2080-EPP-100                   Rev.33           Page 7 of 61 Emergency Response 3.2   SM-SEC Checklist NOTE:
3.2.3 IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers'Bridge.NOTE: Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).
* The following steps are repeated for each classification upgrade.
* A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.
3.2.1   Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.
3.2.2   Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
3.2.3   IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers' Bridge.
NOTE:     Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).
Activation of the ERONS includes activating the Emergency Response Facilities.
Activation of the ERONS includes activating the Emergency Response Facilities.
3.2.4 if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel.
3.2.4     if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).
SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g., hostile force, radiation release, toxic spill, etc.).3.2.5 if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
NOTE:         Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,
3.2.6 JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.
hostile force, radiation release, toxic spill, etc.).
3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
3.2.5     if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12 Upon completion of turnover, inform both control rooms that the Command& Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.3.2.14 IF in an Alert, or higher AND conditions warrant AND SM-SEC has* Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.3.2.15 WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.
Reference PMP-2080-EPP-100 Rev.33 Page 9 of 61 Emergency ResponseI 3.3 Unaffected CR Checklist 3.3.1 WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.


====3.3.3 Notify====
3.2.6  JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.
Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel.
3.2.7  IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).
___3.3.4 Assign an individual to start the Dose Assessment Program (DAP). ___IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP-108, Initial Dose Assessment.
3.2.8  IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).
___3.3.5 TSC Ventilation
3.2.9  IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
: a. IF any of the following conditions are present: ___,, The emergency involves a loss of coolant accident ,, The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.b. Record the Emergency Mode start time on the placard located below the switch.NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.
3.2.10  Assign an individual to complete Data Sheet 3, Plant Status.
3.3.6 IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____
3.2.11  WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12  Upon completion of turnover, inform both control rooms that the Command
        & Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13  IF in a UIE and conditions warrant AND the SM-SEC has Command &
Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.
3.2.14  IF in an Alert, or higher AND conditions warrant AND SM-SEC has
      *Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.
3.2.15  WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.
 
Reference                PMP-2080-EPP-100                Rev.33            Page 9 of 61 Emergency ResponseI 3.3  Unaffected CR Checklist 3.3.1    WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event).          ___
3.3.2    Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.
3.3.3    Notify Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel.                                             ___
3.3.4     Assign an individual to start the Dose Assessment Program (DAP).               ___
IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP- 108, Initial Dose Assessment.                         ___
3.3.5     TSC Ventilation
: a. IF any of the following conditions are present:                             ___
                  ,,   The emergency involves a loss of coolant accident
                  ,,   The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.
: b. Record the Emergency Mode start time on the placard located below the switch.
NOTE:       Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.
3.3.6     IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____
Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
Reference I PMP-2080-EPP-100
[ Rev.33 Page 10 of 61 Emergency Response 3.3.7 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___


===3.4 Shift===
Reference        I      PMP-2080-EPP-100          [    Rev.33          Page 10 of 61 Emergency Response 3.3.7    Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___
Technical Advisor (STA)3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.3.4.2 Provides an independent assessment of conditions present and actions taken.3.4.3 Reports to the SM and acts in an advisory capacity.3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4 Shift Technical Advisor (STA) 3.4.1     Reports to the Control Room in the event of an emergency or off-normal event.
3.4.2     Provides an independent assessment of conditions present and actions taken.
3.4.3     Reports to the SM and acts in an advisory capacity.
3.4.4     Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4.5    Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.
NOTE:        The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.
3.5  Contingency Director 3.5.1    The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.
3.5.2    The Contingency Director performs the following tasks.
o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
* Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.
o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.
* Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.


====3.4.5 Ensures====
Reference               PMP-2080-EPP-100           [   Rev.33             Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.3.5 Contingency Director 3.5.1 The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.3.5.2 The Contingency Director performs the following tasks.o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
NOTE:       Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.
* Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.* Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.
Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.
Reference PMP-2080-EPP-100  
* Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
[ Rev.33 Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
* WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.
NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.* Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.* WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.* Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.o Coordinate the move of personnel to the OSC when directed by the SM.Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
* Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.
4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.Record any comments below (include document numbers for corrective actions): Verified Complete By: Date: / I/_Performer Independently Verified By: Date : I /_Reviewed By: Date: I /__Operations Shift Manager I designee Reference
o Coordinate the move of personnel to the OSC when directed by the SM.
[ PMP-2080-EPP-100 Rev.33 Page 12 of 61 Emergency Response S
Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
4     FINAL CONDITIONS 4.1   The emergency has been terminated and the plant has entered the recovery phase.
Record any comments below (include document numbers for corrective actions):
Verified Complete By:                                               Date:     /   I/_
Performer Independently Verified By:                                         Date :     I   /_
Reviewed By:                                                       Date:     I   /__
Operations Shift Manager I designee


==5.1 REFERENCES==
Reference      [      PMP-2080-EPP-100              Rev.33        Page 12 of 61 Emergency Response S    REFERENCES 5.1 Use
 
==References:==


Use
5.1.1i  PMP-2080-EPP-10I, Emergency Classification 5.1.2    PMP-2080-EPP-108, Initial Dose Assessment 5.1.3    RMT-2080-EOF-O01, Activation and Operation of the EOF.
5.1.4    RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5    SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6    RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7    PMP-7030-001-001, Prompt NRC Notification 5.1.8    EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2  Writing


==References:==
==References:==


5.1.1i PMP-2080-EPP-10I, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-O01, Activation and Operation of the EOF.5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing
5.2.1   Source


==References:==
==References:==
: a. Cook Nuclear Plant Emergency Plan
: b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2    General References
: a. Michigan Emergency Management Plan        ,
: b. NRC Regulatory Issue Summary, RIS-2002-21
: c. NRC Regulatory Issue Summary, RIS-2004-13
: d. NRC Bulletin 2005-02
Reference                PMIP-2080-EPP-100              Rev.33            Page 13 of 61 Emergency Response Attachment 1              Protective Action Recommendations                    Pages:
NOTE:          In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped - e.g., containment pressure relief).
NOTE:          DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.
1      PAR Development 1.1I    Proceed through a flowchart in this attachment to develop a PAR.
The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
o    All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.
2      Issuing a PAR 2.1    After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
2.2      Ensure that the appropriate PAR boxes are checked on the EMD-32a form.
2.3      Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
Reference                  [    PMP-2080-EPP-100                              Rev.33                  Page 14 of 6j Emergency Response Attachment 1                          Protective Action Recommendations                                      13-1Pages:~
Initial - Protective Action Recommendations
                                  ;ENCY been declared?                          N-.(o PAR rqie Yes ISthis a R.APIDl&#xa5; PROG3RESSING3 SEVERE ACCIDENT ?
(If the conditionsfor a Rapidly ProgressingSevere Accident cannot be irrmediately confirmed, then ANSWER.,..No.)
: 1. is there a toss of containment per EAL 3.21 or 3.31                                                                  N*
AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?
OR
: 2. The conditions for EAL. R-l have been met?
J                YeS Yes I                        SHELTER Recommend RAPID EVACUATION.                    SRecommend                  ACTION2 on HOSTILE(Column                    Recommend INITIAL SHELTER IN PLACE.                                  EVACUATION* (Column 3 on PAR (Column i on PAR Table labeled "RAPID"}  (i, z,s                            iPAR Table labeled "HAB SHELTER")                    Table labeled INITIAL") 11,z1 (ILzI
                                                            *SHELTER INPLACE (SIP) 2 miles
* Evacuate 2 mile radius,
* Evacuate areas 2-10 miles                        radius,                                      *Evacuate      areas 2-5 miles
                                                          . Clear lake area to 5 miles,                        downwind, downwind,2*mile radius,
* Evacuate
* All other areas MONITOR &
* All other areas MONITOR &
* All other areas MONITOR &
PREPARE                                          PREPARE                                            PREPARE
                                                      /        END of Initial PAR Flowchart t
I 2, 4, ariddcear lake areas 6& 7                            Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6                                          sudArea1, 2, 3 anddcear lake area 6 213,75to      348.75 Areal1, 303.75 to 236.25            Areal, 2, 3, 3, 5arddclca        lake 4 and clear,-ke  area6areas 6& 7                  dar.Mal1, 3 and clear lake area 6
.348.75 to 56.25              Area 1, 3, 5 and clear lake areas 6 & 7                          laeAreal1, 3 and clear lake area 6 ArA r6ea 1 and dlear lake area 6 56.25 to 168.75              Mreal1, and clear lake areas 6& 7
: 2. Area 6 is t~he lake area at 0 to 5 mile radius; Area      7 is thle lake area 5 to 10 mile r-adiu~s.
Notes:    1. Lake areas are "cleared" for either evacuation or sheltering.
: 3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.
4,
Follow Up - Protective Action Recommendations SEV]ERE ACCJIDNF deda*                              liii, AL El bedm.*4                            Ca--=cooli+/-2g .s utlstar~d .,AND Comaiim~
                                                                                                                      *.M e1              .a20    1/7 driag tla hiiial PAR v'a1ka*?
CommmflHDEXCU..O*                                  HOSTILE ACTION a$~I                                      5*~nn FOLLOW L'P EVACUATION.
StHELTt  ERIN ,LCE.
domv~i,6areaa ' Empad'-< ljar                      (CZahlmI 2 cmAP.R TabIh Llabk-d "HA..P                  *.'m ita*' s.lp4 3            lzt pr-.i"a.
t        ~otmu              ~
nmahiz
* addi                      SmtrER.") *'="                                        *:mndaadim
* adafld.iticm.t ,.asA*.ADD a:ts. iADD Cvhmn I ot PA,-R Ts*bl
* SME(]LTI[L- I*A      (SCIj'V2                C&#xa2;*n~3 amP~AR T~ 1beL~bd "OLILOW
                      -toIxort*R.miks
                    *Id~a                                            ttii, at~e                                      UP-- tz pz~bnre~mtmdi .) ':" :.
T
* AU1othsr a-=m M.N-ITOR &
* E,,acts 2 mi* ra.4i~
      *    *,.cts2-i        am                                PiREP_4,E
* E~ratem arez 2-5 mil.; da xxndi
      *  &#xa3;Emtaxvatssrs 2-10 n*1 *odnzl*Alit&***'T
* Al odi r~h as MONITIOR &                                        *PIPR t  znant**iztsS            *    [*                                    ..    ...        ..
PRIEPA1[
                                        **  Rztmm PA.R's b.* t    DO SE .ASSESSIME'T ta az--    sha1h0 mils *_ h.
Area 1, z, 4, anK *ci ariie area 0& 1                                          Area      1, ania clear .la]e area 6
                                                                                                                          .Z Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25            Area 1, 2,    3, 4 art clear lake areas 6 & 7                    Ar*ea 1 236.25 to 303.75              Areal1, 2,  3, 4, 5 anddlear lake areas 6                                      Ar'ea 1, 2, 3 anud ear lake area 6 303.75 to 348.75              Area 1, 3,    5 and dear lake area 6                              dlear        Area 1, 3 anidcear lake area 6 348.75 to 56.25              Are~al, 3,    5 anddcear lake areas 6& 7                          lake        Area 1, 3 anddcear lake area 6 Area6        Area1 and. dear lake area 6 56,25 to168.75              jArea1, andclear lake areas 6& 7 Notes:  1. Lake areas are "cleared" for either evacuation or shelterin~g.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.
: 3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.
Reference                                            PMP-2080-EPP-100                                                        Rev.33                                  Page 16 of 61 Emergency Response Pages Attachment 1                                                Protective Action Recommendations                                                                                  13age16
_______________                      Reference 3 EPA PAG TABLE*                                                                  Michigan Application Proteactive Ati~on                          PAGi (projected dose)                                                  Comments Shdelrerin*-in~placc or                        i to 5 rc-r*                                  Evariation~ 1er, for sore .situation,=,                                          Fa cilirty operators will reoromnend cv ac u atin of the                            (13 rrSv t~o 53 m*v)i                        shc~tlir~Rrin-n pla co.) chould be- initiate-s                                  eacuation at 1 rern' sheltering in public:                                        over four dais=                              when proie-ceo                  os~e-is 1 rer (1          ~irrR5v              plice- is ti-c prerogatice of thec 5tate- of S____________________                            _________________________________                                                Michiga n~
5tupplermentary                                5 iret"      53 nmSK.                        KI is rmot e*ffe-ctive iftaken prior t:o                                        Thc s.ate of M'dichigan will im..plemnent projc-cted dose t.o                          exposture. Ma' require appro-.al of s'a~o                                      irs HI plan: facility operator's ar,-inistra:--ion of proph:lactic c~ru*                -            child thy~roid fron-                          nmedical officials (or in ascoroa.ncewi h                                      resort nmencation is implicit in dose KJ1                                          ex:posure .to iodine 4
established e* c~r* ercy plans.                                                c tsrnation data, lh l:-..jt- qt&#xa5;"i the"~t                :7lI.
:l[;~l  i"f.tl*t~l!I'  1m71-l    :      3t i;}  i* '        J~tn,:
                                                                                                                                                              'l'  7*f-P '    *h it*&*tC    tj.i  zt  . bt''t*
th t '!,i b~
tJ    itl~e t ,.:fR ..        t,*.K~-.l[.'
i, :* t fh4f~tJ              t*fj' Ir .I 4              ,Jgtli3                t    4i      ;t:t*.!lt'l                      ~~', ~            ?            ~'~      4 1 w
            > t. 's..
I.,!!        ts sf is7-13fl ssr~lr j i                      ;)f/i.
                                                              .l
* i:p*< 7s,.-is        rI      is'sl~ nf1lsit/-5>251;; 255 :si'ie-sf*!          (lf s      ht... si;Csy*. t2*  i l *,l. I 5>12" 125
                                                                                                                                                                            ' *tmss
*Pt 7
                                                                                                                                                                                                                        "-~.3 ,
  > i1 OsC            v..'32.it2 d.&#xa2;i.*            .*-.,.
55>55>                  Z.;,.***
2*ThC*&#xa3;ti      ~      -.- '*~:l=ll:?"l}lT[                      '  i::'>'t",itp.'.*'.t..fl~*-r*;::..**                            ?l*f'l
                                                                                                                                                                                            >    P 1 lil.
                                                                                                                                                                                                            <',t* f **
5                      ,    CI'5:C55        5              >>55      ' 5 "'2'.2              5  5 sf15 5l1 15>1* 1'CEli  m5>,*  LI&#x17d;              ,
55 1-5>5'*  i tsrs5V  T: b  2-                52 4        >
Reference              PMP-2080.-EPP-100                Rev.33            Page 17 of 61 Emergency Responsej Attachment 2                      Activation of ERONS                          17age18 INOTE:        SEC judgment is used to determine which scenario will be used.
1      IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.
SNOTE:          ERONS can be activated using any plant computer with internet access.
1.1    To activate ERONS:
* Click the Everbridge icon on the desk top.
OR
* Log in to Everbridge by entering the web address, https://manager.everbridge.net OR
* IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.2    Enter User Name (erons) 1.3    Enter Password (located in ERO brief case) and Click Sign In.
NOTE:      1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.
: 2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.
1.4    To start a scenario, click on the Notifications tab at the top of the page.
1.5    Click on the Templates header to bring up a list of preprogrammed scenarios.


====5.2.1 Source====
Reference                    PMIP-2080-EPP-100                        Rev.33            Page 18 of 61 Emergency Response Attachment 2                           Activation of ERONS                                    17age18 NOTE:.                                   .      ......
* After a Notification i sents    he    screnautmaiclly~O        goes bac toth Notificati        tons ab whreth                notificatio la~d4ilOPrsaSts        I~sent outisl shw  wt    tetie wassent.                                            '    ro 1.7    Click Send (located close to the botop            of the screen).      Noicaonhvebnset NOTE:          Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the                -99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.


==References:==
f  Reference                PMP-2080-EPP-100 Emergency Response Rev.33            Page 19 of 61 Attachment 3                Dismissal of Non-Essential Personnel                Pages:
: a. Cook Nuclear Plant Emergency Plan b. SPP-2060-SFI-203, Security Actions During Emergency Conditions
19 -20 NOTE:           SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1  IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.
NOTE:           Personnel assisting the ERG (such as a Failure Investigation Process (FIP)
Team) should be Radworker qualified (i.e., have a TLD).
1.1    IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.
1.2    IF radiological conditions may impact dismissal of non-essential personnel (e.g.,
radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
1.3    Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:
Whether or not rapid egress is required (e.g., airborne attack)
Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
o  IF using the Livingston Road route, THEN contact Security to unlock the gates.
1.3.1    Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.


====5.2.2 General====
RfrnePMP-2080-EPP-100                             Rev.33         Page 20 of 61 RefeenceEmergency Response Attachment 3              Dismissal of Non-Essential Personnel              Pages:
References
j                                                            19 -20 1.3.2    Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
: a. Michigan Emergency Management Plan , b. NRC Regulatory Issue Summary, RIS-2002-21
1.4    Inform both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).
: c. NRC Regulatory Issue Summary, RIS-2004-13
1.5    Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.
: d. NRC Bulletin 2005-02 Reference PMIP-2080-EPP-100 Rev.33 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages: NOTE: In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped
1.5.1    Sound the Containment Evacuation Alarm(s), if required.
-e.g., containment pressure relief).NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.1 PAR Development 1.1I Proceed through a flowchart in this attachment to develop a PAR.The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
1.6    Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two times.
o All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.
1.6.1    IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:
2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
              "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
1.6.2    if rapid egress is to be used, THEN make the following announcement two times:
                "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,
                "vehicle portal near the North Access Building") and exiting the site using (State the route)."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.


===2.2 Ensure===
Reference               PMP-2080-EPP-100                 Rev.33           Page 21 of 61
that the appropriate PAR boxes are checked on the EMD-32a form.2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
        ~Emergency                               Response Attachment 4                          Accountability                          Pgs NOTE:           During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
Reference  
1   Review the three methods of Accountability below:
[ PMP-2080-EPP-100 Rev.33 Page 14 of 6j Emergency Response Attachment 1 Protective Action Recommendations 13-1Pages:~
1.1     Primary Method - using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.
Initial -Protective Action Recommendations
o    Personnel will remain in the Assembly Areas until evacuated per SEC direction.
;ENCY been declared?
A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).
N-.(o PAR rqie Yes IS this a R.APIDl&#xa5; PROG3RESSING3 SEVERE ACCIDENT ?(If the conditions for a Rapidly Progressing Severe Accident cannot be irrmediately confirmed, then ANSWER.,..No.)
1.2    Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.
: 1. is there a toss of containment per EAL 3.21 or 3.31 AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?OR 2. The conditions for EAL. R-l have been met?Yes I J YeS SHELTER Recommend RAPID EVACUATION.(Column i on PAR Table labeled"RAPID"} (i, z, s* Evacuate radius,* Evacuate areas 2-10 miles downwind,* All other areas MONITOR &PREPARE SRecommend HOSTILE ACTION SHELTER IN PLACE. (Column 2 on iPAR Table labeled "HAB SHELTER")(ILzI*SHELTER IN PLACE (SIP) 2 miles radius,.Clear lake area to 5 miles,* All other areas MONITOR &PREPARE Recommend INITIAL(Column 3 on PAR Table labeled INITIAL")
* This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.
11,z1* Evacuate 2 mile radius,*Evacuate areas 2-5 miles downwind,* All other areas MONITOR &PREPARE t /END of Initial PAR Flowchart I 2, 4, ariddcear lake areas 6& 7 213,75to 236.25 Areal1, 2, 3, 4 and clear lake areas 6& 7 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6 303.75 to 348.75 Areal, 3, 5arddclca
In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
,-ke area6.348.75 to 56.25 Area 1, 3, 5 and clear lake areas 6 & 7 Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 sudArea1, 2, 3 anddcear lake area 6 dar.Mal1, 3 and clear lake area 6 laeAreal1, 3 and clear lake area 6 Ar A r6ea 1 and dlear lake area 6 56.25 to 168.75 Mreal1, and clear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or sheltering.
o    This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
: 2. Area 6 is t~he lake area at 0 to 5 mile radius; Area 7 is thle lake area 5 to 10 mile r-adiu~s.3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.4, Follow Up -Protective Action Recommendations SEV]ERE ACCJIDNF liii, AL El Ca--= cooli+/-2g .s utlstar~d
.,AND Comaiim~driag tla hiiial PAR e1 .a20 1/7 a$~I HOSTILE ACTION FOLLOW L'P EVACUATION.
StHELTt ER* IN ,LCE.domv~i,6areaa
' Empad '-< ljar (CZahlmI 2 cmAP.R TabIh Llabk-d "HA ..P s.lp4 3 lzt pr-.i"a.t ~otmu nmahiz ~ addi Smt rER.") ad afld.iticm.t a:ts. i ADD Cvhmn I ot PA,-R
* SME(]LTI[
L- (SCIj'V2 amP~AR T~ 1beL~bd "OLILOW-toIxort at~e ttii, T UP-- tz pz~bn re~mtmdi .) ':" :.* AU1 othsr a-=m M.N-ITOR &
* E,,acts 2 ra.4i~*
am PiREP_4,E
* E~ratem arez 2 -5 mil.; da xxndi* &#xa3;Emtaxvatssrs 2-10
* Al odi r~h as MONITIOR &  PRIEPA1[ t .. ... ..Rztmm PA.R's t DO SE .ASSESSIME'T ta az-- sha 1h 0 mils h.Area 1, z, 4, anK ariie area 0& 1 Area 1, .Z ania clear .la]e area 6 Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25 Area 1, 2, 3, 4 art clear lake areas 6 & 7 236.25 to 303.75 Areal1, 2, 3, 4, 5 anddlear lake areas 6 303.75 to 348.75 Area 1, 3, 5 and dear lake area 6 348.75 to 56.25 Are~al, 3, 5 anddcear lake areas 6& 71 dlear lake Area6 Ar'ea 1, 2, 3 anud ear lake area 6 Area 1, 3 anid cear lake area 6 Area 1, 3 anddcear lake area 6 Area1 and. dear lake area 6 56,25 to168.75 jArea1, andclear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or shelterin~g.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.
Reference PMP-2080-EPP-100 Rev.33 Page 16 of 61 Emergency Response Pages Attachment 1 Protective Action Recommendations 13age16_______________
Reference 3 EPA PAG TABLEProteactive Ati~on PAGi (projected dose) Comments Michigan Application or i to 5 Evariation~
1er, for sore .situation,=, Fa cilirty operators will reoromnend cv ac u atin of the (13 rrSv t~o 53 v)i shc~tlir~Rrin-n pla co.) chould be- initiate-s eacuation at 1 rern' sheltering in public: over four dais= when proie-ceo os~e-is 1 rer (1 ~irrR5v plice- is ti-c prerogatice of thec 5tate- of S____________________
_________________________________
M ichiga n~5tupplermentary 5 iret" 53 nmSK. KI is rmot ffe-ctive if taken prior t:o Thc s.ate of M'dichigan will im..plemnent ar,-inistra:--ion of projc-cted dose t.o exposture.
Ma' require appro-.al of s'a~o irs HI plan: facility operator's proph:lactic -child thy~roid fron- nmedical officials (or in ascoroa.ncewi h resort nmencation is implicit in dose KJ1 ex:posure .to iodine 4  established ercy plans. c tsrnation data, th t '!, i tJ b~ itl~e t ,.: fR ..
lh l:-..jt- qt&#xa5;"i the"~ t :l[;~l :7lI.
' 1m 71- l : i;} 3t ' J~ tn,: 'l' f-P ' h it C tj.i zt .fh4 f~tJ i, t Ir 4 ,Jgtli3 t 4 i
~~', ~ ? ~'~ 4 1 .I7 t. w > 's.. I.,! ! ts sf is7-13fl ssr~lr i .l j i:p 7s,.-is ;)f/i. r I is'sl~ nf1ls it/-5>251;;
255 s (lf ht... si;Csy ' tmss i l I 5>12" 125> i 1 OsC v..'32.it2 55>55>
Z.; ~ -.-
' 1 lil. f "-~.3 , sf15 5l 1 1'CEli LI 55 , i tsrs5V T: b 2- 5 52 4 > , CI'5:C55 5 >>55 ' 5 "'2'.2 5 5 > P "
Reference PMP-2080.-EPP-100 Rev.33 Page 17 of 61 Emergency Responsej Attachment 2 Activation of ERONS 17age18 INOTE: SEC judgment is used to determine which scenario will be used.1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.SNOTE: ERONS can be activated using any plant computer with internet access.1.1 To activate ERONS:* Click the Everbridge icon on the desk top.OR* Log in to Everbridge by entering the web address, https://manager.everbridge.net OR* IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911.
A person will answer. Explain why you are calling and the actions the Everbridge person should take.1.2 Enter User Name (erons)1.3 Enter Password (located in ERO brief case) and Click Sign In.NOTE: 1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.1.4 To start a scenario, click on the Notifications tab at the top of the page.1.5 Click on the Templates header to bring up a list of preprogrammed scenarios.
Reference PMIP-2080-EPP-100 Rev.33 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS 17age18 NOTE:. ....... After a Notification i sents he screnautmaiclly~O goes bac toth Notificati tons ab whreth la~d4ilOPrsaSts notificatio I~sent outisl shw wt tetie was sent. ' ro 1.7 Click Send (located close to the botop of the screen). Noicaonhvebnset NOTE: Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the
-99 or 8-1-877-220-4911.
Person will answer. Explain why you are calling and the actions the Everbridge person should take.
f Reference PMP-2080-EPP-100 Rev.33 Page 19 of 61 Emergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages: 19 -20 NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.NOTE: Personnel assisting the ERG (such as a Failure Investigation Process (FIP)Team) should be Radworker qualified (i.e., have a TLD).1.1 IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel.
SEC judgment should be used in determining the type and amount of non-essential help that is needed.1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.


===1.3 Contact===
Reference                PMP-2080-EPP-100                Rev.33            Page 22 of 61 Emergency Response Attachment 4                          Accountability                            Pages:
the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss: Whether or not rapid egress is required (e.g., airborne attack)Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.
The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
RfrnePMP-2080-EPP-100 Rev.33 Page 20 of 61 RefeenceEmergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages: j 19 -20 1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -inprogress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
o   IF using the Livingston Road route, THEN contact Security to unlock the gates.
1.3   No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).
2      Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.
2.1    Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1    IF using the Primary Method of accountability, THEN request that Security:
o    *Prepare for accountability.
o    Commence evacuation of the Owner Controlled Area outside of the Protected Area.
: a. GO TO Step 3.


===1.4 Inform===
RfrnePMP-2080-EPP-100                               Rev.33         Page 23 of 61 RefeenceEmergency Response Attachment 4                           Accountability                       Pgs SNOTE:         RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.
both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.1.5.1 Sound the Containment Evacuation Alarm(s), if required.1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel.
2.1.2   IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.
Make the same announcement two times.1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used: "Attention all personnel.
Attention all personnel.
Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.1.6.2 if rapid egress is to be used, THEN make the following announcement two times: "Attention all personnel.
Attention all personnel.
Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,"vehicle portal near the North Access Building")
and exiting the site using (State the route)." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the"using Security portal" statement.
Reference PMP-2080-EPP-100 Rev.33 Page 21 of 61~Emergency Response Attachment 4 Accountability Pgs NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
1 Review the three methods of Accountability below: 1.1 Primary Method -using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.o Personnel will remain in the Assembly Areas until evacuated per SEC direction.
A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).1.2 Alternate Method -using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.* This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.
In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.o This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
Reference PMP-2080-EPP-100 Rev.33 Page 22 of 61 Emergency Response Attachment 4 Accountability Pages: The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3 No Accountability
-under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area -intrusion by a hostile force).2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1 IF using the Primary Method of accountability, THEN request that Security: o *Prepare for accountability.
o Commence evacuation of the Owner Controlled Area outside of the Protected Area.a. GO TO Step 3.
RfrnePMP-2080-EPP-100 Rev.33 Page 23 of 61 RefeenceEmergency Response Attachment 4 Accountability Pgs SNOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.2.1.2 IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: b. Request that the Owner-Controlled area also be evacuated.
: b. Request that the Owner-Controlled area also be evacuated.
3 Contact Personnel Inside the Protected Area.3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
3       Contact Personnel Inside the Protected Area.
o Sound the Unit 1land Unit 2 Containment Evacuation Alarm.Sound the Nuclear Emergency Alarm.a Make a Public Address announcement for personnel to report for accountability.
3.1     IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
Make the announcement two tunes. An example of this announcement is: "Attention all personnel.
o   Sound the Unit 1land Unit 2 Containment Evacuation Alarm.
Attention all personnel.
Sound the Nuclear Emergency Alarm.
A (State the current classification  
a   Make a Public Address announcement for personnel to report for accountability. Make the announcement two tunes. An example of this announcement is:
-usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements." IF the ERFs have not already been activated, THEN make the following announcement two times: "Attention all personnel.
                  "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."
Attention all personnel.
IF the ERFs have not already been activated, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
                  "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."
RfrnePMIP-2080-EPP-100 Rev.33 Page 24 of 61 RefeenceEmergency ResPonse Attachment 4 Accountability Pages 3.2 IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.* Sound the Nuclear Emergency Alarm.o Make a Public Address announcement for personnel to use the alternate.
 
method of accountability.
RfrnePMIP-2080-EPP-100                           Rev.33           Page 24 of 61 RefeenceEmergency ResPonse Attachment 4                         Accountability                       Pages 3.2   IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:
Make the same announcement two times. An example of this announcement is: "Attention all personnel.
o   Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
Attention all personnel.
* Sound the Nuclear Emergency Alarm.
A (State the current classification  
o   Make a Public Address announcement for personnel to use the alternate.
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building")
method of accountability. Make the same announcement two times. An example of this announcement is:
and exiting the site using (State the route) ." 3.2.1 IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times: "Attention all personnel.
                "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."
Attention all personnel.
3.2.1   IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times: "Attention all personnel.
                "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.
Attention all personnel.
3.2.2   IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times:
ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
                "Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.
3.2.3   Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
3.3     IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.3.1    Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.


====3.3.1 Direct====
Reference               PMiP-2080-EPP-100               Rev.33           Page 25 of 61 Emergency Response Attachment 4                         Accountability                           Pgs 4     Perform follow-up actions.
any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.
4.1   IF the Primary Method of Accountability was used, THEN S   Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.
Reference PMiP-2080-EPP-100 Rev.33 Page 25 of 61 Emergency Response Attachment 4 Accountability Pgs 4 Perform follow-up actions.4.1 IF the Primary Method of Accountability was used, THEN S Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.o Coordinate with Security to locate any missing individuals.
o       Coordinate with Security to locate any missing individuals.
4.2 IF the Alternate Method of Accountability was used, THEN o Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).a Coordinate with Security to locate any missing individuals.
4.2   IF the Alternate Method of Accountability was used, THEN o       Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).
4.3 IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include: o After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).o Coordinate with Security to locate any missing personnel.
a       Coordinate with Security to locate any missing individuals.
a Public Address announcements as necessary.
4.3     IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:
o   After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).
o       Coordinate with Security to locate any missing personnel.
a       Public Address announcements as necessary.
Dismissal or evacuation of personnel as necessary.
Dismissal or evacuation of personnel as necessary.
Reference PMP-2080-EPP-100 Rev.33 Page 26 of 61 Emergency Response Atahmn EvcanPages:
Atacmnt5 vcutin26 -29 j NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings.
Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
Determine If Evacuation Should Be Performed.
Evacuation is performed at a SAE (or GE, if SAE. was not entered).1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.


====1.1.1 Coordinate====
Reference                PMP-2080-EPP-100                Rev.33            Page 26 of 61 Emergency Response Atahmn                              EvcanPages:
Atacmnt5              vcutin26                                -29    j NOTE:        During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE. was not entered).
1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.
1.1.1    Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.
: 1. 1.2    WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.
1.2  IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.
1.3  IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.
1.4  IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.
Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.


with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.
RfrnePMP-2080-EPP-100                                 Rev.33           Page 27 of 61 RefeenceEmergency Response Attachment 5                             Evacuation                             Pages:9 NOTE:         Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.
: 1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.1.2 IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.1.3 IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.
2     Site Evacuation 2.1    Rapid Egress 2.1.1I    IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.
RfrnePMP-2080-EPP-100 Rev.33 Page 27 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.2 Site Evacuation
: a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.
Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
IF using the Livingston Road route, THEN contact Security to unlock the gates.
o Request that the Owner Controlled Area also be evacuated.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.


===2.1 Rapid===
RfrnePMP-2080-EPP-100                               Rev.33         Page 28 of 611 RefeenceEmergency Response
Egress 2.1.1 I IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
[ Attachment 5                           Evacuation                                   e:
IF using the Livingston Road route, THEN contact Security to unlock the gates.o Request that the Owner Controlled Area also be evacuated.
26 - 29Pa
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.
RfrnePMP-2080-EPP-100 Rev.33 Page 28 of 611 RefeenceEmergency Response[ Attachment 5 Evacuation 26 -29Pa e: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s).
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."
Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times."Attention all personnel.
: c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*
Attention all personnel.
(Livingston Road), anld as conditions warrant.
A (State the current classification  
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building')
2.2     Normal Egress 2.2.1   IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
and leave the site using (State the route) ." c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*(Livingston Road), anld as conditions warrant."Attention all personnel.
Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g.,
Attention all personnel.
vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
A (State the current classification  
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ." 2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
* Request that the Owner Controlled Area also be evacuated.
* Request that the Owner Controlled Area also be evacuated.
o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
Reference , PM.P-2080-EPP-100 Rev.33 Pages: o 6 Attachment 5 Evacuation Pages: Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.2.3 Take any necessary follow-up actions..2.3.1 IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.2.3.2 IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.
RfrnePMP-2080-EPP-100 Rev.33 Page 30 of 61 RefeenceEmergency Response Attachment 6 Terminating a UE Paes 1 UIE Termination 1.1 IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:
 
====1.1.1 Instruct====
operators to inform the MSP and BCSD that the event is terminated.


====1.1.2 Instruct====
Reference        ,      PM.P-2080-EPP-100                Rev.33          Pages: o 6 Attachment 5                          Evacuation                            Pages:
operators to: SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.Verify that the form was received by the State and County.o Notify the NRC (Red Phone -NRC Operations Center) that the emergency is terminated.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
2.3    Take any necessary follow-up actions..
2.3.1    IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.
2.3.2    IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.


===1.2 Inform===
RfrnePMP-2080-EPP-100                              Rev.33            Page 30 of 61 RefeenceEmergency Response Attachment 6                          Terminating a UE                        Paes 1      UIE Termination 1.1    IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:
both Control Rooms that the event is terminated.
1.1.1      Instruct operators to inform the MSP and BCSD that the event is terminated.
1.1.2      Instruct operators to:
SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
Verify that the form was received by the State and County.
o Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.
1.2     Inform both Control Rooms that the event is terminated.
1.3    Inform Security that the event is terminated (1118, 1119, 2005 or 2731).
1.4    Direct an operator to make a public address announcement that the UE has been terminated per the SEC.
2      Collection of Data 2.1    Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.


===1.3 Inform===
RfrnePMiP-2080-EPP-100                           Rev.33             Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7               Notification of On-Site Personnel                   Pages:
Security that the event is terminated (1118, 1119, 2005 or 2731).1.4 Direct an operator to make a public address announcement that the UE has been terminated per the SEC.2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.
[                     ~31                                         -34     J 1 Notify Security 1.1   Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.
RfrnePMiP-2080-EPP-100 Rev.33 Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7 Notification of On-Site Personnel Pages:[ ~31 -34 J 1 Notify Security 1.1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.1.1.1 IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
1.1.1   IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
: a. Contact Time _________1.1.2 IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
: a. Contact Time     _________
: a. Contact Time _________1.1.3 IF a SAE, THEN instruct Security to: Ready the Security Computer for accountability and prepare for subsequent evacuation.
1.1.2   IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
: a. Contact Time     _________
1.1.3   IF a SAE, THEN instruct Security to:
Ready the Security Computer for accountability and prepare for subsequent evacuation.
* Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
* Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
: a. Contact Time __________
: a. Contact Time     __________
1.1.4 IF a GE, THEN instruct Security to:* Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
1.1.4   IF a GE, THEN instruct Security to:
* Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
* Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
* Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
: a. Contact Time Reference PMIP-2080-EPP-100 Rev.33 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages: 31 -34 1.1.5 IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.a. Contact Time __________
: a. Contact Time
2 Notify Chemistry and RP Technicians of the initial emergency classification.
 
Reference                 PMIP-2080-EPP-100                   Rev.33         Page 32 of 61 Emergency Response Attachment 7                   Notification of On-Site Personnel                 Pages:
31 -34 1.1.5     IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.
: a. Contact Time         __________
2       Notify Chemistry and RP Technicians of the initial emergency classification.
2.1    Chemistry Contact Time          _____________
2.2    lRP Contact Time                ________________                                      __
3      Make Public Address Announcements                                                  ___
CAUTION:        PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any
    ~PA              announcements or sounding the NEA.
.NOTE:            PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.
3.1    Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.
3.1.1      IF in a UE, THEN make the following announcement two times:
                    "Attention all personnel. Attention all personnel. An Unusual Event has been declared due to              (brief description)      .Continue        with your work and be prepared for future announcements."
 
I  Reference              PMP-2080-EPP-100                Rev.33        Page 33 of 61 I    .                    Emergency Response Attachment 7.            Notification of On-Site Personnel              Pages:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed___________
3.1.2  IF in an Alert, THEN make the fol~lowing announcement two times:
              "Attention all personnel. Attention all personnel. An Alert has been declared due to        (brief description)    ."
IF emergency facilities are not already activated, THEN continue the annoumcement with:
                  "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed


===2.1 Chemistry===
RfrnePMP-2080-EPP-100                              Rev.33        Page 34 of 61 RefeenceEmergency Response Attachment 7                Notification of On-Site Personnel              Pages.
NOTE:        Accountability isperformed per Atahet4, Accountability.
3.1.3  lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s:
                        "Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: 2. Time announcements completed__________
3.1.4  IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
3.1.5  IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:
                    *  "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: 2. Time announcements cornpleted    _________
3.1.6  IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.


Contact Time _____________
Reference               PMVP-2080-EPP-100               Rev.33             Page 35 of 61 Emergency ResponseI Attachment 8                 Notification of Off-Site Agencies                 Pages:9 1 Accelerated Notifications to the NRC for Security Events.
2.2 lRP Contact Time ________________
1.1   IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:
__3 Make Public Address Announcements
1.1.1   Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
___CAUTION: PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any~PA announcements or sounding the NEA..NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.3.1 Direct an operator to make a PA announcement for the current classification.
1.1.2  Provide an accelerated verbal notification, without hard copy, to the NRC with the, following information:
Make the announcement two times. Modify announcements below as conditions warrant.3.1.1 IF in a UE, THEN make the following announcement two times: "Attention all personnel.
* Site Name
Attention all personnel.
* Emergency Classification, if determined.
An Unusual Event has been declared due to (brief description) .Continue with your work and be prepared for future announcements."
o    Nature of the threat (briefly describe) o    Type of attack (e.g., armed assault by land, water, or aircraft) o    Attack status (i.e., imminent, in progress, or repelled)
I Reference PMP-2080-EPP-100 Rev.33 Page 33 of 61 I .Emergency Response Attachment
: 7. Notification of On-Site Personnel Pages: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed___________
3.1.2 IF in an Alert, THEN make the fol~lowing announcement two times: "Attention all personnel.
Attention all personnel.
An Alert has been declared due to (brief description)
." IF emergency facilities are not already activated, THEN continue the annoumcement with: "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed RfrnePMP-2080-EPP-100 Rev.33 Page 34 of 61 RefeenceEmergency Response Attachment 7 Notification of On-Site Personnel Pages.NOTE: Accountability isperformed per Atahet4, Accountability.
3.1.3 lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s: "Attention all personnel.
Attention all personnel.
A Site Area Emergency has been declared due to (brief description)." 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.2. Time announcements completed__________
3.1.4 IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:* "Attention all personnel.
Attention all personnel.
A General Emergency has been declared due to (brief description)." 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.2. Time announcements cornpleted
_________3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
Reference PMVP-2080-EPP-100 Rev.33 Page 35 of 61 Emergency ResponseI Attachment 8 Notification of Off-Site Agencies Pages:9 1 Accelerated Notifications to the NRC for Security Events.1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN: 1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.


====1.1.2 Provide====
RernePMP-2080-EPP-100                               Rev.33         Page 36 of 61 RefeenceEmergency Response Attachment 8                 Notification of Off-Site Agencies               Pages:
an accelerated verbal notification, without hard copy, to the NRC with the, following information:
NOTE:         Notification to offsite authorities (State and County) must be completed within]
* Site Name* Emergency Classification, if determined.
15 minutes of classification.
o Nature of the threat (briefly describe)o Type of attack (e.g., armed assault by land, water, or aircraft)o Attack status (i.e., imminent, in progress, or repelled)
2       Completing EMD-32 Form 2.1   Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.
RernePMP-2080-EPP-100 Rev.33 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: Notification to offsite authorities (State and County) must be completed within]15 minutes of classification.
SNOTE:         PARs aedvlpduigAttachment 1,Protective Action Recommendations.
2 Completing EMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.SNOTE: PARs aedvlpduigAttachment 1,Protective Action Recommendations.
Caution:       Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".
Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".2.1.1 IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).NOTE: An EMD-32a is required within 15 minutes of: eAn initial event classification, or A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms" RfrnePMP-2080-EPP-100 Rev.33 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: An EMD-32b is required to be transmitted with the EMD32a if:General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.
2.1.1     IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP- 108, Initial Dose Assessment, for completion of EMD-32 form(s).
ReferencePMP-2080-EPP-100 Rev.33Pae3of6
NOTE:         An EMD-32a is required within 15 minutes of:
-Reference
eAn     initial event classification, or A change of classification, or SA change of PAR 2.1.2   IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms"
~Emergency ResponsePae3of6 Attachment 8 Notification of Off-Site Agencies Pages.NOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.3 Phone Contacts and Faxes (usually performed by APOs)3.1 Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned).
___3.2 Direct contact with the MSP using Attachment 9, MSP Notification.
___3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___
INOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.


===3.4 Direct===
RfrnePMP-2080-EPP-100                          Rev.33              Page 37 of 61 RefeenceEmergency Response Attachment 8              Notification of Off-Site Agencies                Pages:
that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification
NOTE:        An EMD-32b is required to be transmitted with the EMD32a if:
___3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.
                  *,A General Emergency has been declared, or
___3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3  IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms".                                            ___
___4 Follow Up Notifications
2.1.4  Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.
2.1.5   IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.
2.1.6   Obtain the SM/SECs "Plant Approval" signature on the form(s).         ___
2.1.7  Make copies of the form(s) as necessary for offsite notification phone communicators.


===4.1 UNLESS===
ReferencePMP-2080-EPP-100                          Rev.33Pae3of6
the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing  
          -    Reference              ~Emergency ResponsePae3of6 Attachment 8                  Notification of Off-Site Agencies              Pages.
NOTE:            Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.
3      Phone Contacts and Faxes (usually performed by APOs) 3.1    Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned).                      ___
3.2    Direct contact with the MSP using Attachment 9, MSP Notification.              ___
3.3    Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___
INOTE:            Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.
3.4    Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification                                                ___
3.5    Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.                            ___
3.6    Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.                                              ___
4      Follow Up Notifications 4.1     UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 3.0 minutes from initial notification) per step 2.1.


===3.0 minutes===
Reference               PMP-2080-EPP-100                 Rev.33           Page 39 of 61 Emergency Response Attachment 8                 Notification of Off-Site Agencies                 Pages.
from initial notification) per step 2.1.
4.2   IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12.                                               __
Reference PMP-2080-EPP-100 Rev.33 Page 39 of 61 Emergency Response Attachment 8 Notification of Off-Site Agencies Pages.4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment  
The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
: 12. __The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
4.3 IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
4.3   IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.
Reference PMIP-2080-EPP-100 Rev.33 Page 40 of 61 Emergency Response Attachment 9 MSP Notification 40ge42 NOTE: Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
4.4   Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
Contact: MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.
 
NOTE: An EMD-32a is required within 15 minutes of:* The initial classification, or ,,A change of classification, or* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.An EMD-32b is required to accompany an EMD-32a:* if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2 Provide the following to the MSP:* Provide the information from the EMD-32 form.o Obtain the officers/dispatcher's name and record on table.o Inform the agency that the EMD-32 will be faxed.Request a callback (for authentication) and then hang up.
Reference               PMIP-2080-EPP-100               Rev.33             Page 40 of 61 Emergency Response Attachment 9                       MSP Notification                         40ge42 NOTE:           Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.
RfrnePMP-2080-EPP-100 Rev.33 Page 41 of 61 RefeenceEmergency Response Attachment 9 MSP Notification Pages: 40 -42 For callback:
Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.0F13-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000  
 
/_____ /____I___Initials Time Initials Time Person Contacted MSP Person Contacted:___________________
==Contact:==
Call Back Call Back I Bridge established:___________________
MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.
NOTE:       The poeis the piaymnsfor cmuiangthe EMD-32 information.
NOTE:       An EMD-32a is required within 15 minutes of:
* The initial classification, or
                  ,,A change of classification, or
* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.
An EMD-32b is required to accompany an EMD-32a:
* if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2     Provide the following to the MSP:
* Provide the information from the EMD-32 form.
o       Obtain the officers/dispatcher's name and record on table.
o       Inform the agency that the EMD-32 will be faxed.
Request a callback (for authentication) and then hang up.
 
RfrnePMP-2080-EPP-100                                   Rev.33             Page 41 of 61 RefeenceEmergency Response Attachment 9                           MSP Notification                             Pages:
40 -42 For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.
0F13-SITE           PHONE NUMBER                   CONTACT                       EVENT NOTIFICATION                                       ESTABLISHED                   CLOSEOUT Michigan State Police                   8-1-517-241-8000                     /_____                   /____I___
Initials        Time       Initials     Time Person Contacted         MSP Person Contacted:___________________
Call Back               Call Back I Bridge established:___________________
_____________Time
_____________Time
* IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
* IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
SWrite the question* Obtain the response and get approval o Provide the response to the MSP.INOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
SWrite the question
3 Fax the signed EMD-32 form(s): ___o Make sure that the form is signed by the Shift Manager. ___* Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.
* Obtain the response and get approval o   Provide the response to the MSP.
RernePMIP-2080-EPP-100 Rev.33 Page 42 of 61[RefeenceEmergency Response Attachment 9 MSP Notification Pages: 40 -42 o Push the start button a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
INOTE:         Faxing     the EMD-32 communicator              form(s) or other      can beas performed personnel      necessary. by either the MSP or BCSD 3       Fax the signed EMD-32 form(s):                                                         ___
o        Make sure that the form is signed by the Shift Manager.                     ___
* Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.
 
RernePMIP-2080-EPP-100                             Rev.33           Page 42 of 61
[RefeenceEmergency Response Attachment 9                       MSP Notification                           Pages:
40 -42 o   Push the start button
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                     ___
SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
* BC BOC: 8-1-269-934-9023
* BC BOC: 8-1-269-934-9023
: b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion), THEN also send EMD-32 form(s) to the following:
: b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion),
___HOF: 8-284-2942
THEN also send EMD-32 form(s) to the following:                   ___
* TSC: 2431 o ENC/JIC: 8-284-5 892 o OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the OEO will inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
HOF: 8-284-2942
Reference PMP-2080-EPP-100 Rev.33 Page 43 of 61 Emergency Response[ Attachment 10 Berrien County Sheriff Notification Pages: NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.
* TSC: 2431 o   ENC/JIC: 8-284-5 892 o OSC: 2522 4   WHEN the EOF has established communication with the MSP, THEN the OEOwill inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
oThe dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.1 Contact: BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____
 
IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.For callback:
Reference             PMP-2080-EPP-100                 Rev.33           Page 43 of 61 Emergency Response
dial extension 2316 and wait for the deputy to call into the phone bridge.NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.
[ Attachment 10             Berrien County Sheriff Notification               Pages:
2 Provide the following to the BCSD:* Provide the information from the EMD-32 form.* Obtain the officers/dispatcher's name and record on table.Inform the agency that the EMD-32 will be faxed.
NOTE:             Declaration of an emergency requires the notification of the BCSD within 15 minutes.
RfrnePMP-2080-EPP-100 Rev.33 Page 44 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification Pages: 0FF-SITE PHONE NUMB1IER CONTACT EVENT NOT WICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. /_____I____
Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.
_____/____
oThe   dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.
Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)
1
Person Contacted BCSD Person Contacted:___________________
 
Call Back Call Back I Bridge established:_____________________
==Contact:==
_____________Time aIF the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____
* Write the question* Obtain the response and get approval o Provide the response to the BCSD.SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.
3 Fax the signed EMD-32 form(s): Make sure that the form is signed by the Shift Manager. ___Orient the form(s), as shown on the fax machine, in either Control Room ___IFl the EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.
o   IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.
Reference PMIP-2080-EPP-100 Rev.33 Page 45 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages: 43 -45 Push the start button___a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers: ___* MSP Operations Center: 8-1-517-241-6815
For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.
* State EOC: 8-1-517-333-4987 o BC EOC: 8-1-269-934-9023
NOTE:       The poeis the piaymnsfor cmuiangthe EMD-32 information.
: b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion), TIEEN also send EMD-32 form(s) to the following:
2     Provide the following to the BCSD:
___o EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892
* Provide the information from the EMD-32 form.
* OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge. ___
* Obtain the officers/dispatcher's name and record on table.
RfrnePMP-2080-EPP-100 Rev.33 Page 46 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages: 46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.1 Contact: lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification.
Inform the agency that the EMD-32 will be faxed.
___o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
 
Alternate numbers are listed on the table below. ___o Inform the NRC of the event in progress ___* Provide the information on Data Sheet 3, Plant Status ___Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.
RfrnePMP-2080-EPP-100                               Rev.33           Page 44 of 61 RefeenceEmergency Response Attachment 10                 Berrien County Sheriff Notification             Pages:
SWrite the question SObtain the response and get approval* Provide the response to the NRC.0 Ask the NRC for the Event Notification Number (EN).
0FF-SITE             PHONE NUMB1IER               CONTACT                 EVENT NOT WICATION                                       ESTABLISHED             CLOSEOUT Berrien County         Dedicated phone Sheriff's               line.                             /_____I_________/____
Reference PMP-2080-EPP-100 Rev.33 Page 47 of 61 Emergency Response Attachment 11 NRC Notification Pages: 46 -47 OFF-SITE PHONE NULMBER CONTACT EVENT NOTIFICATION ESTABLISBED CLOSEOUT NRC Operations 1-301- 816-5100 Center 1-301-951-0550  
Department               (IF there is no         Initials     Time     Initials     Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)
/_____ /____I___1-301-415-0553 Initials Time Initials Time 8-1-301-8 16-5 15 1___________(FAX)
Person Contacted       BCSD Person Contacted:___________________
______________
Call Back               Call Back I Bridge established:_____________________
Person Contacted NRC Person Contacted:___________________
_____________Time aIF     the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
Continuous contact, will be required for an Alert, Site Area Emergency_______________of General Emergency.
* Write the question
Event Notification Ask NRC for the EN:_ ______________
* Obtain the response and get approval o   Provide the response to the BCSD.
Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
RfrnePMP-2080-EPP-100 Rev.33 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.NOTE: An EMD-32a is required within 15 minutes of: o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":
3       Fax the signed EMD-32 form(s):
*Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)
Make sure that the form is signed by the Shift Manager.               ___
Indicate location where this form is being generated (Calling From)aRecord "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations" Reference PMLP-2080-EPP-100 Rev.33 Page 49 of 61 Emergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Record PAR basis o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.* Forward completed form to Approver o Complete "Approved By", date and time* Forward completed approved form for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:* A General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data": Indicate whether this is an "Actual Event" or a "Drill"* Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)* Indicate location where this form is being generated (Calling From)o Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number" o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.* Record "Reactor Information"* Record "Plant Status/Additional Information" I Reference PMiP-2080-EPP-100 Rev.33 Page 50 of 61 I Emergency Response I Attachment 12 Manual Completion of EMD Forms Pages5: IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the"Release/Offsite Dose Data" areas as Not Applicable, N/A.* Forward completed form to Approver* Complete "Approved By", date and time Forward completed approved form for transmission RfrnePMP-2080-EPP-100 Rev.33 Page 51 of 61 RefeenceEmergency Response Attachment 13 Activation of FLEX Phase 3 Page: NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Orient the form(s), as shown on the fax machine, in either Control Room                                                         ___
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).* WHEN communication is established THEN provide the following information:
IFlthe EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.
Indicate whether this is an "Actual Event" or a "Drill"* Plant name and affected units* Your name and positionltitle
 
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated.
Reference               PMIP-2080-EPP-100               Rev.33           Page 45 of 61 Emergency Response Attachment 10               Berrien County Sheriff Notification               Pages:
Examples of coordination include, but are not limited to:* Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.* Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".S From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
43 - 45 Push the start button___
S Reference PMP-2080-EPP-100 Rev.33 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages53 Unit No: Date: Time: Data Taken By: Data Reviewed By: SNOTE: When redundant indication exists, record most severe condition.
: a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers:                   ___
1.2.3.4.Containment Temp.Cont. H2 Concentration RWST Level Source Range_________OF
* MSP Operations Center: 8-1-517-241-6815
_______CPM 5.6.7.8.9.Intermediate Range Containment Pressure Containment Sump Level Containment Level Containment High Range Radiation Level Upper/Lower
* State EOC: 8-1-517-333-4987 o   BC EOC: 8-1-269-934-9023
_____AMPS/R/HR 10.11.12.13.14.15.16.17.18.19.20.21.22.CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum Pressure RH-R Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.PZR Steam Temp.PZR Level PRT Temp.East ON / OFF East ____North___LP1 ___LP1 ___East_____
: b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
_LP1 ON/OFF GPM GPM 3PM PSIG GPM LP2 LP2 LP2 West ON / OFF West _____South__ _____GPM LP3 ______PSIG LP3 ____West____ _ON /OFF LP3 ON /OFF GPM GPM GPM PSIG GPM PSI0______GPM 23.24.25.26.27.28.PRT Level PRT Pressure PZR Cycling Htrs PZR Backup Htrs Letdown Flow Saturation Margin LP4 ____ PM LP4 ____PSIG LP4 ON / OFF________PSIG ON / OFF ON I OFF_______GPM Reference PMP-2080-EPP-100 Rev.33 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages: 52 -53 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4 29.30.31.32.33.34.35.36.37.38.39.Wide Range T Hot Wide Range T Cold S / G Pressure S / G N. R. Level S /G W.R. Level Steam Flow (pph x 106), Feed Flow (pph x 106)Aux. Feed Flow (pph x 103)MSIV Status CST Level Steam Dump_______PSIG OPEN / CLOSE ATMOS / COND________PSIG OPEN / CLOSE Ft_______PSIG OPEN / CLOSE________PSIG OPEN / CLOSE EQUIPMENT STATUS 40.41.42.43.44.45.46.47.48.49.East ESW West ESW East CCW West CCW East CTS West CTS North SI South SI East RUR West RHR AVAILABLE
TIEEN also send EMD-32 form(s) to the following:                 ___
/ UNAVAILABLE
o    EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892
_______ _____/__________
* OSC: 2522 4     WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.                                                               ___
/ ________ ~/ __________
 
/ _______________
RfrnePMP-2080-EPP-100                               Rev.33         Page 46 of 61 RefeenceEmergency Response Attachment 11                         NRC Notification                         Pages:
/ _____________
46 -47 NOTE:       The Operations NRC Communicator is normally stationed in the affected unit's Control Room.
/ _____________
NOTE:       Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.
/ ______________
1
/ ______________
 
/ ____/50.51.52.53.54.55.56.57.58.East CCP West CCP TDAFP EMDAFP WMDAFP AB Diesel CD Diesel Normal Res.12 EP AVAILABLE
==Contact:==
/UNAV/AILABLE
lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification.                                   ___
_________
o    Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.                                                                       ___
/ ______________
o    Inform the NRC of the event in progress                                     ___
/ ________ ~ / __________
* Provide the information on Data Sheet 3, Plant Status                       ___
/ ____/ _______ I. ___/_/
Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.
RfrnePMP-2080-EPP-100 Rev.33 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages: Unit No: ____Date:________
SWrite the question SObtain the response and get approval
: 1. Emergency Classification Time:_______Unusual Event________Alert
* Provide the response to the NRC.
_______Site Area Emergency_______General Emergency 2. Have notifications been completed?
0       Ask the NRC for the Event Notification Number (EN).
: a. Michigan:
 
yes / no I in progress b. lBerrien County: yes Ino I in progress c. NRC: yes /no I in progress d. DC Cook Personnel:
Reference               PMP-2080-EPP-100                 Rev.33           Page 47 of 61 Emergency Response Attachment 11                         NRC Notification                         Pages:
yes Ino I in progress 3. Protective Actions: a. Local area evacuation yes / no b. Site evacuation yes / no c. Accountability yes I no d. Site closed to visitors yes I no 4. Offsite protective action recommended:
46 - 47 OFF-SITE           PHONE NULMBER               CONTACT                     EVENT NOTIFICATION                                     ESTABLISBED                 CLOSEOUT NRC Operations         1-301- 816-5100 Center                 1-301-951-0550                     /_____                 /____I___
SEvacuation:
1-301-415-0553         Initials       Time     Initials     Time 8-1-301-8 16-5 15 1
yes /no areas: ____o Shelter: yes / no areas: ____Time Declared Time: Time: Time: Time: Time: Time: Time: Time: Time: Time:
___________(FAX)                         ______________
I Reference PMIP-2080-EPP-100 Rev.33 Page 55 of 61 I Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages.5. Plant Operational Status a. Reactor trip: yes I no time: ____ Trip signal:-b. ESE Status: c. EOP Status:______
Person Contacted       NRC Person Contacted:___________________
______6. Plant Status a. Chronology of Events Time Event b. Current Plant Conditions RefrecePMP-2080-EPP-100 Rev.33 Page 56 of 61 I RefrenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:[ 54 -57 c. Potential.
Continuous contact, will be required for an Alert, Site Area Emergency
for Plant Degradation
_______________of    General Emergency.
: d. Mitigating Actions Taken or Underway 7. Plant Radiological Conditions
Event Notification     Ask NRC for the EN:_ ______________
: a. In-plant/Onsite Radiological Conditions  
Number                 (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2       WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
[ Reference PMVP-2080-EPP-100 Rev.33 Page 57 of 61[ Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 b. Potential for Offsite Release of Radioactivity Airborne Water 8. Injured or Contaminated Personnel:
 
Name Employer Stains 9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)Name Team #//t///Task Description/Time Dispatched RfrnePMP-2080-EPP-100 Rev.33 Page 58 of 61 RefeenceEmergency Response" Data Sheet 3 Plant Status Pages: NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.Reactivity Control* All Control rods inserted?
RfrnePMP-2080-EPP-100                             Rev.33           Page 48 of 61 RefeenceEmergency Response Attachment 12                 Manual Completion of EMD Forms                   Pages:1 Caution:       Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.
Yes No ____# of rods out ,, Reactor Subcritical?
NOTE:           An EMD-32a is required within 15 minutes of:
Yes No* Emergency Boration initiated?
o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":
Yes No* Adequate Shutdown Margin? Yes No RCS Inventory Control -check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)CVCS -Normal Charging Charging Pumps via BIT (High Head SI)Safety injection pumps (Intermediate Head SI)RHR Pumps (Low Head SI)Other:__________
      *Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)
__RCS Pressure Control o Pressurizer PORVs Closed? Yes No* Pressurizer Safeties Closed? Yes No Reference PMP-2080-EPP-100 Rev.33 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages59 RCS Heat Transport Control -check all that apply for the current plant conditions Forced Circulation by RCP ________Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)RCS Heat Sink (Available or In Operation)  
Indicate location where this form is being generated (Calling From) aRecord       "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a   Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations"
-check all that apply for the current plant conditions S/G -Condenser Dump Valves ________S/G -Atmospheric Dump Valves S/G -Safety Valves RCS -Feed/Bleed Decay Heat Removal System (RtIR)SIG Inventory Control -check all that apply for the current plant conditions Main Feed Water _________Aux. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _Containment Control e Ice Condenser Doors OPEN? Yes No*Containment Sprays ON? Yes No*, Hydrogen Recombiners/Igniters ON? Yes No* Containment Isolation Valves fall to CLOSE? Yes No*Phase A Actuation?
 
Yes No Additional Information Reference PMP-2080-EPP-100 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages: Request for additional information Source of request: II MSP LIBCSD LI NRC LIOther_______
Reference               PMLP-2080-EPP-100               Rev.33         Page 49 of 61 Emergency Response Attachment 12               Manual Completion of EMD Forms                 Pages:1 Record PAR basis o   Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
___Date _______Time
* Forward completed form to Approver o   Complete "Approved By", date and time
____Question: Response: Response approved by:___________________________
* Forward completed approved form for transmission NOTE:         An EMD-32b is required to be transmitted with the EMD32a if:
* A General Emergency has been declared, or
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2     Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data":
Indicate whether this is an "Actual Event" or a "Drill"
* Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)
* Indicate location where this form is being generated (Calling From) o   Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o   Record "Plant Message Number" o   Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
* Record "Reactor Information"
* Record "Plant Status/Additional Information"
 
I Reference               PMiP-2080-EPP-100             Rev.33         Page 50 of 61 I                           Emergency Response I Attachment 12               Manual Completion of EMD Forms                 Pages5:
IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.
* Forward completed form to Approver
* Complete "Approved By", date and time Forward completed approved form for transmission
 
RfrnePMP-2080-EPP-100                               Rev.33           Page 51 of 61 RefeenceEmergency Response Attachment 13                   Activation of FLEX Phase 3                     Page:
NOTE:             The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).
* WHEN communication is established THEN provide the following information:
Indicate whether this is an "Actual Event" or a "Drill"
* Plant name and affected units
* Your name and positionltitle
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2     The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).
3     The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:
* Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.
* Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".
4   From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
S     From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
 
S Reference               PMP-2080-EPP-100                   Rev.33       Page 52 of 61 Emergency Response Data Sheet 1               PPC or PSS Control Room Data                     Pages53 Unit No:               Date:                         Time:
Data Taken By:                                       Data Reviewed By:
SNOTE:         When redundant indication exists, record most severe condition.
: 1. Containment Temp.                 _________OF                  5. Intermediate Range                                _____AMPS
: 2. Cont. H2 Concentration                                         6. Containment Pressure
: 3. RWST Level                                                     7. Containment Sump Level
: 4. Source Range                      _______CPM                  8. Containment Level
: 9. Containment High Range Radiation Level Upper/Lower                                           /R/HR
: 10. CTS Pumps                East ON / OFF                                  West ON / OFF
: 11. RHR Spray Flow          East  ____
GPM                          West _____      GPM
: 12. SI Flow                  North___          GPM                          South__ __        GPM
: 13. BIT Flow                LP1 ___            3PM        LP2    ___GPM    LP3 ___          GPM      LP4  ____        PM
: 14. Accum Pressure           LP1 ___            PSIG      LP2    ___PSIG  LP3 ____          PSIG      LP4 ____PSIG
: 15. RH-R Injection Flow     East_____        _ GPM                        West____        _ GPM
: 16. RCP Status               LP1  ON/OFF                 LP2 ON /OFF       LP3    ON /OFF             LP4 ON / OFF
: 17. RCS Pressure                                  PSI0              23. PRT Level
: 18. Charging Flow                        ______GPM                    24. PRT Pressure                        ________PSIG
: 19. PZR Liquid Temp.                                                 25. PZR Cycling Htrs                 ON / OFF
: 20. PZR Steam Temp.                                                  26. PZR Backup Htrs                 ON I OFF
: 21. PZR Level                                                        27. Letdown Flow                       _______GPM
: 22. PRT Temp.                                                        28. Saturation Margin
 
Reference               PMP-2080-EPP-100                 Rev.33         Page 53 of 61 Emergency Response Data Sheet 1                 PPC or PSS Control Room Data                   Pages:
52 -53 NSSS LOOP PARAMETERS                         Loop 1                   Loop 2               Loop 3               Loop 4
: 29. Wide Range T Hot
: 30. Wide Range T Cold
: 31. S / G Pressure                           _______PSIG              ________PSIG        _______PSIG            ________PSIG
: 32. S / G N. R. Level
: 33. S /G W.R. Level
: 34. Steam Flow (pph x 106),
: 35. Feed Flow (pph x 106)
: 36. Aux. Feed Flow (pph x 103)
: 37. MSIV Status                           OPEN / CLOSE             OPEN / CLOSE         OPEN / CLOSE          OPEN / CLOSE
: 38. CST Level                                                                Ft
: 39. Steam Dump                            ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE                                                          AVAILABLE /UNAV/AILABLE
: 40. East ESW                  _______      _____/
: 50. East CCP                    _________  /  ____
: 41. West ESW                   __________ / _____                      51. West CCP                    __________ / _____
: 42. East CCW                  ___    ~/       _                      52. TDAFP                        ___    ~ /       _
: 43. West CCW                  _________  / _____                      53. EMDAFP                      _________  /   ____
: 44. East CTS                  __________ /   ____                    54. WMDAFP                                  /     _
: 45. West CTS                  _________ /    ____                      55. AB Diesel                    ______    I. ___/_
: 46. North SI                  _________ /    ____                      56. CD Diesel
: 47. South SI                  __________ /  _____                      57. Normal Res.
: 48. East RUR                  _________ /    ____                      58. 12 EP                                   /
: 49. West RHR                              /
 
RfrnePMP-2080-EPP-100                               Rev.33         Page 54 of 61 RefeenceEmergency Response Data Sheet 2                     Emergency Turnover Checklist                 Pages:
Unit No: ____Date:________                               Time:
: 1. Emergency Classification Time Declared
_______Unusual       Event
________Alert
_______Site       Area Emergency
_______General      Emergency
: 2. Have notifications been completed?
: a. Michigan:                         yes / no I in progress   Time:
: b. lBerrien County:                   yes Ino I in progress     Time:
: c. NRC:                               yes /no I in progress     Time:
: d. DC Cook Personnel:                 yes Ino I in progress     Time:
: 3. Protective Actions:
: a. Local area evacuation                   yes / no           Time:
: b. Site evacuation                         yes / no           Time:
: c. Accountability                           yes I no           Time:
: d. Site closed to visitors                 yes I no           Time:
: 4. Offsite protective action recommended:
SEvacuation:               yes /no   areas: ____              Time:
o Shelter:                   yes / no areas: ____              Time:
 
I Reference             PMIP-2080-EPP-100               Rev.33 Page 55 of 61 I                         Emergency Response Data Sheet 2               Emergency Turnover Checklist           Pages.
: 5. Plant Operational Status
: a. Reactor trip: yes I no time: ____     Trip signal:-
: b. ESE Status:
: c. EOP Status:______              ______
: 6. Plant Status
: a. Chronology of Events Time                                       Event
: b. Current Plant Conditions
 
RefrecePMP-2080-EPP-100                             Rev.33 Page 56 of 61 I   RefrenceEmergency Response I Data Sheet 2                 Emergency Turnover Checklist     Pages:
[                                             54 -57
: c. Potential. for Plant Degradation
: d. Mitigating Actions Taken or Underway
: 7. Plant Radiological Conditions
: a. In-plant/Onsite Radiological Conditions
 
[
[
Reference               PMVP-2080-EPP-100 Emergency Response Rev.33         Page 57 of 61 Data Sheet 2               Emergency Turnover Checklist                   Pages:7
: b. Potential for Offsite Release of Radioactivity Airborne                 Water
: 8. Injured or Contaminated Personnel:
Name                   Employer                   Stains
: 9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)
Name                 Team #         Task Description/Time Dispatched
                                                                                      /
                                                                                      /
t
                                                                                      /
                                                                                      /
                                                                                      /
 
RfrnePMP-2080-EPP-100                               Rev.33           Page 58 of 61 RefeenceEmergency Response" Data Sheet 3                         Plant Status                           Pages:
NOTE:         This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.
Reactivity Control
* All Control rods inserted?               Yes     No     ____#     of rods out
,, Reactor Subcritical?                     Yes     No
* Emergency Boration initiated?             Yes     No
* Adequate Shutdown Margin?                 Yes     No RCS Inventory Control - check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)
CVCS - Normal Charging Charging Pumps via BIT (High Head SI)
Safety injection pumps (Intermediate Head SI)
RHR Pumps (Low Head SI)
Other:__________                           __
RCS Pressure Control o Pressurizer PORVs Closed?               Yes     No
* Pressurizer Safeties Closed?             Yes     No
 
Reference           PMP-2080-EPP-100             Rev.33           Page 59 of 61 Emergency Response Data Sheet 3                       Plant Status                     Pages59 RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP                                 ________
Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)
RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G -Condenser Dump Valves                                   ________
S/G - Atmospheric Dump Valves S/G - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RtIR)
SIG Inventory Control - check all that apply for the current plant conditions Main Feed Water                                           _________
Aux. Feed Water Other: _ _ _ _ _ _   _   _ _ _
Containment Control e   Ice Condenser Doors OPEN?                       Yes   No
*Containment Sprays ON?                             Yes   No
*, Hydrogen Recombiners/Igniters ON?                 Yes   No
* Containment Isolation Valves fall to CLOSE?       Yes   No
*Phase A Actuation?                                 Yes   No Additional Information
 
Reference               PMP-2080-EPP-100                 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4               Request For Additional Information     Pages:
Request for additional information Source of request:   II MSP LIBCSD LI NRC LIOther_______                       ___
Date  _______Time               ____
Question:
 
===Response===
Response approved by:___________________________
SEC or designee Response delivered to requesting organization:
SEC or designee Response delivered to requesting organization:
Date Time ______by Whom Reference PMP-2080-EPP-100 Rev.33 Page 61 of 61 Emergency Response Page Data Sheet 5 Contingency Team Tracking Form 6 SPERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED
Date                     Time   ______by             Whom
___ _________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED# Turbine Building.
 
ERAEO REVISION  
Reference         PMP-2080-EPP-100             Rev.33   Page 61 of 61 Emergency Response Page Data Sheet 5         Contingency Team Tracking Form         6 SPERSONNEL       TEAM     TASK DESCRIPTION               TIME TIME TCS     TIME EOF TIME TASK   TIME DISPATCHED       ___   _________DISPATCHED                     NOTIFIED     NOTIFIED COMPLETED RETURNED
                    # Turbine Building. ERAEO
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 33 Alteration Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
 
As such, a 10 CFR 72.48 review is not required for this procedure.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.: 33
10 CFR 50.54(q) review was performed and documented.
 
The number for the 50.54(q) is annotated in the workflow for this revision.The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
==Title:==
Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.Added step 3.3.3, "Notify Offsite Step was omitted from Revision 32.Authorities of the emergency using Attachment 8, Notification of Off-site Personnel." Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Emergency Response Alteration                                           Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.
Page 1 of 2 REVISION  
This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required for this procedure.
10 CFR 50.54(q) review was performed and documented. The number for the 50.54(q) is annotated in the workflow for this revision.
The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.
Added step 3.3.3, "Notify Offsite                   Step was omitted from Revision 32.
Authorities of the emergency using , Notification of Off-site Personnel."
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 1 of 2
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Rev. No.: 33 Title: Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions I ~ Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Page 2 of 2 IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14 Doc No.: Title: Alteration Cat.: CDI/150.59:1 CD 1/50.59:2 PORC Mtg. No.: GARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: Effective Date: EPP-2080-ERO-001 EMERGENCY RESPONSE RESOURCE READINESS Major Revision -Full Review 50.54(q) 15-54 PORC #-4666 4666 2/3/2016 12:00:00 AM Rev01 No.: Approvals[Name [Review/Approval Type/Capacity J.Date Becvar,5 RbrJ 11 Special Review:'E-PLAN GROUP 1[i2/11/2015 10:29 1 i~6998 Pees3 Grl Technical Review"..t12/1812015 10:12 ][Hart, William E 11 ehia Rve 02[(376639) 3I TehiaHeiw01/08/2016 102 M Kristen45) 5 Management Review 101/14/2016 07:33[Wendzel, Regan 1 1[(s007887)
~ 7_Approval Authority 101/14/2016 13:22 j Signature Comments F10 CFR 50.54 (q) 15-54 completed.
-~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP;Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.[Technical Review performed by Jerry Peterson.[PORO Approval obtained at meeting 4666 Approved at PORC per Plant Manager, Jim Ross.
EPP-2080-ERO-001 Rev. 14 Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization 1 2 3 4 5 6 TABLE OF CONTENTS PURPOSE AN]) SCOPE ............................................................
3 DEFINITIONS AN]) ABBREVIATIONS
............................................
4 PRECAUTIONS AND LIMITATIONS
..........................................
.... 6 DETAILS............................................................................
6 4.1 Responsibilities
...............................................................
6 FINAL CONDITIONS
..............................................................
10 REFERENCES
.....................................................................
11 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Data Sheet 6: Data Sheet 7: Data Sheet 8: Data Sheet 9: Functional Checks of EOF NRC and MSP Phones.....................
12 Functional Checks of TSC NRC and MSP Phones.....................
13 Functional Checks of ERO Facility Equipment
........................
15 Functional Check of Berrien County 911 Ring Down Phones ..........
22 Satellite Phone Checks ................................................
23 EOF Monthly Checklist
...............................................
25 EOF Quarterly Checklist...............................................26 FOF Quarterly Radiation Protection Checklist........................
29 TSC Monthly Checklist................................................
32 TSC Quarterly Checklist
..............................................
33 TSC Quarterly Radiation Protection Checklist
........................
34 OSC Monthly Checklist..............................................
..35 OSC Quarterly Checklist
..............................................
36 OSC Quarterly Radiation Protection Checklist
.....................
38
=-w-NR EPP-2080-ER0-001 Rev. 14 Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization Data Sheet 10: Data Sheet 11:*Data Sheet 12: Data Sheet 13: Data Sheet 14: Data Sheet 15: Data Sheet 16: Data Sheet 17: Data Sheet 18: Data Sheet 19: Data Sheet 20: Data Sheet 21: Data Sheet 22: Data Sheet 23: Data Sheet 24: Data Sheet 25: Data Sheet 26: ENC/JIC Monthly Checklist
..........................................
41 Survey Vehicle Monthly Checklist.....................................
42 Survey Vehicle Radiation Protection Quarterly Checklist..............
43 Control Room Monthly Checklist......................................
45 Control Room Quarterly Radiation Protection Checklist
..............
47 Control Room Emergency Cabinet Quarterly Radiation Protection Checklist..............................................................
48 CAS/SAS Monthly Checklist...........................................50 Emergency Response Data System Testing ..........................
..51 Berrien County EOC Radiation Protection Quarterly Checklist
........54 Training Center Radiation Protection Quarterly Checklist
............
55 LMC Radiation Protection Quarterly Checklist........................56 Emergency Sampling Station Quarterly Radiation Protection Checklist...eQeee~eoeeeeleeeeee .o-ee--Q.eee-.....................eeeeeo59 Emergency Plan Respiratory Protection...............................
60 RP/Ops Emergency Response Equipment Quarterly Checklist
.........61 Monthly Satellite Phone Checks .......................................
63 Radiation Protection Portable Instrument Kit Inventory...............64 Security Control Center...............................................
65 Information I EPP-2080-ERO-001 I Rev. 14 Page 3 of 65 Emergency Response Resource Readiness 1 PURPOSE AN]) SCOPE 1.1 The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.


===1.2 Establish===
Procedure No.:          PMP-2080-EPP-100                                      Rev. No.:  33
 
==Title:==
Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions ThisI is a free-form
            ~        as called Office      out in PMP-2010-PRC-002, Information                  Procedure for Form Tracking        Alteration, Only          Review, and
                                                                      - Not Part of Form Approval.                                                                                Page 2 of 2
 
IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14


methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.
Rev01 Doc No.:            EPP-2080-ERO-001                                      No.:
1.3 This procedure applies to the following periodic requirements:
EMERGENCY RESPONSE


====1.3.1 Emergency====
==Title:==
RESOURCE READINESS Alteration Cat.:      Major Revision - Full Review CDI/150.59:1        50.54(q) 15-54 CD 1/50.59:2        PORC #-4666 PORC Mtg. No.:      4666 GARB Mtg. No.:
Admin Hold AR No.:
Superceding Proc(s):
Temp Proc Exp Date:
Temp Change Exp Date:
Temp Proc/Change End:
Effective Date:      2/3/2016 12:00:00 AM Approvals
[Name                  [Review/Approval Type/Capacity        J.Date Becvar,5RbrJ            11Special  Review:'E-PLAN GROUP        1[i2/11/2015 10:29 1 i~6998 Pees3      Grl          Technical Review"..t12/1812015                    10:12 ]
[Hart, William E      11  ehia Rve                                          02
[(376639)                3ITehiaHeiw01/08/2016                              102 M            Kristen45) 5 Management Review                  101/14/2016 07:33
[Wendzel, Regan                                                1                  1
[(s007887)      ~      7_Approval Authority                  101/14/2016 13:22  j Signature Comments F10 CFR 50.54 (q) 15-54 completed.                    -              ~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP; Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.
[Technical Review performed by Jerry Peterson.
[PORO Approval obtained at meeting 4666


Response Organization (ERO) drills and exercises 1.3.2 Emergency Response facility inventories
Approved at PORC per Plant Manager, Jim Ross.
          -*                  EPP-2080-ERO-001                                    Rev. 14                    Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart                  Emergency Preparedness                          Emergency Preparedness Writer                            Document Owner                            Cognizant Organization TABLE OF CONTENTS 1  PURPOSE AN]) SCOPE ............................................................                                        3 2  DEFINITIONS AN]) ABBREVIATIONS ............................................ 4 3  PRECAUTIONS AND LIMITATIONS .......................................... ....                                            6 4  DETAILS............................................................................                                    6 4.1  Responsibilities ...............................................................                                6 5  FINAL CONDITIONS .............................................................. 10 6  REFERENCES .....................................................................                                      11 :    Functional Checks of EOF NRC and MSP Phones..................... 12 :    Functional Checks of TSC NRC and MSP Phones..................... 13 :    Functional Checks of ERO Facility Equipment ........................ 15 :    Functional Check of Berrien County 911 Ring Down Phones .......... 22 :    Satellite Phone Checks ................................................ 23 Data Sheet 1:    EOF Monthly Checklist ............................................... 25 Data Sheet 2:    EOF Quarterly Checklist...............................................26 Data Sheet 3:    FOF Quarterly Radiation Protection Checklist........................ 29 Data Sheet 4:    TSC Monthly Checklist................................................ 32 Data Sheet 5:    TSC Quarterly Checklist .............................................. 33 Data Sheet 6:    TSC Quarterly Radiation Protection Checklist ........................ 34 Data Sheet 7:    OSC Monthly Checklist.............................................. .. 35 Data Sheet 8:    OSC Quarterly Checklist .............................................. 36 Data Sheet 9:    OSC Quarterly Radiation Protection Checklist                          .....................            38


====1.3.3 Communications====
        =-w-NR                EPP-2080-ER0-001                    Rev. 14                          Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart            Emergency Preparedness                  Emergency Preparedness Writer                  Document Owner                            Cognizant Organization Data Sheet 10:    ENC/JIC Monthly Checklist .......................................... 41 Data Sheet 11:    Survey Vehicle Monthly Checklist..................................... 42
*Data Sheet 12:    Survey Vehicle Radiation Protection Quarterly Checklist.............. 43 Data Sheet 13:    Control Room Monthly Checklist...................................... 45 Data Sheet 14:    Control Room Quarterly Radiation Protection Checklist .............. 47 Data Sheet 15:    Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.............................................................. 48 Data Sheet 16:    CAS/SAS Monthly Checklist...........................................50 Data Sheet 17:    Emergency Response Data System Testing ..........................                      .. 51 Data Sheet 18:    Berrien County EOC Radiation Protection Quarterly Checklist ........ 54 Data Sheet 19:    Training Center Radiation Protection Quarterly Checklist ............ 55 Data Sheet 20:    LMC Radiation Protection Quarterly Checklist........................56 Data Sheet 21:    Emergency Sampling Station Quarterly Radiation Protection Checklist eQeee~eoeeeeleeeeee          ....o-ee--Q.eee-.....................eeeeeo59 Data Sheet 22:    Emergency Plan Respiratory Protection............................... 60 Data Sheet 23:    RP/Ops Emergency Response Equipment Quarterly Checklist ......... 61 Data Sheet 24:    Monthly Satellite Phone Checks ....................................... 63 Data Sheet 25:    Radiation Protection Portable Instrument Kit Inventory...............64 Data Sheet 26:    Security Control Center............................................... 65


systems tests 1.3.4 Emergency Preparedness (EP) equipment functional tests 1.3.5 Emergency Response Data System (ERDS) test Information EPP-2080-ERO-001 I Rev. 14 Page 4 of 651 Emergency Response Resource ReadinessJ 2 DEFINITIONS AN]) ABBREVIATIONS Term Meaning AR Action Request BCSD Berrien County Sheriff's Department GAS Central Alarm Station CREG Control Room RP Emergency Cabinet DAP Dose Assessment Program ED Electronic Dosimeter ENC Emergency News Center ENS Emergency Notification System EOF Emergency Operations Facility EP Emergency Preparedness EP[P Emergency Plan Implementing Procedure EPM Emergency Preparedness Manager ER Emergency Room ERDS Emergency Response Data System ERO Emergency Response Organization ERONS Emergency Response Organization Notification System FTS-2001 Federal Telephone System-2001.
Information       I    EPP-2080-ERO-001           I     Rev. 14         Page 3 of 65 Emergency Response Resource Readiness 1      PURPOSE AN]) SCOPE 1.1    The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.
This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.It is owned, operated and maintained by the Federal Government.
1.2    Establish methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.
JIG Joint Infonmation Center KI Potassium Iodide LMC Lakeland Medical Center Information I EPP-2080-ERO-001 Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term Meaning MSP Michigan State Police NDM Nuclear Document Management NRC
1.3    This procedure applies to the following periodic requirements:
* Nuclear Regulatory Commission OBA Office Building Addition OSC Operations Support Center PAM Personal Alarming Module PAS Public Address System PPC Plant Process Computer RiP Radiation Protection RPAC Radiation Protection Access Control SAS Secondary Alarm Station SBE Service Building Extension SCC Security Control Center SCBA Self Contained Breathing Apparatus SPS Site Protective Services SRD Self Reading Dosimeter SV Survey Vehicle TLD Thermoluminescent Dosimeter TSC Technical Support Center TRPAC Turbine RPAC Information EPP-2080-ERO-001 I Rev. 14 I Page 6 of 65 Emergency Response Resource Readiness 3 PRECAUTIONS AND LIMiITATIONS 3.1 When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.3.2 A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.3.3 Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.New cartridges should be marked with their expiration date if not already marked by the manufacturer.
1.3.1    Emergency Response Organization (ERO) drills and exercises 1.3.2     Emergency Response facility inventories 1.3.3     Communications systems tests 1.3.4     Emergency Preparedness (EP) equipment functional tests 1.3.5     Emergency Response Data System (ERDS) test
3.4 All readiness checks shall be documented on the applicable data sheet.3.5 This procedure may be performed in part or in whole depending on data sheet(s)being performed.


===3.6 Individual===
Information          EPP-2080-ERO-001        I    Rev. 14            Page 4 of 651 Emergency Response Resource ReadinessJ 2    DEFINITIONS AN]) ABBREVIATIONS Term      Meaning AR        Action Request BCSD      Berrien County Sheriff's Department GAS        Central Alarm Station CREG      Control Room RP Emergency Cabinet DAP        Dose Assessment Program ED        Electronic Dosimeter ENC        Emergency News Center ENS        Emergency Notification System EOF        Emergency Operations Facility EP        Emergency Preparedness EP[P      Emergency Plan Implementing Procedure EPM        Emergency Preparedness Manager ER        Emergency Room ERDS      Emergency Response Data System ERO        Emergency Response Organization ERONS      Emergency Response Organization Notification System FTS-2001  Federal Telephone System-2001. This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.
It is owned, operated and maintained by the Federal Government.
JIG        Joint Infonmation Center KI        Potassium Iodide LMC        Lakeland Medical Center


steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003,"Procedure and Work Instruction Use and Adherence".
Information I     EPP-2080-ERO-001               Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term      Meaning MSP      Michigan State Police NDM      Nuclear Document Management NRC
3.7 EP resource readiness checks on RP equipment do not include handling of sources. This is the responsibility of RP.4 DETAILS 4.1 Responsibilities 4.1.1 The EPM is responsible for the execution of this procedure.
* Nuclear Regulatory Commission OBA      Office Building Addition OSC       Operations Support Center PAM      Personal Alarming Module PAS      Public Address System PPC      Plant Process Computer RiP      Radiation Protection RPAC      Radiation Protection Access Control SAS      Secondary Alarm Station SBE      Service Building Extension SCC      Security Control Center SCBA      Self Contained Breathing Apparatus SPS      Site Protective Services SRD      Self Reading Dosimeter SV        Survey Vehicle TLD      Thermoluminescent Dosimeter TSC      Technical Support Center TRPAC    Turbine RPAC
4.1.2 The EPM or designee is responsible for reviewing and signing the data sheets.
Information I EPP-2080-ERO-001 I Rev. 14 Page 7 of 65 Emergency Response Resource Readiness 4.1.3 The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.* Data Sheet 1, EOF Monthly Checklist o Data Sheet 2, EOF Quarterly Checklist o Data Sheet 4, TSC Monthly Checklist a Data Sheet 5, TSC Quarterly Checklist* Data Sheet 7, OSC Monthly Checklist* Data Sheet 8, OSC Quarterly Checklist* Data Sheet 10, ENC/JIC Monthly Checklist* Data Sheet 11, Survey Vehicle Monthly Checklist* Data Sheet 13, Control Room Monthly Checklist* Data Sheet 16, CAS/SAS Monthly Checklist* Data Sheet 17, Emergency Response Data System Testing* Data Sheet 24, Monthly Satellite Phone Checks 4.1.4 The following Data Sheets are performed by Radiation Protection.
* Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist* Data Sheet 9, OSC Quarterly Radiation Protection Checklist* Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData Sheet 20, LMC Radiation Protection Quarterly Checklist S Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist* Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist* Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory* Data Sheet 26, Security Control Center 4.2 The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.


====4.2.1 Attachment====
Information              EPP-2080-ERO-001            I    Rev. 14    I    Page 6 of 65 Emergency Response Resource Readiness 3      PRECAUTIONS AND LIMiITATIONS 3.1    When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.
3.2    A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.
3.3    Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.
New cartridges should be marked with their expiration date if not already marked by the manufacturer.
3.4   All readiness checks shall be documented on the applicable data sheet.
3.5    This procedure may be performed in part or in whole depending on data sheet(s) being performed.
3.6    Individual steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003, "Procedure and Work Instruction Use and Adherence".
3.7    EP resource readiness checks on RP equipment do not include handling of radioactiv*e sources. This is the responsibility of RP.
4      DETAILS 4.1    Responsibilities 4.1.1      The EPM is responsible for the execution of this procedure.
4.1.2     The EPM or designee is responsible for reviewing and signing the data sheets.


1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.4.2.2 Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.
Information      I      EPP-2080-ERO-001          I    Rev. 14          Page 7 of 65 Emergency Response Resource Readiness 4.1.3    The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.
Information I EPP-2080-ERO-001 I Rev. 14 I Page 8 of 65 Emergency Response Resource Readiness 4.2.3 Place a "1"" or "X" in the box next to each item to signify acceptability.
* Data  Sheet 1, EOF Monthly Checklist o        Data  Sheet 2, EOF Quarterly Checklist o  Data  Sheet 4, TSC Monthly Checklist a        Data  Sheet 5, TSC Quarterly Checklist
4.2.4 A signature block is provided for the person performing the check.4.3 The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.4.3.1 IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced.
* Data  Sheet 7, OSC Monthly Checklist
For example: a frisker could be temporarily substituted for a portal monitor.IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.4.4 Emergency Preparedness Staging Locations 4.4.1 The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).
* Data  Sheet 8, OSC Quarterly Checklist
* Data  Sheet 10, ENC/JIC Monthly Checklist
* Data  Sheet 11, Survey Vehicle Monthly Checklist
* Data  Sheet 13, Control Room Monthly Checklist
* Data  Sheet 16, CAS/SAS Monthly Checklist
* Data  Sheet 17, Emergency Response Data System Testing
* Data  Sheet 24, Monthly Satellite Phone Checks 4.1.4    The following Data Sheets are performed by Radiation Protection.
* Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist
* Data Sheet 9, OSC Quarterly Radiation Protection Checklist
* Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a        Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist
            .. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o        Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData          Sheet 20, LMC Radiation Protection Quarterly Checklist S  Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist
* Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist
* Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a        Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory
* Data Sheet 26, Security Control Center 4.2    The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.
4.2.1    Attachment 1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.
4.2.2   Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.
 
Information       I       EPP-2080-ERO-001           I   Rev. 14       I     Page 8 of 65 Emergency Response Resource Readiness 4.2.3   Place a "1""   or "X" in the box next to each item to signify acceptability.
4.2.4   A signature block is provided for the person performing the check.
4.3   The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.
4.3.1   IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced. For example: a frisker could be temporarily substituted for a portal monitor.
IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.
4.4   Emergency Preparedness Staging Locations 4.4.1   The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).
The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.
The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.
4.4.2 The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3 The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom.
4.4.2     The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.
The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.
The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3     The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom. The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.
4.4.4 The GREG is located on 633' elevation turbine deck next to TSC stairway.The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5 The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.
4.4.4     The GREG is located on 633' elevation turbine deck next to TSC stairway.
Information I EPP-2080-ERO-001 I Rev. 14 I Page 9 of 65 Emergency Response Resource Readiness 4.4.6 The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.4.4.7 The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.
The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5     The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.


====4.4.8 Lakeland====
Information        I    EPP-2080-ERO-001          I    Rev. 14      I      Page 9 of 65 Emergency Response Resource Readiness 4.4.6      The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.
Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.7      The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.
Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.
4.4.8     Lakeland Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.9      Lakeland Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.10    Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.
4.4.11    RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.
4.5    Quarterly checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.
4.6    Control Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
4.7    CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.
4.8    IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation. Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.
4.9    Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.
4.10  Make a copy of the completed data sheets for retention by the EP Department.


====4.4.9 Lakeland====
Information            EPP-2080-ERO-001        [  Rev. 14        Page 10 of 65 Emergency Response Resource Readiness 5      FINAL CONDITIONS 5.1    Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.
Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.10 Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.
4.4.11 RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.


===4.5 Quarterly===
Information            EPP-2080-ERO-001        I    Rev. 14      I  Page 11 of 65 Emergency Response Resource Readiness 6      REFERENCES 6.1i    Use


checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.
==References:==


===4.6 Control===
6.1.1    PMP-2030-R.EC-001, Records Management 6.1.2    PMP-7030-CAP-001, Action Initiation 6.1.3  PMP-2350-CMS-001, Commitmnent Management 6.1.4   RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5  RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6  RMT-2080-TSC-001, Activation and Operation of the TSC 6.2    Writing
Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
4.7 CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.
4.8 IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation.
Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.4.9 Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.4.10 Make a copy of the completed data sheets for retention by the EP Department.
Information EPP-2080-ERO-001  
[ Rev. 14 Page 10 of 65 Emergency Response Resource Readiness 5 5.1 FINAL CONDITIONS Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.
Information EPP-2080-ERO-001 I Rev. 14 I Page 11 of 65 Emergency Response Resource Readiness 6 REFERENCES 6.1i Use


==References:==
==References:==


6.1.1 PMP-2030-R.EC-001, Records Management 6.1.2 PMP-7030-CAP-001, Action Initiation 6.1.3 PMP-2350-CMS-001, Commitmnent Management 6.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5 RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 6.2 Writing
6.2.1   Source


==References:==
==References:==
: a. Emergency Station Minimum Inventory Requirements, RP-95-03
: b. D.C. Cook Emergency Plan, Appendix C
: c. NRC Commitment 1179
: d. NRC Commitment 5392 6.2.2    General References
: a. 10 CFR 50.47(b)
: b. 10 CFR 50, Appendix E
: c. NIJRBG-0654/FEMA-REP- 1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.
: d. D.C. Cook Emergency Plan, Appendix K
: e. AR 00863697


====6.2.1 Source====
Reference              EPP-2080-ERO-001                Rev. 14          Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP                          Pages:
Atahet1Phones                                                      12 1    Monthly Phone System Test in the EOF NOTE:          A "1" must be dialed pirto daigthe 10 dgtNRC number.
1.1  Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.
SNOTE:          Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.
1.2  IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.
1.3  Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.
Area                      Abbreviation    Meaning NRC Work Center            HPN              Health Physics Network NRC Work Center            PMCL            Protective Measure Counterpart Link NRC Work Center            RSCL            Reactor Safety Counterpart Link Dose Assessment Area      HPN              Health Physics Network Dose Assessment Area      HPN              Health Physics Network Dose Assessment Area      PMCL            Protective Measure Counterpart Link Main Area of the EOF      MCL              Management Counterpart Link Main Area of the EOF      ENS              Emergency Notification System (Red Phone)
Main Area of the EOF      ENS            Emergency Notification System (Red Phone) 1.4    Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).
1.5    Document completion of test using Data Sheet 1, BOF Monthly Checklist.


==References:==
Reference               EPP-2080-ERO-001               Rev. 14           Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP                               Pages:
: a. Emergency Station Minimum Inventory Requirements, RP-95-03 b. D.C. Cook Emergency Plan, Appendix C c. NRC Commitment 1179 d. NRC Commitment 5392 6.2.2 General References
Atahet2Phones                                                    13 - 14 1     Monthly NRC Phone System Test in the TSC.
: a. 10 CFR 50.47(b)b. 10 CFR 50, Appendix E c. NIJRBG-0654/FEMA-REP-1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.d. D.C. Cook Emergency Plan, Appendix K e. AR 00863697 Reference EPP-2080-ERO-001 Rev. 14 Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP Pages: Atahet1Phones 12 1 Monthly Phone System Test in the EOF NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.1. 1 Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.SNOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.1.2 IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.1.3 Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.Area Abbreviation Meaning NRC Work Center HPN Health Physics Network NRC Work Center PMCL Protective Measure Counterpart Link NRC Work Center RSCL Reactor Safety Counterpart Link Dose Assessment Area HPN Health Physics Network Dose Assessment Area HPN Health Physics Network Dose Assessment Area PMCL Protective Measure Counterpart Link Main Area of the EOF MCL Management Counterpart Link Main Area of the EOF ENS Emergency Notification System (Red Phone)Main Area of the EOF ENS Emergency Notification System (Red Phone)1.4 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).
NOTE:         A "1" must be dialed pirto daigthe 10 dgtNRC number.
1.1    Notify both Control Rooms that the monthly NRC phone check is being conducted.
1.2    When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.
1.2.1     The Control Room NRC Phone will ring once but should be disregarded.
1.3    Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.
NOTE:         Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.
1.3.1    IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.
1.4    Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone                      Abbreviation   Meaning NRC Communication          HPN             Health Physics Network NRC Communication          PMCL           Protective Measure' Counterpart Link NRC Communication          RSCL           Reactor Safety Counterpart Link NRC Communication          ENS             Emergency Notification System (Red Phone)
Plant Evaluation Team      1{PN            Health Physics Network Plant Evaluation Team      ENS             Emergency Notification System (Red Phone)
 
efrneEPP-2080-ERO-O01                          Rev. 14        Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP                        Pages:
Atahet2Phones                                                  13 - 14 2  Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).
2.1 Document completion of test using Data Sheet 4, TSC Monthly Checklist.
2.2 Notify both Control Rooms that the monthly phone checks are complete.
 
I  Reference                EPP-2080-ERO-001              Rev. 14            Page 15 of 65 I                    Emergency Response Resource Readiness I  Attachment 3          Functional Checks of ERO Facility Equipment            Pages:
1 FAX Machines 1.1    Demonstrate that each FAX machine is capable of sending and receiving FAXs.
* IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.
* Ensure the FAX machine displays the correct date and time.
S    To verify a FAX machine operation;
* Press "Function"
* 6 (Print out)
* 1 (Journal)
* Set
* 1 - to start print of Journal o    Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send) and RCV (receive) FAXs.
* Attach Journal to facility checklist.
1.2    Acceptance Criteria: The minimum number, of functional FAX machines, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.


===1.5 Document===
Reference               EPP-2080-ERO-001                 Rev. 14           Page 16 of 65 Emergency Response Resource Readiness I  Attachment 3      jFunctional Checks of ERO Facility Equipment                Pages:
completion of test using Data Sheet 1, BOF Monthly Checklist.
2        Telephones 2.1i    Verify each phone in the facility is capable of both dialing out and receiving calls.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages: Atahet2Phones 13 -14 1 Monthly NRC Phone System Test in the TSC.NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.1.1 Notify both Control Rooms that the monthly NRC phone check is being conducted.
2.2      Acceptance Criteria: The minimum number, of functional telephones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
1.2 When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.1.2.1 The Control Room NRC Phone will ring once but should be disregarded.
3        Copiers 3.1     Make 1 copy of a test page.
1.3 Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.NOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.1.3.1 IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.1.4 Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone Abbreviation Meaning NRC Communication HPN Health Physics Network NRC Communication PMCL Protective Measure' Counterpart Link NRC Communication RSCL Reactor Safety Counterpart Link NRC Communication ENS Emergency Notification System (Red Phone)Plant Evaluation Team 1{PN Health Physics Network Plant Evaluation Team ENS Emergency Notification System (Red Phone) efrneEPP-2080-ERO-O01 Rev. 14 Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages: Atahet2Phones 13 -14 2 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).
3.2    Acceptance Criteria: The minimum number, of functional copiers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
4        Computers 4.1     Power up each computer. Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP),
as needed on that computer for the ERO position that uses the computer.
4.2      Acceptance Criteria: The minimum number, of functional computers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
5        Monitors 5.1      Power up the monitor(s) and verify it is functional with its associated computer.
5.2      Acceptance Criteria: The minimum number, of functional monitors, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.


===2.1 Document===
Reference                EPP-2080-ERO-001                Rev. 14        Page 17 of 65 Emergency Response Resource Readiness Attachment 3          Functional Checks of ERO Facility Equipment          Pages:
completion of test using Data Sheet 4, TSC Monthly Checklist.
15 - 21 6        Copy Boards 6.1      Make a copy of the board to verify the copy board operates properly.
6.2     Acceptance Criteria: The minimum number, of functional Copy Boards, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
7        Facility Microphones 7.1     Power up the microphone's power supply and talk into the microphone. Verify your voice can be heard in each room of the ERG facility.
7.2      Acceptance Criteria: The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
8        OSC ED)Reader 8.1      Touch the screen of the ED Reader.
8.2      Acceptance Criteria: Ensure that the display screen is functional.
9        Facility Managers' Bridge 9.1      Dial the Facility Managers' Bridge number found on the ERG Toolbox card.
9).2    WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.
9.3      Speak into both phones verifying that each phone can be heard on the other phone.
-9.4     Hang up both phones.
9.5      Acceptance Criteria: Each phone can be heard on the other phone.


===2.2 Notify===
Reference*              EPP-2080-ERO-001                 Rev. 14         Page 18 of 65 Emergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment           Pages:
both Control Rooms that the monthly phone checks are complete.
10    Projector Unit & Microphone in JIC Auditorium 10.1   Power up the unit using the touch screen on the podium.
I Reference EPP-2080-ERO-001 Rev. 14 Page 15 of 65 I Emergency Response Resource Readiness I Attachment 3 Functional Checks of ERO Facility Equipment Pages: 1 FAX Machines 1.1 Demonstrate that each FAX machine is capable of sending and receiving FAXs.* IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.* Ensure the FAX machine displays the correct date and time.S To verify a FAX machine operation;
10.2  Touch the icon for computer, TV, camera, etc.
* Press "Function"* 6 (Print out)* 1 (Journal)* Set* 1 -to start print of Journal o Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send)and RCV (receive)
10.3    Verify the projector is displayed on the auditorium screen.
FAXs.* Attach Journal to facility checklist.
10.4  Verify the microphone is functional by talking into it.
10.5  Power down the auditorium system.
10.6  Acceptance Criteria: The JIC projector and microphone work satisfactorily.
11    Frisker 11.1  Verify the frisker is plugged in to a functioning AC outlet.
11.2    Turn on.
11.3  Increase speaker volume and verify audible response when a background count is detected.
11.4    Verify meter deflection when a background count is detected.
11.5    Turn frisker off.
11.6   Verify calibration does not expire prior to the end of the next month.
11.7    Acceptance criteria: Audible response and meter deflection.
12      Area Radiation Monitor 12.1    Verify the monitor is plugged in to a functioning AC outlet.
12.2    Turn on.
12.3    Verify an upscale meter response when a background count is detected.
12.4    Turn monitor off.
12.5    Verify calibration does not expire prior to the end of the next month.


===1.2 Acceptance===
Reference              EPP-2080-ERO-001              Rev. 14        Page 19 of 65 I                  Emergency Response Resource Readiness Attachment 3        Functional Checks of ERO. Facility Equipment        Pages:
12.6  Acceptance criteria: An upscale meter response when a background count is detected.


Criteria:
RfrneEPP-2080-ERO-001                             Rev. 14         Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment             Pages:
The minimum number, of functional FAX machines, is shown on the facility monthly checklist.
13      Equipment 13.1    Inventory frequency 13.1.1  All emergency supplies and equipment are inventoried at the following prescribed frequencies:
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.
Quarterly portable instrumentation            SRDs laboratory instrumentation          KI tablets vehicle radios                      TLDs respiratory equipment              All other supplies 13.1.2  Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.
Reference EPP-2080-ERO-001 Rev. 14 Page 16 of 65 Emergency Response Resource Readiness I Attachment 3 jFunctional Checks of ERO Facility Equipment Pages: 2 Telephones 2.1i Verify each phone in the facility is capable of both dialing out and receiving calls.2.2 Acceptance Criteria:
13.2   Facility Readiness 13.2.1  Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.
The minimum number, of functional telephones, is shown on the facility monthly checklist.
13.2.2   Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.3 Copiers 3.1 Make 1 copy of a test page.3.2 Acceptance Criteria:
13.2.3  Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.
The minimum number, of functional copiers, is shown on the facility monthly checklist.
13.2.4  Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.4 Computers 4.1 Power up each computer.
13.2.5  Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.
Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP), as needed on that computer for the ERO position that uses the computer.4.2 Acceptance Criteria:
13.2.6  Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.
The minimum number, of functional computers, is shown on the facility monthly checklist.
13.2.7  Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.5 Monitors 5.1 Power up the monitor(s) and verify it is functional with its associated computer.5.2 Acceptance Criteria:
The minimum number, of functional monitors, is shown on the facility monthly checklist.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
Reference EPP-2080-ERO-001 Rev. 14 Page 17 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 15 -21 6 Copy Boards 6.1 Make a copy of the board to verify the copy board operates properly.6.2 Acceptance Criteria:
The minimum number, of functional Copy Boards, is shown on the facility monthly checklist.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.7 Facility Microphones


===7.1 Power===
[   Reference               EPP-2080-ERO-001               Rev. 14         Page 21 of 65 Emergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment             Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.
up the microphone's power supply and talk into the microphone.
13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent. [NRC Commitment 1179]
Verify your voice can be heard in each room of the ERG facility.7.2 Acceptance Criteria:
13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.
The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist.
13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.8 OSC ED) Reader 8.1 Touch the screen of the ED Reader.8.2 Acceptance Criteria:
13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.
Ensure that the display screen is functional.
13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory. RP performs Periodic Performance Tests (PPT) and calibrates as necessary.
9 Facility Managers' Bridge 9.1 Dial the Facility Managers' Bridge number found on the ERG Toolbox card.9).2 WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.9.3 Speak into both phones verifying that each phone can be heard on the other phone.-9.4 Hang up both phones.9.5 Acceptance Criteria:
Each phone can be heard on the other phone.
Reference*
EPP-2080-ERO-001 Rev. 14 Page 18 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 10 Projector Unit & Microphone in JIC Auditorium 10.1 Power up the unit using the touch screen on the podium.10.2 Touch the icon for computer, TV, camera, etc.10.3 Verify the projector is displayed on the auditorium screen.10.4 Verify the microphone is functional by talking into it.10.5 Power down the auditorium system.10.6 Acceptance Criteria:
The JIC projector and microphone work satisfactorily.
11 Frisker 11.1 Verify the frisker is plugged in to a functioning AC outlet.11.2 Turn on.11.3 Increase speaker volume and verify audible response when a background count is detected.11.4 Verify meter deflection when a background count is detected.11.5 Turn frisker off.11.6 Verify calibration does not expire prior to the end of the next month.11.7 Acceptance criteria:
Audible response and meter deflection.
12 Area Radiation Monitor 12.1 Verify the monitor is plugged in to a functioning AC outlet.12.2 Turn on.12.3 Verify an upscale meter response when a background count is detected.12.4 Turn monitor off.12.5 Verify calibration does not expire prior to the end of the next month.
Reference EPP-2080-ERO-001 Rev. 14 Page 19 of 65 I Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO. Facility Equipment Pages: 12.6 Acceptance detected.criteria:
An upscale meter response when a background count is RfrneEPP-2080-ERO-001 Rev. 14 Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 13 Equipment 13.1 Inventory frequency 13.1.1 All emergency supplies and equipment are inventoried at the following prescribed frequencies:
Quarterly portable instrumentation SRDs laboratory instrumentation KI tablets vehicle radios TLDs respiratory equipment All other supplies 13.1.2 Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.
13.2 Facility Readiness 13.2.1 Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.
13.2.2 Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.
13.2.3 Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.
13.2.4 Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.
13.2.5 Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.
13.2.6 Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.
13.2.7 Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 21 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.
13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent.  
[NRC Commitment 1179]13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.
13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.
13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
RP performs Periodic Performance Tests (PPT) and calibrates as necessary.
Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.
Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.
o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.
o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.
* After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
* After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
* Record the serial number of equipment in the space provided.13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.14 Documentation 14.1 Document test results on the specific data sheet.
* Record the serial number of equipment in the space provided.
Reference EPP-2080-ERO-001 Rev. 14 Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring Pages: Atahet4Down Phones "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1 Testing of the ring down phone system in the Control Room 1.1.1 Request permission from the Control Room to perform the monthly check.1.1.2 Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.1.1.3 Pick up the phone and talk to the 911 Dispatch Center.1.1.4 Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.
14     Documentation 14.1   Document test results on the specific data sheet.
 
Reference               EPP-2080-ERO-001               Rev. 14         Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring             Pages:
Atahet4Down                         Phones                       "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1   Testing of the ring down phone system in the Control Room 1.1.1   Request permission from the Control Room to perform the monthly check.
1.1.2     Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.
1.1.3   Pick up the phone and talk to the 911 Dispatch Center.
1.1.4   Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
1.2  Testing of the ring down phone system in the EOF.
1.2.1    Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.
1.2.2    Pick up the phone and talk to the 911 Dispatch Center.
1.2.3    Document completion on Data Sheet 1, EOF Monthly Checklist.
1.3    Testing of the ring down phone system in the CAS and SAS.
1.3.1    Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.
1.3.2    Document completion onl Data Sheet 16, CAS/SAS Monthly Checklist.
 
Reference                EPP-2080-ERO-001                Rev. 14          Page 23 of 65 Emergency Response Resource Readiness Attachment 5                      Satellite Phone Checks                      Pages.
NOTE      ;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.
1      MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE 1.1    Turn on by holding button on top of phone.
1.2    Check battery charge level 1.2.1    Locate the battery icon on the upper right side of the phone display 1.2.2    Level of charge should be full
: a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours.
1.3    To place acall.
1.3.1    extend antenna.
1.3.2    dial number.
1.3.3    make contact with another person/phone.
1.4    To receive a call.
1.4.1    The phone will display a call attempt.
1.4.2    Extend antenna.
1.4.3    After several seconds the phone will vibrate or ring and display an incoming call.
1.4.4    Select accept.
1.4.5    Make contact.
 
Reference                EPP-2080-ERO-001                  Rev. 14              Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5                      Satellite Phone Checks                          Pages.
1.5    End call.
1.6    Place on charging unit.
1.7    Acceptance Criteria 1.7.1    Contact is made by either placing or receiving a call.
1.7.2    Battery is fully charged.
1.8    For the phones located at Berrien County, Lake Township and Lake-Michigan College.
1.8.1    Call the location to be tested prior to the test to inform them that the test is about to commence.
1.8.2    Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.
1.8.3    Document completion on Data Sheet 24, Monthly Satellite Phone Checks
 
Reference                  EPP-2080-ERO-00I                      Rev. 14          Page 25 of 65 Emergency Response Resource Readiness 25ges:
Data Sheet 1                        EOF Monthly Checklist                            Pag 2 EOF Monthly Checklist
_______________    _________/_
Month                  Year Equipment Functional Checks:                              Equipment Functional Checks:
ci 2 FAX machine(s) (Attachment 3)                      ci 1 Frisker (Attachment 3) ci 1 Telephone (Attachment 3)                            ci 1 Area Radiation Monitor (Attachment 3) ci 1 Copier (Attachment 3)                              ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment 3)                        tranlsmission) ci 1 DAP computer (Attachment 3)                                          Facility Set Up:
ci 1 Flat screen monitors (Attachment 3)                ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment 3)                              boards/copier ci 1 PAS microphone                                      [] 1 toner for copier ci 1 Projector                                          ci Check EPiIiP procedure books for current ciMSP phones (Attachment 1)                              revision ci NRC FTS-2001 phones (Attachment 1)                    ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment 5)                    [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)
Facility Readiness:              [21 Satisfactory            ci Unsatisfactory (enter comment below)
Comments:
Print Name                          Signature                    Date Reviewed by:    ____________/
EPM or designee                    Signature                    Date
 
I  Reference                EPP-2080-ERO-0O1                Rev. 14          Page 26 of 65 I                    Emergency Response Resource Readiness I                                                              Pages:
Data Sheet 2                      EOF Quarterly Checklist                      26 -. 28 EOF Quarterly Checklist
__________________/
Quarter        Year Portable Instrument Kits in storage area
[] Verify kit is sealed J]  Air Sampling Kit [Ref 6.2. laII.
II  14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
[]  14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a] and [Ref 6.2. lb].
Li  2 Count Rate Meters (friskers).
Li  Miscellaneous RP Supply Box.
NOTE:            *Before    testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe  table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room:
ElVerify radio is turned on and is on the correct frequency.
Li Contact 'the person in the OSC and verify two-way communication is obtained.
Li Clear communication successful, EOF to OSC.
Li Clear communication successful, OSC to EOF.
[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF
 
[  Reference                EPP-2080-ERO-001                Rev. 14          Page 27 of 65 I                    Emergency Response Resource Readiness Data Sheet 2                    EOF Quarterly Checklist                      26 - 28 24-hour coping supplies El      Open storage area.
El      Ensure that the Contents agree with the inventory sheet.
LII      IF the inventory is correct, THEN close the cabinet/storage container.
El      IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.
LI]      Close the Cabinet/storage container.
Alternate OSC Equipment and Supplies:
El      10 copies of RMT-2080-OSC-0O1 El      1 Lap Top computer El      Copier Board El      Extension Cord LII    System overview drawings book El      Plant Phone List El    ,Laminated Field Monitoring Team maps El      Cube signs El      4 Telephones El      Pens El      Pads of lined paper El      Post Its El      Calculator Alternate TSC Equipment and Supplies:
El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC
 
Reference                EPP-2080-ERO-001              Revo 14              Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2                    EOF Quarterly Checklist                        26age28 F-i Copi~er Board CL Sign in board Li EPZ maps    - poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.
El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE:        An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:            Li Satisfactory      Cl Unsatisfactory (enter comment below)
Comments:
Performed by:____________I____________                                        ______
Print Name                    Signature                      Date Reviewed by:
EPM or designee              Signature                      Date
 
Reference                EPP-2080-ERO-001              Rev. 14          Page 29 of  651 Emergency Response Resource Readiness Data Sheet 3          EOF Quarterly Radiation Protection Checklist            Pages.
EOE Quarterly Radiation Protection Checklist Quarter      Year NOTE:            Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.
1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]
EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1.a] [Ref 6.2.l.b]
[] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)
Radiation Protection Portable Instrument Kit
[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
Air sampling Kit o      El Break Seal and inventory
[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes
[] Particulate Filters (47mm filters)
Li Time Piece
[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date  _______
a      Li Install new seal Additional Equipment
[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number        ____Serial    Number__
[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)
Li 8 TLDs (Area TLD Badges)
Li 8 EDs (Area EDs)
Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3            EOF Quarterly Radiation Protection Checklist            Pages31 2        Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
EL    Donald C. Cook EPZ Map Li    Berrien County Map Li1    12 Blank Data Sheets (verify current revision)
RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li    Key to Air Sampling Stations (B-i)
Li Keys to Rosemary Beach Gate Li    2 Clipboards Li      1 Air Sampler with sample head: Serial Number________
L-i    RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )
Li      1 Assorted Tool Kit Li    2 Site Maps Li    1 Flashlight/Lantern with Batteries, verify operation.
Li    Compass Li2      Sets Winter Apparel Li    Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)
Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags
 
[  Reference                      EPP-2080-ERO-001                                      Rev. 14          Page 31 of 65 I                        Emergency Response Resource Readiness Data Sheet 3              EOF Quarterly Radiation Protection Checklist                                  29age31 Facility Readiness:                  El Satisfactory                      El Unsatisfactory (enter comment below)
Comments:
Performed by: ______________________________________________I________________________________________________
El              Print Name                                      Signature                          Date Reviewed by: __________________________________________/____________________________________________
EPM or designee                                  Signature                          Date
 
[  Reference                EPP-2080-ERO-O01                  Rev. 14            Page 32 of 65 I                  Emergency Response Resource Readiness Data Sheet 4                      TSC Monthly Checklist                          Pages TSC Monthly Checklist
__________________/
Month            Year Equipment Functional Checks:                        Equipment Functional Checks:
El 1 Copier (Attachment 3)                          El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment 3)                    output)
LI 2 Flat screen monitors (Attachment 3)            EL1 Frisker (Attachment 3)
El 3 PPC computers (Attachment 3)                  El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment 3)                      display)
LI 2 Telephones (Attachment 3)                                      Facility Set Up:
LI 1 MSP phone (Attachment 2)                      LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment 2)              boards/copier LI 1 Iridium 9555 Satellite phones                  LI 1 toner for copier (Attachment 5)                                      LI Check procedure books for current revision LI 3 EP radios (turn on and verify                  LI Check data sheet folders for current revision transmission)
LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:            LI1 Satisfactory        LI1 Unsatisfactory (enter comment below)
Comments Performed by:
Print Name                      Signature                      Date Reviewed by:                                  /_
EPM or designee                  Signature                      Date
 
RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev. 14Pages3            f6 Data Sheet 5                    TSC Quarterly Checklist TSC Quarterly Checklist Quarter      Year 24-hour coping supplies El    Open storage area.
Li    Ensure that the Contents agree with the inventory sheet.
Li    IF the inventory is correct, THEN close the cabinet/storage container.
LI    IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
Li    Close the Cabinet/storage container.
Performed by:____________/____________                                      ______
Print Name                  Signature                      Date Reviewed by:____________/__________________
EPM or designee              Signature                      Date
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 34 of 65 I                    Emergency Response Resource Readiness Data Sheet 6          TSC Quarterly Radiation Protection Checklist              Pages:
TSC Quarterly Radiation Protection Checklist Quarter      Year Cabinet Inventory LI Break seal and perform inventory EL        4 TLDs (Area TLDs)
LI        4 EDs (Area EDs)
LI        25 EDs LI        Count Rate Meter [Ref 6.2.1 .a]                        Serial Number  ________
LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI        Portable Continuous Air Monitor [Ref 6.2.1 .a]        Serial Number  _________
LI        Area Radiation Monitors (ARM)                          Serial Number_________
LI        Charcoal lInpregnated fiber filters LI        Air Sample Envelopes LI        26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]
LI        25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]
LI      25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1..a]
LI        65 packages of KI tablets with:
[] 25 KI1 Consent Forms        RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)
LI Install new seal NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
*Facility Readiness:            ElI Satisfactory    LI Unsatisfactory (enter comment below)
Comments:
Performed by:____________/_____________                                        ______
Print Name                    Signature                      Date Reviewed by: ___________/___________                                          _____
EPM or designee              Signature                        Date Dt
 
Reference                EPP-2080-ERO-001                  Rev. 14          Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7                      OSC Monthly Checklist                          Pages:5 OSC Monthly Checklist Month            Year Equipment Functional Checks:                        Equipment Functional Checks:
C] 1 Copy Board (Attachment 3)                    C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment 3)                        output)
C] 1 FAX machine (Attachment 3)                    C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment 3)                transmission)
C]3 Computers (Attachment 3)                                        Facility Set Up:
C] 10 Telephones (Attachment 3)                  C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 - onsite survey, 2 -            boards/copier off-site survey teams) (Attachment 5)              C] 1 toner for copier C] EP radios (18 DCT or RP                        C] Check procedure books for current revision teams/personnel, 6 for Operations                  C]1 Check data sheet folders for current revision personnel) (turn on and verify charged)            C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify            C]Oealcanissndperne display)                                          QOealceniesadapaac C]2Fikr (tahet3                                    C] Verify survey vehicle keys are in 2 Frskes 3)Emergency (ttacmen                              Key box.
C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.
NOTE:          An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory. Document *number in comments.
Facility Readiness:            C] Satisfactory        [21 Unsatisfactory (enter comment below).
Comments:"
Performed by:                                /
Print Name                      Signature                      Date Reviewed by:
EPM or designee                Signature                      Date
 
Reference              EPP-2080-ERO-001                Rev. 14        Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8                  OSC Quarterly Checklist                    36age37 OSC Quarterly Checklist
__________________/
Quarter        Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.
24-hour coping supplies J    Open storage area.
L)  Ensure that the Contents agree with the inventory sheet.
0l  IF the inventory is correct, THEN close the cabinet/storage container.
[I1  IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
LI]  Close the Cabinet/storage container.
 
Reference              EPP-2080-ERO-001                Rev. 14          Page 37 of 65 Emergency Response Resource Readiness Pages:
Data Sheet 8                      OSC Quarterly Checklist                      36 - 37    j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.
El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.
Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.
For example:
Hand-held radio Channel 1: KNDP798 (off-site)      =  Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site) =Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.* Document number in comments.
Facility Readiness:            Li Satisfactory      Li Unsatisfactory (enter comment below)
Comments:
Performed by:
Print Name                    Signature                    Date Reviewed by:                                  /
EPM or designee        /      Signature                    Date
 
I  Reference              EPP-2080-ERO-OO1                Rev. 14      Page 38 of 65 I                    Emergency Response Resource Readiness DataShet OSCQuatery 9    Rdiaton rotctin CeckistPages.
Data Seet 9        OSC Quarterly Radiation Protection Checklist38-4 Quarter            Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)
El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[
Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)
Calibration Due Date    _____
Li Area Radiation Monitor (ARM): Serial Number            ____
CL Area Radiation Monitor (ARM): Serial Number____
Li 2 Count Rate Meters:          Serial Number    _______
Serial Number_______
Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters:
Serial Number    _______
Serial Number    _______
Serial Number_______
Li 3 GM Survey Meters [Ref 6.2.1.a]:
Serial Number    _______
Serial Number    _______
Serial Number_______
Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number    _______
Serial Number_______
Serial Number    _______
Serial Number________
Li  Purge Rig (located in the Lakeside Office Building north ventilation room)
Li  Walk-Through Portal Monitor Cal Due Date_____
Li  Set of RP Procedures Li  Donald C. Cook 10 mile EPZ map Li Site Map
 
Reference              EPP-2080-ERO-001              Rev. 14            Page 39 of 65 I                  Emergency Response Resource Readiness Data Sheet 9        OSC Quarterly Radiation Protection Checklist            Pages40 LI 15 Blank Data Sheets (verify current revision)
RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)
LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001 - Data Sheet 3 (verify current revision)
LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.
LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]
LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1. .a]
LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment # 5392)
Air Sampling Kit [Ref 6.2.l.a]
LI Break seal and perform inventory LIPad of Paper                          LI Planchetts          LI Particulate filters (47-mam)
LI Sealable Plastic Bags                  LITweezers            LI Time Piece LI Air Sample Envelopes                  LICalculator          LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___
LI Install new seal.
CL Portable Instrument Kit [-Ref 6.2.1 .a]
LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Off Site Responder / Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)
LI 20 EDs


===1.2 Testing===
ReferenceEPP-2080-ERO-001                            Rev. 14Pae4of6 Reference        Emergency Response Resource ReadinessPae4of6 Data Sheet 9            OSC Quarterly Radiation Protection Checklist            Pages:
of the ring down phone system in the EOF.1.2.1 Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.1.2.2 Pick up the phone and talk to the 911 Dispatch Center.1.2.3 Document completion on Data Sheet 1, EOF Monthly Checklist.
Miscellaneous Supply -Box Li Break the seal and inventory.
I] Rad Ribbon / rope                Li Rad Tape                    Li Smears Li Planchetts                        Li Tweezers                    Li Safety Glasses Li Paper                            Li Pens                        Li Disposable Gloves Li Envelopes                        EL Hearing Protection
[] Install-new seal.
Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]
Li 30 Full plastic suits with hoods NOTE:              An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:              LI] Satisfactory      Li Unsatisfactory (enter comment below)
Comets Performed by:
Print Name                    Signature                    Date Reviewed by:-
EPM or designee                Signature                    Date


===1.3 Testing===
efrneEPP-2080-ERO-001                              Rev. 14            Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10                  ENC/JIC Monthly Checklist                        Pages:
of the ring down phone system in the CAS and SAS.1.3.1 Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.
41 -41 ENC/JIC Monthly Checklist I
Month            Year Equipment Functional Checks:                                Facility Set Up:
Li 1 Copier (Attachment 3)                          Li 1 box of Extra paper El 2 FAX machine(s) (Attachment 3)                  [] 1 toner for copier Li 2 Flat screen monitors (Attachment 3)            LiCheck procedure books for current revision
[] 3 Computers (Attachment 3)                        Li Check data sheet folders for current rev.
EL 2 TVs and 2 Radios                                Li Supply cabinets and key box sealed Li 1 TV recording device(s)                          Li Extra bulbs for large screen projector Ei 15 Telephones (Attachment 3)                      Li Verify the current ERG calendar is in the Li 1 PA microphone (turn on and verify output)          press packets LI] 1 Security Computer in Stairwell (Plug in        EL Check keys in key box and turn on)                                            EiReceptionist - Master Key Li 1 County laptop (Plug in and turn on)                LiSpokesperson - Master Key Li Verify recorded message.
Li 1 Projector in auditorium (Attachment 3)            LiAudio Visual - Master key & cabinet key ELSupport Coordinator - Master Key Li 2 TLDs (Area TLDs)                                  LiMedia Center Manager -Master Key Li 2 EDs (Area EDs)                                    LIMedia Area Coordinator - Master Key LIJIC Setup Coordinator - Master Key, Stair Li Overall cleanliness and appearance                      screen key (#45), 2 Misc Keys NOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:            LI Satisfactory        Li Unsatisfactory (enter comment below)
Comments:
Performed by:
Print Name                    Signature                      Date Reviewed by:                                  I_
Date EPM or designee                M1gnature


====1.3.2 Document====
Reference               EPP-2080-ERO-O01                  Rev. 14             Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11              Survey Vehicle Monthly Checklist                      42 - 42 Survey Vehicle Monthly Checklist LiVehicle #1       El Vehicle #2
completion onl Data Sheet 16, CAS/SAS Monthly Checklist.
____________________/
Reference EPP-2080-ERO-001 Rev. 14 Page 23 of 65 Emergency Response Resource Readiness Attachment 5 Satellite Phone Checks Pages.NOTE 1 1.1 1.2;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.
Month            Year L1      Check fuel supply (keep tank full)
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.
Li      Check battery (start and drive for 30 minutes)
MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE Turn on by holding button on top of phone.Check battery charge level 1.2.1 Locate the battery icon on the upper right side of the phone display 1.2.2 Level of charge should be full a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours.1.3 To place acall.1.3.1 extend antenna.1.3.2 dial number.1.3.3 make contact with another person/phone.
Li      Check that tires are not flat
1.4 To receive a call.1.4.1 The phone will display a call attempt.1.4.2 Extend antenna.1.4.3 After several seconds the phone will vibrate or ring and display an incoming call.1.4.4 Select accept.1.4.5 Make contact.
[21    Check that there is no leaking/puddle fluids under vehicle CI      Check that the lights (including turn signals) work Li    Check that windows are not cracked/broken
Reference EPP-2080-ERO-001 Rev. 14 Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5 Satellite Phone Checks Pages.1.5 1.6 End call.Place on charging unit.1.7 Acceptance Criteria 1.7.1 Contact is made by either placing or receiving a call.1.7.2 Battery is fully charged.1.8 For the phones located at Berrien County, Lake Township and Lake-Michigan College.1.8.1 Call the location to be tested prior to the test to inform them that the test is about to commence.1.8.2 Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.1.8.3 Document completion on Data Sheet 24, Monthly Satellite Phone Checks Reference EPP-2080-ERO-00I Rev. 14 Page 25 of 65 Emergency Response Resource Readiness 25ges: Data Sheet 1 EOF Monthly Checklist Pag 2 EOF Monthly Checklist_______________
[II    Odometer reading _____miles Odometer reading _____miles Li    Spare batteries, 1 set for each vehicle flashlight.
_________/_
Li    Check vehicle for overall cleanliness and appearance CL      Check recharge tag on battery jump pack (recharge if necessary)
Month Year Equipment Functional Checks: Equipment Functional Checks: ci 2 FAX machine(s) (Attachment
Vehicle Readiness:            Li Satisfactory        EL Unsatisfactory (enter comment below)
: 3) ci 1 Frisker (Attachment 3)ci 1 Telephone (Attachment
Performed by:____________/_____________                                        ______
: 3) ci 1 Area Radiation Monitor (Attachment 3)ci 1 Copier (Attachment
Print Name                      Signature                      Date Reviewed by:____________/__________________
: 3) ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment
EPM or designee                Signature                      Date
: 3) tranlsmission) ci 1 DAP computer (Attachment
 
: 3) Facility Set Up: ci 1 Flat screen monitors (Attachment
Ref erence              EPP-2080-ERO-001                       Rev. 14         Page 43 of 65 Emergency Response Resource Readiness Daa het 2          Survey Vehicle Radiation Protection Quarterly                Pages:
: 3) ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment
DtShe12Checklist                                                          43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1             LI Vehicle #2
: 3) boards/copier ci 1 PAS microphone
_________________/ _______
[] 1 toner for copier ci 1 Projector ci Check EPiIiP procedure books for current ciMSP phones (Attachment
Quarter              Year EL        Site Map
: 1) revision ci NRC FTS-2001 phones (Attachment
[]        Berrien County Map LI 15 Blank Data Sheets (verify current revision)
: 1) ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment
RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI        RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)
: 5) [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)Facility Readiness:
LI        Clipboard LI        Flashlight/Lantern with Batteries El        2 Sets Winter Apparel .[Ref 6.2.1.a]
[21 Satisfactory ci Unsatisfactory (enter comment below)Comments: Print Name Reviewed by: ____________/
LI        Clippers EL        Shovel LI        2 Full Face Respirators with Iodine and Particulate Cartridges . [Ref 6.2.1. a]
Signature Date Date EPM or designee Signature I Reference EPP-2080-ERO-0O1 Rev. 14 Page 26 of 65 I Emergency Response Resource Readiness I Pages: Data Sheet 2 EOF Quarterly Checklist 26 -. 28 EOF Quarterly Checklist__________________/
LI        Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)
_________Quarter Year Portable Instrument Kits in storage area[] Verify kit is sealed J] Air Sampling Kit [Ref 6.2. laII.II 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
Miscellaneous Supply Box LI Break the seal and inventory LI Paper            LI  Rad Tape                                    LI Disposable Gloves LI Envelopes          LI Tweezers                                    LI Sample Collection Bags LI Labels            LI Compass                                    LI Rad Ribbon ! rope LI Smears            LI  Keys to Rosemary Beach Gate                LI Writing Implements EL  Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]
[] 14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a]
LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
and [Ref 6.2. lb].Li 2 Count Rate Meters (friskers).
 
Li Miscellaneous RP Supply Box.NOTE: *Before testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room: ElVerify radio is turned on and is on the correct frequency.
Reference                 EPP-2080-ERO-001              Rev. 14             Page 44 of 65 Emergency Response Resource Readiness het 2 Daa              Survey Vehicle Radiation Protection Quarterly            Pages:
Li Contact 'the person in the OSC and verify two-way communication is obtained.Li Clear communication successful, EOF to OSC.Li Clear communication successful, OSC to EOF.[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF
DtShe12Checklist                                                      43- 44 lNOTE:          Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 27 of 65 I Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26 -28 24-hour coping supplies El Open storage area.El Ensure that the Contents agree with the inventory sheet.LII IF the inventory is correct, THEN close the cabinet/storage container.
Air Sampling Kit .I[Ref 6.2.1.a]
El IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.
II] Break the seal and inventory C)Pad of Paper                      C)Planchetts        C)Particulate filters (47-mm filters)
LI] Close the Cabinet/storage container.
C)Sealable Plastic Bags            C)Time Piece        C)Writing Implements C)Air Sample Envelopes              C)Calculator
Alternate OSC Equipment and Supplies: El 10 copies of RMT-2080-OSC-0O1 El 1 Lap Top computer El Copier Board El Extension Cord LII System overview drawings book El Plant Phone List El ,Laminated Field Monitoring Team maps El Cube signs El 4 Telephones El Pens El Pads of lined paper El Post Its El Calculator Alternate TSC Equipment and Supplies: El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC Reference EPP-2080-ERO-001 Revo 14 Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26age28 F-i Copi~er Board CL Sign in board Li EPZ maps -poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE: An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
[] Silver Zeolite Cartridges (min 5 cartridges) Exp Date____
Document number in comments.Facility Readiness:
C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]
Li Satisfactory Cl Unsatisfactory (enter comment below)Comments: Performed by:____________I____________
C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE:           An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
______Print Name EPM or designee Signature Date Signature Date Reviewed by:
Vehicle Readiness:              I] Satisfactory      C)Unsatisfactory (enter comment below)
Reference EPP-2080-ERO-001 Rev. 14 Page 29 of 651 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages.EOE Quarterly Radiation Protection Checklist Quarter Year NOTE: Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.
Comments:
1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
Performed by:
[Ref 6.2.1.a] [Ref 6.2.l.b][] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)Radiation Protection Portable Instrument Kit[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
Print Name                  Signature                      Date Reviewed by:
Air sampling Kit o El Break Seal and inventory[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes[] Particulate Filters (47mm filters)Li Time Piece[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date _______a Li Install new seal Additional Equipment[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number ____Serial Number__[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)Li 8 TLDs (Area TLD Badges)Li 8 EDs (Area EDs)Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__
EPM or designee              Signature                      Date
Reference EPP-2080-ERO-001 Rev. 14 Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages31 2 Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
 
EL Donald C. Cook EPZ Map Li Berrien County Map Li1 12 Blank Data Sheets (verify current revision)RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li Key to Air Sampling Stations (B-i)Li Keys to Rosemary Beach Gate Li 2 Clipboards Li 1 Air Sampler with sample head: Serial Number________
Reference                      EPP-2080-ERO-001                     Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13                        Control Room Monthly Checklist             45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)
L-i RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )Li 1 Assorted Tool Kit Li 2 Site Maps Li 1 Flashlight/Lantern with Batteries, verify operation.
__________________/
Li Compass Li2 Sets Winter Apparel Li Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags
Month              Year One FAX Machine Verify the FAX machine functions per Attachment 3.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 31 of 65 I Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist 29age31 Facility Readiness:
________________________________________/___________
El Satisfactory El Unsatisfactory (enter comment below)Comments: Performed by: El Reviewed by:______________________________________________I________________________________________________
EP Staff                        Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.
Print Name Signature__________________________________________/____________________________________________
Verify the password is correct by logging into ERONS.
Date Date EPM or designee Signature
________________________________________/___________
[ Reference EPP-2080-ERO-O01 Rev. 14 Page 32 of 65 I Emergency Response Resource Readiness Data Sheet 4 TSC Monthly Checklist Pages TSC Monthly Checklist__________________/
EP Staff                        Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4.
_________Month Year Equipment Functional Checks: Equipment Functional Checks: El 1 Copier (Attachment
_______________________________________/___________
: 3) El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment
EP Staff                        Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff                        Date Dt
: 3) output)LI 2 Flat screen monitors (Attachment
 
: 3) EL 1 Frisker (Attachment 3)El 3 PPC computers (Attachment
Reference               EPP-2080-ERO-001               Rev. 14           Page 46 of 65 I                  Emergency Response Resource Readiness I
: 3) El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment
Data Sheet 3CotoRom 13Conrol           oomMontly heckistPages:
: 3) display)LI 2 Telephones (Attachment
othyhelit45                       -46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)
: 3) Facility Set Up: LI 1 MSP phone (Attachment
: 2) LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment
: 2) boards/copier LI 1 Iridium 9555 Satellite phones LI 1 toner for copier (Attachment
: 5) LI Check procedure books for current revision LI 3 EP radios (turn on and verify LI Check data sheet folders for current revision transmission)
LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Facility Readiness:
LI1 Satisfactory LI1 Unsatisfactory (enter comment below)Comments Performed by: Reviewed by: Print Name/_Signature Date Date EPM or designee Signature RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev.
14Pages3 f6 Data Sheet 5 TSC Quarterly Checklist TSC Quarterly Checklist Quarter Year 24-hour coping supplies El Open storage area.Li Ensure that the Contents agree with the inventory sheet.Li IF the inventory is correct, THEN close the cabinet/storage container.
LI IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
Li Close the Cabinet/storage container.
Performed by:____________/____________
______Print Name Signature Date Reviewed by:____________/__________________
EPM or designee Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 34 of 65 I Emergency Response Resource Readiness Data Sheet 6 TSC Quarterly Radiation Protection Checklist Pages: TSC Quarterly Radiation Protection Checklist Quarter Year Cabinet Inventory LI Break seal and perform inventory EL 4 TLDs (Area TLDs)LI 4 EDs (Area EDs)LI 25 EDs LI Count Rate Meter [Ref 6.2.1 .a] Serial Number ________LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI Portable Continuous Air Monitor [Ref 6.2.1 .a] Serial Number _________LI Area Radiation Monitors (ARM) Serial Number_________
LI Charcoal lInpregnated fiber filters LI Air Sample Envelopes LI 26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]LI 25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]LI 25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges
[Ref 6.2.1. .a]LI 65 packages of KI tablets with:[] 25 KI1 Consent Forms RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)LI Install new seal NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.*Facility Readiness:
ElI Satisfactory LI Unsatisfactory (enter comment below)Comments: Performed by:____________/_____________
______Print Name Signature Date Reviewed by: ___________/___________
_____EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7 OSC Monthly Checklist Pages:5 OSC Monthly Checklist Month Year Equipment Functional Checks: Equipment Functional Checks: C] 1 Copy Board (Attachment
: 3) C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment
: 3) output)C] 1 FAX machine (Attachment
: 3) C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment
: 3) transmission)
C]3 Computers (Attachment
: 3) Facility Set Up: C] 10 Telephones (Attachment
: 3) C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 -onsite survey, 2 -boards/copier off-site survey teams) (Attachment
: 5) C] 1 toner for copier C] EP radios (18 DCT or RP C] Check procedure books for current revision teams/personnel, 6 for Operations C]1 Check data sheet folders for current revision personnel) (turn on and verify charged) C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify C]Oealcanissndperne display) QOealceniesadapaac C]2Fikr (tahet3 C] Verify survey vehicle keys are in 2 Frskes (ttacmen 3)Emergency Key box.C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.
NOTE: An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory.
Document *number in comments.Facility Readiness:
C] Satisfactory
[21 Unsatisfactory (enter comment below).Comments:" Performed by: Reviewed by:/Print Name EPM or designee Signature Signature Date Date Reference EPP-2080-ERO-001 Rev. 14 Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8 OSC Quarterly Checklist 36age37 OSC Quarterly Checklist__________________/
_________Quarter Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.24-hour coping supplies J Open storage area.L) Ensure that the Contents agree with the inventory sheet.0l IF the inventory is correct, THEN close the cabinet/storage container.
[I1 IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
LI] Close the Cabinet/storage container.
Reference EPP-2080-ERO-001 Rev. 14 Page 37 of 65 Emergency Response Resource Readiness Pages: Data Sheet 8 OSC Quarterly Checklist 36 -37 j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.For example: Hand-held radio Channel 1: KNDP798 (off-site)
= Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site)
=Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.
NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.*
Document number in comments.Facility Readiness:
Li Satisfactory Li Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name/Signature Date Date Signature/EPM or designee Signature I Reference EPP-2080-ERO-OO1 Rev. 14 Page 38 of 65 I Emergency Response Resource Readiness DataShet 9 OSCQuatery Rdiaton rotctin CeckistPages.
Data Seet 9 OSC Quarterly Radiation Protection Checklist38-4 Quarter Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)
El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)Calibration Due Date _____Li Area Radiation Monitor (ARM): Serial Number ____CL Area Radiation Monitor (ARM): Serial Number____
Li 2 Count Rate Meters: Serial Number _______Serial Number_______
Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters: Serial Number _______Serial Number _______Serial Number_______
Li 3 GM Survey Meters [Ref 6.2.1.a]: Serial Number _______Serial Number _______Serial Number_______
Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number _______Serial Number_______
Serial Number _______Serial Number________
Li Purge Rig (located in the Lakeside Office Building north ventilation room)Li Walk-Through Portal Monitor Cal Due Date_____Li Set of RP Procedures Li Donald C. Cook 10 mile EPZ map Li Site Map Reference EPP-2080-ERO-001 Rev. 14 Page 39 of 65 I Emergency Response Resource Readiness Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages40 LI 15 Blank Data Sheets (verify current revision)RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001
-Data Sheet 3 (verify current revision)LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges
[Ref 6.2.1. .a]LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment
# 5392)Air Sampling Kit [Ref 6.2.l.a]LI Break seal and perform inventory LIPad of Paper LI Planchetts LI Particulate filters (47-mam)LI Sealable Plastic Bags LI Tweezers LI Time Piece LI Air Sample Envelopes LI Calculator LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges)
Exp Date___LI Install new seal.CL Portable Instrument Kit [-Ref 6.2.1 .a]LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Off Site Responder
/ Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)LI 20 EDs ReferenceEPP-2080-ERO-001 Rev. 14Pae4of6 Reference Emergency Response Resource ReadinessPae4of6 Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages: Miscellaneous Supply -Box Li Break the seal and inventory.
I] Rad Ribbon / rope Li Rad Tape Li Smears Li Planchetts Li Tweezers Li Safety Glasses Li Paper Li Pens Li Disposable Gloves Li Envelopes EL Hearing Protection
[] Install- new seal.Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]Li 30 Full plastic suits with hoods NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Facility Readiness:
LI] Satisfactory Li Unsatisfactory (enter comment below)Comets Performed by: Reviewed by:-Print Name Signature Date Date EPM or designee Signature efrneEPP-2080-ERO-001 Rev. 14 Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10 ENC/JIC Monthly Checklist Pages: 41 -41 ENC/JIC Monthly Checklist I Month Year Equipment Functional Checks: Facility Set Up: Li 1 Copier (Attachment 3)El 2 FAX machine(s) (Attachment 3)Li 2 Flat screen monitors (Attachment 3)[] 3 Computers (Attachment 3)EL 2 TVs and 2 Radios Li 1 TV recording device(s)Ei 15 Telephones (Attachment 3)Li 1 PA microphone (turn on and verify output)LI] 1 Security Computer in Stairwell (Plug in and turn on)Li 1 County laptop (Plug in and turn on)Li Verify recorded message.Li 1 Projector in auditorium (Attachment 3)Li 2 TLDs (Area TLDs)Li 2 EDs (Area EDs)Li Overall cleanliness and appearance Li 1 box of Extra paper[] 1 toner for copier LiCheck procedure books for current revision Li Check data sheet folders for current rev.Li Supply cabinets and key box sealed Li Extra bulbs for large screen projector Li Verify the current ERG calendar is in the press packets EL Check keys in key box EiReceptionist
-Master Key LiSpokesperson
-Master Key LiAudio Visual -Master key & cabinet key ELSupport Coordinator
-Master Key LiMedia Center Manager -Master Key LIMedia Area Coordinator
-Master Key LIJIC Setup Coordinator
-Master Key, Stair screen key (#45), 2 Misc Keys NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Facility Readiness:
LI Satisfactory Li Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name I_Signature Date Date EPM or designee M1gnature Reference EPP-2080-ERO-O01 Rev. 14 Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11 Survey Vehicle Monthly Checklist 42 -42 Survey Vehicle Monthly Checklist LiVehicle
#1 El Vehicle #2____________________/
_________Month Year L1 Check fuel supply (keep tank full)Li Check battery (start and drive for 30 minutes)Li Check that tires are not flat[21 Check that there is no leaking/puddle fluids under vehicle CI Check that the lights (including turn signals) work Li Check that windows are not cracked/broken
[II Odometer reading _____miles Odometer reading _____miles Li Spare batteries, 1 set for each vehicle flashlight.
Li Check vehicle for overall cleanliness and appearance CL Check recharge tag on battery jump pack (recharge if necessary)
Vehicle Readiness:
Li Satisfactory EL Unsatisfactory (enter comment below)Performed by:____________/_____________
______Print Name Signature Date Reviewed by:____________/__________________
EPM or designee Signature Date Ref erence EPP-2080-ERO-001 Rev. 14 Page 43 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages: DtShe12Checklist 43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1 LI Vehicle #2_________________/
_______Quarter Year EL Site Map[] Berrien County Map LI 15 Blank Data Sheets (verify current revision)RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)LI Clipboard LI Flashlight/Lantern with Batteries El 2 Sets Winter Apparel .[Ref 6.2.1.a]LI Clippers EL Shovel LI 2 Full Face Respirators with Iodine and Particulate Cartridges
.[Ref 6.2.1. a]LI Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)
Miscellaneous Supply Box LI Break the seal and inventory LI Paper LI Rad Tape LI Disposable Gloves LI Envelopes LI Tweezers LI Sample Collection Bags LI Labels LI Compass LI Rad Ribbon ! rope LI Smears LI Keys to Rosemary Beach Gate LI Writing Implements EL Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Reference EPP-2080-ERO-001 Rev. 14 Page 44 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages: DtShe12Checklist 43- 44 lNOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit .I[Ref 6.2.1.a]II] Break the seal and inventory C) Pad of Paper C) Planchetts C) Particulate filters (47-mm filters)C) Sealable Plastic Bags C) Time Piece C) Writing Implements C) Air Sample Envelopes C) Calculator
[] Silver Zeolite Cartridges (min 5 cartridges)
Exp Date____C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Vehicle Readiness:
I] Satisfactory C) Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name EPM or designee Signature Date Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13 Control Room Monthly Checklist 45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)__________________/
_________Month Year One FAX Machine Verify the FAX machine functions per Attachment 3.________________________________________/___________
EP Staff Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.
Verify the password is correct by logging into ERONS.________________________________________/___________
EP Staff Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4._______________________________________/___________
EP Staff Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff Dt Date I Reference EPP-2080-ERO-001 Rev. 14 Page 46 of 65 I Emergency Response Resource Readiness I 13Conrol oomMontly heckistPages:
Data Sheet 3CotoRom othyhelit45  
-46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, Attachment 1 IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)
J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment
J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment
: 11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi 3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:
: 11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms I* 1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:
NOTE: An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory.
NOTE:         An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Document number in comments.Performed by:__________________________
Performed by:__________________________                                   ______
______Print Name Signature Date Reviewed by: ____________/__________________
Print Name                   Signature                   Date Reviewed by: ____________/__________________
EPM or designee Signature Date  
EPM or designee               Signature                   Date
[ Reference EPP-2080-ERO-001 Rev. 14 Page 47 of 65 I Emergency Response Resource Readiness Daa~et 4 Control Room Quarterly Radiation Protection Pages: Daahe 4Checklist 47- 47 J________________
 
_________/_
[   Reference               EPP-2080-ERO-001                     Rev. 14           Page 47 of 65 I                   Emergency Response Resource Readiness Daa~et 4         Control Room Quarterly Radiation Protection                   Pages:
Quarter Year Unit One Control Room El 11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]El 10OEDs.El 5 packages of KI tablets.El 25 KI Consent Forms -RMT-2080-OSC-001, Data Sheet 3 (verify current revision )El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]El 4 SCBA Units [Ref 6.2.1.a]El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges  
Daahe 4Checklist                                                             47- 47     J
[Ref 6.2.1 .a]Unit Two Control Room El 11 TLDs~ (10 Whole Body and 1 Control) [Ref 6.2.1.a]El 10OEDs.El 5 packages of KI tablets.El 25 KI Consent Forms -RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).
________________ _________/_
El Portable SPING Monitor (PSM) Serial Number _______El Particulate Filters (50-mm filters)El Silver Zeolite Cartridges (min 5 cartridges)
Quarter             Year Unit One Control Room El   11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]
Expiration Date________
El   10OEDs.
El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]El 4 SCBA Units..[Ref 6.2.1.a]El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.  
El 5 packages of KI tablets.
[Ref 6.2.1. a]Comments: Location Readiness:  
El 25 KI Consent Forms - RMT-2080-OSC-001, Data Sheet 3 (verify current revision )
[] Satisfactory El Unsatisfactory (enter comment below)Performed by:____________I_____________
El   4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]
______Print Name Signature Date Signature Date Reviewed by: EPM or designee v Reference EPP-2080-ERO-001 Rev. 14 Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly Pages: DtShe15Radiation Protection Checklist 48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway_________________
El 4 SCBA Units [Ref 6.2.1.a]
I__________/_
El   4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]
Quarter Year[] Break the seal and inventory SNOTE: This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number ______Serial Number_____
Unit Two Control Room El   11 TLDs~(10 Whole Body and 1 Control) [Ref 6.2.1.a]
Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges  
El   10OEDs.
[Ref 6.2.1 .a]Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]Li 10 SCB3A Units [Ref 6.2.1.a]Li 10 Spare SCBA bottles [Ref 6.2.l.a][] Install new seal Miscellaneous Supply Box[] Break the seal and inventory Li Rad Ribbon / rope Li Rad Tape Li Smears Li Paper Li Pens Li Duct Tape Li Install new seal I Reference EPP-2080-ERO-001 Rev. 14 Page 49 of 65 I Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly Pages: DtShe15Radiation Protection Checklist 48 -49 j IO Portable Instrument Kit [Ref 6.2.1 .a]Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
El   5 packages of KI tablets.
Comments: NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory.
El   25 KI Consent Forms - RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).
Document number in comments.j Location Readiness:
El   Portable SPING Monitor (PSM)                         Serial Number   _______
[] Satisfactory
El Particulate Filters (50-mm filters)
[] Unsatisfactory (enter comment below)Performed by: Reviewed by:/Print Name I-Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16 CAS/SAS Monthly Checklist Pages.CAS/SAS Monthly Checklist__________________/
El Silver Zeolite Cartridges (min 5 cartridges) Expiration Date________
_________Month Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)ELISAS / _ _ _EP Staff Date ElICAS ________I___
El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]
EP Staff Date Verify that the Iridium 9555 Satellite phone system functions properly.(Attachment 5, Satellite Phone Checks)LI SAS________I__
El 4 SCBA Units..[Ref 6.2.1.a]
EP Staff Date uCAS ___________
El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1. a]
EP Staff Date Comments: NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Comments:
Document number in comments.Performed by: Reviewed by: I Print Name/Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 51 of 65 Emergency Response Resource Readiness Dat Shet17 megeny espns Daa ystm estngPages.
Location Readiness:             [] Satisfactory           El Unsatisfactory (enter comment below)
Data Seet 17 Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR)
Performed by:____________I_____________                                             ______
_____________
Print Name                       Signature                       Date Reviewed by:
Computer being used to test ERDS ______________
EPM or designee                   Signature                      Date v
1 ERDS Testing Process 1.1 ERDS is active 24/7 and testing is not normally required.
 
IF testing is necessary THEN continue with this attachment.
Reference                 EPP-2080-ERO-001                       Rev. 14       Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly                     Pages:
1.2 This process can be performed from any Local Area Network (LAN) computer.1.3 Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.
DtShe15Radiation Protection Checklist                                       48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway I__________/_
Was the test started at the pre-determined time? Yes IJ No I 1.3.1 Record time NRC was contacted
Quarter         Year
_______1.3.2 The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.1.3.3 The NRC ERDS Operations Center will give instructions on how they will be conducting the test.
[] Break the seal and inventory SNOTE:           This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number       ______Serial             Number_____
Reference EPP-2080-ERO-001 Rev. 14 Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing Pages: 1.3.4 For performing from any LAN computer: a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).b. In the white background box under the window menu option, type in"ERDS" and press enter.c. When prompted enter User Name and Password.* Obtain User Name and Password from Position Specific Desktop Guide d. Click on the screen location labeled "ACTIVATE" 1.4.4 Open another PPC display by clicking on file menu option and selecting the top menu.a. Repeat steps (a) through (d) for the other unit.Did both units connect with no problem? Yes IJ No ElI 1.4 The NRC will let both systems run for approximately 1 hour and then disconnect the transmission at the NRC's end.1.4.1 The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.1.4.2 The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.1.4.3 A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.
Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors
Did the NRC personnel verify that the test passed for both units? Yes LI] No E .
[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]
Reference EPP-2080-ERO-001 Rev. 14 Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing51-3 1.5 IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.1.5.1 Verify that the Status on the ERDS screen is "Inactive".-
Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]
Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]
Li 10 SCB3A Units [Ref 6.2.1.a]
Li 10 Spare SCBA bottles [Ref 6.2.l.a]
[] Install new seal Miscellaneous Supply Box
[] Break the seal and inventory Li Rad Ribbon / rope             Li Rad Tape                           Li Smears Li Paper                         Li Pens                               Li Duct Tape Li Install new seal
 
I Reference               EPP-2080-ERO-001               Rev. 14           Page 49 of 65 I                 Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly                                 Pages:
DtShe15Radiation Protection Checklist                                 48 -49     j IOPortable Instrument Kit [Ref 6.2.1 .a]
Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Comments:
NOTE:       An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory. Document number in comments.j Location Readiness:         [] Satisfactory       [] Unsatisfactory (enter comment below)
Performed by:                               /
Print Name                   Signature                   Date Reviewed by:                                I-Date EPM or designee             Signature
 
Reference               EPP-2080-ERO-001                   Rev. 14   Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16                 CAS/SAS Monthly Checklist                   Pages.
CAS/SAS Monthly Checklist
__________________/
Month              Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.
(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)
ELISAS                                           /     _   _   _
EP Staff                 Date ElICAS       ________I___
EP Staff                 Date Verify that the Iridium 9555 Satellite phone system functions properly.
(Attachment 5, Satellite Phone Checks)
LI SAS________I__
EP Staff                       Date uCAS ___________
EP Staff                         Date Comments:
NOTE:           An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                 I Print Name                       Signature             Date Reviewed by:                                  /
Date EPM or designee                 Signature
 
Reference               EPP-2080-ERO-001                 Rev. 14         Page 51 of 65 Emergency Response Resource Readiness Dat megeny Shet17             espns Daa ystm   estngPages.
Seet 17 Data              Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR)       _____________
Computer being used to test ERDS         ______________
1     ERDS Testing Process 1.1   ERDS is active 24/7 and testing is not normally required. IF testing is necessary THEN continue with this attachment.
1.2     This process can be performed from any Local Area Network (LAN) computer.
1.3     Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.
Was the test started at the pre-determined time?               Yes IJ     No I 1.3.1     Record time NRC was contacted         _______
1.3.2     The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.
1.3.3     The NRC ERDS Operations Center will give instructions on how they will be conducting the test.
 
Reference                 EPP-2080-ERO-001               Rev. 14           Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17           Emergency Response Data System Testing                   Pages:
1.3.4   For performing from any LAN computer:
: a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).
: b. In the white background box under the window menu option, type in "ERDS" and press enter.
: c. When prompted enter User Name and Password.
* Obtain User Name and Password from Position Specific Desktop Guide
: d. Click on the screen location labeled "ACTIVATE" 1.4.4   Open another PPC display by clicking on file menu option and selecting the top menu.
: a. Repeat steps (a) through (d) for the other unit.
Did both units connect with no problem?                         Yes IJ     No ElI 1.4     The NRC will let both systems run for approximately 1 hour and then disconnect the transmission at the NRC's end.
1.4.1   The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.
1.4.2   The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.
1.4.3   A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.
Did the NRC personnel verify that the test passed for both units?       Yes LI]       No E .
 
Reference               EPP-2080-ERO-001               Rev. 14           Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17           Emergency Response Data System Testing51-3 1.5   IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.
1.5.1   Verify that the Status on the ERDS screen is "Inactive".-
1.5.2    Close the PPC application.
1.6    IF the test is unsuccessful, THEN:
Obtain reason for the failure from the NRC or IT.
o    Inform Information Technology (IT) of the failure.
o    Retest the system when repairs are complete.
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Comments:
Performed by:____________/_____________                                    ______
Print Name                    Signature                    Date Reviewed by:                                /-
EPM or designee              Signature                    Date Dt
 
Reference              EPP-2080-ERO-001                  Rev. 14        Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection              Pages:
DtSee18Quarterly                        Checklist                  54 - 54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.
______________ I________/_
Quarter            Year SNOTE:        Place a"I"" orXo          the line pedigthe item to indicateacetb.
Berrien County Sheriff Department CI      201 TLDs (200 Whole Body and 1 Control)
SComments:
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                /
Print Name                      Signature                Date Reviewed by:                                I Date EPM or designee                  Signature
 
I  Reference                EPP-2080-ERO-001                      Rev. 14        Page 55 of 65 I                    Emergency Response Resource Readiness Daa het 9          Training Center Radiation Protection Quarterly            Pages:
DtShe19Checklist                                                      55 -55 Training Center Radiation Protection Quarterly Checklist
________________ _________/_
Quarter            Year El      Count Rate Meter                        Serial Number    ________Cal Due Date Li      2 Count Rate Meter Cables' Li      2 Count Rate Meter Detectors Li      1 Air sampler with sample head          Serial Number    _________Cal        Due Date Li      16 Electronic Dosimeters . [Ref 6.2.1 .a]                      Cal Due Date Li Li 17 TLDs (16 Whole Body, 1 Control). [Ref 6.2.1.a]
2 Flashlights E
El      Box of Smears Li      14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges EL      14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]
NOTE:            An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                  /
Print Name                        Signature                  Date Reviewed by:                                  /-
EPM or designeeSintr                                          Date Signature
 
Reference                EPP-2080-ERO-001                    Rev. 14            Page 56 of 65 Emergency Response Resource Readiness                        Pgs Data Sheet 20        LMC Radiation Protection Quarterly Checklist                56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph                              Li Niles (1307 Storage Room)
(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)
Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.
__________________/
Quarter          Year SNOTE:          Tehospital supply cbntianEPan              App. Crequirement.
LiBreak the seal and inventory Li    Count Rate Meter              Serial Number    ________Cal                Due Date_____
Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head                      Serial Number      _______
EL    E-Plan Air Sample Activity Determination Worksheet Li    20 EDs Cal Due Date_ __
LiAssorted Tool Kit Li    Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)
Li    Clipboard EL    21 TLDs (20 Whole Body, 1 Control)
Li      12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.
if the inventory is short, THEN contact the hospital to replenish.
Li    Stanchions or portable barriers sufficient to post area.
Li1    3 Step-Off-Pads Li    6 Tni-foil Signs with Assorted Inserts Li    6 Cloth/Poly Bags Li  2 Trash Bag Holders Li1    Water Collection Bottle Li      Stretcher Insert Li    Water Collection Tray Li    Shower Head Li    Hose Li1  Herculite Runner (or equivalent)
Li    Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20        LMC Radiation Protection Quarterly Checklist              Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable
*Instrument Kit Inventory.
NOTE:            Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit [Ref 6.2.1.a]
LI Break the seal and inventory LI Pad of Paper                  LI Planchetts        LI Particulate filters (47-mm filters)
El Sealable Plastic Bags        LI Time Piece        LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___
[] Air Sample Envelopes          LI Calculator        LI Writing Implements LITweezers                        LIRad Tape          LI1 Rad Ribbon/rope LI Shoe Covers                  LI Smears            LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)
LI Break the seal and inventory LI Nail Clippers              LI Smears            LI  Vomitus Containers LI  Writing Implements          LIScissors          LI  Urine Containers LI  Envelopes                  LI Forceps          LI  Cotton Swabs in Vials LI  Eyedropper Bottle          LI Tweezers          LI  Poly Bags LIInstall new seal
 
Reference              EPP-2080-ERO-001                  Rev. 14        Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20        LMC Radiation Protection Quarterly Checklist            Pgs Hospital Decon Kit (In Cabinet)
C] Break the seal and inventory C] Skin Cream                C] Clorox              C] Cotton Tip Applicators C] Detergent                  C] Towels              C] Phisoderm (or equivalent)
C] Corn Meal                  C] Nail Clippers      C] Writing Implements C] Gauze Pads                C] Steri-Drape        UI Decon Procedures C] Surgical Tape              C] Forceps            C] Transparent Dressing C]-Solution Bowls            C] Scissors            C] Irrigation Syringe C] Shave Kit                  C1 Shampoo            C] Disposable Gloves C] Poly Bags C] Install new seal Comments:
SNOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:
Print Name                    Signature                    Date Reviewed by:
EPM or designee              Signature                    Date
 
Reference              EPP-2080-ERO-001                      Rev. 14      Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21        Emergency Sampling Station Quarterly Radiation            Pages:
Protection Checklist                      59 - 59    J Emergency Sampling Station Quarterly Radiation Protection Checklist
_________________/ _______
Quarter              Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler            El Extension Cord
[] Water Sampling Bottles                    El Air Sample Head              .
[] Air Sampling Envelopes                    IJ Tygon Tubing
[21 Pad of Paper                              El Air Sample Filters (47 and 50 mm filters)
ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)
[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)
El Silver Zeolite Cartridges (main 5 cartridges) Exp Date___
-Turbine Building El    609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El    609' at SRA-2900, Steam Jet Air Ejector Monitor El    591' at SRA-2800, Gland Steam Condenser Vent Monitor El    609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El    587' Spray Additive Tank Room at Chemistry Sampling Station NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:
Print Name                                                  Date Signature Reviewed by:                                    /_
Date EPM or designee                    Signature
 
Reference              EPP-2080-ERO-001                ;'Rev. 14        Page 60 of 65 I                    Emergency Response Resource Readiness I Data Sheet 22            Emergency Plan Respiratory Protection                Pages IQuarterly                                Checklist                      60 - 60 Emergency Plan Respiratory Protection Quarterly Checklist
__________________/
Quarter        Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.
IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.
Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.
Radiation Protection Access Control                  LI 10 SCBA Units (clean side) 609 Turbine                                          LI10OSCBA Units Auxiliary Building                                  LI 17 SCBA Units (various locations)
Location                          Number      Location                              Number LI 609 Turbine by TRPAC              1      LI 633 by Freight Elevator                  1 LI 609 by Elevator                  5      LI 650                                      4 LI 573 by Freight Elevator            1      LI 612 Unit 1 Containment CAC                2 LI 587 by Freight Elevator            1      LI 612 Unit 2 Containment                    2 Comments:
NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                /
Print Name                      Signature                  Date Reviewed by:                                /-
EPM or designee                Signature                  Date
 
RefeenceEmergency Response Resource Readiness Data Sheet 23              RP/Ops Emergency Response Equipment                            Pages:
Quarterly CheckliSt                              61- 62 RP/POps Emergency Response Equipment Quarterly Checklist
_________________/    ________
Quarter                Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")
The emergency RP supply boxes are located at the Auxiliary Building exits:
* RPAC      -  supply box is located in cabinet near the shower.
o,  TRPAC    -  supply box is located in the decontamination room.
RPAC    -  Emergency RIP Supply Box ID Break the seal and inventory ID 4  full face respirators with Iodine cart.              [] 8 pair of pairs of rubber gloves ID 4  plastic suits w/ hoods                                ID 4 pair of booties ID 4  hoods                                                ID 4 pair of rubber boots ID 4  pair of glove liners                                  ID 1 box of smears ID Install- new seal TRPAC      -  Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart.              ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods                                ID[ 4 pair of booties ID 4 hoods                                                  ID 4 pair of rubber boots El 4 pair of glove liners                                  ID 1 box of smears ID 1 Portable Air Sampler                                  ID 1 Dose Rate Meter ID Install new seal
 
I  Reference                EPP-2080-ERO-001              Rev. 14        Page 62 of 65 I                    Emergency Response Resource Readiness I  Data Sheet 23            RPIOps Emergency Response Equipment            Pages:
IQuarterly                              Checklist                  61- 62 SComments:
NOTE:          An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Print Name                  Signature                Date Reviewed by:  ____________/
EPM or designee            Signature                Date Dt
 
Reference                EPP-2080-ERO-001                            Rev. 14            Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24                Monthly Satellite Phone Checks                              Pages63 Monthly Satellite Phone Checks Month                    Year Verify that the Iridium  9555  Satellite phone system functions properly EL Lake Township Fire Department                    ___________/                              _    __
Performed By                        Date El Berrien County EGG                  ____________/                              ___
Performed By                        Date CL Lake Michigan College                ___________/___
Performed By                        Date.
Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex                                                          /____________I____
                      ..                            Performed By                        Date Comments:
INOTE:            An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                    /
Print Name                              Signature                    Date Reviewed by:                                    /-
Date EPM or designee                          Signature
 
Reference                      EPP-2080-ERO-001                  Rev. 14              Page 64 of 65 Emergency Response Resource Readiness DaaSee    5              Radiation Protection Portable Instrument Kit                Pages:
DtShe25Inventory                                                                64- 65 SNOTE:            This datasheet is used by Radiation Protection to inventory a kit when the seal l              on a kit is found broken or is broken for maintenance of the kit.
Kit Number    __________Kit                      Location (check the box for the appropriate location)
[]I EOF (Off-Site survey team contingency equipment)                J  Survey Vehicle #1 1]  EOF (RP Equipment storage area)                                  LII Survey Vehicle #2 Li  Unit One Control Room (CREC)                                    LII OSC Li  Lakeland Medical Center St. Joseph                              Li  Lakeland Medical Center Niles
[3  Other  _________
Response Source JCN            _____
NOTE:            The floiginstrument tye                reuvln        r  eurdto be in the kits.
Li  RO-7 Survey Meter                                        El  ESP-2 Survey Meter EL  RO-7-BM (Mid-Range) Detector                              Li  HP-270 Dose Rate Probe Li  RO-7-BH (High Range) Detector                            Li  HP-260 Frisker Probe (2)
ELI MHV/BNC Cables (2)                                        Li  HP-210 Shielded Probe
[]  SH-4A Sample Holder                                      Li  Screwdriver
[]I 9 Volt Batteries (3)                                      El  Writing Implements (2)
LII 30 Volt Batteries (2)                                    LII Notebook El  D Cell batteries (2)                                      El 3 EDs LI1 C Cell batteries (6)                                      Li ESP-2 Detector Change Flowchart Installed new seal.
Comments:
SNOTE:            An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                        /I______________________        ___________
Print Name                    Signature                          Date Reviewed by:
EPM or designee                Signature                          Date
 
RfrneEPP-2080-ERO-001                                      Rev. 14        Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26                      Security Control Center                        Pages:
[                                                                    65 -65 Security Control Center
_______________I ________/_
Quarter              Year SNOTE:          Place a ""      or"X" onthe line pedigthe item to indicateacetb.
North Access Vehicle Portal LII    3 Electronic Dosimeters Cal Due Date          ___________
LII    4 TLDs (3 Whole Body, 1 Control)
I]      3 Sets of Anti-C's for first responders, Level 2.          [Ref 6.2.1 .a] [Ref 6.2. ib]
Comments:
NOTE:            An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                    /
Print Name                            Signature                  Date Reviewed by:          _____________________________I___________________________/_
EPM or designee                      Signature                  Date


====1.5.2 Close====
REVISION  
the PPC application.
1.6 IF the test is unsuccessful, THEN: Obtain reason for the failure from the NRC or IT.o Inform Information Technology (IT) of the failure.o Retest the system when repairs are complete.NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Comments: Performed by:____________/_____________
______Print Name/-Signature Date Reviewed by: EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection Pages: DtSee18Quarterly Checklist 54 -54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.
______________
I________/_
Quarter Year SNOTE: Place a"I"" orXo the line pedigthe item to indicateacetb.
Berrien County Sheriff Department CI 201 TLDs (200 Whole Body and 1 Control)SComments:
NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by:/Print Name Signature Date Date Reviewed by: I EPM or designee Signature I Reference EPP-2080-ERO-001 Rev. 14 Page 55 of 65 I Emergency Response Resource Readiness Daa het 9 Training Center Radiation Protection Quarterly Pages: DtShe19Checklist 55 -55 El Li Li Li Li Li Li El Li EL Training Center Radiation Protection Quarterly Checklist________________
_________/_
Quarter Year Count Rate Meter Serial Number ________Cal 2 Count Rate Meter Cables'2 Count Rate Meter Detectors 1 Air sampler with sample head Serial Number _________Cal 16 Electronic Dosimeters
.[Ref 6.2.1 .a] Cal Due Date 17 TLDs (16 Whole Body, 1 Control).
[Ref 6.2.1.a]2 Flashlights Box of Smears 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges 14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]Due Date Due Date E NOTE: An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designeeSintr Signature Reference EPP-2080-ERO-001 Rev. 14 Page 56 of 65 Emergency Response Resource Readiness Pgs Data Sheet 20 LMC Radiation Protection Quarterly Checklist 56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph Li Niles (1307 Storage Room)(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)
Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.__________________/
_________Quarter Year SNOTE: Tehospital supply cbntianEPan App. Crequirement.
LiBreak the seal and inventory Li Count Rate Meter Serial Number ________Cal Due Date_____Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head Serial Number _______EL E-Plan Air Sample Activity Determination Worksheet Li 20 EDs Cal Due Date_ __LiAssorted Tool Kit Li Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)Li Clipboard EL 21 TLDs (20 Whole Body, 1 Control)Li 12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.if the inventory is short, THEN contact the hospital to replenish.
Li Stanchions or portable barriers sufficient to post area.Li1 3 Step-Off-Pads Li 6 Tni-foil Signs with Assorted Inserts Li 6 Cloth/Poly Bags Li 2 Trash Bag Holders Li1 Water Collection Bottle Li Stretcher Insert Li Water Collection Tray Li Shower Head Li Hose Li1 Herculite Runner (or equivalent)
Li Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal Reference EPP-2080-ERO-001 Rev. 14 Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable*Instrument Kit Inventory.
NOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit [Ref 6.2.1.a]LI Break the seal and inventory LI Pad of Paper El Sealable Plastic Bags[] Air Sample Envelopes LITweezers LI Shoe Covers LI Planchetts LI Time Piece LI Calculator LI Rad Tape LI Smears LI Particulate filters (47-mm filters)LI Silver Zeolite Cartridges (rai 5 cartridges)
Exp Date___LI Writing Implements LI1 Rad Ribbon/rope LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)
LI Break the seal and inventory LI Nail Clippers LI Writing Implements LI Envelopes LI Eyedropper Bottle LIInstall new seal LI Smears LI Scissors LI Forceps LI Tweezers LI Vomitus Containers LI Urine Containers LI Cotton Swabs in Vials LI Poly Bags Reference EPP-2080-ERO-001 Rev. 14 Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pgs Hospital Decon Kit (In Cabinet)C] Break the seal and inventory C] Skin Cream C] Clorox C] Cotton Tip Applicators C] Detergent C] Towels C] Phisoderm (or equivalent)
C] Corn Meal C] Nail Clippers C] Writing Implements C] Gauze Pads C] Steri-Drape UI Decon Procedures C] Surgical Tape C] Forceps C] Transparent Dressing C]-Solution Bowls C] Scissors C] Irrigation Syringe C] Shave Kit C1 Shampoo C] Disposable Gloves C] Poly Bags C] Install new seal Comments: SNOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name EPM or designee Signature Date Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21 Emergency Sampling Station Quarterly Radiation Pages: Protection Checklist 59 -59 J Emergency Sampling Station Quarterly Radiation Protection Checklist_________________/
_______Quarter Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler El Extension Cord[] Water Sampling Bottles El Air Sample Head .[] Air Sampling Envelopes IJ Tygon Tubing[21 Pad of Paper El Air Sample Filters (47 and 50 mm filters)ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)El Silver Zeolite Cartridges (main 5 cartridges)
Exp Date___-Turbine Building El 609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El 609' at SRA-2900, Steam Jet Air Ejector Monitor El 591' at SRA-2800, Gland Steam Condenser Vent Monitor El 609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El 587' Spray Additive Tank Room at Chemistry Sampling Station NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name/_Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001
;'Rev. 14 Page 60 of 65 I Emergency Response Resource Readiness I Data Sheet 22 Emergency Plan Respiratory Protection Pages IQuarterly Checklist 60 -60 Emergency Plan Respiratory Protection Quarterly Checklist__________________/
_________Quarter Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.Radiation Protection Access Control LI 10 SCBA Units (clean side)609 Turbine LI10OSCBA Units Auxiliary Building LI 17 SCBA Units (various locations)
Location Number Location Number LI 609 Turbine by TRPAC 1 LI 633 by Freight Elevator 1 LI 609 by Elevator 5 LI 650 4 LI 573 by Freight Elevator 1 LI 612 Unit 1 Containment CAC 2 LI 587 by Freight Elevator 1 LI 612 Unit 2 Containment 2 Comments: NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designee Signature RefeenceEmergency Response Resource Readiness Data Sheet 23 RP/Ops Emergency Response Equipment Pages: Quarterly CheckliSt 61- 62 RP/POps Emergency Response Equipment Quarterly Checklist_________________/
________Quarter Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")The emergency RP supply boxes are located at the Auxiliary Building exits:* RPAC -supply box is located in cabinet near the shower.o, TRPAC -supply box is located in the decontamination room.RPAC -Emergency RIP Supply Box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. [] 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID 4 pair of booties ID 4 hoods ID 4 pair of rubber boots ID 4 pair of glove liners ID 1 box of smears ID Install- new seal TRPAC -Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID[ 4 pair of booties ID 4 hoods ID 4 pair of rubber boots El 4 pair of glove liners ID 1 box of smears ID 1 Portable Air Sampler ID 1 Dose Rate Meter ID Install new seal I Reference EPP-2080-ERO-001 Rev. 14 Page 62 of 65 I Emergency Response Resource Readiness I Data Sheet 23 RPIOps Emergency Response Equipment Pages: IQuarterly Checklist 61- 62 SComments:
NOTE: An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Print Name Reviewed by: ____________/
Signature Date EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24 Monthly Satellite Phone Checks Pages63 Monthly Satellite Phone Checks Month Year Verify that the Iridium 9555 Satellite phone system functions properly EL Lake Township Fire Department
___________/
_ __Performed By Date El Berrien County EGG ____________/
___Performed By Date CL Lake Michigan College ___________/___
Performed By Date.Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex /____________I____
..Performed By Date Comments: INOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 64 of 65 Emergency Response Resource Readiness DaaSee 5 Radiation Protection Portable Instrument Kit Pages: DtShe25Inventory 64- 65 SNOTE: This datasheet is used by Radiation Protection to inventory a kit when the seal l on a kit is found broken or is broken for maintenance of the kit.Kit Number __________Kit Location (check the box for the appropriate location)[]I EOF (Off-Site survey team contingency equipment)
J Survey Vehicle #1 1] EOF (RP Equipment storage area) LII Survey Vehicle #2 Li Unit One Control Room (CREC) LII OSC Li Lakeland Medical Center St. Joseph Li Lakeland Medical Center Niles[3 Other _________Response Source JCN _____NOTE: The floiginstrument tye reuvln r eurdto be in the kits.Li RO-7 Survey Meter El ESP-2 Survey Meter EL RO-7-BM (Mid-Range)
Detector Li HP-270 Dose Rate Probe Li RO-7-BH (High Range) Detector Li HP-260 Frisker Probe (2)ELI MHV/BNC Cables (2) Li HP-210 Shielded Probe[] SH-4A Sample Holder Li Screwdriver
[]I 9 Volt Batteries (3) El Writing Implements (2)LII 30 Volt Batteries (2) LII Notebook El D Cell batteries (2) El 3 EDs LI1 C Cell batteries (6) Li ESP-2 Detector Change Flowchart Installed new seal.Comments: SNOTE: An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name EPM or designee/I______________________
___________
Signature Date Signature Date RfrneEPP-2080-ERO-001 Rev. 14 Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26 Security Control Center Pages:[ 65 -65 Security Control Center_______________I
________/_
Quarter Year SNOTE: Place a "" or"X" onthe line pedigthe item to indicateacetb.
North Access Vehicle Portal LII 3 Electronic Dosimeters Cal Due Date ___________
LII 4 TLDs (3 Whole Body, 1 Control)I] 3 Sets of Anti-C's for first responders, Level 2. [Ref 6.2.1 .a] [Ref 6.2. ib]Comments: NOTE: An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by:/Print Name Signature Date Date Reviewed by:_____________________________I___________________________/_
EPM or designee Signature REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration  
 
[Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
As such, a 10 CFR 72.48 review is not required to this procedure alteration.
 
A 10 CFR 50.5 4 (q) review was performed.
==Title:==
The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
Emergency Response Resource Readiness Alteration                     [Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.
Therefore, this procedure revision can be implemented without prior NRC approval.Step 4.1.4, Added Data Sheet 26, Security This inventory was previously performed on Control Center. No margin mark was used. Data Sheet 18 which has the Berrien County Adde Ste 4.46 wich escrbes heEOC inventory on it. Users requested these SeuiyControl Center. inventories be separated into two Data Securitysheets.
The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required to this procedure alteration.
Attachment 3 added step 13.2.14 for Data Sheet 26, Security Control Center.Removed Rev 13 step 4.2.4 which stated Recording the seal numbers so that for the"Blanks for recording storage container seal next scheduled inventory the seal could be numbers are provided as verification tool. verified intact and therefore an inventory IF the installed seal is the same seal as would not need to be performed has proven recorded during previous check THEN it is to be ineffective.
A 10 CFR 50.5 4 (q) review was performed. The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.
This revision changes the no necessary to break the seal and inventory process to breaking all seals and performing the contents." a complete inventory each time and then resealing the item.Seal number blanks have been removed from the procedure.
The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this procedure revision can be implemented without prior NRC approval.
No margin marks were used.Revised step 4.4.5 to state that the locations This list was inaccurate and incomplete.
Step 4.1.4, Added Data Sheet 26, Security             This inventory was previously performed on Control Center. No margin mark was used.               Data Sheet 18 which has the Berrien County Adde 4.46 Ste wich escrbes heEOC                     inventory on it. Users requested these SeuiyControl Center.                             inventories be separated into two Data Securitysheets. added step 13.2.14 for Data Sheet 26, Security Control Center.
The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan. Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure.
Removed Rev 13 step 4.2.4 which stated                 Recording the seal numbers so that for the "Blanks for recording storage container seal         next scheduled inventory the seal could be numbers are provided as verification tool.             verified intact and therefore an inventory IF the installed seal is the same seal as             would not need to be performed has proven recorded during previous check THEN it is             to be ineffective. This revision changes the no necessary to break the seal and inventory           process to breaking all seals and performing the contents."                                         a complete inventory each time and then resealing the item.
These data sheets provide the user with the locations.
Seal number blanks have been removed from the procedure.
Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval.
No margin marks were used.
Page 1 of 9 REVISION  
Revised step 4.4.5 to state that the locations       This list was inaccurate and incomplete. The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan.               Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure. These data sheets provide the user with the locations.
Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval.                                                                                 Page 1 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.C's on Data Sheets 9, 12, and 23. Reviewer comments.Attachment 2, removed "either Control This attachment is used for functional checkcs Room or" from step 1.2 of the phones in the TSC only.Attachment 3, was revised to state, "Verify Previous wording of this step did not require each phone in the facility is capable of both that both functions be checked on all phones.dialing out and receiving a call" AR 2015-15253 Attachment 3, Step 2.1 was revised to state Editorial change requested by EP Manager.that the phone check is to verify the phones can call out and receive a call.Attachment 3, added Steps 11.6 and 12.5 to Added to ensure that the instrument will not verify that the instrument calibration does go out of cal prior to the next check.not expire prior to the end of the next month.Attachment 3, Step 13.1 was reworded and This revision changes the process to removed the annual requirement to breaking all seals and performing a complete unlock/unseal all facilities and storage areas. inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.
 
No margin marks were used Attachment 3, changed the title of PMP- Procedure title has changed.2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment Gt 2015-11455-4 Important to Emergency Response.Attachment 4, switched the order of steps User comment. Permission from the control 1.1.1 and 1.1.2. room is needed before contacting the county.Attachment 5, added note at beginning User Comment concerning reference to EPP-"Additional information for use of Satellite 600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be with these phone checks.found in RMT-2080-EPP-600, Satellite Phone Instructions.
Procedure No.:         EPP-2080-ERO-001                                     Rev. No.:      14
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________
 
Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
==Title:==
Page 2 of 9 REVISION  
Emergency Response Resource Readiness Alteration                                           Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.
C's on Data Sheets 9, 12, and 23.                     Reviewer comments. , removed "either Control                 This attachment is used for functional checkcs Room or" from step 1.2                                 of the phones in the TSC only. , was revised to state, "Verify           Previous wording of this step did not require each phone in the facility is capable of both         that both functions be checked on all phones.
dialing out and receiving a call"                     AR 2015-15253 , Step 2.1 was revised to state           Editorial change requested by EP Manager.
that the phone check is to verify the phones can call out and receive a call. , added Steps 11.6 and 12.5 to             Added to ensure that the instrument will not verify that the instrument calibration does           go out of cal prior to the next check.
not expire prior to the end of the next month. , Step 13.1 was reworded and               This revision changes the process to removed the annual requirement to                     breaking all seals and performing a complete unlock/unseal all facilities and storage areas.       inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.
No margin marks were used , changed the title of PMP-               Procedure title has changed.
2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment                   Gt 2015-11455-4 Important to Emergency Response. , switched the order of steps             User comment. Permission from the control 1.1.1 and 1.1.2.                                     room is needed before contacting the county. , added note at beginning                 User Comment concerning reference to EPP-
"Additional information for use of Satellite         600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be             with these phone checks.
found in RMT-2080-EPP-600, Satellite Phone Instructions. The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 2 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Attachment 5, Step 1.8, added Lake This is a new phone for the alternate EOF Michigan College to satellite phones to be location at LMC.checked.GT 2015-8471-1 Data Sheet 1, removed verification that the 24 hour coping supplies are inventoried 24 hour coping supply cabinet was locked or quarterly using Data Sheet 2.Sealed.Data Sheet 2, This revision changes the process to Removed blanks for recording seal breaking all seals and performing a complete numbers. inventory each time and then resealing the item.S Removed locked or seal check for 24 hour coping supplies.
 
GT 2015-13295-1 Data Sheet 3 was reorganized for ease of Reorganization did not change the inventory.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
use. No items were added or removed during the reorganization.
 
Data Sheet 3, Under Re-Entry Personnel The change from SRDs to EDs due to Equipment changed 14 SRL~s -7 (0-1 .5R) 7 technical advances.
==Title:==
An ED is capable of (0-10R) to 14 EDs. measuring dose that encompasses the range of both SRDs._____________________________GT2014-15551.
Emergency Response Resource Readiness Alteration                                           Justification Attachment 5, Step 1.8, added Lake                     This is a new phone for the alternate EOF Michigan College to satellite phones to be             location at LMC.
Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.and added JIG to General distribution badges.Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551.
checked.
The addition from 8 to 2. Added 2 Area EDs to this of the Area ED facilitates total dose section. determinations for the EOF personnel.
GT 2015-8471-1 Data Sheet 1, removed verification that the           24 hour coping supplies are inventoried 24 hour coping supply cabinet was locked or           quarterly using Data Sheet 2.
GT2014-15551 Data Sheet 3, Under Additional Equipment The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.This change eliminates unnecessary equipment from the inventory.
Sealed.
GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist, User comment that this board is no longer-removed Copy Board. used.GT 2015-13643-1 Office Information for Form Tracking Only -Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Data Sheet 2,                                         This revision changes the process to Removed blanks for recording seal             breaking all seals and performing a complete numbers.                                     inventory each time and then resealing the item.
Page 3 of 9 REVISION  
S Removed locked or seal check for 24 hour coping supplies.                         GT 2015-13295-1 Data Sheet 3 was reorganized for ease of               Reorganization did not change the inventory.
use.                                                   No items were added or removed during the reorganization.
Data Sheet 3, Under Re-Entry Personnel                 The change from SRDs to EDs due to Equipment changed 14 SRL~s - 7 (0-1 .5R) 7             technical advances. An ED is capable of (0-10R) to 14 EDs.                                     measuring dose that encompasses the range of both SRDs.
_____________________________GT2014-15551.
Data Sheet 3, Under Additional Equipment               The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.
and added JIG to General distribution badges.
Data Sheet 3, Under Additional Equipment               The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551. The addition from 8 to 2. Added 2 Area EDs to this                 of the Area ED facilitates total dose section.                                               determinations for the EOF personnel.
GT2014-15551 Data Sheet 3, Under Additional Equipment               The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.
This change eliminates unnecessary equipment from the inventory.
GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist,                   User comment that this board is no longer-removed Copy Board.                                   used.
GT 2015-13643-1 Office Information for Form Tracking Only - Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 3 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 6, Removed 25 SRDs and SRiD The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.GT2014-15551.
 
Data Sheet 7, removed label color The radios are located in different areas of designators for radios, the facility and the color designator is not necessary.
Procedure No.:     EPP-2080-ERO-001                               Rev. No.:      14
Data Sheet 9, reduced the number of EDs The revised numbers of EDs was determined from 50 to 40. in GT2014-15551.
 
Data Sheet 9, reduced the number of TLDs The revised numbers of EDs was determined from 141 to 41. in GT2014-15551 which determined that the 100 extremity TLDs were not required.Data Sheet 9, added the Off Site Responder  
==Title:==
/ Determination from GT 2014-15551 and Security Dosimetry Box section. user comments.
Emergency Response Resource Readiness Alteration                                   Justification Data Sheet 6, Removed 25 SRDs and SRiD       The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.
Reorganization did not change the inventory.
GT2014-15551.
No items were added or removed during the reorganization.
Data Sheet 7, removed label color           The radios are located in different areas of designators for radios,                     the facility and the color designator is not necessary.
No Data Sheet was reorganized, margin marks were used for the reorganization.
Data Sheet 9, reduced the number of EDs     The revised numbers of EDs was determined from 50 to 40.                               in GT2014-15551.
Data Sheet 10, added two area TLDs and The addition of the Area ED facilitates total two area EDs to Equipment functional dose determinations for the ENC/JIC Checks section. personnel.
Data Sheet 9, reduced the number of TLDs     The revised numbers of EDs was determined from 141 to 41.                             in GT2014-15551 which determined that the 100 extremity TLDs were not required.
GT 2014-15551 Data Sheet 10, removed "and install New style computers do not require this updates" from Security Computer and action to be performed.
Data Sheet 9, added the Off Site Responder / Determination from GT 2014-15551 and Security Dosimetry Box section.             user comments. Reorganization did not change the inventory. No items were added or removed during the reorganization. No Data Sheet was reorganized,                 margin marks were used for the reorganization.
This occurs County Lap Top Computer checks. automatically when computer is turmed on.GT 2015-2610-1 Data Sheet 10, changed the name of the key User Commentthe key box from Media Area Manager to Media Area Coordinator.
Data Sheet 10, added two area TLDs and       The addition of the Area ED facilitates total two area EDs to Equipment functional         dose determinations for the ENC/JIC Checks section.                             personnel.
GT 2015-7276 Data Sheet 11, Added "Check recharge tag New battery jump packs have been placed in on battery jump pack (recharge if survey vehicles.*
GT 2014-15551 Data Sheet 10, removed "and install         New style computers do not require this updates" from Security Computer and         action to be performed. This occurs County Lap Top Computer checks.             automatically when computer is turmed on.
These jump packs have a necessary) " one year charge life.GT 2015-6016-1 Data Sheet 13, Added "One" designator to User comment.FAX machine check to clearly indicate ,that there is only one FAX machine to test. GT 2015-7209 REVISION  
GT 2015-2610-1 Data Sheet 10, changed the name of the key   User Comment in* the key box from Media Area Manager to Media Area Coordinator.                     GT 2015-7276 Data Sheet 11, Added "Check recharge tag     New battery jump packs have been placed in on battery jump pack (recharge if           survey vehicles.* These jump packs have a necessary) "                                 one year charge life.
GT 2015-6016-1 Data Sheet 13, Added "One" designator to     User comment.
FAX machine check to clearly indicate ,that there is only one FAX machine to test.       GT 2015-7209
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Resp~onse Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 13, Added ERONS password User comment.verification by logging into ERONS to perform the ERONS check. GT 2015-7209-1 Data Sheet 13, Added "One" designator to User comment.911 Dispatch Center Phone check to clearly indicate that there is only one phone to test. GT 20 15-2575 Also changed this test to have EP Staff GT-2015-8602-1 perform the phone test per Attachment 4.Data Sheet 13, Added "One" designator to User comment.DAP computer check to clearly indicate that there is only one DAP computer to test. GT 2015-7209 Data Sheet 13, Removed the following from User comment.the Control Room briefcase inventoried items. Approval to remove these items was* 10blak lo shetsobtained from the Operations Senior License.* 1 calculator
 
* 10 miscellaneous pens GT 20 15-7209 a 2 pencils*with erasers* 1 ruler a 2 pads of lined paper* 5 red fine markers.* 5 black fine markers* 3 orange markers o 3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs. techflical advances.GT2014-1555 1.Data Sheets 14 and 15, items were Per user comment the Control Room checks rearranged.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
should be on one attachment and the Control.... Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment.
 
No items were removed from the procedure.
==Title:==
____________________________No margin markings were used.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.Page 5 of 9 REVISION  
Emergency Resp~onse Resource Readiness Alteration                                         Justification Data Sheet 13, Added ERONS password                   User comment.
verification by logging into ERONS to perform the ERONS check.                               GT 2015-7209-1 Data Sheet 13, Added "One" designator to               User comment.
911 Dispatch Center Phone check to clearly indicate that there is only one phone to test.         GT 20 15-2575 Also changed this test to have EP Staff               GT-2015-8602-1 perform the phone test per Attachment 4.
Data Sheet 13, Added "One" designator to               User comment.
DAP computer check to clearly indicate that there is only one DAP computer to test.               GT 2015-7209 Data Sheet 13, Removed the following from             User comment.
the Control Room briefcase inventoried items.                                                 Approval to remove these items was
* 10blak lo shetsobtained                           from the Operations Senior License.
* 1 calculator
* 10 miscellaneous pens                       GT 20 15-7209 a       2 pencils*with erasers
* 1 ruler a       2 pads of lined paper
* 5 red fine markers.
* 5 black fine markers
* 3 orange markers o       3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs.               techflical advances.
GT2014-1555 1.
Data Sheets 14 and 15, items were                     Per user comment the Control Room checks rearranged.                                           should be on one attachment and the Control
                                  ....                 Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment. No items were removed from the procedure.
____________________________No margin markings were used.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 5 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Resp~onse Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 16, added references to User comment.Attachments 4 and 5 for directions for how GT 20 15-2575-1 to perform checks. No Margin marks were used.Data Sheet 19, reduced the number of EDs This change aligns the number of EDs from 30 to 16. available with the number of TLDs.GT 2014-15551 Data Sheet 19, change the format of the Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used Control)" from "16 TLDs plus 1 Control throughout this procedure.
 
TLD".Data Sheet 20, Removed 20 SRDs and SRD The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs. technical advances.GT2O014-1555 1.Data Sheet 20, added "(1307 Storage Room) Added to provide user with a better location to the location at Niles Hospital.
Procedure No.:         EPP-2080-ERO-001                                     Rev. No.:      14
of equipment.
 
Data Sheet 20, organized list of items under No items were added or removed. This new heading "Decon Room". organization groups items in the same location together.Data Sheet 20, added "(In Cabinet)" to the Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit. of equipment.
==Title:==
Data Sheet 20, Added reference to Data Added to remind user that when performing Sheet 25. the instrument kit inventory it is necessary to document the inventory on DS 25.Data Sheet 23, changed the location of Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.
Emergency Resp~onse Resource Readiness Alteration                                           Justification Data Sheet 16, added references to                     User comment.
Attachments 4 and 5 for directions for how             GT 20 15-2575-1 to perform checks.                                     No Margin marks were used.
Data Sheet 19, reduced the number of EDs               This change aligns the number of EDs from 30 to 16.                                         available with the number of TLDs.
GT 2014-15551 Data Sheet 19, change the format of the               Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used               Control)" from "16 TLDs plus 1 Control throughout this procedure.                             TLD".
Data Sheet 20, Removed 20 SRDs and SRD                 The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs.               technical advances.
GT2O014-1555 1.
Data Sheet 20, added "(1307 Storage Room)             Added to provide user with a better location to the location at Niles Hospital.                     of equipment.
Data Sheet 20, organized list of items under           No items were added or removed. This new heading "Decon Room".                             organization groups items in the same location together.
Data Sheet 20, added "(In Cabinet)" to the             Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit.           of equipment.
Data Sheet 20, Added reference to Data                 Added to remind user that when performing Sheet 25.                                             the instrument kit inventory it is necessary to document the inventory on DS 25.
Data Sheet 23, changed the location of                 Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.
better describe the locations.
better describe the locations.
Data Sheet 23, removed Operations Electronic Dosimeters for Operations Emergency Supplies -6 Electronic personnel are located in the Control Rooms Dosimeters.
Data Sheet 23, removed Operations                     Electronic Dosimeters for Operations Emergency Supplies - 6 Electronic                     personnel are located in the Control Rooms Dosimeters.                                           and inventoried using Data Sheets 14 and 15.
and inventoried using Data Sheets 14 and 15.Data Sheet 23, Added a portable air sampler Requested by RP personnel to ensure this and a dose rate meter to the inventory for the equipment is readily available when needed TRPAC Emergency Cabinet in an emergency.
Data Sheet 23, Added a portable air sampler           Requested by RP personnel to ensure this and a dose rate meter to the inventory for the         equipment is readily available when needed TRPAC Emergency Cabinet                               in an emergency.
No Margin Marks were used.GT 2015-13295-1 Data Sheet 24, added Lake Michigan This is a new phone for the alternate BOF College satellite phone check. location at LMC.GT 2015-8471-1 Data Sheet 25, Added blank to record the User comment Response Source ICN.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
No Margin Marks were used.
Page 6 of 9 REVISION  
GT 2015-13295-1 Data Sheet 24, added Lake Michigan                     This is a new phone for the alternate BOF College satellite phone check.                         location at LMC.
GT 2015-8471-1 Data Sheet 25, Added blank to record the               User comment Response Source ICN.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 6 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14-Alteration Justification Moved Security Control Center Quarterly Previously these checks were on Data Sheet checks to new Data Sheet 26. 18 which is for the Berrien County EOC.User Comment.Office Informa~tion for Form Tracking Only -Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.
 
Page 7 of 9 REVISION  
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:   14-
 
==Title:==
Emergency Response Resource Readiness Alteration                                           Justification Moved Security Control Center Quarterly                 Previously these checks were on Data Sheet checks to new Data Sheet 26.                           18 which is for the Berrien County EOC.
User Comment.
Office Informa~tion for Form Tracking Only         - Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 7 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Rev. No.: 14 Title: Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.Implementation Schedule* The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.* The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.* PORC week 1 /11/20 16-Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions None I Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
 
Page 8 of 9 REVISION  
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:   14
 
==Title:==
Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.
Implementation Schedule
* The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.
* The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.
* PORC week 1/11/20 16
- Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions None I             Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 8 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
ProcdureNo.
 
EP-28-EO-Rev. No.: 14 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval.
Rev. No.:  14 ProcdureNo.       EP-28-EO-Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 9 of 9
Page 9 of 9 INDIA NA MICHIGAN POWER A unit of American Electric Power February 19, 2016 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 lndianaMichiganPower.com AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
 
INDIA NA MICHIGAN                                                                               Indiana Michigan Power Cook Nuclear Plant POWER                                                                                One Cook Place Bridgrnan, Ml 49106 A unit ofAmerican Electric Power                                                        lndianaMichiganPower.com February 19, 2016                                                                  AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.:         50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001


==SUBJECT:==
==SUBJECT:==
Line 1,441: Line 2,648:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:
Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:
Procedure Number Title Revision Effective Date PMP-2080-EPP-i100 -Emergency Response 32 1/28/2016 PMP-2080-EPP-100 Emergency Response 33 2/12/2016 EPP-2080-ERO--001 -Emergency Response Resource Readiness 14 2/3/2016 There are no new or revised commitments in this letter. Should you have any contact me at (269) 466-2649.Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l questions, please
Procedure Number                                 Title                   Revision   Effective Date PMP-2080-EPP-i100               -Emergency   Response                         32           1/28/2016 PMP-2080-EPP-100                 Emergency Response                           33           2/12/2016 EPP-2080-ERO--001               -Emergency   Response Resource Readiness       14           2/3/2016 There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.
Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l


==Enclosure:==
==Enclosure:==
Encloure:
Encloure:
Emergency Plan Implementing Procedures
Emergency Plan Implementing Procedures
./I U. S. Nuclear Regulatory Commission AEP-NRC-201 6-22 Page 2 c: R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich -NRC Washington, DC, w/o enclosure MDEQ -RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson -NRC Region Ill (CD)A. J. Williamson  
                                                                                                                . /I
-AEP Ft. Wayne, w/o enclosure Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14 IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32 Doc No.: Title: Alteration Cat.: CDI/50.59:1 PORC Mtg. No.: CARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: Effective Date: PMP-2080-EPP-1 00 EMERGENCY RESPONSE Major Editorial Correction
 
-Full Review 50.54(q) #15-46 4666 N/A 1/28/2016 12:00:00 AM Rev03 No.: Approvals NaImeIReview/Approval Type/Capacity Date]Hart, William E 1 (i376639) 1l Validation Review 112/16/2015 12:12 J Hart, William E ~ 1 Cross-Discipline Review: EMERGENCY 1 12/16/2015_12:1 Thompson, Alisa I (s0841 jlSpecial Review : E-PLAN GROUP 12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536 1 Hat( illiam9 E l3 Technical Review 101/08/2016 10:15 j M s065 5_Management Review 101/14/2016 07:32 ]Wendzel, Regan 7ApoaAuhrt01/1/01 32 (s007887)
U. S. Nuclear Regulatory Commission                       AEP-NRC-201 6-22 Page 2 c:     R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich - NRC Washington, DC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson - NRC Region Ill (CD)
Apoa uhrt 0/421 32 Signature Comments=Validation Review performed by Simpson, EP]Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]
A. J. Williamson - AEP Ft. Wayne, w/o enclosure
]-he technical review was performed by Jerry Peterson]IPORC approval obtained at meeting 4666 Approved at PORC per Plant Manager, Jim Ross.
PMP-2080-EPP-100 Rev. 32 Page 1 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AND SCOPE ............................................................
3 2 DEFINITIONS AN]) ABBREVIATIONS
............................................
3 3 DETAILS............................................................................
6 3.1 General Information
..........................................................
6 3.2 SM-SEC Checklist
............................................................
7 3.3 Unaffected CR Checklist....................9


===3.4 Shift===
Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14
Technical Advisor (STA) ................................................
10 3.5 Contingency Director ............
............................................
10 4 FINAL CONDITIONS..............................................................
11 5 REFERENCES..
...................................................................
12 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Attachment 6: Attachment 7: Attachment 8: Attachment 9: Attachment 10: Attachment 11: Protective Action Recommendations
..................................
13 Activation of ERONS..................................................17 Dismissal of Non-Essential Personnel
...................................
19 Accountability
.........................................................
21 Evacuation............................................................
26 Terminating a IJE....:.................................................
30 Notification of On-Site Personnel......................................
31 Notification of Off-Site Agencies ......................................
35 MSP Notification.......................................................40 Berrien County Sheriff Notification
...................................
43 NRC Notification
..........................
............................
46 PMP-2080-EPP-100 Rev. 32 Page 2 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency PreparednesS Writer Document Owner Cognizant Organization Attachment 12: Attachment 13: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Manual Completion of EM!) Forms ...................................
48 Activation of FLEX Phase 3...........................................
51 PPC or PSS Control Room Data ......................................
52 Emergency Turnover Checklist
........................................
54 Plant Status.............................................................
58 Request For Additional Information
..................................
60 Contingency Team Tracking Form ....................................
61 Reference PMP-2080-EPP-100 Rev. 32 Page 3 of 61 Emergency Response 1 PURPOSE AND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.


===1.2 Terminating===
IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32


an event if the conditions for the UE no longer exist, and no escalation of classification is expected.2 DEFINITIONS AND ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AEO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources.
Rev03 Doc No.:                PMP-2080-EPP-1 00                                No.:
Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.Control Room An available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.*CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to*Status Trees restore safety functions that are challenged.
 
DAP Dose Assessment Program EAL Emergency Action Level Reference PMiP-2080-EPP-100 Rev. 32 Page 4 of 61 Emergency Response Term Meaning ED Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency ResPonse Auxiliary Equipment Operators.
==Title:==
ERDS Emergency Response Data System ERE Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency flAB Hostile Action Based IC Initiating Conditions IIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation responsible for placing the unit in a safe condition, during emergency Team conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
EMERGENCY RESPONSE Major Editorial Correction - Full Alteration Cat.:
MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.
Review CDI/50.59:1              50.54(q) #15-46 PORC Mtg. No.:          4666 CARB Mtg. No.:
OSC Operations Support Center PA Public Address Reference  
Admin Hold AR No.:
[ PMLP-2080-EPP-100  
Superceding Proc(s):
[ Rev. 32 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Containment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data.RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager -Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building TIE Unusual Event US .Unit Supervisor WCC-SRO Work Control Center -Senior Reactor Operator Reference PM~P-2080-EPP-100 Rev. 32 Page 6 of 61 Emergency Response 3 DETAILS NOTE: eSteps in this procedure that do not apply to the current classification may be marked N/A.e The steps in this procedure are listed in the preferred order of performance.
Temp Proc Exp Date:
Steps may be performed in a different sequence.3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.3.1.3 The following actions shall not be delegated by the SEC (Command &Control Function):
Temp Change Exp Date:
Temp Proc/Change N/A End:
Effective Date:          1/28/2016 12:00:00 AM Approvals NaImeIReview/Approval Type/Capacity                            Date]
Hart, William E (i376639) 1 1lValidation Review                  112/16/2015 12:12 J Hart, William E ~        1 Cross-Discipline Review: EMERGENCY1 12/16/2015_12:1 Thompson, Alisa        I (s0841          jlSpecial Review : E-PLAN GROUP        12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536                                            1 Hat(illiam9    E        l3 Technical Review                  101/08/2016 10:15  j M s065            5_Management Review                  101/14/2016 07:32  ]
Wendzel, Regan          7ApoaAuhrt01/1/01                                  32 (s007887)                  Apoa uhrt                            0/421      32 Signature Comments
=Validation Review performed by Simpson, EP]
Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]
]-he technical review was performed by Jerry Peterson]
IPORC approval obtained at meeting 4666
 
Approved at PORC per Plant Manager, Jim Ross.
              *'            PMP-2080-EPP-100                Rev. 32                  Page 1 of 61 Emergency Response Reference Bill Hart            Emergency Preparedness            Emergency Preparedness Writer                    Document Owner                  Cognizant Organization TABLE OF CONTENTS 1  PURPOSE AND SCOPE ............................................................ 3 2  DEFINITIONS AN]) ABBREVIATIONS ............................................ 3 3  DETAILS............................................................................ 6 3.1  General Information .......................................................... 6 3.2  SM-SEC Checklist ............................................................ 7 3.3  Unaffected CR Checklist....................9 3.4  Shift Technical Advisor (STA) ................................................ 10 3.5  Contingency Director ............            ............................................ 10 4  FINAL CONDITIONS.............................................................. 11 5  REFERENCES.. ...................................................................                12 :    Protective Action Recommendations .................................. 13 :    Activation of ERONS..................................................17 :    Dismissal of Non-Essential Personnel ...................................19 :    Accountability ......................................................... 21 :    Evacuation............................................................ 26 :    Terminating a IJE....:................................................. 30 :    Notification of On-Site Personnel...................................... 31 :    Notification of Off-Site Agencies ...................................... 35 :    MSP Notification.......................................................40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification .......................... ............................            46
 
PMP-2080-EPP-100              Rev. 32              Page 2 of 61 Emergency Response Reference Bill Hart            Emergency Preparedness          Emergency PreparednesS Writer                  Document Owner                Cognizant Organization 2: Manual Completion of EM!) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1:    PPC or PSS Control Room Data ...................................... 52 Data Sheet 2:    Emergency Turnover Checklist ........................................ 54 Data Sheet 3:    Plant Status............................................................. 58 Data Sheet 4:    Request For Additional Information .................................. 60 Data Sheet 5:    Contingency Team Tracking Form .................................... 61
 
Reference                PMP-2080-EPP-100                Rev. 32            Page 3 of 61 Emergency Response 1      PURPOSE AND SCOPE 1.1    This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.
1.2    Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.
2       DEFINITIONS AND ABBREVIATIONS Term               Meaning AOP               Abnormal Operating Procedure AEO               Auxiliary Equipment Operator BCSD               Berrien County Sheriff Department BOP               Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency     accountability at the beginning of the event to ensure persons are Coningency         accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.
Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency         Equipment, Utility, Makeup Plant) from the shift not assigned to other Team               duties who are responsible for responding to the operations needs of the affected unit.
Control Room       Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.
Control Room       An available extra SRO or RO who acts as a single point contact for the Liaison           Unit Supervisor to the Contingency Director, and the SM/SEC.
*CR                 Control Room Critical Safety     A set of flowchart diagnostic aids used to monitor the condition of critical Function           safety functions and select appropriate Function Restoration Procedures to
*Status Trees       restore safety functions that are challenged.
DAP                 Dose Assessment Program EAL                 Emergency Action Level
 
Reference             PMiP-2080-EPP-100               Rev. 32             Page 4 of 61 Emergency Response Term           Meaning ED             Emergency Director EMD-32         Nuclear Plant Accident Notification form ENC           Emergency News Center EOC           Emergency Operation Center EOF           Emergency Operations Facility EOP           Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO         Security are designated as Emergency ResPonse Auxiliary Equipment Operators.
ERDS           Emergency Response Data System ERE           Emergency Response Facility ERONS         Emergency Response Organization Notification System ERO           Emergency Response Organization GE             General Emergency flAB           Hostile Action Based IC             Initiating Conditions IIC           Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation     responsible for placing the unit in a safe condition, during emergency Team       conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
MSP           Michigan State Police NEA           Nuclear Emergency Alarm NRC           Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.
Off-site Response Organization refers to Berrien County Sheriff's ORO       Department, Michigan State Police or local fire departments.
OSC           Operations Support Center PA             Public Address
 
Reference       [     PMLP-2080-EPP-100         [   Rev. 32         Page 5 of 61 Emergency Response Term           Meaning PACHMT         Post-Accident Containment Hydrogen Monitoring team PAR           Protective Action Recommendation PPC           Plant Process Computer PSP           Plant Status PAR PSS           Plant System Server Local Area Network application for PPC data
.RAC           Radiological Assessment Coordinator RO             Reactor Operator RP             Radiation Protection SAE             Site Area Emergency SAS             Secondary Alarm Station SEC             Site Emergency Coordinator SIP             Shelter In Place SM             Shift Manager SM-SEC         Shift Manager - Site Emergency Coordinator SRO             Senior Reactor Operator STA             Shift Technical Advisor TSC             Technical Support Center TSC-SEC         Technical Support Center   - Site Emergency Coordinator NEST           Nuclear Engineering Services & Technology Building TIE             Unusual Event US             .Unit Supervisor WCC-SRO         Work Control Center   - Senior Reactor Operator
 
Reference               PM~P-2080-EPP-100               Rev. 32             Page 6 of 61 Emergency Response 3   DETAILS NOTE:       eSteps     in this procedure that do not apply to the current classification may be marked N/A.
e   The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.
3.1 General Information 3.1.1   SM-SEC implements this procedure until relieved of SEC duties.
3.1.2   Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.
3.1.3   The following actions shall not be delegated by the SEC (Command &
Control Function):
* Classification of the emergency.
* Classification of the emergency.
o Directing the notification of offsite officials.
o Directing the notification of offsite officials.
o Approval of PAR to offsite emergency management agencies.3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications.
o Approval of PAR to offsite emergency management agencies.
This should be supported, as resources become available.
3.1.4   Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.
3.1.5   The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.
3.1.6   PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)
3.1.7   Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.
The use of Operations Department staff is recommended.
The use of Operations Department staff is recommended.
Reference PMP-2080-EPP-100  
 
[ Rev. 32 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:
Reference                 PMP-2080-EPP-100           [     Rev. 32           Page 7 of 61 Emergency Response 3.2   SM-SEC Checklist NOTE:
* The following steps are repeated for each classification upgrade.*A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
* The following steps are repeated for each classification upgrade.
3.2.3 IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers'Bridge.NOTE: Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).
                *A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.
3.2.1     Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.
3.2.2     Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
3.2.3     IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers' Bridge.
NOTE:     Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).
Activation of the ERONS includes activating the Emergency Response Facilities.
Activation of the ERONS includes activating the Emergency Response Facilities.
3.2.4 IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel.
3.2.4     IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).
SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g., hostile force, radiation release, toxic spill, etc.).3.2.5 IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
NOTE:         Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,
Reference I PMP-2080-EPP-100
hostile force, radiation release, toxic spill, etc.).
[ Rev. 32 Page 8 of 61 Emergency Response 3.2.6 IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.
3.2.5     IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12 Upon completion of turnover, inform both control rooms that the Command& Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.3.2.14 IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.3.2.15 WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.
Reference PMP-2080-EPP-100 Rev. 32 Page 9 of 61 Emergency Response 3.3 Unaffected CR Checklist 3.3.1 WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.
___3.3.3 Assign an individual to start the Dose Assessment Program (DAP). ___IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP-108, Initial Dose Assessment.___
3.3.4 TSC Ventilation
: a. IF any of the following conditions are present: ___* The emergency involves a loss of coolant accident* The Control Room Pressurization System has been activated o A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode. ___b. Record the Emergency Mode start time on the placard located below the switch.NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.
3.3.5 if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.
___* Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).3.3.6 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration S Reference
[ PMP-2080-EPP-100 I Rev. 32 Page 10 of 61 Emergency Response 3.4 Shift Technical Advisor (STA)3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.3.4.2 Provides an independent assessment of conditions present and actions taken.3.4.3 Reports to the SM and acts in an advisory capacity.3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.


====3.4.5 Ensures====
Reference      I    PMP-2080-EPP-100          [    Rev. 32            Page 8 of 61 Emergency Response 3.2.6    IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.
that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.3.5 Contingency Director 3.5.1 The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.3.5.2 The Contingency Director performs the following tasks.o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
3.2.7    IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).
a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.* Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.* Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
3.2.8    IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).
Reference  
3.2.9    IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
] Rev. 32 Page 11 of 61 Emergency Response NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.* WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.* Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.a Coordinate the move of personnel to the OSC when directed by the SM.o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
3.2.10  Assign an individual to complete Data Sheet 3, Plant Status.
4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.Record any comments below (include document numbers for corrective actions): Verified Complete By: Performer Independently Verified By:-Date: ___ I/Date : __/ _Date: I/ __Performer Reviewed By: Operations Shift Manager I designee Reference I PMP-2080-EPP-100 I Rev. 32 I Page 12 of 61 Emergency Response 5 5.1 REEERENCES Use  
3.2.11  WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12  Upon completion of turnover, inform both control rooms that the Command
          & Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13  IF in a UIE and conditions warrant AND the SM-SEC has Command &
Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.
3.2.14  IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.
3.2.15  WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.
 
Reference                PMP-2080-EPP-100                Rev. 32            Page 9 of 61 Emergency Response 3.3  Unaffected CR Checklist 3.3.1    WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event).        ___
3.3.2    Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.                                              ___
3.3.3    Assign an individual to start the Dose Assessment Program (DAP).                ___
IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP- 108, Initial Dose Assessment.___
3.3.4     TSC Ventilation
: a. IF any of the following conditions are present:                          ___
* The emergency involves a loss of coolant accident
* The Control Room Pressurization System has been activated o    A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.                                                          ___
: b. Record the Emergency Mode start time on the placard located below the switch.
NOTE:      Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.
3.3.5   if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.                                                                      ___
* Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
3.3.6    Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration
 
S Reference        [      PMP-2080-EPP-100 Emergency Response I    Rev. 32            Page 10 of 61 3.4  Shift Technical Advisor (STA) 3.4.1    Reports to the Control Room in the event of an emergency or off-normal event.
3.4.2    Provides an independent assessment of conditions present and actions taken.
3.4.3    Reports to the SM and acts in an advisory capacity.
3.4.4    Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4.5    Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.
NOTE:       The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.
3.5   Contingency Director 3.5.1   The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.
3.5.2   The Contingency Director performs the following tasks.
o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.
* Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.
o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.
* Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
 
Reference             PM*P-2080-EPP-100            ]   Rev. 32             Page 11 of 61 Emergency Response NOTE:       Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.
a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.
o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
* WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.
* Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.
a Coordinate the move of personnel to the OSC when directed by the SM.
o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
4     FINAL CONDITIONS 4.1   The emergency has been terminated and the plant has entered the recovery phase.
Record any comments below (include document numbers for corrective actions):
Verified Complete By:                                               Date: ___      I/
Performer Independently Verified By:-                                         Date : __/       _
Performer Reviewed By:                                                        Date:     I/   __
Operations Shift Manager I designee
 
Reference     I     PMP-2080-EPP-100       I   Rev. 32     I Page 12 of 61 Emergency Response 5   REEERENCES 5.1 Use  


==References:==
==References:==


5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-00 1, Activation and Operation of the EOF.5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1i.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing  
5.1.1   PMP-2080-EPP-101, Emergency Classification 5.1.2   PMP-2080-EPP-108, Initial Dose Assessment 5.1.3   RMT-2080-EOF-00 1, Activation and Operation of the EOF.
5.1.4   RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5   SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6   RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7   PMP-7030-001-001, Prompt NRC Notification 5.1i.8   EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing  


==References:==
==References:==


====5.2.1 Source====
5.2.1   Source  


==References:==
==References:==
: a. Cook Nuclear Plant Emergency Plan b. SPP-2060-SFI-203, Security Actions During Emergency Conditions
: a. Cook Nuclear Plant Emergency Plan
: b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2    General References
: a. Michigan Emergency Management Plan
: b. NRC Regulatory Issue Summary, RIS-2002-21
: c. NRC Regulatory Issue Summary, RIS-2004-13
: d. NRC Bulletin 2005-02
 
Reference                PMiP-2080-EPP-100              Rev. 32            Page 13 of 61 Emergency Response Attachment 1              Protective Action Recommendations                    Pages:
NOTE:          In selecting a PAR, consider the radiological release characteristic
              *(continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped - e.g., containment pressure relief).
NOTE:          DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.
1      PAR Development 1.1    Proceed through a flowchart in this attachment to develop a PAR.
S    The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
            ,    All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.
2      Issuing a PAR 2.1    After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
2.2    Ensure that the appropriate PAR boxes are checked on the EMD-32a form.
2.3    Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
 
Reference                    PMP-2080-EPP-100                            Rev. 32              Page 14 of 61 I                                    Emergency Response I    Attachment 1                    Protective Action Recommendations                                  Pages:6 Initial - Protective Action Recommendations Yes bsthis a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?
(!f the conditions for a Rapidly ProgressingSevere Accident cannot be immediately confirmed, then A.NSWER .. ,No.)
: 1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?
OR
: 2. The conditions for EAt. R-1 have been met?
Yes HAB        "\
                                                      .HELTER Recommend HOSTILE ACTION                    Recommend INITIAL SHELTER IN PLACE. {Column 2 on              EVACUATION. (Column 3 on PAR PAR Table labeled "HAB SHELTERI*            Table labeled 'INITIAL")it, z1 (L1}
                                                          . SHELTER INPLACE (SIP) 2 miles
* Evacuate 2 mile radius, radius,
* Evacuate areas 2-S miles
* Clear lake area to 5 miles,                downwind,
* All other areas MONITOR &
* All other areas MONITOR &
PREPARE                                    PREPARE END of Initial PAR Flowchart    N
                                                    \    Go to the Follow Up, PAR Flowchart s
Area 1, 2 and clear lake area 6 213.75to      236.25 Areal, 2, 3, 4anddlear lake areas 6& 7                                Area 1, 2, 3, and~clear lake area 6 236.25 to      303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6                        and    Areal, 2, 3 andclear lake area 6 303.75 to      348.75 Area 1, 3, 5antd cear lake area 6                                clear Areal1, 3 aaddcear lake area 6 348.75to      56.25      Areal1, 3, 5 anddcear lake areas 6& 7                              Area 1, 3 and clear lake area 6 Areca 6 Area 1 and clear lake area 6 56.25 to 168.75            Area 1, and dlear lake areas 6 & 7 Notes:    1. Lake areas are =cleared" for eithter evacuation or sheltering.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.
: 3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.
1~
 
I    Reference                                PMIP-2080-EPP-100                                      Rev. 32                    Page 15 of 61 I                                                Emergency Response Atahet1PotcieAto                                                              RcmedtosPages:
Attahmet 1Protctie              Atio Recmmedatons13                                                  -  16 Follow Up - Protective Action Recommendations Has aaL -NITIAL PAR t*e        m-ade?
          ~AZIIZ,
                                                                                                                                    ~o to iii+/-~1 PAR
                                                                                      ]
45                                                        4                        r~J H
Was a RAPiDLY PROCRESSING tlore ctooI~e ~ ~tabIi~edAND Co~iai~~
SEVERE ACCIDENT 8~dax~d                        ~                                                                  ~ra1st          rImi20~ R~'BR?
d~xEt~ Iu~s1 PAR e~slmrj~'
W              i                                    SHELTER RnnnHOSTIL~E ACTION                                R    *omesdOLLOW UP EVACIATIO.N.
SHHEIER IN ILACE.
      .4      axea2 Epamdyx lst dovoreirA areasarEspiad .tn at ti.
eiwas re-cs nmdatima t* add a~dii, sl                      SHELTER') <x:
m x-a (ADD cohamx 1 onPA5 TaUl*
* SHELTER INILACE *SO' 2                          *ColmmS on oPAR Table la1bh--d '*OLLOW
* All otte area MONITOR &
* Eseroat 2 mie rains PREP.ARE
* catem aresas 2-10 miles do*.n, imd
* Alloh. areas M )N*ITOR &
          *All oth* areas    O*N'I-OR &                                                                                    PREPARE PREPARE beo    It~ar~ith d~ Sates
                                                                  ~        4S~~t ~stetm ee~lre~ r~    to do so mcdi~ PARs of all a~aei arms
                                                                                                                                                                'S 4,
exssaedPAC's.
* E~xpaad PAE'a bated at DOSE A*~*SSESS -E"to armsx be~nd 10 tuTIms maedPA(Ia (Atrealasn 1*0mil.s          ~vi~l Ibed*ed*ad hoc*in mrlais dea I.'
                                                  *shd th Sate of Mrr*mniasrar-).
4, and dear ]ake areas 6 & 7                                        Area 1, 2 anddcear lake area 6 213.75 t0 236.25              Area 1, 2, 3, 4artddear lake: areas 6 & 7                                          Ara1Area 1, 2, 3, and dearlake area 6 aauid  IAreal1, 2, 3 and clear lake area 6 303.751 o348.75              Areal, 3,5 andclear lake area 6                                              clear    Areal1, :3and clear lake area 6 lake    Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75              Area 1, anddcear lake areas 6& 7 Notes:    1. Lake areas are 'cleared - fbia either evacuation or sheltering.
: 2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.
: 3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.
 
I      Reference                    ,,,,            PMP-2080-EPP-100                                        Rev. 32                      Page 16 of 61 I                                                    Emergency Response I        tahet1PotcieAto                                                                    Rcm edtosPages:
Attahmet 1Protctie              Atio Recmmedatons13-                                                      16
______________          ______________                          Reference 3 EPA PAG TABLE*
Protective Action                      PAG (projected dose)                                      Comments                                          Michigan Application


====5.2.2 General====
===Response===
References
Theleerin2-in-place or                  1 to S relmt                              Evacuation~lir, for snm<e situations,                    racility operator~s will recommeno ev~acuation of the                      (11 rv&#xa2;iv t~o 53q m.Sv)                  shecering* in~place) should; be initiat=ed              evacuation at 1 remn sheltering in public*                                over four day*                            whern projectcd dose is 1 remn (13 rosy)                place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy                        S en'e(S3 rr5,                            KI is' r:ost effectcive if taken prior t:o              The stateco Michigan will irmplem~ent administ:ration or                      projected dto.'c to                      e*:posure. Ma? resiuire approval of st.ate              irs 1(I plan; facility operator's prophylactic drugs* -                  child thyroid E~rr                        medical officials ior in actordance with                recommen~datrion is implicit in dose KI:                                  expos'ure t.o iocinc                        es*tablished en' eraencv plans).                        estidmation data.
: a. Michigan Emergency Management Plan b. NRC Regulatory Issue Summary, RIS-2002-21
        *t.+Tw*,~l.**o,*'D,+++    -                          I c'r ife~~v,+t++*:e    =:J&* j
: c. NRC Regulatory Issue Summary, RIS-2004-13
                                                                    -+..+t*t+-;te          t+nD
: d. NRC Bulletin 2005-02 Reference PMiP-2080-EPP-100 Rev. 32 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages: NOTE: In selecting a PAR, consider the radiological release characteristic
                                                                                            +I+                fI b.tp:,!'i,J+***
*(continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped
flt i~rle
-e.g., containment pressure relief).NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.1 PAR Development
:v++                      +e  ie+;        h~'
                                                                                                                                          *._*J+.,:  ait+n :* ~t+:.i*+m  .. ,+/+,*.
th'4 r,++            tnJ++.+ :i-m; +++ *-&#xf7;          tt* n
                                              +t*ft"1t3.+n+.5                                                                      i di+'
* m,.t n
    "+a+              the
                        .      t**+++1 e f,+'Jm +t~      ii
                                                        'Tb    - J&#x17d; ti . I ,*r+ +'I r,t~ +-.ix[rt+++=, + +,'Li.                    .* .+
i++*.+ +*,                        ifl r +-J+ *,' +,' u'"int~
                                                                                                                                                          *.*,    :b+-frt
                                                                                                                                                                    *      +;+r*+i 1,
 
Reference                 PMIP-2080-EPP-100               Rev. 32           Page 17 of 61 Emergency Response Attachment 2                        Activation of ERONS                          Pages:
NOTE:       SEC jugetis used todetermine which scenario will be used.
1      IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.
1.1    To activate ERONS:
* Click the Everbridge icon on the desk top.
OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.2    Enter User Name (erons) 1.3    Enter Password (located in ERO brief case) and Click Sign In.
NOTE:     1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.
: 2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.
1.4    To start a scenario, click on the Notifications tab at the top of the page.
1.5    Click on the Templates header to bring up a list of pteprogrammed scenarios.


===1.1 Proceed===
Reference                    PMP-2080-EPP-100                                      Rev. 32            Page 18 of 61 Emergency Response Attachment 2                                    Activation of ERONS                                        Pages:
through a flowchart in this attachment to develop a PAR.S The first PAR is developed using the "Initial Protective Action Recommendation" flowchart., All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.
17 - 18 INOTE:                                ........      ..............              .s ii&deg;t t 1.7 Click Send (loca          ptedB clos to    e te      tpofte          cee) 1.C    mesag      wi      opup askin          ifyuwatt                ddYthisto an evet.t Cick"N,            en Afe      a N  ntification        isrt senat thet  srenauomatiitEcall            goner sbacktr NoiictosrTab                where      thei last  ntfcation            sentCut~is~E Cshonwthtetie 1.7      Click Send (located close to the botop                  of the screen).            Noicaonhaebnsnt NOTE:            Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.
2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.


===2.2 Ensure===
Reference               PMP-2080-EPP-100               Rev. 32       I    Page 19 of 61
that the appropriate PAR boxes are checked on the EMD-32a form.2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
[  Attachment 3 Emergency Response Dismissal of Non-Essential Personnel              PaeI NOTE:           SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
Reference PMP-2080-EPP-100 Rev. 32 Page 14 of 61 I Emergency Response I Attachment 1 Protective Action Recommendations Pages:6 Initial -Protective Action Recommendations Yes bs this a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?(!f the conditions for a Rapidly Progressing Severe Accident cannot be immediately confirmed, then A.NSWER ..,No.)1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?OR 2. The conditions for EAt. R-1 have been met?Yes HAB "\.HELTER Recommend HOSTILE ACTION SHELTER IN PLACE. {Column 2 on PAR Table labeled "HAB SHELTERI*(L1}.SHELTER IN PLACE (SIP) 2 miles radius,* Clear lake area to 5 miles,* All other areas MONITOR &PREPARE Recommend INITIAL EVACUATION. (Column 3 on PAR Table labeled 'INITIAL")it, z1* Evacuate 2 mile radius,* Evacuate areas 2-S miles downwind,* All other areas MONITOR &PREPARE\N END of Initial PAR Flowchart Go to the Follow Up, PAR Flowchart s Area 1, 2 and clear lake area 6 213.75to 236.25 Areal, 2, 3, 4anddlear lake areas 6& 7 236.25 to 303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6 303.75 to 348.75 Area 1, 3, 5antd cear lake area 6 348.75to 56.25 Areal1, 3, 5 anddcear lake areas 6& 7 and clear Areca 6 Area 1, 2, 3, and~clear lake area 6 Areal, 2, 3 andclear lake area 6 Areal1, 3 aaddcear lake area 6 Area 1, 3 and clear lake area 6 Area 1 and clear lake area 6 56.25 to 168.75 Area 1, and dlear lake areas 6 & 7 Notes: 1. Lake areas are =cleared" for eithter evacuation or sheltering.
1   IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.1~
NOTE:           Personnel assisting the ERO (such as a Failure Investigation Process (FTP)
I Reference PMIP-2080-EPP-100 Rev. 32 Page 15 of 61 I Emergency Response Atahet1PotcieAto RcmedtosPages:
Team) should be Radworker qualified (i.e., have a TLD).
Attahmet 1Protctie Atio Recmmedatons13
1.1      IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.
-16 Follow Up -Protective Action Recommendations
1.2     IF radiological conditions may impact dismissal of non-essential personnel (e.g.,
~AZIIZ, Has aaL -NITIAL PAR m-ade?~o to iii+/-~1 PAR]45 4 Was a RAPiDLY PROCRESSING r~J SEVERE ACCIDENT 8~dax~d ~d~xEt~ Iu~s1 PAR e~slmrj~'W i SHELTER tlore ctooI~e ~ ~tabIi~edAND Co~iai~~~ra1st rImi20~ R~'BR?H.4 axea2 Epamdyx lst eiwas re-cs nmdatima add a~dii, sl m x-a (ADD cohamx 1 onPA5
radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* catem aresas 2-10 miles imd*All areas &PREPARE RnnnHOSTIL~E ACTION SHHEIER IN ILACE.SHELTER')  
1.3      Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:
<x :* SHELTER IN ILACE 2* All otte area MONITOR &PREP.ARE R UP EVACIATIO.N.
* Whether or not rapid egress is required (e.g., airborne attack)
dovoreirA areasa rEspiad .tn at ti.on oPAR Table la1bh--d
* Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
* Eseroat 2 mie rains* Alloh. areas M &PREPARE be o It~ar~ith d~ Sates~ 4S~~t ~stetm ee~lre~ r~ to do so mcdi~ PARs of all a~aei arms'S 4, e xssaedPAC's.
o    IF using the Livingston Road route, THEN contact Security to unlock the gates.
* E~xpaad PAE'a bated at DOSE ESS -E " to armsx be~nd 10 tuTIms dea maedPA(Ia (Atrea lasn 1*0 mil.s ~vi~l Ibe in mrlaisth Sate of I.'4, and dear ]ake areas 6 & 7 213.75 t0 236.25 Area 1, 2, 3, 4artddear lake: areas 6 & 7 303.751 o348.75 Areal, 3, 5 andclear lake area 6 Area 1, 2 anddcear lake area 6 Ara1Area 1, 2, 3, and dearlake area 6 aauid IAreal1, 2, 3 and clear lake area 6 clear Areal1, :3and clear lake area 6 lake Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75 Area 1, anddcear lake areas 6& 7 Notes: 1. Lake areas are 'cleared -fbia either evacuation or sheltering.
1.3.1   Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.
: 2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.
I Reference
,,,, PMP-2080-EPP-100 Rev. 32 Page 16 of 61 I Emergency Response I tahet1PotcieAto Rcm edtosPages:
Attahmet 1Protctie Atio Recmmedatons13-16______________
______________
Reference 3 EPA PAG Protective Action PAG (projected dose) Comments Michigan Application Response Theleerin2-in-place or 1 to S relmt Evacuation~
lir, for snm<e situations, racility operator~s will recommeno ev~acuation of the (11 rv&#xa2;iv t~o 53q m.Sv) in~place) should; be initiat=ed evacuation at 1 remn sheltering inover four whern projectcd dose is 1 remn (13 rosy) place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy S en'e (S3 rr5, KI is' r:ost effectcive if taken prior t:o The stateco Michigan will irmplem~ent administ:ration or projected dto.'c to Ma? resiuire approval of st.ate irs 1(I plan; facility operator's prophylactic -child thyroid E~r r medical officials ior in actordance with recommen~datrion is implicit in dose KI: expos'ure t.o iocinc en' eraencv plans). estidmation data.
-
I c'r j t+nD +I+ :v++ flt i~rle fI b.tp:,!' +e ie+ ; *._J+.,:
' h~ ait+n
..th'4 r,++ tnJ++.+ :i-m; +++ n i di+'"+a+
* m,.t n .the 1 e f,+'Jm +t~ 'Tb -ii .ti J I r+ +'I r,t~ +-.ix[rt++
+= , + +,'Li. r +*, .+ + -J + +,' u'"int~ ifl :b+-frt ;+ r*+ i + 1, Reference PMIP-2080-EPP-100 Rev. 32 Page 17 of 61 Emergency Response Attachment 2 Activation of ERONS Pages: NOTE: SEC jugetis used todetermine which scenario will be used.1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.1.1 To activate ERONS:* Click the Everbridge icon on the desk top.OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911.
A person will answer. Explain why you are calling and the actions the Everbridge person should take.1.2 Enter User Name (erons)1.3 Enter Password (located in ERO brief case) and Click Sign In.NOTE: 1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.1.4 To start a scenario, click on the Notifications tab at the top of the page.1.5 Click on the Templates header to bring up a list of pteprogrammed scenarios.
Reference PMP-2080-EPP-100 Rev. 32 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS Pages: 17 -18 INOTE: ........ .............. .s ii&deg; t t 1.7 Click Send (loca ptedB clos e to te tpofte cee)1.C mesag wi opup askin ifyuwatt ddY thisto an evet.t Cick"N, en Afe a n N tification isrt senat thet srenauomati itEcall goner s backtr NoiictosrTab where thei last ntfcation sent Cut ~is~E Cshonwthtetie


===1.7 Click===
1.3.2    Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
Send (located close to the botop of the screen). Noicaonhaebnsnt NOTE: Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911.
1.4 Inform both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).
Person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.
[ Reference PMP-2080-EPP-100 Rev. 32 I Page 19 of 61 Emergency Response[ Attachment 3 Dismissal of Non-Essential Personnel PaeI NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1.5.1    Sound the Containment Evacuation Alarm(s), if required.
1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.NOTE: Personnel assisting the ERO (such as a Failure Investigation Process (FTP)Team) should be Radworker qualified (i.e., have a TLD).1.1 IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel.
1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two tunes.
SEC judgment should be used in determining the type and amount of non-essential help that is needed.1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
1.6.1   IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:
            "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential_ personnel are requested to leave the plant site at this time using the main plant access road."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
1.6.2   if rapid egress is to be used, THEN make the following announcement two times:
            "Attention all personnel. Attention all personnel. Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,
            "vehicle portal near the North Access Building") and exiting the site using (State the route)."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.


===1.3 Contact===
Reference                PMP-2080-EPP-100              Rev. 32            Page 21 of 61 Emergency Response Attachment 4                          Accountability                        2Pages NOTE:          During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:* Whether or not rapid egress is required (e.g., airborne attack)* Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.  
1  Review the three methods of Accountability below:
1.1    Primary Method - using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.
* Personnel will remain in the Assembly Areas until evacuated per SEC direction.
* A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).
1.2    Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.
This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.
* In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
* This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.


====1.3.2 Instruct====
Reference                PMP-2080-EPP-100                Rev. 32            Page 22 of 61 Emergency Response Attachment 4                          Accountability                            2Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* IF using the Livingston Road route, ThEN contact Security to unlock the gates.
1.3   No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).
2     Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.
2.1    Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1    IF using the Primary Method of accountability, TthEN request that Security:
o Prepare for accountability.
o    Commence evacuation of the Owner Controlled Area outside of the Protected Area.
: a. GO TO Step 3.


===1.4 Inform===
Reference               PMP-2080-EPP-100                 Rev. 32         Page 23 of 61 Emergency Response
both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.1.5.1 Sound the Containment Evacuation Alarm(s), if required.1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel.
    *Attachment 4                           Accountability                       Pages:
Make the same announcement two tunes.1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used: "Attention all personnel.
NOTE:           RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.
Attention all personnel.
2.1.2     IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.
Due to the current plant conditions, all non-essential_
personnel are requested to leave the plant site at this time using the main plant access road." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.1.6.2 if rapid egress is to be used, THEN make the following announcement two times: "Attention all personnel.
Attention all personnel.
Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,"vehicle portal near the North Access Building")
and exiting the site using (State the route)." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the"using Security portal" statement.
Reference PMP-2080-EPP-100 Rev. 32 Page 21 of 61 Emergency Response Attachment 4 Accountability 2 Pages NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
1 Review the three methods of Accountability below: 1.1 Primary Method -using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.* Personnel will remain in the Assembly Areas until evacuated per SEC direction.
* A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).1.2 Alternate Method -using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.* In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.* This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
Reference PMP-2080-EPP-100 Rev. 32 Page 22 of 61 Emergency Response Attachment 4 Accountability 2 Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
* IF using the Livingston Road route, ThEN contact Security to unlock the gates.1.3 No Accountability
-under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area -intrusion by a hostile force).2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1 IF using the Primary Method of accountability, TthEN request that Security: o Prepare for accountability.
o Commence evacuation of the Owner Controlled Area outside of the Protected Area.a. GO TO Step 3.
Reference PMP-2080-EPP-100 Rev. 32 Page 23 of 61 Emergency Response*Attachment 4 Accountability Pages: NOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.
2.1.2 IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: b. Request that the Owner-Controlled area also be evacuated.
: b. Request that the Owner-Controlled area also be evacuated.
3 Contact Personnel Inside the Protected Area.3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
3       Contact Personnel Inside the Protected Area.
Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.Sound the Nuclear Emergency Alarm.Make a Public Address announcement for personnel to report for accountability.
3.1     IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
Make the announcement two times. An example of this announcement is: "Attention all personnel.
Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
Attention all personnel.
Sound the Nuclear Emergency Alarm.
A (State the current classification  
Make a Public Address announcement for personnel to report for accountability. Make the announcement two times. An example of this announcement is:
-usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements." IF the ER~s have not already been activated, THEN make the following announcement two times: "Attention all personnel.
                  "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."
Attention all personnel.
IF the ER~s have not already been activated, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
                  "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."
Reference PMP-2080-EPP-l00O Rev. 32 Page 24 of 61 Emergency Response Attachment 4 Accountability Pages.3.2 IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.o Sound the Nuclear Emergency Alarm.Make a Public Address announcement for personnel to use the alternate method of accountability.
 
Make the same announcement two times. Anl example of this announcement is: "Attention all personnel.
Reference               PMP-2080-EPP-l00O               Rev. 32         Page 24 of 61 Emergency Response Attachment 4                         Accountability                         Pages.
Attention all personnel.
3.2     IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:
A (State the current classification  
o   Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building")
o   Sound the Nuclear Emergency Alarm.
and exiting the site using (State the route) ." 3.2.1 IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times: "Attention all personnel.
Make a Public Address announcement for personnel to use the alternate method of accountability. Make the same announcement two times. Anl example of this announcement is:
Attention all personnel.
                "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times: "Attention all personnel.
3.2.1   IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:
Attention all personnel.
                "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.
ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.2.2   IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times:
                "Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.
3.2.3   Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
3.3     IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.3.1    Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.


====3.3.1 Direct====
Reference               PMP-2080-EPP-100               Rev. 32           Page 25 of 61 Emergency Response Attachment 4                         Accountability                           Pages 4     Perform follow-up actions.
any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.
4.1   IF the Primary Method of Accountability was used, THtEN o       Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.
Reference PMP-2080-EPP-100 Rev. 32 Page 25 of 61 Emergency Response Attachment 4 Accountability Pages 4 Perform follow-up actions.4.1 IF the Primary Method of Accountability was used, THtEN o Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.* Coordinate with Security to locate any missing individuals.
* Coordinate with Security to locate any missing individuals.
4.2 IF the Alternate Method of Accountability was used, THEN a Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).* Coordinate with Security to locate any missing individuals.
4.2   IF the Alternate Method of Accountability was used, THEN a       Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).
4.3 IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include: a After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).o Coordinate with Security to locate any missing personnel.
* Coordinate with Security to locate any missing individuals.
4.3   IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:
a       After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).
o       Coordinate with Security to locate any missing personnel.
* Public Address announcements as necessary.
* Public Address announcements as necessary.
S Dismissal or evacuation of personnel as necessary.
S   Dismissal or evacuation of personnel as necessary.
I-Reference PMP-2080-EPP-100 Rev. 32 Page 26 of 611 Emergency Response Pages: Attachment 5 Evacuation 26 -29 NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings.
Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
1 Determine If Evacuation Should Be Performed.
Evacuation is performed at a SAE (or GE, if SAE was not entered).*1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.


====1.1.1 Coordinate====
I-Reference                PMP-2080-EPP-100                Rev. 32            Page 26 of  611 Emergency Response Pages:
Attachment 5                              Evacuation                            26 - 29 NOTE:            During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
1  Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE was not entered).
*1.1     IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.
1.1.1    Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary 'for plant personnel.
: 1. 1.2    WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.
1.2    IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.
1.3    IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.
1.4    IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.
* Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.


with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary
Reference               PMP-2080-EPP-100                 Rev. 32           Page 27 of 61 Emergency Response Attachment 5                             Evacuation                             Pages29 NOTE:         Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.
'for plant personnel.
2     Site Evacuation 2.1    Rapid Egress 2.1.1    IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.
: 1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.1.2 IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.1.3 IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.* Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.
: a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.
Reference PMP-2080-EPP-100 Rev. 32 Page 27 of 61 Emergency Response Attachment 5 Evacuation Pages29 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.2 Site Evacuation
Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
IF using the Livingston Road route, THEN contact Security to unlock the gates.
* Request that the Owner Controlled Area also be evacuated.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.


===2.1 Rapid===
Reference               PMP-2080-EPP-100               Rev. 32           Page 28 of 61 Emergency Response Attachment 5                           Evacuation                             Pages:9
Egress 2.1.1 IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.
IF using the Livingston Road route, THEN contact Security to unlock the gates.* Request that the Owner Controlled Area also be evacuated.
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
: c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant.
Reference PMP-2080-EPP-100 Rev. 32 Page 28 of 61 Emergency Response Attachment 5 Evacuation Pages:9 b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s).
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."
Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times."Attention all personnel.
2.2   Normal Egress 2.2.1   IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.                                         ___
Attention all personnel.
* Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,
A (State the current classification  
                  *vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.           ___
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building')
* Request that the Owner Controlled Area also be evacuated.
and leave the site using (State the route) ." c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant."Attention all personnel.
Attention all personnel.
A (State the current classification  
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ." 2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
___* Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,*vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
___* Request that the Owner Controlled Area also be evacuated.
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____
* Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____
RfrnePMI?-2080-EPP-100 Rev. 32 Page 29 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.2.3 Take any necessary follow-up actions.2.3.1 IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.2.3.2 IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.
I Reference PMP-2080-EPIP-100 Rev. 32 Page 30 of 61 I Emergency Response I Attachment 6 Terminating a UJE Pages: 1 IJE Termination 1.1 IF the conditions for the UBE no longer exist, and no escalation of classification is expected, perform the following:


====1.1.1 Instruct====
RfrnePMI?-2080-EPP-100                            Rev. 32          Page 29 of 61 RefeenceEmergency Response Attachment 5                          Evacuation                            Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
operators to inform the MSP and BCSD that the event is terminated.
2.3    Take any necessary follow-up actions.
2.3.1   IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.
2.3.2  IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.


====1.1.2 Instruct====
I  Reference                  PMP-2080-EPIP-100              Rev. 32            Page 30 of 61 I                            Emergency Response I  Attachment 6                          Terminating a UJE                        Pages:
operators to:* Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.* Verify that the form was received by the State and County.* Notify the NRC (Red Phone -NRC Operations Center) that the emergency is terminated.
1        IJE Termination 1.1      IF the conditions for the UBE no longer exist, and no escalation of classification is expected, THE*N perform the following:
1.1.1      Instruct operators to inform the MSP and BCSD that the event is terminated.
1.1.2     Instruct operators to:
* Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
* Verify that the form was received by the State and County.
* Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.
1.2      Inform both Control Rooms that the event is terminated.
1.3      Inform Security that the event is terminated (1118, 1119, 2005 or 2731).
1.4      Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.
2        Collection of Data 2.1      Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.


===1.2 Inform===
I Reference             PMP-2080-EPP-100                 Rev. 32             Page 31 of 61 I                           Emergency Response I   Attachment 7               Notification of On-Site Personnel                   Pages:
both Control Rooms that the event is terminated.
1                                                               31 -34 1 Notify Security
 
: 1. 1   Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.
===1.3 Inform===
1:1.1   if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
Security that the event is terminated (1118, 1119, 2005 or 2731).1.4 Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.
: a. Contact Time         _     _______
I Reference PMP-2080-EPP-100 Rev. 32 Page 31 of 61 I Emergency Response I Attachment 7 Notification of On-Site Personnel Pages: 1 31 -34 1 Notify Security 1. 1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.1:1.1 if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
1.1.2   if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
: a. Contact Time _ _______1.1.2 if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.
: a. Contact Time     __________
: a. Contact Time __________
1.1.3   IF a SAL, THEN instruct Security to:
1.1.3 IF a SAL, THEN instruct Security to: a Ready the Security Computer for accountability and prepare for subsequent evacuation.
a   Ready the Security Computer for accountability and prepare for subsequent evacuation.
* Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
* Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
: a. Contact Time _ _______1.1.4 IF a GE, THEN instruct Security to: a Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
: a. Contact Time         _     _______
1.1.4   IF a GE, THEN instruct Security to:
a   Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
* Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
* Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
: a. Contact Time Reference PMP-2080-EPP-100 Rev. 32 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages: 31 -34 1.1.5 IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.a. Contact Time _________2 Notify Chemistry and RP Technicians of the initial emergency classification.
: a. Contact Time


===2.1 Chemistry===
Reference                  PMP-2080-EPP-100                Rev. 32            Page 32 of 61 Emergency Response Attachment 7                    Notification of On-Site Personnel                Pages:
31 -34 1.1.5      IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.
: a. Contact Time        _________
2      Notify Chemistry and RP Technicians of the initial emergency classification.
2.1   Chemistry Contact Time____________
2.2    RP Contact Time__                __________                  ______                ___
3      Make Public Address Announcements                                                  ___
CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.
[ NOTE:            PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.
3.1    Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.
3.1.1      IF in a LUE, THEN make the following announcement two times:
                    "Attention all personnel. Attention all personnel. An Unusual Event has been declared due to            (brief description)      . Continue with your work and be prepared for future announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed      __________
3.1.2 fI? in an Alert, THEN make the following announcement two times:
      "Attention all personnel. Attention all personnel. An Alert has been declared due to        (brief description)    .'
IF emergency facilities are not already activated, THEN continue the announcement with:
            "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed


Contact Time____________
Reference               PMIP-2080-EPP-100             Rev. 32         Page 34 of 61 Emergency ResponseI Attachment 7               Notification of On-Site Personnel               Pages:
2.2 RP Contact Time__ __________
31 -34 NOTE:       Aconaiiyis promderAttachment 4, Accountability.
______ ___3 Make Public Address Announcements
3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes:
___CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.[ NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.3.1 Direct an operator to make a PA announcement for the current classification.
                      "Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."         ___
Make the announcement two times. Modify announcements below as conditions warrant.3.1.1 IF in a LUE, THEN make the following announcement two times: "Attention all personnel.
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.                   _ _
Attention all personnel.
: 2. Time announcements completed_____________
An Unusual Event has been declared due to (brief description)
3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.             ___
.Continue with your work and be prepared for future announcements."
3.1.5   IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed
                      "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."         ___
__________
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___
3.1.2 fI? in an Alert, THEN make the following announcement two times: "Attention all personnel.
: 2. Time announcements completed_____________
Attention all personnel.
3.1.6   IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.           ___
An Alert has been declared due to (brief description)
.'IF emergency facilities are not already activated, THEN continue the announcement with: "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed Reference PMIP-2080-EPP-100 Rev. 32 Page 34 of 61 Emergency ResponseI Attachment 7 Notification of On-Site Personnel Pages: 31 -34 NOTE: Aconaiiyis promderAttachment 4, Accountability.
3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes: "Attention all personnel.
Attention all personnel.
A Site Area Emergency has been declared due to (brief description)." ___1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646. _ _2. Time announcements completed_____________
3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
___3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____"Attention all personnel.
Attention all personnel.
A General Emergency has been declared due to (brief description)." ___1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___2. Time announcements completed_____________
3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
___
RfrnePMP-2080-EPP-100 Rev. 32 Page 35 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages.1 Accelerated Notifications to the NRC for Security Events.1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN: 1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.


====1.1.2 Provide====
RfrnePMP-2080-EPP-100                            Rev. 32            Page 35 of 61 RefeenceEmergency Response Attachment 8                Notification of Off-Site Agencies                Pages.
an accelerated verbal notification, without hard copy, to the NRC with the following information:
1  Accelerated Notifications to the NRC for Security Events.
1.1    IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:
1.1.1  Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
1.1.2   Provide an accelerated verbal notification, without hard copy, to the NRC with the following information:
* Site Name Emergency Classification, if determined.
* Site Name Emergency Classification, if determined.
* Nature of the threat (briefly describe)Type of attack (e.g., armed assault by land, water, or aircraft)Attack status (i.e., imminent, in progress, or repelled)
* Nature of the threat (briefly describe)
RfrnePMP-2080-EPP-100 Rev. 32 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:9 INOTE: Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.
Type of attack (e.g., armed assault by land, water, or aircraft)
2 Completing ENMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.SNOTE: PARsardeeodusg Attachment 1, Protective Action Recommendations.
Attack status (i.e., imminent, in progress, or repelled)
SCaution:
Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using~Attachment 12, "Manual Completion of EMD Forms".2.1.1 IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).NOTE: An EMD-32a is required within 15 minutes of:*An initial event classification, or*A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".
RfrnePMiP-2080-EPP-100 Rev. 32 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: An EMD-32b is required to be transmitted with the EMD32a if: SA General Emergency has been declared, or o There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.
Reference PMP-2080-EPP-100 Rev. 32 Page 38 of 61 Emergency Response Attahmet 8Notiicaionof ff-Ste geniesPages:
Atahet8Ntfcto f f-ieAece 5-3 SNOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.3 Phone Contacts and Faxes (usually performed by AE~s)3.1i Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed).
___3.2 Direct contact with the MSP using Attachment 9, MSP Notification.
___3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.
___SNOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.


===3.4 Direct===
RfrnePMP-2080-EPP-100                              Rev. 32          Page 36 of 61 RefeenceEmergency Response Attachment 8                  Notification of Off-Site Agencies              Pages:9 INOTE:          Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.
that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification
2      Completing ENMD-32 Form 2.1    Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.
___3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___
SNOTE:        PARsardeeodusg Attachment 1, Protective Action Recommendations.
SCaution:      Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using
    ~Attachment 12, "Manual Completion of EMD Forms".
2.1.1    IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).
NOTE:          An EMD-32a is required within 15 minutes of:
                    *An    initial event classification, or
                    *A    change of classification, or SA change of PAR 2.1.2    IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".


===3.6 Direct===
RfrnePMiP-2080-EPP-100                          Rev. 32            Page 37 of 61 RefeenceEmergency Response Attachment 8              Notification of Off-Site Agencies                Pages:
that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____
NOTE:      An EMD-32b is required to be transmitted with the EMD32a if:
4 Follow Up Notifications
SA General Emergency has been declared, or o  There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3  IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms".                                            ___
2.1.4  Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.
2.1.5  IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.
2.1.6    Obtain the SM/SECs "Plant Approval" signature on the form(s).       ___
2.1.7  Make copies of the form(s) as necessary for offsite notification phone communicators.


===4.1 UNLESS===
Reference                PMP-2080-EPP-100              Rev. 32            Page 38 of 61 Emergency Response Attahmet 8Notiicaionof  ff-Ste  geniesPages:
the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.
Atahet8Ntfcto                            f f-ieAece                          5-3 SNOTE:          Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.
RfrnePMP-2080-EPP-i00 Rev. 32 Page 39 of 61 ReferenceEmergency Response]Attachment 8 Notification of Off-Site Agencies Pages: 35 -39 4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment  
3      Phone Contacts and Faxes (usually performed by AE~s) 3.1i  Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed).                      ___
: 12. ___The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
3.2    Direct contact with the MSP using Attachment 9, MSP Notification.              ___
3.3    Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.                                                                  ___
SNOTE:          Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
3.4    Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification                                                  ___
3.5    Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___
3.6    Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____
4      Follow Up Notifications 4.1   UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.
 
RfrnePMP-2080-EPP-i00                               Rev. 32           Page 39 of 61 ReferenceEmergency Response]
Attachment 8                 Notification of Off-Site Agencies                 Pages:
35 -39 4.2   IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12.                                               ___
The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
4.3 IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
4.3   IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.
Reference PMP-2080-EPP-100 Rev. 32 Page 40 of 61 Emergency Response Attachment 9 MSP Notification Pages: 40 -42 NOTE: Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
4.4   Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
1 Contact: MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.NOTE: The phone is the primary means for communicating the EMD-32 information.
 
NOTE: An EMD-32a is required within 15 minutes of: ,,The initial classification, or* A change of classification, or* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.An EMD-32b is required to accompany an EMD-32a:* if the declaration of a General Emergency is due to dose, or* if a PAR change is due to dose 2 Provide the following to the MSP: o Provide the information from the EMD-32 form.o Obtain the officers/dispatcher's name and record on table.* Inform the agency that the EMD-32 will be faxed.*0 Request a callback (for authentication) and then hang up.
Reference                 PMP-2080-EPP-100             Rev. 32           Page 40 of 61 Emergency Response Attachment 9                         MSP Notification                       Pages:
RfrnePMP-2080-EPP-100 Rev. 32 Page 41 of 61 RefeenceEmergency Response a For callback:
40 -42 NOTE:           Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.
MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000  
Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
/____I____
1
___ /_____Initials Time Initials Time Person Contacted MSP Person Contacted:___________________
 
Call Back Call Back I Bridge established:____________________
==Contact:==
MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.
NOTE:       The phone is the primary means for communicating the EMD-32 information.
NOTE:       An EMD-32a is required within 15 minutes of:
                  ,,The initial classification, or
* A change of classification, or
* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.
An EMD-32b is required to accompany an EMD-32a:
* if the declaration of a General Emergency is due to dose, or
* if a PAR change is due to dose 2     Provide the following to the MSP:
o   Provide the information from the EMD-32 form.
o       Obtain the officers/dispatcher's name and record on table.
* Inform the agency that the EMD-32 will be faxed.
      *0     Request a callback (for authentication) and then hang up.
 
RfrnePMP-2080-EPP-100                                 Rev. 32           Page 41 of 61 RefeenceEmergency Response a   For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.
0FF-SITE           PHONE NUMBER                   CONTACT                   EVENT NOTIFICATION                                       ESTABLISHED               CLOSEOUT Michigan State Police                 8-1-517-241-8000                     /____I____   ___       /_____
Initials    Time     Initials     Time Person Contacted       MSP Person Contacted:___________________
Call Back               Call Back I Bridge established:____________________
_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
o Write the question aObtain the response and get approval aProvide the response to the MSP.SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
o Write the question aObtain     the response and get approval aProvide     the response to the MSP.
3 Fax the signed EMD-32 form(s): ___a Make sure that the form is signed by the Shift Manager. ___Orient the form(s), as shown on the fax machine, in either Control Room a IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
Reference PMiP-2080-EPP-100 Rev. 32 Page 42 of 61 Emergency Response Attachment 9 MSP Notification Pages: Push the start button___a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023
3     Fax the signed EMD-32 form(s):                                                     ___
: b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion), THEN also send EMD-32 form(s) to the following:
a    Make sure that the form is signed by the Shift Manager.                 ___
___,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
Orient the form(s), as shown on the fax machine, in either Control Room a   IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.
RfrnePMP-2080-EPP-100 Rev. 32 Page 43 of 61 RefeenceEmergency Response 43-45: Attachment 10 Berrien County Sheriff Notification Pages:5 NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
 
*The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.Contact:* BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.
Reference             PMiP-2080-EPP-100             Rev. 32           Page 42 of 61 Emergency Response                       MSP Notification                         Pages:
___* IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.o For callback:
Push the start button___
dial extension 2316 and wait for the deputy to call into the phone bridge.[NOTE: The phone is the primary means for communicating the EMD-32 information.
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                   ___
2 Provide the following to the BCSD: Provide the information from the EMD-32 form.* Obtain the officers/dispatcher's name and record on table.Inform the agency that the EMD-32 will be faxed.
o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023
Reference PMP-2080-EPP-100 Rev. 32 Page 44 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:5 OFF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. _____/_____
: b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
_____/_____
THEN also send EMD-32 form(s) to the following:                 ___
Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-983-7141)Person Contacted BCSD Person Contacted:___________________
                  ,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4   WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
Call Back Call Back / Bridge established:__________________
 
RfrnePMP-2080-EPP-100                             Rev. 32           Page 43 of 61 RefeenceEmergency Response Attachment 10               Berrien County Sheriff Notification               43-45:
Pages:5 NOTE:             Declaration of an emergency requires the notification of the BCSD within 15 minutes.
oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
                  *The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.
 
==Contact:==
* BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher. ___
* IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.
o   IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.
o       For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.
[NOTE:       The phone is the primary means for communicating the EMD-32 information.
2     Provide the following to the BCSD:
Provide the information from the EMD-32 form.
* Obtain the officers/dispatcher's name and record on table.
Inform the agency that the EMD-32 will be faxed.
 
Reference             PMP-2080-EPP-100               Rev. 32               Page 44 of 61 Emergency Response Attachment 10               Berrien County Sheriff Notification                   Pages:5 OFF-SITE         PHONE NUMBER                   CONTACT                     EVENT NOTIFICATION                                   ESTABLISHED                   CLOSEOUT Berrien County       Dedicated phone Sheriff's             line.                 _____/_____               _____/_____
Department           (IF there is no       Initials     Time       Initials       Time response on the dedicated line, THEN dial 8-1-269-983-7141)
Person Contacted     BCSD Person Contacted:___________________
Call Back             Call Back / Bridge established:__________________
Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.
Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.
SWrite the question e Obtain the response and get approval Provide the response to the BCSD. ___SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
SWrite the question e Obtain the response and get approval Provide the response to the BCSD.                             ___
3 Fax the signed EMD-32 form(s): o Make sure that the form is signed by the Shift Manager. ___* Orient the form(s), as shown on the fax machine, in either Control Room* IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
RfrnePMP-2080-EPP-100 Rev. 32 Page 45 of 61 RefeenceEmergency Response 43-45: Attachment 10 Berrien County Sheriff Notification Pages:5 Push the start button ___a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
3       Fax the signed EMD-32 form(s):
,, BC EOC: 8-1-269-934-9023
o   Make sure that the form is signed by the Shift Manager.                   ___
: b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion), THEN also send EMD-32 form(s) to the following:
* Orient the form(s), as shown on the fax machine, in either Control Room
___a EOF: 8-284-2942 o TSC: 2431 ,o ENC/JIC: 8-284-5892 a, OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____
* IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.
Reference PMP-2080-EPP-100 Rev. 32 Page 46 of 61 Emergency Response Attachment 11 NRC Notification Pages: 46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.1 Contact: a IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.
 
o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
RfrnePMP-2080-EPP-100                             Rev. 32           Page 45 of 61 RefeenceEmergency Response 43-45:
Alternate numbers are listed on the table below.* Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
Attachment 10             Berrien County Sheriff Notification               Pages:5 Push the start button                                                 ___
* Write the question* Obtain the response and get approval* Provide the response to the NRC.Ask the N-RC for the Event Notification Number (EN).
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                   ___
RfrnePMP-2080-EPP-100 Rev. 32 Page 47 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:7 0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION
o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
_______ ESTABLISHElD CLOSEOUT NRC Operations 1-301t-816-5100 Center 1-301-951-0550  
                  ,,   BC EOC: 8-1-269-934-9023
/_____ _____I___1-301-415-0553 Initials Time Initials Time 8-1-301-816-5151 (FAX) ______________
: b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
Person Contacted NRC Person Contacted:___________________
THEN also send EMD-32 form(s) to the following:                   ___
a    EOF: 8-284-2942 o   TSC: 2431
                  ,o   ENC/JIC: 8-284-5892 a,   OSC: 2522 4     WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____
 
Reference               PMP-2080-EPP-100               Rev. 32         Page 46 of 61 Emergency Response Attachment 11                       NRC Notification                         Pages:
46 - 47 NOTE:       The Operations NRC Communicator is normally stationed in the affected unit's Control Room.
NOTE:       Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.
1
 
==Contact:==
a   IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.
o   Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.
* Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a   IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
* Write the question
* Obtain the response and get approval
* Provide the response to the NRC.
Ask the N-RC for the Event Notification Number (EN).
 
RfrnePMP-2080-EPP-100                           Rev. 32           Page 47 of 61 RefeenceEmergency Response Attachment 11                     NRC Notification                         Pages:7 0FF-SITE         PHONE NUMBER               CONTACT                     EVENT NOTIFICATION       _______                 ESTABLISHElD               CLOSEOUT NRC Operations       1-301t-816-5100 Center               1-301-951-0550                     /_____     _____I___
1-301-415-0553       Initials       Time     Initials     Time 8-1-301-816-5151 (FAX)                 ______________
Person Contacted   NRC Person Contacted:___________________
Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.
Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.
Event Notification Ask NRC for the EN:________________
Event Notification Ask NRC for the EN:________________
Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 .WHEN the BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
Number               (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2       .WHENthe BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
RfrnePMP-2080-EPP-100 Rev. 32 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages: Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.NOTE: An EMD-32a is required within 15 minutes of:*An initial event classification, or* A change of classification, or* A change of PAR 1 Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
 
* Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant* Record name of Plant Communicator(s) o Indicate location where this form is being generated (Calling From)* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number"* Indicate "Current Classification" S Indicate date and time of current classification was declared* Indicate "Reason for Classification"* Record the IC Number* Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a Indicate any current "Protective Action Recommendations" RfrnePMP-2080-EPP-100 Rev. 32 Page 49 of 61 RefeenceEmergency Response Pages: Attachment 12 Manual Completion of EMD Forms 48 -50 a Record PAR basis* Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.a Forward completed form to Approver* Complete "Approved By", date and time* Forward completed approved form -for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:* A General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":* Indicate whether this is an "Actual Event" or a "Drill"* Record "Nuclear Power Plant" as Cook Nuclear Plant* Record name of "Plant Communicator"(s)
RfrnePMP-2080-EPP-100                           Rev. 32           Page 48 of 61 RefeenceEmergency Response Attachment 12               Manual Completion of EMD Forms                   Pages:
* Indicate location where this form is being generated (Calling From)* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088* a. Record "Plant Message Number"* *Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.o Record "Reactor Information"* Record "Plant Status/Additional Information" efrnePMJ'-2080-EPP-100 Rev. 32 Page 50 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms 48 -50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas* IF there is NOT a release in progress due to the event THEN mark the"Release/Offsite Dose Data" areas as Not Applicable, N/A.o Forward completed form to Approver* Complete "Approved By", date and time* Forward completed approved form for transmission RfrnePMP-2080-EPP-100 Rev. 32 Page 51 of 61 RefeenceEmergency Response IAttachment 13 Activation of FLEX Phase 3 Page: NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Caution:     Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (S CC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).WHEN communication is established THEN provide the following information:
NOTE:         An EMD-32a is required within 15 minutes of:
* Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units* Your name and position/title
                  *An   initial event classification, or
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated.
* A change of classification, or
Examples of coordination include, but are not limited to: Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".5 From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
* A change of PAR 1     Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
S Reference PMP-2080-EPP-100 Rev. 32 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:~52 -53 Unit No: Date: Time: Data Taken By: Data Reviewed By: SNOTE: When redundant  
* Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant
:indication exists, record most severe condition.
* Record name of Plant Communicator(s) o     Indicate location where this form is being generated (Calling From)
1.2.3.4.Containment Temp.Cont. 112 Concentration RWST Level Source Range_______CPM 5.6.7.8.9.Intermediate Range Containment Pressure Containment Sump Level Containment Level Containment High Range Radiation Level Upper/Lower
* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o     Record "Plant Message Number"
_____AMPS_______PSIG
* Indicate "Current Classification" S Indicate date and time of current classification was declared
/R/HR 10.11.12.13.14.15.16.CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum Pressure RHR Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.PZR Steam Temp.PZR Level PRT Temp.East ON / OFF East ____ GPM North ___GPM LP 1 ___GPM LP1 ____PSIG East ____GPM LP1 ON /OFF LP2 LP2 LP2 West ON / OFF West____ _South _______GPM LP3 ______PSIG LP3 ____West____ _ON /OFF LP3 ON/IOFF GPM GPM GPM PSIG GPM 17.18.19.20.21.22.______PSIG
* Indicate "Reason for Classification"
______GPM__ __ _ 0 F 23..24.25.26.27.28.PRT Level PRT Pressure PZR Cycling Htrs PZR Backup Htrs Letdown Flow Saturation Margin LP4 ____GPM LP4 ____PSIG LP4 ON /OFF________PSIG ON / OFF ON / OFF____ ___GPM oF Reference PMP-2080-EPP-100 Rev. 32 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:3 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4 29.30.31.32.33.34.35.36.37.38.39.Wide Range T Hot Wide Range T Cold S / G Pressure S /0G N. R. Level S I G W .R. Level Steam Flow (pph x 106)" Feed Flow (pph x 106)Aux. Feed Flow (pph x 103)MSIV Status CST Level Steam Dump________PSIG OPEN ICLOSE ATMOS / COND_______PSIG OPEN / CLOSE Ft_____ ___ F OPEN / CLOSE________PSIG OPEN / CLOSE 40.41.42.43.44.45.46.47.48.49.East ESW West ESW East CCW West CCW East CTS West CTS North SI South SI East RHR West RHR AVAILABLE
* Record the IC Number
/ UNAVAILABLE
* Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a     Indicate any current "Protective Action Recommendations"
___ I _/_________
 
/ ______________
RfrnePMP-2080-EPP-100                           Rev. 32         Page 49 of 61 RefeenceEmergency Response Pages:
/ _____________ I ______/_______ _____/_________  
Attachment 12                 Manual Completion of EMD Forms                   48 -50 a     Record PAR basis
/ ______________
* Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP- 108, Initial Dose Assessment, Attachment 1.
/ _______________
a     Forward completed form to Approver
/ ______________
* Complete "Approved By", date and time
/ ____/EQUIPMENT STATUS 50. East CCP 51. West CCP 52. TDAFP 53. EMDAFP 54. WMDAFP 55. AB Diesel 56. CD Diesel 57. Normal Res.58. 12 EP AVAILABLE
* Forward completed approved form -for transmission NOTE:           An EMD-32b is required to be transmitted with the EMD32a if:
/ UNAVAILABLE
* A General Emergency has been declared, or
_________
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2       Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":
/ ____/ ____________ I ______/________ ______/_________
* Indicate whether this is an "Actual Event" or a "Drill"
/ _____________
* Record "Nuclear Power Plant" as Cook Nuclear Plant
/ _____________
* Record name of "Plant Communicator"(s)
/ ______________
* Indicate location where this form is being generated (Calling From)
/ _____/
* Record "Call Back Telephone Number" 269-465-5901 Ext. 1088
RfrnePMP-2080-EPP-100 Rev. 32 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 Unit No: _____Date:
* a.       Record "Plant Message Number"
________1. Emergency Classification Time: Time Declared______Unusual Event_______Alert
    * *Record     "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
________Site Area Emergency______General Emergency 2. Have notifications been completed?
o     Record "Reactor Information"
: a. Michigan:
* Record "Plant Status/Additional Information"
yes / no /in progress b. Berrien County: yes I no Iin progress c. NRC: yes I no Iin progress d. DC Cook Personnel:
 
yes I no / in progress 3. Protective Actions: a. Local area evacuation yes I no b. Site evacuation yes / no c. Accountability yes / no d. Site closed to visitors yes I no 4. Offsite protective action recommended:Evacuation:
efrnePMJ'-2080-EPP-100                           Rev. 32         Page 50 of 61 RefeenceEmergency Response 2              Manual Completion of EMD Forms               48 - 50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas
yes / no areas: _____.Shelter:
* IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.
yes I no areas: _____Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time: ___Time:
o   Forward completed form to Approver
RfrnePMP-2080-EPP-100 Rev. 32 Page 55 of 61 RefeenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages: 54 5 5. Plant Operational Status a. Reactor trip: yes i no time: ____ Trip signal: ______________
* Complete "Approved By", date and time
: b. ESF Status: c. EOP Status: 6. Plant Status a. Chronology of Events Time Event b. Current Plant Conditions Reference PMVP-2080-EPP-100 Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2 Emergency Turnover Checklist Pages:7 c. Potential for Plant Degradation
* Forward completed approved form for transmission
: d. Mitigating Actions Taken or Underway 7. Plant Radiological Conditions
 
: a. Jn-plant/Onsite Radiological Conditions  
RfrnePMP-2080-EPP-100                             Rev. 32           Page 51 of 61 RefeenceEmergency Response IAttachment   13                 Activation of FLEX Phase 3                       Page:
: b. Potential for Offsite Release of Radioactivity Airborne Water 8. Injured or Contaminated Personnel:
NOTE:             The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Name Employer Status 9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)Name Team #Task DescriptionlTime Dispatched
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).
//////
WHEN communication is established THEN provide the following information:
Reference PMP-2080-EPP-100 Rev. 32 Page 58 of 61 Emergency Response Data Sheet 3 Plant Status Pages:9 NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.Reactivity Control*, All Control rods inserted?
* Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units
Yes No ____# of rods out* Reactor Subcritical?
* Your name and position/title
Yes No o, Emergency Boration initiated?
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2     The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).
Yes No* Adequate Shutdown Margin? Yes No RCS Inventory Control -check all that apply for the current plant conditions
3   The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:
*Inventory makeup controlled by: (Identify all pumps injecting into RCS)CVCS -Normal Charging Charging Pumps via BIT (High Head SI)Safety injection pumps (Intermediate Head SI)RUR Pumps (Low Head SI)Other: ____________
Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.
RCS Pressure Control* Pressurizer PORVs Closed? Yes No ,, Pressurizer Safeties Closed? *Yes No Reference PMP-2080-EPP-100 Rev. 32 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages:*RCS Heat Transport Control -check all that apply for the current plant conditions Forced Circulation by RCP ________Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)RCS Heat Sink (Available or In Operation)  
Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".
-check all that apply for the current plant conditions S/G -Condenser Dump Valves ________S/G -Atmospheric Dump Valves SIG -Safety Valves RCS -Feed/Bleed Decay Heat Removal System (RUR)SIG' Inventory Control -check all that apply for the current plant conditions Main Feed Water _________Auix. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _Containment Control*, Ice Condenser Doors OPEN? Yes No* Containment Sprays ON? Yes No ,, Hydrogen Recombiners/Igniters ON? Yes No* Containment Isolation Valves fail to CLOSE? Yes No o, Phase A Actuation?
4     From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
Yes No Additional Information Reference PMP-2080-EPP-100 Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages: Request for additional information Source of request: El MSP[21 BCSD El NRC El Other_______
5     From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
___Date ____ __Time ____Question: Response: Response approved by: _________________________
 
S Reference               PMP-2080-EPP-100                 Rev. 32         Page 52 of 61 Emergency Response Data Sheet 1               PPC or PSS Control Room Data                     Pages:
                                                ~52                                 - 53 Unit No:             Date:                             Time:
Data Taken By:                                         Data Reviewed By:
SNOTE:         When redundant :indication exists, record most severe condition.
: 1. Containment Temp.                                                5. Intermediate Range                                    _____AMPS
: 2. Cont. 112 Concentration                                         6. Containment Pressure                                  _______PSIG
: 3. RWST Level                                                       7. Containment Sump Level
: 4. Source Range                        _______CPM                  8. Containment Level
: 9. Containment High Range Radiation Level Upper/Lower                                                       /R/HR
: 10. CTS Pumps                East ON / OFF                                    West ON / OFF
: 11. RHR Spray Flow           East ____            GPM                        West____      _
GPM
: 12. SI Flow                   North  ___GPM                                  South ____        GPM
: 13. BIT Flow                 LP 1 ___GPM                  LP2    ___GPM    LP3 ___          GPM      LP4  ____GPM
: 14. Accum Pressure           LP1 ____PSIG                  LP2    ___PSIG    LP3 ____          PSIG    LP4  ____PSIG
: 15. RHR Injection Flow       East ____GPM                                    West____        _ GPM
: 16. RCP Status                LP1 ON /OFF                  LP2 ON /OFF       LP3  ON/IOFF              LP4 ON /OFF
: 17. RCS Pressure                          ______PSIG                  23. PRT Level
: 18. Charging Flow                          ______GPM                  .24. PRT Pressure                        ________PSIG
: 19. PZR Liquid Temp.                         __ ___
0F                25. PZR Cycling Htrs                ON / OFF
: 20. PZR Steam Temp.                                                   26. PZR Backup Htrs                 ON / OFF
: 21. PZR Level                                                          27. Letdown Flow                        ____  ___GPM
: 22. PRT Temp.                                                          28. Saturation Margin                                 oF
 
Reference               PMP-2080-EPP-100               Rev. 32             Page 53 of 61 Emergency Response Data Sheet 1                 PPC or PSS Control Room Data                       Pages:3 NSSS LOOP PARAMETERS                         Loop 1                 Loop 2                 Loop 3             Loop 4
: 29. Wide Range T Hot                                                                         _____ ___ F
: 30. Wide Range T Cold
: 31. S / G Pressure                             ________PSIG          _______PSIG                                  ________PSIG
: 32. S /0G N. R. Level
: 33. S I G W .R. Level
: 34. Steam Flow (pph x 106)"
: 35. Feed Flow (pph x 106)
: 36. Aux. Feed Flow (pph x 103)
: 37. MSIV Status                           OPEN ICLOSE             OPEN / CLOSE           OPEN / CLOSE        OPEN / CLOSE
: 38. CST Level                                                                  Ft
: 39. Steam Dump                            ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE                                                          AVAILABLE / UNAVAILABLE
: 40. East ESW                  ___        I  _/                      50.       East CCP                  _________ /    ____
: 41. West ESW                 _________  /  ____                    51.      West CCP                            /    ____
: 42. East CCW                   __________ / _____                    52.      TDAFP                      ________  I   ______/
: 43. West CCW                  ________  I  ______/                 53.      EMDAFP                    ________      ______/
: 44. East CTS                  _______     _____/                   54.      WMDAFP                    _________ /   ____
: 45. West CTS                  _________  / ____                    55.      AB Diesel                  _________ /   ____
: 46. North SI                  __________/ _____                    56.      CD Diesel                  _________ /    ____
: 47. South SI                  __________/ _____                    57.       Normal Res.               __________/  _____
: 48. East RHR                  _________ /  ____                    58.       12 EP                                /
: 49. West RHR                              /
 
RfrnePMP-2080-EPP-100                              Rev. 32        Page 54 of 61 RefeenceEmergency Response Data Sheet 2                    Emergency Turnover Checklist                  Pages:7 Unit No:  _____Date:        ________                Time:
: 1. Emergency Classification Time Declared
______Unusual    Event
_______Alert
________Site Area Emergency
______General    Emergency
: 2. Have notifications been completed?
: a. Michigan:                        yes / no /in progress      Time: ___
: b. Berrien County:                  yes I no Iin progress      Time: ___
: c. NRC:                             yes I no Iin progress     Time: ___
: d. DC Cook Personnel:               yes I no / in progress     Time: ___
: 3. Protective Actions:
: a. Local area evacuation                 yes I no             Time: ___
: b. Site evacuation                       yes / no             Time: ___
: c. Accountability                         yes / no             Time: ___
: d. Site closed to visitors               yes I no             Time: ___
: 4. Offsite protective action recommended:
      *, Evacuation:             yes / no areas: _____             Time: ___
      .Shelter:                 yes I no areas: _____              Time:
 
RfrnePMP-2080-EPP-100                         Rev. 32       Page 55 of 61 RefeenceEmergency Response I Data Sheet 2               Emergency Turnover Checklist             Pages:
54 5
: 5. Plant Operational Status
: a. Reactor trip: yes i no time: ____ Trip signal: ______________
: b. ESF Status:
: c. EOP Status:
: 6. Plant Status
: a. Chronology of Events Time                                   Event
: b. Current Plant Conditions
 
Reference             PMVP-2080-EPP-100           Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2               Emergency Turnover Checklist     Pages:7
: c. Potential for Plant Degradation
: d. Mitigating Actions Taken or Underway
: 7. Plant Radiological Conditions
: a. Jn-plant/Onsite Radiological Conditions
: b. Potential for Offsite Release of Radioactivity Airborne                 Water
: 8. Injured or Contaminated Personnel:
Name                     Employer                   Status
: 9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)
Name                   Team #         Task DescriptionlTime Dispatched
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
                                                                                  /
 
Reference             PMP-2080-EPP-100                 Rev. 32         Page 58 of 61 Emergency Response Data Sheet 3                           Plant Status                           Pages:9 NOTE:         This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.
Reactivity Control
*, All Control rods inserted?               Yes     No     ____#     of rods out
* Reactor Subcritical?                     Yes     No o, Emergency Boration initiated?           Yes     No
* Adequate Shutdown Margin?                 Yes     No RCS Inventory Control           - check all that apply for the current plant conditions
*Inventory makeup controlled by: (Identify all pumps injecting into RCS)
CVCS - Normal Charging Charging Pumps via BIT (High Head SI)
Safety injection pumps (Intermediate Head SI)
RUR Pumps (Low Head SI)
Other: ____________
RCS Pressure Control
* Pressurizer PORVs Closed?                 Yes   No
,, Pressurizer Safeties Closed? *Yes               No
 
Reference           PMP-2080-EPP-100             Rev. 32           Page 59 of 61 Emergency Response Data Sheet 3                         Plant Status                     Pages:
*RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP                                   ________
Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)
RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G - Condenser Dump Valves                                     ________
S/G - Atmospheric Dump Valves SIG - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RUR)
SIG' Inventory Control - check all that apply for the current plant conditions Main Feed Water                                             _________
Auix. Feed Water Other: _ _   _ _ _ _   _   _ _ _
Containment Control
*, Ice Condenser Doors OPEN?                         Yes   No
* Containment Sprays ON?                             Yes   No
,, Hydrogen Recombiners/Igniters ON?                 Yes   No
* Containment Isolation Valves fail to CLOSE?       Yes   No o, Phase A Actuation?                                 Yes   No Additional Information
 
Reference               PMP-2080-EPP-100               Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4              Request For Additional Information    Pages:
Request for additional information Source of request:    El MSP
[21 BCSD El NRC El Other_______                    ___
Date ____          __Time    ____
Question:
 
===Response===
Response approved by: _________________________
SEC or designee Response delivered to requesting organization:
SEC or designee Response delivered to requesting organization:
Date Time ____ __by Whom Reference PMP-2080-EPP-100 Rev. 32 Page 61 of 61 Emergency Response DataShet 5 ontngecy Tam rackng ormPage DataShet 5 ontngecy Tam rackng orm61 PERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED
Date                       Time ____         __by   Whom
__________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED# Turbine Building.
 
ERAEO REVISION  
Reference         PMP-2080-EPP-100               Rev. 32 Page 61 of 61 Emergency Response DataShet ontngecy 5   Tam   rackng ormPage DataShet ontngecy  5 Tam   rackng orm61 PERSONNEL     TEAM       TASK DESCRIPTION                 TIME TIME TCS     TIME EOF TIME TASK   TIME DISPATCHED           __________DISPATCHED                       NOTIFIED     NOTIFIED COMPLETED RETURNED
                #     Turbine Building. ERAEO
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Alteration  
 
!,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
As such, a 10 CFR 72.48 review- is not required for this procedure.
 
10 CFR 50.54(q) review was performed and documented.
==Title:==
The number for .the 50.54(q) is annotated inl the workflow for this revision.The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
Emergency Response Alteration                       !,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.
Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.Replaced TSOC with NEST throughout The TSOC has been replaced by the NEST. The the procedure.
This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review- is not required for this procedure.
TSOC has been removed from site.This change was not margin marked.GT 2015-15895 Step 1.1 was reworded.
10 CFR 50.54(q) review was performed and documented. The number for .the 50.54(q) is annotated inl the workflow for this revision.
Removed unnecessary information and Removed "(under the direction of the abbreviations.
The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.
The term "an emergency" SEC)" and "Unusual Event (U-E), Alert, encompasses all Emergency Classifications.
Replaced TSOC with NEST throughout                   The TSOC has been replaced by the NEST. The the procedure.                                       TSOC has been removed from site.
Site Area Emergency (SAE) and General The meaning of the step is unchanged.
This change was not margin marked.
Emergency (GE) after an emergency has been declared." One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT 2015-15895 Step 1.1 was reworded.                               Removed unnecessary information and Removed "(under the direction of the                 abbreviations. The term "an emergency" SEC)" and "Unusual Event (U-E), Alert,               encompasses all Emergency Classifications.
Reviewer comments.Purpose and Scope step (1.2 previously)
Site Area Emergency (SAE) and General                 The meaning of the step is unchanged.
Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "Once turnover of SEC procedure.
Emergency (GE) after an emergency has been declared."                                       One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
duties has been completed, the SM retains the overall responsibility of One of the purposes of this revision is to remove directing and implementing emergency unnecessary wording that can distract the users and abnormal procedures to bring the from taking necessary actions or making required unit(s) to a safe condition." communications.
Reviewer comments.
Reviewer comments.Office Information for Form Tracking Only -Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.
Purpose and Scope step (1.2 previously)               Unnecessary statement that is not a purpose or was removed. This step made the                       scope statement and adds nothing to this statement that "Once turnover of SEC                 procedure.
Page 1 of 5 REVISION  
duties has been completed, the SM retains the overall responsibility of                 One of the purposes of this revision is to remove directing and implementing emergency                 unnecessary wording that can distract the users and abnormal procedures to bring the                 from taking necessary actions or making required unit(s) to a safe condition."                         communications.
Reviewer comments.
Office Information for Form Tracking Only - Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 1 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Purpose and Scope step (1.3 previously) was removed. This step made the statement that "The CR will retain responsibility for Public Address (PA)announcements and Nuclear Emergency Alarm (NEA) activation throughout the emergency." Unnecessary statement that is not a purpose or scope statement and adds nothing to this procedure.
 
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
Reviewer comments.Purpose and Scope step (1.3.1 Unnecessary statement that is not a purpose or previously) stating, "Others may use the scope statement and adds nothing to this PA as directed by procedure (Security, procedure.
 
RAG, etc.)." was removed.Reviewer comments.Step 1.4 stating; "The steps in this The step is not a Purpose and Scope.procedure are listed in the preferred order of performance for maximum Reviewer comments.efficiency.
==Title:==
However, the steps may be performed in a different order." was No margin markings were used for these changes.moved to the beginning of the "Details" section, prior to step 3.1, as a Note.Previous Purpose and Scope step 1.5 is Step renumbering due to removal of steps.now step 1.2 due to removing steps 1.2, 1.3 and 1.4. No margin markings were used.Added ORO and SEC-TSC to definitions Not previously defined.section. -Reviewer comment.Operations Training Comments.
Emergency Response Purpose and Scope step (1.3 previously)             Unnecessary statement that is not a purpose or was removed. This step made the                     scope statement and adds nothing to this statement that "The CR will retain                 procedure.
This section was The Details section was completely reorganized to provide clearer direction of actions.reorganized.
responsibility for Public Address (PA) announcements and Nuclear Emergency                 One of the purposes of this revision is to remove Alarm (NEA) activation throughout the              unnecessary wording that can distract the users emergency."                                        from taking necessary actions or making required communications.
The subsections (3.1, 3.2, The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of would normally be performed.
Reviewer comments.
Incorporated Contents.
Purpose and Scope step (1.3.1                       Unnecessary statement that is not a purpose or previously) stating, "Others may use the           scope statement and adds nothing to this PA as directed by procedure (Security,             procedure.
applicable steps from OHI-2080.No actions were removed from the procedure.
RAG, etc.)." was removed.
No margin markings were used for these changes.GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Reviewer comments.
Page 2 of 5 REVISION  
Step 1.4 stating; "The steps in this               The step is not a Purpose and Scope.
procedure are listed in the preferred order of performance for maximum                   Reviewer comments.
efficiency. However, the steps may be performed in a different order." was               No margin markings were used for these changes.
moved to the beginning of the "Details" section, prior to step 3.1, as a Note.
Previous Purpose and Scope step 1.5 is             Step renumbering due to removal of steps.
now step 1.2 due to removing steps 1.2, 1.3 and 1.4.                                       No margin markings were used.
Added ORO and SEC-TSC to definitions               Not previously defined.
section.                     -Reviewer                       comment.
Operations Training Comments. This section was The Details section was completely                 reorganized to provide clearer direction of actions.
reorganized. The subsections (3.1, 3.2,             The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of           would normally be performed. Incorporated Contents.                                           applicable steps from OHI-2080.No actions were removed from the procedure.
No margin markings were used for these changes.
GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 2 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Step 4, Final Conditions, added These changes align this procedure with the comments section, and signature and date requirements of PRC-001.blanks for Verified Complete, Independently Verified and Reviewed Reviewer comment.By.Attachment 5, Evacuation:
 
* Added signoff blanks to action steps and removed blanks from message Reviewer comment.steps.Removed Attachment 9, Drills and- This procedure provides guidance for actual Exercise.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.:     32
emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.
 
Deleted step 3.3 which referred to PA Drill and exercise guidance is contained in RMT-announcements during drills and 2080-EPP-500.
==Title:==
Emergency Response Step 4, Final Conditions, added                     These changes align this procedure with the comments section, and signature and date           requirements of PRC-001.
blanks for Verified Complete, Independently Verified and Reviewed                 Reviewer comment.
By. , Evacuation:
* Added signoff blanks to action steps and removed blanks from message                 Reviewer comment.
steps.
Removed Attachment 9, Drills and-                   This procedure provides guidance for actual Exercise.                                           emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.
Deleted step 3.3 which referred to PA               Drill and exercise guidance is contained in RMT-announcements during drills and                     2080-EPP-500.
*exercises.
*exercises.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT 2014-15961-1 Attachment 11 (REV 31 Att 12), This action for the STA is not necessary as the Removed note and step, stating that the control room will be in direct phone contact with STA should perform the 1 hour the NRC and will provide necessary and requested notification to the NRC and should fill information.
GT 2014-15961-1 1 (REV 31 Att 12),                     This action for the STA is not necessary as the Removed note and step, stating that the             control room will be in direct phone contact with STA should perform the 1 hour                       the NRC and will provide necessary and requested notification to the NRC and should fill             information. PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet,                   datasheet can be done as "time permit".
PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet, datasheet can be done as "time permit".Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.
Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.
GT-20 14-8280-1 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval.
GT-20 14-8280-1 Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 3 of 5
Page 3 of 5 REVISION  
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 32 Added the following to the Definitions and Abbreviations:
 
AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM, CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.Incorporated from OHI1-2080, Conduct of Operations (Emergency Organization)
Procedure No.:             PMP-2080-EPP- 100                                     Rev. No.:         32
AR 2014-14572-5 Added DS 5, Contingency Team Tracking Form.Incorporated from OHI1-2080, Conduct of Operations (Emergency Organization)
 
AR 2014-14572-5 Attachment 7, Added "main body of Clarifying information for user.procedure" to steps 3.1.3 and 3.1.5.Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology*
==Title:==
or intent of the steps.)____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of This attachment provides guidance for requesting FLEX Phase 3. phase 3 equipment per the SAFER Plan.____________________________No Marginal Markings were used.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Emergency Response Added the following to the Definitions             Incorporated from OHI1-2080, Conduct of and Abbreviations:                                 Operations (Emergency Organization)
Page 4 of 5 REVISION  
AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM,                       AR 2014-14572-5 CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.
Added DS 5, Contingency Team                       Incorporated from OHI1-2080, Conduct of Tracking Form.                                    Operations (Emergency Organization)
AR 2014-14572-5 , Added "main body of                 Clarifying information for user.
procedure" to steps 3.1.3 and 3.1.5.
Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology or intent of the steps.)
____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of                 This attachment provides guidance for requesting FLEX Phase 3.                                     phase 3 equipment per the SAFER Plan.
____________________________No             Marginal Markings were used.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                         Page 4 of 5
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev..No.: 32 IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions Office Information for Form Tracking Only -Not Part of Form'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Page 5 of 5 IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33 Doc No.: PMP-2080-EPP-100 Title: EMERGENCY RESPONSE Alteration Cat.: Minor Revision CD 1/50.59: PORC Mtg. No.: CARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: N/A Effective Date: 2/12/2016 12:00:00 AM Rev No.: 033 Approvals Na 111 ReviewlApproval Type/Capacity
[1111 Becvar, Robert J i (s228955) 1l Validation Review ~02/03/2016 09:48 Etheridge, William 1110/9261:7 (1266712) 1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9 WilamE 1 Special Review: E-PLAN GROUP 102/10/2016 09:35 1[Peterson, Gerald T11 j(i689988) il3 Technical Review 102/10/2016 10:31 Schrubba, Jennifer 11 (s245259)
J7 Approval Authority 102/11/2016 09:51 Signature Comments~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.[Minor change![Approved per Plant Manager, Jim Ross.I
---W-'R PMLP-2080-EPP-100 Rev. 33 Page 1 of 61 Emergency Response Bife ll 1 Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 2 3 4 5 PURPOSE AM) SCOPE.............................................................3 DEFINITIONS AM) ABBREVIATIONS............................................
3 DETAILS ...........................................
.................................
6 3.1 General Information..........................................................
6 3.2 SM-SEC Checklist.............................................................7


===3.3 Unaffected===
Procedure No.:          PMP-2080-EPP-100                                      Rev..No.:  32
 
==Title:==
Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions Office Information for Form Tracking Only - Not Partof Form
'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                Page 5 of 5
 
IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33
 
Doc No.:                  PMP-2080-EPP-100                              Rev No.: 033
 
==Title:==
EMERGENCY RESPONSE Alteration Cat.:          Minor Revision CD 1/50.59:
PORC Mtg. No.:
CARB Mtg. No.:
Admin Hold AR No.:
Superceding Proc(s):
Temp Proc Exp Date:
Temp Change Exp Date:
Temp Proc/Change End: N/A Effective Date:            2/12/2016 12:00:00 AM Approvals Na        111        ReviewlApproval Type/Capacity            [1111 Becvar, Robert J                                                i (s228955)              1lValidation Review          ~02/03/2016            09:48 Etheridge, William  1110/9261:7 (1266712)              1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9WilamE          1 Special Review: E-PLAN GROUP          102/10/2016 09:35    1
[Peterson, Gerald T11 j(i689988)          il3  Technical Review                      102/10/2016 10:31 Schrubba, Jennifer                                              11 (s245259)            J7 Approval Authority                    102/11/2016 09:51 Signature Comments
~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.
[Minor change!
[Approved per Plant Manager, Jim Ross.I
 
        --- W-'R                PMLP-2080-EPP-100              Rev. 33                  Page 1 of 61 Emergency Response Bife 1ll Hart            Emergency Preparedness            Emergency Preparedness Writer                    Document Owner                  Cognizant Organization TABLE OF CONTENTS 1  PURPOSE AM) SCOPE.............................................................3 2  DEFINITIONS AM) ABBREVIATIONS............................................ 3 3  DETAILS ........................................... .................................            6 3.1    General Information.......................................................... 6 3.2    SM-SEC Checklist.............................................................7 3.3     Unaffected CR Checklist...................................................... 9 3.4    Shift Technical Advisor (STA) ..........          ............................. ........ 10 3.5    Contingency Director......................................................... 10 4  FINAL CONDITIONS .............................................................. 11 5  REFERENCES ..................................................................... 12 :        Protective Action Recommendations................................... 13 :        Activation of ERONS..................................................17 :        Dismissal of Non-Essential Personnel .................................. 19 :        Accountability......................................................... 21 :        Evacuation............................................................ 26 :        Terminating a UiE..................................................... 30 :        Notification of On-Site Personnel...................................... 31 :        Notification of Off-Site Agencies ...................................... 35 :        MSP Notification...................................................... 40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification...................................................... 46
 
      --- EtR*                PMIP-2080-EPP-100              Rev. 33              Page 2 of 61 Emergency Response Reference IBill Hart            Emergency Preparedness          Emergency Preparedness Writer                    Document Owner              Cognaizant Organization 2:      Manual Completion of EMD) Forms ................................... 48 3:      Activation of FLEX Phase 3........................................... 51 Data Sheet 1:      PPC or PSS Control Room Data ...................................... 52 Data Sheet 2:      *Emergency Turnover Checklist......................................... 54 Data Sheet 3:      Plant Status ........................................................... 58 Data Sheet 4:      Request For Additional Information...................................60 Data Sheet 5:        Contingency Team Tracking Form .................................... 61
 
Reference                PMiP-2080-EPP-100          ]    Rev.33            Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1    This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP- 101, Emergency Classification.
1.2    Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.
2      DEFINITIONS AMD ABBREVIATIONS Term                Meaning AOP                Abnormal Operating Procedure AFO                Auxiliary Equipment Operator BCSD                Berrien County Sheriff Department BOP                Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency    accountability at the beginning of the event to ensure persons are Coningency          accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.
Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency        Equipment, Utility, Makeup Plant) from the shift not assigned to other Team                duties who are responsible for responding to the operations needs of the affected unit.
Control Room        Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.
Control Room        Ant available extra SRO or RO who acts as a single point contact for the Liaison            Unit Supervisor to the Contingency Director, and the SM/SEC.
CR                  Control Room Critical Safety    A set of flowchart diagnostic aids used to monitor the condition of critical Function            safety functions and select appropriate Function Restoration Procedures to Status Trees        restore safety functions that are challenged.
DAP                Dose Assessment Program EAL                Emergency Action Level


CR Checklist......................................................
Reference              PMP-2080-EPP-100                 Rev.33             Page 4 of 61 Emergency Response Term          Meaning ED)            Emergency Director EMD-32        Nuclear Plant Accident Notification form ENC            Emergency News Center EOC            Emergency Operation Center EOF            Emergency Operations Facility EOP            Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO          Security are designated as Emergency Response Auxiliary Equipment Operators.
9 3.4 Shift Technical Advisor (STA) ..........
ERDS          Emergency Response Data System ERF            Emergency Response Facility ERONS          Emergency Response Organization Notification System ERO            Emergency Response Organization GE            General Emergency HAB            Hostile Action Based IC            Initiating Conditions TIC            Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion  addition of an RO from the unaffected unit or an. extra RO who is Mtegamio      responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
.............................
MSP            Michigan State Police NEA            Nuclear Emergency Alarm NRC            Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole        at the S/E's    discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.
........ 10 3.5 Contingency Director.........................................................
Off-site Response Organization refers to Berrien County Sheriff's ORO        Department, Michigan State Police or local fire departments.
10 FINAL CONDITIONS
OSC            Operations Support Center PA            Public Address
..............................................................
11 REFERENCES
.....................................................................
12 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Attachment 6: Attachment 7: Attachment 8: Attachment 9: Attachment 10: Attachment 11: Protective Action Recommendations...................................
13 Activation of ERONS..................................................17 Dismissal of Non-Essential Personnel
..................................
19 Accountability.........................................................
21 Evacuation............................................................
26 Terminating a UiE.....................................................
30 Notification of On-Site Personnel......................................
31 Notification of Off-Site Agencies ......................................
35 MSP Notification......................................................
40 Berrien County Sheriff Notification
...................................
43 NRC Notification......................................................
46
---PMIP-2080-EPP-100 Rev. 33 Page 2 of 61 Emergency Response Reference IBill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognaizant Organization Attachment 12: Attachment 13: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Manual Completion of EMD) Forms ...................................
48 Activation of FLEX Phase 3...........................................
51 PPC or PSS Control Room Data ......................................
52*Emergency Turnover Checklist.........................................
54 Plant Status ...........................................................
58 Request For Additional Information...................................60 Contingency Team Tracking Form ....................................
61 Reference PMiP-2080-EPP-100
] Rev.33 Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP-101, Emergency Classification.


===1.2 Terminating===
Reference            PMiP-2080-EPP-100              Rev.33        Page 5 of 61 Emergency Response Term          Meaning PACHMT        Post-Accident Contaixnment Hydrogen Monitoring team PAR            Protective Action Recommendation PPC            Plant Process Computer PSP            Plant Status PAR PSS            Plant System Server Local Area Network application for PPC data RAC            Radiological Assessment Coordinator RO            Reactor Operator RP            Radiation Protection SAE            Site Area Emergency SAS            Secondary Alarm Station SEC            Site Emergency Coordinator SIP            Shelter In Place SM            Shift Manager SM-SEC        Shift Manager  - Site Emergency Coordinator SRO            Senior Reactor Operator STA            Shift Technical Advisor TSC            Technical Support Center TSC-SEC        Technical Support Center -Site Emergency Coordinator NEST          Nuclear Engineering Services & Technology Building IJE          Unusual Event US            Unit Supervisor WCC-SRO        Work Control Center    - Senior Reactor Operator


an event if the conditions for the UE no longer exist, and no escalation of classification is expected.2 DEFINITIONS AMD ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AFO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources.
Reference       [       PMP-2080-EPP-100                   Rev.33             page 6 of 61 Emergency Response 3   DETAILS NOTE:       *Steps     in this procedure that do not apply to the current classification may be marked N/A.
Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.Control Room Ant available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to Status Trees restore safety functions that are challenged.
              *The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.
DAP Dose Assessment Program EAL Emergency Action Level Reference PMP-2080-EPP-100 Rev.33 Page 4 of 61 Emergency Response Term Meaning ED) Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency Response Auxiliary Equipment Operators.
3.1 General Information 3.1.1   SM-SEC implements this procedure until relieved of SEC duties.
ERDS Emergency Response Data System ERF Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency HAB Hostile Action Based IC Initiating Conditions TIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion addition of an RO from the unaffected unit or an. extra RO who is Mtegamio responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.
3.1.2   Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.
MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole at the S/E's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.
3.1.3   The following actions shall not be delegated by the SEC (Command &
OSC Operations Support Center PA Public Address Reference PMiP-2080-EPP-100 Rev.33 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Contaixnment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager -Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building IJE Unusual Event US Unit Supervisor WCC-SRO Work Control Center -Senior Reactor Operator Reference
Control Function):
[ PMP-2080-EPP-100 Rev.33 page 6 of 61 Emergency Response 3 DETAILS NOTE: *Steps in this procedure that do not apply to the current classification may be marked N/A.*The steps in this procedure are listed in the preferred order of performance.
Steps may be performed in a different sequence.3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.3.1.3 The following actions shall not be delegated by the SEC (Command &Control Function):
* Classification of the emergency.
* Classification of the emergency.
* Directing the notification of offsite officials.
* Directing the notification of offsite officials.
* Approval of PAR to offsite emergency management agencies.3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications.
* Approval of PAR to offsite emergency management agencies.
This should be supported, as resources become available.
3.1.4   Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.
3.1.5   The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.
3.1.6   PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)
3.1.7   Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.
The use of Operations Department staff is recommended.
The use of Operations Department staff is recommended.
Reference PMP-2080-EPP-100 Rev.33 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:
 
* The following steps are repeated for each classification upgrade.* A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
Reference                 PMP-2080-EPP-100                   Rev.33           Page 7 of 61 Emergency Response 3.2   SM-SEC Checklist NOTE:
3.2.3 IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers'Bridge.NOTE: Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).
* The following steps are repeated for each classification upgrade.
* A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.
3.2.1   Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.
3.2.2   Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.
3.2.3   IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers' Bridge.
NOTE:     Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).
Activation of the ERONS includes activating the Emergency Response Facilities.
Activation of the ERONS includes activating the Emergency Response Facilities.
3.2.4 if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel.
3.2.4     if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).
SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g., hostile force, radiation release, toxic spill, etc.).3.2.5 if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
NOTE:         Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,
3.2.6 JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.
hostile force, radiation release, toxic spill, etc.).
3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
3.2.5     if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).
3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12 Upon completion of turnover, inform both control rooms that the Command& Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.3.2.14 IF in an Alert, or higher AND conditions warrant AND SM-SEC has* Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.3.2.15 WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.
Reference PMP-2080-EPP-100 Rev.33 Page 9 of 61 Emergency ResponseI 3.3 Unaffected CR Checklist 3.3.1 WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.


====3.3.3 Notify====
3.2.6  JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.
Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel.
3.2.7  IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).
___3.3.4 Assign an individual to start the Dose Assessment Program (DAP). ___IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP-108, Initial Dose Assessment.
3.2.8  IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).
___3.3.5 TSC Ventilation
3.2.9  IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.
: a. IF any of the following conditions are present: ___,, The emergency involves a loss of coolant accident ,, The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.b. Record the Emergency Mode start time on the placard located below the switch.NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.
3.2.10  Assign an individual to complete Data Sheet 3, Plant Status.
3.3.6 IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____
3.2.11  WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.
3.2.12  Upon completion of turnover, inform both control rooms that the Command
        & Control Function has been transferred to the SEC (or ED, as applicable).
3.2.13  IF in a UIE and conditions warrant AND the SM-SEC has Command &
Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.
3.2.14  IF in an Alert, or higher AND conditions warrant AND SM-SEC has
      *Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.
3.2.15  WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.
 
Reference                PMP-2080-EPP-100                Rev.33            Page 9 of 61 Emergency ResponseI 3.3  Unaffected CR Checklist 3.3.1    WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event).          ___
3.3.2    Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.
3.3.3    Notify Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel.                                             ___
3.3.4     Assign an individual to start the Dose Assessment Program (DAP).               ___
IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP- 108, Initial Dose Assessment.                         ___
3.3.5     TSC Ventilation
: a. IF any of the following conditions are present:                             ___
                  ,,   The emergency involves a loss of coolant accident
                  ,,   The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.
: b. Record the Emergency Mode start time on the placard located below the switch.
NOTE:       Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.
3.3.6     IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____
Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).
Reference I PMP-2080-EPP-100
[ Rev.33 Page 10 of 61 Emergency Response 3.3.7 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___


===3.4 Shift===
Reference        I      PMP-2080-EPP-100          [    Rev.33          Page 10 of 61 Emergency Response 3.3.7    Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___
Technical Advisor (STA)3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.3.4.2 Provides an independent assessment of conditions present and actions taken.3.4.3 Reports to the SM and acts in an advisory capacity.3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4 Shift Technical Advisor (STA) 3.4.1     Reports to the Control Room in the event of an emergency or off-normal event.
3.4.2     Provides an independent assessment of conditions present and actions taken.
3.4.3     Reports to the SM and acts in an advisory capacity.
3.4.4     Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.
3.4.5    Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.
NOTE:        The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.
3.5  Contingency Director 3.5.1    The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.
3.5.2    The Contingency Director performs the following tasks.
o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
* Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.
o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.
* Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.
 
Reference              PMP-2080-EPP-100            [    Rev.33            Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
NOTE:        Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.
Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.
* Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
* WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.
* Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.
o Coordinate the move of personnel to the OSC when directed by the SM.
Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
4    FINAL CONDITIONS 4.1  The emergency has been terminated and the plant has entered the recovery phase.
Record any comments below (include document numbers for corrective actions):
Verified Complete By:                                              Date:    /    I/_
Performer Independently Verified By:                                          Date :    I    /_
Reviewed By:                                                        Date:    I    /__
Operations Shift Manager I designee


====3.4.5 Ensures====
Reference     [     PMP-2080-EPP-100             Rev.33       Page 12 of 61 Emergency Response S   REFERENCES 5.1  Use
that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.3.5 Contingency Director 3.5.1 The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.3.5.2 The Contingency Director performs the following tasks.o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.
* Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.* Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.
Reference PMP-2080-EPP-100
[ Rev.33 Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.
NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.* Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.* WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.* Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.o Coordinate the move of personnel to the OSC when directed by the SM.Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.
4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.Record any comments below (include document numbers for corrective actions): Verified Complete By: Date: / I/_Performer Independently Verified By: Date : I /_Reviewed By: Date: I /__Operations Shift Manager I designee Reference
[ PMP-2080-EPP-100 Rev.33 Page 12 of 61 Emergency Response S  


==5.1 REFERENCES==
==References:==


Use
5.1.1i  PMP-2080-EPP-10I, Emergency Classification 5.1.2    PMP-2080-EPP-108, Initial Dose Assessment 5.1.3    RMT-2080-EOF-O01, Activation and Operation of the EOF.
5.1.4    RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5    SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6    RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7    PMP-7030-001-001, Prompt NRC Notification 5.1.8    EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2  Writing


==References:==
==References:==


5.1.1i PMP-2080-EPP-10I, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-O01, Activation and Operation of the EOF.5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing
5.2.1   Source


==References:==
==References:==
: a. Cook Nuclear Plant Emergency Plan
: b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2    General References
: a. Michigan Emergency Management Plan        ,
: b. NRC Regulatory Issue Summary, RIS-2002-21
: c. NRC Regulatory Issue Summary, RIS-2004-13
: d. NRC Bulletin 2005-02
Reference                PMIP-2080-EPP-100              Rev.33            Page 13 of 61 Emergency Response Attachment 1              Protective Action Recommendations                    Pages:
NOTE:          In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped - e.g., containment pressure relief).
NOTE:          DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.
1      PAR Development 1.1I    Proceed through a flowchart in this attachment to develop a PAR.
The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
o    All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.
2      Issuing a PAR 2.1    After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
2.2      Ensure that the appropriate PAR boxes are checked on the EMD-32a form.
2.3      Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
Reference                  [    PMP-2080-EPP-100                              Rev.33                  Page 14 of 6j Emergency Response Attachment 1                          Protective Action Recommendations                                      13-1Pages:~
Initial - Protective Action Recommendations
                                  ;ENCY been declared?                          N-.(o PAR rqie Yes ISthis a R.APIDl&#xa5; PROG3RESSING3 SEVERE ACCIDENT ?
(If the conditionsfor a Rapidly ProgressingSevere Accident cannot be irrmediately confirmed, then ANSWER.,..No.)
: 1. is there a toss of containment per EAL 3.21 or 3.31                                                                  N*
AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?
OR
: 2. The conditions for EAL. R-l have been met?
J                YeS Yes I                        SHELTER Recommend RAPID EVACUATION.                    SRecommend                  ACTION2 on HOSTILE(Column                    Recommend INITIAL SHELTER IN PLACE.                                  EVACUATION* (Column 3 on PAR (Column i on PAR Table labeled "RAPID"}  (i, z,s                            iPAR Table labeled "HAB SHELTER")                    Table labeled INITIAL") 11,z1 (ILzI
                                                            *SHELTER INPLACE (SIP) 2 miles
* Evacuate 2 mile radius,
* Evacuate areas 2-10 miles                        radius,                                      *Evacuate      areas 2-5 miles
                                                          . Clear lake area to 5 miles,                        downwind, downwind,2*mile radius,
* Evacuate
* All other areas MONITOR &
* All other areas MONITOR &
* All other areas MONITOR &
PREPARE                                          PREPARE                                            PREPARE
                                                      /        END of Initial PAR Flowchart t
I 2, 4, ariddcear lake areas 6& 7                            Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6                                          sudArea1, 2, 3 anddcear lake area 6 213,75to      348.75 Areal1, 303.75 to 236.25            Areal, 2, 3, 3, 5arddclca        lake 4 and clear,-ke  area6areas 6& 7                  dar.Mal1, 3 and clear lake area 6
.348.75 to 56.25              Area 1, 3, 5 and clear lake areas 6 & 7                          laeAreal1, 3 and clear lake area 6 ArA r6ea 1 and dlear lake area 6 56.25 to 168.75              Mreal1, and clear lake areas 6& 7
: 2. Area 6 is t~he lake area at 0 to 5 mile radius; Area      7 is thle lake area 5 to 10 mile r-adiu~s.
Notes:    1. Lake areas are "cleared" for either evacuation or sheltering.
: 3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.
4,
Follow Up - Protective Action Recommendations SEV]ERE ACCJIDNF deda*                              liii, AL El bedm.*4                            Ca--=cooli+/-2g .s utlstar~d .,AND Comaiim~
                                                                                                                      *.M e1              .a20    1/7 driag tla hiiial PAR v'a1ka*?
CommmflHDEXCU..O*                                  HOSTILE ACTION a$~I                                      5*~nn FOLLOW L'P EVACUATION.
StHELTt  ERIN ,LCE.
domv~i,6areaa ' Empad'-< ljar                      (CZahlmI 2 cmAP.R TabIh Llabk-d "HA..P                  *.'m ita*' s.lp4 3            lzt pr-.i"a.
t        ~otmu              ~
nmahiz
* addi                      SmtrER.") *'="                                        *:mndaadim
* adafld.iticm.t ,.asA*.ADD a:ts. iADD Cvhmn I ot PA,-R Ts*bl
* SME(]LTI[L- I*A      (SCIj'V2                C&#xa2;*n~3 amP~AR T~ 1beL~bd "OLILOW
                      -toIxort*R.miks
                    *Id~a                                            ttii, at~e                                      UP-- tz pz~bnre~mtmdi .) ':" :.
T
* AU1othsr a-=m M.N-ITOR &
* E,,acts 2 mi* ra.4i~
      *    *,.cts2-i        am                                PiREP_4,E
* E~ratem arez 2-5 mil.; da xxndi
      *  &#xa3;Emtaxvatssrs 2-10 n*1 *odnzl*Alit&***'T
* Al odi r~h as MONITIOR &                                        *PIPR t  znant**iztsS            *    [*                                    ..    ...        ..
PRIEPA1[
                                        **  Rztmm PA.R's b.* t    DO SE .ASSESSIME'T ta az--    sha1h0 mils *_ h.
Area 1, z, 4, anK *ci ariie area 0& 1                                          Area      1, ania clear .la]e area 6
                                                                                                                          .Z Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25            Area 1, 2,    3, 4 art clear lake areas 6 & 7                    Ar*ea 1 236.25 to 303.75              Areal1, 2,  3, 4, 5 anddlear lake areas 6                                      Ar'ea 1, 2, 3 anud ear lake area 6 303.75 to 348.75              Area 1, 3,    5 and dear lake area 6                              dlear        Area 1, 3 anidcear lake area 6 348.75 to 56.25              Are~al, 3,    5 anddcear lake areas 6& 7                          lake        Area 1, 3 anddcear lake area 6 Area6        Area1 and. dear lake area 6 56,25 to168.75              jArea1, andclear lake areas 6& 7 Notes:  1. Lake areas are "cleared" for either evacuation or shelterin~g.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.
: 3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.
Reference                                            PMP-2080-EPP-100                                                        Rev.33                                  Page 16 of 61 Emergency Response Pages Attachment 1                                                Protective Action Recommendations                                                                                  13age16
_______________                      Reference 3 EPA PAG TABLE*                                                                  Michigan Application Proteactive Ati~on                          PAGi (projected dose)                                                  Comments Shdelrerin*-in~placc or                        i to 5 rc-r*                                  Evariation~ 1er, for sore .situation,=,                                          Fa cilirty operators will reoromnend cv ac u atin of the                            (13 rrSv t~o 53 m*v)i                        shc~tlir~Rrin-n pla co.) chould be- initiate-s                                  eacuation at 1 rern' sheltering in public:                                        over four dais=                              when proie-ceo                  os~e-is 1 rer (1          ~irrR5v              plice- is ti-c prerogatice of thec 5tate- of S____________________                            _________________________________                                                Michiga n~
5tupplermentary                                5 iret"      53 nmSK.                        KI is rmot e*ffe-ctive iftaken prior t:o                                        Thc s.ate of M'dichigan will im..plemnent projc-cted dose t.o                          exposture. Ma' require appro-.al of s'a~o                                      irs HI plan: facility operator's ar,-inistra:--ion of proph:lactic c~ru*                -            child thy~roid fron-                          nmedical officials (or in ascoroa.ncewi h                                      resort nmencation is implicit in dose KJ1                                          ex:posure .to iodine 4
established e* c~r* ercy plans.                                                c tsrnation data, lh l:-..jt- qt&#xa5;"i the"~t                :7lI.
:l[;~l  i"f.tl*t~l!I'  1m71-l    :      3t i;}  i* '        J~tn,:
                                                                                                                                                              'l'  7*f-P '    *h it*&*tC    tj.i  zt  . bt''t*
th t '!,i b~
tJ    itl~e t ,.:fR ..        t,*.K~-.l[.'
i, :* t fh4f~tJ              t*fj' Ir .I 4              ,Jgtli3                t    4i      ;t:t*.!lt'l                      ~~', ~            ?            ~'~      4 1 w
            > t. 's..
I.,!!        ts sf is7-13fl ssr~lr j i                      ;)f/i.
                                                              .l
* i:p*< 7s,.-is        rI      is'sl~ nf1lsit/-5>251;; 255 :si'ie-sf*!          (lf s      ht... si;Csy*. t2*  i l *,l. I 5>12" 125
                                                                                                                                                                            ' *tmss
*Pt 7
                                                                                                                                                                                                                        "-~.3 ,
  > i1 OsC            v..'32.it2 d.&#xa2;i.*            .*-.,.
55>55>                  Z.;,.***
2*ThC*&#xa3;ti      ~      -.- '*~:l=ll:?"l}lT[                      '  i::'>'t",itp.'.*'.t..fl~*-r*;::..**                            ?l*f'l
                                                                                                                                                                                            >    P 1 lil.
                                                                                                                                                                                                            <',t* f **
5                      ,    CI'5:C55        5              >>55      ' 5 "'2'.2              5  5 sf15 5l1 15>1* 1'CEli  m5>,*  LI&#x17d;              ,
55 1-5>5'*  i tsrs5V  T: b  2-                52 4        >
Reference              PMP-2080.-EPP-100                Rev.33            Page 17 of 61 Emergency Responsej Attachment 2                      Activation of ERONS                          17age18 INOTE:        SEC judgment is used to determine which scenario will be used.
1      IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.
SNOTE:          ERONS can be activated using any plant computer with internet access.
1.1    To activate ERONS:
* Click the Everbridge icon on the desk top.
OR
* Log in to Everbridge by entering the web address, https://manager.everbridge.net OR
* IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.
1.2    Enter User Name (erons) 1.3    Enter Password (located in ERO brief case) and Click Sign In.
NOTE:      1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.
: 2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.
1.4    To start a scenario, click on the Notifications tab at the top of the page.
1.5    Click on the Templates header to bring up a list of preprogrammed scenarios.


====5.2.1 Source====
Reference                    PMIP-2080-EPP-100                        Rev.33            Page 18 of 61 Emergency Response Attachment 2                           Activation of ERONS                                    17age18 NOTE:.                                   .      ......
* After a Notification i sents    he    screnautmaiclly~O        goes bac toth Notificati        tons ab whreth                notificatio la~d4ilOPrsaSts        I~sent outisl shw  wt    tetie wassent.                                            '    ro 1.7    Click Send (located close to the botop            of the screen).      Noicaonhvebnset NOTE:          Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the                -99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.


==References:==
f  Reference                PMP-2080-EPP-100 Emergency Response Rev.33            Page 19 of 61 Attachment 3                Dismissal of Non-Essential Personnel                Pages:
: a. Cook Nuclear Plant Emergency Plan b. SPP-2060-SFI-203, Security Actions During Emergency Conditions
19 -20 NOTE:           SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1  IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.
NOTE:           Personnel assisting the ERG (such as a Failure Investigation Process (FIP)
Team) should be Radworker qualified (i.e., have a TLD).
1.1    IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.
1.2    IF radiological conditions may impact dismissal of non-essential personnel (e.g.,
radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
1.3    Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:
Whether or not rapid egress is required (e.g., airborne attack)
Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
o  IF using the Livingston Road route, THEN contact Security to unlock the gates.
1.3.1    Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.


====5.2.2 General====
RfrnePMP-2080-EPP-100                             Rev.33         Page 20 of 61 RefeenceEmergency Response Attachment 3              Dismissal of Non-Essential Personnel              Pages:
References
j                                                            19 -20 1.3.2    Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
: a. Michigan Emergency Management Plan , b. NRC Regulatory Issue Summary, RIS-2002-21
1.4    Inform both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).
: c. NRC Regulatory Issue Summary, RIS-2004-13
1.5    Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.
: d. NRC Bulletin 2005-02 Reference PMIP-2080-EPP-100 Rev.33 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages: NOTE: In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped
1.5.1    Sound the Containment Evacuation Alarm(s), if required.
-e.g., containment pressure relief).NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.1 PAR Development 1.1I Proceed through a flowchart in this attachment to develop a PAR.The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.
1.6    Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two times.
o All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.
1.6.1    IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:
2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.
              "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
1.6.2    if rapid egress is to be used, THEN make the following announcement two times:
                "Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,
                "vehicle portal near the North Access Building") and exiting the site using (State the route)."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.


===2.2 Ensure===
Reference               PMP-2080-EPP-100                 Rev.33           Page 21 of 61
that the appropriate PAR boxes are checked on the EMD-32a form.2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.
        ~Emergency                               Response Attachment 4                          Accountability                          Pgs NOTE:           During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
Reference  
1   Review the three methods of Accountability below:
[ PMP-2080-EPP-100 Rev.33 Page 14 of 6j Emergency Response Attachment 1 Protective Action Recommendations 13-1Pages:~
1.1     Primary Method - using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.
Initial -Protective Action Recommendations
o    Personnel will remain in the Assembly Areas until evacuated per SEC direction.
;ENCY been declared?
A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).
N-.(o PAR rqie Yes IS this a R.APIDl&#xa5; PROG3RESSING3 SEVERE ACCIDENT ?(If the conditions for a Rapidly Progressing Severe Accident cannot be irrmediately confirmed, then ANSWER.,..No.)
1.2    Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.
: 1. is there a toss of containment per EAL 3.21 or 3.31 AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?OR 2. The conditions for EAL. R-l have been met?Yes I J YeS SHELTER Recommend RAPID EVACUATION.(Column i on PAR Table labeled"RAPID"} (i, z, s* Evacuate radius,* Evacuate areas 2-10 miles downwind,* All other areas MONITOR &PREPARE SRecommend HOSTILE ACTION SHELTER IN PLACE. (Column 2 on iPAR Table labeled "HAB SHELTER")(ILzI*SHELTER IN PLACE (SIP) 2 miles radius,.Clear lake area to 5 miles,* All other areas MONITOR &PREPARE Recommend INITIAL(Column 3 on PAR Table labeled INITIAL")
* This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.
11,z1* Evacuate 2 mile radius,*Evacuate areas 2-5 miles downwind,* All other areas MONITOR &PREPARE t /END of Initial PAR Flowchart I 2, 4, ariddcear lake areas 6& 7 213,75to 236.25 Areal1, 2, 3, 4 and clear lake areas 6& 7 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6 303.75 to 348.75 Areal, 3, 5arddclca
In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
,-ke area6.348.75 to 56.25 Area 1, 3, 5 and clear lake areas 6 & 7 Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 sudArea1, 2, 3 anddcear lake area 6 dar.Mal1, 3 and clear lake area 6 laeAreal1, 3 and clear lake area 6 Ar A r6ea 1 and dlear lake area 6 56.25 to 168.75 Mreal1, and clear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or sheltering.
o    This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
: 2. Area 6 is t~he lake area at 0 to 5 mile radius; Area 7 is thle lake area 5 to 10 mile r-adiu~s.3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.4, Follow Up -Protective Action Recommendations SEV]ERE ACCJIDNF liii, AL El Ca--= cooli+/-2g .s utlstar~d
.,AND Comaiim~driag tla hiiial PAR e1 .a20 1/7 a$~I HOSTILE ACTION FOLLOW L'P EVACUATION.
StHELTt ER* IN ,LCE.domv~i,6areaa
' Empad '-< ljar (CZahlmI 2 cmAP.R TabIh Llabk-d "HA ..P s.lp4 3 lzt pr-.i"a.t ~otmu nmahiz ~ addi Smt rER.") ad afld.iticm.t a:ts. i ADD Cvhmn I ot PA,-R
* SME(]LTI[
L- (SCIj'V2 amP~AR T~ 1beL~bd "OLILOW-toIxort at~e ttii, T UP-- tz pz~bn re~mtmdi .) ':" :.* AU1 othsr a-=m M.N-ITOR &
* E,,acts 2 ra.4i~*
am PiREP_4,E
* E~ratem arez 2 -5 mil.; da xxndi* &#xa3;Emtaxvatssrs 2-10
* Al odi r~h as MONITIOR &  PRIEPA1[ t .. ... ..Rztmm PA.R's t DO SE .ASSESSIME'T ta az-- sha 1h 0 mils h.Area 1, z, 4, anK ariie area 0& 1 Area 1, .Z ania clear .la]e area 6 Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25 Area 1, 2, 3, 4 art clear lake areas 6 & 7 236.25 to 303.75 Areal1, 2, 3, 4, 5 anddlear lake areas 6 303.75 to 348.75 Area 1, 3, 5 and dear lake area 6 348.75 to 56.25 Are~al, 3, 5 anddcear lake areas 6& 71 dlear lake Area6 Ar'ea 1, 2, 3 anud ear lake area 6 Area 1, 3 anid cear lake area 6 Area 1, 3 anddcear lake area 6 Area1 and. dear lake area 6 56,25 to168.75 jArea1, andclear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or shelterin~g.
: 2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.
Reference PMP-2080-EPP-100 Rev.33 Page 16 of 61 Emergency Response Pages Attachment 1 Protective Action Recommendations 13age16_______________
Reference 3 EPA PAG TABLEProteactive Ati~on PAGi (projected dose) Comments Michigan Application or i to 5 Evariation~
1er, for sore .situation,=, Fa cilirty operators will reoromnend cv ac u atin of the (13 rrSv t~o 53 v)i shc~tlir~Rrin-n pla co.) chould be- initiate-s eacuation at 1 rern' sheltering in public: over four dais= when proie-ceo os~e-is 1 rer (1 ~irrR5v plice- is ti-c prerogatice of thec 5tate- of S____________________
_________________________________
M ichiga n~5tupplermentary 5 iret" 53 nmSK. KI is rmot ffe-ctive if taken prior t:o Thc s.ate of M'dichigan will im..plemnent ar,-inistra:--ion of projc-cted dose t.o exposture.
Ma' require appro-.al of s'a~o irs HI plan: facility operator's proph:lactic -child thy~roid fron- nmedical officials (or in ascoroa.ncewi h resort nmencation is implicit in dose KJ1 ex:posure .to iodine 4  established ercy plans. c tsrnation data, th t '!, i tJ b~ itl~e t ,.: fR ..
lh l:-..jt- qt&#xa5;"i the"~ t :l[;~l :7lI.
' 1m 71- l : i;} 3t ' J~ tn,: 'l' f-P ' h it C tj.i zt .fh4 f~tJ i, t Ir 4 ,Jgtli3 t 4 i
~~', ~ ? ~'~ 4 1 .I7 t. w > 's.. I.,! ! ts sf is7-13fl ssr~lr i .l j i:p 7s,.-is ;)f/i. r I is'sl~ nf1ls it/-5>251;;
255 s (lf ht... si;Csy ' tmss i l I 5>12" 125> i 1 OsC v..'32.it2 55>55>
Z.; ~ -.-
' 1 lil. f "-~.3 , sf15 5l 1 1'CEli LI 55 , i tsrs5V T: b 2- 5 52 4 > , CI'5:C55 5 >>55 ' 5 "'2'.2 5 5 > P "
Reference PMP-2080.-EPP-100 Rev.33 Page 17 of 61 Emergency Responsej Attachment 2 Activation of ERONS 17age18 INOTE: SEC judgment is used to determine which scenario will be used.1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.SNOTE: ERONS can be activated using any plant computer with internet access.1.1 To activate ERONS:* Click the Everbridge icon on the desk top.OR* Log in to Everbridge by entering the web address, https://manager.everbridge.net OR* IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911.
A person will answer. Explain why you are calling and the actions the Everbridge person should take.1.2 Enter User Name (erons)1.3 Enter Password (located in ERO brief case) and Click Sign In.NOTE: 1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.1.4 To start a scenario, click on the Notifications tab at the top of the page.1.5 Click on the Templates header to bring up a list of preprogrammed scenarios.
Reference PMIP-2080-EPP-100 Rev.33 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS 17age18 NOTE:. ....... After a Notification i sents he screnautmaiclly~O goes bac toth Notificati tons ab whreth la~d4ilOPrsaSts notificatio I~sent outisl shw wt tetie was sent. ' ro 1.7 Click Send (located close to the botop of the screen). Noicaonhvebnset NOTE: Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the
-99 or 8-1-877-220-4911.
Person will answer. Explain why you are calling and the actions the Everbridge person should take.
f Reference PMP-2080-EPP-100 Rev.33 Page 19 of 61 Emergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages: 19 -20 NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.
1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.NOTE: Personnel assisting the ERG (such as a Failure Investigation Process (FIP)Team) should be Radworker qualified (i.e., have a TLD).1.1 IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel.
SEC judgment should be used in determining the type and amount of non-essential help that is needed.1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.


===1.3 Contact===
Reference                PMP-2080-EPP-100                Rev.33            Page 22 of 61 Emergency Response Attachment 4                          Accountability                            Pages:
the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss: Whether or not rapid egress is required (e.g., airborne attack)Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.
The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).
RfrnePMP-2080-EPP-100 Rev.33 Page 20 of 61 RefeenceEmergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages: j 19 -20 1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.
if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -inprogress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
o   IF using the Livingston Road route, THEN contact Security to unlock the gates.
1.3   No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).
2      Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.
2.1    Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1    IF using the Primary Method of accountability, THEN request that Security:
o    *Prepare for accountability.
o    Commence evacuation of the Owner Controlled Area outside of the Protected Area.
: a. GO TO Step 3.


===1.4 Inform===
RfrnePMP-2080-EPP-100                               Rev.33         Page 23 of 61 RefeenceEmergency Response Attachment 4                           Accountability                       Pgs SNOTE:         RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.
both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.1.5.1 Sound the Containment Evacuation Alarm(s), if required.1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel.
2.1.2   IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.
Make the same announcement two times.1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used: "Attention all personnel.
Attention all personnel.
Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.1.6.2 if rapid egress is to be used, THEN make the following announcement two times: "Attention all personnel.
Attention all personnel.
Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,"vehicle portal near the North Access Building")
and exiting the site using (State the route)." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the"using Security portal" statement.
Reference PMP-2080-EPP-100 Rev.33 Page 21 of 61~Emergency Response Attachment 4 Accountability Pgs NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.
1 Review the three methods of Accountability below: 1.1 Primary Method -using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.o Personnel will remain in the Assembly Areas until evacuated per SEC direction.
A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).1.2 Alternate Method -using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.* This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.
In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.o This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.
Reference PMP-2080-EPP-100 Rev.33 Page 22 of 61 Emergency Response Attachment 4 Accountability Pages: The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.
o IF using the Livingston Road route, THEN contact Security to unlock the gates.1.3 No Accountability
-under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area -intrusion by a hostile force).2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.
2.1.1 IF using the Primary Method of accountability, THEN request that Security: o *Prepare for accountability.
o Commence evacuation of the Owner Controlled Area outside of the Protected Area.a. GO TO Step 3.
RfrnePMP-2080-EPP-100 Rev.33 Page 23 of 61 RefeenceEmergency Response Attachment 4 Accountability Pgs SNOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.2.1.2 IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
: b. Request that the Owner-Controlled area also be evacuated.
: b. Request that the Owner-Controlled area also be evacuated.
3 Contact Personnel Inside the Protected Area.3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
3       Contact Personnel Inside the Protected Area.
o Sound the Unit 1land Unit 2 Containment Evacuation Alarm.Sound the Nuclear Emergency Alarm.a Make a Public Address announcement for personnel to report for accountability.
3.1     IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:
Make the announcement two tunes. An example of this announcement is: "Attention all personnel.
o   Sound the Unit 1land Unit 2 Containment Evacuation Alarm.
Attention all personnel.
Sound the Nuclear Emergency Alarm.
A (State the current classification  
a   Make a Public Address announcement for personnel to report for accountability. Make the announcement two tunes. An example of this announcement is:
-usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements." IF the ERFs have not already been activated, THEN make the following announcement two times: "Attention all personnel.
                  "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."
Attention all personnel.
IF the ERFs have not already been activated, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
                  "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."
RfrnePMIP-2080-EPP-100 Rev.33 Page 24 of 61 RefeenceEmergency ResPonse Attachment 4 Accountability Pages 3.2 IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.* Sound the Nuclear Emergency Alarm.o Make a Public Address announcement for personnel to use the alternate.
 
method of accountability.
RfrnePMIP-2080-EPP-100                           Rev.33           Page 24 of 61 RefeenceEmergency ResPonse Attachment 4                         Accountability                       Pages 3.2   IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:
Make the same announcement two times. An example of this announcement is: "Attention all personnel.
o   Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.
Attention all personnel.
* Sound the Nuclear Emergency Alarm.
A (State the current classification  
o   Make a Public Address announcement for personnel to use the alternate.
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building")
method of accountability. Make the same announcement two times. An example of this announcement is:
and exiting the site using (State the route) ." 3.2.1 IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times: "Attention all personnel.
                "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."
Attention all personnel.
3.2.1   IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:
Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times: "Attention all personnel.
                "Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.
Attention all personnel.
3.2.2   IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times:
ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
                "Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.
3.2.3   Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
3.3     IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.
3.3.1    Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.


====3.3.1 Direct====
Reference               PMiP-2080-EPP-100               Rev.33           Page 25 of 61 Emergency Response Attachment 4                         Accountability                           Pgs 4     Perform follow-up actions.
any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.
4.1   IF the Primary Method of Accountability was used, THEN S   Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.
Reference PMiP-2080-EPP-100 Rev.33 Page 25 of 61 Emergency Response Attachment 4 Accountability Pgs 4 Perform follow-up actions.4.1 IF the Primary Method of Accountability was used, THEN S Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.o Coordinate with Security to locate any missing individuals.
o       Coordinate with Security to locate any missing individuals.
4.2 IF the Alternate Method of Accountability was used, THEN o Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).a Coordinate with Security to locate any missing individuals.
4.2   IF the Alternate Method of Accountability was used, THEN o       Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).
4.3 IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include: o After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).o Coordinate with Security to locate any missing personnel.
a       Coordinate with Security to locate any missing individuals.
a Public Address announcements as necessary.
4.3     IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:
o   After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).
o       Coordinate with Security to locate any missing personnel.
a       Public Address announcements as necessary.
Dismissal or evacuation of personnel as necessary.
Dismissal or evacuation of personnel as necessary.
Reference PMP-2080-EPP-100 Rev.33 Page 26 of 61 Emergency Response Atahmn EvcanPages:
Atacmnt5 vcutin26 -29 j NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings.
Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
Determine If Evacuation Should Be Performed.
Evacuation is performed at a SAE (or GE, if SAE. was not entered).1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.


====1.1.1 Coordinate====
Reference                PMP-2080-EPP-100                Rev.33            Page 26 of 61 Emergency Response Atahmn                              EvcanPages:
Atacmnt5              vcutin26                                -29    j NOTE:        During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.
Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE. was not entered).
1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.
1.1.1    Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.
: 1. 1.2    WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.
1.2  IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.
1.3  IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.
1.4  IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.
Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.


with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.
RfrnePMP-2080-EPP-100                                 Rev.33           Page 27 of 61 RefeenceEmergency Response Attachment 5                             Evacuation                             Pages:9 NOTE:         Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.
: 1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.1.2 IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.1.3 IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.
2     Site Evacuation 2.1    Rapid Egress 2.1.1I    IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.
RfrnePMP-2080-EPP-100 Rev.33 Page 27 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.2 Site Evacuation
: a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.
Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
IF using the Livingston Road route, THEN contact Security to unlock the gates.
o Request that the Owner Controlled Area also be evacuated.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.


===2.1 Rapid===
RfrnePMP-2080-EPP-100                               Rev.33         Page 28 of 611 RefeenceEmergency Response
Egress 2.1.1 I IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.
[ Attachment 5                           Evacuation                                   e:
IF using the Livingston Road route, THEN contact Security to unlock the gates.o Request that the Owner Controlled Area also be evacuated.
26 - 29Pa
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.
RfrnePMP-2080-EPP-100 Rev.33 Page 28 of 611 RefeenceEmergency Response[ Attachment 5 Evacuation 26 -29Pa e: b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s).
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."
Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times."Attention all personnel.
: c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*
Attention all personnel.
(Livingston Road), anld as conditions warrant.
A (State the current classification  
                    "Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building')
2.2     Normal Egress 2.2.1   IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
and leave the site using (State the route) ." c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*(Livingston Road), anld as conditions warrant."Attention all personnel.
Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g.,
Attention all personnel.
vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
A (State the current classification  
-usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ." 2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.
Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.
* Request that the Owner Controlled Area also be evacuated.
* Request that the Owner Controlled Area also be evacuated.
o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
Reference , PM.P-2080-EPP-100 Rev.33 Pages: o 6 Attachment 5 Evacuation Pages: Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.2.3 Take any necessary follow-up actions..2.3.1 IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.2.3.2 IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.
RfrnePMP-2080-EPP-100 Rev.33 Page 30 of 61 RefeenceEmergency Response Attachment 6 Terminating a UE Paes 1 UIE Termination 1.1 IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:


====1.1.1 Instruct====
Reference        ,      PM.P-2080-EPP-100                Rev.33          Pages: o 6 Attachment 5                          Evacuation                            Pages:
operators to inform the MSP and BCSD that the event is terminated.
Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.
2.3    Take any necessary follow-up actions..
2.3.1    IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.
2.3.2    IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.


====1.1.2 Instruct====
RfrnePMP-2080-EPP-100                              Rev.33            Page 30 of 61 RefeenceEmergency Response Attachment 6                          Terminating a UE                        Paes 1      UIE Termination 1.1    IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:
operators to: SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.Verify that the form was received by the State and County.o Notify the NRC (Red Phone -NRC Operations Center) that the emergency is terminated.
1.1.1      Instruct operators to inform the MSP and BCSD that the event is terminated.
1.1.2     Instruct operators to:
SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
Verify that the form was received by the State and County.
o Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.
1.2    Inform both Control Rooms that the event is terminated.
1.3    Inform Security that the event is terminated (1118, 1119, 2005 or 2731).
1.4    Direct an operator to make a public address announcement that the UE has been terminated per the SEC.
2      Collection of Data 2.1    Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.


===1.2 Inform===
RfrnePMiP-2080-EPP-100                           Rev.33             Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7               Notification of On-Site Personnel                   Pages:
both Control Rooms that the event is terminated.
[                     ~31                                         -34     J 1 Notify Security 1.1   Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.
 
1.1.1   IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
===1.3 Inform===
: a. Contact Time     _________
Security that the event is terminated (1118, 1119, 2005 or 2731).1.4 Direct an operator to make a public address announcement that the UE has been terminated per the SEC.2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.
1.1.2   IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
RfrnePMiP-2080-EPP-100 Rev.33 Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7 Notification of On-Site Personnel Pages:[ ~31 -34 J 1 Notify Security 1.1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.1.1.1 IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
: a. Contact Time     _________
: a. Contact Time _________1.1.2 IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.
1.1.3   IF a SAE, THEN instruct Security to:
: a. Contact Time _________1.1.3 IF a SAE, THEN instruct Security to: Ready the Security Computer for accountability and prepare for subsequent evacuation.
Ready the Security Computer for accountability and prepare for subsequent evacuation.
* Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
* Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
: a. Contact Time __________
: a. Contact Time     __________
1.1.4 IF a GE, THEN instruct Security to:* Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
1.1.4   IF a GE, THEN instruct Security to:
* Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
* Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
* Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
: a. Contact Time Reference PMIP-2080-EPP-100 Rev.33 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages: 31 -34 1.1.5 IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.a. Contact Time __________
: a. Contact Time
2 Notify Chemistry and RP Technicians of the initial emergency classification.
 
Reference                 PMIP-2080-EPP-100                   Rev.33         Page 32 of 61 Emergency Response Attachment 7                   Notification of On-Site Personnel                 Pages:
31 -34 1.1.5     IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.
: a. Contact Time         __________
2       Notify Chemistry and RP Technicians of the initial emergency classification.
2.1    Chemistry Contact Time          _____________
2.2    lRP Contact Time                ________________                                      __
3      Make Public Address Announcements                                                  ___
CAUTION:        PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any
    ~PA              announcements or sounding the NEA.
.NOTE:            PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.
3.1    Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.
3.1.1      IF in a UE, THEN make the following announcement two times:
                    "Attention all personnel. Attention all personnel. An Unusual Event has been declared due to              (brief description)      .Continue        with your work and be prepared for future announcements."
 
I  Reference              PMP-2080-EPP-100                Rev.33        Page 33 of 61 I    .                    Emergency Response Attachment 7.            Notification of On-Site Personnel              Pages:
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed___________
3.1.2  IF in an Alert, THEN make the fol~lowing announcement two times:
              "Attention all personnel. Attention all personnel. An Alert has been declared due to        (brief description)    ."
IF emergency facilities are not already activated, THEN continue the annoumcement with:
                  "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."
: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: b. Time announcements completed


===2.1 Chemistry===
RfrnePMP-2080-EPP-100                              Rev.33        Page 34 of 61 RefeenceEmergency Response Attachment 7                Notification of On-Site Personnel              Pages.
NOTE:        Accountability isperformed per Atahet4, Accountability.
3.1.3  lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s:
                        "Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: 2. Time announcements completed__________
3.1.4  IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
3.1.5  IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:
                    *  "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."
: 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
: 2. Time announcements cornpleted    _________
3.1.6  IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.


Contact Time _____________
Reference               PMVP-2080-EPP-100               Rev.33             Page 35 of 61 Emergency ResponseI Attachment 8                 Notification of Off-Site Agencies                 Pages:9 1 Accelerated Notifications to the NRC for Security Events.
2.2 lRP Contact Time ________________
1.1   IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:
__3 Make Public Address Announcements
1.1.1   Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
___CAUTION: PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any~PA announcements or sounding the NEA..NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.3.1 Direct an operator to make a PA announcement for the current classification.
1.1.2  Provide an accelerated verbal notification, without hard copy, to the NRC with the, following information:
Make the announcement two times. Modify announcements below as conditions warrant.3.1.1 IF in a UE, THEN make the following announcement two times: "Attention all personnel.
* Site Name
Attention all personnel.
* Emergency Classification, if determined.
An Unusual Event has been declared due to (brief description) .Continue with your work and be prepared for future announcements."
o    Nature of the threat (briefly describe) o    Type of attack (e.g., armed assault by land, water, or aircraft) o    Attack status (i.e., imminent, in progress, or repelled)
I Reference PMP-2080-EPP-100 Rev.33 Page 33 of 61 I .Emergency Response Attachment
: 7. Notification of On-Site Personnel Pages: a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed___________
3.1.2 IF in an Alert, THEN make the fol~lowing announcement two times: "Attention all personnel.
Attention all personnel.
An Alert has been declared due to (brief description)
." IF emergency facilities are not already activated, THEN continue the annoumcement with: "Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements." a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.b. Time announcements completed RfrnePMP-2080-EPP-100 Rev.33 Page 34 of 61 RefeenceEmergency Response Attachment 7 Notification of On-Site Personnel Pages.NOTE: Accountability isperformed per Atahet4, Accountability.
3.1.3 lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s: "Attention all personnel.
Attention all personnel.
A Site Area Emergency has been declared due to (brief description)." 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.2. Time announcements completed__________
3.1.4 IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:* "Attention all personnel.
Attention all personnel.
A General Emergency has been declared due to (brief description)." 1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.2. Time announcements cornpleted
_________3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.
Reference PMVP-2080-EPP-100 Rev.33 Page 35 of 61 Emergency ResponseI Attachment 8 Notification of Off-Site Agencies Pages:9 1 Accelerated Notifications to the NRC for Security Events.1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN: 1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.


====1.1.2 Provide====
RernePMP-2080-EPP-100                               Rev.33         Page 36 of 61 RefeenceEmergency Response Attachment 8                 Notification of Off-Site Agencies               Pages:
an accelerated verbal notification, without hard copy, to the NRC with the, following information:
NOTE:         Notification to offsite authorities (State and County) must be completed within]
* Site Name* Emergency Classification, if determined.
15 minutes of classification.
o Nature of the threat (briefly describe)o Type of attack (e.g., armed assault by land, water, or aircraft)o Attack status (i.e., imminent, in progress, or repelled)
2       Completing EMD-32 Form 2.1   Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.
RernePMP-2080-EPP-100 Rev.33 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: Notification to offsite authorities (State and County) must be completed within]15 minutes of classification.
SNOTE:         PARs aedvlpduigAttachment 1,Protective Action Recommendations.
2 Completing EMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.SNOTE: PARs aedvlpduigAttachment 1,Protective Action Recommendations.
Caution:       Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".
Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".2.1.1 IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).NOTE: An EMD-32a is required within 15 minutes of: eAn initial event classification, or A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms" RfrnePMP-2080-EPP-100 Rev.33 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages: NOTE: An EMD-32b is required to be transmitted with the EMD32a if:General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.
2.1.1     IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP- 108, Initial Dose Assessment, for completion of EMD-32 form(s).
ReferencePMP-2080-EPP-100 Rev.33Pae3of6
NOTE:         An EMD-32a is required within 15 minutes of:
-Reference
eAn     initial event classification, or A change of classification, or SA change of PAR 2.1.2   IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms"
~Emergency ResponsePae3of6 Attachment 8 Notification of Off-Site Agencies Pages.NOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.3 Phone Contacts and Faxes (usually performed by APOs)3.1 Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned).
___3.2 Direct contact with the MSP using Attachment 9, MSP Notification.
___3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___
INOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.


===3.4 Direct===
RfrnePMP-2080-EPP-100                          Rev.33              Page 37 of 61 RefeenceEmergency Response Attachment 8              Notification of Off-Site Agencies                Pages:
that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification
NOTE:        An EMD-32b is required to be transmitted with the EMD32a if:
___3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.
                  *,A General Emergency has been declared, or
___3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3  IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms".                                            ___
___4 Follow Up Notifications
2.1.4  Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.
2.1.5   IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.
2.1.6   Obtain the SM/SECs "Plant Approval" signature on the form(s).         ___
2.1.7  Make copies of the form(s) as necessary for offsite notification phone communicators.


===4.1 UNLESS===
ReferencePMP-2080-EPP-100                          Rev.33Pae3of6
the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing  
          -    Reference              ~Emergency ResponsePae3of6 Attachment 8                  Notification of Off-Site Agencies              Pages.
NOTE:            Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.
3      Phone Contacts and Faxes (usually performed by APOs) 3.1    Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned).                      ___
3.2    Direct contact with the MSP using Attachment 9, MSP Notification.              ___
3.3    Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___
INOTE:            Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.
3.4    Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification                                                ___
3.5    Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.                            ___
3.6    Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.                                              ___
4      Follow Up Notifications 4.1     UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 3.0 minutes from initial notification) per step 2.1.


===3.0 minutes===
Reference               PMP-2080-EPP-100                 Rev.33           Page 39 of 61 Emergency Response Attachment 8                 Notification of Off-Site Agencies                 Pages.
from initial notification) per step 2.1.
4.2   IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12.                                               __
Reference PMP-2080-EPP-100 Rev.33 Page 39 of 61 Emergency Response Attachment 8 Notification of Off-Site Agencies Pages.4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment  
The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
: 12. __The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.
4.3 IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
4.3   IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.
Reference PMIP-2080-EPP-100 Rev.33 Page 40 of 61 Emergency Response Attachment 9 MSP Notification 40ge42 NOTE: Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
4.4   Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.
Contact: MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.
 
NOTE: An EMD-32a is required within 15 minutes of:* The initial classification, or ,,A change of classification, or* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.An EMD-32b is required to accompany an EMD-32a:* if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2 Provide the following to the MSP:* Provide the information from the EMD-32 form.o Obtain the officers/dispatcher's name and record on table.o Inform the agency that the EMD-32 will be faxed.Request a callback (for authentication) and then hang up.
Reference               PMIP-2080-EPP-100               Rev.33             Page 40 of 61 Emergency Response Attachment 9                       MSP Notification                         40ge42 NOTE:           Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.
RfrnePMP-2080-EPP-100 Rev.33 Page 41 of 61 RefeenceEmergency Response Attachment 9 MSP Notification Pages: 40 -42 For callback:
Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.
MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.0F13-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000  
 
/_____ /____I___Initials Time Initials Time Person Contacted MSP Person Contacted:___________________
==Contact:==
Call Back Call Back I Bridge established:___________________
MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.
NOTE:       The poeis the piaymnsfor cmuiangthe EMD-32 information.
NOTE:       An EMD-32a is required within 15 minutes of:
* The initial classification, or
                  ,,A change of classification, or
* A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.
An EMD-32b is required to accompany an EMD-32a:
* if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2     Provide the following to the MSP:
* Provide the information from the EMD-32 form.
o       Obtain the officers/dispatcher's name and record on table.
o       Inform the agency that the EMD-32 will be faxed.
Request a callback (for authentication) and then hang up.
 
RfrnePMP-2080-EPP-100                                   Rev.33             Page 41 of 61 RefeenceEmergency Response Attachment 9                           MSP Notification                             Pages:
40 -42 For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.
0F13-SITE           PHONE NUMBER                   CONTACT                       EVENT NOTIFICATION                                       ESTABLISHED                   CLOSEOUT Michigan State Police                   8-1-517-241-8000                     /_____                   /____I___
Initials        Time       Initials     Time Person Contacted         MSP Person Contacted:___________________
Call Back               Call Back I Bridge established:___________________
_____________Time
_____________Time
* IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
* IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
SWrite the question* Obtain the response and get approval o Provide the response to the MSP.INOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
SWrite the question
3 Fax the signed EMD-32 form(s): ___o Make sure that the form is signed by the Shift Manager. ___* Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.
* Obtain the response and get approval o   Provide the response to the MSP.
RernePMIP-2080-EPP-100 Rev.33 Page 42 of 61[RefeenceEmergency Response Attachment 9 MSP Notification Pages: 40 -42 o Push the start button a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
INOTE:         Faxing     the EMD-32 communicator              form(s) or other      can beas performed personnel      necessary. by either the MSP or BCSD 3       Fax the signed EMD-32 form(s):                                                         ___
o        Make sure that the form is signed by the Shift Manager.                     ___
* Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.
 
RernePMIP-2080-EPP-100                             Rev.33           Page 42 of 61
[RefeenceEmergency Response Attachment 9                       MSP Notification                           Pages:
40 -42 o   Push the start button
: a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers:                     ___
SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987
* BC BOC: 8-1-269-934-9023
* BC BOC: 8-1-269-934-9023
: b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion), THEN also send EMD-32 form(s) to the following:
: b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion),
___HOF: 8-284-2942
THEN also send EMD-32 form(s) to the following:                   ___
* TSC: 2431 o ENC/JIC: 8-284-5 892 o OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the OEO will inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
HOF: 8-284-2942
Reference PMP-2080-EPP-100 Rev.33 Page 43 of 61 Emergency Response[ Attachment 10 Berrien County Sheriff Notification Pages: NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.
* TSC: 2431 o   ENC/JIC: 8-284-5 892 o OSC: 2522 4   WHEN the EOF has established communication with the MSP, THEN the OEOwill inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.
oThe dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.1 Contact: BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____
 
IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.For callback:
Reference             PMP-2080-EPP-100                 Rev.33           Page 43 of 61 Emergency Response
dial extension 2316 and wait for the deputy to call into the phone bridge.NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.
[ Attachment 10             Berrien County Sheriff Notification               Pages:
2 Provide the following to the BCSD:* Provide the information from the EMD-32 form.* Obtain the officers/dispatcher's name and record on table.Inform the agency that the EMD-32 will be faxed.
NOTE:             Declaration of an emergency requires the notification of the BCSD within 15 minutes.
RfrnePMP-2080-EPP-100 Rev.33 Page 44 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification Pages: 0FF-SITE PHONE NUMB1IER CONTACT EVENT NOT WICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. /_____I____
Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.
_____/____
oThe   dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.
Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)
1
Person Contacted BCSD Person Contacted:___________________
 
Call Back Call Back I Bridge established:_____________________
==Contact:==
_____________Time aIF the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____
* Write the question* Obtain the response and get approval o Provide the response to the BCSD.SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.
3 Fax the signed EMD-32 form(s): Make sure that the form is signed by the Shift Manager. ___Orient the form(s), as shown on the fax machine, in either Control Room ___IFl the EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.
o   IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.
Reference PMIP-2080-EPP-100 Rev.33 Page 45 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages: 43 -45 Push the start button___a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers: ___* MSP Operations Center: 8-1-517-241-6815
For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.
* State EOC: 8-1-517-333-4987 o BC EOC: 8-1-269-934-9023
NOTE:       The poeis the piaymnsfor cmuiangthe EMD-32 information.
: b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion), TIEEN also send EMD-32 form(s) to the following:
2     Provide the following to the BCSD:
___o EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892
* Provide the information from the EMD-32 form.
* OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge. ___
* Obtain the officers/dispatcher's name and record on table.
RfrnePMP-2080-EPP-100 Rev.33 Page 46 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages: 46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.1 Contact: lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification.
Inform the agency that the EMD-32 will be faxed.
___o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.
 
Alternate numbers are listed on the table below. ___o Inform the NRC of the event in progress ___* Provide the information on Data Sheet 3, Plant Status ___Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.
RfrnePMP-2080-EPP-100                               Rev.33           Page 44 of 61 RefeenceEmergency Response Attachment 10                 Berrien County Sheriff Notification             Pages:
SWrite the question SObtain the response and get approval* Provide the response to the NRC.0 Ask the NRC for the Event Notification Number (EN).
0FF-SITE             PHONE NUMB1IER               CONTACT                 EVENT NOT WICATION                                       ESTABLISHED             CLOSEOUT Berrien County         Dedicated phone Sheriff's               line.                             /_____I_________/____
Reference PMP-2080-EPP-100 Rev.33 Page 47 of 61 Emergency Response Attachment 11 NRC Notification Pages: 46 -47 OFF-SITE PHONE NULMBER CONTACT EVENT NOTIFICATION ESTABLISBED CLOSEOUT NRC Operations 1-301- 816-5100 Center 1-301-951-0550  
Department               (IF there is no         Initials     Time     Initials     Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)
/_____ /____I___1-301-415-0553 Initials Time Initials Time 8-1-301-8 16-5 15 1___________(FAX)
Person Contacted       BCSD Person Contacted:___________________
______________
Call Back               Call Back I Bridge established:_____________________
Person Contacted NRC Person Contacted:___________________
_____________Time aIF     the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
Continuous contact, will be required for an Alert, Site Area Emergency_______________of General Emergency.
* Write the question
Event Notification Ask NRC for the EN:_ ______________
* Obtain the response and get approval o   Provide the response to the BCSD.
Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
SNOTE:         Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.
RfrnePMP-2080-EPP-100 Rev.33 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.NOTE: An EMD-32a is required within 15 minutes of: o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":
3       Fax the signed EMD-32 form(s):
*Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)
Make sure that the form is signed by the Shift Manager.               ___
Indicate location where this form is being generated (Calling From)aRecord "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations" Reference PMLP-2080-EPP-100 Rev.33 Page 49 of 61 Emergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Record PAR basis o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.* Forward completed form to Approver o Complete "Approved By", date and time* Forward completed approved form for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:* A General Emergency has been declared, or* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data": Indicate whether this is an "Actual Event" or a "Drill"* Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)* Indicate location where this form is being generated (Calling From)o Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number" o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.* Record "Reactor Information"* Record "Plant Status/Additional Information" I Reference PMiP-2080-EPP-100 Rev.33 Page 50 of 61 I Emergency Response I Attachment 12 Manual Completion of EMD Forms Pages5: IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the"Release/Offsite Dose Data" areas as Not Applicable, N/A.* Forward completed form to Approver* Complete "Approved By", date and time Forward completed approved form for transmission RfrnePMP-2080-EPP-100 Rev.33 Page 51 of 61 RefeenceEmergency Response Attachment 13 Activation of FLEX Phase 3 Page: NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
Orient the form(s), as shown on the fax machine, in either Control Room                                                         ___
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).* WHEN communication is established THEN provide the following information:
IFlthe EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.
Indicate whether this is an "Actual Event" or a "Drill"* Plant name and affected units* Your name and positionltitle
 
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated.
Reference               PMIP-2080-EPP-100               Rev.33           Page 45 of 61 Emergency Response Attachment 10               Berrien County Sheriff Notification               Pages:
Examples of coordination include, but are not limited to:* Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.* Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".S From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
43 - 45 Push the start button___
S Reference PMP-2080-EPP-100 Rev.33 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages53 Unit No: Date: Time: Data Taken By: Data Reviewed By: SNOTE: When redundant indication exists, record most severe condition.
: a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers:                   ___
1.2.3.4.Containment Temp.Cont. H2 Concentration RWST Level Source Range_________OF
* MSP Operations Center: 8-1-517-241-6815
_______CPM 5.6.7.8.9.Intermediate Range Containment Pressure Containment Sump Level Containment Level Containment High Range Radiation Level Upper/Lower
* State EOC: 8-1-517-333-4987 o   BC EOC: 8-1-269-934-9023
_____AMPS/R/HR 10.11.12.13.14.15.16.17.18.19.20.21.22.CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum Pressure RH-R Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.PZR Steam Temp.PZR Level PRT Temp.East ON / OFF East ____North___LP1 ___LP1 ___East_____
: b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),
_LP1 ON/OFF GPM GPM 3PM PSIG GPM LP2 LP2 LP2 West ON / OFF West _____South__ _____GPM LP3 ______PSIG LP3 ____West____ _ON /OFF LP3 ON /OFF GPM GPM GPM PSIG GPM PSI0______GPM 23.24.25.26.27.28.PRT Level PRT Pressure PZR Cycling Htrs PZR Backup Htrs Letdown Flow Saturation Margin LP4 ____ PM LP4 ____PSIG LP4 ON / OFF________PSIG ON / OFF ON I OFF_______GPM Reference PMP-2080-EPP-100 Rev.33 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages: 52 -53 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4 29.30.31.32.33.34.35.36.37.38.39.Wide Range T Hot Wide Range T Cold S / G Pressure S / G N. R. Level S /G W.R. Level Steam Flow (pph x 106), Feed Flow (pph x 106)Aux. Feed Flow (pph x 103)MSIV Status CST Level Steam Dump_______PSIG OPEN / CLOSE ATMOS / COND________PSIG OPEN / CLOSE Ft_______PSIG OPEN / CLOSE________PSIG OPEN / CLOSE EQUIPMENT STATUS 40.41.42.43.44.45.46.47.48.49.East ESW West ESW East CCW West CCW East CTS West CTS North SI South SI East RUR West RHR AVAILABLE
TIEEN also send EMD-32 form(s) to the following:                 ___
/ UNAVAILABLE
o    EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892
_______ _____/__________
* OSC: 2522 4     WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.                                                               ___
/ ________ ~/ __________
 
/ _______________
RfrnePMP-2080-EPP-100                               Rev.33         Page 46 of 61 RefeenceEmergency Response Attachment 11                         NRC Notification                         Pages:
/ _____________
46 -47 NOTE:       The Operations NRC Communicator is normally stationed in the affected unit's Control Room.
/ _____________
NOTE:       Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.
/ ______________
1
/ ______________
 
/ ____/50.51.52.53.54.55.56.57.58.East CCP West CCP TDAFP EMDAFP WMDAFP AB Diesel CD Diesel Normal Res.12 EP AVAILABLE
==Contact:==
/UNAV/AILABLE
lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification.                                   ___
_________
o    Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.                                                                       ___
/ ______________
o    Inform the NRC of the event in progress                                     ___
/ ________ ~ / __________
* Provide the information on Data Sheet 3, Plant Status                       ___
/ ____/ _______ I. ___/_/
Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.
RfrnePMP-2080-EPP-100 Rev.33 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages: Unit No: ____Date:________
SWrite the question SObtain the response and get approval
: 1. Emergency Classification Time:_______Unusual Event________Alert
* Provide the response to the NRC.
_______Site Area Emergency_______General Emergency 2. Have notifications been completed?
0       Ask the NRC for the Event Notification Number (EN).
: a. Michigan:
 
yes / no I in progress b. lBerrien County: yes Ino I in progress c. NRC: yes /no I in progress d. DC Cook Personnel:
Reference               PMP-2080-EPP-100                 Rev.33           Page 47 of 61 Emergency Response Attachment 11                         NRC Notification                         Pages:
yes Ino I in progress 3. Protective Actions: a. Local area evacuation yes / no b. Site evacuation yes / no c. Accountability yes I no d. Site closed to visitors yes I no 4. Offsite protective action recommended:
46 - 47 OFF-SITE           PHONE NULMBER               CONTACT                     EVENT NOTIFICATION                                     ESTABLISBED                 CLOSEOUT NRC Operations         1-301- 816-5100 Center                 1-301-951-0550                     /_____                 /____I___
SEvacuation:
1-301-415-0553         Initials       Time     Initials     Time 8-1-301-8 16-5 15 1
yes /no areas: ____o Shelter: yes / no areas: ____Time Declared Time: Time: Time: Time: Time: Time: Time: Time: Time: Time:
___________(FAX)                         ______________
I Reference PMIP-2080-EPP-100 Rev.33 Page 55 of 61 I Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages.5. Plant Operational Status a. Reactor trip: yes I no time: ____ Trip signal:-b. ESE Status: c. EOP Status:______
Person Contacted       NRC Person Contacted:___________________
______6. Plant Status a. Chronology of Events Time Event b. Current Plant Conditions RefrecePMP-2080-EPP-100 Rev.33 Page 56 of 61 I RefrenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:[ 54 -57 c. Potential.
Continuous contact, will be required for an Alert, Site Area Emergency
for Plant Degradation
_______________of    General Emergency.
: d. Mitigating Actions Taken or Underway 7. Plant Radiological Conditions
Event Notification     Ask NRC for the EN:_ ______________
: a. In-plant/Onsite Radiological Conditions  
Number                 (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2       WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.
[ Reference PMVP-2080-EPP-100 Rev.33 Page 57 of 61[ Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 b. Potential for Offsite Release of Radioactivity Airborne Water 8. Injured or Contaminated Personnel:
 
Name Employer Stains 9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)Name Team #//t///Task Description/Time Dispatched RfrnePMP-2080-EPP-100 Rev.33 Page 58 of 61 RefeenceEmergency Response" Data Sheet 3 Plant Status Pages: NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.Reactivity Control* All Control rods inserted?
RfrnePMP-2080-EPP-100                             Rev.33           Page 48 of 61 RefeenceEmergency Response Attachment 12                 Manual Completion of EMD Forms                   Pages:1 Caution:       Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.
Yes No ____# of rods out ,, Reactor Subcritical?
NOTE:           An EMD-32a is required within 15 minutes of:
Yes No* Emergency Boration initiated?
o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":
Yes No* Adequate Shutdown Margin? Yes No RCS Inventory Control -check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)CVCS -Normal Charging Charging Pumps via BIT (High Head SI)Safety injection pumps (Intermediate Head SI)RHR Pumps (Low Head SI)Other:__________
      *Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)
__RCS Pressure Control o Pressurizer PORVs Closed? Yes No* Pressurizer Safeties Closed? Yes No Reference PMP-2080-EPP-100 Rev.33 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages59 RCS Heat Transport Control -check all that apply for the current plant conditions Forced Circulation by RCP ________Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)RCS Heat Sink (Available or In Operation)  
Indicate location where this form is being generated (Calling From) aRecord       "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a   Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations"
-check all that apply for the current plant conditions S/G -Condenser Dump Valves ________S/G -Atmospheric Dump Valves S/G -Safety Valves RCS -Feed/Bleed Decay Heat Removal System (RtIR)SIG Inventory Control -check all that apply for the current plant conditions Main Feed Water _________Aux. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _Containment Control e Ice Condenser Doors OPEN? Yes No*Containment Sprays ON? Yes No*, Hydrogen Recombiners/Igniters ON? Yes No* Containment Isolation Valves fall to CLOSE? Yes No*Phase A Actuation?
 
Yes No Additional Information Reference PMP-2080-EPP-100 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages: Request for additional information Source of request: II MSP LIBCSD LI NRC LIOther_______
Reference               PMLP-2080-EPP-100               Rev.33         Page 49 of 61 Emergency Response Attachment 12               Manual Completion of EMD Forms                 Pages:1 Record PAR basis o   Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
___Date _______Time
* Forward completed form to Approver o   Complete "Approved By", date and time
____Question: Response: Response approved by:___________________________
* Forward completed approved form for transmission NOTE:         An EMD-32b is required to be transmitted with the EMD32a if:
* A General Emergency has been declared, or
* There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2     Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data":
Indicate whether this is an "Actual Event" or a "Drill"
* Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)
* Indicate location where this form is being generated (Calling From) o   Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o   Record "Plant Message Number" o   Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
* Record "Reactor Information"
* Record "Plant Status/Additional Information"
 
I Reference               PMiP-2080-EPP-100             Rev.33         Page 50 of 61 I                           Emergency Response I Attachment 12               Manual Completion of EMD Forms                 Pages5:
IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.
* Forward completed form to Approver
* Complete "Approved By", date and time Forward completed approved form for transmission
 
RfrnePMP-2080-EPP-100                               Rev.33           Page 51 of 61 RefeenceEmergency Response Attachment 13                   Activation of FLEX Phase 3                     Page:
NOTE:             The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.
WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).
* WHEN communication is established THEN provide the following information:
Indicate whether this is an "Actual Event" or a "Drill"
* Plant name and affected units
* Your name and positionltitle
* The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2     The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).
3     The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:
* Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.
* Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".
4   From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
S     From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".
 
S Reference               PMP-2080-EPP-100                   Rev.33       Page 52 of 61 Emergency Response Data Sheet 1               PPC or PSS Control Room Data                     Pages53 Unit No:               Date:                         Time:
Data Taken By:                                       Data Reviewed By:
SNOTE:         When redundant indication exists, record most severe condition.
: 1. Containment Temp.                 _________OF                  5. Intermediate Range                                _____AMPS
: 2. Cont. H2 Concentration                                         6. Containment Pressure
: 3. RWST Level                                                     7. Containment Sump Level
: 4. Source Range                      _______CPM                  8. Containment Level
: 9. Containment High Range Radiation Level Upper/Lower                                           /R/HR
: 10. CTS Pumps                East ON / OFF                                  West ON / OFF
: 11. RHR Spray Flow          East  ____
GPM                          West _____      GPM
: 12. SI Flow                  North___          GPM                          South__ __        GPM
: 13. BIT Flow                LP1 ___            3PM        LP2    ___GPM    LP3 ___          GPM      LP4  ____        PM
: 14. Accum Pressure           LP1 ___            PSIG      LP2    ___PSIG  LP3 ____          PSIG      LP4 ____PSIG
: 15. RH-R Injection Flow     East_____        _ GPM                        West____        _ GPM
: 16. RCP Status               LP1  ON/OFF                 LP2 ON /OFF       LP3    ON /OFF             LP4 ON / OFF
: 17. RCS Pressure                                  PSI0              23. PRT Level
: 18. Charging Flow                        ______GPM                    24. PRT Pressure                        ________PSIG
: 19. PZR Liquid Temp.                                                 25. PZR Cycling Htrs                 ON / OFF
: 20. PZR Steam Temp.                                                  26. PZR Backup Htrs                 ON I OFF
: 21. PZR Level                                                        27. Letdown Flow                       _______GPM
: 22. PRT Temp.                                                        28. Saturation Margin
 
Reference               PMP-2080-EPP-100                 Rev.33         Page 53 of 61 Emergency Response Data Sheet 1                 PPC or PSS Control Room Data                   Pages:
52 -53 NSSS LOOP PARAMETERS                         Loop 1                   Loop 2               Loop 3               Loop 4
: 29. Wide Range T Hot
: 30. Wide Range T Cold
: 31. S / G Pressure                           _______PSIG              ________PSIG        _______PSIG            ________PSIG
: 32. S / G N. R. Level
: 33. S /G W.R. Level
: 34. Steam Flow (pph x 106),
: 35. Feed Flow (pph x 106)
: 36. Aux. Feed Flow (pph x 103)
: 37. MSIV Status                           OPEN / CLOSE             OPEN / CLOSE         OPEN / CLOSE          OPEN / CLOSE
: 38. CST Level                                                                Ft
: 39. Steam Dump                            ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE                                                          AVAILABLE /UNAV/AILABLE
: 40. East ESW                  _______      _____/
: 50. East CCP                    _________  /  ____
: 41. West ESW                   __________ / _____                      51. West CCP                    __________ / _____
: 42. East CCW                  ___    ~/       _                      52. TDAFP                        ___    ~ /       _
: 43. West CCW                  _________  / _____                      53. EMDAFP                      _________  /   ____
: 44. East CTS                  __________ /   ____                    54. WMDAFP                                  /     _
: 45. West CTS                  _________ /    ____                      55. AB Diesel                    ______    I. ___/_
: 46. North SI                  _________ /    ____                      56. CD Diesel
: 47. South SI                  __________ /  _____                      57. Normal Res.
: 48. East RUR                  _________ /    ____                      58. 12 EP                                   /
: 49. West RHR                              /
 
RfrnePMP-2080-EPP-100                               Rev.33         Page 54 of 61 RefeenceEmergency Response Data Sheet 2                     Emergency Turnover Checklist                 Pages:
Unit No: ____Date:________                               Time:
: 1. Emergency Classification Time Declared
_______Unusual       Event
________Alert
_______Site       Area Emergency
_______General      Emergency
: 2. Have notifications been completed?
: a. Michigan:                         yes / no I in progress   Time:
: b. lBerrien County:                   yes Ino I in progress     Time:
: c. NRC:                               yes /no I in progress     Time:
: d. DC Cook Personnel:                 yes Ino I in progress     Time:
: 3. Protective Actions:
: a. Local area evacuation                   yes / no           Time:
: b. Site evacuation                         yes / no           Time:
: c. Accountability                           yes I no           Time:
: d. Site closed to visitors                 yes I no           Time:
: 4. Offsite protective action recommended:
SEvacuation:               yes /no   areas: ____              Time:
o Shelter:                   yes / no areas: ____              Time:
 
I Reference             PMIP-2080-EPP-100               Rev.33 Page 55 of 61 I                         Emergency Response Data Sheet 2               Emergency Turnover Checklist           Pages.
: 5. Plant Operational Status
: a. Reactor trip: yes I no time: ____     Trip signal:-
: b. ESE Status:
: c. EOP Status:______              ______
: 6. Plant Status
: a. Chronology of Events Time                                       Event
: b. Current Plant Conditions
 
RefrecePMP-2080-EPP-100                             Rev.33 Page 56 of 61 I   RefrenceEmergency Response I Data Sheet 2                 Emergency Turnover Checklist     Pages:
[                                             54 -57
: c. Potential. for Plant Degradation
: d. Mitigating Actions Taken or Underway
: 7. Plant Radiological Conditions
: a. In-plant/Onsite Radiological Conditions
 
[
[
Reference               PMVP-2080-EPP-100 Emergency Response Rev.33         Page 57 of 61 Data Sheet 2               Emergency Turnover Checklist                   Pages:7
: b. Potential for Offsite Release of Radioactivity Airborne                 Water
: 8. Injured or Contaminated Personnel:
Name                   Employer                   Stains
: 9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)
Name                 Team #         Task Description/Time Dispatched
                                                                                      /
                                                                                      /
t
                                                                                      /
                                                                                      /
                                                                                      /
 
RfrnePMP-2080-EPP-100                               Rev.33           Page 58 of 61 RefeenceEmergency Response" Data Sheet 3                         Plant Status                           Pages:
NOTE:         This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.
Reactivity Control
* All Control rods inserted?               Yes     No     ____#     of rods out
,, Reactor Subcritical?                     Yes     No
* Emergency Boration initiated?             Yes     No
* Adequate Shutdown Margin?                 Yes     No RCS Inventory Control - check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)
CVCS - Normal Charging Charging Pumps via BIT (High Head SI)
Safety injection pumps (Intermediate Head SI)
RHR Pumps (Low Head SI)
Other:__________                           __
RCS Pressure Control o Pressurizer PORVs Closed?               Yes     No
* Pressurizer Safeties Closed?             Yes     No
 
Reference           PMP-2080-EPP-100             Rev.33           Page 59 of 61 Emergency Response Data Sheet 3                       Plant Status                     Pages59 RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP                                 ________
Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)
RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G -Condenser Dump Valves                                   ________
S/G - Atmospheric Dump Valves S/G - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RtIR)
SIG Inventory Control - check all that apply for the current plant conditions Main Feed Water                                           _________
Aux. Feed Water Other: _ _ _ _ _ _   _   _ _ _
Containment Control e   Ice Condenser Doors OPEN?                       Yes   No
*Containment Sprays ON?                             Yes   No
*, Hydrogen Recombiners/Igniters ON?                 Yes   No
* Containment Isolation Valves fall to CLOSE?       Yes   No
*Phase A Actuation?                                 Yes   No Additional Information
 
Reference               PMP-2080-EPP-100                 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4               Request For Additional Information     Pages:
Request for additional information Source of request:   II MSP LIBCSD LI NRC LIOther_______                       ___
Date  _______Time               ____
Question:
 
===Response===
Response approved by:___________________________
SEC or designee Response delivered to requesting organization:
SEC or designee Response delivered to requesting organization:
Date Time ______by Whom Reference PMP-2080-EPP-100 Rev.33 Page 61 of 61 Emergency Response Page Data Sheet 5 Contingency Team Tracking Form 6 SPERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED
Date                     Time   ______by             Whom
___ _________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED# Turbine Building.
 
ERAEO REVISION  
Reference         PMP-2080-EPP-100             Rev.33   Page 61 of 61 Emergency Response Page Data Sheet 5         Contingency Team Tracking Form         6 SPERSONNEL       TEAM     TASK DESCRIPTION               TIME TIME TCS     TIME EOF TIME TASK   TIME DISPATCHED       ___   _________DISPATCHED                     NOTIFIED     NOTIFIED COMPLETED RETURNED
                    # Turbine Building. ERAEO
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Title: Emergency Response Rev. No.: 33 Alteration Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
 
As such, a 10 CFR 72.48 review is not required for this procedure.
Procedure No.:         PMP-2080-EPP-100                                       Rev. No.: 33
10 CFR 50.54(q) review was performed and documented.
 
The number for the 50.54(q) is annotated in the workflow for this revision.The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
==Title:==
Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.Added step 3.3.3, "Notify Offsite Step was omitted from Revision 32.Authorities of the emergency using Attachment 8, Notification of Off-site Personnel." Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Emergency Response Alteration                                           Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.
Page 1 of 2 REVISION  
This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required for this procedure.
10 CFR 50.54(q) review was performed and documented. The number for the 50.54(q) is annotated in the workflow for this revision.
The conclusion was that the changes in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.
Added step 3.3.3, "Notify Offsite                   Step was omitted from Revision 32.
Authorities of the emergency using , Notification of Off-site Personnel."
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 1 of 2
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: PMP-2080-EPP-100 Rev. No.: 33 Title: Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions I ~ Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Page 2 of 2 IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14 Doc No.: Title: Alteration Cat.: CDI/150.59:1 CD 1/50.59:2 PORC Mtg. No.: GARB Mtg. No.: Admin Hold AR No.: Superceding Proc(s): Temp Proc Exp Date: Temp Change Exp Date: Temp Proc/Change End: Effective Date: EPP-2080-ERO-001 EMERGENCY RESPONSE RESOURCE READINESS Major Revision -Full Review 50.54(q) 15-54 PORC #-4666 4666 2/3/2016 12:00:00 AM Rev01 No.: Approvals[Name [Review/Approval Type/Capacity J.Date Becvar,5 RbrJ 11 Special Review:'E-PLAN GROUP 1[i2/11/2015 10:29 1 i~6998 Pees3 Grl Technical Review"..t12/1812015 10:12 ][Hart, William E 11 ehia Rve 02[(376639) 3I TehiaHeiw01/08/2016 102 M Kristen45) 5 Management Review 101/14/2016 07:33[Wendzel, Regan 1 1[(s007887)
~ 7_Approval Authority 101/14/2016 13:22 j Signature Comments F10 CFR 50.54 (q) 15-54 completed.
-~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP;Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.[Technical Review performed by Jerry Peterson.[PORO Approval obtained at meeting 4666 Approved at PORC per Plant Manager, Jim Ross.
EPP-2080-ERO-001 Rev. 14 Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization 1 2 3 4 5 6 TABLE OF CONTENTS PURPOSE AN]) SCOPE ............................................................
3 DEFINITIONS AN]) ABBREVIATIONS
............................................
4 PRECAUTIONS AND LIMITATIONS
..........................................
.... 6 DETAILS............................................................................
6 4.1 Responsibilities
...............................................................
6 FINAL CONDITIONS
..............................................................
10 REFERENCES
.....................................................................
11 Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Data Sheet 1: Data Sheet 2: Data Sheet 3: Data Sheet 4: Data Sheet 5: Data Sheet 6: Data Sheet 7: Data Sheet 8: Data Sheet 9: Functional Checks of EOF NRC and MSP Phones.....................
12 Functional Checks of TSC NRC and MSP Phones.....................
13 Functional Checks of ERO Facility Equipment
........................
15 Functional Check of Berrien County 911 Ring Down Phones ..........
22 Satellite Phone Checks ................................................
23 EOF Monthly Checklist
...............................................
25 EOF Quarterly Checklist...............................................26 FOF Quarterly Radiation Protection Checklist........................
29 TSC Monthly Checklist................................................
32 TSC Quarterly Checklist
..............................................
33 TSC Quarterly Radiation Protection Checklist
........................
34 OSC Monthly Checklist..............................................
..35 OSC Quarterly Checklist
..............................................
36 OSC Quarterly Radiation Protection Checklist
.....................
38
=-w-NR EPP-2080-ER0-001 Rev. 14 Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization Data Sheet 10: Data Sheet 11:*Data Sheet 12: Data Sheet 13: Data Sheet 14: Data Sheet 15: Data Sheet 16: Data Sheet 17: Data Sheet 18: Data Sheet 19: Data Sheet 20: Data Sheet 21: Data Sheet 22: Data Sheet 23: Data Sheet 24: Data Sheet 25: Data Sheet 26: ENC/JIC Monthly Checklist
..........................................
41 Survey Vehicle Monthly Checklist.....................................
42 Survey Vehicle Radiation Protection Quarterly Checklist..............
43 Control Room Monthly Checklist......................................
45 Control Room Quarterly Radiation Protection Checklist
..............
47 Control Room Emergency Cabinet Quarterly Radiation Protection Checklist..............................................................
48 CAS/SAS Monthly Checklist...........................................50 Emergency Response Data System Testing ..........................
..51 Berrien County EOC Radiation Protection Quarterly Checklist
........54 Training Center Radiation Protection Quarterly Checklist
............
55 LMC Radiation Protection Quarterly Checklist........................56 Emergency Sampling Station Quarterly Radiation Protection Checklist...eQeee~eoeeeeleeeeee .o-ee--Q.eee-.....................eeeeeo59 Emergency Plan Respiratory Protection...............................
60 RP/Ops Emergency Response Equipment Quarterly Checklist
.........61 Monthly Satellite Phone Checks .......................................
63 Radiation Protection Portable Instrument Kit Inventory...............64 Security Control Center...............................................
65 Information I EPP-2080-ERO-001 I Rev. 14 Page 3 of 65 Emergency Response Resource Readiness 1 PURPOSE AN]) SCOPE 1.1 The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.


===1.2 Establish===
Procedure No.:          PMP-2080-EPP-100                                      Rev. No.:  33
 
==Title:==
Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions ThisI is a free-form
            ~        as called Office      out in PMP-2010-PRC-002, Information                  Procedure for Form Tracking        Alteration, Only          Review, and
                                                                      - Not Part of Form Approval.                                                                                Page 2 of 2


methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.
IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14
1.3 This procedure applies to the following periodic requirements:


====1.3.1 Emergency====
Rev01 Doc No.:            EPP-2080-ERO-001                                      No.:
EMERGENCY RESPONSE


Response Organization (ERO) drills and exercises 1.3.2 Emergency Response facility inventories
==Title:==
RESOURCE READINESS Alteration Cat.:      Major Revision - Full Review CDI/150.59:1        50.54(q) 15-54 CD 1/50.59:2        PORC #-4666 PORC Mtg. No.:      4666 GARB Mtg. No.:
Admin Hold AR No.:
Superceding Proc(s):
Temp Proc Exp Date:
Temp Change Exp Date:
Temp Proc/Change End:
Effective Date:      2/3/2016 12:00:00 AM Approvals
[Name                  [Review/Approval Type/Capacity        J.Date Becvar,5RbrJ            11Special  Review:'E-PLAN GROUP        1[i2/11/2015 10:29 1 i~6998 Pees3      Grl          Technical Review"..t12/1812015                    10:12 ]
[Hart, William E      11  ehia Rve                                          02
[(376639)                3ITehiaHeiw01/08/2016                              102 M            Kristen45) 5 Management Review                  101/14/2016 07:33
[Wendzel, Regan                                                1                  1
[(s007887)      ~      7_Approval Authority                  101/14/2016 13:22  j Signature Comments F10 CFR 50.54 (q) 15-54 completed.                    -              ~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP; Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.
[Technical Review performed by Jerry Peterson.
[PORO Approval obtained at meeting 4666


====1.3.3 Communications====
Approved at PORC per Plant Manager, Jim Ross.
          -*                  EPP-2080-ERO-001                                    Rev. 14                    Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart                  Emergency Preparedness                          Emergency Preparedness Writer                            Document Owner                            Cognizant Organization TABLE OF CONTENTS 1   PURPOSE AN]) SCOPE ............................................................                                        3 2  DEFINITIONS AN]) ABBREVIATIONS ............................................ 4 3   PRECAUTIONS AND LIMITATIONS .......................................... ....                                            6 4  DETAILS............................................................................                                    6 4.1  Responsibilities ...............................................................                                6 5  FINAL CONDITIONS .............................................................. 10 6  REFERENCES .....................................................................                                      11 :    Functional Checks of EOF NRC and MSP Phones..................... 12 :    Functional Checks of TSC NRC and MSP Phones..................... 13 :    Functional Checks of ERO Facility Equipment ........................ 15 :    Functional Check of Berrien County 911 Ring Down Phones .......... 22 :    Satellite Phone Checks ................................................ 23 Data Sheet 1:    EOF Monthly Checklist ............................................... 25 Data Sheet 2:    EOF Quarterly Checklist...............................................26 Data Sheet 3:    FOF Quarterly Radiation Protection Checklist........................ 29 Data Sheet 4:    TSC Monthly Checklist................................................ 32 Data Sheet 5:    TSC Quarterly Checklist .............................................. 33 Data Sheet 6:    TSC Quarterly Radiation Protection Checklist ........................ 34 Data Sheet 7:    OSC Monthly Checklist.............................................. .. 35 Data Sheet 8:    OSC Quarterly Checklist .............................................. 36 Data Sheet 9:    OSC Quarterly Radiation Protection Checklist                          .....................            38


systems tests 1.3.4 Emergency Preparedness (EP) equipment functional tests 1.3.5 Emergency Response Data System (ERDS) test Information EPP-2080-ERO-001 I Rev. 14 Page 4 of 651 Emergency Response Resource ReadinessJ 2 DEFINITIONS AN]) ABBREVIATIONS Term Meaning AR Action Request BCSD Berrien County Sheriff's Department GAS Central Alarm Station CREG Control Room RP Emergency Cabinet DAP Dose Assessment Program ED Electronic Dosimeter ENC Emergency News Center ENS Emergency Notification System EOF Emergency Operations Facility EP Emergency Preparedness EP[P Emergency Plan Implementing Procedure EPM Emergency Preparedness Manager ER Emergency Room ERDS Emergency Response Data System ERO Emergency Response Organization ERONS Emergency Response Organization Notification System FTS-2001 Federal Telephone System-2001.
        =-w-NR                EPP-2080-ER0-001                   Rev. 14                         Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart            Emergency Preparedness                   Emergency Preparedness Writer                  Document Owner                            Cognizant Organization Data Sheet 10:    ENC/JIC Monthly Checklist .......................................... 41 Data Sheet 11:    Survey Vehicle Monthly Checklist..................................... 42
This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.It is owned, operated and maintained by the Federal Government.
*Data Sheet 12:    Survey Vehicle Radiation Protection Quarterly Checklist.............. 43 Data Sheet 13:    Control Room Monthly Checklist...................................... 45 Data Sheet 14:    Control Room Quarterly Radiation Protection Checklist .............. 47 Data Sheet 15:    Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.............................................................. 48 Data Sheet 16:    CAS/SAS Monthly Checklist...........................................50 Data Sheet 17:    Emergency Response Data System Testing ..........................                      .. 51 Data Sheet 18:    Berrien County EOC Radiation Protection Quarterly Checklist ........ 54 Data Sheet 19:    Training Center Radiation Protection Quarterly Checklist ............ 55 Data Sheet 20:    LMC Radiation Protection Quarterly Checklist........................56 Data Sheet 21:    Emergency Sampling Station Quarterly Radiation Protection Checklist eQeee~eoeeeeleeeeee          ....o-ee--Q.eee-.....................eeeeeo59 Data Sheet 22:    Emergency Plan Respiratory Protection............................... 60 Data Sheet 23:    RP/Ops Emergency Response Equipment Quarterly Checklist ......... 61 Data Sheet 24:    Monthly Satellite Phone Checks ....................................... 63 Data Sheet 25:    Radiation Protection Portable Instrument Kit Inventory...............64 Data Sheet 26:    Security Control Center............................................... 65
JIG Joint Infonmation Center KI Potassium Iodide LMC Lakeland Medical Center Information I EPP-2080-ERO-001 Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term Meaning MSP Michigan State Police NDM Nuclear Document Management NRC
* Nuclear Regulatory Commission OBA Office Building Addition OSC Operations Support Center PAM Personal Alarming Module PAS Public Address System PPC Plant Process Computer RiP Radiation Protection RPAC Radiation Protection Access Control SAS Secondary Alarm Station SBE Service Building Extension SCC Security Control Center SCBA Self Contained Breathing Apparatus SPS Site Protective Services SRD Self Reading Dosimeter SV Survey Vehicle TLD Thermoluminescent Dosimeter TSC Technical Support Center TRPAC Turbine RPAC Information EPP-2080-ERO-001 I Rev. 14 I Page 6 of 65 Emergency Response Resource Readiness 3 PRECAUTIONS AND LIMiITATIONS 3.1 When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.3.2 A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.3.3 Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.New cartridges should be marked with their expiration date if not already marked by the manufacturer.
3.4 All readiness checks shall be documented on the applicable data sheet.3.5 This procedure may be performed in part or in whole depending on data sheet(s)being performed.


===3.6 Individual===
Information      I    EPP-2080-ERO-001            I      Rev. 14          Page 3 of 65 Emergency Response Resource Readiness 1      PURPOSE AN]) SCOPE 1.1    The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.
1.2    Establish methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.
1.3    This procedure applies to the following periodic requirements:
1.3.1    Emergency Response Organization (ERO) drills and exercises 1.3.2    Emergency Response facility inventories 1.3.3    Communications systems tests 1.3.4    Emergency Preparedness (EP) equipment functional tests 1.3.5    Emergency Response Data System (ERDS) test


steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003,"Procedure and Work Instruction Use and Adherence".
Information         EPP-2080-ERO-001         I   Rev. 14             Page 4 of 651 Emergency Response Resource ReadinessJ 2   DEFINITIONS AN]) ABBREVIATIONS Term      Meaning AR        Action Request BCSD      Berrien County Sheriff's Department GAS        Central Alarm Station CREG      Control Room RP Emergency Cabinet DAP        Dose Assessment Program ED        Electronic Dosimeter ENC        Emergency News Center ENS        Emergency Notification System EOF       Emergency Operations Facility EP        Emergency Preparedness EP[P      Emergency Plan Implementing Procedure EPM        Emergency Preparedness Manager ER        Emergency Room ERDS      Emergency Response Data System ERO        Emergency Response Organization ERONS      Emergency Response Organization Notification System FTS-2001  Federal Telephone System-2001. This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.
3.7 EP resource readiness checks on RP equipment do not include handling of sources. This is the responsibility of RP.4 DETAILS 4.1 Responsibilities 4.1.1 The EPM is responsible for the execution of this procedure.
It is owned, operated and maintained by the Federal Government.
4.1.2 The EPM or designee is responsible for reviewing and signing the data sheets.
JIG        Joint Infonmation Center KI        Potassium Iodide LMC        Lakeland Medical Center
Information I EPP-2080-ERO-001 I Rev. 14 Page 7 of 65 Emergency Response Resource Readiness 4.1.3 The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.* Data Sheet 1, EOF Monthly Checklist o Data Sheet 2, EOF Quarterly Checklist o Data Sheet 4, TSC Monthly Checklist a Data Sheet 5, TSC Quarterly Checklist* Data Sheet 7, OSC Monthly Checklist* Data Sheet 8, OSC Quarterly Checklist* Data Sheet 10, ENC/JIC Monthly Checklist* Data Sheet 11, Survey Vehicle Monthly Checklist* Data Sheet 13, Control Room Monthly Checklist* Data Sheet 16, CAS/SAS Monthly Checklist* Data Sheet 17, Emergency Response Data System Testing* Data Sheet 24, Monthly Satellite Phone Checks 4.1.4 The following Data Sheets are performed by Radiation Protection.
* Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist* Data Sheet 9, OSC Quarterly Radiation Protection Checklist* Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData Sheet 20, LMC Radiation Protection Quarterly Checklist S Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist* Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist* Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory* Data Sheet 26, Security Control Center 4.2 The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.


====4.2.1 Attachment====
Information I      EPP-2080-ERO-001              Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term      Meaning MSP      Michigan State Police NDM      Nuclear Document Management NRC
* Nuclear Regulatory Commission OBA      Office Building Addition OSC      Operations Support Center PAM      Personal Alarming Module PAS      Public Address System PPC      Plant Process Computer RiP      Radiation Protection RPAC      Radiation Protection Access Control SAS      Secondary Alarm Station SBE      Service Building Extension SCC      Security Control Center SCBA      Self Contained Breathing Apparatus SPS      Site Protective Services SRD      Self Reading Dosimeter SV        Survey Vehicle TLD      Thermoluminescent Dosimeter TSC      Technical Support Center TRPAC    Turbine RPAC


1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.4.2.2 Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.
Information              EPP-2080-ERO-001            I    Rev. 14    I    Page 6 of 65 Emergency Response Resource Readiness 3      PRECAUTIONS AND LIMiITATIONS 3.1    When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.
Information I EPP-2080-ERO-001 I Rev. 14 I Page 8 of 65 Emergency Response Resource Readiness 4.2.3 Place a "1"" or "X" in the box next to each item to signify acceptability.
3.2    A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.
4.2.4 A signature block is provided for the person performing the check.4.3 The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.4.3.1 IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced.
3.3    Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.
For example: a frisker could be temporarily substituted for a portal monitor.IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.4.4 Emergency Preparedness Staging Locations 4.4.1 The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).
New cartridges should be marked with their expiration date if not already marked by the manufacturer.
3.4    All readiness checks shall be documented on the applicable data sheet.
3.5    This procedure may be performed in part or in whole depending on data sheet(s) being performed.
3.6    Individual steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003, "Procedure and Work Instruction Use and Adherence".
3.7    EP resource readiness checks on RP equipment do not include handling of radioactiv*e sources. This is the responsibility of RP.
4      DETAILS 4.1    Responsibilities 4.1.1      The EPM is responsible for the execution of this procedure.
4.1.2      The EPM or designee is responsible for reviewing and signing the data sheets.
 
Information      I      EPP-2080-ERO-001          I    Rev. 14          Page 7 of 65 Emergency Response Resource Readiness 4.1.3    The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.
* Data  Sheet 1, EOF Monthly Checklist o        Data  Sheet 2, EOF Quarterly Checklist o  Data  Sheet 4, TSC Monthly Checklist a        Data  Sheet 5, TSC Quarterly Checklist
* Data  Sheet 7, OSC Monthly Checklist
* Data  Sheet 8, OSC Quarterly Checklist
* Data  Sheet 10, ENC/JIC Monthly Checklist
* Data  Sheet 11, Survey Vehicle Monthly Checklist
* Data  Sheet 13, Control Room Monthly Checklist
* Data  Sheet 16, CAS/SAS Monthly Checklist
* Data  Sheet 17, Emergency Response Data System Testing
* Data  Sheet 24, Monthly Satellite Phone Checks 4.1.4    The following Data Sheets are performed by Radiation Protection.
* Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist
* Data Sheet 9, OSC Quarterly Radiation Protection Checklist
* Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a        Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist
            .. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o        Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData          Sheet 20, LMC Radiation Protection Quarterly Checklist S  Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist
* Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist
* Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a        Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory
* Data Sheet 26, Security Control Center 4.2    The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.
4.2.1    Attachment 1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.
4.2.2   Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.
 
Information       I       EPP-2080-ERO-001           I   Rev. 14       I     Page 8 of 65 Emergency Response Resource Readiness 4.2.3   Place a "1""   or "X" in the box next to each item to signify acceptability.
4.2.4   A signature block is provided for the person performing the check.
4.3   The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.
4.3.1   IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced. For example: a frisker could be temporarily substituted for a portal monitor.
IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.
4.4   Emergency Preparedness Staging Locations 4.4.1   The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).
The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.
The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.
4.4.2 The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3 The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom.
4.4.2     The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.
The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.
The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3     The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom. The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.
4.4.4 The GREG is located on 633' elevation turbine deck next to TSC stairway.The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5 The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.
4.4.4     The GREG is located on 633' elevation turbine deck next to TSC stairway.
Information I EPP-2080-ERO-001 I Rev. 14 I Page 9 of 65 Emergency Response Resource Readiness 4.4.6 The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.4.4.7 The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.
The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5     The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.


====4.4.8 Lakeland====
Information        I    EPP-2080-ERO-001          I    Rev. 14      I      Page 9 of 65 Emergency Response Resource Readiness 4.4.6      The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.
Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.7      The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.
Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.
4.4.8     Lakeland Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.9      Lakeland Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.10    Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.
4.4.11    RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.
4.5    Quarterly checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.
4.6    Control Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
4.7    CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.
4.8    IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation. Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.
4.9    Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.
4.10  Make a copy of the completed data sheets for retention by the EP Department.


====4.4.9 Lakeland====
Information            EPP-2080-ERO-001        [  Rev. 14        Page 10 of 65 Emergency Response Resource Readiness 5      FINAL CONDITIONS 5.1    Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.
Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.
4.4.10 Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.
4.4.11 RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.


===4.5 Quarterly===
Information            EPP-2080-ERO-001        I    Rev. 14      I  Page 11 of 65 Emergency Response Resource Readiness 6      REFERENCES 6.1i    Use


checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.
==References:==


===4.6 Control===
6.1.1    PMP-2030-R.EC-001, Records Management 6.1.2    PMP-7030-CAP-001, Action Initiation 6.1.3  PMP-2350-CMS-001, Commitmnent Management 6.1.4   RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5  RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6  RMT-2080-TSC-001, Activation and Operation of the TSC 6.2    Writing
Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
4.7 CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.
4.8 IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation.
Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.4.9 Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.4.10 Make a copy of the completed data sheets for retention by the EP Department.
Information EPP-2080-ERO-001  
[ Rev. 14 Page 10 of 65 Emergency Response Resource Readiness 5 5.1 FINAL CONDITIONS Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.
Information EPP-2080-ERO-001 I Rev. 14 I Page 11 of 65 Emergency Response Resource Readiness 6 REFERENCES 6.1i Use


==References:==
==References:==


6.1.1 PMP-2030-R.EC-001, Records Management 6.1.2 PMP-7030-CAP-001, Action Initiation 6.1.3 PMP-2350-CMS-001, Commitmnent Management 6.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5 RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 6.2 Writing
6.2.1   Source


==References:==
==References:==
: a. Emergency Station Minimum Inventory Requirements, RP-95-03
: b. D.C. Cook Emergency Plan, Appendix C
: c. NRC Commitment 1179
: d. NRC Commitment 5392 6.2.2    General References
: a. 10 CFR 50.47(b)
: b. 10 CFR 50, Appendix E
: c. NIJRBG-0654/FEMA-REP- 1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.
: d. D.C. Cook Emergency Plan, Appendix K
: e. AR 00863697
Reference              EPP-2080-ERO-001                Rev. 14          Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP                          Pages:
Atahet1Phones                                                      12 1    Monthly Phone System Test in the EOF NOTE:          A "1" must be dialed pirto daigthe 10 dgtNRC number.
1.1  Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.
SNOTE:          Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.
1.2  IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.
1.3  Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.
Area                      Abbreviation    Meaning NRC Work Center            HPN              Health Physics Network NRC Work Center            PMCL            Protective Measure Counterpart Link NRC Work Center            RSCL            Reactor Safety Counterpart Link Dose Assessment Area      HPN              Health Physics Network Dose Assessment Area      HPN              Health Physics Network Dose Assessment Area      PMCL            Protective Measure Counterpart Link Main Area of the EOF      MCL              Management Counterpart Link Main Area of the EOF      ENS              Emergency Notification System (Red Phone)
Main Area of the EOF      ENS            Emergency Notification System (Red Phone) 1.4    Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).
1.5    Document completion of test using Data Sheet 1, BOF Monthly Checklist.
[  Reference              EPP-2080-ERO-001              Rev. 14          Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP                                Pages:
Atahet2Phones                                                    13 - 14 1      Monthly NRC Phone System Test in the TSC.
NOTE:        A "1" must be dialed pirto daigthe 10 dgtNRC number.
1.1    Notify both Control Rooms that the monthly NRC phone check is being conducted.
1.2    When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.
1.2.1    The Control Room NRC Phone will ring once but should be disregarded.
1.3    Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.
NOTE:          Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.
1.3.1    IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.
1.4    Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone                      Abbreviation    Meaning NRC Communication          HPN            Health Physics Network NRC Communication          PMCL            Protective Measure' Counterpart Link NRC Communication          RSCL            Reactor Safety Counterpart Link NRC Communication          ENS            Emergency Notification System (Red Phone)
Plant Evaluation Team      1{PN            Health Physics Network Plant Evaluation Team      ENS            Emergency Notification System (Red Phone)


====6.2.1 Source====
efrneEPP-2080-ERO-O01                          Rev. 14        Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP                        Pages:
Atahet2Phones                                                  13 - 14 2  Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).
2.1 Document completion of test using Data Sheet 4, TSC Monthly Checklist.
2.2 Notify both Control Rooms that the monthly phone checks are complete.


==References:==
Reference                 EPP-2080-ERO-001               Rev. 14           Page 15 of 65 I                    Emergency Response Resource Readiness I  Attachment 3          Functional Checks of ERO Facility Equipment            Pages:
: a. Emergency Station Minimum Inventory Requirements, RP-95-03 b. D.C. Cook Emergency Plan, Appendix C c. NRC Commitment 1179 d. NRC Commitment 5392 6.2.2 General References
1 FAX Machines 1.1     Demonstrate that each FAX machine is capable of sending and receiving FAXs.
: a. 10 CFR 50.47(b)b. 10 CFR 50, Appendix E c. NIJRBG-0654/FEMA-REP-1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.d. D.C. Cook Emergency Plan, Appendix K e. AR 00863697 Reference EPP-2080-ERO-001 Rev. 14 Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP Pages: Atahet1Phones 12 1 Monthly Phone System Test in the EOF NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.1. 1 Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.SNOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.1.2 IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.1.3 Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.Area Abbreviation Meaning NRC Work Center HPN Health Physics Network NRC Work Center PMCL Protective Measure Counterpart Link NRC Work Center RSCL Reactor Safety Counterpart Link Dose Assessment Area HPN Health Physics Network Dose Assessment Area HPN Health Physics Network Dose Assessment Area PMCL Protective Measure Counterpart Link Main Area of the EOF MCL Management Counterpart Link Main Area of the EOF ENS Emergency Notification System (Red Phone)Main Area of the EOF ENS Emergency Notification System (Red Phone)1.4 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).
* IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.
* Ensure the FAX machine displays the correct date and time.
S    To verify a FAX machine operation;
* Press "Function"
* 6 (Print out)
* 1 (Journal)
* Set
* 1 - to start print of Journal o    Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send) and RCV (receive) FAXs.
* Attach Journal to facility checklist.
1.2    Acceptance Criteria: The minimum number, of functional FAX machines, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.


===1.5 Document===
Reference               EPP-2080-ERO-001                 Rev. 14           Page 16 of 65 Emergency Response Resource Readiness I  Attachment 3      jFunctional Checks of ERO Facility Equipment                Pages:
completion of test using Data Sheet 1, BOF Monthly Checklist.
2        Telephones 2.1i    Verify each phone in the facility is capable of both dialing out and receiving calls.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages: Atahet2Phones 13 -14 1 Monthly NRC Phone System Test in the TSC.NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.1.1 Notify both Control Rooms that the monthly NRC phone check is being conducted.
2.2      Acceptance Criteria: The minimum number, of functional telephones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
1.2 When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.1.2.1 The Control Room NRC Phone will ring once but should be disregarded.
3        Copiers 3.1     Make 1 copy of a test page.
1.3 Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.NOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.1.3.1 IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.1.4 Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone Abbreviation Meaning NRC Communication HPN Health Physics Network NRC Communication PMCL Protective Measure' Counterpart Link NRC Communication RSCL Reactor Safety Counterpart Link NRC Communication ENS Emergency Notification System (Red Phone)Plant Evaluation Team 1{PN Health Physics Network Plant Evaluation Team ENS Emergency Notification System (Red Phone) efrneEPP-2080-ERO-O01 Rev. 14 Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages: Atahet2Phones 13 -14 2 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).
3.2    Acceptance Criteria: The minimum number, of functional copiers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
4        Computers 4.1     Power up each computer. Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP),
as needed on that computer for the ERO position that uses the computer.
4.2      Acceptance Criteria: The minimum number, of functional computers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
5        Monitors 5.1      Power up the monitor(s) and verify it is functional with its associated computer.
5.2      Acceptance Criteria: The minimum number, of functional monitors, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.


===2.1 Document===
Reference                EPP-2080-ERO-001                Rev. 14        Page 17 of 65 Emergency Response Resource Readiness Attachment 3          Functional Checks of ERO Facility Equipment          Pages:
completion of test using Data Sheet 4, TSC Monthly Checklist.
15 - 21 6        Copy Boards 6.1      Make a copy of the board to verify the copy board operates properly.
6.2     Acceptance Criteria: The minimum number, of functional Copy Boards, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
7        Facility Microphones 7.1     Power up the microphone's power supply and talk into the microphone. Verify your voice can be heard in each room of the ERG facility.
7.2      Acceptance Criteria: The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
8        OSC ED)Reader 8.1      Touch the screen of the ED Reader.
8.2      Acceptance Criteria: Ensure that the display screen is functional.
9        Facility Managers' Bridge 9.1      Dial the Facility Managers' Bridge number found on the ERG Toolbox card.
9).2    WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.
9.3      Speak into both phones verifying that each phone can be heard on the other phone.
-9.4     Hang up both phones.
9.5      Acceptance Criteria: Each phone can be heard on the other phone.


===2.2 Notify===
Reference*              EPP-2080-ERO-001                 Rev. 14         Page 18 of 65 Emergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment           Pages:
both Control Rooms that the monthly phone checks are complete.
10    Projector Unit & Microphone in JIC Auditorium 10.1   Power up the unit using the touch screen on the podium.
I Reference EPP-2080-ERO-001 Rev. 14 Page 15 of 65 I Emergency Response Resource Readiness I Attachment 3 Functional Checks of ERO Facility Equipment Pages: 1 FAX Machines 1.1 Demonstrate that each FAX machine is capable of sending and receiving FAXs.* IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.* Ensure the FAX machine displays the correct date and time.S To verify a FAX machine operation;
10.2  Touch the icon for computer, TV, camera, etc.
* Press "Function"* 6 (Print out)* 1 (Journal)* Set* 1 -to start print of Journal o Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send)and RCV (receive)
10.3    Verify the projector is displayed on the auditorium screen.
FAXs.* Attach Journal to facility checklist.
10.4  Verify the microphone is functional by talking into it.
10.5  Power down the auditorium system.
10.6  Acceptance Criteria: The JIC projector and microphone work satisfactorily.
11    Frisker 11.1  Verify the frisker is plugged in to a functioning AC outlet.
11.2    Turn on.
11.3  Increase speaker volume and verify audible response when a background count is detected.
11.4    Verify meter deflection when a background count is detected.
11.5    Turn frisker off.
11.6   Verify calibration does not expire prior to the end of the next month.
11.7    Acceptance criteria: Audible response and meter deflection.
12      Area Radiation Monitor 12.1    Verify the monitor is plugged in to a functioning AC outlet.
12.2    Turn on.
12.3    Verify an upscale meter response when a background count is detected.
12.4    Turn monitor off.
12.5    Verify calibration does not expire prior to the end of the next month.


===1.2 Acceptance===
Reference              EPP-2080-ERO-001              Rev. 14        Page 19 of 65 I                  Emergency Response Resource Readiness Attachment 3        Functional Checks of ERO. Facility Equipment        Pages:
12.6  Acceptance criteria: An upscale meter response when a background count is detected.


Criteria:
RfrneEPP-2080-ERO-001                             Rev. 14         Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment             Pages:
The minimum number, of functional FAX machines, is shown on the facility monthly checklist.
13      Equipment 13.1    Inventory frequency 13.1.1  All emergency supplies and equipment are inventoried at the following prescribed frequencies:
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.
Quarterly portable instrumentation            SRDs laboratory instrumentation          KI tablets vehicle radios                      TLDs respiratory equipment              All other supplies 13.1.2  Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.
Reference EPP-2080-ERO-001 Rev. 14 Page 16 of 65 Emergency Response Resource Readiness I Attachment 3 jFunctional Checks of ERO Facility Equipment Pages: 2 Telephones 2.1i Verify each phone in the facility is capable of both dialing out and receiving calls.2.2 Acceptance Criteria:
13.2   Facility Readiness 13.2.1  Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.
The minimum number, of functional telephones, is shown on the facility monthly checklist.
13.2.2   Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.3 Copiers 3.1 Make 1 copy of a test page.3.2 Acceptance Criteria:
13.2.3  Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.
The minimum number, of functional copiers, is shown on the facility monthly checklist.
13.2.4  Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.4 Computers 4.1 Power up each computer.
13.2.5  Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.
Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP), as needed on that computer for the ERO position that uses the computer.4.2 Acceptance Criteria:
13.2.6  Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.
The minimum number, of functional computers, is shown on the facility monthly checklist.
13.2.7  Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.5 Monitors 5.1 Power up the monitor(s) and verify it is functional with its associated computer.5.2 Acceptance Criteria:
The minimum number, of functional monitors, is shown on the facility monthly checklist.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.
Reference EPP-2080-ERO-001 Rev. 14 Page 17 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 15 -21 6 Copy Boards 6.1 Make a copy of the board to verify the copy board operates properly.6.2 Acceptance Criteria:
The minimum number, of functional Copy Boards, is shown on the facility monthly checklist.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.7 Facility Microphones


===7.1 Power===
[   Reference               EPP-2080-ERO-001               Rev. 14         Page 21 of 65 Emergency Response Resource Readiness Attachment 3         Functional Checks of ERO Facility Equipment             Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.
up the microphone's power supply and talk into the microphone.
13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent. [NRC Commitment 1179]
Verify your voice can be heard in each room of the ERG facility.7.2 Acceptance Criteria:
13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.
The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist.
13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.
IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.8 OSC ED) Reader 8.1 Touch the screen of the ED Reader.8.2 Acceptance Criteria:
13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.
Ensure that the display screen is functional.
13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory. RP performs Periodic Performance Tests (PPT) and calibrates as necessary.
9 Facility Managers' Bridge 9.1 Dial the Facility Managers' Bridge number found on the ERG Toolbox card.9).2 WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.9.3 Speak into both phones verifying that each phone can be heard on the other phone.-9.4 Hang up both phones.9.5 Acceptance Criteria:
Each phone can be heard on the other phone.
Reference*
EPP-2080-ERO-001 Rev. 14 Page 18 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 10 Projector Unit & Microphone in JIC Auditorium 10.1 Power up the unit using the touch screen on the podium.10.2 Touch the icon for computer, TV, camera, etc.10.3 Verify the projector is displayed on the auditorium screen.10.4 Verify the microphone is functional by talking into it.10.5 Power down the auditorium system.10.6 Acceptance Criteria:
The JIC projector and microphone work satisfactorily.
11 Frisker 11.1 Verify the frisker is plugged in to a functioning AC outlet.11.2 Turn on.11.3 Increase speaker volume and verify audible response when a background count is detected.11.4 Verify meter deflection when a background count is detected.11.5 Turn frisker off.11.6 Verify calibration does not expire prior to the end of the next month.11.7 Acceptance criteria:
Audible response and meter deflection.
12 Area Radiation Monitor 12.1 Verify the monitor is plugged in to a functioning AC outlet.12.2 Turn on.12.3 Verify an upscale meter response when a background count is detected.12.4 Turn monitor off.12.5 Verify calibration does not expire prior to the end of the next month.
Reference EPP-2080-ERO-001 Rev. 14 Page 19 of 65 I Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO. Facility Equipment Pages: 12.6 Acceptance detected.criteria:
An upscale meter response when a background count is RfrneEPP-2080-ERO-001 Rev. 14 Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages: 13 Equipment 13.1 Inventory frequency 13.1.1 All emergency supplies and equipment are inventoried at the following prescribed frequencies:
Quarterly portable instrumentation SRDs laboratory instrumentation KI tablets vehicle radios TLDs respiratory equipment All other supplies 13.1.2 Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.
13.2 Facility Readiness 13.2.1 Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.
13.2.2 Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.
13.2.3 Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.
13.2.4 Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.
13.2.5 Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.
13.2.6 Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.
13.2.7 Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.
[ Reference EPP-2080-ERO-001 Rev. 14 Page 21 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.
13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent.  
[NRC Commitment 1179]13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.
13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.
13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
RP performs Periodic Performance Tests (PPT) and calibrates as necessary.
Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.
Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.
o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.
o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.
* After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
* After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
* Record the serial number of equipment in the space provided.13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.14 Documentation 14.1 Document test results on the specific data sheet.
* Record the serial number of equipment in the space provided.
Reference EPP-2080-ERO-001 Rev. 14 Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring Pages: Atahet4Down Phones "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1 Testing of the ring down phone system in the Control Room 1.1.1 Request permission from the Control Room to perform the monthly check.1.1.2 Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.1.1.3 Pick up the phone and talk to the 911 Dispatch Center.1.1.4 Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.
14     Documentation 14.1   Document test results on the specific data sheet.
 
Reference               EPP-2080-ERO-001               Rev. 14         Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring             Pages:
Atahet4Down                         Phones                       "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1   Testing of the ring down phone system in the Control Room 1.1.1   Request permission from the Control Room to perform the monthly check.
1.1.2     Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.
1.1.3   Pick up the phone and talk to the 911 Dispatch Center.
1.1.4   Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.
1.2  Testing of the ring down phone system in the EOF.
1.2.1    Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.
1.2.2    Pick up the phone and talk to the 911 Dispatch Center.
1.2.3    Document completion on Data Sheet 1, EOF Monthly Checklist.
1.3    Testing of the ring down phone system in the CAS and SAS.
1.3.1    Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.
1.3.2    Document completion onl Data Sheet 16, CAS/SAS Monthly Checklist.
 
Reference                EPP-2080-ERO-001                Rev. 14          Page 23 of 65 Emergency Response Resource Readiness Attachment 5                      Satellite Phone Checks                      Pages.
NOTE      ;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.
1      MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE 1.1    Turn on by holding button on top of phone.
1.2    Check battery charge level 1.2.1    Locate the battery icon on the upper right side of the phone display 1.2.2    Level of charge should be full
: a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours.
1.3    To place acall.
1.3.1    extend antenna.
1.3.2    dial number.
1.3.3    make contact with another person/phone.
1.4    To receive a call.
1.4.1    The phone will display a call attempt.
1.4.2    Extend antenna.
1.4.3    After several seconds the phone will vibrate or ring and display an incoming call.
1.4.4    Select accept.
1.4.5    Make contact.
 
Reference                EPP-2080-ERO-001                  Rev. 14              Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5                      Satellite Phone Checks                          Pages.
1.5    End call.
1.6    Place on charging unit.
1.7    Acceptance Criteria 1.7.1    Contact is made by either placing or receiving a call.
1.7.2    Battery is fully charged.
1.8    For the phones located at Berrien County, Lake Township and Lake-Michigan College.
1.8.1    Call the location to be tested prior to the test to inform them that the test is about to commence.
1.8.2    Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.
1.8.3    Document completion on Data Sheet 24, Monthly Satellite Phone Checks
 
Reference                  EPP-2080-ERO-00I                      Rev. 14          Page 25 of 65 Emergency Response Resource Readiness 25ges:
Data Sheet 1                        EOF Monthly Checklist                            Pag 2 EOF Monthly Checklist
_______________    _________/_
Month                  Year Equipment Functional Checks:                              Equipment Functional Checks:
ci 2 FAX machine(s) (Attachment 3)                      ci 1 Frisker (Attachment 3) ci 1 Telephone (Attachment 3)                            ci 1 Area Radiation Monitor (Attachment 3) ci 1 Copier (Attachment 3)                              ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment 3)                        tranlsmission) ci 1 DAP computer (Attachment 3)                                          Facility Set Up:
ci 1 Flat screen monitors (Attachment 3)                ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment 3)                              boards/copier ci 1 PAS microphone                                      [] 1 toner for copier ci 1 Projector                                          ci Check EPiIiP procedure books for current ciMSP phones (Attachment 1)                              revision ci NRC FTS-2001 phones (Attachment 1)                    ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment 5)                    [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)
Facility Readiness:              [21 Satisfactory            ci Unsatisfactory (enter comment below)
Comments:
Print Name                          Signature                    Date Reviewed by:    ____________/
EPM or designee                    Signature                    Date
 
I  Reference                EPP-2080-ERO-0O1                Rev. 14          Page 26 of 65 I                    Emergency Response Resource Readiness I                                                              Pages:
Data Sheet 2                      EOF Quarterly Checklist                      26 -. 28 EOF Quarterly Checklist
__________________/
Quarter        Year Portable Instrument Kits in storage area
[] Verify kit is sealed J]  Air Sampling Kit [Ref 6.2. laII.
II  14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
[]  14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a] and [Ref 6.2. lb].
Li  2 Count Rate Meters (friskers).
Li  Miscellaneous RP Supply Box.
NOTE:            *Before    testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe  table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room:
ElVerify radio is turned on and is on the correct frequency.
Li Contact 'the person in the OSC and verify two-way communication is obtained.
Li Clear communication successful, EOF to OSC.
Li Clear communication successful, OSC to EOF.
[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF
 
[  Reference                EPP-2080-ERO-001                Rev. 14          Page 27 of 65 I                    Emergency Response Resource Readiness Data Sheet 2                    EOF Quarterly Checklist                      26 - 28 24-hour coping supplies El      Open storage area.
El      Ensure that the Contents agree with the inventory sheet.
LII      IF the inventory is correct, THEN close the cabinet/storage container.
El      IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.
LI]      Close the Cabinet/storage container.
Alternate OSC Equipment and Supplies:
El      10 copies of RMT-2080-OSC-0O1 El      1 Lap Top computer El      Copier Board El      Extension Cord LII    System overview drawings book El      Plant Phone List El    ,Laminated Field Monitoring Team maps El      Cube signs El      4 Telephones El      Pens El      Pads of lined paper El      Post Its El      Calculator Alternate TSC Equipment and Supplies:
El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC
 
Reference                EPP-2080-ERO-001              Revo 14              Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2                    EOF Quarterly Checklist                        26age28 F-i Copi~er Board CL Sign in board Li EPZ maps    - poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.
El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE:        An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:            Li Satisfactory      Cl Unsatisfactory (enter comment below)
Comments:
Performed by:____________I____________                                        ______
Print Name                    Signature                      Date Reviewed by:
EPM or designee              Signature                      Date
 
Reference                EPP-2080-ERO-001              Rev. 14          Page 29 of  651 Emergency Response Resource Readiness Data Sheet 3          EOF Quarterly Radiation Protection Checklist            Pages.
EOE Quarterly Radiation Protection Checklist Quarter      Year NOTE:            Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.
1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]
EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1.a] [Ref 6.2.l.b]
[] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)
Radiation Protection Portable Instrument Kit
[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
Air sampling Kit o      El Break Seal and inventory
[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes
[] Particulate Filters (47mm filters)
Li Time Piece
[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date  _______
a      Li Install new seal Additional Equipment
[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number        ____Serial    Number__
[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)
Li 8 TLDs (Area TLD Badges)
Li 8 EDs (Area EDs)
Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3            EOF Quarterly Radiation Protection Checklist            Pages31 2        Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
EL    Donald C. Cook EPZ Map Li    Berrien County Map Li1    12 Blank Data Sheets (verify current revision)
RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li    Key to Air Sampling Stations (B-i)
Li Keys to Rosemary Beach Gate Li    2 Clipboards Li      1 Air Sampler with sample head: Serial Number________
L-i    RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )
Li      1 Assorted Tool Kit Li    2 Site Maps Li    1 Flashlight/Lantern with Batteries, verify operation.
Li    Compass Li2      Sets Winter Apparel Li    Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)
Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags
 
[  Reference                      EPP-2080-ERO-001                                      Rev. 14          Page 31 of 65 I                        Emergency Response Resource Readiness Data Sheet 3              EOF Quarterly Radiation Protection Checklist                                  29age31 Facility Readiness:                  El Satisfactory                      El Unsatisfactory (enter comment below)
Comments:
Performed by: ______________________________________________I________________________________________________
El              Print Name                                      Signature                          Date Reviewed by: __________________________________________/____________________________________________
EPM or designee                                  Signature                          Date
 
[  Reference                EPP-2080-ERO-O01                  Rev. 14            Page 32 of 65 I                  Emergency Response Resource Readiness Data Sheet 4                      TSC Monthly Checklist                          Pages TSC Monthly Checklist
__________________/
Month            Year Equipment Functional Checks:                        Equipment Functional Checks:
El 1 Copier (Attachment 3)                          El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment 3)                    output)
LI 2 Flat screen monitors (Attachment 3)            EL1 Frisker (Attachment 3)
El 3 PPC computers (Attachment 3)                  El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment 3)                      display)
LI 2 Telephones (Attachment 3)                                      Facility Set Up:
LI 1 MSP phone (Attachment 2)                      LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment 2)              boards/copier LI 1 Iridium 9555 Satellite phones                  LI 1 toner for copier (Attachment 5)                                      LI Check procedure books for current revision LI 3 EP radios (turn on and verify                  LI Check data sheet folders for current revision transmission)
LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:            LI1 Satisfactory        LI1 Unsatisfactory (enter comment below)
Comments Performed by:
Print Name                      Signature                      Date Reviewed by:                                  /_
EPM or designee                  Signature                      Date
 
RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev. 14Pages3            f6 Data Sheet 5                    TSC Quarterly Checklist TSC Quarterly Checklist Quarter      Year 24-hour coping supplies El    Open storage area.
Li    Ensure that the Contents agree with the inventory sheet.
Li    IF the inventory is correct, THEN close the cabinet/storage container.
LI    IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
Li    Close the Cabinet/storage container.
Performed by:____________/____________                                      ______
Print Name                  Signature                      Date Reviewed by:____________/__________________
EPM or designee              Signature                      Date
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 34 of 65 I                    Emergency Response Resource Readiness Data Sheet 6          TSC Quarterly Radiation Protection Checklist              Pages:
TSC Quarterly Radiation Protection Checklist Quarter      Year Cabinet Inventory LI Break seal and perform inventory EL        4 TLDs (Area TLDs)
LI        4 EDs (Area EDs)
LI        25 EDs LI        Count Rate Meter [Ref 6.2.1 .a]                        Serial Number  ________
LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI        Portable Continuous Air Monitor [Ref 6.2.1 .a]        Serial Number  _________
LI        Area Radiation Monitors (ARM)                          Serial Number_________
LI        Charcoal lInpregnated fiber filters LI        Air Sample Envelopes LI        26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]
LI        25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]
LI      25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1..a]
LI        65 packages of KI tablets with:
[] 25 KI1 Consent Forms        RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)
LI Install new seal NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
*Facility Readiness:            ElI Satisfactory    LI Unsatisfactory (enter comment below)
Comments:
Performed by:____________/_____________                                        ______
Print Name                    Signature                      Date Reviewed by: ___________/___________                                          _____
EPM or designee              Signature                        Date Dt
 
Reference                EPP-2080-ERO-001                  Rev. 14          Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7                      OSC Monthly Checklist                          Pages:5 OSC Monthly Checklist Month            Year Equipment Functional Checks:                        Equipment Functional Checks:
C] 1 Copy Board (Attachment 3)                    C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment 3)                        output)
C] 1 FAX machine (Attachment 3)                    C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment 3)                transmission)
C]3 Computers (Attachment 3)                                        Facility Set Up:
C] 10 Telephones (Attachment 3)                  C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 - onsite survey, 2 -            boards/copier off-site survey teams) (Attachment 5)              C] 1 toner for copier C] EP radios (18 DCT or RP                        C] Check procedure books for current revision teams/personnel, 6 for Operations                  C]1 Check data sheet folders for current revision personnel) (turn on and verify charged)            C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify            C]Oealcanissndperne display)                                          QOealceniesadapaac C]2Fikr (tahet3                                    C] Verify survey vehicle keys are in 2 Frskes 3)Emergency (ttacmen                              Key box.
C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.
NOTE:          An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory. Document *number in comments.
Facility Readiness:            C] Satisfactory        [21 Unsatisfactory (enter comment below).
Comments:"
Performed by:                                /
Print Name                      Signature                      Date Reviewed by:
EPM or designee                Signature                      Date
 
Reference              EPP-2080-ERO-001                Rev. 14        Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8                  OSC Quarterly Checklist                    36age37 OSC Quarterly Checklist
__________________/
Quarter        Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.
24-hour coping supplies J    Open storage area.
L)  Ensure that the Contents agree with the inventory sheet.
0l  IF the inventory is correct, THEN close the cabinet/storage container.
[I1  IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
LI]  Close the Cabinet/storage container.
 
Reference              EPP-2080-ERO-001                Rev. 14          Page 37 of 65 Emergency Response Resource Readiness Pages:
Data Sheet 8                      OSC Quarterly Checklist                      36 - 37    j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.
El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.
Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.
For example:
Hand-held radio Channel 1: KNDP798 (off-site)      =  Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site) =Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.* Document number in comments.
Facility Readiness:            Li Satisfactory      Li Unsatisfactory (enter comment below)
Comments:
Performed by:
Print Name                    Signature                    Date Reviewed by:                                  /
EPM or designee        /      Signature                    Date
 
I  Reference              EPP-2080-ERO-OO1                Rev. 14      Page 38 of 65 I                    Emergency Response Resource Readiness DataShet OSCQuatery 9    Rdiaton rotctin CeckistPages.
Data Seet 9        OSC Quarterly Radiation Protection Checklist38-4 Quarter            Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)
El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[
Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)
Calibration Due Date    _____
Li Area Radiation Monitor (ARM): Serial Number            ____
CL Area Radiation Monitor (ARM): Serial Number____
Li 2 Count Rate Meters:          Serial Number    _______
Serial Number_______
Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters:
Serial Number    _______
Serial Number    _______
Serial Number_______
Li 3 GM Survey Meters [Ref 6.2.1.a]:
Serial Number    _______
Serial Number    _______
Serial Number_______
Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number    _______
Serial Number_______
Serial Number    _______
Serial Number________
Li  Purge Rig (located in the Lakeside Office Building north ventilation room)
Li  Walk-Through Portal Monitor Cal Due Date_____
Li  Set of RP Procedures Li  Donald C. Cook 10 mile EPZ map Li Site Map


===1.2 Testing===
Reference              EPP-2080-ERO-001              Rev. 14            Page 39 of 65 I                  Emergency Response Resource Readiness Data Sheet 9        OSC Quarterly Radiation Protection Checklist            Pages40 LI 15 Blank Data Sheets (verify current revision)
of the ring down phone system in the EOF.1.2.1 Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.1.2.2 Pick up the phone and talk to the 911 Dispatch Center.1.2.3 Document completion on Data Sheet 1, EOF Monthly Checklist.
RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)
LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001 - Data Sheet 3 (verify current revision)
LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.
LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]
LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1. .a]
LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment # 5392)
Air Sampling Kit [Ref 6.2.l.a]
LI Break seal and perform inventory LIPad of Paper                          LI Planchetts          LI Particulate filters (47-mam)
LI Sealable Plastic Bags                  LITweezers            LI Time Piece LI Air Sample Envelopes                  LICalculator          LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___
LI Install new seal.
CL Portable Instrument Kit [-Ref 6.2.1 .a]
LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Off Site Responder / Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)
LI 20 EDs


===1.3 Testing===
ReferenceEPP-2080-ERO-001                            Rev. 14Pae4of6 Reference        Emergency Response Resource ReadinessPae4of6 Data Sheet 9            OSC Quarterly Radiation Protection Checklist            Pages:
of the ring down phone system in the CAS and SAS.1.3.1 Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.
Miscellaneous Supply -Box Li Break the seal and inventory.
I] Rad Ribbon / rope                Li Rad Tape                    Li Smears Li Planchetts                        Li Tweezers                    Li Safety Glasses Li Paper                            Li Pens                        Li Disposable Gloves Li Envelopes                        EL Hearing Protection
[] Install-new seal.
Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]
Li 30 Full plastic suits with hoods NOTE:              An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Facility Readiness:              LI] Satisfactory      Li Unsatisfactory (enter comment below)
Comets Performed by:
Print Name                    Signature                    Date Reviewed by:-
EPM or designee                Signature                    Date


====1.3.2 Document====
efrneEPP-2080-ERO-001                             Rev. 14           Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10                  ENC/JIC Monthly Checklist                        Pages:
completion onl Data Sheet 16, CAS/SAS Monthly Checklist.
41 -41 ENC/JIC Monthly Checklist I
Reference EPP-2080-ERO-001 Rev. 14 Page 23 of 65 Emergency Response Resource Readiness Attachment 5 Satellite Phone Checks Pages.NOTE 1 1.1 1.2;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.
Month            Year Equipment Functional Checks:                                Facility Set Up:
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.
Li 1 Copier (Attachment 3)                          Li 1 box of Extra paper El 2 FAX machine(s) (Attachment 3)                  [] 1 toner for copier Li 2 Flat screen monitors (Attachment 3)            LiCheck procedure books for current revision
MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE Turn on by holding button on top of phone.Check battery charge level 1.2.1 Locate the battery icon on the upper right side of the phone display 1.2.2 Level of charge should be full a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours.1.3 To place acall.1.3.1 extend antenna.1.3.2 dial number.1.3.3 make contact with another person/phone.
[] 3 Computers (Attachment 3)                        Li Check data sheet folders for current rev.
1.4 To receive a call.1.4.1 The phone will display a call attempt.1.4.2 Extend antenna.1.4.3 After several seconds the phone will vibrate or ring and display an incoming call.1.4.4 Select accept.1.4.5 Make contact.
EL 2 TVs and 2 Radios                                Li Supply cabinets and key box sealed Li 1 TV recording device(s)                          Li Extra bulbs for large screen projector Ei 15 Telephones (Attachment 3)                      Li Verify the current ERG calendar is in the Li 1 PA microphone (turn on and verify output)          press packets LI] 1 Security Computer in Stairwell (Plug in        EL Check keys in key box and turn on)                                            EiReceptionist - Master Key Li 1 County laptop (Plug in and turn on)                LiSpokesperson - Master Key Li Verify recorded message.
Reference EPP-2080-ERO-001 Rev. 14 Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5 Satellite Phone Checks Pages.1.5 1.6 End call.Place on charging unit.1.7 Acceptance Criteria 1.7.1 Contact is made by either placing or receiving a call.1.7.2 Battery is fully charged.1.8 For the phones located at Berrien County, Lake Township and Lake-Michigan College.1.8.1 Call the location to be tested prior to the test to inform them that the test is about to commence.1.8.2 Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.1.8.3 Document completion on Data Sheet 24, Monthly Satellite Phone Checks Reference EPP-2080-ERO-00I Rev. 14 Page 25 of 65 Emergency Response Resource Readiness 25ges: Data Sheet 1 EOF Monthly Checklist Pag 2 EOF Monthly Checklist_______________
Li 1 Projector in auditorium (Attachment 3)            LiAudio Visual - Master key & cabinet key ELSupport Coordinator - Master Key Li 2 TLDs (Area TLDs)                                  LiMedia Center Manager -Master Key Li 2 EDs (Area EDs)                                    LIMedia Area Coordinator - Master Key LIJIC Setup Coordinator - Master Key, Stair Li Overall cleanliness and appearance                      screen key (#45), 2 Misc Keys NOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
_________/_
Facility Readiness:            LI Satisfactory        Li Unsatisfactory (enter comment below)
Month Year Equipment Functional Checks: Equipment Functional Checks: ci 2 FAX machine(s) (Attachment
Comments:
: 3) ci 1 Frisker (Attachment 3)ci 1 Telephone (Attachment
Performed by:
: 3) ci 1 Area Radiation Monitor (Attachment 3)ci 1 Copier (Attachment
Print Name                    Signature                      Date Reviewed by:                                  I_
: 3) ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment
Date EPM or designee                M1gnature
: 3) tranlsmission) ci 1 DAP computer (Attachment
 
: 3) Facility Set Up: ci 1 Flat screen monitors (Attachment
Reference              EPP-2080-ERO-O01                  Rev. 14              Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11              Survey Vehicle Monthly Checklist                      42 - 42 Survey Vehicle Monthly Checklist LiVehicle #1       El Vehicle #2
: 3) ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment
____________________/
: 3) boards/copier ci 1 PAS microphone
Month            Year L1      Check fuel supply (keep tank full)
[] 1 toner for copier ci 1 Projector ci Check EPiIiP procedure books for current ciMSP phones (Attachment
Li      Check battery (start and drive for 30 minutes)
: 1) revision ci NRC FTS-2001 phones (Attachment
Li      Check that tires are not flat
: 1) ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment
[21    Check that there is no leaking/puddle fluids under vehicle CI      Check that the lights (including turn signals) work Li    Check that windows are not cracked/broken
: 5) [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)Facility Readiness:
[II    Odometer reading _____miles Odometer reading _____miles Li    Spare batteries, 1 set for each vehicle flashlight.
[21 Satisfactory ci Unsatisfactory (enter comment below)Comments: Print Name Reviewed by: ____________/
Li    Check vehicle for overall cleanliness and appearance CL      Check recharge tag on battery jump pack (recharge if necessary)
Signature Date Date EPM or designee Signature I Reference EPP-2080-ERO-0O1 Rev. 14 Page 26 of 65 I Emergency Response Resource Readiness I Pages: Data Sheet 2 EOF Quarterly Checklist 26 -. 28 EOF Quarterly Checklist__________________/
Vehicle Readiness:             Li Satisfactory        EL Unsatisfactory (enter comment below)
_________Quarter Year Portable Instrument Kits in storage area[] Verify kit is sealed J] Air Sampling Kit [Ref 6.2. laII.II 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
Performed by:____________/_____________                                        ______
[] 14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a]
Print Name                      Signature                      Date Reviewed by:____________/__________________
and [Ref 6.2. lb].Li 2 Count Rate Meters (friskers).
EPM or designee                Signature                      Date
Li Miscellaneous RP Supply Box.NOTE: *Before testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room: ElVerify radio is turned on and is on the correct frequency.
 
Li Contact 'the person in the OSC and verify two-way communication is obtained.Li Clear communication successful, EOF to OSC.Li Clear communication successful, OSC to EOF.[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF
Ref erence              EPP-2080-ERO-001                      Rev. 14        Page 43 of 65 Emergency Response Resource Readiness Daa het 2          Survey Vehicle Radiation Protection Quarterly                Pages:
[ Reference EPP-2080-ERO-001 Rev. 14 Page 27 of 65 I Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26 -28 24-hour coping supplies El Open storage area.El Ensure that the Contents agree with the inventory sheet.LII IF the inventory is correct, THEN close the cabinet/storage container.
DtShe12Checklist                                                          43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1             LI Vehicle #2
El IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.
_________________/ _______
LI] Close the Cabinet/storage container.
Quarter              Year EL        Site Map
Alternate OSC Equipment and Supplies: El 10 copies of RMT-2080-OSC-0O1 El 1 Lap Top computer El Copier Board El Extension Cord LII System overview drawings book El Plant Phone List El ,Laminated Field Monitoring Team maps El Cube signs El 4 Telephones El Pens El Pads of lined paper El Post Its El Calculator Alternate TSC Equipment and Supplies: El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC Reference EPP-2080-ERO-001 Revo 14 Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26age28 F-i Copi~er Board CL Sign in board Li EPZ maps -poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE: An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
[]       Berrien County Map LI 15 Blank Data Sheets (verify current revision)
Document number in comments.Facility Readiness:
RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI        RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)
Li Satisfactory Cl Unsatisfactory (enter comment below)Comments: Performed by:____________I____________
LI        Clipboard LI        Flashlight/Lantern with Batteries El        2 Sets Winter Apparel .[Ref 6.2.1.a]
______Print Name EPM or designee Signature Date Signature Date Reviewed by:
LI        Clippers EL        Shovel LI        2 Full Face Respirators with Iodine and Particulate Cartridges . [Ref 6.2.1. a]
Reference EPP-2080-ERO-001 Rev. 14 Page 29 of 651 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages.EOE Quarterly Radiation Protection Checklist Quarter Year NOTE: Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.
LI        Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)
1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.
Miscellaneous Supply Box LI Break the seal and inventory LI Paper            LI  Rad Tape                                    LI Disposable Gloves LI Envelopes          LI Tweezers                                    LI Sample Collection Bags LI Labels            LI Compass                                    LI Rad Ribbon ! rope LI Smears            LI  Keys to Rosemary Beach Gate                LI Writing Implements EL  Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]
[Ref 6.2.1.a] [Ref 6.2.l.b][] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)Radiation Protection Portable Instrument Kit[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Air sampling Kit o El Break Seal and inventory[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes[] Particulate Filters (47mm filters)Li Time Piece[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date _______a Li Install new seal Additional Equipment[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number ____Serial Number__[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)Li 8 TLDs (Area TLD Badges)Li 8 EDs (Area EDs)Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__
 
Reference EPP-2080-ERO-001 Rev. 14 Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages31 2 Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.
Reference                EPP-2080-ERO-001              Rev. 14             Page 44 of 65 Emergency Response Resource Readiness het 2 Daa              Survey Vehicle Radiation Protection Quarterly            Pages:
EL Donald C. Cook EPZ Map Li Berrien County Map Li1 12 Blank Data Sheets (verify current revision)RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li Key to Air Sampling Stations (B-i)Li Keys to Rosemary Beach Gate Li 2 Clipboards Li 1 Air Sampler with sample head: Serial Number________
DtShe12Checklist                                                      43- 44 lNOTE:          Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
L-i RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )Li 1 Assorted Tool Kit Li 2 Site Maps Li 1 Flashlight/Lantern with Batteries, verify operation.
Air Sampling Kit .I[Ref 6.2.1.a]
Li Compass Li2 Sets Winter Apparel Li Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags
II] Break the seal and inventory C)Pad of Paper                      C)Planchetts        C)Particulate filters (47-mm filters)
[ Reference EPP-2080-ERO-001 Rev. 14 Page 31 of 65 I Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist 29age31 Facility Readiness:
C)Sealable Plastic Bags            C)Time Piece        C)Writing Implements C)Air Sample Envelopes              C)Calculator
El Satisfactory El Unsatisfactory (enter comment below)Comments: Performed by: El Reviewed by:______________________________________________I________________________________________________
[] Silver Zeolite Cartridges (min 5 cartridges) Exp Date____
Print Name Signature__________________________________________/____________________________________________
C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]
Date Date EPM or designee Signature
C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
[ Reference EPP-2080-ERO-O01 Rev. 14 Page 32 of 65 I Emergency Response Resource Readiness Data Sheet 4 TSC Monthly Checklist Pages TSC Monthly Checklist__________________/
Vehicle Readiness:             I] Satisfactory      C)Unsatisfactory (enter comment below)
_________Month Year Equipment Functional Checks: Equipment Functional Checks: El 1 Copier (Attachment
Comments:
: 3) El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment
Performed by:
: 3) output)LI 2 Flat screen monitors (Attachment
Print Name                  Signature                      Date Reviewed by:
: 3) EL 1 Frisker (Attachment 3)El 3 PPC computers (Attachment
EPM or designee              Signature                      Date
: 3) El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment
 
: 3) display)LI 2 Telephones (Attachment
Reference                      EPP-2080-ERO-001                    Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13                        Control Room Monthly Checklist             45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)
: 3) Facility Set Up: LI 1 MSP phone (Attachment
__________________/
: 2) LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment
Month              Year One FAX Machine Verify the FAX machine functions per Attachment 3.
: 2) boards/copier LI 1 Iridium 9555 Satellite phones LI 1 toner for copier (Attachment
________________________________________/___________
: 5) LI Check procedure books for current revision LI 3 EP radios (turn on and verify LI Check data sheet folders for current revision transmission)
EP Staff                        Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.
LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Verify the password is correct by logging into ERONS.
Document number in comments.Facility Readiness:
________________________________________/___________
LI1 Satisfactory LI1 Unsatisfactory (enter comment below)Comments Performed by: Reviewed by: Print Name/_Signature Date Date EPM or designee Signature RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev.
EP Staff                        Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4.
14Pages3 f6 Data Sheet 5 TSC Quarterly Checklist TSC Quarterly Checklist Quarter Year 24-hour coping supplies El Open storage area.Li Ensure that the Contents agree with the inventory sheet.Li IF the inventory is correct, THEN close the cabinet/storage container.
_______________________________________/___________
LI IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
EP Staff                        Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff                        Date Dt
Li Close the Cabinet/storage container.
 
Performed by:____________/____________
I  Reference              EPP-2080-ERO-001                Rev. 14           Page 46 of 65 I                  Emergency Response Resource Readiness I
______Print Name Signature Date Reviewed by:____________/__________________
Data Sheet 3CotoRom 13Conrol           oomMontly heckistPages:
EPM or designee Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 34 of 65 I Emergency Response Resource Readiness Data Sheet 6 TSC Quarterly Radiation Protection Checklist Pages: TSC Quarterly Radiation Protection Checklist Quarter Year Cabinet Inventory LI Break seal and perform inventory EL 4 TLDs (Area TLDs)LI 4 EDs (Area EDs)LI 25 EDs LI Count Rate Meter [Ref 6.2.1 .a] Serial Number ________LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI Portable Continuous Air Monitor [Ref 6.2.1 .a] Serial Number _________LI Area Radiation Monitors (ARM) Serial Number_________
othyhelit45                       -46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)
LI Charcoal lInpregnated fiber filters LI Air Sample Envelopes LI 26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]LI 25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]LI 25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges
[Ref 6.2.1. .a]LI 65 packages of KI tablets with:[] 25 KI1 Consent Forms RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)LI Install new seal NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.*Facility Readiness:
ElI Satisfactory LI Unsatisfactory (enter comment below)Comments: Performed by:____________/_____________
______Print Name Signature Date Reviewed by: ___________/___________
_____EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7 OSC Monthly Checklist Pages:5 OSC Monthly Checklist Month Year Equipment Functional Checks: Equipment Functional Checks: C] 1 Copy Board (Attachment
: 3) C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment
: 3) output)C] 1 FAX machine (Attachment
: 3) C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment
: 3) transmission)
C]3 Computers (Attachment
: 3) Facility Set Up: C] 10 Telephones (Attachment
: 3) C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 -onsite survey, 2 -boards/copier off-site survey teams) (Attachment
: 5) C] 1 toner for copier C] EP radios (18 DCT or RP C] Check procedure books for current revision teams/personnel, 6 for Operations C]1 Check data sheet folders for current revision personnel) (turn on and verify charged) C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify C]Oealcanissndperne display) QOealceniesadapaac C]2Fikr (tahet3 C] Verify survey vehicle keys are in 2 Frskes (ttacmen 3)Emergency Key box.C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.
NOTE: An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory.
Document *number in comments.Facility Readiness:
C] Satisfactory
[21 Unsatisfactory (enter comment below).Comments:" Performed by: Reviewed by:/Print Name EPM or designee Signature Signature Date Date Reference EPP-2080-ERO-001 Rev. 14 Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8 OSC Quarterly Checklist 36age37 OSC Quarterly Checklist__________________/
_________Quarter Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.24-hour coping supplies J Open storage area.L) Ensure that the Contents agree with the inventory sheet.0l IF the inventory is correct, THEN close the cabinet/storage container.
[I1 IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.
LI] Close the Cabinet/storage container.
Reference EPP-2080-ERO-001 Rev. 14 Page 37 of 65 Emergency Response Resource Readiness Pages: Data Sheet 8 OSC Quarterly Checklist 36 -37 j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.For example: Hand-held radio Channel 1: KNDP798 (off-site)
= Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site)
=Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.
NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.*
Document number in comments.Facility Readiness:
Li Satisfactory Li Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name/Signature Date Date Signature/EPM or designee Signature I Reference EPP-2080-ERO-OO1 Rev. 14 Page 38 of 65 I Emergency Response Resource Readiness DataShet 9 OSCQuatery Rdiaton rotctin CeckistPages.
Data Seet 9 OSC Quarterly Radiation Protection Checklist38-4 Quarter Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)
El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)Calibration Due Date _____Li Area Radiation Monitor (ARM): Serial Number ____CL Area Radiation Monitor (ARM): Serial Number____
Li 2 Count Rate Meters: Serial Number _______Serial Number_______
Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters: Serial Number _______Serial Number _______Serial Number_______
Li 3 GM Survey Meters [Ref 6.2.1.a]: Serial Number _______Serial Number _______Serial Number_______
Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number _______Serial Number_______
Serial Number _______Serial Number________
Li Purge Rig (located in the Lakeside Office Building north ventilation room)Li Walk-Through Portal Monitor Cal Due Date_____Li Set of RP Procedures Li Donald C. Cook 10 mile EPZ map Li Site Map Reference EPP-2080-ERO-001 Rev. 14 Page 39 of 65 I Emergency Response Resource Readiness Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages40 LI 15 Blank Data Sheets (verify current revision)RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001
-Data Sheet 3 (verify current revision)LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges
[Ref 6.2.1. .a]LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment
# 5392)Air Sampling Kit [Ref 6.2.l.a]LI Break seal and perform inventory LIPad of Paper LI Planchetts LI Particulate filters (47-mam)LI Sealable Plastic Bags LI Tweezers LI Time Piece LI Air Sample Envelopes LI Calculator LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges)
Exp Date___LI Install new seal.CL Portable Instrument Kit [-Ref 6.2.1 .a]LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Off Site Responder
/ Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)LI 20 EDs ReferenceEPP-2080-ERO-001 Rev. 14Pae4of6 Reference Emergency Response Resource ReadinessPae4of6 Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages: Miscellaneous Supply -Box Li Break the seal and inventory.
I] Rad Ribbon / rope Li Rad Tape Li Smears Li Planchetts Li Tweezers Li Safety Glasses Li Paper Li Pens Li Disposable Gloves Li Envelopes EL Hearing Protection
[] Install- new seal.Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]Li 30 Full plastic suits with hoods NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Facility Readiness:
LI] Satisfactory Li Unsatisfactory (enter comment below)Comets Performed by: Reviewed by:-Print Name Signature Date Date EPM or designee Signature efrneEPP-2080-ERO-001 Rev. 14 Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10 ENC/JIC Monthly Checklist Pages: 41 -41 ENC/JIC Monthly Checklist I Month Year Equipment Functional Checks: Facility Set Up: Li 1 Copier (Attachment 3)El 2 FAX machine(s) (Attachment 3)Li 2 Flat screen monitors (Attachment 3)[] 3 Computers (Attachment 3)EL 2 TVs and 2 Radios Li 1 TV recording device(s)Ei 15 Telephones (Attachment 3)Li 1 PA microphone (turn on and verify output)LI] 1 Security Computer in Stairwell (Plug in and turn on)Li 1 County laptop (Plug in and turn on)Li Verify recorded message.Li 1 Projector in auditorium (Attachment 3)Li 2 TLDs (Area TLDs)Li 2 EDs (Area EDs)Li Overall cleanliness and appearance Li 1 box of Extra paper[] 1 toner for copier LiCheck procedure books for current revision Li Check data sheet folders for current rev.Li Supply cabinets and key box sealed Li Extra bulbs for large screen projector Li Verify the current ERG calendar is in the press packets EL Check keys in key box EiReceptionist
-Master Key LiSpokesperson
-Master Key LiAudio Visual -Master key & cabinet key ELSupport Coordinator
-Master Key LiMedia Center Manager -Master Key LIMedia Area Coordinator
-Master Key LIJIC Setup Coordinator
-Master Key, Stair screen key (#45), 2 Misc Keys NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Facility Readiness:
LI Satisfactory Li Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name I_Signature Date Date EPM or designee M1gnature Reference EPP-2080-ERO-O01 Rev. 14 Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11 Survey Vehicle Monthly Checklist 42 -42 Survey Vehicle Monthly Checklist LiVehicle
#1 El Vehicle #2____________________/
_________Month Year L1 Check fuel supply (keep tank full)Li Check battery (start and drive for 30 minutes)Li Check that tires are not flat[21 Check that there is no leaking/puddle fluids under vehicle CI Check that the lights (including turn signals) work Li Check that windows are not cracked/broken
[II Odometer reading _____miles Odometer reading _____miles Li Spare batteries, 1 set for each vehicle flashlight.
Li Check vehicle for overall cleanliness and appearance CL Check recharge tag on battery jump pack (recharge if necessary)
Vehicle Readiness:
Li Satisfactory EL Unsatisfactory (enter comment below)Performed by:____________/_____________
______Print Name Signature Date Reviewed by:____________/__________________
EPM or designee Signature Date Ref erence EPP-2080-ERO-001 Rev. 14 Page 43 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages: DtShe12Checklist 43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1 LI Vehicle #2_________________/
_______Quarter Year EL Site Map[] Berrien County Map LI 15 Blank Data Sheets (verify current revision)RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)LI Clipboard LI Flashlight/Lantern with Batteries El 2 Sets Winter Apparel .[Ref 6.2.1.a]LI Clippers EL Shovel LI 2 Full Face Respirators with Iodine and Particulate Cartridges
.[Ref 6.2.1. a]LI Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)
Miscellaneous Supply Box LI Break the seal and inventory LI Paper LI Rad Tape LI Disposable Gloves LI Envelopes LI Tweezers LI Sample Collection Bags LI Labels LI Compass LI Rad Ribbon ! rope LI Smears LI Keys to Rosemary Beach Gate LI Writing Implements EL Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Reference EPP-2080-ERO-001 Rev. 14 Page 44 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages: DtShe12Checklist 43- 44 lNOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit .I[Ref 6.2.1.a]II] Break the seal and inventory C) Pad of Paper C) Planchetts C) Particulate filters (47-mm filters)C) Sealable Plastic Bags C) Time Piece C) Writing Implements C) Air Sample Envelopes C) Calculator
[] Silver Zeolite Cartridges (min 5 cartridges)
Exp Date____C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Vehicle Readiness:
I] Satisfactory C) Unsatisfactory (enter comment below)Comments: Performed by: Reviewed by: Print Name EPM or designee Signature Date Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13 Control Room Monthly Checklist 45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)__________________/
_________Month Year One FAX Machine Verify the FAX machine functions per Attachment 3.________________________________________/___________
EP Staff Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.
Verify the password is correct by logging into ERONS.________________________________________/___________
EP Staff Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4._______________________________________/___________
EP Staff Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff Dt Date I Reference EPP-2080-ERO-001 Rev. 14 Page 46 of 65 I Emergency Response Resource Readiness I 13Conrol oomMontly heckistPages:
Data Sheet 3CotoRom othyhelit45  
-46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, Attachment 1 IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)
J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment
J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment
: 11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi 3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:
: 11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms I* 1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:
NOTE: An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory.
NOTE:         An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Document number in comments.Performed by:__________________________
Performed by:__________________________                                   ______
______Print Name Signature Date Reviewed by: ____________/__________________
Print Name                   Signature                   Date Reviewed by: ____________/__________________
EPM or designee Signature Date  
EPM or designee               Signature                   Date
[ Reference EPP-2080-ERO-001 Rev. 14 Page 47 of 65 I Emergency Response Resource Readiness Daa~et 4 Control Room Quarterly Radiation Protection Pages: Daahe 4Checklist 47- 47 J________________
 
_________/_
[   Reference               EPP-2080-ERO-001                     Rev. 14           Page 47 of 65 I                   Emergency Response Resource Readiness Daa~et 4         Control Room Quarterly Radiation Protection                   Pages:
Quarter Year Unit One Control Room El 11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]El 10OEDs.El 5 packages of KI tablets.El 25 KI Consent Forms -RMT-2080-OSC-001, Data Sheet 3 (verify current revision )El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]El 4 SCBA Units [Ref 6.2.1.a]El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges  
Daahe 4Checklist                                                             47- 47     J
[Ref 6.2.1 .a]Unit Two Control Room El 11 TLDs~ (10 Whole Body and 1 Control) [Ref 6.2.1.a]El 10OEDs.El 5 packages of KI tablets.El 25 KI Consent Forms -RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).
________________ _________/_
El Portable SPING Monitor (PSM) Serial Number _______El Particulate Filters (50-mm filters)El Silver Zeolite Cartridges (min 5 cartridges)
Quarter             Year Unit One Control Room El   11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]
Expiration Date________
El   10OEDs.
El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]El 4 SCBA Units..[Ref 6.2.1.a]El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.  
El 5 packages of KI tablets.
[Ref 6.2.1. a]Comments: Location Readiness:  
El 25 KI Consent Forms - RMT-2080-OSC-001, Data Sheet 3 (verify current revision )
[] Satisfactory El Unsatisfactory (enter comment below)Performed by:____________I_____________
El   4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]
______Print Name Signature Date Signature Date Reviewed by: EPM or designee v Reference EPP-2080-ERO-001 Rev. 14 Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly Pages: DtShe15Radiation Protection Checklist 48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway_________________
El 4 SCBA Units [Ref 6.2.1.a]
I__________/_
El   4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]
Quarter Year[] Break the seal and inventory SNOTE: This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number ______Serial Number_____
Unit Two Control Room El   11 TLDs~(10 Whole Body and 1 Control) [Ref 6.2.1.a]
Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges  
El   10OEDs.
[Ref 6.2.1 .a]Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]Li 10 SCB3A Units [Ref 6.2.1.a]Li 10 Spare SCBA bottles [Ref 6.2.l.a][] Install new seal Miscellaneous Supply Box[] Break the seal and inventory Li Rad Ribbon / rope Li Rad Tape Li Smears Li Paper Li Pens Li Duct Tape Li Install new seal I Reference EPP-2080-ERO-001 Rev. 14 Page 49 of 65 I Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly Pages: DtShe15Radiation Protection Checklist 48 -49 j IO Portable Instrument Kit [Ref 6.2.1 .a]Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
El   5 packages of KI tablets.
Comments: NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory.
El   25 KI Consent Forms - RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).
Document number in comments.j Location Readiness:
El   Portable SPING Monitor (PSM)                         Serial Number   _______
[] Satisfactory
El Particulate Filters (50-mm filters)
[] Unsatisfactory (enter comment below)Performed by: Reviewed by:/Print Name I-Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16 CAS/SAS Monthly Checklist Pages.CAS/SAS Monthly Checklist__________________/
El Silver Zeolite Cartridges (min 5 cartridges) Expiration Date________
_________Month Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)ELISAS / _ _ _EP Staff Date ElICAS ________I___
El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]
EP Staff Date Verify that the Iridium 9555 Satellite phone system functions properly.(Attachment 5, Satellite Phone Checks)LI SAS________I__
El 4 SCBA Units..[Ref 6.2.1.a]
EP Staff Date uCAS ___________
El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1. a]
EP Staff Date Comments: NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Comments:
Document number in comments.Performed by: Reviewed by: I Print Name/Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 51 of 65 Emergency Response Resource Readiness Dat Shet17 megeny espns Daa ystm estngPages.
Location Readiness:             [] Satisfactory           El Unsatisfactory (enter comment below)
Data Seet 17 Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR)
Performed by:____________I_____________                                             ______
_____________
Print Name                       Signature                       Date Reviewed by:
Computer being used to test ERDS ______________
EPM or designee                   Signature                      Date v
1 ERDS Testing Process 1.1 ERDS is active 24/7 and testing is not normally required.
 
IF testing is necessary THEN continue with this attachment.
Reference                 EPP-2080-ERO-001                       Rev. 14       Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly                     Pages:
1.2 This process can be performed from any Local Area Network (LAN) computer.1.3 Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.
DtShe15Radiation Protection Checklist                                       48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway I__________/_
Was the test started at the pre-determined time? Yes IJ No I 1.3.1 Record time NRC was contacted
Quarter         Year
_______1.3.2 The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.1.3.3 The NRC ERDS Operations Center will give instructions on how they will be conducting the test.
[] Break the seal and inventory SNOTE:           This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number       ______Serial             Number_____
Reference EPP-2080-ERO-001 Rev. 14 Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing Pages: 1.3.4 For performing from any LAN computer: a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).b. In the white background box under the window menu option, type in"ERDS" and press enter.c. When prompted enter User Name and Password.* Obtain User Name and Password from Position Specific Desktop Guide d. Click on the screen location labeled "ACTIVATE" 1.4.4 Open another PPC display by clicking on file menu option and selecting the top menu.a. Repeat steps (a) through (d) for the other unit.Did both units connect with no problem? Yes IJ No ElI 1.4 The NRC will let both systems run for approximately 1 hour and then disconnect the transmission at the NRC's end.1.4.1 The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.1.4.2 The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.1.4.3 A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.
Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors
Did the NRC personnel verify that the test passed for both units? Yes LI] No E .
[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]
Reference EPP-2080-ERO-001 Rev. 14 Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing51-3 1.5 IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.1.5.1 Verify that the Status on the ERDS screen is "Inactive".-
Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]
Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]
Li 10 SCB3A Units [Ref 6.2.1.a]
Li 10 Spare SCBA bottles [Ref 6.2.l.a]
[] Install new seal Miscellaneous Supply Box
[] Break the seal and inventory Li Rad Ribbon / rope             Li Rad Tape                           Li Smears Li Paper                         Li Pens                               Li Duct Tape Li Install new seal
 
I Reference               EPP-2080-ERO-001               Rev. 14           Page 49 of 65 I                 Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly                                 Pages:
DtShe15Radiation Protection Checklist                                 48 -49     j IOPortable Instrument Kit [Ref 6.2.1 .a]
Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.
Comments:
NOTE:       An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory. Document number in comments.j Location Readiness:         [] Satisfactory       [] Unsatisfactory (enter comment below)
Performed by:                               /
Print Name                   Signature                    Date Reviewed by:                                I-Date EPM or designee             Signature
 
Reference               EPP-2080-ERO-001                   Rev. 14   Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16                 CAS/SAS Monthly Checklist                   Pages.
CAS/SAS Monthly Checklist
__________________/
Month              Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.
(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)
ELISAS                                           /     _    _   _
EP Staff                 Date ElICAS       ________I___
EP Staff                 Date Verify that the Iridium 9555 Satellite phone system functions properly.
(Attachment 5, Satellite Phone Checks)
LI SAS________I__
EP Staff                       Date uCAS ___________
EP Staff                         Date Comments:
NOTE:           An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                 I Print Name                       Signature             Date Reviewed by:                                  /
Date EPM or designee                 Signature
 
Reference               EPP-2080-ERO-001                 Rev. 14         Page 51 of 65 Emergency Response Resource Readiness Dat megeny Shet17             espns Daa ystm   estngPages.
Seet 17 Data              Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR)       _____________
Computer being used to test ERDS         ______________
1     ERDS Testing Process 1.1   ERDS is active 24/7 and testing is not normally required. IF testing is necessary THEN continue with this attachment.
1.2     This process can be performed from any Local Area Network (LAN) computer.
1.3     Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.
Was the test started at the pre-determined time?               Yes IJ     No I 1.3.1     Record time NRC was contacted         _______
1.3.2     The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.
1.3.3     The NRC ERDS Operations Center will give instructions on how they will be conducting the test.
 
Reference                 EPP-2080-ERO-001               Rev. 14           Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17           Emergency Response Data System Testing                   Pages:
1.3.4   For performing from any LAN computer:
: a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).
: b. In the white background box under the window menu option, type in "ERDS" and press enter.
: c. When prompted enter User Name and Password.
* Obtain User Name and Password from Position Specific Desktop Guide
: d. Click on the screen location labeled "ACTIVATE" 1.4.4   Open another PPC display by clicking on file menu option and selecting the top menu.
: a. Repeat steps (a) through (d) for the other unit.
Did both units connect with no problem?                         Yes IJ     No ElI 1.4     The NRC will let both systems run for approximately 1 hour and then disconnect the transmission at the NRC's end.
1.4.1   The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.
1.4.2   The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.
1.4.3   A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.
Did the NRC personnel verify that the test passed for both units?       Yes LI]       No E .
 
Reference               EPP-2080-ERO-001               Rev. 14           Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17           Emergency Response Data System Testing51-3 1.5   IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.
1.5.1   Verify that the Status on the ERDS screen is "Inactive".-
1.5.2    Close the PPC application.
1.6    IF the test is unsuccessful, THEN:
Obtain reason for the failure from the NRC or IT.
o    Inform Information Technology (IT) of the failure.
o    Retest the system when repairs are complete.
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Comments:
Performed by:____________/_____________                                    ______
Print Name                    Signature                    Date Reviewed by:                                /-
EPM or designee              Signature                    Date Dt
 
Reference              EPP-2080-ERO-001                  Rev. 14        Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection              Pages:
DtSee18Quarterly                        Checklist                  54 - 54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.
______________ I________/_
Quarter            Year SNOTE:        Place a"I"" orXo          the line pedigthe item to indicateacetb.
Berrien County Sheriff Department CI      201 TLDs (200 Whole Body and 1 Control)
SComments:
NOTE:          An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                /
Print Name                      Signature                Date Reviewed by:                                I Date EPM or designee                  Signature
 
I  Reference                EPP-2080-ERO-001                      Rev. 14        Page 55 of 65 I                    Emergency Response Resource Readiness Daa het 9          Training Center Radiation Protection Quarterly            Pages:
DtShe19Checklist                                                      55 -55 Training Center Radiation Protection Quarterly Checklist
________________ _________/_
Quarter            Year El      Count Rate Meter                        Serial Number    ________Cal Due Date Li      2 Count Rate Meter Cables' Li      2 Count Rate Meter Detectors Li      1 Air sampler with sample head          Serial Number    _________Cal        Due Date Li      16 Electronic Dosimeters . [Ref 6.2.1 .a]                      Cal Due Date Li Li 17 TLDs (16 Whole Body, 1 Control). [Ref 6.2.1.a]
2 Flashlights E
El      Box of Smears Li      14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges EL      14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]
NOTE:            An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                  /
Print Name                        Signature                  Date Reviewed by:                                  /-
EPM or designeeSintr                                          Date Signature
 
Reference                EPP-2080-ERO-001                    Rev. 14            Page 56 of 65 Emergency Response Resource Readiness                        Pgs Data Sheet 20        LMC Radiation Protection Quarterly Checklist                56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph                              Li Niles (1307 Storage Room)
(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)
Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.
__________________/
Quarter          Year SNOTE:          Tehospital supply cbntianEPan              App. Crequirement.
LiBreak the seal and inventory Li    Count Rate Meter              Serial Number    ________Cal                Due Date_____
Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head                      Serial Number      _______
EL    E-Plan Air Sample Activity Determination Worksheet Li    20 EDs Cal Due Date_ __
LiAssorted Tool Kit Li    Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)
Li    Clipboard EL    21 TLDs (20 Whole Body, 1 Control)
Li      12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.
if the inventory is short, THEN contact the hospital to replenish.
Li    Stanchions or portable barriers sufficient to post area.
Li1    3 Step-Off-Pads Li    6 Tni-foil Signs with Assorted Inserts Li    6 Cloth/Poly Bags Li  2 Trash Bag Holders Li1    Water Collection Bottle Li      Stretcher Insert Li    Water Collection Tray Li    Shower Head Li    Hose Li1  Herculite Runner (or equivalent)
Li    Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal
 
Reference                EPP-2080-ERO-001                Rev. 14            Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20        LMC Radiation Protection Quarterly Checklist              Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable
*Instrument Kit Inventory.
NOTE:            Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit [Ref 6.2.1.a]
LI Break the seal and inventory LI Pad of Paper                  LI Planchetts        LI Particulate filters (47-mm filters)
El Sealable Plastic Bags        LI Time Piece        LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___
[] Air Sample Envelopes          LI Calculator        LI Writing Implements LITweezers                        LIRad Tape          LI1 Rad Ribbon/rope LI Shoe Covers                  LI Smears            LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)
LI Break the seal and inventory LI Nail Clippers              LI Smears            LI  Vomitus Containers LI  Writing Implements          LIScissors          LI  Urine Containers LI  Envelopes                  LI Forceps          LI  Cotton Swabs in Vials LI  Eyedropper Bottle          LI Tweezers          LI  Poly Bags LIInstall new seal
 
Reference              EPP-2080-ERO-001                  Rev. 14        Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20        LMC Radiation Protection Quarterly Checklist            Pgs Hospital Decon Kit (In Cabinet)
C] Break the seal and inventory C] Skin Cream                C] Clorox              C] Cotton Tip Applicators C] Detergent                  C] Towels              C] Phisoderm (or equivalent)
C] Corn Meal                  C] Nail Clippers      C] Writing Implements C] Gauze Pads                C] Steri-Drape        UI Decon Procedures C] Surgical Tape              C] Forceps            C] Transparent Dressing C]-Solution Bowls            C] Scissors            C] Irrigation Syringe C] Shave Kit                  C1 Shampoo            C] Disposable Gloves C] Poly Bags C] Install new seal Comments:
SNOTE:          An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:
Print Name                    Signature                    Date Reviewed by:
EPM or designee              Signature                    Date
 
Reference              EPP-2080-ERO-001                      Rev. 14      Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21        Emergency Sampling Station Quarterly Radiation            Pages:
Protection Checklist                      59 - 59    J Emergency Sampling Station Quarterly Radiation Protection Checklist
_________________/ _______
Quarter              Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler            El Extension Cord
[] Water Sampling Bottles                    El Air Sample Head              .
[] Air Sampling Envelopes                    IJ Tygon Tubing
[21 Pad of Paper                              El Air Sample Filters (47 and 50 mm filters)
ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)
[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)
El Silver Zeolite Cartridges (main 5 cartridges) Exp Date___
-Turbine Building El    609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El    609' at SRA-2900, Steam Jet Air Ejector Monitor El    591' at SRA-2800, Gland Steam Condenser Vent Monitor El    609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El    587' Spray Additive Tank Room at Chemistry Sampling Station NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:
Print Name                                                  Date Signature Reviewed by:                                    /_
Date EPM or designee                    Signature
 
Reference              EPP-2080-ERO-001                ;'Rev. 14        Page 60 of 65 I                    Emergency Response Resource Readiness I Data Sheet 22            Emergency Plan Respiratory Protection                Pages IQuarterly                                Checklist                      60 - 60 Emergency Plan Respiratory Protection Quarterly Checklist
__________________/
Quarter        Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.
IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.
Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.
Radiation Protection Access Control                  LI 10 SCBA Units (clean side) 609 Turbine                                          LI10OSCBA Units Auxiliary Building                                  LI 17 SCBA Units (various locations)
Location                          Number      Location                              Number LI 609 Turbine by TRPAC              1      LI 633 by Freight Elevator                  1 LI 609 by Elevator                  5      LI 650                                      4 LI 573 by Freight Elevator            1      LI 612 Unit 1 Containment CAC                2 LI 587 by Freight Elevator            1      LI 612 Unit 2 Containment                    2 Comments:
NOTE:            An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                /
Print Name                      Signature                  Date Reviewed by:                                /-
EPM or designee                Signature                  Date
 
RefeenceEmergency Response Resource Readiness Data Sheet 23              RP/Ops Emergency Response Equipment                            Pages:
Quarterly CheckliSt                              61- 62 RP/POps Emergency Response Equipment Quarterly Checklist
_________________/    ________
Quarter                Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")
The emergency RP supply boxes are located at the Auxiliary Building exits:
* RPAC      -  supply box is located in cabinet near the shower.
o,  TRPAC    -  supply box is located in the decontamination room.
RPAC    -  Emergency RIP Supply Box ID Break the seal and inventory ID 4  full face respirators with Iodine cart.              [] 8 pair of pairs of rubber gloves ID 4  plastic suits w/ hoods                                ID 4 pair of booties ID 4  hoods                                                ID 4 pair of rubber boots ID 4  pair of glove liners                                  ID 1 box of smears ID Install- new seal TRPAC      -  Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart.              ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods                                ID[ 4 pair of booties ID 4 hoods                                                  ID 4 pair of rubber boots El 4 pair of glove liners                                  ID 1 box of smears ID 1 Portable Air Sampler                                  ID 1 Dose Rate Meter ID Install new seal
 
I  Reference                EPP-2080-ERO-001              Rev. 14        Page 62 of 65 I                    Emergency Response Resource Readiness I  Data Sheet 23            RPIOps Emergency Response Equipment            Pages:
IQuarterly                              Checklist                  61- 62 SComments:
NOTE:          An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Print Name                  Signature                Date Reviewed by:  ____________/
EPM or designee            Signature                Date Dt
 
Reference                EPP-2080-ERO-001                            Rev. 14            Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24                Monthly Satellite Phone Checks                              Pages63 Monthly Satellite Phone Checks Month                    Year Verify that the Iridium  9555  Satellite phone system functions properly EL Lake Township Fire Department                    ___________/                              _    __
Performed By                        Date El Berrien County EGG                  ____________/                              ___
Performed By                        Date CL Lake Michigan College                ___________/___
Performed By                        Date.
Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex                                                          /____________I____
                      ..                            Performed By                        Date Comments:
INOTE:            An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                    /
Print Name                              Signature                    Date Reviewed by:                                    /-
Date EPM or designee                          Signature
 
Reference                      EPP-2080-ERO-001                  Rev. 14              Page 64 of 65 Emergency Response Resource Readiness DaaSee    5              Radiation Protection Portable Instrument Kit                Pages:
DtShe25Inventory                                                                64- 65 SNOTE:            This datasheet is used by Radiation Protection to inventory a kit when the seal l              on a kit is found broken or is broken for maintenance of the kit.
Kit Number    __________Kit                      Location (check the box for the appropriate location)
[]I EOF (Off-Site survey team contingency equipment)                J  Survey Vehicle #1 1]  EOF (RP Equipment storage area)                                  LII Survey Vehicle #2 Li  Unit One Control Room (CREC)                                    LII OSC Li  Lakeland Medical Center St. Joseph                              Li  Lakeland Medical Center Niles
[3  Other  _________
Response Source JCN            _____
NOTE:            The floiginstrument tye                reuvln        r  eurdto be in the kits.
Li  RO-7 Survey Meter                                        El  ESP-2 Survey Meter EL  RO-7-BM (Mid-Range) Detector                              Li  HP-270 Dose Rate Probe Li  RO-7-BH (High Range) Detector                            Li  HP-260 Frisker Probe (2)
ELI MHV/BNC Cables (2)                                        Li  HP-210 Shielded Probe
[]  SH-4A Sample Holder                                      Li  Screwdriver
[]I 9 Volt Batteries (3)                                      El  Writing Implements (2)
LII 30 Volt Batteries (2)                                    LII Notebook El  D Cell batteries (2)                                      El 3 EDs LI1 C Cell batteries (6)                                      Li ESP-2 Detector Change Flowchart Installed new seal.
Comments:
SNOTE:            An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
Performed by:                                        /I______________________        ___________
Print Name                    Signature                          Date Reviewed by:
EPM or designee                Signature                          Date


====1.5.2 Close====
RfrneEPP-2080-ERO-001                                     Rev. 14         Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26                       Security Control Center                         Pages:
the PPC application.
[                                                                   65 -65 Security Control Center
1.6 IF the test is unsuccessful, THEN: Obtain reason for the failure from the NRC or IT.o Inform Information Technology (IT) of the failure.o Retest the system when repairs are complete.NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
_______________I ________/_
Document number in comments.Comments: Performed by:____________/_____________
Quarter               Year SNOTE:         Place a ""     or"X" onthe line pedigthe item to indicateacetb.
______Print Name/-Signature Date Reviewed by: EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection Pages: DtSee18Quarterly Checklist 54 -54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.
North Access Vehicle Portal LII     3 Electronic Dosimeters Cal Due Date         ___________
______________
LII     4 TLDs (3 Whole Body, 1 Control)
I________/_
I]       3 Sets of Anti-C's for first responders, Level 2.           [Ref 6.2.1 .a] [Ref 6.2. ib]
Quarter Year SNOTE: Place a"I"" orXo the line pedigthe item to indicateacetb.
Comments:
Berrien County Sheriff Department CI 201 TLDs (200 Whole Body and 1 Control)SComments:
NOTE:           An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.
NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Performed by:                                     /
Document number in comments.Performed by:/Print Name Signature Date Date Reviewed by: I EPM or designee Signature I Reference EPP-2080-ERO-001 Rev. 14 Page 55 of 65 I Emergency Response Resource Readiness Daa het 9 Training Center Radiation Protection Quarterly Pages: DtShe19Checklist 55 -55 El Li Li Li Li Li Li El Li EL Training Center Radiation Protection Quarterly Checklist________________
Print Name                           Signature                 Date Reviewed by:           _____________________________I___________________________/_
_________/_
EPM or designee                       Signature                 Date
Quarter Year Count Rate Meter Serial Number ________Cal 2 Count Rate Meter Cables'2 Count Rate Meter Detectors 1 Air sampler with sample head Serial Number _________Cal 16 Electronic Dosimeters
 
.[Ref 6.2.1 .a] Cal Due Date 17 TLDs (16 Whole Body, 1 Control).
REVISION  
[Ref 6.2.1.a]2 Flashlights Box of Smears 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges 14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]Due Date Due Date E NOTE: An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designeeSintr Signature Reference EPP-2080-ERO-001 Rev. 14 Page 56 of 65 Emergency Response Resource Readiness Pgs Data Sheet 20 LMC Radiation Protection Quarterly Checklist 56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph Li Niles (1307 Storage Room)(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)
Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.__________________/
_________Quarter Year SNOTE: Tehospital supply cbntianEPan App. Crequirement.
LiBreak the seal and inventory Li Count Rate Meter Serial Number ________Cal Due Date_____Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head Serial Number _______EL E-Plan Air Sample Activity Determination Worksheet Li 20 EDs Cal Due Date_ __LiAssorted Tool Kit Li Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)Li Clipboard EL 21 TLDs (20 Whole Body, 1 Control)Li 12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.if the inventory is short, THEN contact the hospital to replenish.
Li Stanchions or portable barriers sufficient to post area.Li1 3 Step-Off-Pads Li 6 Tni-foil Signs with Assorted Inserts Li 6 Cloth/Poly Bags Li 2 Trash Bag Holders Li1 Water Collection Bottle Li Stretcher Insert Li Water Collection Tray Li Shower Head Li Hose Li1 Herculite Runner (or equivalent)
Li Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal Reference EPP-2080-ERO-001 Rev. 14 Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable*Instrument Kit Inventory.
NOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.
Air Sampling Kit [Ref 6.2.1.a]LI Break the seal and inventory LI Pad of Paper El Sealable Plastic Bags[] Air Sample Envelopes LITweezers LI Shoe Covers LI Planchetts LI Time Piece LI Calculator LI Rad Tape LI Smears LI Particulate filters (47-mm filters)LI Silver Zeolite Cartridges (rai 5 cartridges)
Exp Date___LI Writing Implements LI1 Rad Ribbon/rope LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)
LI Break the seal and inventory LI Nail Clippers LI Writing Implements LI Envelopes LI Eyedropper Bottle LIInstall new seal LI Smears LI Scissors LI Forceps LI Tweezers LI Vomitus Containers LI Urine Containers LI Cotton Swabs in Vials LI Poly Bags Reference EPP-2080-ERO-001 Rev. 14 Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pgs Hospital Decon Kit (In Cabinet)C] Break the seal and inventory C] Skin Cream C] Clorox C] Cotton Tip Applicators C] Detergent C] Towels C] Phisoderm (or equivalent)
C] Corn Meal C] Nail Clippers C] Writing Implements C] Gauze Pads C] Steri-Drape UI Decon Procedures C] Surgical Tape C] Forceps C] Transparent Dressing C]-Solution Bowls C] Scissors C] Irrigation Syringe C] Shave Kit C1 Shampoo C] Disposable Gloves C] Poly Bags C] Install new seal Comments: SNOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name EPM or designee Signature Date Signature Date Reference EPP-2080-ERO-001 Rev. 14 Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21 Emergency Sampling Station Quarterly Radiation Pages: Protection Checklist 59 -59 J Emergency Sampling Station Quarterly Radiation Protection Checklist_________________/
_______Quarter Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler El Extension Cord[] Water Sampling Bottles El Air Sample Head .[] Air Sampling Envelopes IJ Tygon Tubing[21 Pad of Paper El Air Sample Filters (47 and 50 mm filters)ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)El Silver Zeolite Cartridges (main 5 cartridges)
Exp Date___-Turbine Building El 609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El 609' at SRA-2900, Steam Jet Air Ejector Monitor El 591' at SRA-2800, Gland Steam Condenser Vent Monitor El 609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El 587' Spray Additive Tank Room at Chemistry Sampling Station NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name/_Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001
;'Rev. 14 Page 60 of 65 I Emergency Response Resource Readiness I Data Sheet 22 Emergency Plan Respiratory Protection Pages IQuarterly Checklist 60 -60 Emergency Plan Respiratory Protection Quarterly Checklist__________________/
_________Quarter Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.Radiation Protection Access Control LI 10 SCBA Units (clean side)609 Turbine LI10OSCBA Units Auxiliary Building LI 17 SCBA Units (various locations)
Location Number Location Number LI 609 Turbine by TRPAC 1 LI 633 by Freight Elevator 1 LI 609 by Elevator 5 LI 650 4 LI 573 by Freight Elevator 1 LI 612 Unit 1 Containment CAC 2 LI 587 by Freight Elevator 1 LI 612 Unit 2 Containment 2 Comments: NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designee Signature RefeenceEmergency Response Resource Readiness Data Sheet 23 RP/Ops Emergency Response Equipment Pages: Quarterly CheckliSt 61- 62 RP/POps Emergency Response Equipment Quarterly Checklist_________________/
________Quarter Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")The emergency RP supply boxes are located at the Auxiliary Building exits:* RPAC -supply box is located in cabinet near the shower.o, TRPAC -supply box is located in the decontamination room.RPAC -Emergency RIP Supply Box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. [] 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID 4 pair of booties ID 4 hoods ID 4 pair of rubber boots ID 4 pair of glove liners ID 1 box of smears ID Install- new seal TRPAC -Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID[ 4 pair of booties ID 4 hoods ID 4 pair of rubber boots El 4 pair of glove liners ID 1 box of smears ID 1 Portable Air Sampler ID 1 Dose Rate Meter ID Install new seal I Reference EPP-2080-ERO-001 Rev. 14 Page 62 of 65 I Emergency Response Resource Readiness I Data Sheet 23 RPIOps Emergency Response Equipment Pages: IQuarterly Checklist 61- 62 SComments:
NOTE: An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Print Name Reviewed by: ____________/
Signature Date EPM or designee Signature Dt Date Reference EPP-2080-ERO-001 Rev. 14 Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24 Monthly Satellite Phone Checks Pages63 Monthly Satellite Phone Checks Month Year Verify that the Iridium 9555 Satellite phone system functions properly EL Lake Township Fire Department
___________/
_ __Performed By Date El Berrien County EGG ____________/
___Performed By Date CL Lake Michigan College ___________/___
Performed By Date.Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex /____________I____
..Performed By Date Comments: INOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by:/Print Name/-Signature Date Date EPM or designee Signature Reference EPP-2080-ERO-001 Rev. 14 Page 64 of 65 Emergency Response Resource Readiness DaaSee 5 Radiation Protection Portable Instrument Kit Pages: DtShe25Inventory 64- 65 SNOTE: This datasheet is used by Radiation Protection to inventory a kit when the seal l on a kit is found broken or is broken for maintenance of the kit.Kit Number __________Kit Location (check the box for the appropriate location)[]I EOF (Off-Site survey team contingency equipment)
J Survey Vehicle #1 1] EOF (RP Equipment storage area) LII Survey Vehicle #2 Li Unit One Control Room (CREC) LII OSC Li Lakeland Medical Center St. Joseph Li Lakeland Medical Center Niles[3 Other _________Response Source JCN _____NOTE: The floiginstrument tye reuvln r eurdto be in the kits.Li RO-7 Survey Meter El ESP-2 Survey Meter EL RO-7-BM (Mid-Range)
Detector Li HP-270 Dose Rate Probe Li RO-7-BH (High Range) Detector Li HP-260 Frisker Probe (2)ELI MHV/BNC Cables (2) Li HP-210 Shielded Probe[] SH-4A Sample Holder Li Screwdriver
[]I 9 Volt Batteries (3) El Writing Implements (2)LII 30 Volt Batteries (2) LII Notebook El D Cell batteries (2) El 3 EDs LI1 C Cell batteries (6) Li ESP-2 Detector Change Flowchart Installed new seal.Comments: SNOTE: An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by: Reviewed by: Print Name EPM or designee/I______________________
___________
Signature Date Signature Date RfrneEPP-2080-ERO-001 Rev. 14 Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26 Security Control Center Pages:[ 65 -65 Security Control Center_______________I
________/_
Quarter Year SNOTE: Place a "" or"X" onthe line pedigthe item to indicateacetb.
North Access Vehicle Portal LII 3 Electronic Dosimeters Cal Due Date ___________
LII 4 TLDs (3 Whole Body, 1 Control)I] 3 Sets of Anti-C's for first responders, Level 2. [Ref 6.2.1 .a] [Ref 6.2. ib]Comments: NOTE: An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory.
Document number in comments.Performed by:/Print Name Signature Date Date Reviewed by:_____________________________I___________________________/_
EPM or designee Signature REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration  
 
[Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
As such, a 10 CFR 72.48 review is not required to this procedure alteration.
 
A 10 CFR 50.5 4 (q) review was performed.
==Title:==
The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness.
Emergency Response Resource Readiness Alteration                     [Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.
Therefore, this procedure revision can be implemented without prior NRC approval.Step 4.1.4, Added Data Sheet 26, Security This inventory was previously performed on Control Center. No margin mark was used. Data Sheet 18 which has the Berrien County Adde Ste 4.46 wich escrbes heEOC inventory on it. Users requested these SeuiyControl Center. inventories be separated into two Data Securitysheets.
The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required to this procedure alteration.
Attachment 3 added step 13.2.14 for Data Sheet 26, Security Control Center.Removed Rev 13 step 4.2.4 which stated Recording the seal numbers so that for the"Blanks for recording storage container seal next scheduled inventory the seal could be numbers are provided as verification tool. verified intact and therefore an inventory IF the installed seal is the same seal as would not need to be performed has proven recorded during previous check THEN it is to be ineffective.
A 10 CFR 50.5 4 (q) review was performed. The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.
This revision changes the no necessary to break the seal and inventory process to breaking all seals and performing the contents." a complete inventory each time and then resealing the item.Seal number blanks have been removed from the procedure.
The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of &sect;50.47(b) and &sect;50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this procedure revision can be implemented without prior NRC approval.
No margin marks were used.Revised step 4.4.5 to state that the locations This list was inaccurate and incomplete.
Step 4.1.4, Added Data Sheet 26, Security             This inventory was previously performed on Control Center. No margin mark was used.               Data Sheet 18 which has the Berrien County Adde 4.46 Ste wich escrbes heEOC                     inventory on it. Users requested these SeuiyControl Center.                             inventories be separated into two Data Securitysheets. added step 13.2.14 for Data Sheet 26, Security Control Center.
The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan. Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure.
Removed Rev 13 step 4.2.4 which stated                 Recording the seal numbers so that for the "Blanks for recording storage container seal         next scheduled inventory the seal could be numbers are provided as verification tool.             verified intact and therefore an inventory IF the installed seal is the same seal as             would not need to be performed has proven recorded during previous check THEN it is             to be ineffective. This revision changes the no necessary to break the seal and inventory           process to breaking all seals and performing the contents."                                         a complete inventory each time and then resealing the item.
These data sheets provide the user with the locations.
Seal number blanks have been removed from the procedure.
Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval.
No margin marks were used.
Page 1 of 9 REVISION  
Revised step 4.4.5 to state that the locations       This list was inaccurate and incomplete. The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan.               Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure. These data sheets provide the user with the locations.
Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval.                                                                                 Page 1 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.C's on Data Sheets 9, 12, and 23. Reviewer comments.Attachment 2, removed "either Control This attachment is used for functional checkcs Room or" from step 1.2 of the phones in the TSC only.Attachment 3, was revised to state, "Verify Previous wording of this step did not require each phone in the facility is capable of both that both functions be checked on all phones.dialing out and receiving a call" AR 2015-15253 Attachment 3, Step 2.1 was revised to state Editorial change requested by EP Manager.that the phone check is to verify the phones can call out and receive a call.Attachment 3, added Steps 11.6 and 12.5 to Added to ensure that the instrument will not verify that the instrument calibration does go out of cal prior to the next check.not expire prior to the end of the next month.Attachment 3, Step 13.1 was reworded and This revision changes the process to removed the annual requirement to breaking all seals and performing a complete unlock/unseal all facilities and storage areas. inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.
 
No margin marks were used Attachment 3, changed the title of PMP- Procedure title has changed.2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment Gt 2015-11455-4 Important to Emergency Response.Attachment 4, switched the order of steps User comment. Permission from the control 1.1.1 and 1.1.2. room is needed before contacting the county.Attachment 5, added note at beginning User Comment concerning reference to EPP-"Additional information for use of Satellite 600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be with these phone checks.found in RMT-2080-EPP-600, Satellite Phone Instructions.
Procedure No.:         EPP-2080-ERO-001                                     Rev. No.:      14
The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________
 
Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
==Title:==
Page 2 of 9 REVISION  
Emergency Response Resource Readiness Alteration                                           Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.
C's on Data Sheets 9, 12, and 23.                     Reviewer comments. , removed "either Control                 This attachment is used for functional checkcs Room or" from step 1.2                                 of the phones in the TSC only. , was revised to state, "Verify           Previous wording of this step did not require each phone in the facility is capable of both         that both functions be checked on all phones.
dialing out and receiving a call"                     AR 2015-15253 , Step 2.1 was revised to state           Editorial change requested by EP Manager.
that the phone check is to verify the phones can call out and receive a call. , added Steps 11.6 and 12.5 to             Added to ensure that the instrument will not verify that the instrument calibration does           go out of cal prior to the next check.
not expire prior to the end of the next month. , Step 13.1 was reworded and               This revision changes the process to removed the annual requirement to                     breaking all seals and performing a complete unlock/unseal all facilities and storage areas.       inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.
No margin marks were used , changed the title of PMP-               Procedure title has changed.
2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment                   Gt 2015-11455-4 Important to Emergency Response. , switched the order of steps             User comment. Permission from the control 1.1.1 and 1.1.2.                                     room is needed before contacting the county. , added note at beginning                 User Comment concerning reference to EPP-
"Additional information for use of Satellite         600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be             with these phone checks.
found in RMT-2080-EPP-600, Satellite Phone Instructions. The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 2 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Attachment 5, Step 1.8, added Lake This is a new phone for the alternate EOF Michigan College to satellite phones to be location at LMC.checked.GT 2015-8471-1 Data Sheet 1, removed verification that the 24 hour coping supplies are inventoried 24 hour coping supply cabinet was locked or quarterly using Data Sheet 2.Sealed.Data Sheet 2, This revision changes the process to Removed blanks for recording seal breaking all seals and performing a complete numbers. inventory each time and then resealing the item.S Removed locked or seal check for 24 hour coping supplies.
 
GT 2015-13295-1 Data Sheet 3 was reorganized for ease of Reorganization did not change the inventory.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
use. No items were added or removed during the reorganization.
 
Data Sheet 3, Under Re-Entry Personnel The change from SRDs to EDs due to Equipment changed 14 SRL~s -7 (0-1 .5R) 7 technical advances.
==Title:==
An ED is capable of (0-10R) to 14 EDs. measuring dose that encompasses the range of both SRDs._____________________________GT2014-15551.
Emergency Response Resource Readiness Alteration                                           Justification Attachment 5, Step 1.8, added Lake                     This is a new phone for the alternate EOF Michigan College to satellite phones to be             location at LMC.
Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.and added JIG to General distribution badges.Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551.
checked.
The addition from 8 to 2. Added 2 Area EDs to this of the Area ED facilitates total dose section. determinations for the EOF personnel.
GT 2015-8471-1 Data Sheet 1, removed verification that the           24 hour coping supplies are inventoried 24 hour coping supply cabinet was locked or           quarterly using Data Sheet 2.
GT2014-15551 Data Sheet 3, Under Additional Equipment The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.This change eliminates unnecessary equipment from the inventory.
Sealed.
GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist, User comment that this board is no longer-removed Copy Board. used.GT 2015-13643-1 Office Information for Form Tracking Only -Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
Data Sheet 2,                                         This revision changes the process to Removed blanks for recording seal             breaking all seals and performing a complete numbers.                                     inventory each time and then resealing the item.
Page 3 of 9 REVISION  
S Removed locked or seal check for 24 hour coping supplies.                         GT 2015-13295-1 Data Sheet 3 was reorganized for ease of               Reorganization did not change the inventory.
use.                                                   No items were added or removed during the reorganization.
Data Sheet 3, Under Re-Entry Personnel                 The change from SRDs to EDs due to Equipment changed 14 SRL~s - 7 (0-1 .5R) 7             technical advances. An ED is capable of (0-10R) to 14 EDs.                                     measuring dose that encompasses the range of both SRDs.
_____________________________GT2014-15551.
Data Sheet 3, Under Additional Equipment               The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.
and added JIG to General distribution badges.
Data Sheet 3, Under Additional Equipment               The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551. The addition from 8 to 2. Added 2 Area EDs to this                 of the Area ED facilitates total dose section.                                               determinations for the EOF personnel.
GT2014-15551 Data Sheet 3, Under Additional Equipment               The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.
This change eliminates unnecessary equipment from the inventory.
GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist,                   User comment that this board is no longer-removed Copy Board.                                   used.
GT 2015-13643-1 Office Information for Form Tracking Only - Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 3 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 6, Removed 25 SRDs and SRiD The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.GT2014-15551.
 
Data Sheet 7, removed label color The radios are located in different areas of designators for radios, the facility and the color designator is not necessary.
Procedure No.:     EPP-2080-ERO-001                               Rev. No.:      14
Data Sheet 9, reduced the number of EDs The revised numbers of EDs was determined from 50 to 40. in GT2014-15551.
 
Data Sheet 9, reduced the number of TLDs The revised numbers of EDs was determined from 141 to 41. in GT2014-15551 which determined that the 100 extremity TLDs were not required.Data Sheet 9, added the Off Site Responder  
==Title:==
/ Determination from GT 2014-15551 and Security Dosimetry Box section. user comments.
Emergency Response Resource Readiness Alteration                                   Justification Data Sheet 6, Removed 25 SRDs and SRiD       The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.
Reorganization did not change the inventory.
GT2014-15551.
No items were added or removed during the reorganization.
Data Sheet 7, removed label color           The radios are located in different areas of designators for radios,                     the facility and the color designator is not necessary.
No Data Sheet was reorganized, margin marks were used for the reorganization.
Data Sheet 9, reduced the number of EDs     The revised numbers of EDs was determined from 50 to 40.                               in GT2014-15551.
Data Sheet 10, added two area TLDs and The addition of the Area ED facilitates total two area EDs to Equipment functional dose determinations for the ENC/JIC Checks section. personnel.
Data Sheet 9, reduced the number of TLDs     The revised numbers of EDs was determined from 141 to 41.                             in GT2014-15551 which determined that the 100 extremity TLDs were not required.
GT 2014-15551 Data Sheet 10, removed "and install New style computers do not require this updates" from Security Computer and action to be performed.
Data Sheet 9, added the Off Site Responder / Determination from GT 2014-15551 and Security Dosimetry Box section.             user comments. Reorganization did not change the inventory. No items were added or removed during the reorganization. No Data Sheet was reorganized,                 margin marks were used for the reorganization.
This occurs County Lap Top Computer checks. automatically when computer is turmed on.GT 2015-2610-1 Data Sheet 10, changed the name of the key User Commentthe key box from Media Area Manager to Media Area Coordinator.
Data Sheet 10, added two area TLDs and       The addition of the Area ED facilitates total two area EDs to Equipment functional         dose determinations for the ENC/JIC Checks section.                             personnel.
GT 2015-7276 Data Sheet 11, Added "Check recharge tag New battery jump packs have been placed in on battery jump pack (recharge if survey vehicles.*
GT 2014-15551 Data Sheet 10, removed "and install         New style computers do not require this updates" from Security Computer and         action to be performed. This occurs County Lap Top Computer checks.             automatically when computer is turmed on.
These jump packs have a necessary) " one year charge life.GT 2015-6016-1 Data Sheet 13, Added "One" designator to User comment.FAX machine check to clearly indicate ,that there is only one FAX machine to test. GT 2015-7209 REVISION  
GT 2015-2610-1 Data Sheet 10, changed the name of the key   User Comment in* the key box from Media Area Manager to Media Area Coordinator.                     GT 2015-7276 Data Sheet 11, Added "Check recharge tag     New battery jump packs have been placed in on battery jump pack (recharge if           survey vehicles.* These jump packs have a necessary) "                                 one year charge life.
GT 2015-6016-1 Data Sheet 13, Added "One" designator to     User comment.
FAX machine check to clearly indicate ,that there is only one FAX machine to test.       GT 2015-7209
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Resp~onse Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 13, Added ERONS password User comment.verification by logging into ERONS to perform the ERONS check. GT 2015-7209-1 Data Sheet 13, Added "One" designator to User comment.911 Dispatch Center Phone check to clearly indicate that there is only one phone to test. GT 20 15-2575 Also changed this test to have EP Staff GT-2015-8602-1 perform the phone test per Attachment 4.Data Sheet 13, Added "One" designator to User comment.DAP computer check to clearly indicate that there is only one DAP computer to test. GT 2015-7209 Data Sheet 13, Removed the following from User comment.the Control Room briefcase inventoried items. Approval to remove these items was* 10blak lo shetsobtained from the Operations Senior License.* 1 calculator
 
* 10 miscellaneous pens GT 20 15-7209 a 2 pencils*with erasers* 1 ruler a 2 pads of lined paper* 5 red fine markers.* 5 black fine markers* 3 orange markers o 3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs. techflical advances.GT2014-1555 1.Data Sheets 14 and 15, items were Per user comment the Control Room checks rearranged.
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:    14
should be on one attachment and the Control.... Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment.
 
No items were removed from the procedure.
==Title:==
____________________________No margin markings were used.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.Page 5 of 9 REVISION  
Emergency Resp~onse Resource Readiness Alteration                                         Justification Data Sheet 13, Added ERONS password                   User comment.
verification by logging into ERONS to perform the ERONS check.                               GT 2015-7209-1 Data Sheet 13, Added "One" designator to               User comment.
911 Dispatch Center Phone check to clearly indicate that there is only one phone to test.         GT 20 15-2575 Also changed this test to have EP Staff               GT-2015-8602-1 perform the phone test per Attachment 4.
Data Sheet 13, Added "One" designator to               User comment.
DAP computer check to clearly indicate that there is only one DAP computer to test.               GT 2015-7209 Data Sheet 13, Removed the following from             User comment.
the Control Room briefcase inventoried items.                                                 Approval to remove these items was
* 10blak lo shetsobtained                           from the Operations Senior License.
* 1 calculator
* 10 miscellaneous pens                       GT 20 15-7209 a       2 pencils*with erasers
* 1 ruler a       2 pads of lined paper
* 5 red fine markers.
* 5 black fine markers
* 3 orange markers o       3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs.               techflical advances.
GT2014-1555 1.
Data Sheets 14 and 15, items were                     Per user comment the Control Room checks rearranged.                                           should be on one attachment and the Control
                                  ....                 Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment. No items were removed from the procedure.
____________________________No margin markings were used.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 5 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Resp~onse Resource Readiness Rev. No.: 14 Alteration Justification Data Sheet 16, added references to User comment.Attachments 4 and 5 for directions for how GT 20 15-2575-1 to perform checks. No Margin marks were used.Data Sheet 19, reduced the number of EDs This change aligns the number of EDs from 30 to 16. available with the number of TLDs.GT 2014-15551 Data Sheet 19, change the format of the Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used Control)" from "16 TLDs plus 1 Control throughout this procedure.
 
TLD".Data Sheet 20, Removed 20 SRDs and SRD The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs. technical advances.GT2O014-1555 1.Data Sheet 20, added "(1307 Storage Room) Added to provide user with a better location to the location at Niles Hospital.
Procedure No.:         EPP-2080-ERO-001                                     Rev. No.:      14
of equipment.
 
Data Sheet 20, organized list of items under No items were added or removed. This new heading "Decon Room". organization groups items in the same location together.Data Sheet 20, added "(In Cabinet)" to the Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit. of equipment.
==Title:==
Data Sheet 20, Added reference to Data Added to remind user that when performing Sheet 25. the instrument kit inventory it is necessary to document the inventory on DS 25.Data Sheet 23, changed the location of Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.
Emergency Resp~onse Resource Readiness Alteration                                           Justification Data Sheet 16, added references to                     User comment.
Attachments 4 and 5 for directions for how             GT 20 15-2575-1 to perform checks.                                     No Margin marks were used.
Data Sheet 19, reduced the number of EDs               This change aligns the number of EDs from 30 to 16.                                         available with the number of TLDs.
GT 2014-15551 Data Sheet 19, change the format of the               Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used               Control)" from "16 TLDs plus 1 Control throughout this procedure.                             TLD".
Data Sheet 20, Removed 20 SRDs and SRD                 The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs.               technical advances.
GT2O014-1555 1.
Data Sheet 20, added "(1307 Storage Room)             Added to provide user with a better location to the location at Niles Hospital.                     of equipment.
Data Sheet 20, organized list of items under           No items were added or removed. This new heading "Decon Room".                             organization groups items in the same location together.
Data Sheet 20, added "(In Cabinet)" to the             Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit.           of equipment.
Data Sheet 20, Added reference to Data                 Added to remind user that when performing Sheet 25.                                             the instrument kit inventory it is necessary to document the inventory on DS 25.
Data Sheet 23, changed the location of                 Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.
better describe the locations.
better describe the locations.
Data Sheet 23, removed Operations Electronic Dosimeters for Operations Emergency Supplies -6 Electronic personnel are located in the Control Rooms Dosimeters.
Data Sheet 23, removed Operations                     Electronic Dosimeters for Operations Emergency Supplies - 6 Electronic                     personnel are located in the Control Rooms Dosimeters.                                           and inventoried using Data Sheets 14 and 15.
and inventoried using Data Sheets 14 and 15.Data Sheet 23, Added a portable air sampler Requested by RP personnel to ensure this and a dose rate meter to the inventory for the equipment is readily available when needed TRPAC Emergency Cabinet in an emergency.
Data Sheet 23, Added a portable air sampler           Requested by RP personnel to ensure this and a dose rate meter to the inventory for the         equipment is readily available when needed TRPAC Emergency Cabinet                               in an emergency.
No Margin Marks were used.GT 2015-13295-1 Data Sheet 24, added Lake Michigan This is a new phone for the alternate BOF College satellite phone check. location at LMC.GT 2015-8471-1 Data Sheet 25, Added blank to record the User comment Response Source ICN.Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
No Margin Marks were used.
Page 6 of 9 REVISION  
GT 2015-13295-1 Data Sheet 24, added Lake Michigan                     This is a new phone for the alternate BOF College satellite phone check.                         location at LMC.
GT 2015-8471-1 Data Sheet 25, Added blank to record the               User comment Response Source ICN.
Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                                   Page 6 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Title: Emergency Response Resource Readiness Rev. No.: 14-Alteration Justification Moved Security Control Center Quarterly Previously these checks were on Data Sheet checks to new Data Sheet 26. 18 which is for the Berrien County EOC.User Comment.Office Informa~tion for Form Tracking Only -Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.
 
Page 7 of 9 REVISION  
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:   14-
 
==Title:==
Emergency Response Resource Readiness Alteration                                           Justification Moved Security Control Center Quarterly                 Previously these checks were on Data Sheet checks to new Data Sheet 26.                           18 which is for the Berrien County EOC.
User Comment.
Office Informa~tion for Form Tracking Only         - Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval.                                                                                 Page 7 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
Procedure No.: EPP-2080-ERO-001 Rev. No.: 14 Title: Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.Implementation Schedule* The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.* The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.* PORC week 1 /11/20 16-Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.None Related Actions None I Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.
 
Page 8 of 9 REVISION  
Procedure No.:         EPP-2080-ERO-001                                       Rev. No.:   14
 
==Title:==
Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.
Implementation Schedule
* The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.
* The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.
* PORC week 1/11/20 16
- Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.
None Related Actions None I             Office Information for Form Tracking Only         - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 8 of 9
 
REVISION  


==SUMMARY==
==SUMMARY==
ProcdureNo.
 
EP-28-EO-Rev. No.: 14 Office Information for Form Tracking Only -Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval.
Rev. No.:  14 ProcdureNo.       EP-28-EO-Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval.                                                                               Page 9 of 9}}
Page 9 of 9}}

Latest revision as of 05:42, 5 February 2020

Transmittal of Revision to Emergency Plan Implementing Procedures, Including Revision 32 to PMP-2080-EPP-100, Revision 33 to PMP-2080-EPP-100, and Revision 14 to EPP-2080-ERO-001
ML16055A138
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/19/2016
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2016-22
Download: ML16055A138 (214)


Text

INDIA NA MICHIGAN Indiana Michigan Power Cook Nuclear Plant POWER One Cook Place Bridgrnan, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com February 19, 2016 AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Donald C. Cook Nuclear Plant Units 1 and 2 Transmittal of Revision to Emergency Plan Implementing Procedures

Dear Sir or Madam:

Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:

Procedure Number Title Revision Effective Date PMP-2080-EPP-i100 -Emergency Response 32 1/28/2016 PMP-2080-EPP-100 Emergency Response 33 2/12/2016 EPP-2080-ERO--001 -Emergency Response Resource Readiness 14 2/3/2016 There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.

Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l

Enclosure:

Encloure:

Emergency Plan Implementing Procedures

. /I

U. S. Nuclear Regulatory Commission AEP-NRC-201 6-22 Page 2 c: R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich - NRC Washington, DC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson - NRC Region Ill (CD)

A. J. Williamson - AEP Ft. Wayne, w/o enclosure

Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14

IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32

Rev03 Doc No.: PMP-2080-EPP-1 00 No.:

Title:

EMERGENCY RESPONSE Major Editorial Correction - Full Alteration Cat.:

Review CDI/50.59:1 50.54(q) #15-46 PORC Mtg. No.: 4666 CARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change N/A End:

Effective Date: 1/28/2016 12:00:00 AM Approvals NaImeIReview/Approval Type/Capacity Date]

Hart, William E (i376639) 1 1lValidation Review 112/16/2015 12:12 J Hart, William E ~ 1 Cross-Discipline Review: EMERGENCY1 12/16/2015_12:1 Thompson, Alisa I (s0841 jlSpecial Review : E-PLAN GROUP 12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536 1 Hat(illiam9 E l3 Technical Review 101/08/2016 10:15 j M s065 5_Management Review 101/14/2016 07:32 ]

Wendzel, Regan 7ApoaAuhrt01/1/01 32 (s007887) Apoa uhrt 0/421 32 Signature Comments

=Validation Review performed by Simpson, EP]

Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]

]-he technical review was performed by Jerry Peterson]

IPORC approval obtained at meeting 4666

Approved at PORC per Plant Manager, Jim Ross.

  • ' PMP-2080-EPP-100 Rev. 32 Page 1 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AND SCOPE ............................................................ 3 2 DEFINITIONS AN]) ABBREVIATIONS ............................................ 3 3 DETAILS............................................................................ 6 3.1 General Information .......................................................... 6 3.2 SM-SEC Checklist ............................................................ 7 3.3 Unaffected CR Checklist....................9 3.4 Shift Technical Advisor (STA) ................................................ 10 3.5 Contingency Director ............ ............................................ 10 4 FINAL CONDITIONS.............................................................. 11 5 REFERENCES.. ................................................................... 12 : Protective Action Recommendations .................................. 13 : Activation of ERONS..................................................17 : Dismissal of Non-Essential Personnel ...................................19 : Accountability ......................................................... 21 : Evacuation............................................................ 26 : Terminating a IJE....:................................................. 30 : Notification of On-Site Personnel...................................... 31 : Notification of Off-Site Agencies ...................................... 35 : MSP Notification.......................................................40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification .......................... ............................ 46

PMP-2080-EPP-100 Rev. 32 Page 2 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency PreparednesS Writer Document Owner Cognizant Organization 2: Manual Completion of EM!) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1: PPC or PSS Control Room Data ...................................... 52 Data Sheet 2: Emergency Turnover Checklist ........................................ 54 Data Sheet 3: Plant Status............................................................. 58 Data Sheet 4: Request For Additional Information .................................. 60 Data Sheet 5: Contingency Team Tracking Form .................................... 61

Reference PMP-2080-EPP-100 Rev. 32 Page 3 of 61 Emergency Response 1 PURPOSE AND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.

1.2 Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.

2 DEFINITIONS AND ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AEO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.

Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.

Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.

Control Room An available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.

  • CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to
  • Status Trees restore safety functions that are challenged.

DAP Dose Assessment Program EAL Emergency Action Level

Reference PMiP-2080-EPP-100 Rev. 32 Page 4 of 61 Emergency Response Term Meaning ED Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency ResPonse Auxiliary Equipment Operators.

ERDS Emergency Response Data System ERE Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency flAB Hostile Action Based IC Initiating Conditions IIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation responsible for placing the unit in a safe condition, during emergency Team conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.

MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.

Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.

OSC Operations Support Center PA Public Address

Reference [ PMLP-2080-EPP-100 [ Rev. 32 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Containment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data

.RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager - Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center - Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building TIE Unusual Event US .Unit Supervisor WCC-SRO Work Control Center - Senior Reactor Operator

Reference PM~P-2080-EPP-100 Rev. 32 Page 6 of 61 Emergency Response 3 DETAILS NOTE: eSteps in this procedure that do not apply to the current classification may be marked N/A.

e The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.

3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.

3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.

3.1.3 The following actions shall not be delegated by the SEC (Command &

Control Function):

  • Classification of the emergency.

o Directing the notification of offsite officials.

o Approval of PAR to offsite emergency management agencies.

3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.

3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.

3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)

3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.

The use of Operations Department staff is recommended.

Reference PMP-2080-EPP-100 [ Rev. 32 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:

  • The following steps are repeated for each classification upgrade.
  • A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.

3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.

3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.

3.2.3 IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers' Bridge.

NOTE: Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).

Activation of the ERONS includes activating the Emergency Response Facilities.

3.2.4 IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).

NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,

hostile force, radiation release, toxic spill, etc.).

3.2.5 IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).

Reference I PMP-2080-EPP-100 [ Rev. 32 Page 8 of 61 Emergency Response 3.2.6 IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.

3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).

3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).

3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.

3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.

3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.

3.2.12 Upon completion of turnover, inform both control rooms that the Command

& Control Function has been transferred to the SEC (or ED, as applicable).

3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &

Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.

3.2.14 IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.

3.2.15 WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.

Reference PMP-2080-EPP-100 Rev. 32 Page 9 of 61 Emergency Response 3.3 Unaffected CR Checklist 3.3.1 WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___

3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel. ___

3.3.3 Assign an individual to start the Dose Assessment Program (DAP). ___

IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP- 108, Initial Dose Assessment.___

3.3.4 TSC Ventilation

a. IF any of the following conditions are present: ___
  • The emergency involves a loss of coolant accident
  • The Control Room Pressurization System has been activated o A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode. ___
b. Record the Emergency Mode start time on the placard located below the switch.

NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.

3.3.5 if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable. ___

  • Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).

3.3.6 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration

S Reference [ PMP-2080-EPP-100 Emergency Response I Rev. 32 Page 10 of 61 3.4 Shift Technical Advisor (STA) 3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.

3.4.2 Provides an independent assessment of conditions present and actions taken.

3.4.3 Reports to the SM and acts in an advisory capacity.

3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.

3.4.5 Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.

NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.

3.5 Contingency Director 3.5.1 The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.

3.5.2 The Contingency Director performs the following tasks.

o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.

a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.

  • Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.

o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.

  • Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.

Reference PM*P-2080-EPP-100 ] Rev. 32 Page 11 of 61 Emergency Response NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.

a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.

o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.

  • WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.
  • Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.

a Coordinate the move of personnel to the OSC when directed by the SM.

o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.

4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.

Record any comments below (include document numbers for corrective actions):

Verified Complete By: Date: ___ I/

Performer Independently Verified By:- Date : __/ _

Performer Reviewed By: Date: I/ __

Operations Shift Manager I designee

Reference I PMP-2080-EPP-100 I Rev. 32 I Page 12 of 61 Emergency Response 5 REEERENCES 5.1 Use

References:

5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-00 1, Activation and Operation of the EOF.

5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1i.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing

References:

5.2.1 Source

References:

a. Cook Nuclear Plant Emergency Plan
b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2 General References
a. Michigan Emergency Management Plan
b. NRC Regulatory Issue Summary, RIS-2002-21
c. NRC Regulatory Issue Summary, RIS-2004-13
d. NRC Bulletin 2005-02

Reference PMiP-2080-EPP-100 Rev. 32 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages:

NOTE: In selecting a PAR, consider the radiological release characteristic

  • (continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped - e.g., containment pressure relief).

NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.

1 PAR Development 1.1 Proceed through a flowchart in this attachment to develop a PAR.

S The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.

, All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.

2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.

2.2 Ensure that the appropriate PAR boxes are checked on the EMD-32a form.

2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.

Reference PMP-2080-EPP-100 Rev. 32 Page 14 of 61 I Emergency Response I Attachment 1 Protective Action Recommendations Pages:6 Initial - Protective Action Recommendations Yes bsthis a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?

(!f the conditions for a Rapidly ProgressingSevere Accident cannot be immediately confirmed, then A.NSWER .. ,No.)

1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?

OR

2. The conditions for EAt. R-1 have been met?

Yes HAB "\

.HELTER Recommend HOSTILE ACTION Recommend INITIAL SHELTER IN PLACE. {Column 2 on EVACUATION. (Column 3 on PAR PAR Table labeled "HAB SHELTERI* Table labeled 'INITIAL")it, z1 (L1}

. SHELTER INPLACE (SIP) 2 miles

  • Evacuate 2 mile radius, radius,
  • Evacuate areas 2-S miles
  • Clear lake area to 5 miles, downwind,
  • All other areas MONITOR &
  • All other areas MONITOR &

PREPARE PREPARE END of Initial PAR Flowchart N

\ Go to the Follow Up, PAR Flowchart s

Area 1, 2 and clear lake area 6 213.75to 236.25 Areal, 2, 3, 4anddlear lake areas 6& 7 Area 1, 2, 3, and~clear lake area 6 236.25 to 303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6 and Areal, 2, 3 andclear lake area 6 303.75 to 348.75 Area 1, 3, 5antd cear lake area 6 clear Areal1, 3 aaddcear lake area 6 348.75to 56.25 Areal1, 3, 5 anddcear lake areas 6& 7 Area 1, 3 and clear lake area 6 Areca 6 Area 1 and clear lake area 6 56.25 to 168.75 Area 1, and dlear lake areas 6 & 7 Notes: 1. Lake areas are =cleared" for eithter evacuation or sheltering.

2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.
3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.

1~

I Reference PMIP-2080-EPP-100 Rev. 32 Page 15 of 61 I Emergency Response Atahet1PotcieAto RcmedtosPages:

Attahmet 1Protctie Atio Recmmedatons13 - 16 Follow Up - Protective Action Recommendations Has aaL -NITIAL PAR t*e m-ade?

~AZIIZ,

~o to iii+/-~1 PAR

]

45 4 r~J H

Was a RAPiDLY PROCRESSING tlore ctooI~e ~ ~tabIi~edAND Co~iai~~

SEVERE ACCIDENT 8~dax~d ~ ~ra1st rImi20~ R~'BR?

d~xEt~ Iu~s1 PAR e~slmrj~'

W i SHELTER RnnnHOSTIL~E ACTION R *omesdOLLOW UP EVACIATIO.N.

SHHEIER IN ILACE.

.4 axea2 Epamdyx lst dovoreirA areasarEspiad .tn at ti.

eiwas re-cs nmdatima t* add a~dii, sl SHELTER') <x:

m x-a (ADD cohamx 1 onPA5 TaUl*

  • SHELTER INILACE *SO' 2 *ColmmS on oPAR Table la1bh--d '*OLLOW
  • All otte area MONITOR &
  • Eseroat 2 mie rains PREP.ARE
  • catem aresas 2-10 miles do*.n, imd
  • Alloh. areas M )N*ITOR &
  • All oth* areas O*N'I-OR & PREPARE PREPARE beo It~ar~ith d~ Sates

~ 4S~~t ~stetm ee~lre~ r~ to do so mcdi~ PARs of all a~aei arms

'S 4,

exssaedPAC's.

  • E~xpaad PAE'a bated at DOSE A*~*SSESS -E"to armsx be~nd 10 tuTIms maedPA(Ia (Atrealasn 1*0mil.s ~vi~l Ibed*ed*ad hoc*in mrlais dea I.'
  • shd th Sate of Mrr*mniasrar-).

4, and dear ]ake areas 6 & 7 Area 1, 2 anddcear lake area 6 213.75 t0 236.25 Area 1, 2, 3, 4artddear lake: areas 6 & 7 Ara1Area 1, 2, 3, and dearlake area 6 aauid IAreal1, 2, 3 and clear lake area 6 303.751 o348.75 Areal, 3,5 andclear lake area 6 clear Areal1, :3and clear lake area 6 lake Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75 Area 1, anddcear lake areas 6& 7 Notes: 1. Lake areas are 'cleared - fbia either evacuation or sheltering.

2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.
3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.

I Reference ,,,, PMP-2080-EPP-100 Rev. 32 Page 16 of 61 I Emergency Response I tahet1PotcieAto Rcm edtosPages:

Attahmet 1Protctie Atio Recmmedatons13- 16

______________ ______________ Reference 3 EPA PAG TABLE*

Protective Action PAG (projected dose) Comments Michigan Application

Response

Theleerin2-in-place or 1 to S relmt Evacuation~lir, for snm<e situations, racility operator~s will recommeno ev~acuation of the (11 rv¢iv t~o 53q m.Sv) shecering* in~place) should; be initiat=ed evacuation at 1 remn sheltering in public* over four day* whern projectcd dose is 1 remn (13 rosy) place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy S en'e(S3 rr5, KI is' r:ost effectcive if taken prior t:o The stateco Michigan will irmplem~ent administ:ration or projected dto.'c to e*:posure. Ma? resiuire approval of st.ate irs 1(I plan; facility operator's prophylactic drugs* - child thyroid E~rr medical officials ior in actordance with recommen~datrion is implicit in dose KI: expos'ure t.o iocinc es*tablished en' eraencv plans). estidmation data.

  • t.+Tw*,~l.**o,*'D,+++ - I c'r ife~~v,+t++*:e =:J&* j

-+..+t*t+-;te t+nD

+I+ fI b.tp:,!'i,J+***

flt i~rle

v++ +e ie+; h~'
  • ._*J+.,: ait+n :* ~t+:.i*+m .. ,+/+,*.

th'4 r,++ tnJ++.+ :i-m; +++ *-÷ tt* n

+t*ft"1t3.+n+.5 i di+'

  • m,.t n

"+a+ the

. t**+++1 e f,+'Jm +t~ ii

'Tb - JŽ ti . I ,*r+ +'I r,t~ +-.ix[rt+++=, + +,'Li. .* .+

i++*.+ +*, ifl r +-J+ *,' +,' u'"int~

  • .*, :b+-frt
  • +;+r*+i 1,

Reference PMIP-2080-EPP-100 Rev. 32 Page 17 of 61 Emergency Response Attachment 2 Activation of ERONS Pages:

NOTE: SEC jugetis used todetermine which scenario will be used.

1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.

1.1 To activate ERONS:

  • Click the Everbridge icon on the desk top.

OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.

1.2 Enter User Name (erons) 1.3 Enter Password (located in ERO brief case) and Click Sign In.

NOTE: 1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.

2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.

1.4 To start a scenario, click on the Notifications tab at the top of the page.

1.5 Click on the Templates header to bring up a list of pteprogrammed scenarios.

Reference PMP-2080-EPP-100 Rev. 32 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS Pages:

17 - 18 INOTE: ........ .............. .s ii°t t 1.7 Click Send (loca ptedB clos to e te tpofte cee) 1.C mesag wi opup askin ifyuwatt ddYthisto an evet.t Cick"N, en Afe a N ntification isrt senat thet srenauomatiitEcall goner sbacktr NoiictosrTab where thei last ntfcation sentCut~is~E Cshonwthtetie 1.7 Click Send (located close to the botop of the screen). Noicaonhaebnsnt NOTE: Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.

[ Reference PMP-2080-EPP-100 Rev. 32 I Page 19 of 61

[ Attachment 3 Emergency Response Dismissal of Non-Essential Personnel PaeI NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.

1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.

NOTE: Personnel assisting the ERO (such as a Failure Investigation Process (FTP)

Team) should be Radworker qualified (i.e., have a TLD).

1.1 IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.

1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g.,

radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

1.3 Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:

  • Whether or not rapid egress is required (e.g., airborne attack)
  • Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.

1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.

1.4 Inform both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).

1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.

1.5.1 Sound the Containment Evacuation Alarm(s), if required.

1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two tunes.

1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential_ personnel are requested to leave the plant site at this time using the main plant access road."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

1.6.2 if rapid egress is to be used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,

"vehicle portal near the North Access Building") and exiting the site using (State the route)."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.

Reference PMP-2080-EPP-100 Rev. 32 Page 21 of 61 Emergency Response Attachment 4 Accountability 2Pages NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.

1 Review the three methods of Accountability below:

1.1 Primary Method - using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.

  • Personnel will remain in the Assembly Areas until evacuated per SEC direction.
  • A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).

1.2 Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.

This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.

  • In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
  • This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.

Reference PMP-2080-EPP-100 Rev. 32 Page 22 of 61 Emergency Response Attachment 4 Accountability 2Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

  • IF using the Livingston Road route, ThEN contact Security to unlock the gates.

1.3 No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).

2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.

2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.

2.1.1 IF using the Primary Method of accountability, TthEN request that Security:

o Prepare for accountability.

o Commence evacuation of the Owner Controlled Area outside of the Protected Area.

a. GO TO Step 3.

Reference PMP-2080-EPP-100 Rev. 32 Page 23 of 61 Emergency Response

  • Attachment 4 Accountability Pages:

NOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.

2.1.2 IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.

a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
b. Request that the Owner-Controlled area also be evacuated.

3 Contact Personnel Inside the Protected Area.

3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:

Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

Sound the Nuclear Emergency Alarm.

Make a Public Address announcement for personnel to report for accountability. Make the announcement two times. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."

IF the ER~s have not already been activated, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

Reference PMP-2080-EPP-l00O Rev. 32 Page 24 of 61 Emergency Response Attachment 4 Accountability Pages.

3.2 IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:

o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

o Sound the Nuclear Emergency Alarm.

Make a Public Address announcement for personnel to use the alternate method of accountability. Make the same announcement two times. Anl example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."

3.2.1 IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.

3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times:

"Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.

3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.

3.3.1 Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.

Reference PMP-2080-EPP-100 Rev. 32 Page 25 of 61 Emergency Response Attachment 4 Accountability Pages 4 Perform follow-up actions.

4.1 IF the Primary Method of Accountability was used, THtEN o Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.

  • Coordinate with Security to locate any missing individuals.

4.2 IF the Alternate Method of Accountability was used, THEN a Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).

  • Coordinate with Security to locate any missing individuals.

4.3 IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:

a After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).

o Coordinate with Security to locate any missing personnel.

  • Public Address announcements as necessary.

S Dismissal or evacuation of personnel as necessary.

I-Reference PMP-2080-EPP-100 Rev. 32 Page 26 of 611 Emergency Response Pages:

Attachment 5 Evacuation 26 - 29 NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.

1 Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE was not entered).

  • 1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.

1.1.1 Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary 'for plant personnel.

1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.

1.2 IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.

1.3 IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.

1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.

  • Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.

Reference PMP-2080-EPP-100 Rev. 32 Page 27 of 61 Emergency Response Attachment 5 Evacuation Pages29 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.

2 Site Evacuation 2.1 Rapid Egress 2.1.1 IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.

a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.

Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.

IF using the Livingston Road route, THEN contact Security to unlock the gates.

  • Request that the Owner Controlled Area also be evacuated.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

Reference PMP-2080-EPP-100 Rev. 32 Page 28 of 61 Emergency Response Attachment 5 Evacuation Pages:9

b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."

c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."

2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation. ___

  • Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,
  • vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation. ___
  • Request that the Owner Controlled Area also be evacuated.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____

RfrnePMI?-2080-EPP-100 Rev. 32 Page 29 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

2.3 Take any necessary follow-up actions.

2.3.1 IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.

2.3.2 IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.

I Reference PMP-2080-EPIP-100 Rev. 32 Page 30 of 61 I Emergency Response I Attachment 6 Terminating a UJE Pages:

1 IJE Termination 1.1 IF the conditions for the UBE no longer exist, and no escalation of classification is expected, THE*N perform the following:

1.1.1 Instruct operators to inform the MSP and BCSD that the event is terminated.

1.1.2 Instruct operators to:

  • Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
  • Verify that the form was received by the State and County.
  • Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.

1.2 Inform both Control Rooms that the event is terminated.

1.3 Inform Security that the event is terminated (1118, 1119, 2005 or 2731).

1.4 Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.

2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.

I Reference PMP-2080-EPP-100 Rev. 32 Page 31 of 61 I Emergency Response I Attachment 7 Notification of On-Site Personnel Pages:

1 31 -34 1 Notify Security

1. 1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.

1:1.1 if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.

a. Contact Time _ _______

1.1.2 if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.

a. Contact Time __________

1.1.3 IF a SAL, THEN instruct Security to:

a Ready the Security Computer for accountability and prepare for subsequent evacuation.

  • Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
a. Contact Time _ _______

1.1.4 IF a GE, THEN instruct Security to:

a Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).

  • Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
a. Contact Time

Reference PMP-2080-EPP-100 Rev. 32 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages:

31 -34 1.1.5 IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.

a. Contact Time _________

2 Notify Chemistry and RP Technicians of the initial emergency classification.

2.1 Chemistry Contact Time____________

2.2 RP Contact Time__ __________ ______ ___

3 Make Public Address Announcements ___

CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.

[ NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.

3.1 Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.

3.1.1 IF in a LUE, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Unusual Event has been declared due to (brief description) . Continue with your work and be prepared for future announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed __________

3.1.2 fI? in an Alert, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Alert has been declared due to (brief description) .'

IF emergency facilities are not already activated, THEN continue the announcement with:

"Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed

Reference PMIP-2080-EPP-100 Rev. 32 Page 34 of 61 Emergency ResponseI Attachment 7 Notification of On-Site Personnel Pages:

31 -34 NOTE: Aconaiiyis promderAttachment 4, Accountability.

3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes:

"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)." ___

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646. _ _
2. Time announcements completed_____________

3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability. ___

3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____

"Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)." ___

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___
2. Time announcements completed_____________

3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability. ___

RfrnePMP-2080-EPP-100 Rev. 32 Page 35 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages.

1 Accelerated Notifications to the NRC for Security Events.

1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:

1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.

1.1.2 Provide an accelerated verbal notification, without hard copy, to the NRC with the following information:

  • Site Name Emergency Classification, if determined.
  • Nature of the threat (briefly describe)

Type of attack (e.g., armed assault by land, water, or aircraft)

Attack status (i.e., imminent, in progress, or repelled)

RfrnePMP-2080-EPP-100 Rev. 32 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:9 INOTE: Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.

2 Completing ENMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.

SNOTE: PARsardeeodusg Attachment 1, Protective Action Recommendations.

SCaution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using

~Attachment 12, "Manual Completion of EMD Forms".

2.1.1 IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).

NOTE: An EMD-32a is required within 15 minutes of:

  • An initial event classification, or
  • A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".

RfrnePMiP-2080-EPP-100 Rev. 32 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: An EMD-32b is required to be transmitted with the EMD32a if:

SA General Emergency has been declared, or o There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___

2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.

2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.

2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___

2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.

Reference PMP-2080-EPP-100 Rev. 32 Page 38 of 61 Emergency Response Attahmet 8Notiicaionof ff-Ste geniesPages:

Atahet8Ntfcto f f-ieAece 5-3 SNOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.

3 Phone Contacts and Faxes (usually performed by AE~s) 3.1i Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed). ___

3.2 Direct contact with the MSP using Attachment 9, MSP Notification. ___

3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification. ___

SNOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

3.4 Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification ___

3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___

3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____

4 Follow Up Notifications 4.1 UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.

RfrnePMP-2080-EPP-i00 Rev. 32 Page 39 of 61 ReferenceEmergency Response]

Attachment 8 Notification of Off-Site Agencies Pages:

35 -39 4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12. ___

The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.

The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.

4.3 IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.

4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.

Reference PMP-2080-EPP-100 Rev. 32 Page 40 of 61 Emergency Response Attachment 9 MSP Notification Pages:

40 -42 NOTE: Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

1

Contact:

MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.

NOTE: The phone is the primary means for communicating the EMD-32 information.

NOTE: An EMD-32a is required within 15 minutes of:

,,The initial classification, or

  • A change of classification, or
  • A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.

An EMD-32b is required to accompany an EMD-32a:

  • if the declaration of a General Emergency is due to dose, or
  • if a PAR change is due to dose 2 Provide the following to the MSP:

o Provide the information from the EMD-32 form.

o Obtain the officers/dispatcher's name and record on table.

  • Inform the agency that the EMD-32 will be faxed.
  • 0 Request a callback (for authentication) and then hang up.

RfrnePMP-2080-EPP-100 Rev. 32 Page 41 of 61 RefeenceEmergency Response a For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.

0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000 /____I____ ___ /_____

Initials Time Initials Time Person Contacted MSP Person Contacted:___________________

Call Back Call Back I Bridge established:____________________

_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

o Write the question aObtain the response and get approval aProvide the response to the MSP.

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s): ___

a Make sure that the form is signed by the Shift Manager. ___

Orient the form(s), as shown on the fax machine, in either Control Room a IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.

Reference PMiP-2080-EPP-100 Rev. 32 Page 42 of 61 Emergency Response MSP Notification Pages:

Push the start button___

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023

b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.

RfrnePMP-2080-EPP-100 Rev. 32 Page 43 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification 43-45:

Pages:5 NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.

oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

  • The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.

Contact:

  • BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher. ___
  • IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.

o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.

o For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.

[NOTE: The phone is the primary means for communicating the EMD-32 information.

2 Provide the following to the BCSD:

Provide the information from the EMD-32 form.

  • Obtain the officers/dispatcher's name and record on table.

Inform the agency that the EMD-32 will be faxed.

Reference PMP-2080-EPP-100 Rev. 32 Page 44 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:5 OFF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. _____/_____ _____/_____

Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-983-7141)

Person Contacted BCSD Person Contacted:___________________

Call Back Call Back / Bridge established:__________________

Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.

SWrite the question e Obtain the response and get approval Provide the response to the BCSD. ___

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s):

o Make sure that the form is signed by the Shift Manager. ___

  • Orient the form(s), as shown on the fax machine, in either Control Room
  • IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.

RfrnePMP-2080-EPP-100 Rev. 32 Page 45 of 61 RefeenceEmergency Response 43-45:

Attachment 10 Berrien County Sheriff Notification Pages:5 Push the start button ___

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987

,, BC EOC: 8-1-269-934-9023

b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

a EOF: 8-284-2942 o TSC: 2431

,o ENC/JIC: 8-284-5892 a, OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____

Reference PMP-2080-EPP-100 Rev. 32 Page 46 of 61 Emergency Response Attachment 11 NRC Notification Pages:

46 - 47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.

NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.

1

Contact:

a IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.

o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.

  • Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
  • Write the question
  • Obtain the response and get approval
  • Provide the response to the NRC.

Ask the N-RC for the Event Notification Number (EN).

RfrnePMP-2080-EPP-100 Rev. 32 Page 47 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:7 0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION _______ ESTABLISHElD CLOSEOUT NRC Operations 1-301t-816-5100 Center 1-301-951-0550 /_____ _____I___

1-301-415-0553 Initials Time Initials Time 8-1-301-816-5151 (FAX) ______________

Person Contacted NRC Person Contacted:___________________

Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.

Event Notification Ask NRC for the EN:________________

Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 .WHENthe BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.

RfrnePMP-2080-EPP-100 Rev. 32 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:

Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.

NOTE: An EMD-32a is required within 15 minutes of:

  • An initial event classification, or
  • A change of classification, or
  • A change of PAR 1 Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
  • Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant
  • Record name of Plant Communicator(s) o Indicate location where this form is being generated (Calling From)
  • Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number"
  • Indicate "Current Classification" S Indicate date and time of current classification was declared
  • Indicate "Reason for Classification"
  • Record the IC Number
  • Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a Indicate any current "Protective Action Recommendations"

RfrnePMP-2080-EPP-100 Rev. 32 Page 49 of 61 RefeenceEmergency Response Pages:

Attachment 12 Manual Completion of EMD Forms 48 -50 a Record PAR basis

  • Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP- 108, Initial Dose Assessment, Attachment 1.

a Forward completed form to Approver

  • Complete "Approved By", date and time
  • Forward completed approved form -for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:
  • A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":
  • Indicate whether this is an "Actual Event" or a "Drill"
  • Record "Nuclear Power Plant" as Cook Nuclear Plant
  • Record name of "Plant Communicator"(s)
  • Indicate location where this form is being generated (Calling From)
  • Record "Call Back Telephone Number" 269-465-5901 Ext. 1088
  • a. Record "Plant Message Number"
  • *Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.

o Record "Reactor Information"

  • Record "Plant Status/Additional Information"

efrnePMJ'-2080-EPP-100 Rev. 32 Page 50 of 61 RefeenceEmergency Response 2 Manual Completion of EMD Forms 48 - 50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas

  • IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.

o Forward completed form to Approver

  • Complete "Approved By", date and time
  • Forward completed approved form for transmission

RfrnePMP-2080-EPP-100 Rev. 32 Page 51 of 61 RefeenceEmergency Response IAttachment 13 Activation of FLEX Phase 3 Page:

NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.

WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).

WHEN communication is established THEN provide the following information:

  • Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units
  • Your name and position/title
  • The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).

3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:

Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.

Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".

4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

5 From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S Reference PMP-2080-EPP-100 Rev. 32 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:

~52 - 53 Unit No: Date: Time:

Data Taken By: Data Reviewed By:

SNOTE: When redundant :indication exists, record most severe condition.

1. Containment Temp. 5. Intermediate Range _____AMPS
2. Cont. 112 Concentration 6. Containment Pressure _______PSIG
3. RWST Level 7. Containment Sump Level
4. Source Range _______CPM 8. Containment Level
9. Containment High Range Radiation Level Upper/Lower /R/HR
10. CTS Pumps East ON / OFF West ON / OFF
11. RHR Spray Flow East ____ GPM West____ _

GPM

12. SI Flow North ___GPM South ____ GPM
13. BIT Flow LP 1 ___GPM LP2 ___GPM LP3 ___ GPM LP4 ____GPM
14. Accum Pressure LP1 ____PSIG LP2 ___PSIG LP3 ____ PSIG LP4 ____PSIG
15. RHR Injection Flow East ____GPM West____ _ GPM
16. RCP Status LP1 ON /OFF LP2 ON /OFF LP3 ON/IOFF LP4 ON /OFF
17. RCS Pressure ______PSIG 23. PRT Level
18. Charging Flow ______GPM .24. PRT Pressure ________PSIG
19. PZR Liquid Temp. __ ___

0F 25. PZR Cycling Htrs ON / OFF

20. PZR Steam Temp. 26. PZR Backup Htrs ON / OFF
21. PZR Level 27. Letdown Flow ____ ___GPM
22. PRT Temp. 28. Saturation Margin oF

Reference PMP-2080-EPP-100 Rev. 32 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:3 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4

29. Wide Range T Hot _____ ___ F
30. Wide Range T Cold
31. S / G Pressure ________PSIG _______PSIG ________PSIG
32. S /0G N. R. Level
33. S I G W .R. Level
34. Steam Flow (pph x 106)"
35. Feed Flow (pph x 106)
36. Aux. Feed Flow (pph x 103)
37. MSIV Status OPEN ICLOSE OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE
38. CST Level Ft
39. Steam Dump ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE AVAILABLE / UNAVAILABLE
40. East ESW ___ I _/ 50. East CCP _________ / ____
41. West ESW _________ / ____ 51. West CCP / ____
42. East CCW __________ / _____ 52. TDAFP ________ I ______/
43. West CCW ________ I ______/ 53. EMDAFP ________ ______/
44. East CTS _______ _____/ 54. WMDAFP _________ / ____
45. West CTS _________ / ____ 55. AB Diesel _________ / ____
46. North SI __________/ _____ 56. CD Diesel _________ / ____
47. South SI __________/ _____ 57. Normal Res. __________/ _____
48. East RHR _________ / ____ 58. 12 EP /
49. West RHR /

RfrnePMP-2080-EPP-100 Rev. 32 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 Unit No: _____Date: ________ Time:

1. Emergency Classification Time Declared

______Unusual Event

_______Alert

________Site Area Emergency

______General Emergency

2. Have notifications been completed?
a. Michigan: yes / no /in progress Time: ___
b. Berrien County: yes I no Iin progress Time: ___
c. NRC: yes I no Iin progress Time: ___
d. DC Cook Personnel: yes I no / in progress Time: ___
3. Protective Actions:
a. Local area evacuation yes I no Time: ___
b. Site evacuation yes / no Time: ___
c. Accountability yes / no Time: ___
d. Site closed to visitors yes I no Time: ___
4. Offsite protective action recommended:
  • , Evacuation: yes / no areas: _____ Time: ___

.Shelter: yes I no areas: _____ Time:

RfrnePMP-2080-EPP-100 Rev. 32 Page 55 of 61 RefeenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:

54 5

5. Plant Operational Status
a. Reactor trip: yes i no time: ____ Trip signal: ______________
b. ESF Status:
c. EOP Status:
6. Plant Status
a. Chronology of Events Time Event
b. Current Plant Conditions

Reference PMVP-2080-EPP-100 Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2 Emergency Turnover Checklist Pages:7

c. Potential for Plant Degradation
d. Mitigating Actions Taken or Underway
7. Plant Radiological Conditions
a. Jn-plant/Onsite Radiological Conditions
b. Potential for Offsite Release of Radioactivity Airborne Water
8. Injured or Contaminated Personnel:

Name Employer Status

9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)

Name Team # Task DescriptionlTime Dispatched

/

/

/

/

/

/

Reference PMP-2080-EPP-100 Rev. 32 Page 58 of 61 Emergency Response Data Sheet 3 Plant Status Pages:9 NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.

Reactivity Control

  • Reactor Subcritical? Yes No o, Emergency Boration initiated? Yes No
  • Adequate Shutdown Margin? Yes No RCS Inventory Control - check all that apply for the current plant conditions
  • Inventory makeup controlled by: (Identify all pumps injecting into RCS)

CVCS - Normal Charging Charging Pumps via BIT (High Head SI)

Safety injection pumps (Intermediate Head SI)

RUR Pumps (Low Head SI)

Other: ____________

RCS Pressure Control

  • Pressurizer PORVs Closed? Yes No

,, Pressurizer Safeties Closed? *Yes No

Reference PMP-2080-EPP-100 Rev. 32 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages:

  • RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP ________

Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)

RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G - Condenser Dump Valves ________

S/G - Atmospheric Dump Valves SIG - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RUR)

SIG' Inventory Control - check all that apply for the current plant conditions Main Feed Water _________

Auix. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _

Containment Control

  • , Ice Condenser Doors OPEN? Yes No

,, Hydrogen Recombiners/Igniters ON? Yes No

  • Containment Isolation Valves fail to CLOSE? Yes No o, Phase A Actuation? Yes No Additional Information

Reference PMP-2080-EPP-100 Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages:

Request for additional information Source of request: El MSP

[21 BCSD El NRC El Other_______ ___

Date ____ __Time ____

Question:

Response

Response approved by: _________________________

SEC or designee Response delivered to requesting organization:

Date Time ____ __by Whom

Reference PMP-2080-EPP-100 Rev. 32 Page 61 of 61 Emergency Response DataShet ontngecy 5 Tam rackng ormPage DataShet ontngecy 5 Tam rackng orm61 PERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED __________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED

  1. Turbine Building. ERAEO

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Alteration  !,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.

This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review- is not required for this procedure.

10 CFR 50.54(q) review was performed and documented. The number for .the 50.54(q) is annotated inl the workflow for this revision.

The conclusion was that the changes in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.

Replaced TSOC with NEST throughout The TSOC has been replaced by the NEST. The the procedure. TSOC has been removed from site.

This change was not margin marked.

GT 2015-15895 Step 1.1 was reworded. Removed unnecessary information and Removed "(under the direction of the abbreviations. The term "an emergency" SEC)" and "Unusual Event (U-E), Alert, encompasses all Emergency Classifications.

Site Area Emergency (SAE) and General The meaning of the step is unchanged.

Emergency (GE) after an emergency has been declared." One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

Reviewer comments.

Purpose and Scope step (1.2 previously) Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "Once turnover of SEC procedure.

duties has been completed, the SM retains the overall responsibility of One of the purposes of this revision is to remove directing and implementing emergency unnecessary wording that can distract the users and abnormal procedures to bring the from taking necessary actions or making required unit(s) to a safe condition." communications.

Reviewer comments.

Office Information for Form Tracking Only - Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval. Page 1 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Purpose and Scope step (1.3 previously) Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "The CR will retain procedure.

responsibility for Public Address (PA) announcements and Nuclear Emergency One of the purposes of this revision is to remove Alarm (NEA) activation throughout the unnecessary wording that can distract the users emergency." from taking necessary actions or making required communications.

Reviewer comments.

Purpose and Scope step (1.3.1 Unnecessary statement that is not a purpose or previously) stating, "Others may use the scope statement and adds nothing to this PA as directed by procedure (Security, procedure.

RAG, etc.)." was removed.

Reviewer comments.

Step 1.4 stating; "The steps in this The step is not a Purpose and Scope.

procedure are listed in the preferred order of performance for maximum Reviewer comments.

efficiency. However, the steps may be performed in a different order." was No margin markings were used for these changes.

moved to the beginning of the "Details" section, prior to step 3.1, as a Note.

Previous Purpose and Scope step 1.5 is Step renumbering due to removal of steps.

now step 1.2 due to removing steps 1.2, 1.3 and 1.4. No margin markings were used.

Added ORO and SEC-TSC to definitions Not previously defined.

section. -Reviewer comment.

Operations Training Comments. This section was The Details section was completely reorganized to provide clearer direction of actions.

reorganized. The subsections (3.1, 3.2, The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of would normally be performed. Incorporated Contents. applicable steps from OHI-2080.No actions were removed from the procedure.

No margin markings were used for these changes.

GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 2 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Step 4, Final Conditions, added These changes align this procedure with the comments section, and signature and date requirements of PRC-001.

blanks for Verified Complete, Independently Verified and Reviewed Reviewer comment.

By. , Evacuation:

  • Added signoff blanks to action steps and removed blanks from message Reviewer comment.

steps.

Removed Attachment 9, Drills and- This procedure provides guidance for actual Exercise. emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.

Deleted step 3.3 which referred to PA Drill and exercise guidance is contained in RMT-announcements during drills and 2080-EPP-500.

  • exercises.

One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

GT 2014-15961-1 1 (REV 31 Att 12), This action for the STA is not necessary as the Removed note and step, stating that the control room will be in direct phone contact with STA should perform the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the NRC and will provide necessary and requested notification to the NRC and should fill information. PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet, datasheet can be done as "time permit".

Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.

One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

GT-20 14-8280-1 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 3 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP- 100 Rev. No.: 32

Title:

Emergency Response Added the following to the Definitions Incorporated from OHI1-2080, Conduct of and Abbreviations: Operations (Emergency Organization)

AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM, AR 2014-14572-5 CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.

Added DS 5, Contingency Team Incorporated from OHI1-2080, Conduct of Tracking Form. Operations (Emergency Organization)

AR 2014-14572-5 , Added "main body of Clarifying information for user.

procedure" to steps 3.1.3 and 3.1.5.

Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology or intent of the steps.)

____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of This attachment provides guidance for requesting FLEX Phase 3. phase 3 equipment per the SAFER Plan.

____________________________No Marginal Markings were used.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 4 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev..No.: 32

Title:

Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions Office Information for Form Tracking Only - Not Partof Form

'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 5 of 5

IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33

Doc No.: PMP-2080-EPP-100 Rev No.: 033

Title:

EMERGENCY RESPONSE Alteration Cat.: Minor Revision CD 1/50.59:

PORC Mtg. No.:

CARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change End: N/A Effective Date: 2/12/2016 12:00:00 AM Approvals Na 111 ReviewlApproval Type/Capacity [1111 Becvar, Robert J i (s228955) 1lValidation Review ~02/03/2016 09:48 Etheridge, William 1110/9261:7 (1266712) 1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9WilamE 1 Special Review: E-PLAN GROUP 102/10/2016 09:35 1

[Peterson, Gerald T11 j(i689988) il3 Technical Review 102/10/2016 10:31 Schrubba, Jennifer 11 (s245259) J7 Approval Authority 102/11/2016 09:51 Signature Comments

~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.

[Minor change!

[Approved per Plant Manager, Jim Ross.I

--- W-'R PMLP-2080-EPP-100 Rev. 33 Page 1 of 61 Emergency Response Bife 1ll Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AM) SCOPE.............................................................3 2 DEFINITIONS AM) ABBREVIATIONS............................................ 3 3 DETAILS ........................................... ................................. 6 3.1 General Information.......................................................... 6 3.2 SM-SEC Checklist.............................................................7 3.3 Unaffected CR Checklist...................................................... 9 3.4 Shift Technical Advisor (STA) .......... ............................. ........ 10 3.5 Contingency Director......................................................... 10 4 FINAL CONDITIONS .............................................................. 11 5 REFERENCES ..................................................................... 12 : Protective Action Recommendations................................... 13 : Activation of ERONS..................................................17 : Dismissal of Non-Essential Personnel .................................. 19 : Accountability......................................................... 21 : Evacuation............................................................ 26 : Terminating a UiE..................................................... 30 : Notification of On-Site Personnel...................................... 31 : Notification of Off-Site Agencies ...................................... 35 : MSP Notification...................................................... 40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification...................................................... 46

--- EtR* PMIP-2080-EPP-100 Rev. 33 Page 2 of 61 Emergency Response Reference IBill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognaizant Organization 2: Manual Completion of EMD) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1: PPC or PSS Control Room Data ...................................... 52 Data Sheet 2: *Emergency Turnover Checklist......................................... 54 Data Sheet 3: Plant Status ........................................................... 58 Data Sheet 4: Request For Additional Information...................................60 Data Sheet 5: Contingency Team Tracking Form .................................... 61

Reference PMiP-2080-EPP-100 ] Rev.33 Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP- 101, Emergency Classification.

1.2 Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.

2 DEFINITIONS AMD ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AFO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.

Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.

Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.

Control Room Ant available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.

CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to Status Trees restore safety functions that are challenged.

DAP Dose Assessment Program EAL Emergency Action Level

Reference PMP-2080-EPP-100 Rev.33 Page 4 of 61 Emergency Response Term Meaning ED) Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency Response Auxiliary Equipment Operators.

ERDS Emergency Response Data System ERF Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency HAB Hostile Action Based IC Initiating Conditions TIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion addition of an RO from the unaffected unit or an. extra RO who is Mtegamio responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.

MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole at the S/E's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.

Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.

OSC Operations Support Center PA Public Address

Reference PMiP-2080-EPP-100 Rev.33 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Contaixnment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager - Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building IJE Unusual Event US Unit Supervisor WCC-SRO Work Control Center - Senior Reactor Operator

Reference [ PMP-2080-EPP-100 Rev.33 page 6 of 61 Emergency Response 3 DETAILS NOTE: *Steps in this procedure that do not apply to the current classification may be marked N/A.

  • The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.

3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.

3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.

3.1.3 The following actions shall not be delegated by the SEC (Command &

Control Function):

  • Classification of the emergency.
  • Directing the notification of offsite officials.
  • Approval of PAR to offsite emergency management agencies.

3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.

3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.

3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)

3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.

The use of Operations Department staff is recommended.

Reference PMP-2080-EPP-100 Rev.33 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:

  • The following steps are repeated for each classification upgrade.
  • A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.

3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.

3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.

3.2.3 IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers' Bridge.

NOTE: Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).

Activation of the ERONS includes activating the Emergency Response Facilities.

3.2.4 if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).

NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,

hostile force, radiation release, toxic spill, etc.).

3.2.5 if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).

3.2.6 JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.

3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).

3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).

3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.

3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.

3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.

3.2.12 Upon completion of turnover, inform both control rooms that the Command

& Control Function has been transferred to the SEC (or ED, as applicable).

3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &

Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.

3.2.14 IF in an Alert, or higher AND conditions warrant AND SM-SEC has

  • Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.

3.2.15 WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.

Reference PMP-2080-EPP-100 Rev.33 Page 9 of 61 Emergency ResponseI 3.3 Unaffected CR Checklist 3.3.1 WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___

3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.

3.3.3 Notify Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel. ___

3.3.4 Assign an individual to start the Dose Assessment Program (DAP). ___

IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP- 108, Initial Dose Assessment. ___

3.3.5 TSC Ventilation

a. IF any of the following conditions are present: ___

,, The emergency involves a loss of coolant accident

,, The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.

b. Record the Emergency Mode start time on the placard located below the switch.

NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.

3.3.6 IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____

Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).

Reference I PMP-2080-EPP-100 [ Rev.33 Page 10 of 61 Emergency Response 3.3.7 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___

3.4 Shift Technical Advisor (STA) 3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.

3.4.2 Provides an independent assessment of conditions present and actions taken.

3.4.3 Reports to the SM and acts in an advisory capacity.

3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.

3.4.5 Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.

NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.

3.5 Contingency Director 3.5.1 The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.

3.5.2 The Contingency Director performs the following tasks.

o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.

  • Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.

o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.

  • Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.

Reference PMP-2080-EPP-100 [ Rev.33 Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.

NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.

Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.

  • Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
  • WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.
  • Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.

o Coordinate the move of personnel to the OSC when directed by the SM.

Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.

4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.

Record any comments below (include document numbers for corrective actions):

Verified Complete By: Date: / I/_

Performer Independently Verified By: Date : I /_

Reviewed By: Date: I /__

Operations Shift Manager I designee

Reference [ PMP-2080-EPP-100 Rev.33 Page 12 of 61 Emergency Response S REFERENCES 5.1 Use

References:

5.1.1i PMP-2080-EPP-10I, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-O01, Activation and Operation of the EOF.

5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing

References:

5.2.1 Source

References:

a. Cook Nuclear Plant Emergency Plan
b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2 General References
a. Michigan Emergency Management Plan ,
b. NRC Regulatory Issue Summary, RIS-2002-21
c. NRC Regulatory Issue Summary, RIS-2004-13
d. NRC Bulletin 2005-02

Reference PMIP-2080-EPP-100 Rev.33 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages:

NOTE: In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped - e.g., containment pressure relief).

NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.

1 PAR Development 1.1I Proceed through a flowchart in this attachment to develop a PAR.

The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.

o All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.

2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.

2.2 Ensure that the appropriate PAR boxes are checked on the EMD-32a form.

2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.

Reference [ PMP-2080-EPP-100 Rev.33 Page 14 of 6j Emergency Response Attachment 1 Protective Action Recommendations 13-1Pages:~

Initial - Protective Action Recommendations

ENCY been declared? N-.(o PAR rqie Yes ISthis a R.APIDl¥ PROG3RESSING3 SEVERE ACCIDENT ?

(If the conditionsfor a Rapidly ProgressingSevere Accident cannot be irrmediately confirmed, then ANSWER.,..No.)

1. is there a toss of containment per EAL 3.21 or 3.31 N*

AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?

OR

2. The conditions for EAL. R-l have been met?

J YeS Yes I SHELTER Recommend RAPID EVACUATION. SRecommend ACTION2 on HOSTILE(Column Recommend INITIAL SHELTER IN PLACE. EVACUATION* (Column 3 on PAR (Column i on PAR Table labeled "RAPID"} (i, z,s iPAR Table labeled "HAB SHELTER") Table labeled INITIAL") 11,z1 (ILzI

  • SHELTER INPLACE (SIP) 2 miles
  • Evacuate 2 mile radius,
  • Evacuate areas 2-10 miles radius, *Evacuate areas 2-5 miles

. Clear lake area to 5 miles, downwind, downwind,2*mile radius,

  • Evacuate
  • All other areas MONITOR &
  • All other areas MONITOR &
  • All other areas MONITOR &

PREPARE PREPARE PREPARE

/ END of Initial PAR Flowchart t

I 2, 4, ariddcear lake areas 6& 7 Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6 sudArea1, 2, 3 anddcear lake area 6 213,75to 348.75 Areal1, 303.75 to 236.25 Areal, 2, 3, 3, 5arddclca lake 4 and clear,-ke area6areas 6& 7 dar.Mal1, 3 and clear lake area 6

.348.75 to 56.25 Area 1, 3, 5 and clear lake areas 6 & 7 laeAreal1, 3 and clear lake area 6 ArA r6ea 1 and dlear lake area 6 56.25 to 168.75 Mreal1, and clear lake areas 6& 7

2. Area 6 is t~he lake area at 0 to 5 mile radius; Area 7 is thle lake area 5 to 10 mile r-adiu~s.

Notes: 1. Lake areas are "cleared" for either evacuation or sheltering.

3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.

4,

Follow Up - Protective Action Recommendations SEV]ERE ACCJIDNF deda* liii, AL El bedm.*4 Ca--=cooli+/-2g .s utlstar~d .,AND Comaiim~

  • .M e1 .a20 1/7 driag tla hiiial PAR v'a1ka*?

CommmflHDEXCU..O* HOSTILE ACTION a$~I 5*~nn FOLLOW L'P EVACUATION.

StHELTt ERIN ,LCE.

domv~i,6areaa ' Empad'-< ljar (CZahlmI 2 cmAP.R TabIh Llabk-d "HA..P *.'m ita*' s.lp4 3 lzt pr-.i"a.

t ~otmu ~

nmahiz

  • addi SmtrER.") *'=" *:mndaadim
  • adafld.iticm.t ,.asA*.ADD a:ts. iADD Cvhmn I ot PA,-R Ts*bl
  • SME(]LTI[L- I*A (SCIj'V2 C¢*n~3 amP~AR T~ 1beL~bd "OLILOW

-toIxort*R.miks

  • Id~a ttii, at~e UP-- tz pz~bnre~mtmdi .) ':" :.

T

  • AU1othsr a-=m M.N-ITOR &
  • E,,acts 2 mi* ra.4i~
  • *,.cts2-i am PiREP_4,E
  • E~ratem arez 2-5 mil.; da xxndi
  • £Emtaxvatssrs 2-10 n*1 *odnzl*Alit&***'T
  • Al odi r~h as MONITIOR & *PIPR t znant**iztsS * [* .. ... ..

PRIEPA1[

    • Rztmm PA.R's b.* t DO SE .ASSESSIME'T ta az-- sha1h0 mils *_ h.

Area 1, z, 4, anK *ci ariie area 0& 1 Area 1, ania clear .la]e area 6

.Z Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25 Area 1, 2, 3, 4 art clear lake areas 6 & 7 Ar*ea 1 236.25 to 303.75 Areal1, 2, 3, 4, 5 anddlear lake areas 6 Ar'ea 1, 2, 3 anud ear lake area 6 303.75 to 348.75 Area 1, 3, 5 and dear lake area 6 dlear Area 1, 3 anidcear lake area 6 348.75 to 56.25 Are~al, 3, 5 anddcear lake areas 6& 7 lake Area 1, 3 anddcear lake area 6 Area6 Area1 and. dear lake area 6 56,25 to168.75 jArea1, andclear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or shelterin~g.

2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.
3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.

Reference PMP-2080-EPP-100 Rev.33 Page 16 of 61 Emergency Response Pages Attachment 1 Protective Action Recommendations 13age16

_______________ Reference 3 EPA PAG TABLE* Michigan Application Proteactive Ati~on PAGi (projected dose) Comments Shdelrerin*-in~placc or i to 5 rc-r* Evariation~ 1er, for sore .situation,=, Fa cilirty operators will reoromnend cv ac u atin of the (13 rrSv t~o 53 m*v)i shc~tlir~Rrin-n pla co.) chould be- initiate-s eacuation at 1 rern' sheltering in public: over four dais= when proie-ceo os~e-is 1 rer (1 ~irrR5v plice- is ti-c prerogatice of thec 5tate- of S____________________ _________________________________ Michiga n~

5tupplermentary 5 iret" 53 nmSK. KI is rmot e*ffe-ctive iftaken prior t:o Thc s.ate of M'dichigan will im..plemnent projc-cted dose t.o exposture. Ma' require appro-.al of s'a~o irs HI plan: facility operator's ar,-inistra:--ion of proph:lactic c~ru* - child thy~roid fron- nmedical officials (or in ascoroa.ncewi h resort nmencation is implicit in dose KJ1 ex:posure .to iodine 4

established e* c~r* ercy plans. c tsrnation data, lh l:-..jt- qt¥"i the"~t :7lI.

l[;~l i"f.tl*t~l!I' 1m71-l  : 3t i;} i* ' J~tn,:

'l' 7*f-P ' *h it*&*tC tj.i zt . btt*

th t '!,i b~

tJ itl~e t ,.:fR .. t,*.K~-.l[.'

i, :* t fh4f~tJ t*fj' Ir .I 4 ,Jgtli3 t 4i ;t:t*.!lt'l ~~', ~  ? ~'~ 4 1 w

> t. 's..

I.,!! ts sf is7-13fl ssr~lr j i  ;)f/i.

.l

  • i:p*< 7s,.-is rI is'sl~ nf1lsit/-5>251;; 255 :si'ie-sf*! (lf s ht... si;Csy*. t2* i l *,l. I 5>12" 125

' *tmss

  • Pt 7

"-~.3 ,

> i1 OsC v..'32.it2 d.¢i.* .*-.,.

55>55> Z.;,.***

2*ThC*£ti ~ -.- '*~:l=ll:?"l}lT[ ' i::'>'t",itp.'.*'.t..fl~*-r*;::..** ?l*f'l

> P 1 lil.

<',t* f **

5 , CI'5:C55 5 >>55 ' 5 "'2'.2 5 5 sf15 5l1 15>1* 1'CEli m5>,* LIŽ ,

55 1-5>5'* i tsrs5V T: b 2- 52 4 >

Reference PMP-2080.-EPP-100 Rev.33 Page 17 of 61 Emergency Responsej Attachment 2 Activation of ERONS 17age18 INOTE: SEC judgment is used to determine which scenario will be used.

1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.

SNOTE: ERONS can be activated using any plant computer with internet access.

1.1 To activate ERONS:

  • Click the Everbridge icon on the desk top.

OR

  • IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.

1.2 Enter User Name (erons) 1.3 Enter Password (located in ERO brief case) and Click Sign In.

NOTE: 1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.

2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.

1.4 To start a scenario, click on the Notifications tab at the top of the page.

1.5 Click on the Templates header to bring up a list of preprogrammed scenarios.

Reference PMIP-2080-EPP-100 Rev.33 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS 17age18 NOTE:. . ......

  • After a Notification i sents he screnautmaiclly~O goes bac toth Notificati tons ab whreth notificatio la~d4ilOPrsaSts I~sent outisl shw wt tetie wassent. ' ro 1.7 Click Send (located close to the botop of the screen). Noicaonhvebnset NOTE: Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the -99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.

f Reference PMP-2080-EPP-100 Emergency Response Rev.33 Page 19 of 61 Attachment 3 Dismissal of Non-Essential Personnel Pages:

19 -20 NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.

1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.

NOTE: Personnel assisting the ERG (such as a Failure Investigation Process (FIP)

Team) should be Radworker qualified (i.e., have a TLD).

1.1 IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.

1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g.,

radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

1.3 Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:

Whether or not rapid egress is required (e.g., airborne attack)

Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.

RfrnePMP-2080-EPP-100 Rev.33 Page 20 of 61 RefeenceEmergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages:

j 19 -20 1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.

1.4 Inform both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).

1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.

1.5.1 Sound the Containment Evacuation Alarm(s), if required.

1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two times.

1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

1.6.2 if rapid egress is to be used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,

"vehicle portal near the North Access Building") and exiting the site using (State the route)."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.

Reference PMP-2080-EPP-100 Rev.33 Page 21 of 61

~Emergency Response Attachment 4 Accountability Pgs NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.

1 Review the three methods of Accountability below:

1.1 Primary Method - using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.

o Personnel will remain in the Assembly Areas until evacuated per SEC direction.

A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).

1.2 Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.

  • This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.

In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.

o This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.

Reference PMP-2080-EPP-100 Rev.33 Page 22 of 61 Emergency Response Attachment 4 Accountability Pages:

The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -inprogress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3 No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).

2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.

2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.

2.1.1 IF using the Primary Method of accountability, THEN request that Security:

o *Prepare for accountability.

o Commence evacuation of the Owner Controlled Area outside of the Protected Area.

a. GO TO Step 3.

RfrnePMP-2080-EPP-100 Rev.33 Page 23 of 61 RefeenceEmergency Response Attachment 4 Accountability Pgs SNOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.

2.1.2 IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.

a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
b. Request that the Owner-Controlled area also be evacuated.

3 Contact Personnel Inside the Protected Area.

3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:

o Sound the Unit 1land Unit 2 Containment Evacuation Alarm.

Sound the Nuclear Emergency Alarm.

a Make a Public Address announcement for personnel to report for accountability. Make the announcement two tunes. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."

IF the ERFs have not already been activated, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

RfrnePMIP-2080-EPP-100 Rev.33 Page 24 of 61 RefeenceEmergency ResPonse Attachment 4 Accountability Pages 3.2 IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:

o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

  • Sound the Nuclear Emergency Alarm.

o Make a Public Address announcement for personnel to use the alternate.

method of accountability. Make the same announcement two times. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."

3.2.1 IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.

3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times:

"Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.

3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.

3.3.1 Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.

Reference PMiP-2080-EPP-100 Rev.33 Page 25 of 61 Emergency Response Attachment 4 Accountability Pgs 4 Perform follow-up actions.

4.1 IF the Primary Method of Accountability was used, THEN S Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.

o Coordinate with Security to locate any missing individuals.

4.2 IF the Alternate Method of Accountability was used, THEN o Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).

a Coordinate with Security to locate any missing individuals.

4.3 IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:

o After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).

o Coordinate with Security to locate any missing personnel.

a Public Address announcements as necessary.

Dismissal or evacuation of personnel as necessary.

Reference PMP-2080-EPP-100 Rev.33 Page 26 of 61 Emergency Response Atahmn EvcanPages:

Atacmnt5 vcutin26 -29 j NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.

Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE. was not entered).

1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.

1.1.1 Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.

1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.

1.2 IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.

1.3 IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.

1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.

Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.

RfrnePMP-2080-EPP-100 Rev.33 Page 27 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.

2 Site Evacuation 2.1 Rapid Egress 2.1.1I IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.

a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.

Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.

IF using the Livingston Road route, THEN contact Security to unlock the gates.

o Request that the Owner Controlled Area also be evacuated.

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

RfrnePMP-2080-EPP-100 Rev.33 Page 28 of 611 RefeenceEmergency Response

[ Attachment 5 Evacuation e:

26 - 29Pa

b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."

c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*

(Livingston Road), anld as conditions warrant.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."

2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.

Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g.,

vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.

  • Request that the Owner Controlled Area also be evacuated.

o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.

Reference , PM.P-2080-EPP-100 Rev.33 Pages: o 6 Attachment 5 Evacuation Pages:

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

2.3 Take any necessary follow-up actions..

2.3.1 IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.

2.3.2 IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.

RfrnePMP-2080-EPP-100 Rev.33 Page 30 of 61 RefeenceEmergency Response Attachment 6 Terminating a UE Paes 1 UIE Termination 1.1 IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:

1.1.1 Instruct operators to inform the MSP and BCSD that the event is terminated.

1.1.2 Instruct operators to:

SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.

Verify that the form was received by the State and County.

o Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.

1.2 Inform both Control Rooms that the event is terminated.

1.3 Inform Security that the event is terminated (1118, 1119, 2005 or 2731).

1.4 Direct an operator to make a public address announcement that the UE has been terminated per the SEC.

2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.

RfrnePMiP-2080-EPP-100 Rev.33 Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7 Notification of On-Site Personnel Pages:

[ ~31 -34 J 1 Notify Security 1.1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.

1.1.1 IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.

a. Contact Time _________

1.1.2 IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.

a. Contact Time _________

1.1.3 IF a SAE, THEN instruct Security to:

Ready the Security Computer for accountability and prepare for subsequent evacuation.

  • Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
a. Contact Time __________

1.1.4 IF a GE, THEN instruct Security to:

  • Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
  • Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
a. Contact Time

Reference PMIP-2080-EPP-100 Rev.33 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages:

31 -34 1.1.5 IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.

a. Contact Time __________

2 Notify Chemistry and RP Technicians of the initial emergency classification.

2.1 Chemistry Contact Time _____________

2.2 lRP Contact Time ________________ __

3 Make Public Address Announcements ___

CAUTION: PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any

~PA announcements or sounding the NEA.

.NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.

3.1 Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.

3.1.1 IF in a UE, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Unusual Event has been declared due to (brief description) .Continue with your work and be prepared for future announcements."

I Reference PMP-2080-EPP-100 Rev.33 Page 33 of 61 I . Emergency Response Attachment 7. Notification of On-Site Personnel Pages:

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed___________

3.1.2 IF in an Alert, THEN make the fol~lowing announcement two times:

"Attention all personnel. Attention all personnel. An Alert has been declared due to (brief description) ."

IF emergency facilities are not already activated, THEN continue the annoumcement with:

"Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed

RfrnePMP-2080-EPP-100 Rev.33 Page 34 of 61 RefeenceEmergency Response Attachment 7 Notification of On-Site Personnel Pages.

NOTE: Accountability isperformed per Atahet4, Accountability.

3.1.3 lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s:

"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
2. Time announcements completed__________

3.1.4 IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.

3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:

  • "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."
1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
2. Time announcements cornpleted _________

3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.

Reference PMVP-2080-EPP-100 Rev.33 Page 35 of 61 Emergency ResponseI Attachment 8 Notification of Off-Site Agencies Pages:9 1 Accelerated Notifications to the NRC for Security Events.

1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:

1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.

1.1.2 Provide an accelerated verbal notification, without hard copy, to the NRC with the, following information:

  • Site Name
  • Emergency Classification, if determined.

o Nature of the threat (briefly describe) o Type of attack (e.g., armed assault by land, water, or aircraft) o Attack status (i.e., imminent, in progress, or repelled)

RernePMP-2080-EPP-100 Rev.33 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: Notification to offsite authorities (State and County) must be completed within]

15 minutes of classification.

2 Completing EMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.

SNOTE: PARs aedvlpduigAttachment 1,Protective Action Recommendations.

Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".

2.1.1 IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP- 108, Initial Dose Assessment, for completion of EMD-32 form(s).

NOTE: An EMD-32a is required within 15 minutes of:

eAn initial event classification, or A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms"

RfrnePMP-2080-EPP-100 Rev.33 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: An EMD-32b is required to be transmitted with the EMD32a if:

  • ,A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___

2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.

2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.

2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___

2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.

ReferencePMP-2080-EPP-100 Rev.33Pae3of6

- Reference ~Emergency ResponsePae3of6 Attachment 8 Notification of Off-Site Agencies Pages.

NOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.

3 Phone Contacts and Faxes (usually performed by APOs) 3.1 Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned). ___

3.2 Direct contact with the MSP using Attachment 9, MSP Notification. ___

3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___

INOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.

3.4 Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification ___

3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification. ___

3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification. ___

4 Follow Up Notifications 4.1 UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 3.0 minutes from initial notification) per step 2.1.

Reference PMP-2080-EPP-100 Rev.33 Page 39 of 61 Emergency Response Attachment 8 Notification of Off-Site Agencies Pages.

4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12. __

The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.

The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.

4.3 IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.

4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.

Reference PMIP-2080-EPP-100 Rev.33 Page 40 of 61 Emergency Response Attachment 9 MSP Notification 40ge42 NOTE: Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

Contact:

MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.

NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.

NOTE: An EMD-32a is required within 15 minutes of:

  • The initial classification, or

,,A change of classification, or

  • A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.

An EMD-32b is required to accompany an EMD-32a:

  • if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2 Provide the following to the MSP:
  • Provide the information from the EMD-32 form.

o Obtain the officers/dispatcher's name and record on table.

o Inform the agency that the EMD-32 will be faxed.

Request a callback (for authentication) and then hang up.

RfrnePMP-2080-EPP-100 Rev.33 Page 41 of 61 RefeenceEmergency Response Attachment 9 MSP Notification Pages:

40 -42 For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.

0F13-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000 /_____ /____I___

Initials Time Initials Time Person Contacted MSP Person Contacted:___________________

Call Back Call Back I Bridge established:___________________

_____________Time

  • IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

SWrite the question

  • Obtain the response and get approval o Provide the response to the MSP.

INOTE: Faxing the EMD-32 communicator form(s) or other can beas performed personnel necessary. by either the MSP or BCSD 3 Fax the signed EMD-32 form(s): ___

o Make sure that the form is signed by the Shift Manager. ___

  • Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.

RernePMIP-2080-EPP-100 Rev.33 Page 42 of 61

[RefeenceEmergency Response Attachment 9 MSP Notification Pages:

40 -42 o Push the start button

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987

  • BC BOC: 8-1-269-934-9023
b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

HOF: 8-284-2942

  • TSC: 2431 o ENC/JIC: 8-284-5 892 o OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the OEOwill inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.

Reference PMP-2080-EPP-100 Rev.33 Page 43 of 61 Emergency Response

[ Attachment 10 Berrien County Sheriff Notification Pages:

NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.

oThe dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.

1

Contact:

BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____

IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.

o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.

For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.

NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.

2 Provide the following to the BCSD:

  • Provide the information from the EMD-32 form.
  • Obtain the officers/dispatcher's name and record on table.

Inform the agency that the EMD-32 will be faxed.

RfrnePMP-2080-EPP-100 Rev.33 Page 44 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification Pages:

0FF-SITE PHONE NUMB1IER CONTACT EVENT NOT WICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. /_____I_________/____

Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)

Person Contacted BCSD Person Contacted:___________________

Call Back Call Back I Bridge established:_____________________

_____________Time aIF the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

  • Write the question
  • Obtain the response and get approval o Provide the response to the BCSD.

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s):

Make sure that the form is signed by the Shift Manager. ___

Orient the form(s), as shown on the fax machine, in either Control Room ___

IFlthe EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.

Reference PMIP-2080-EPP-100 Rev.33 Page 45 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:

43 - 45 Push the start button___

a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers: ___
  • MSP Operations Center: 8-1-517-241-6815
  • State EOC: 8-1-517-333-4987 o BC EOC: 8-1-269-934-9023
b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

TIEEN also send EMD-32 form(s) to the following: ___

o EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892

  • OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge. ___

RfrnePMP-2080-EPP-100 Rev.33 Page 46 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:

46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.

NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.

1

Contact:

lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification. ___

o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below. ___

o Inform the NRC of the event in progress ___

  • Provide the information on Data Sheet 3, Plant Status ___

Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.

SWrite the question SObtain the response and get approval

  • Provide the response to the NRC.

0 Ask the NRC for the Event Notification Number (EN).

Reference PMP-2080-EPP-100 Rev.33 Page 47 of 61 Emergency Response Attachment 11 NRC Notification Pages:

46 - 47 OFF-SITE PHONE NULMBER CONTACT EVENT NOTIFICATION ESTABLISBED CLOSEOUT NRC Operations 1-301- 816-5100 Center 1-301-951-0550 /_____ /____I___

1-301-415-0553 Initials Time Initials Time 8-1-301-8 16-5 15 1

___________(FAX) ______________

Person Contacted NRC Person Contacted:___________________

Continuous contact, will be required for an Alert, Site Area Emergency

_______________of General Emergency.

Event Notification Ask NRC for the EN:_ ______________

Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.

RfrnePMP-2080-EPP-100 Rev.33 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.

NOTE: An EMD-32a is required within 15 minutes of:

o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":

  • Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)

Indicate location where this form is being generated (Calling From) aRecord "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations"

Reference PMLP-2080-EPP-100 Rev.33 Page 49 of 61 Emergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Record PAR basis o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.

  • Forward completed form to Approver o Complete "Approved By", date and time
  • Forward completed approved form for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:
  • A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data":

Indicate whether this is an "Actual Event" or a "Drill"

  • Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)
  • Indicate location where this form is being generated (Calling From) o Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number" o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
  • Record "Reactor Information"
  • Record "Plant Status/Additional Information"

I Reference PMiP-2080-EPP-100 Rev.33 Page 50 of 61 I Emergency Response I Attachment 12 Manual Completion of EMD Forms Pages5:

IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.

  • Forward completed form to Approver
  • Complete "Approved By", date and time Forward completed approved form for transmission

RfrnePMP-2080-EPP-100 Rev.33 Page 51 of 61 RefeenceEmergency Response Attachment 13 Activation of FLEX Phase 3 Page:

NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.

WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).

  • WHEN communication is established THEN provide the following information:

Indicate whether this is an "Actual Event" or a "Drill"

  • Plant name and affected units
  • Your name and positionltitle
  • The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).

3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:

  • Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.
  • Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".

4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S Reference PMP-2080-EPP-100 Rev.33 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages53 Unit No: Date: Time:

Data Taken By: Data Reviewed By:

SNOTE: When redundant indication exists, record most severe condition.

1. Containment Temp. _________OF 5. Intermediate Range _____AMPS
2. Cont. H2 Concentration 6. Containment Pressure
3. RWST Level 7. Containment Sump Level
4. Source Range _______CPM 8. Containment Level
9. Containment High Range Radiation Level Upper/Lower /R/HR
10. CTS Pumps East ON / OFF West ON / OFF
11. RHR Spray Flow East ____

GPM West _____ GPM

12. SI Flow North___ GPM South__ __ GPM
13. BIT Flow LP1 ___ 3PM LP2 ___GPM LP3 ___ GPM LP4 ____ PM
14. Accum Pressure LP1 ___ PSIG LP2 ___PSIG LP3 ____ PSIG LP4 ____PSIG
15. RH-R Injection Flow East_____ _ GPM West____ _ GPM
16. RCP Status LP1 ON/OFF LP2 ON /OFF LP3 ON /OFF LP4 ON / OFF
17. RCS Pressure PSI0 23. PRT Level
18. Charging Flow ______GPM 24. PRT Pressure ________PSIG
19. PZR Liquid Temp. 25. PZR Cycling Htrs ON / OFF
20. PZR Steam Temp. 26. PZR Backup Htrs ON I OFF
21. PZR Level 27. Letdown Flow _______GPM
22. PRT Temp. 28. Saturation Margin

Reference PMP-2080-EPP-100 Rev.33 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:

52 -53 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4

29. Wide Range T Hot
30. Wide Range T Cold
31. S / G Pressure _______PSIG ________PSIG _______PSIG ________PSIG
32. S / G N. R. Level
33. S /G W.R. Level
34. Steam Flow (pph x 106),
35. Feed Flow (pph x 106)
36. Aux. Feed Flow (pph x 103)
37. MSIV Status OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE
38. CST Level Ft
39. Steam Dump ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE AVAILABLE /UNAV/AILABLE
40. East ESW _______ _____/
50. East CCP _________ / ____
41. West ESW __________ / _____ 51. West CCP __________ / _____
42. East CCW ___ ~/ _ 52. TDAFP ___ ~ / _
43. West CCW _________ / _____ 53. EMDAFP _________ / ____
44. East CTS __________ / ____ 54. WMDAFP / _
45. West CTS _________ / ____ 55. AB Diesel ______ I. ___/_
46. North SI _________ / ____ 56. CD Diesel
47. South SI __________ / _____ 57. Normal Res.
48. East RUR _________ / ____ 58. 12 EP /
49. West RHR /

RfrnePMP-2080-EPP-100 Rev.33 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:

Unit No: ____Date:________ Time:

1. Emergency Classification Time Declared

_______Unusual Event

________Alert

_______Site Area Emergency

_______General Emergency

2. Have notifications been completed?
a. Michigan: yes / no I in progress Time:
b. lBerrien County: yes Ino I in progress Time:
c. NRC: yes /no I in progress Time:
d. DC Cook Personnel: yes Ino I in progress Time:
3. Protective Actions:
a. Local area evacuation yes / no Time:
b. Site evacuation yes / no Time:
c. Accountability yes I no Time:
d. Site closed to visitors yes I no Time:
4. Offsite protective action recommended:

SEvacuation: yes /no areas: ____ Time:

o Shelter: yes / no areas: ____ Time:

I Reference PMIP-2080-EPP-100 Rev.33 Page 55 of 61 I Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages.

5. Plant Operational Status
a. Reactor trip: yes I no time: ____ Trip signal:-
b. ESE Status:
c. EOP Status:______ ______
6. Plant Status
a. Chronology of Events Time Event
b. Current Plant Conditions

RefrecePMP-2080-EPP-100 Rev.33 Page 56 of 61 I RefrenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:

[ 54 -57

c. Potential. for Plant Degradation
d. Mitigating Actions Taken or Underway
7. Plant Radiological Conditions
a. In-plant/Onsite Radiological Conditions

[

[

Reference PMVP-2080-EPP-100 Emergency Response Rev.33 Page 57 of 61 Data Sheet 2 Emergency Turnover Checklist Pages:7

b. Potential for Offsite Release of Radioactivity Airborne Water
8. Injured or Contaminated Personnel:

Name Employer Stains

9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)

Name Team # Task Description/Time Dispatched

/

/

t

/

/

/

RfrnePMP-2080-EPP-100 Rev.33 Page 58 of 61 RefeenceEmergency Response" Data Sheet 3 Plant Status Pages:

NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.

Reactivity Control

,, Reactor Subcritical? Yes No

  • Emergency Boration initiated? Yes No
  • Adequate Shutdown Margin? Yes No RCS Inventory Control - check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)

CVCS - Normal Charging Charging Pumps via BIT (High Head SI)

Safety injection pumps (Intermediate Head SI)

RHR Pumps (Low Head SI)

Other:__________ __

RCS Pressure Control o Pressurizer PORVs Closed? Yes No

  • Pressurizer Safeties Closed? Yes No

Reference PMP-2080-EPP-100 Rev.33 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages59 RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP ________

Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)

RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G -Condenser Dump Valves ________

S/G - Atmospheric Dump Valves S/G - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RtIR)

SIG Inventory Control - check all that apply for the current plant conditions Main Feed Water _________

Aux. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _

Containment Control e Ice Condenser Doors OPEN? Yes No

  • Containment Sprays ON? Yes No
  • , Hydrogen Recombiners/Igniters ON? Yes No
  • Containment Isolation Valves fall to CLOSE? Yes No
  • Phase A Actuation? Yes No Additional Information

Reference PMP-2080-EPP-100 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages:

Request for additional information Source of request: II MSP LIBCSD LI NRC LIOther_______ ___

Date _______Time ____

Question:

Response

Response approved by:___________________________

SEC or designee Response delivered to requesting organization:

Date Time ______by Whom

Reference PMP-2080-EPP-100 Rev.33 Page 61 of 61 Emergency Response Page Data Sheet 5 Contingency Team Tracking Form 6 SPERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED ___ _________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED

  1. Turbine Building. ERAEO

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 33

Title:

Emergency Response Alteration Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.

This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required for this procedure.

10 CFR 50.54(q) review was performed and documented. The number for the 50.54(q) is annotated in the workflow for this revision.

The conclusion was that the changes in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.

Added step 3.3.3, "Notify Offsite Step was omitted from Revision 32.

Authorities of the emergency using , Notification of Off-site Personnel."

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 1 of 2

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 33

Title:

Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions ThisI is a free-form

~ as called Office out in PMP-2010-PRC-002, Information Procedure for Form Tracking Alteration, Only Review, and

- Not Part of Form Approval. Page 2 of 2

IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14

Rev01 Doc No.: EPP-2080-ERO-001 No.:

EMERGENCY RESPONSE

Title:

RESOURCE READINESS Alteration Cat.: Major Revision - Full Review CDI/150.59:1 50.54(q) 15-54 CD 1/50.59:2 PORC #-4666 PORC Mtg. No.: 4666 GARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change End:

Effective Date: 2/3/2016 12:00:00 AM Approvals

[Name [Review/Approval Type/Capacity J.Date Becvar,5RbrJ 11Special Review:'E-PLAN GROUP 1[i2/11/2015 10:29 1 i~6998 Pees3 Grl Technical Review"..t12/1812015 10:12 ]

[Hart, William E 11 ehia Rve 02

[(376639) 3ITehiaHeiw01/08/2016 102 M Kristen45) 5 Management Review 101/14/2016 07:33

[Wendzel, Regan 1 1

[(s007887) ~ 7_Approval Authority 101/14/2016 13:22 j Signature Comments F10 CFR 50.54 (q) 15-54 completed. - ~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP; Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.

[Technical Review performed by Jerry Peterson.

[PORO Approval obtained at meeting 4666

Approved at PORC per Plant Manager, Jim Ross.

-* EPP-2080-ERO-001 Rev. 14 Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AN]) SCOPE ............................................................ 3 2 DEFINITIONS AN]) ABBREVIATIONS ............................................ 4 3 PRECAUTIONS AND LIMITATIONS .......................................... .... 6 4 DETAILS............................................................................ 6 4.1 Responsibilities ............................................................... 6 5 FINAL CONDITIONS .............................................................. 10 6 REFERENCES ..................................................................... 11 : Functional Checks of EOF NRC and MSP Phones..................... 12 : Functional Checks of TSC NRC and MSP Phones..................... 13 : Functional Checks of ERO Facility Equipment ........................ 15 : Functional Check of Berrien County 911 Ring Down Phones .......... 22 : Satellite Phone Checks ................................................ 23 Data Sheet 1: EOF Monthly Checklist ............................................... 25 Data Sheet 2: EOF Quarterly Checklist...............................................26 Data Sheet 3: FOF Quarterly Radiation Protection Checklist........................ 29 Data Sheet 4: TSC Monthly Checklist................................................ 32 Data Sheet 5: TSC Quarterly Checklist .............................................. 33 Data Sheet 6: TSC Quarterly Radiation Protection Checklist ........................ 34 Data Sheet 7: OSC Monthly Checklist.............................................. .. 35 Data Sheet 8: OSC Quarterly Checklist .............................................. 36 Data Sheet 9: OSC Quarterly Radiation Protection Checklist ..................... 38

=-w-NR EPP-2080-ER0-001 Rev. 14 Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization Data Sheet 10: ENC/JIC Monthly Checklist .......................................... 41 Data Sheet 11: Survey Vehicle Monthly Checklist..................................... 42

  • Data Sheet 12: Survey Vehicle Radiation Protection Quarterly Checklist.............. 43 Data Sheet 13: Control Room Monthly Checklist...................................... 45 Data Sheet 14: Control Room Quarterly Radiation Protection Checklist .............. 47 Data Sheet 15: Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.............................................................. 48 Data Sheet 16: CAS/SAS Monthly Checklist...........................................50 Data Sheet 17: Emergency Response Data System Testing .......................... .. 51 Data Sheet 18: Berrien County EOC Radiation Protection Quarterly Checklist ........ 54 Data Sheet 19: Training Center Radiation Protection Quarterly Checklist ............ 55 Data Sheet 20: LMC Radiation Protection Quarterly Checklist........................56 Data Sheet 21: Emergency Sampling Station Quarterly Radiation Protection Checklist eQeee~eoeeeeleeeeee ....o-ee--Q.eee-.....................eeeeeo59 Data Sheet 22: Emergency Plan Respiratory Protection............................... 60 Data Sheet 23: RP/Ops Emergency Response Equipment Quarterly Checklist ......... 61 Data Sheet 24: Monthly Satellite Phone Checks ....................................... 63 Data Sheet 25: Radiation Protection Portable Instrument Kit Inventory...............64 Data Sheet 26: Security Control Center............................................... 65

Information I EPP-2080-ERO-001 I Rev. 14 Page 3 of 65 Emergency Response Resource Readiness 1 PURPOSE AN]) SCOPE 1.1 The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.

1.2 Establish methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.

1.3 This procedure applies to the following periodic requirements:

1.3.1 Emergency Response Organization (ERO) drills and exercises 1.3.2 Emergency Response facility inventories 1.3.3 Communications systems tests 1.3.4 Emergency Preparedness (EP) equipment functional tests 1.3.5 Emergency Response Data System (ERDS) test

Information EPP-2080-ERO-001 I Rev. 14 Page 4 of 651 Emergency Response Resource ReadinessJ 2 DEFINITIONS AN]) ABBREVIATIONS Term Meaning AR Action Request BCSD Berrien County Sheriff's Department GAS Central Alarm Station CREG Control Room RP Emergency Cabinet DAP Dose Assessment Program ED Electronic Dosimeter ENC Emergency News Center ENS Emergency Notification System EOF Emergency Operations Facility EP Emergency Preparedness EP[P Emergency Plan Implementing Procedure EPM Emergency Preparedness Manager ER Emergency Room ERDS Emergency Response Data System ERO Emergency Response Organization ERONS Emergency Response Organization Notification System FTS-2001 Federal Telephone System-2001. This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.

It is owned, operated and maintained by the Federal Government.

JIG Joint Infonmation Center KI Potassium Iodide LMC Lakeland Medical Center

Information I EPP-2080-ERO-001 Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term Meaning MSP Michigan State Police NDM Nuclear Document Management NRC

  • Nuclear Regulatory Commission OBA Office Building Addition OSC Operations Support Center PAM Personal Alarming Module PAS Public Address System PPC Plant Process Computer RiP Radiation Protection RPAC Radiation Protection Access Control SAS Secondary Alarm Station SBE Service Building Extension SCC Security Control Center SCBA Self Contained Breathing Apparatus SPS Site Protective Services SRD Self Reading Dosimeter SV Survey Vehicle TLD Thermoluminescent Dosimeter TSC Technical Support Center TRPAC Turbine RPAC

Information EPP-2080-ERO-001 I Rev. 14 I Page 6 of 65 Emergency Response Resource Readiness 3 PRECAUTIONS AND LIMiITATIONS 3.1 When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.

3.2 A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.

3.3 Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.

New cartridges should be marked with their expiration date if not already marked by the manufacturer.

3.4 All readiness checks shall be documented on the applicable data sheet.

3.5 This procedure may be performed in part or in whole depending on data sheet(s) being performed.

3.6 Individual steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003, "Procedure and Work Instruction Use and Adherence".

3.7 EP resource readiness checks on RP equipment do not include handling of radioactiv*e sources. This is the responsibility of RP.

4 DETAILS 4.1 Responsibilities 4.1.1 The EPM is responsible for the execution of this procedure.

4.1.2 The EPM or designee is responsible for reviewing and signing the data sheets.

Information I EPP-2080-ERO-001 I Rev. 14 Page 7 of 65 Emergency Response Resource Readiness 4.1.3 The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.

  • Data Sheet 1, EOF Monthly Checklist o Data Sheet 2, EOF Quarterly Checklist o Data Sheet 4, TSC Monthly Checklist a Data Sheet 5, TSC Quarterly Checklist
  • Data Sheet 7, OSC Monthly Checklist
  • Data Sheet 8, OSC Quarterly Checklist
  • Data Sheet 10, ENC/JIC Monthly Checklist
  • Data Sheet 11, Survey Vehicle Monthly Checklist
  • Data Sheet 13, Control Room Monthly Checklist
  • Data Sheet 16, CAS/SAS Monthly Checklist
  • Data Sheet 24, Monthly Satellite Phone Checks 4.1.4 The following Data Sheets are performed by Radiation Protection.
  • Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist
  • Data Sheet 9, OSC Quarterly Radiation Protection Checklist
  • Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist

.. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData Sheet 20, LMC Radiation Protection Quarterly Checklist S Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist

  • Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist
  • Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory
  • Data Sheet 26, Security Control Center 4.2 The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.

4.2.1 Attachment 1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.

4.2.2 Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.

Information I EPP-2080-ERO-001 I Rev. 14 I Page 8 of 65 Emergency Response Resource Readiness 4.2.3 Place a "1"" or "X" in the box next to each item to signify acceptability.

4.2.4 A signature block is provided for the person performing the check.

4.3 The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.

4.3.1 IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced. For example: a frisker could be temporarily substituted for a portal monitor.

IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.

4.4 Emergency Preparedness Staging Locations 4.4.1 The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).

The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.

4.4.2 The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.

The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3 The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom. The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.

4.4.4 The GREG is located on 633' elevation turbine deck next to TSC stairway.

The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5 The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.

Information I EPP-2080-ERO-001 I Rev. 14 I Page 9 of 65 Emergency Response Resource Readiness 4.4.6 The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.

4.4.7 The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.

Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.

4.4.8 Lakeland Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.

4.4.9 Lakeland Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.

4.4.10 Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.

4.4.11 RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.

4.5 Quarterly checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.

4.6 Control Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.

4.7 CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.

4.8 IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation. Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.

4.9 Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.

4.10 Make a copy of the completed data sheets for retention by the EP Department.

Information EPP-2080-ERO-001 [ Rev. 14 Page 10 of 65 Emergency Response Resource Readiness 5 FINAL CONDITIONS 5.1 Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.

Information EPP-2080-ERO-001 I Rev. 14 I Page 11 of 65 Emergency Response Resource Readiness 6 REFERENCES 6.1i Use

References:

6.1.1 PMP-2030-R.EC-001, Records Management 6.1.2 PMP-7030-CAP-001, Action Initiation 6.1.3 PMP-2350-CMS-001, Commitmnent Management 6.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5 RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 6.2 Writing

References:

6.2.1 Source

References:

a. Emergency Station Minimum Inventory Requirements, RP-95-03
b. D.C. Cook Emergency Plan, Appendix C
c. NRC Commitment 1179
d. NRC Commitment 5392 6.2.2 General References
a. 10 CFR 50.47(b)
b. 10 CFR 50, Appendix E
c. NIJRBG-0654/FEMA-REP- 1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.
d. D.C. Cook Emergency Plan, Appendix K
e. AR 00863697

Reference EPP-2080-ERO-001 Rev. 14 Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP Pages:

Atahet1Phones 12 1 Monthly Phone System Test in the EOF NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.

1.1 Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.

SNOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.

1.2 IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.

1.3 Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.

Area Abbreviation Meaning NRC Work Center HPN Health Physics Network NRC Work Center PMCL Protective Measure Counterpart Link NRC Work Center RSCL Reactor Safety Counterpart Link Dose Assessment Area HPN Health Physics Network Dose Assessment Area HPN Health Physics Network Dose Assessment Area PMCL Protective Measure Counterpart Link Main Area of the EOF MCL Management Counterpart Link Main Area of the EOF ENS Emergency Notification System (Red Phone)

Main Area of the EOF ENS Emergency Notification System (Red Phone) 1.4 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).

1.5 Document completion of test using Data Sheet 1, BOF Monthly Checklist.

[ Reference EPP-2080-ERO-001 Rev. 14 Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages:

Atahet2Phones 13 - 14 1 Monthly NRC Phone System Test in the TSC.

NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.

1.1 Notify both Control Rooms that the monthly NRC phone check is being conducted.

1.2 When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.

1.2.1 The Control Room NRC Phone will ring once but should be disregarded.

1.3 Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.

NOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.

1.3.1 IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.

1.4 Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone Abbreviation Meaning NRC Communication HPN Health Physics Network NRC Communication PMCL Protective Measure' Counterpart Link NRC Communication RSCL Reactor Safety Counterpart Link NRC Communication ENS Emergency Notification System (Red Phone)

Plant Evaluation Team 1{PN Health Physics Network Plant Evaluation Team ENS Emergency Notification System (Red Phone)

efrneEPP-2080-ERO-O01 Rev. 14 Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages:

Atahet2Phones 13 - 14 2 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).

2.1 Document completion of test using Data Sheet 4, TSC Monthly Checklist.

2.2 Notify both Control Rooms that the monthly phone checks are complete.

I Reference EPP-2080-ERO-001 Rev. 14 Page 15 of 65 I Emergency Response Resource Readiness I Attachment 3 Functional Checks of ERO Facility Equipment Pages:

1 FAX Machines 1.1 Demonstrate that each FAX machine is capable of sending and receiving FAXs.

  • IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.
  • Ensure the FAX machine displays the correct date and time.

S To verify a FAX machine operation;

  • Press "Function"
  • 6 (Print out)
  • 1 (Journal)
  • Set
  • 1 - to start print of Journal o Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send) and RCV (receive) FAXs.
  • Attach Journal to facility checklist.

1.2 Acceptance Criteria: The minimum number, of functional FAX machines, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.

Reference EPP-2080-ERO-001 Rev. 14 Page 16 of 65 Emergency Response Resource Readiness I Attachment 3 jFunctional Checks of ERO Facility Equipment Pages:

2 Telephones 2.1i Verify each phone in the facility is capable of both dialing out and receiving calls.

2.2 Acceptance Criteria: The minimum number, of functional telephones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

3 Copiers 3.1 Make 1 copy of a test page.

3.2 Acceptance Criteria: The minimum number, of functional copiers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

4 Computers 4.1 Power up each computer. Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP),

as needed on that computer for the ERO position that uses the computer.

4.2 Acceptance Criteria: The minimum number, of functional computers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

5 Monitors 5.1 Power up the monitor(s) and verify it is functional with its associated computer.

5.2 Acceptance Criteria: The minimum number, of functional monitors, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

Reference EPP-2080-ERO-001 Rev. 14 Page 17 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

15 - 21 6 Copy Boards 6.1 Make a copy of the board to verify the copy board operates properly.

6.2 Acceptance Criteria: The minimum number, of functional Copy Boards, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

7 Facility Microphones 7.1 Power up the microphone's power supply and talk into the microphone. Verify your voice can be heard in each room of the ERG facility.

7.2 Acceptance Criteria: The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

8 OSC ED)Reader 8.1 Touch the screen of the ED Reader.

8.2 Acceptance Criteria: Ensure that the display screen is functional.

9 Facility Managers' Bridge 9.1 Dial the Facility Managers' Bridge number found on the ERG Toolbox card.

9).2 WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.

9.3 Speak into both phones verifying that each phone can be heard on the other phone.

-9.4 Hang up both phones.

9.5 Acceptance Criteria: Each phone can be heard on the other phone.

Reference* EPP-2080-ERO-001 Rev. 14 Page 18 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

10 Projector Unit & Microphone in JIC Auditorium 10.1 Power up the unit using the touch screen on the podium.

10.2 Touch the icon for computer, TV, camera, etc.

10.3 Verify the projector is displayed on the auditorium screen.

10.4 Verify the microphone is functional by talking into it.

10.5 Power down the auditorium system.

10.6 Acceptance Criteria: The JIC projector and microphone work satisfactorily.

11 Frisker 11.1 Verify the frisker is plugged in to a functioning AC outlet.

11.2 Turn on.

11.3 Increase speaker volume and verify audible response when a background count is detected.

11.4 Verify meter deflection when a background count is detected.

11.5 Turn frisker off.

11.6 Verify calibration does not expire prior to the end of the next month.

11.7 Acceptance criteria: Audible response and meter deflection.

12 Area Radiation Monitor 12.1 Verify the monitor is plugged in to a functioning AC outlet.

12.2 Turn on.

12.3 Verify an upscale meter response when a background count is detected.

12.4 Turn monitor off.

12.5 Verify calibration does not expire prior to the end of the next month.

Reference EPP-2080-ERO-001 Rev. 14 Page 19 of 65 I Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO. Facility Equipment Pages:

12.6 Acceptance criteria: An upscale meter response when a background count is detected.

RfrneEPP-2080-ERO-001 Rev. 14 Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

13 Equipment 13.1 Inventory frequency 13.1.1 All emergency supplies and equipment are inventoried at the following prescribed frequencies:

Quarterly portable instrumentation SRDs laboratory instrumentation KI tablets vehicle radios TLDs respiratory equipment All other supplies 13.1.2 Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.

13.2 Facility Readiness 13.2.1 Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.

13.2.2 Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.

13.2.3 Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.

13.2.4 Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.

13.2.5 Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.

13.2.6 Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.

13.2.7 Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.

[ Reference EPP-2080-ERO-001 Rev. 14 Page 21 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.

13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent. [NRC Commitment 1179]

13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.

13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.

13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.

13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory. RP performs Periodic Performance Tests (PPT) and calibrates as necessary.

Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.

o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.

  • After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
  • Record the serial number of equipment in the space provided.

13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.

14 Documentation 14.1 Document test results on the specific data sheet.

Reference EPP-2080-ERO-001 Rev. 14 Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring Pages:

Atahet4Down Phones "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1 Testing of the ring down phone system in the Control Room 1.1.1 Request permission from the Control Room to perform the monthly check.

1.1.2 Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.

1.1.3 Pick up the phone and talk to the 911 Dispatch Center.

1.1.4 Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.

1.2 Testing of the ring down phone system in the EOF.

1.2.1 Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.

1.2.2 Pick up the phone and talk to the 911 Dispatch Center.

1.2.3 Document completion on Data Sheet 1, EOF Monthly Checklist.

1.3 Testing of the ring down phone system in the CAS and SAS.

1.3.1 Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.

1.3.2 Document completion onl Data Sheet 16, CAS/SAS Monthly Checklist.

Reference EPP-2080-ERO-001 Rev. 14 Page 23 of 65 Emergency Response Resource Readiness Attachment 5 Satellite Phone Checks Pages.

NOTE  ;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.

The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.

1 MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE 1.1 Turn on by holding button on top of phone.

1.2 Check battery charge level 1.2.1 Locate the battery icon on the upper right side of the phone display 1.2.2 Level of charge should be full

a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

1.3 To place acall.

1.3.1 extend antenna.

1.3.2 dial number.

1.3.3 make contact with another person/phone.

1.4 To receive a call.

1.4.1 The phone will display a call attempt.

1.4.2 Extend antenna.

1.4.3 After several seconds the phone will vibrate or ring and display an incoming call.

1.4.4 Select accept.

1.4.5 Make contact.

Reference EPP-2080-ERO-001 Rev. 14 Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5 Satellite Phone Checks Pages.

1.5 End call.

1.6 Place on charging unit.

1.7 Acceptance Criteria 1.7.1 Contact is made by either placing or receiving a call.

1.7.2 Battery is fully charged.

1.8 For the phones located at Berrien County, Lake Township and Lake-Michigan College.

1.8.1 Call the location to be tested prior to the test to inform them that the test is about to commence.

1.8.2 Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.

1.8.3 Document completion on Data Sheet 24, Monthly Satellite Phone Checks

Reference EPP-2080-ERO-00I Rev. 14 Page 25 of 65 Emergency Response Resource Readiness 25ges:

Data Sheet 1 EOF Monthly Checklist Pag 2 EOF Monthly Checklist

_______________ _________/_

Month Year Equipment Functional Checks: Equipment Functional Checks:

ci 2 FAX machine(s) (Attachment 3) ci 1 Frisker (Attachment 3) ci 1 Telephone (Attachment 3) ci 1 Area Radiation Monitor (Attachment 3) ci 1 Copier (Attachment 3) ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment 3) tranlsmission) ci 1 DAP computer (Attachment 3) Facility Set Up:

ci 1 Flat screen monitors (Attachment 3) ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment 3) boards/copier ci 1 PAS microphone [] 1 toner for copier ci 1 Projector ci Check EPiIiP procedure books for current ciMSP phones (Attachment 1) revision ci NRC FTS-2001 phones (Attachment 1) ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment 5) [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)

Facility Readiness: [21 Satisfactory ci Unsatisfactory (enter comment below)

Comments:

Print Name Signature Date Reviewed by: ____________/

EPM or designee Signature Date

I Reference EPP-2080-ERO-0O1 Rev. 14 Page 26 of 65 I Emergency Response Resource Readiness I Pages:

Data Sheet 2 EOF Quarterly Checklist 26 -. 28 EOF Quarterly Checklist

__________________/

Quarter Year Portable Instrument Kits in storage area

[] Verify kit is sealed J] Air Sampling Kit [Ref 6.2. laII.

II 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.

[] 14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a] and [Ref 6.2. lb].

Li 2 Count Rate Meters (friskers).

Li Miscellaneous RP Supply Box.

NOTE: *Before testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room:

ElVerify radio is turned on and is on the correct frequency.

Li Contact 'the person in the OSC and verify two-way communication is obtained.

Li Clear communication successful, EOF to OSC.

Li Clear communication successful, OSC to EOF.

[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF

[ Reference EPP-2080-ERO-001 Rev. 14 Page 27 of 65 I Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26 - 28 24-hour coping supplies El Open storage area.

El Ensure that the Contents agree with the inventory sheet.

LII IF the inventory is correct, THEN close the cabinet/storage container.

El IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.

LI] Close the Cabinet/storage container.

Alternate OSC Equipment and Supplies:

El 10 copies of RMT-2080-OSC-0O1 El 1 Lap Top computer El Copier Board El Extension Cord LII System overview drawings book El Plant Phone List El ,Laminated Field Monitoring Team maps El Cube signs El 4 Telephones El Pens El Pads of lined paper El Post Its El Calculator Alternate TSC Equipment and Supplies:

El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC

Reference EPP-2080-ERO-001 Revo 14 Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26age28 F-i Copi~er Board CL Sign in board Li EPZ maps - poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.

El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE: An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: Li Satisfactory Cl Unsatisfactory (enter comment below)

Comments:

Performed by:____________I____________ ______

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 29 of 651 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages.

EOE Quarterly Radiation Protection Checklist Quarter Year NOTE: Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.

1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]

EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1.a] [Ref 6.2.l.b]

[] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)

Radiation Protection Portable Instrument Kit

[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.

Air sampling Kit o El Break Seal and inventory

[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes

[] Particulate Filters (47mm filters)

Li Time Piece

[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date _______

a Li Install new seal Additional Equipment

[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number ____Serial Number__

[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)

Li 8 TLDs (Area TLD Badges)

Li 8 EDs (Area EDs)

Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__

Reference EPP-2080-ERO-001 Rev. 14 Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages31 2 Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.

EL Donald C. Cook EPZ Map Li Berrien County Map Li1 12 Blank Data Sheets (verify current revision)

RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li Key to Air Sampling Stations (B-i)

Li Keys to Rosemary Beach Gate Li 2 Clipboards Li 1 Air Sampler with sample head: Serial Number________

L-i RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )

Li 1 Assorted Tool Kit Li 2 Site Maps Li 1 Flashlight/Lantern with Batteries, verify operation.

Li Compass Li2 Sets Winter Apparel Li Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)

Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags

[ Reference EPP-2080-ERO-001 Rev. 14 Page 31 of 65 I Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist 29age31 Facility Readiness: El Satisfactory El Unsatisfactory (enter comment below)

Comments:

Performed by: ______________________________________________I________________________________________________

El Print Name Signature Date Reviewed by: __________________________________________/____________________________________________

EPM or designee Signature Date

[ Reference EPP-2080-ERO-O01 Rev. 14 Page 32 of 65 I Emergency Response Resource Readiness Data Sheet 4 TSC Monthly Checklist Pages TSC Monthly Checklist

__________________/

Month Year Equipment Functional Checks: Equipment Functional Checks:

El 1 Copier (Attachment 3) El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment 3) output)

LI 2 Flat screen monitors (Attachment 3) EL1 Frisker (Attachment 3)

El 3 PPC computers (Attachment 3) El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment 3) display)

LI 2 Telephones (Attachment 3) Facility Set Up:

LI 1 MSP phone (Attachment 2) LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment 2) boards/copier LI 1 Iridium 9555 Satellite phones LI 1 toner for copier (Attachment 5) LI Check procedure books for current revision LI 3 EP radios (turn on and verify LI Check data sheet folders for current revision transmission)

LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI1 Satisfactory LI1 Unsatisfactory (enter comment below)

Comments Performed by:

Print Name Signature Date Reviewed by: /_

EPM or designee Signature Date

RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev. 14Pages3 f6 Data Sheet 5 TSC Quarterly Checklist TSC Quarterly Checklist Quarter Year 24-hour coping supplies El Open storage area.

Li Ensure that the Contents agree with the inventory sheet.

Li IF the inventory is correct, THEN close the cabinet/storage container.

LI IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.

Li Close the Cabinet/storage container.

Performed by:____________/____________ ______

Print Name Signature Date Reviewed by:____________/__________________

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 34 of 65 I Emergency Response Resource Readiness Data Sheet 6 TSC Quarterly Radiation Protection Checklist Pages:

TSC Quarterly Radiation Protection Checklist Quarter Year Cabinet Inventory LI Break seal and perform inventory EL 4 TLDs (Area TLDs)

LI 4 EDs (Area EDs)

LI 25 EDs LI Count Rate Meter [Ref 6.2.1 .a] Serial Number ________

LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI Portable Continuous Air Monitor [Ref 6.2.1 .a] Serial Number _________

LI Area Radiation Monitors (ARM) Serial Number_________

LI Charcoal lInpregnated fiber filters LI Air Sample Envelopes LI 26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]

LI 25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]

LI 25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1..a]

LI 65 packages of KI tablets with:

[] 25 KI1 Consent Forms RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)

LI Install new seal NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

  • Facility Readiness: ElI Satisfactory LI Unsatisfactory (enter comment below)

Comments:

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by: ___________/___________ _____

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7 OSC Monthly Checklist Pages:5 OSC Monthly Checklist Month Year Equipment Functional Checks: Equipment Functional Checks:

C] 1 Copy Board (Attachment 3) C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment 3) output)

C] 1 FAX machine (Attachment 3) C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment 3) transmission)

C]3 Computers (Attachment 3) Facility Set Up:

C] 10 Telephones (Attachment 3) C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 - onsite survey, 2 - boards/copier off-site survey teams) (Attachment 5) C] 1 toner for copier C] EP radios (18 DCT or RP C] Check procedure books for current revision teams/personnel, 6 for Operations C]1 Check data sheet folders for current revision personnel) (turn on and verify charged) C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify C]Oealcanissndperne display) QOealceniesadapaac C]2Fikr (tahet3 C] Verify survey vehicle keys are in 2 Frskes 3)Emergency (ttacmen Key box.

C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.

NOTE: An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory. Document *number in comments.

Facility Readiness: C] Satisfactory [21 Unsatisfactory (enter comment below).

Comments:"

Performed by: /

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8 OSC Quarterly Checklist 36age37 OSC Quarterly Checklist

__________________/

Quarter Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.

24-hour coping supplies J Open storage area.

L) Ensure that the Contents agree with the inventory sheet.

0l IF the inventory is correct, THEN close the cabinet/storage container.

[I1 IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.

LI] Close the Cabinet/storage container.

Reference EPP-2080-ERO-001 Rev. 14 Page 37 of 65 Emergency Response Resource Readiness Pages:

Data Sheet 8 OSC Quarterly Checklist 36 - 37 j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.

El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.

Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.

For example:

Hand-held radio Channel 1: KNDP798 (off-site) = Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site) =Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.* Document number in comments.

Facility Readiness: Li Satisfactory Li Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by: /

EPM or designee / Signature Date

I Reference EPP-2080-ERO-OO1 Rev. 14 Page 38 of 65 I Emergency Response Resource Readiness DataShet OSCQuatery 9 Rdiaton rotctin CeckistPages.

Data Seet 9 OSC Quarterly Radiation Protection Checklist38-4 Quarter Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)

El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[

Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)

Calibration Due Date _____

Li Area Radiation Monitor (ARM): Serial Number ____

CL Area Radiation Monitor (ARM): Serial Number____

Li 2 Count Rate Meters: Serial Number _______

Serial Number_______

Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters:

Serial Number _______

Serial Number _______

Serial Number_______

Li 3 GM Survey Meters [Ref 6.2.1.a]:

Serial Number _______

Serial Number _______

Serial Number_______

Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number _______

Serial Number_______

Serial Number _______

Serial Number________

Li Purge Rig (located in the Lakeside Office Building north ventilation room)

Li Walk-Through Portal Monitor Cal Due Date_____

Li Set of RP Procedures Li Donald C. Cook 10 mile EPZ map Li Site Map

Reference EPP-2080-ERO-001 Rev. 14 Page 39 of 65 I Emergency Response Resource Readiness Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages40 LI 15 Blank Data Sheets (verify current revision)

RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)

LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001 - Data Sheet 3 (verify current revision)

LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.

LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]

LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1. .a]

LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment # 5392)

Air Sampling Kit [Ref 6.2.l.a]

LI Break seal and perform inventory LIPad of Paper LI Planchetts LI Particulate filters (47-mam)

LI Sealable Plastic Bags LITweezers LI Time Piece LI Air Sample Envelopes LICalculator LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___

LI Install new seal.

CL Portable Instrument Kit [-Ref 6.2.1 .a]

LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Off Site Responder / Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)

LI 20 EDs

ReferenceEPP-2080-ERO-001 Rev. 14Pae4of6 Reference Emergency Response Resource ReadinessPae4of6 Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages:

Miscellaneous Supply -Box Li Break the seal and inventory.

I] Rad Ribbon / rope Li Rad Tape Li Smears Li Planchetts Li Tweezers Li Safety Glasses Li Paper Li Pens Li Disposable Gloves Li Envelopes EL Hearing Protection

[] Install-new seal.

Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]

Li 30 Full plastic suits with hoods NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI] Satisfactory Li Unsatisfactory (enter comment below)

Comets Performed by:

Print Name Signature Date Reviewed by:-

EPM or designee Signature Date

efrneEPP-2080-ERO-001 Rev. 14 Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10 ENC/JIC Monthly Checklist Pages:

41 -41 ENC/JIC Monthly Checklist I

Month Year Equipment Functional Checks: Facility Set Up:

Li 1 Copier (Attachment 3) Li 1 box of Extra paper El 2 FAX machine(s) (Attachment 3) [] 1 toner for copier Li 2 Flat screen monitors (Attachment 3) LiCheck procedure books for current revision

[] 3 Computers (Attachment 3) Li Check data sheet folders for current rev.

EL 2 TVs and 2 Radios Li Supply cabinets and key box sealed Li 1 TV recording device(s) Li Extra bulbs for large screen projector Ei 15 Telephones (Attachment 3) Li Verify the current ERG calendar is in the Li 1 PA microphone (turn on and verify output) press packets LI] 1 Security Computer in Stairwell (Plug in EL Check keys in key box and turn on) EiReceptionist - Master Key Li 1 County laptop (Plug in and turn on) LiSpokesperson - Master Key Li Verify recorded message.

Li 1 Projector in auditorium (Attachment 3) LiAudio Visual - Master key & cabinet key ELSupport Coordinator - Master Key Li 2 TLDs (Area TLDs) LiMedia Center Manager -Master Key Li 2 EDs (Area EDs) LIMedia Area Coordinator - Master Key LIJIC Setup Coordinator - Master Key, Stair Li Overall cleanliness and appearance screen key (#45), 2 Misc Keys NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI Satisfactory Li Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by: I_

Date EPM or designee M1gnature

Reference EPP-2080-ERO-O01 Rev. 14 Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11 Survey Vehicle Monthly Checklist 42 - 42 Survey Vehicle Monthly Checklist LiVehicle #1 El Vehicle #2

____________________/

Month Year L1 Check fuel supply (keep tank full)

Li Check battery (start and drive for 30 minutes)

Li Check that tires are not flat

[21 Check that there is no leaking/puddle fluids under vehicle CI Check that the lights (including turn signals) work Li Check that windows are not cracked/broken

[II Odometer reading _____miles Odometer reading _____miles Li Spare batteries, 1 set for each vehicle flashlight.

Li Check vehicle for overall cleanliness and appearance CL Check recharge tag on battery jump pack (recharge if necessary)

Vehicle Readiness: Li Satisfactory EL Unsatisfactory (enter comment below)

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by:____________/__________________

EPM or designee Signature Date

Ref erence EPP-2080-ERO-001 Rev. 14 Page 43 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages:

DtShe12Checklist 43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1 LI Vehicle #2

_________________/ _______

Quarter Year EL Site Map

[] Berrien County Map LI 15 Blank Data Sheets (verify current revision)

RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)

LI Clipboard LI Flashlight/Lantern with Batteries El 2 Sets Winter Apparel .[Ref 6.2.1.a]

LI Clippers EL Shovel LI 2 Full Face Respirators with Iodine and Particulate Cartridges . [Ref 6.2.1. a]

LI Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)

Miscellaneous Supply Box LI Break the seal and inventory LI Paper LI Rad Tape LI Disposable Gloves LI Envelopes LI Tweezers LI Sample Collection Bags LI Labels LI Compass LI Rad Ribbon ! rope LI Smears LI Keys to Rosemary Beach Gate LI Writing Implements EL Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]

LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Reference EPP-2080-ERO-001 Rev. 14 Page 44 of 65 Emergency Response Resource Readiness het 2 Daa Survey Vehicle Radiation Protection Quarterly Pages:

DtShe12Checklist 43- 44 lNOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.

Air Sampling Kit .I[Ref 6.2.1.a]

II] Break the seal and inventory C)Pad of Paper C)Planchetts C)Particulate filters (47-mm filters)

C)Sealable Plastic Bags C)Time Piece C)Writing Implements C)Air Sample Envelopes C)Calculator

[] Silver Zeolite Cartridges (min 5 cartridges) Exp Date____

C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]

C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Vehicle Readiness: I] Satisfactory C)Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13 Control Room Monthly Checklist 45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)

__________________/

Month Year One FAX Machine Verify the FAX machine functions per Attachment 3.

________________________________________/___________

EP Staff Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.

Verify the password is correct by logging into ERONS.

________________________________________/___________

EP Staff Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4.

_______________________________________/___________

EP Staff Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff Date Dt

I Reference EPP-2080-ERO-001 Rev. 14 Page 46 of 65 I Emergency Response Resource Readiness I

Data Sheet 3CotoRom 13Conrol oomMontly heckistPages:

othyhelit45 -46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)

J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment

11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms I* 1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:

NOTE: An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:__________________________ ______

Print Name Signature Date Reviewed by: ____________/__________________

EPM or designee Signature Date

[ Reference EPP-2080-ERO-001 Rev. 14 Page 47 of 65 I Emergency Response Resource Readiness Daa~et 4 Control Room Quarterly Radiation Protection Pages:

Daahe 4Checklist 47- 47 J

________________ _________/_

Quarter Year Unit One Control Room El 11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]

El 10OEDs.

El 5 packages of KI tablets.

El 25 KI Consent Forms - RMT-2080-OSC-001, Data Sheet 3 (verify current revision )

El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]

El 4 SCBA Units [Ref 6.2.1.a]

El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]

Unit Two Control Room El 11 TLDs~(10 Whole Body and 1 Control) [Ref 6.2.1.a]

El 10OEDs.

El 5 packages of KI tablets.

El 25 KI Consent Forms - RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).

El Portable SPING Monitor (PSM) Serial Number _______

El Particulate Filters (50-mm filters)

El Silver Zeolite Cartridges (min 5 cartridges) Expiration Date________

El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]

El 4 SCBA Units..[Ref 6.2.1.a]

El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1. a]

Comments:

Location Readiness: [] Satisfactory El Unsatisfactory (enter comment below)

Performed by:____________I_____________ ______

Print Name Signature Date Reviewed by:

EPM or designee Signature Date v

Reference EPP-2080-ERO-001 Rev. 14 Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly Pages:

DtShe15Radiation Protection Checklist 48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway I__________/_

Quarter Year

[] Break the seal and inventory SNOTE: This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number ______Serial Number_____

Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors

[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]

Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]

Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]

Li 10 SCB3A Units [Ref 6.2.1.a]

Li 10 Spare SCBA bottles [Ref 6.2.l.a]

[] Install new seal Miscellaneous Supply Box

[] Break the seal and inventory Li Rad Ribbon / rope Li Rad Tape Li Smears Li Paper Li Pens Li Duct Tape Li Install new seal

I Reference EPP-2080-ERO-001 Rev. 14 Page 49 of 65 I Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly Pages:

DtShe15Radiation Protection Checklist 48 -49 j IOPortable Instrument Kit [Ref 6.2.1 .a]

Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Comments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory. Document number in comments.j Location Readiness: [] Satisfactory [] Unsatisfactory (enter comment below)

Performed by: /

Print Name Signature Date Reviewed by: I-Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16 CAS/SAS Monthly Checklist Pages.

CAS/SAS Monthly Checklist

__________________/

Month Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.

(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)

ELISAS / _ _ _

EP Staff Date ElICAS ________I___

EP Staff Date Verify that the Iridium 9555 Satellite phone system functions properly.

(Attachment 5, Satellite Phone Checks)

LI SAS________I__

EP Staff Date uCAS ___________

EP Staff Date Comments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: I Print Name Signature Date Reviewed by: /

Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 51 of 65 Emergency Response Resource Readiness Dat megeny Shet17 espns Daa ystm estngPages.

Seet 17 Data Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR) _____________

Computer being used to test ERDS ______________

1 ERDS Testing Process 1.1 ERDS is active 24/7 and testing is not normally required. IF testing is necessary THEN continue with this attachment.

1.2 This process can be performed from any Local Area Network (LAN) computer.

1.3 Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.

Was the test started at the pre-determined time? Yes IJ No I 1.3.1 Record time NRC was contacted _______

1.3.2 The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.

1.3.3 The NRC ERDS Operations Center will give instructions on how they will be conducting the test.

Reference EPP-2080-ERO-001 Rev. 14 Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing Pages:

1.3.4 For performing from any LAN computer:

a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).
b. In the white background box under the window menu option, type in "ERDS" and press enter.
c. When prompted enter User Name and Password.
  • Obtain User Name and Password from Position Specific Desktop Guide
d. Click on the screen location labeled "ACTIVATE" 1.4.4 Open another PPC display by clicking on file menu option and selecting the top menu.
a. Repeat steps (a) through (d) for the other unit.

Did both units connect with no problem? Yes IJ No ElI 1.4 The NRC will let both systems run for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and then disconnect the transmission at the NRC's end.

1.4.1 The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.

1.4.2 The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.

1.4.3 A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.

Did the NRC personnel verify that the test passed for both units? Yes LI] No E .

Reference EPP-2080-ERO-001 Rev. 14 Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing51-3 1.5 IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.

1.5.1 Verify that the Status on the ERDS screen is "Inactive".-

1.5.2 Close the PPC application.

1.6 IF the test is unsuccessful, THEN:

Obtain reason for the failure from the NRC or IT.

o Inform Information Technology (IT) of the failure.

o Retest the system when repairs are complete.

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Comments:

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by: /-

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection Pages:

DtSee18Quarterly Checklist 54 - 54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.

______________ I________/_

Quarter Year SNOTE: Place a"I"" orXo the line pedigthe item to indicateacetb.

Berrien County Sheriff Department CI 201 TLDs (200 Whole Body and 1 Control)

SComments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: I Date EPM or designee Signature

I Reference EPP-2080-ERO-001 Rev. 14 Page 55 of 65 I Emergency Response Resource Readiness Daa het 9 Training Center Radiation Protection Quarterly Pages:

DtShe19Checklist 55 -55 Training Center Radiation Protection Quarterly Checklist

________________ _________/_

Quarter Year El Count Rate Meter Serial Number ________Cal Due Date Li 2 Count Rate Meter Cables' Li 2 Count Rate Meter Detectors Li 1 Air sampler with sample head Serial Number _________Cal Due Date Li 16 Electronic Dosimeters . [Ref 6.2.1 .a] Cal Due Date Li Li 17 TLDs (16 Whole Body, 1 Control). [Ref 6.2.1.a]

2 Flashlights E

El Box of Smears Li 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges EL 14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]

NOTE: An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

EPM or designeeSintr Date Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 56 of 65 Emergency Response Resource Readiness Pgs Data Sheet 20 LMC Radiation Protection Quarterly Checklist 56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph Li Niles (1307 Storage Room)

(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)

Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.

__________________/

Quarter Year SNOTE: Tehospital supply cbntianEPan App. Crequirement.

LiBreak the seal and inventory Li Count Rate Meter Serial Number ________Cal Due Date_____

Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head Serial Number _______

EL E-Plan Air Sample Activity Determination Worksheet Li 20 EDs Cal Due Date_ __

LiAssorted Tool Kit Li Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)

Li Clipboard EL 21 TLDs (20 Whole Body, 1 Control)

Li 12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.

if the inventory is short, THEN contact the hospital to replenish.

Li Stanchions or portable barriers sufficient to post area.

Li1 3 Step-Off-Pads Li 6 Tni-foil Signs with Assorted Inserts Li 6 Cloth/Poly Bags Li 2 Trash Bag Holders Li1 Water Collection Bottle Li Stretcher Insert Li Water Collection Tray Li Shower Head Li Hose Li1 Herculite Runner (or equivalent)

Li Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal

Reference EPP-2080-ERO-001 Rev. 14 Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable

  • Instrument Kit Inventory.

NOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.

Air Sampling Kit [Ref 6.2.1.a]

LI Break the seal and inventory LI Pad of Paper LI Planchetts LI Particulate filters (47-mm filters)

El Sealable Plastic Bags LI Time Piece LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___

[] Air Sample Envelopes LI Calculator LI Writing Implements LITweezers LIRad Tape LI1 Rad Ribbon/rope LI Shoe Covers LI Smears LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)

LI Break the seal and inventory LI Nail Clippers LI Smears LI Vomitus Containers LI Writing Implements LIScissors LI Urine Containers LI Envelopes LI Forceps LI Cotton Swabs in Vials LI Eyedropper Bottle LI Tweezers LI Poly Bags LIInstall new seal

Reference EPP-2080-ERO-001 Rev. 14 Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pgs Hospital Decon Kit (In Cabinet)

C] Break the seal and inventory C] Skin Cream C] Clorox C] Cotton Tip Applicators C] Detergent C] Towels C] Phisoderm (or equivalent)

C] Corn Meal C] Nail Clippers C] Writing Implements C] Gauze Pads C] Steri-Drape UI Decon Procedures C] Surgical Tape C] Forceps C] Transparent Dressing C]-Solution Bowls C] Scissors C] Irrigation Syringe C] Shave Kit C1 Shampoo C] Disposable Gloves C] Poly Bags C] Install new seal Comments:

SNOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21 Emergency Sampling Station Quarterly Radiation Pages:

Protection Checklist 59 - 59 J Emergency Sampling Station Quarterly Radiation Protection Checklist

_________________/ _______

Quarter Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler El Extension Cord

[] Water Sampling Bottles El Air Sample Head .

[] Air Sampling Envelopes IJ Tygon Tubing

[21 Pad of Paper El Air Sample Filters (47 and 50 mm filters)

ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)

[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)

El Silver Zeolite Cartridges (main 5 cartridges) Exp Date___

-Turbine Building El 609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El 609' at SRA-2900, Steam Jet Air Ejector Monitor El 591' at SRA-2800, Gland Steam Condenser Vent Monitor El 609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El 587' Spray Additive Tank Room at Chemistry Sampling Station NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:

Print Name Date Signature Reviewed by: /_

Date EPM or designee Signature

Reference EPP-2080-ERO-001  ;'Rev. 14 Page 60 of 65 I Emergency Response Resource Readiness I Data Sheet 22 Emergency Plan Respiratory Protection Pages IQuarterly Checklist 60 - 60 Emergency Plan Respiratory Protection Quarterly Checklist

__________________/

Quarter Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.

IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.

Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.

Radiation Protection Access Control LI 10 SCBA Units (clean side) 609 Turbine LI10OSCBA Units Auxiliary Building LI 17 SCBA Units (various locations)

Location Number Location Number LI 609 Turbine by TRPAC 1 LI 633 by Freight Elevator 1 LI 609 by Elevator 5 LI 650 4 LI 573 by Freight Elevator 1 LI 612 Unit 1 Containment CAC 2 LI 587 by Freight Elevator 1 LI 612 Unit 2 Containment 2 Comments:

NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

EPM or designee Signature Date

RefeenceEmergency Response Resource Readiness Data Sheet 23 RP/Ops Emergency Response Equipment Pages:

Quarterly CheckliSt 61- 62 RP/POps Emergency Response Equipment Quarterly Checklist

_________________/ ________

Quarter Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")

The emergency RP supply boxes are located at the Auxiliary Building exits:

  • RPAC - supply box is located in cabinet near the shower.

o, TRPAC - supply box is located in the decontamination room.

RPAC - Emergency RIP Supply Box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. [] 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID 4 pair of booties ID 4 hoods ID 4 pair of rubber boots ID 4 pair of glove liners ID 1 box of smears ID Install- new seal TRPAC - Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID[ 4 pair of booties ID 4 hoods ID 4 pair of rubber boots El 4 pair of glove liners ID 1 box of smears ID 1 Portable Air Sampler ID 1 Dose Rate Meter ID Install new seal

I Reference EPP-2080-ERO-001 Rev. 14 Page 62 of 65 I Emergency Response Resource Readiness I Data Sheet 23 RPIOps Emergency Response Equipment Pages:

IQuarterly Checklist 61- 62 SComments:

NOTE: An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Print Name Signature Date Reviewed by: ____________/

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24 Monthly Satellite Phone Checks Pages63 Monthly Satellite Phone Checks Month Year Verify that the Iridium 9555 Satellite phone system functions properly EL Lake Township Fire Department ___________/ _ __

Performed By Date El Berrien County EGG ____________/ ___

Performed By Date CL Lake Michigan College ___________/___

Performed By Date.

Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex /____________I____

.. Performed By Date Comments:

INOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 64 of 65 Emergency Response Resource Readiness DaaSee 5 Radiation Protection Portable Instrument Kit Pages:

DtShe25Inventory 64- 65 SNOTE: This datasheet is used by Radiation Protection to inventory a kit when the seal l on a kit is found broken or is broken for maintenance of the kit.

Kit Number __________Kit Location (check the box for the appropriate location)

[]I EOF (Off-Site survey team contingency equipment) J Survey Vehicle #1 1] EOF (RP Equipment storage area) LII Survey Vehicle #2 Li Unit One Control Room (CREC) LII OSC Li Lakeland Medical Center St. Joseph Li Lakeland Medical Center Niles

[3 Other _________

Response Source JCN _____

NOTE: The floiginstrument tye reuvln r eurdto be in the kits.

Li RO-7 Survey Meter El ESP-2 Survey Meter EL RO-7-BM (Mid-Range) Detector Li HP-270 Dose Rate Probe Li RO-7-BH (High Range) Detector Li HP-260 Frisker Probe (2)

ELI MHV/BNC Cables (2) Li HP-210 Shielded Probe

[] SH-4A Sample Holder Li Screwdriver

[]I 9 Volt Batteries (3) El Writing Implements (2)

LII 30 Volt Batteries (2) LII Notebook El D Cell batteries (2) El 3 EDs LI1 C Cell batteries (6) Li ESP-2 Detector Change Flowchart Installed new seal.

Comments:

SNOTE: An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /I______________________ ___________

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

RfrneEPP-2080-ERO-001 Rev. 14 Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26 Security Control Center Pages:

[ 65 -65 Security Control Center

_______________I ________/_

Quarter Year SNOTE: Place a "" or"X" onthe line pedigthe item to indicateacetb.

North Access Vehicle Portal LII 3 Electronic Dosimeters Cal Due Date ___________

LII 4 TLDs (3 Whole Body, 1 Control)

I] 3 Sets of Anti-C's for first responders, Level 2. [Ref 6.2.1 .a] [Ref 6.2. ib]

Comments:

NOTE: An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: _____________________________I___________________________/_

EPM or designee Signature Date

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration [Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.

The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required to this procedure alteration.

A 10 CFR 50.5 4 (q) review was performed. The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.

The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this procedure revision can be implemented without prior NRC approval.

Step 4.1.4, Added Data Sheet 26, Security This inventory was previously performed on Control Center. No margin mark was used. Data Sheet 18 which has the Berrien County Adde 4.46 Ste wich escrbes heEOC inventory on it. Users requested these SeuiyControl Center. inventories be separated into two Data Securitysheets. added step 13.2.14 for Data Sheet 26, Security Control Center.

Removed Rev 13 step 4.2.4 which stated Recording the seal numbers so that for the "Blanks for recording storage container seal next scheduled inventory the seal could be numbers are provided as verification tool. verified intact and therefore an inventory IF the installed seal is the same seal as would not need to be performed has proven recorded during previous check THEN it is to be ineffective. This revision changes the no necessary to break the seal and inventory process to breaking all seals and performing the contents." a complete inventory each time and then resealing the item.

Seal number blanks have been removed from the procedure.

No margin marks were used.

Revised step 4.4.5 to state that the locations This list was inaccurate and incomplete. The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan. Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure. These data sheets provide the user with the locations.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval. Page 1 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.

C's on Data Sheets 9, 12, and 23. Reviewer comments. , removed "either Control This attachment is used for functional checkcs Room or" from step 1.2 of the phones in the TSC only. , was revised to state, "Verify Previous wording of this step did not require each phone in the facility is capable of both that both functions be checked on all phones.

dialing out and receiving a call" AR 2015-15253 , Step 2.1 was revised to state Editorial change requested by EP Manager.

that the phone check is to verify the phones can call out and receive a call. , added Steps 11.6 and 12.5 to Added to ensure that the instrument will not verify that the instrument calibration does go out of cal prior to the next check.

not expire prior to the end of the next month. , Step 13.1 was reworded and This revision changes the process to removed the annual requirement to breaking all seals and performing a complete unlock/unseal all facilities and storage areas. inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.

No margin marks were used , changed the title of PMP- Procedure title has changed.

2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment Gt 2015-11455-4 Important to Emergency Response. , switched the order of steps User comment. Permission from the control 1.1.1 and 1.1.2. room is needed before contacting the county. , added note at beginning User Comment concerning reference to EPP-

"Additional information for use of Satellite 600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be with these phone checks.

found in RMT-2080-EPP-600, Satellite Phone Instructions. The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 2 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Attachment 5, Step 1.8, added Lake This is a new phone for the alternate EOF Michigan College to satellite phones to be location at LMC.

checked.

GT 2015-8471-1 Data Sheet 1, removed verification that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supplies are inventoried 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supply cabinet was locked or quarterly using Data Sheet 2.

Sealed.

Data Sheet 2, This revision changes the process to Removed blanks for recording seal breaking all seals and performing a complete numbers. inventory each time and then resealing the item.

S Removed locked or seal check for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supplies. GT 2015-13295-1 Data Sheet 3 was reorganized for ease of Reorganization did not change the inventory.

use. No items were added or removed during the reorganization.

Data Sheet 3, Under Re-Entry Personnel The change from SRDs to EDs due to Equipment changed 14 SRL~s - 7 (0-1 .5R) 7 technical advances. An ED is capable of (0-10R) to 14 EDs. measuring dose that encompasses the range of both SRDs.

_____________________________GT2014-15551.

Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.

and added JIG to General distribution badges.

Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551. The addition from 8 to 2. Added 2 Area EDs to this of the Area ED facilitates total dose section. determinations for the EOF personnel.

GT2014-15551 Data Sheet 3, Under Additional Equipment The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.

This change eliminates unnecessary equipment from the inventory.

GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist, User comment that this board is no longer-removed Copy Board. used.

GT 2015-13643-1 Office Information for Form Tracking Only - Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 3 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Data Sheet 6, Removed 25 SRDs and SRiD The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.

GT2014-15551.

Data Sheet 7, removed label color The radios are located in different areas of designators for radios, the facility and the color designator is not necessary.

Data Sheet 9, reduced the number of EDs The revised numbers of EDs was determined from 50 to 40. in GT2014-15551.

Data Sheet 9, reduced the number of TLDs The revised numbers of EDs was determined from 141 to 41. in GT2014-15551 which determined that the 100 extremity TLDs were not required.

Data Sheet 9, added the Off Site Responder / Determination from GT 2014-15551 and Security Dosimetry Box section. user comments. Reorganization did not change the inventory. No items were added or removed during the reorganization. No Data Sheet was reorganized, margin marks were used for the reorganization.

Data Sheet 10, added two area TLDs and The addition of the Area ED facilitates total two area EDs to Equipment functional dose determinations for the ENC/JIC Checks section. personnel.

GT 2014-15551 Data Sheet 10, removed "and install New style computers do not require this updates" from Security Computer and action to be performed. This occurs County Lap Top Computer checks. automatically when computer is turmed on.

GT 2015-2610-1 Data Sheet 10, changed the name of the key User Comment in* the key box from Media Area Manager to Media Area Coordinator. GT 2015-7276 Data Sheet 11, Added "Check recharge tag New battery jump packs have been placed in on battery jump pack (recharge if survey vehicles.* These jump packs have a necessary) " one year charge life.

GT 2015-6016-1 Data Sheet 13, Added "One" designator to User comment.

FAX machine check to clearly indicate ,that there is only one FAX machine to test. GT 2015-7209

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Resp~onse Resource Readiness Alteration Justification Data Sheet 13, Added ERONS password User comment.

verification by logging into ERONS to perform the ERONS check. GT 2015-7209-1 Data Sheet 13, Added "One" designator to User comment.

911 Dispatch Center Phone check to clearly indicate that there is only one phone to test. GT 20 15-2575 Also changed this test to have EP Staff GT-2015-8602-1 perform the phone test per Attachment 4.

Data Sheet 13, Added "One" designator to User comment.

DAP computer check to clearly indicate that there is only one DAP computer to test. GT 2015-7209 Data Sheet 13, Removed the following from User comment.

the Control Room briefcase inventoried items. Approval to remove these items was

  • 10blak lo shetsobtained from the Operations Senior License.
  • 1 calculator
  • 10 miscellaneous pens GT 20 15-7209 a 2 pencils*with erasers
  • 1 ruler a 2 pads of lined paper
  • 5 red fine markers.
  • 5 black fine markers
  • 3 orange markers o 3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs. techflical advances.

GT2014-1555 1.

Data Sheets 14 and 15, items were Per user comment the Control Room checks rearranged. should be on one attachment and the Control

.... Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment. No items were removed from the procedure.

____________________________No margin markings were used.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 5 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Resp~onse Resource Readiness Alteration Justification Data Sheet 16, added references to User comment.

Attachments 4 and 5 for directions for how GT 20 15-2575-1 to perform checks. No Margin marks were used.

Data Sheet 19, reduced the number of EDs This change aligns the number of EDs from 30 to 16. available with the number of TLDs.

GT 2014-15551 Data Sheet 19, change the format of the Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used Control)" from "16 TLDs plus 1 Control throughout this procedure. TLD".

Data Sheet 20, Removed 20 SRDs and SRD The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs. technical advances.

GT2O014-1555 1.

Data Sheet 20, added "(1307 Storage Room) Added to provide user with a better location to the location at Niles Hospital. of equipment.

Data Sheet 20, organized list of items under No items were added or removed. This new heading "Decon Room". organization groups items in the same location together.

Data Sheet 20, added "(In Cabinet)" to the Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit. of equipment.

Data Sheet 20, Added reference to Data Added to remind user that when performing Sheet 25. the instrument kit inventory it is necessary to document the inventory on DS 25.

Data Sheet 23, changed the location of Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.

better describe the locations.

Data Sheet 23, removed Operations Electronic Dosimeters for Operations Emergency Supplies - 6 Electronic personnel are located in the Control Rooms Dosimeters. and inventoried using Data Sheets 14 and 15.

Data Sheet 23, Added a portable air sampler Requested by RP personnel to ensure this and a dose rate meter to the inventory for the equipment is readily available when needed TRPAC Emergency Cabinet in an emergency.

No Margin Marks were used.

GT 2015-13295-1 Data Sheet 24, added Lake Michigan This is a new phone for the alternate BOF College satellite phone check. location at LMC.

GT 2015-8471-1 Data Sheet 25, Added blank to record the User comment Response Source ICN.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 6 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14-

Title:

Emergency Response Resource Readiness Alteration Justification Moved Security Control Center Quarterly Previously these checks were on Data Sheet checks to new Data Sheet 26. 18 which is for the Berrien County EOC.

User Comment.

Office Informa~tion for Form Tracking Only - Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval. Page 7 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.

Implementation Schedule

  • The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.
  • The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.
  • PORC week 1/11/20 16

- Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions None I Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 8 of 9

REVISION

SUMMARY

Rev. No.: 14 ProcdureNo. EP-28-EO-Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval. Page 9 of 9

INDIA NA MICHIGAN Indiana Michigan Power Cook Nuclear Plant POWER One Cook Place Bridgrnan, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com February 19, 2016 AEP-N RC-20 16-22 10 CFR 50.4 10 CFR Part 50, Appendix E.V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Donald C. Cook Nuclear Plant Units 1 and 2 Transmittal of Revision to Emergency Plan Implementing Procedures

Dear Sir or Madam:

Pursuant to 10 CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting the following revision to CNP Emergency Plan Implementing Procedures:

Procedure Number Title Revision Effective Date PMP-2080-EPP-i100 -Emergency Response 32 1/28/2016 PMP-2080-EPP-100 Emergency Response 33 2/12/2016 EPP-2080-ERO--001 -Emergency Response Resource Readiness 14 2/3/2016 There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.

Sincerely, Michael K. Scarpello Regulatory Affairs Manager DMB/m~l

Enclosure:

Encloure:

Emergency Plan Implementing Procedures

. /I

U. S. Nuclear Regulatory Commission AEP-NRC-201 6-22 Page 2 c: R. J. Ancona-- MPSC, w/o enclosure A. W. Dietrich - NRC Washington, DC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector, wlo enclosure C. D. Pederson - NRC Region Ill (CD)

A. J. Williamson - AEP Ft. Wayne, w/o enclosure

Enclosure to AEP-NRC-2016-22, DONALD C. COOK NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES PMP-2080-EPP-1 00, Revision 32 PMP-2080-EPP-1 00, Revision 33 EPP-2080-ERO-001, Revision 14

IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 32

Rev03 Doc No.: PMP-2080-EPP-1 00 No.:

Title:

EMERGENCY RESPONSE Major Editorial Correction - Full Alteration Cat.:

Review CDI/50.59:1 50.54(q) #15-46 PORC Mtg. No.: 4666 CARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change N/A End:

Effective Date: 1/28/2016 12:00:00 AM Approvals NaImeIReview/Approval Type/Capacity Date]

Hart, William E (i376639) 1 1lValidation Review 112/16/2015 12:12 J Hart, William E ~ 1 Cross-Discipline Review: EMERGENCY1 12/16/2015_12:1 Thompson, Alisa I (s0841 jlSpecial Review : E-PLAN GROUP 12/16/20 15 12:24 Peterson, Gerald TllTehiaReiw121/0536 1 Hat(illiam9 E l3 Technical Review 101/08/2016 10:15 j M s065 5_Management Review 101/14/2016 07:32 ]

Wendzel, Regan 7ApoaAuhrt01/1/01 32 (s007887) Apoa uhrt 0/421 32 Signature Comments

=Validation Review performed by Simpson, EP]

Cross Discipline Reviews performed by Ashley, Training and Humes, Operations.]

]-he technical review was performed by Jerry Peterson]

IPORC approval obtained at meeting 4666

Approved at PORC per Plant Manager, Jim Ross.

  • ' PMP-2080-EPP-100 Rev. 32 Page 1 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AND SCOPE ............................................................ 3 2 DEFINITIONS AN]) ABBREVIATIONS ............................................ 3 3 DETAILS............................................................................ 6 3.1 General Information .......................................................... 6 3.2 SM-SEC Checklist ............................................................ 7 3.3 Unaffected CR Checklist....................9 3.4 Shift Technical Advisor (STA) ................................................ 10 3.5 Contingency Director ............ ............................................ 10 4 FINAL CONDITIONS.............................................................. 11 5 REFERENCES.. ................................................................... 12 : Protective Action Recommendations .................................. 13 : Activation of ERONS..................................................17 : Dismissal of Non-Essential Personnel ...................................19 : Accountability ......................................................... 21 : Evacuation............................................................ 26 : Terminating a IJE....:................................................. 30 : Notification of On-Site Personnel...................................... 31 : Notification of Off-Site Agencies ...................................... 35 : MSP Notification.......................................................40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification .......................... ............................ 46

PMP-2080-EPP-100 Rev. 32 Page 2 of 61 Emergency Response Reference Bill Hart Emergency Preparedness Emergency PreparednesS Writer Document Owner Cognizant Organization 2: Manual Completion of EM!) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1: PPC or PSS Control Room Data ...................................... 52 Data Sheet 2: Emergency Turnover Checklist ........................................ 54 Data Sheet 3: Plant Status............................................................. 58 Data Sheet 4: Request For Additional Information .................................. 60 Data Sheet 5: Contingency Team Tracking Form .................................... 61

Reference PMP-2080-EPP-100 Rev. 32 Page 3 of 61 Emergency Response 1 PURPOSE AND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to ant emergency declared per PMP-2080-EPP-101, Emergency Classification.

1.2 Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.

2 DEFINITIONS AND ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AEO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.

Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.

Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.

Control Room An available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.

  • CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to
  • Status Trees restore safety functions that are challenged.

DAP Dose Assessment Program EAL Emergency Action Level

Reference PMiP-2080-EPP-100 Rev. 32 Page 4 of 61 Emergency Response Term Meaning ED Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency ResPonse Auxiliary Equipment Operators.

ERDS Emergency Response Data System ERE Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency flAB Hostile Action Based IC Initiating Conditions IIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the addition of an RO from the unaffected unit or an extra RO who is Mitigation responsible for placing the unit in a safe condition, during emergency Team conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.

MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Offsiterole at the SM/SEC's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.

Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.

OSC Operations Support Center PA Public Address

Reference [ PMLP-2080-EPP-100 [ Rev. 32 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Containment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data

.RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager - Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center - Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building TIE Unusual Event US .Unit Supervisor WCC-SRO Work Control Center - Senior Reactor Operator

Reference PM~P-2080-EPP-100 Rev. 32 Page 6 of 61 Emergency Response 3 DETAILS NOTE: eSteps in this procedure that do not apply to the current classification may be marked N/A.

e The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.

3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.

3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.

3.1.3 The following actions shall not be delegated by the SEC (Command &

Control Function):

  • Classification of the emergency.

o Directing the notification of offsite officials.

o Approval of PAR to offsite emergency management agencies.

3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.

3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.

3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)

3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.

The use of Operations Department staff is recommended.

Reference PMP-2080-EPP-100 [ Rev. 32 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:

  • The following steps are repeated for each classification upgrade.
  • A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.

3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.

3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.

3.2.3 IF the emergency response facilities have been activated THEN establish communications with emergency response facilities using the Managers' Bridge.

NOTE: Actions already taken in SPP-2060-SFI-216, Plant Response to a Security Threat, need not be repeated in this procedure (e.g., protective measures such as evacuation).

Activation of the ERONS includes activating the Emergency Response Facilities.

3.2.4 IF at Alert or higher, (OR UE at SEC discretion), THEN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).

NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,

hostile force, radiation release, toxic spill, etc.).

3.2.5 IF at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).

Reference I PMP-2080-EPP-100 [ Rev. 32 Page 8 of 61 Emergency Response 3.2.6 IF any 11-2 ICs (Security EALs) were used to classify the current event, ThEN implement actions in accordance with SPP-2060-SFI-2 16, Plant Response to a Security and continue in this procedure.

3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THZEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).

3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).

3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.

3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.

3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THtEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.

3.2.12 Upon completion of turnover, inform both control rooms that the Command

& Control Function has been transferred to the SEC (or ED, as applicable).

3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &

Control Function, THEN terminate the UE using Attachment 6, Terminating a UIE.

3.2.14 IF in an Alert, or higher AND conditions warrant AN]) SM-SEC has Command & Control Function, THEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.

3.2.15 WUEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-001-001, Prompt NRC Notification.

Reference PMP-2080-EPP-100 Rev. 32 Page 9 of 61 Emergency Response 3.3 Unaffected CR Checklist 3.3.1 WHEN directed by the SEC, THEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___

3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel. ___

3.3.3 Assign an individual to start the Dose Assessment Program (DAP). ___

IF a radiological release is in progress due to the emergency, ThEN perform PMP-2080-EPP- 108, Initial Dose Assessment.___

3.3.4 TSC Ventilation

a. IF any of the following conditions are present: ___
  • The emergency involves a loss of coolant accident
  • The Control Room Pressurization System has been activated o A valid Safety Injection signal THEN verify 12-l01-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode. ___
b. Record the Emergency Mode start time on the placard located below the switch.

NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired infonmation.

3.3.5 if the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable. ___

  • Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).

3.3.6 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration

S Reference [ PMP-2080-EPP-100 Emergency Response I Rev. 32 Page 10 of 61 3.4 Shift Technical Advisor (STA) 3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.

3.4.2 Provides an independent assessment of conditions present and actions taken.

3.4.3 Reports to the SM and acts in an advisory capacity.

3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.

3.4.5 Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.

NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.

3.5 Contingency Director 3.5.1 The Contingency Director is responsible for the industrial and radiological safety of personnel dispatched from the Control Room.

3.5.2 The Contingency Director performs the following tasks.

o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.

a Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.

  • Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.

o Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.

  • Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.

Reference PM*P-2080-EPP-100 ] Rev. 32 Page 11 of 61 Emergency Response NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.

a Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.

o Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.

  • WHEN accountability is directed, THEN provide a list of Contingency Team members to the TSC.
  • Inform the SM of teams in the field, including the ERALEOs, prior to moving the Contingency Team to the OSC.

a Coordinate the move of personnel to the OSC when directed by the SM.

o Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.

4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.

Record any comments below (include document numbers for corrective actions):

Verified Complete By: Date: ___ I/

Performer Independently Verified By:- Date : __/ _

Performer Reviewed By: Date: I/ __

Operations Shift Manager I designee

Reference I PMP-2080-EPP-100 I Rev. 32 I Page 12 of 61 Emergency Response 5 REEERENCES 5.1 Use

References:

5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-00 1, Activation and Operation of the EOF.

5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-216, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1i.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing

References:

5.2.1 Source

References:

a. Cook Nuclear Plant Emergency Plan
b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2 General References
a. Michigan Emergency Management Plan
b. NRC Regulatory Issue Summary, RIS-2002-21
c. NRC Regulatory Issue Summary, RIS-2004-13
d. NRC Bulletin 2005-02

Reference PMiP-2080-EPP-100 Rev. 32 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages:

NOTE: In selecting a PAR, consider the radiological release characteristic

  • (continuous release due to the event, which cannot be controlled, vice a short-term "puff' release that can be controlled/stopped - e.g., containment pressure relief).

NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed in previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.

1 PAR Development 1.1 Proceed through a flowchart in this attachment to develop a PAR.

S The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.

, All PARs after the fi~rst are developed using the "Follow up Protective Action Recommendation" flowchart.

2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.

2.2 Ensure that the appropriate PAR boxes are checked on the EMD-32a form.

2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.

Reference PMP-2080-EPP-100 Rev. 32 Page 14 of 61 I Emergency Response I Attachment 1 Protective Action Recommendations Pages:6 Initial - Protective Action Recommendations Yes bsthis a RAPIDLY PROG3RESSING3 SEVRE ACCIDENT ?

(!f the conditions for a Rapidly ProgressingSevere Accident cannot be immediately confirmed, then A.NSWER .. ,No.)

1. is there a loss of containment per EAL 3.21 or 3.31 AND Containment High Range Radiation Monitors are greater than IO00R/HR?

OR

2. The conditions for EAt. R-1 have been met?

Yes HAB "\

.HELTER Recommend HOSTILE ACTION Recommend INITIAL SHELTER IN PLACE. {Column 2 on EVACUATION. (Column 3 on PAR PAR Table labeled "HAB SHELTERI* Table labeled 'INITIAL")it, z1 (L1}

. SHELTER INPLACE (SIP) 2 miles

  • Evacuate 2 mile radius, radius,
  • Evacuate areas 2-S miles
  • Clear lake area to 5 miles, downwind,
  • All other areas MONITOR &
  • All other areas MONITOR &

PREPARE PREPARE END of Initial PAR Flowchart N

\ Go to the Follow Up, PAR Flowchart s

Area 1, 2 and clear lake area 6 213.75to 236.25 Areal, 2, 3, 4anddlear lake areas 6& 7 Area 1, 2, 3, and~clear lake area 6 236.25 to 303.75 A~real1, 2, 3, 4, 5 anddcear lake areas 6 and Areal, 2, 3 andclear lake area 6 303.75 to 348.75 Area 1, 3, 5antd cear lake area 6 clear Areal1, 3 aaddcear lake area 6 348.75to 56.25 Areal1, 3, 5 anddcear lake areas 6& 7 Area 1, 3 and clear lake area 6 Areca 6 Area 1 and clear lake area 6 56.25 to 168.75 Area 1, and dlear lake areas 6 & 7 Notes: 1. Lake areas are =cleared" for eithter evacuation or sheltering.

2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lak~e area 5 to 10 mile radius.
3. IF Impediments exist as determined by the Offsite Response Organizations, the ORO may shelter in place.

1~

I Reference PMIP-2080-EPP-100 Rev. 32 Page 15 of 61 I Emergency Response Atahet1PotcieAto RcmedtosPages:

Attahmet 1Protctie Atio Recmmedatons13 - 16 Follow Up - Protective Action Recommendations Has aaL -NITIAL PAR t*e m-ade?

~AZIIZ,

~o to iii+/-~1 PAR

]

45 4 r~J H

Was a RAPiDLY PROCRESSING tlore ctooI~e ~ ~tabIi~edAND Co~iai~~

SEVERE ACCIDENT 8~dax~d ~ ~ra1st rImi20~ R~'BR?

d~xEt~ Iu~s1 PAR e~slmrj~'

W i SHELTER RnnnHOSTIL~E ACTION R *omesdOLLOW UP EVACIATIO.N.

SHHEIER IN ILACE.

.4 axea2 Epamdyx lst dovoreirA areasarEspiad .tn at ti.

eiwas re-cs nmdatima t* add a~dii, sl SHELTER') <x:

m x-a (ADD cohamx 1 onPA5 TaUl*

  • SHELTER INILACE *SO' 2 *ColmmS on oPAR Table la1bh--d '*OLLOW
  • All otte area MONITOR &
  • Eseroat 2 mie rains PREP.ARE
  • catem aresas 2-10 miles do*.n, imd
  • Alloh. areas M )N*ITOR &
  • All oth* areas O*N'I-OR & PREPARE PREPARE beo It~ar~ith d~ Sates

~ 4S~~t ~stetm ee~lre~ r~ to do so mcdi~ PARs of all a~aei arms

'S 4,

exssaedPAC's.

  • E~xpaad PAE'a bated at DOSE A*~*SSESS -E"to armsx be~nd 10 tuTIms maedPA(Ia (Atrealasn 1*0mil.s ~vi~l Ibed*ed*ad hoc*in mrlais dea I.'
  • shd th Sate of Mrr*mniasrar-).

4, and dear ]ake areas 6 & 7 Area 1, 2 anddcear lake area 6 213.75 t0 236.25 Area 1, 2, 3, 4artddear lake: areas 6 & 7 Ara1Area 1, 2, 3, and dearlake area 6 aauid IAreal1, 2, 3 and clear lake area 6 303.751 o348.75 Areal, 3,5 andclear lake area 6 clear Areal1, :3and clear lake area 6 lake Area I, 3-nddealake area 6 Ara6Area 1 and dear lake area 6 56,25,.10 168.75 Area 1, anddcear lake areas 6& 7 Notes: 1. Lake areas are 'cleared - fbia either evacuation or sheltering.

2. 3Aea 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radius.
3. IF Impediments exist as determined by the Off'site Response Organizations, the ORO :may shelter in place.

I Reference ,,,, PMP-2080-EPP-100 Rev. 32 Page 16 of 61 I Emergency Response I tahet1PotcieAto Rcm edtosPages:

Attahmet 1Protctie Atio Recmmedatons13- 16

______________ ______________ Reference 3 EPA PAG TABLE*

Protective Action PAG (projected dose) Comments Michigan Application

Response

Theleerin2-in-place or 1 to S relmt Evacuation~lir, for snm<e situations, racility operator~s will recommeno ev~acuation of the (11 rv¢iv t~o 53q m.Sv) shecering* in~place) should; be initiat=ed evacuation at 1 remn sheltering in public* over four day* whern projectcd dose is 1 remn (13 rosy) place is t~he prerog:ative of the state of M ichi~a n Supplen'ent:aiy S en'e(S3 rr5, KI is' r:ost effectcive if taken prior t:o The stateco Michigan will irmplem~ent administ:ration or projected dto.'c to e*:posure. Ma? resiuire approval of st.ate irs 1(I plan; facility operator's prophylactic drugs* - child thyroid E~rr medical officials ior in actordance with recommen~datrion is implicit in dose KI: expos'ure t.o iocinc es*tablished en' eraencv plans). estidmation data.

  • t.+Tw*,~l.**o,*'D,+++ - I c'r ife~~v,+t++*:e =:J&* j

-+..+t*t+-;te t+nD

+I+ fI b.tp:,!'i,J+***

flt i~rle

v++ +e ie+; h~'
  • ._*J+.,: ait+n :* ~t+:.i*+m .. ,+/+,*.

th'4 r,++ tnJ++.+ :i-m; +++ *-÷ tt* n

+t*ft"1t3.+n+.5 i di+'

  • m,.t n

"+a+ the

. t**+++1 e f,+'Jm +t~ ii

'Tb - JŽ ti . I ,*r+ +'I r,t~ +-.ix[rt+++=, + +,'Li. .* .+

i++*.+ +*, ifl r +-J+ *,' +,' u'"int~

  • .*, :b+-frt
  • +;+r*+i 1,

Reference PMIP-2080-EPP-100 Rev. 32 Page 17 of 61 Emergency Response Attachment 2 Activation of ERONS Pages:

NOTE: SEC jugetis used todetermine which scenario will be used.

1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THLEN activate the ERONS.

1.1 To activate ERONS:

  • Click the Everbridge icon on the desk top.

OR SLog in to Everbridge by entering the web address, https://manager.everbridge.net OR SIF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.

1.2 Enter User Name (erons) 1.3 Enter Password (located in ERO brief case) and Click Sign In.

NOTE: 1) Code "911" scenario will direct ERG responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.

2) Code "007" scenario, will direct ERG responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.

1.4 To start a scenario, click on the Notifications tab at the top of the page.

1.5 Click on the Templates header to bring up a list of pteprogrammed scenarios.

Reference PMP-2080-EPP-100 Rev. 32 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS Pages:

17 - 18 INOTE: ........ .............. .s ii°t t 1.7 Click Send (loca ptedB clos to e te tpofte cee) 1.C mesag wi opup askin ifyuwatt ddYthisto an evet.t Cick"N, en Afe a N ntification isrt senat thet srenauomatiitEcall goner sbacktr NoiictosrTab where thei last ntfcation sentCut~is~E Cshonwthtetie 1.7 Click Send (located close to the botop of the screen). Noicaonhaebnsnt NOTE: Afcopter acNtifiation isno senttescreen automatcallyEerrigoes backto the8823-99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.

[ Reference PMP-2080-EPP-100 Rev. 32 I Page 19 of 61

[ Attachment 3 Emergency Response Dismissal of Non-Essential Personnel PaeI NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.

1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.

NOTE: Personnel assisting the ERO (such as a Failure Investigation Process (FTP)

Team) should be Radworker qualified (i.e., have a TLD).

1.1 IF personnel may be needed to assist the ERO (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.

1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g.,

radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

1.3 Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:

  • Whether or not rapid egress is required (e.g., airborne attack)
  • Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.

1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.

1.4 Inform both Control Rooms of the decision to- dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).

1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.

1.5.1 Sound the Containment Evacuation Alarm(s), if required.

1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two tunes.

1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential_ personnel are requested to leave the plant site at this time using the main plant access road."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

1.6.2 if rapid egress is to be used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Dne to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,

"vehicle portal near the North Access Building") and exiting the site using (State the route)."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.

Reference PMP-2080-EPP-100 Rev. 32 Page 21 of 61 Emergency Response Attachment 4 Accountability 2Pages NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.

1 Review the three methods of Accountability below:

1.1 Primary Method - using this method, all plant personnel and ERO members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.

  • Personnel will remain in the Assembly Areas until evacuated per SEC direction.
  • A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).

1.2 Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERO individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.

This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be bypassed.

  • In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.
  • This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.

Reference PMP-2080-EPP-100 Rev. 32 Page 22 of 61 Emergency Response Attachment 4 Accountability 2Pages The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

IF radiological conditions may impact dismissal of non-essential persounel (e.g., radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

  • IF using the Livingston Road route, ThEN contact Security to unlock the gates.

1.3 No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).

2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.

2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.

2.1.1 IF using the Primary Method of accountability, TthEN request that Security:

o Prepare for accountability.

o Commence evacuation of the Owner Controlled Area outside of the Protected Area.

a. GO TO Step 3.

Reference PMP-2080-EPP-100 Rev. 32 Page 23 of 61 Emergency Response

  • Attachment 4 Accountability Pages:

NOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or iimninent.

2.1.2 IF using the Alternate Method of accountability, THEN request that Security initiate the alternate method of accountability.

a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
b. Request that the Owner-Controlled area also be evacuated.

3 Contact Personnel Inside the Protected Area.

3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:

Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

Sound the Nuclear Emergency Alarm.

Make a Public Address announcement for personnel to report for accountability. Make the announcement two times. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."

IF the ER~s have not already been activated, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

Reference PMP-2080-EPP-l00O Rev. 32 Page 24 of 61 Emergency Response Attachment 4 Accountability Pages.

3.2 IF using the Alternate Method of Accountability, THEN direct ant Operator to perform the following:

o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

o Sound the Nuclear Emergency Alarm.

Make a Public Address announcement for personnel to use the alternate method of accountability. Make the same announcement two times. Anl example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."

3.2.1 IF the ER~s have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.

3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, ThEN make the following announcement two times:

"Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.

3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.

3.3.1 Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.

Reference PMP-2080-EPP-100 Rev. 32 Page 25 of 61 Emergency Response Attachment 4 Accountability Pages 4 Perform follow-up actions.

4.1 IF the Primary Method of Accountability was used, THtEN o Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.

  • Coordinate with Security to locate any missing individuals.

4.2 IF the Alternate Method of Accountability was used, THEN a Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).

  • Coordinate with Security to locate any missing individuals.

4.3 IT the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:

a After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).

o Coordinate with Security to locate any missing personnel.

  • Public Address announcements as necessary.

S Dismissal or evacuation of personnel as necessary.

I-Reference PMP-2080-EPP-100 Rev. 32 Page 26 of 611 Emergency Response Pages:

Attachment 5 Evacuation 26 - 29 NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.

1 Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE was not entered).

  • 1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.

1.1.1 Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary 'for plant personnel.

1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.

1.2 IF a radiological release is in progress, ThEN consult with RP in determining whether evacuation should be delayed.

1.3 IF no new hazards would be introduced by evacuation, THEN evacuate personnel per Step 2.

1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, ThEN determine if these personnel should be evacuated or if they will remain on site.

  • Take _appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.

Reference PMP-2080-EPP-100 Rev. 32 Page 27 of 61 Emergency Response Attachment 5 Evacuation Pages29 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.

2 Site Evacuation 2.1 Rapid Egress 2.1.1 IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), ThIEN implement such evacuation by using the Rapid Egress Method.

a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.

Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is imminent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.

IF using the Livingston Road route, THEN contact Security to unlock the gates.

  • Request that the Owner Controlled Area also be evacuated.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

Reference PMP-2080-EPP-100 Rev. 32 Page 28 of 61 Emergency Response Attachment 5 Evacuation Pages:9

b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."

c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used (Livingston Road), and as conditions warrant.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."

2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation. ___

  • Coordinate with the Security Shift Supervisor (and RP, if a radiological release is immninent or in progress) as to which evacuation route "(e.g.,
  • vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation. ___
  • Request that the Owner Controlled Area also be evacuated.
  • Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.____

RfrnePMI?-2080-EPP-100 Rev. 32 Page 29 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

2.3 Take any necessary follow-up actions.

2.3.1 IF pedestrian routes were used for evacuation, ThtEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.

2.3.2 IF pedestrian routes were used for evacuation, THEN coordinate with the BOF to arrange for an alternate means of evacuation for. those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.

I Reference PMP-2080-EPIP-100 Rev. 32 Page 30 of 61 I Emergency Response I Attachment 6 Terminating a UJE Pages:

1 IJE Termination 1.1 IF the conditions for the UBE no longer exist, and no escalation of classification is expected, THE*N perform the following:

1.1.1 Instruct operators to inform the MSP and BCSD that the event is terminated.

1.1.2 Instruct operators to:

  • Fax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.
  • Verify that the form was received by the State and County.
  • Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.

1.2 Inform both Control Rooms that the event is terminated.

1.3 Inform Security that the event is terminated (1118, 1119, 2005 or 2731).

1.4 Direct an operator to make a public address announcement that the UiE has been terminated per the SEC.

2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.

I Reference PMP-2080-EPP-100 Rev. 32 Page 31 of 61 I Emergency Response I Attachment 7 Notification of On-Site Personnel Pages:

1 31 -34 1 Notify Security

1. 1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.

1:1.1 if an ULE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.

a. Contact Time _ _______

1.1.2 if an Alert, THtEN instruct Security to notify personnel as prescribed in Section 5 of the ERO Phone Directory.

a. Contact Time __________

1.1.3 IF a SAL, THEN instruct Security to:

a Ready the Security Computer for accountability and prepare for subsequent evacuation.

  • Notify personnel as prescribed in Section 5 of the ERO Phone Directory (if not already performed for this emergency).
a. Contact Time _ _______

1.1.4 IF a GE, THEN instruct Security to:

a Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).

  • Notify personnel per instructions in the ERO Phone Directory (if not already performed for this emergency).
a. Contact Time

Reference PMP-2080-EPP-100 Rev. 32 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages:

31 -34 1.1.5 IF? conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.

a. Contact Time _________

2 Notify Chemistry and RP Technicians of the initial emergency classification.

2.1 Chemistry Contact Time____________

2.2 RP Contact Time__ __________ ______ ___

3 Make Public Address Announcements ___

CAUTION:PA announcements should not be made for some ICs (EALs) due to their CAUTION:sensitive nature. IF any of the H-2, Security ICs (EALs) have been used to classify the current event, THEN obtain SEC permission before making any PA announcements or sounding the NEA.

[ NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation, Attachment 5, are performed only once per event.

3.1 Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.

3.1.1 IF in a LUE, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Unusual Event has been declared due to (brief description) . Continue with your work and be prepared for future announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed __________

3.1.2 fI? in an Alert, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Alert has been declared due to (brief description) .'

IF emergency facilities are not already activated, THEN continue the announcement with:

"Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed

Reference PMIP-2080-EPP-100 Rev. 32 Page 34 of 61 Emergency ResponseI Attachment 7 Notification of On-Site Personnel Pages:

31 -34 NOTE: Aconaiiyis promderAttachment 4, Accountability.

3.1.3 11F in a SAE AND) accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two tunes:

"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)." ___

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646. _ _
2. Time announcements completed_____________

3.1.4 IF in a SAE AND) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability. ___

3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:____

"Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)." ___

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.___
2. Time announcements completed_____________

3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability. ___

RfrnePMP-2080-EPP-100 Rev. 32 Page 35 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages.

1 Accelerated Notifications to the NRC for Security Events.

1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:

1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.

1.1.2 Provide an accelerated verbal notification, without hard copy, to the NRC with the following information:

  • Site Name Emergency Classification, if determined.
  • Nature of the threat (briefly describe)

Type of attack (e.g., armed assault by land, water, or aircraft)

Attack status (i.e., imminent, in progress, or repelled)

RfrnePMP-2080-EPP-100 Rev. 32 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:9 INOTE: Notification to offsite authorities (State and County) must be completed within 15 minutes of classification.

2 Completing ENMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.

SNOTE: PARsardeeodusg Attachment 1, Protective Action Recommendations.

SCaution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies are developed using

~Attachment 12, "Manual Completion of EMD Forms".

2.1.1 IF a release is in progress due to the event, THtEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32 form(s).

NOTE: An EMD-32a is required within 15 minutes of:

  • An initial event classification, or
  • A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms".

RfrnePMiP-2080-EPP-100 Rev. 32 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: An EMD-32b is required to be transmitted with the EMD32a if:

SA General Emergency has been declared, or o There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event TIEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___

2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.

2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.

2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___

2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.

Reference PMP-2080-EPP-100 Rev. 32 Page 38 of 61 Emergency Response Attahmet 8Notiicaionof ff-Ste geniesPages:

Atahet8Ntfcto f f-ieAece 5-3 SNOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.

3 Phone Contacts and Faxes (usually performed by AE~s) 3.1i Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) inl the back of the Control Room (if not already performed). ___

3.2 Direct contact with the MSP using Attachment 9, MSP Notification. ___

3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification. ___

SNOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

3.4 Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification ___

3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification.___

3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification.____

4 Follow Up Notifications 4.1 UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 30 minutes from initial notification) per step 2.1.

RfrnePMP-2080-EPP-i00 Rev. 32 Page 39 of 61 ReferenceEmergency Response]

Attachment 8 Notification of Off-Site Agencies Pages:

35 -39 4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12. ___

The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.

The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.

4.3 IF a release is in progress due to the event THEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.

4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.

Reference PMP-2080-EPP-100 Rev. 32 Page 40 of 61 Emergency Response Attachment 9 MSP Notification Pages:

40 -42 NOTE: Declaration of an emergency requires the notification of the Michigan State Police within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

1

Contact:

MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.

NOTE: The phone is the primary means for communicating the EMD-32 information.

NOTE: An EMD-32a is required within 15 minutes of:

,,The initial classification, or

  • A change of classification, or
  • A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.

An EMD-32b is required to accompany an EMD-32a:

  • if the declaration of a General Emergency is due to dose, or
  • if a PAR change is due to dose 2 Provide the following to the MSP:

o Provide the information from the EMD-32 form.

o Obtain the officers/dispatcher's name and record on table.

  • Inform the agency that the EMD-32 will be faxed.
  • 0 Request a callback (for authentication) and then hang up.

RfrnePMP-2080-EPP-100 Rev. 32 Page 41 of 61 RefeenceEmergency Response a For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.

0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000 /____I____ ___ /_____

Initials Time Initials Time Person Contacted MSP Person Contacted:___________________

Call Back Call Back I Bridge established:____________________

_____________Time IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

o Write the question aObtain the response and get approval aProvide the response to the MSP.

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s): ___

a Make sure that the form is signed by the Shift Manager. ___

Orient the form(s), as shown on the fax machine, in either Control Room a IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ER~s.

Reference PMiP-2080-EPP-100 Rev. 32 Page 42 of 61 Emergency Response MSP Notification Pages:

Push the start button___

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

o MSP Operations Center: 8-1-517-241-6815 State EOC: 8-1-517-333-4987 BC EOG: 8-1-269-934-9023

b. IF the broadcast feature does not work AND the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

,, EOF: 8-284-2942 TSC: 2431 ENC/JIC: 8-284-5 892 OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the EOF will inform the Control Room that the EOF has taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.

RfrnePMP-2080-EPP-100 Rev. 32 Page 43 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification 43-45:

Pages:5 NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.

oOffsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

  • The dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.

Contact:

  • BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher. ___
  • IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7 141 and dial 4900 if the automated system answers.

o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.

o For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.

[NOTE: The phone is the primary means for communicating the EMD-32 information.

2 Provide the following to the BCSD:

Provide the information from the EMD-32 form.

  • Obtain the officers/dispatcher's name and record on table.

Inform the agency that the EMD-32 will be faxed.

Reference PMP-2080-EPP-100 Rev. 32 Page 44 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:5 OFF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. _____/_____ _____/_____

Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-983-7141)

Person Contacted BCSD Person Contacted:___________________

Call Back Call Back / Bridge established:__________________

Time IF the BCSD has additional questions THEN fil out Data Sheet 4, Request For Additional Information.

SWrite the question e Obtain the response and get approval Provide the response to the BCSD. ___

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s):

o Make sure that the form is signed by the Shift Manager. ___

  • Orient the form(s), as shown on the fax machine, in either Control Room
  • IF the EMD-32 have not already been faxed, THEN Push the red Blast button to broadcast the form(s) to the State, County and ERFs.

RfrnePMP-2080-EPP-100 Rev. 32 Page 45 of 61 RefeenceEmergency Response 43-45:

Attachment 10 Berrien County Sheriff Notification Pages:5 Push the start button ___

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

o MSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987

,, BC EOC: 8-1-269-934-9023

b. IF the broadcast feature does not work AN]) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

a EOF: 8-284-2942 o TSC: 2431

,o ENC/JIC: 8-284-5892 a, OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the EOF will inform the Control Room that the BOF has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge.____

Reference PMP-2080-EPP-100 Rev. 32 Page 46 of 61 Emergency Response Attachment 11 NRC Notification Pages:

46 - 47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.

NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.

1

Contact:

a IF 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-00 1-001, Prompt NRC Notification.

o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below.

  • Inform the NRC of the event in progress Provide the information on Data Sheet 3, Plant Status a IF the N-RC has additional questions THEN fill out Data Sheet 4, Request For Additional Information.
  • Write the question
  • Obtain the response and get approval
  • Provide the response to the NRC.

Ask the N-RC for the Event Notification Number (EN).

RfrnePMP-2080-EPP-100 Rev. 32 Page 47 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:7 0FF-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION _______ ESTABLISHElD CLOSEOUT NRC Operations 1-301t-816-5100 Center 1-301-951-0550 /_____ _____I___

1-301-415-0553 Initials Time Initials Time 8-1-301-816-5151 (FAX) ______________

Person Contacted NRC Person Contacted:___________________

Continuous contact will be required for an Alert, Site Area Emergency of General Emergency.

Event Notification Ask NRC for the EN:________________

Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 .WHENthe BOF has established communication with the NRC, THlEN the BOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.

RfrnePMP-2080-EPP-100 Rev. 32 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:

Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.

NOTE: An EMD-32a is required within 15 minutes of:

  • An initial event classification, or
  • A change of classification, or
  • A change of PAR 1 Manual completion of hard copy EMID-32a, "Nuclear Plant Event Notification":
  • Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant
  • Record name of Plant Communicator(s) o Indicate location where this form is being generated (Calling From)
  • Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number"
  • Indicate "Current Classification" S Indicate date and time of current classification was declared
  • Indicate "Reason for Classification"
  • Record the IC Number
  • Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" a Indicate any current "Protective Action Recommendations"

RfrnePMP-2080-EPP-100 Rev. 32 Page 49 of 61 RefeenceEmergency Response Pages:

Attachment 12 Manual Completion of EMD Forms 48 -50 a Record PAR basis

  • Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP- 108, Initial Dose Assessment, Attachment 1.

a Forward completed form to Approver

  • Complete "Approved By", date and time
  • Forward completed approved form -for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:
  • A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMID-32b, "Nuclear Plant Event Technical Data":
  • Indicate whether this is an "Actual Event" or a "Drill"
  • Record "Nuclear Power Plant" as Cook Nuclear Plant
  • Record name of "Plant Communicator"(s)
  • Indicate location where this form is being generated (Calling From)
  • Record "Call Back Telephone Number" 269-465-5901 Ext. 1088
  • a. Record "Plant Message Number"
  • *Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.

o Record "Reactor Information"

  • Record "Plant Status/Additional Information"

efrnePMJ'-2080-EPP-100 Rev. 32 Page 50 of 61 RefeenceEmergency Response 2 Manual Completion of EMD Forms 48 - 50 IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas

  • IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.

o Forward completed form to Approver

  • Complete "Approved By", date and time
  • Forward completed approved form for transmission

RfrnePMP-2080-EPP-100 Rev. 32 Page 51 of 61 RefeenceEmergency Response IAttachment 13 Activation of FLEX Phase 3 Page:

NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.

WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).

WHEN communication is established THEN provide the following information:

  • Indicate whether this is an "Actual Event"' or a "Drill" o Plant name and affected units
  • Your name and position/title
  • The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).

3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:

Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" and associated travel routes to the site.

Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Iinforming the SAFER SCC Team Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging.Area "B".

4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

5 From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S Reference PMP-2080-EPP-100 Rev. 32 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:

~52 - 53 Unit No: Date: Time:

Data Taken By: Data Reviewed By:

SNOTE: When redundant :indication exists, record most severe condition.

1. Containment Temp. 5. Intermediate Range _____AMPS
2. Cont. 112 Concentration 6. Containment Pressure _______PSIG
3. RWST Level 7. Containment Sump Level
4. Source Range _______CPM 8. Containment Level
9. Containment High Range Radiation Level Upper/Lower /R/HR
10. CTS Pumps East ON / OFF West ON / OFF
11. RHR Spray Flow East ____ GPM West____ _

GPM

12. SI Flow North ___GPM South ____ GPM
13. BIT Flow LP 1 ___GPM LP2 ___GPM LP3 ___ GPM LP4 ____GPM
14. Accum Pressure LP1 ____PSIG LP2 ___PSIG LP3 ____ PSIG LP4 ____PSIG
15. RHR Injection Flow East ____GPM West____ _ GPM
16. RCP Status LP1 ON /OFF LP2 ON /OFF LP3 ON/IOFF LP4 ON /OFF
17. RCS Pressure ______PSIG 23. PRT Level
18. Charging Flow ______GPM .24. PRT Pressure ________PSIG
19. PZR Liquid Temp. __ ___

0F 25. PZR Cycling Htrs ON / OFF

20. PZR Steam Temp. 26. PZR Backup Htrs ON / OFF
21. PZR Level 27. Letdown Flow ____ ___GPM
22. PRT Temp. 28. Saturation Margin oF

Reference PMP-2080-EPP-100 Rev. 32 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:3 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4

29. Wide Range T Hot _____ ___ F
30. Wide Range T Cold
31. S / G Pressure ________PSIG _______PSIG ________PSIG
32. S /0G N. R. Level
33. S I G W .R. Level
34. Steam Flow (pph x 106)"
35. Feed Flow (pph x 106)
36. Aux. Feed Flow (pph x 103)
37. MSIV Status OPEN ICLOSE OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE
38. CST Level Ft
39. Steam Dump ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE AVAILABLE / UNAVAILABLE
40. East ESW ___ I _/ 50. East CCP _________ / ____
41. West ESW _________ / ____ 51. West CCP / ____
42. East CCW __________ / _____ 52. TDAFP ________ I ______/
43. West CCW ________ I ______/ 53. EMDAFP ________ ______/
44. East CTS _______ _____/ 54. WMDAFP _________ / ____
45. West CTS _________ / ____ 55. AB Diesel _________ / ____
46. North SI __________/ _____ 56. CD Diesel _________ / ____
47. South SI __________/ _____ 57. Normal Res. __________/ _____
48. East RHR _________ / ____ 58. 12 EP /
49. West RHR /

RfrnePMP-2080-EPP-100 Rev. 32 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:7 Unit No: _____Date: ________ Time:

1. Emergency Classification Time Declared

______Unusual Event

_______Alert

________Site Area Emergency

______General Emergency

2. Have notifications been completed?
a. Michigan: yes / no /in progress Time: ___
b. Berrien County: yes I no Iin progress Time: ___
c. NRC: yes I no Iin progress Time: ___
d. DC Cook Personnel: yes I no / in progress Time: ___
3. Protective Actions:
a. Local area evacuation yes I no Time: ___
b. Site evacuation yes / no Time: ___
c. Accountability yes / no Time: ___
d. Site closed to visitors yes I no Time: ___
4. Offsite protective action recommended:
  • , Evacuation: yes / no areas: _____ Time: ___

.Shelter: yes I no areas: _____ Time:

RfrnePMP-2080-EPP-100 Rev. 32 Page 55 of 61 RefeenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:

54 5

5. Plant Operational Status
a. Reactor trip: yes i no time: ____ Trip signal: ______________
b. ESF Status:
c. EOP Status:
6. Plant Status
a. Chronology of Events Time Event
b. Current Plant Conditions

Reference PMVP-2080-EPP-100 Rev. 32 Page 56 of 61 Emergency ResponseI I Data Sheet 2 Emergency Turnover Checklist Pages:7

c. Potential for Plant Degradation
d. Mitigating Actions Taken or Underway
7. Plant Radiological Conditions
a. Jn-plant/Onsite Radiological Conditions
b. Potential for Offsite Release of Radioactivity Airborne Water
8. Injured or Contaminated Personnel:

Name Employer Status

9. List of Personnel Currently Assigned to Contingency Teams: (Facsimile may be attached)

Name Team # Task DescriptionlTime Dispatched

/

/

/

/

/

/

Reference PMP-2080-EPP-100 Rev. 32 Page 58 of 61 Emergency Response Data Sheet 3 Plant Status Pages:9 NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.

Reactivity Control

  • Reactor Subcritical? Yes No o, Emergency Boration initiated? Yes No
  • Adequate Shutdown Margin? Yes No RCS Inventory Control - check all that apply for the current plant conditions
  • Inventory makeup controlled by: (Identify all pumps injecting into RCS)

CVCS - Normal Charging Charging Pumps via BIT (High Head SI)

Safety injection pumps (Intermediate Head SI)

RUR Pumps (Low Head SI)

Other: ____________

RCS Pressure Control

  • Pressurizer PORVs Closed? Yes No

,, Pressurizer Safeties Closed? *Yes No

Reference PMP-2080-EPP-100 Rev. 32 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages:

  • RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP ________

Natural Circulation Feed and Bleed Decay Heat Removal System (RITR)

RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G - Condenser Dump Valves ________

S/G - Atmospheric Dump Valves SIG - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RUR)

SIG' Inventory Control - check all that apply for the current plant conditions Main Feed Water _________

Auix. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _

Containment Control

  • , Ice Condenser Doors OPEN? Yes No

,, Hydrogen Recombiners/Igniters ON? Yes No

  • Containment Isolation Valves fail to CLOSE? Yes No o, Phase A Actuation? Yes No Additional Information

Reference PMP-2080-EPP-100 Rev. 32 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages:

Request for additional information Source of request: El MSP

[21 BCSD El NRC El Other_______ ___

Date ____ __Time ____

Question:

Response

Response approved by: _________________________

SEC or designee Response delivered to requesting organization:

Date Time ____ __by Whom

Reference PMP-2080-EPP-100 Rev. 32 Page 61 of 61 Emergency Response DataShet ontngecy 5 Tam rackng ormPage DataShet ontngecy 5 Tam rackng orm61 PERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED __________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED

  1. Turbine Building. ERAEO

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Alteration  !,Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.

This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review- is not required for this procedure.

10 CFR 50.54(q) review was performed and documented. The number for .the 50.54(q) is annotated inl the workflow for this revision.

The conclusion was that the changes in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.

Replaced TSOC with NEST throughout The TSOC has been replaced by the NEST. The the procedure. TSOC has been removed from site.

This change was not margin marked.

GT 2015-15895 Step 1.1 was reworded. Removed unnecessary information and Removed "(under the direction of the abbreviations. The term "an emergency" SEC)" and "Unusual Event (U-E), Alert, encompasses all Emergency Classifications.

Site Area Emergency (SAE) and General The meaning of the step is unchanged.

Emergency (GE) after an emergency has been declared." One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

Reviewer comments.

Purpose and Scope step (1.2 previously) Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "Once turnover of SEC procedure.

duties has been completed, the SM retains the overall responsibility of One of the purposes of this revision is to remove directing and implementing emergency unnecessary wording that can distract the users and abnormal procedures to bring the from taking necessary actions or making required unit(s) to a safe condition." communications.

Reviewer comments.

Office Information for Form Tracking Only - Not Part of Form Ths is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval. Page 1 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Purpose and Scope step (1.3 previously) Unnecessary statement that is not a purpose or was removed. This step made the scope statement and adds nothing to this statement that "The CR will retain procedure.

responsibility for Public Address (PA) announcements and Nuclear Emergency One of the purposes of this revision is to remove Alarm (NEA) activation throughout the unnecessary wording that can distract the users emergency." from taking necessary actions or making required communications.

Reviewer comments.

Purpose and Scope step (1.3.1 Unnecessary statement that is not a purpose or previously) stating, "Others may use the scope statement and adds nothing to this PA as directed by procedure (Security, procedure.

RAG, etc.)." was removed.

Reviewer comments.

Step 1.4 stating; "The steps in this The step is not a Purpose and Scope.

procedure are listed in the preferred order of performance for maximum Reviewer comments.

efficiency. However, the steps may be performed in a different order." was No margin markings were used for these changes.

moved to the beginning of the "Details" section, prior to step 3.1, as a Note.

Previous Purpose and Scope step 1.5 is Step renumbering due to removal of steps.

now step 1.2 due to removing steps 1.2, 1.3 and 1.4. No margin markings were used.

Added ORO and SEC-TSC to definitions Not previously defined.

section. -Reviewer comment.

Operations Training Comments. This section was The Details section was completely reorganized to provide clearer direction of actions.

reorganized. The subsections (3.1, 3.2, The items were organized in the order that they 3.3, 3.4, 3.5) were added to the Table of would normally be performed. Incorporated Contents. applicable steps from OHI-2080.No actions were removed from the procedure.

No margin markings were used for these changes.

GT-20 15-8402-1 AR 2014-14572-5 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 2 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 32

Title:

Emergency Response Step 4, Final Conditions, added These changes align this procedure with the comments section, and signature and date requirements of PRC-001.

blanks for Verified Complete, Independently Verified and Reviewed Reviewer comment.

By. , Evacuation:

  • Added signoff blanks to action steps and removed blanks from message Reviewer comment.

steps.

Removed Attachment 9, Drills and- This procedure provides guidance for actual Exercise. emergency conditions; therefore the inclusion of guidance for drills and exercises is inappropriate.

Deleted step 3.3 which referred to PA Drill and exercise guidance is contained in RMT-announcements during drills and 2080-EPP-500.

  • exercises.

One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

GT 2014-15961-1 1 (REV 31 Att 12), This action for the STA is not necessary as the Removed note and step, stating that the control room will be in direct phone contact with STA should perform the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the NRC and will provide necessary and requested notification to the NRC and should fill information. PMP-7030-001-001 notes that the out PMP-7030-00 1-001 datasheet, datasheet can be done as "time permit".

Therefore all actions are directed by PMP-7030-001-001 and are not required in this procedure.

One of the purposes of this revision is to remove unnecessary wording that can distract the users from taking necessary actions or making required communications.

GT-20 14-8280-1 Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMIP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 3 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP- 100 Rev. No.: 32

Title:

Emergency Response Added the following to the Definitions Incorporated from OHI1-2080, Conduct of and Abbreviations: Operations (Emergency Organization)

AEO, BOP, CONTINGENCY DIRECTOR, CONTINGENCY TEAM, AR 2014-14572-5 CONTROL ROOM COMMUNICATOR, CONTROL ROOM LIAISON, CRITICAL SAFETY FUNCTION STATUS TREES, ERAEO MITIGATION TEAM, NRC, OFF-SITE COMMUNICATOR, PACHMT, RO, RP, SRO, STA, US, AND WCC-SRO.

Added DS 5, Contingency Team Incorporated from OHI1-2080, Conduct of Tracking Form. Operations (Emergency Organization)

AR 2014-14572-5 , Added "main body of Clarifying information for user.

procedure" to steps 3.1.3 and 3.1.5.

Editorial Correct Criteria q, (Rewording (including addition or deletion of words) of steps, NOTES, or CAUTIONS for clarification, which clearly does not change the methodology or intent of the steps.)

____________________________GT-2015-1417 1-1 Added Attachment 13, Activation of This attachment provides guidance for requesting FLEX Phase 3. phase 3 equipment per the SAFER Plan.

____________________________No Marginal Markings were used.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 4 of 5

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev..No.: 32

Title:

Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1/4/16 Effective date week of 1/11/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions Office Information for Form Tracking Only - Not Partof Form

'This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 5 of 5

IMPLEMENTING PROCEDURE PMP-2080-EPP-1 00, Emergency Response, Revision 33

Doc No.: PMP-2080-EPP-100 Rev No.: 033

Title:

EMERGENCY RESPONSE Alteration Cat.: Minor Revision CD 1/50.59:

PORC Mtg. No.:

CARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change End: N/A Effective Date: 2/12/2016 12:00:00 AM Approvals Na 111 ReviewlApproval Type/Capacity [1111 Becvar, Robert J i (s228955) 1lValidation Review ~02/03/2016 09:48 Etheridge, William 1110/9261:7 (1266712) 1 Cross-Discipline Review:'OPERATIONS 1 020!01I22 Hart,9WilamE 1 Special Review: E-PLAN GROUP 102/10/2016 09:35 1

[Peterson, Gerald T11 j(i689988) il3 Technical Review 102/10/2016 10:31 Schrubba, Jennifer 11 (s245259) J7 Approval Authority 102/11/2016 09:51 Signature Comments

~Review of change is complete Special Review, a 50.54(q) #16-03 was performed by Becvar and Simpson, EP.

[Minor change!

[Approved per Plant Manager, Jim Ross.I

--- W-'R PMLP-2080-EPP-100 Rev. 33 Page 1 of 61 Emergency Response Bife 1ll Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AM) SCOPE.............................................................3 2 DEFINITIONS AM) ABBREVIATIONS............................................ 3 3 DETAILS ........................................... ................................. 6 3.1 General Information.......................................................... 6 3.2 SM-SEC Checklist.............................................................7 3.3 Unaffected CR Checklist...................................................... 9 3.4 Shift Technical Advisor (STA) .......... ............................. ........ 10 3.5 Contingency Director......................................................... 10 4 FINAL CONDITIONS .............................................................. 11 5 REFERENCES ..................................................................... 12 : Protective Action Recommendations................................... 13 : Activation of ERONS..................................................17 : Dismissal of Non-Essential Personnel .................................. 19 : Accountability......................................................... 21 : Evacuation............................................................ 26 : Terminating a UiE..................................................... 30 : Notification of On-Site Personnel...................................... 31 : Notification of Off-Site Agencies ...................................... 35 : MSP Notification...................................................... 40 0: Berrien County Sheriff Notification ................................... 43 1: NRC Notification...................................................... 46

--- EtR* PMIP-2080-EPP-100 Rev. 33 Page 2 of 61 Emergency Response Reference IBill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognaizant Organization 2: Manual Completion of EMD) Forms ................................... 48 3: Activation of FLEX Phase 3........................................... 51 Data Sheet 1: PPC or PSS Control Room Data ...................................... 52 Data Sheet 2: *Emergency Turnover Checklist......................................... 54 Data Sheet 3: Plant Status ........................................................... 58 Data Sheet 4: Request For Additional Information...................................60 Data Sheet 5: Contingency Team Tracking Form .................................... 61

Reference PMiP-2080-EPP-100 ] Rev.33 Page 3 of 61 Emergency Response PURPOSE ALND SCOPE 1.1 This procedure provides Instructions to the Shift Manager acting as the Site Emergency Coordinator (SM-SEC), and to the Control Room (CR) for implementing a response to an emergency declared per PMP-2080-EPP- 101, Emergency Classification.

1.2 Terminating an event if the conditions for the UE no longer exist, and no escalation of classification is expected.

2 DEFINITIONS AMD ABBREVIATIONS Term Meaning AOP Abnormal Operating Procedure AFO Auxiliary Equipment Operator BCSD Berrien County Sheriff Department BOP Balance of Plant A Senior Reactor Operator assigned by the Shift Manager who performs Contigency accountability at the beginning of the event to ensure persons are Coningency accounted for and to quantify available resources. Also provides Directorsupervisory oversight and technical direction for the personnel assigned to the Contingency Team.

Includes RP and Chemistry Technicians, and Operators (Auxiliary Contingency Equipment, Utility, Makeup Plant) from the shift not assigned to other Team duties who are responsible for responding to the operations needs of the affected unit.

Control Room Usually a member of the Operations Department who comes to the Control Room whenever the Technical Support Center is activated and Communcatorestablishes communications with the TSC and EOF.

Control Room Ant available extra SRO or RO who acts as a single point contact for the Liaison Unit Supervisor to the Contingency Director, and the SM/SEC.

CR Control Room Critical Safety A set of flowchart diagnostic aids used to monitor the condition of critical Function safety functions and select appropriate Function Restoration Procedures to Status Trees restore safety functions that are challenged.

DAP Dose Assessment Program EAL Emergency Action Level

Reference PMP-2080-EPP-100 Rev.33 Page 4 of 61 Emergency Response Term Meaning ED) Emergency Director EMD-32 Nuclear Plant Accident Notification form ENC Emergency News Center EOC Emergency Operation Center EOF Emergency Operations Facility EOP Emergency Operating Procedure Operator(s) that will initiate preventative actions as required to support ERAEO Security are designated as Emergency Response Auxiliary Equipment Operators.

ERDS Emergency Response Data System ERF Emergency Response Facility ERONS Emergency Response Organization Notification System ERO Emergency Response Organization GE General Emergency HAB Hostile Action Based IC Initiating Conditions TIC Joint Information Center Consists of the standard crew compliment (US, RO and BOP) with the Mitigtion addition of an RO from the unaffected unit or an. extra RO who is Mtegamio responsible for placing the unit in a safe condition, during emergency conditions in accordance with approved plant procedures under the direct supervision of the affected unit's Unit Supervisor.

MSP Michigan State Police NEA Nuclear Emergency Alarm NRC Nuclear Regulatory Commission An operator (SRO/RO/qualified AEO) assigned to the shift assumes the Ofsierole at the S/E's discretion and ensures communications are established at an Alert or higher level, or as directed by the SM/SEC, Commnictorwith the Michigan State Police, Berrien County Sheriff's Department and NRC.

Off-site Response Organization refers to Berrien County Sheriff's ORO Department, Michigan State Police or local fire departments.

OSC Operations Support Center PA Public Address

Reference PMiP-2080-EPP-100 Rev.33 Page 5 of 61 Emergency Response Term Meaning PACHMT Post-Accident Contaixnment Hydrogen Monitoring team PAR Protective Action Recommendation PPC Plant Process Computer PSP Plant Status PAR PSS Plant System Server Local Area Network application for PPC data RAC Radiological Assessment Coordinator RO Reactor Operator RP Radiation Protection SAE Site Area Emergency SAS Secondary Alarm Station SEC Site Emergency Coordinator SIP Shelter In Place SM Shift Manager SM-SEC Shift Manager - Site Emergency Coordinator SRO Senior Reactor Operator STA Shift Technical Advisor TSC Technical Support Center TSC-SEC Technical Support Center -Site Emergency Coordinator NEST Nuclear Engineering Services & Technology Building IJE Unusual Event US Unit Supervisor WCC-SRO Work Control Center - Senior Reactor Operator

Reference [ PMP-2080-EPP-100 Rev.33 page 6 of 61 Emergency Response 3 DETAILS NOTE: *Steps in this procedure that do not apply to the current classification may be marked N/A.

  • The steps in this procedure are listed in the preferred order of performance. Steps may be performed in a different sequence.

3.1 General Information 3.1.1 SM-SEC implements this procedure until relieved of SEC duties.

3.1.2 Notification duties, under the direction of the SM-SEC remain with the CR until relieved of the duties by the EOF.

3.1.3 The following actions shall not be delegated by the SEC (Command &

Control Function):

  • Classification of the emergency.
  • Directing the notification of offsite officials.
  • Approval of PAR to offsite emergency management agencies.

3.1.4 Declaration of an emergency requires the notification of the MSP and BCSD within 15 minutes. Notification of the NRC follows state and county notification and in all cases must be completed within one hour.

3.1.5 The OSC, TSC, and the EOF are required to be activated at an ALERT classification or higher. The TSC and OSC will not be activated on site if the security event pager code is used.

3.1.6 PA announcements for protective measures implemented during security events may be modified or omitted as conditions warrant (e.g., omitting announcement for accountability, if dismissal of non-essential personnel has already taken place.)

3.1.7 Once phone communications are established with off-site agencies, it is probable that the agencies contacted may request continuous communications. This should be supported, as resources become available.

The use of Operations Department staff is recommended.

Reference PMP-2080-EPP-100 Rev.33 Page 7 of 61 Emergency Response 3.2 SM-SEC Checklist NOTE:

  • The following steps are repeated for each classification upgrade.
  • A new EMD-32A is required within 15 minutes of each subsequent classification upgrade.

3.2.1 Inform Unit 1 and Unit 2 CR personnel of the event classification and that the SM has assumed the position of SEC.

3.2.2 Direct the Unaffected Unit (or Unit 1 if a dual unit event) to perform Step 3.3 of this procedure.

3.2.3 IF the emergency response facilities have been activated TILEgN establish communications with emergency response facilities using the Managers' Bridge.

NOTE: Actions already taken in SPP-2060-SFJ-216, Plant Response to a Security Threat, need not be repeated in this procedure (e~g., protective measures such as evacuation).

Activation of the ERONS includes activating the Emergency Response Facilities.

3.2.4 if at Alert or higher, (OR UE at SEC discretion), THEIN direct the Unaffected Unit (or Unit 1 if a dual unit event) to activate the Emergency Response Organization Notification System (ERONS) per Attachment 2, Activation of ERONS. (Performed only once per event).

NOTE: Accountability and subsequent evacuation are required at a SAE or higher for non-essential personnel. SEC discretion should be used for these activities when taking these actions would jeopardize the safety of personnel (e.g.,

hostile force, radiation release, toxic spill, etc.).

3.2.5 if at UE or Alert and degrading/hazardous conditions warrant, THEN use SEC discretion to Dismiss Non-Essential Personnel from the site per Attachment 3, Dismissal of Non-Essential Personnel (performed only once per event).

3.2.6 JiF any H-2 ICs (Security EALs) were used to classify the current event, THEN implement actions in accordance with SPP-206O-SFI-216, Plant Response to a Security and continue in this procedure.

3.2.7 IF in a SAE or GE AND) personnel have not been dismissed THLEN order Site Evacuation using Attachment 5, Evacuation, (performed only once per event).

3.2.8 IF in a SAE or GE, (or at SM-SEC discretion), THEN implement Accountability using Attachment 4, Accountability, (performed only once per event).

3.2.9 IF in a GE, THEN verify a Protective Action Recommendation is developed using Attachment 1, Protective Action Recommendations.

3.2.10 Assign an individual to complete Data Sheet 3, Plant Status.

3.2.11 WHEN the TSC-SEC or EOF-ED reports for duty, THEN conduct turnover and transfer Command and Control Function using Data Sheet 2, Emergency Turnover Checklist.

3.2.12 Upon completion of turnover, inform both control rooms that the Command

& Control Function has been transferred to the SEC (or ED, as applicable).

3.2.13 IF in a UIE and conditions warrant AND the SM-SEC has Command &

Control Function, THEN terminate the UIE using Attachment 6, Terminating a UIE.

3.2.14 IF in an Alert, or higher AND conditions warrant AND SM-SEC has

  • Command & Control Function, THIEN terminate the event using RMT-2080-EOF-002, Emergency Termination and Recovery.

3.2.15 WHEN 10 CFR 50.54(x) or 10 CFR 72.32(d) are invoked, THEN ensure communications to the NRC are performed per PMP-7030-00 1-001, Prompt NRC Notification.

Reference PMP-2080-EPP-100 Rev.33 Page 9 of 61 Emergency ResponseI 3.3 Unaffected CR Checklist 3.3.1 WHtEN directed by the SEC, TILEN verify that ERONS has been activated per Attachment 2, Activation of ERONS, (performed only once per event). ___

3.3.2 Notify Site Personnel of the emergency classification using Attachment 7, Notification of On-Site Personnel.

3.3.3 Notify Offsite Authorities of the emergency using Attachment 8, Notification of Off-site Personnel. ___

3.3.4 Assign an individual to start the Dose Assessment Program (DAP). ___

IF a radiological release is in progress due to the emergency, TI{EN perform PMP-2080-EPP- 108, Initial Dose Assessment. ___

3.3.5 TSC Ventilation

a. IF any of the following conditions are present: ___

,, The emergency involves a loss of coolant accident

,, The Control Room Pressurization System has been activated A valid Safety Injection signal TILEN verify 12-101-TSC-EM, 12-HV-TSC-FIL Unit Damper, in Emergency Mode.

b. Record the Emergency Mode start time on the placard located below the switch.

NOTE: Not all portions of Data Sheet 1, PPC or PSS Control Room Data, need to be completed; coordinate with requesting facility (usually TSC) for desired information.

3.3.6 IF the PPC or PSS are inoperable THEN complete portions of Data Sheet 1, PPC or PSS Control Room Data, every 15 minutes, or as otherwise specified by requesting facility until the PPC and PSS are operable.____

Transmit Data Sheet 1, PPC or PSS Control Room Data, to requesting facility (usually TSC).

Reference I PMP-2080-EPP-100 [ Rev.33 Page 10 of 61 Emergency Response 3.3.7 Verify ERDS for the affected Unit is operational and transmitting data to the NRC within one hour of an ALERT or higher declaration___

3.4 Shift Technical Advisor (STA) 3.4.1 Reports to the Control Room in the event of an emergency or off-normal event.

3.4.2 Provides an independent assessment of conditions present and actions taken.

3.4.3 Reports to the SM and acts in an advisory capacity.

3.4.4 Implementation and monitoring of Critical Safety Function Status Trees in the event that the Emergency Operating Procedures (EOPs) are implemented.

3.4.5 Ensures that the Emergency Plan is being implemented at an emergency action level appropriate to plant conditions by independently classifying the event.

NOTE: The Contingency Director position is filled by an SRO. The WCC-SRO would normally, at the discretion of the SM, fill the role of the Contingency Director.

3.5 Contingency Director 3.5.1 The Contingency Director is resp~onsible for the industrial and radiological safety of personnel dispatched from the Control Room.

3.5.2 The Contingency Director performs the following tasks.

o Perform accountability at the beginning of the event to ensure persons are accounted for and to quantify available resources.

  • Provide the supervisory oversight and technical direction for the personnel assigned to the Contingency Team.

o Logging personnel dispatched from the Control Room on Data Sheet 5, Contingency Team Tracking Form.

  • Provide briefings for the personnel dispatched from the Control Room on the radiological and hazardous environmental conditions that may exist in the plant.

Reference PMP-2080-EPP-100 [ Rev.33 Page 11 of 61 Emergency Response Provide updates on the plant conditions to personnel dispatched out of the Control Room as appropriate.

NOTE: Several sets of anti-C's are available in each Control Room. Anti-C's and dose rate meters are available in the locker just outside and to the west of the SM/TSC complex.

Specify and ensure that the proper protective clothing and dosimetry is provided for the Contingency Team members.

  • Provide the TSC, after it's been declared operational, with the logged information of those Contingency Teams currently outside the Control Room.
  • WILEN accountability is directed, TthEN provide a list of Contingency Team members to the TSC.
  • Inform the SM of teams in the field, including the ERAEOs, prior to moving the Contingency Team to the OSC.

o Coordinate the move of personnel to the OSC when directed by the SM.

Be cognizant of radiological conditions for briefing purposes and shall notify personnel already dispatched from the Control Room of changing conditions as necessary.

4 FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.

Record any comments below (include document numbers for corrective actions):

Verified Complete By: Date: / I/_

Performer Independently Verified By: Date : I /_

Reviewed By: Date: I /__

Operations Shift Manager I designee

Reference [ PMP-2080-EPP-100 Rev.33 Page 12 of 61 Emergency Response S REFERENCES 5.1 Use

References:

5.1.1i PMP-2080-EPP-10I, Emergency Classification 5.1.2 PMP-2080-EPP-108, Initial Dose Assessment 5.1.3 RMT-2080-EOF-O01, Activation and Operation of the EOF.

5.1.4 RMT-2080-EOF-002, Emergency Termination and Recovery 5.1.5 SPP-2060-SFI-2 16, Plant Response to a Security Threat 5.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 5.1.7 PMP-7030-001-001, Prompt NRC Notification 5.1.8 EPP-2080-ERO-002, Emergency response Organization Notification System Activation and Testing 5.2 Writing

References:

5.2.1 Source

References:

a. Cook Nuclear Plant Emergency Plan
b. SPP-2060-SFI-203, Security Actions During Emergency Conditions 5.2.2 General References
a. Michigan Emergency Management Plan ,
b. NRC Regulatory Issue Summary, RIS-2002-21
c. NRC Regulatory Issue Summary, RIS-2004-13
d. NRC Bulletin 2005-02

Reference PMIP-2080-EPP-100 Rev.33 Page 13 of 61 Emergency Response Attachment 1 Protective Action Recommendations Pages:

NOTE: In selecting a PAR, consider the radiological release characteristic (continuous release due to the event, which cannot be controlled, vice a short-term "puff" release that can be controlled/stopped - e.g., containment pressure relief).

NOTE: DO NOT revise protective actions such that protection is reduced for areas already addressed inl previously issued PARs. For example, if evacuation was recommended for Area 1 in a previous PAR, do not revise this recommendation to sheltering for Area 1 in any subsequent PAR.

1 PAR Development 1.1I Proceed through a flowchart in this attachment to develop a PAR.

The first PAR is developed using the "Initial Protective Action Recommendation" flowchart.

o All PARs after the first are developed using the "Follow up Protective Action Recommendation" flowchart.

2 Issuing a PAR 2.1 After a PAR is developed, SEC judgment should be applied as necessary in altering the PAR from that determined by use of the flowchart.

2.2 Ensure that the appropriate PAR boxes are checked on the EMD-32a form.

2.3 Ensure that the GE and PAR are verbally transmitted to the State, and that the EMD-32a (and EMD-32b, if GE is due to dose considerations) is/are transmitted to offsite agencies per Attachment 8, within 15 minutes of the GE/PAR declaration, or PAR change.

Reference [ PMP-2080-EPP-100 Rev.33 Page 14 of 6j Emergency Response Attachment 1 Protective Action Recommendations 13-1Pages:~

Initial - Protective Action Recommendations

ENCY been declared? N-.(o PAR rqie Yes ISthis a R.APIDl¥ PROG3RESSING3 SEVERE ACCIDENT ?

(If the conditionsfor a Rapidly ProgressingSevere Accident cannot be irrmediately confirmed, then ANSWER.,..No.)

1. is there a toss of containment per EAL 3.21 or 3.31 N*

AN__D Containment High Range Radiation Monitors are greater than IOO0R/HR?

OR

2. The conditions for EAL. R-l have been met?

J YeS Yes I SHELTER Recommend RAPID EVACUATION. SRecommend ACTION2 on HOSTILE(Column Recommend INITIAL SHELTER IN PLACE. EVACUATION* (Column 3 on PAR (Column i on PAR Table labeled "RAPID"} (i, z,s iPAR Table labeled "HAB SHELTER") Table labeled INITIAL") 11,z1 (ILzI

  • SHELTER INPLACE (SIP) 2 miles
  • Evacuate 2 mile radius,
  • Evacuate areas 2-10 miles radius, *Evacuate areas 2-5 miles

. Clear lake area to 5 miles, downwind, downwind,2*mile radius,

  • Evacuate
  • All other areas MONITOR &
  • All other areas MONITOR &
  • All other areas MONITOR &

PREPARE PREPARE PREPARE

/ END of Initial PAR Flowchart t

I 2, 4, ariddcear lake areas 6& 7 Areal1, 2 and dlear lake area 6 Ara1Area 1, 2, 3, and dlear lake area 6 236.25to 303.75 Areal, 2,3, 4, 5anddlear lake areas 6 sudArea1, 2, 3 anddcear lake area 6 213,75to 348.75 Areal1, 303.75 to 236.25 Areal, 2, 3, 3, 5arddclca lake 4 and clear,-ke area6areas 6& 7 dar.Mal1, 3 and clear lake area 6

.348.75 to 56.25 Area 1, 3, 5 and clear lake areas 6 & 7 laeAreal1, 3 and clear lake area 6 ArA r6ea 1 and dlear lake area 6 56.25 to 168.75 Mreal1, and clear lake areas 6& 7

2. Area 6 is t~he lake area at 0 to 5 mile radius; Area 7 is thle lake area 5 to 10 mile r-adiu~s.

Notes: 1. Lake areas are "cleared" for either evacuation or sheltering.

3. IF Impediments exist as determined by the Offlite. Responlse Organizations, the OR0 may shelter in place.

4,

Follow Up - Protective Action Recommendations SEV]ERE ACCJIDNF deda* liii, AL El bedm.*4 Ca--=cooli+/-2g .s utlstar~d .,AND Comaiim~

  • .M e1 .a20 1/7 driag tla hiiial PAR v'a1ka*?

CommmflHDEXCU..O* HOSTILE ACTION a$~I 5*~nn FOLLOW L'P EVACUATION.

StHELTt ERIN ,LCE.

domv~i,6areaa ' Empad'-< ljar (CZahlmI 2 cmAP.R TabIh Llabk-d "HA..P *.'m ita*' s.lp4 3 lzt pr-.i"a.

t ~otmu ~

nmahiz

  • addi SmtrER.") *'=" *:mndaadim
  • adafld.iticm.t ,.asA*.ADD a:ts. iADD Cvhmn I ot PA,-R Ts*bl
  • SME(]LTI[L- I*A (SCIj'V2 C¢*n~3 amP~AR T~ 1beL~bd "OLILOW

-toIxort*R.miks

  • Id~a ttii, at~e UP-- tz pz~bnre~mtmdi .) ':" :.

T

  • AU1othsr a-=m M.N-ITOR &
  • E,,acts 2 mi* ra.4i~
  • *,.cts2-i am PiREP_4,E
  • E~ratem arez 2-5 mil.; da xxndi
  • £Emtaxvatssrs 2-10 n*1 *odnzl*Alit&***'T
  • Al odi r~h as MONITIOR & *PIPR t znant**iztsS * [* .. ... ..

PRIEPA1[

    • Rztmm PA.R's b.* t DO SE .ASSESSIME'T ta az-- sha1h0 mils *_ h.

Area 1, z, 4, anK *ci ariie area 0& 1 Area 1, ania clear .la]e area 6

.Z Area 1, 2, 13,. and clear lake area 6 213.75 to :236.25 Area 1, 2, 3, 4 art clear lake areas 6 & 7 Ar*ea 1 236.25 to 303.75 Areal1, 2, 3, 4, 5 anddlear lake areas 6 Ar'ea 1, 2, 3 anud ear lake area 6 303.75 to 348.75 Area 1, 3, 5 and dear lake area 6 dlear Area 1, 3 anidcear lake area 6 348.75 to 56.25 Are~al, 3, 5 anddcear lake areas 6& 7 lake Area 1, 3 anddcear lake area 6 Area6 Area1 and. dear lake area 6 56,25 to168.75 jArea1, andclear lake areas 6& 7 Notes: 1. Lake areas are "cleared" for either evacuation or shelterin~g.

2. Area 6 is the lake area at 0 to 5 mile radius; Area 7 is the lake area 5 to 10 mile radiuts.
3. IF Impediments exist as determined by the Off~ite Response Organizations, the ORO may shelter in place.

Reference PMP-2080-EPP-100 Rev.33 Page 16 of 61 Emergency Response Pages Attachment 1 Protective Action Recommendations 13age16

_______________ Reference 3 EPA PAG TABLE* Michigan Application Proteactive Ati~on PAGi (projected dose) Comments Shdelrerin*-in~placc or i to 5 rc-r* Evariation~ 1er, for sore .situation,=, Fa cilirty operators will reoromnend cv ac u atin of the (13 rrSv t~o 53 m*v)i shc~tlir~Rrin-n pla co.) chould be- initiate-s eacuation at 1 rern' sheltering in public: over four dais= when proie-ceo os~e-is 1 rer (1 ~irrR5v plice- is ti-c prerogatice of thec 5tate- of S____________________ _________________________________ Michiga n~

5tupplermentary 5 iret" 53 nmSK. KI is rmot e*ffe-ctive iftaken prior t:o Thc s.ate of M'dichigan will im..plemnent projc-cted dose t.o exposture. Ma' require appro-.al of s'a~o irs HI plan: facility operator's ar,-inistra:--ion of proph:lactic c~ru* - child thy~roid fron- nmedical officials (or in ascoroa.ncewi h resort nmencation is implicit in dose KJ1 ex:posure .to iodine 4

established e* c~r* ercy plans. c tsrnation data, lh l:-..jt- qt¥"i the"~t :7lI.

l[;~l i"f.tl*t~l!I' 1m71-l  : 3t i;} i* ' J~tn,:

'l' 7*f-P ' *h it*&*tC tj.i zt . btt*

th t '!,i b~

tJ itl~e t ,.:fR .. t,*.K~-.l[.'

i, :* t fh4f~tJ t*fj' Ir .I 4 ,Jgtli3 t 4i ;t:t*.!lt'l ~~', ~  ? ~'~ 4 1 w

> t. 's..

I.,!! ts sf is7-13fl ssr~lr j i  ;)f/i.

.l

  • i:p*< 7s,.-is rI is'sl~ nf1lsit/-5>251;; 255 :si'ie-sf*! (lf s ht... si;Csy*. t2* i l *,l. I 5>12" 125

' *tmss

  • Pt 7

"-~.3 ,

> i1 OsC v..'32.it2 d.¢i.* .*-.,.

55>55> Z.;,.***

2*ThC*£ti ~ -.- '*~:l=ll:?"l}lT[ ' i::'>'t",itp.'.*'.t..fl~*-r*;::..** ?l*f'l

> P 1 lil.

<',t* f **

5 , CI'5:C55 5 >>55 ' 5 "'2'.2 5 5 sf15 5l1 15>1* 1'CEli m5>,* LIŽ ,

55 1-5>5'* i tsrs5V T: b 2- 52 4 >

Reference PMP-2080.-EPP-100 Rev.33 Page 17 of 61 Emergency Responsej Attachment 2 Activation of ERONS 17age18 INOTE: SEC judgment is used to determine which scenario will be used.

1 IF an Alert or higher classification has been declared, OR if the ERO is needed at a UE per SEC discretion, THEN activate the ERONS.

SNOTE: ERONS can be activated using any plant computer with internet access.

1.1 To activate ERONS:

  • Click the Everbridge icon on the desk top.

OR

  • IF computer activation is not successful THEN call Everbridge at 8-1-818-230-9797 or 8-1-877-220-4911. A person will answer. Explain why you are calling and the actions the Everbridge person should take.

1.2 Enter User Name (erons) 1.3 Enter Password (located in ERO brief case) and Click Sign In.

NOTE: 1) Code "911" scenario will direct ERO responders to their respective facilities in the TSC, OSC, EOF, and ENC/JIC.

2) Code "007" scenario, will direct ERO responders to report to the Buchanan Office Building if it is determined to be unsafe to report to the plant site. The EOF will activate and the alternate TSC and OSC will be manned. Personnel will remain in Buchanan pending further instructions by the SEC or ED.

1.4 To start a scenario, click on the Notifications tab at the top of the page.

1.5 Click on the Templates header to bring up a list of preprogrammed scenarios.

Reference PMIP-2080-EPP-100 Rev.33 Page 18 of 61 Emergency Response Attachment 2 Activation of ERONS 17age18 NOTE:. . ......

  • After a Notification i sents he screnautmaiclly~O goes bac toth Notificati tons ab whreth notificatio la~d4ilOPrsaSts I~sent outisl shw wt tetie wassent. ' ro 1.7 Click Send (located close to the botop of the screen). Noicaonhvebnset NOTE: Afcopter acNtifiation isnt senttescreen automatcallyEerrigoes backto81-the -99 or 8-1-877-220-4911. Person will answer. Explain why you are calling and the actions the Everbridge person should take.

f Reference PMP-2080-EPP-100 Emergency Response Rev.33 Page 19 of 61 Attachment 3 Dismissal of Non-Essential Personnel Pages:

19 -20 NOTE: SEC judgment should be used in making the decision to dismiss non-essential personnel from the site. Events where dismissal should strongly be considered are rapidly degrading conditions (core damage is occurring or imminent), large fire, or other conditions which, in the judgment of the SEC warrants such dismissal.

1 IF hazardous conditions are occurring or imminent AND no further hazard would be introduced by the dismissal of non-essential personnel, THEN dismiss all non-essential personnel from the site.

NOTE: Personnel assisting the ERG (such as a Failure Investigation Process (FIP)

Team) should be Radworker qualified (i.e., have a TLD).

1.1 IF personnel may be needed to assist the ERG (e.g., FIP Team), THEN arrange for utilization of such personnel. SEC judgment should be used in determining the type and amount of non-essential help that is needed.

1.2 IF radiological conditions may impact dismissal of non-essential personnel (e.g.,

radiological release in progress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

1.3 Contact the Security Shift Supervisor (2005 or 2731) to coordinate the dismissal of non-essential personnel from site. Discuss:

Whether or not rapid egress is required (e.g., airborne attack)

Route to be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3.1 Instruct the Security Shift Supervisor to carry out agreed upon method of egress using specific route, and to inform personnel in the Owner-Controlled Area to leave the site.

RfrnePMP-2080-EPP-100 Rev.33 Page 20 of 61 RefeenceEmergency Response Attachment 3 Dismissal of Non-Essential Personnel Pages:

j 19 -20 1.3.2 Instruct the Security Shift Supervisor to inform the SM/SEC when dismissal of Non-Essential Personnel has been completed.

1.4 Inform both Control Rooms of the decision to dismiss non-essential personnel and how dismissal will be accomplished (normal or rapid egress, with specific route to be used).

1.5 Determine if the Unit 1 and/or Unit 2 Containment Evacuation Alarm should be sounded.

1.5.1 Sound the Containment Evacuation Alarm(s), if required.

1.6 Direct an operator to make PA announcement for dismissal of all non-essential personnel. Make the same announcement two times.

1.6.1 IF normal egress is to be used, THEN make the following announcement two times. Modify the announcement if an alternate route (Livingston Road) is used:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site at this time using the main plant access road."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

1.6.2 if rapid egress is to be used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g.,

"vehicle portal near the North Access Building") and exiting the site using (State the route)."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646, omitting the "using Security portal" statement.

Reference PMP-2080-EPP-100 Rev.33 Page 21 of 61

~Emergency Response Attachment 4 Accountability Pgs NOTE: During some postulated events, assembly & accountability, may pose a greater danger than directing a rapid egress of personnel from the Protected Area, or directing personnel to remain in their work areas. SEC discretion, with input from Security personnel when necessary, should be used in the decision to perform accountability and/or evacuation under these conditions.

1 Review the three methods of Accountability below:

1.1 Primary Method - using this method, all plant personnel and ERG members not on duty within the Protected Area will proceed to an Assembly Area located in the Office Building and Service Building and swipe their security badges at one of the associated Accountability Card Readers.

o Personnel will remain in the Assembly Areas until evacuated per SEC direction.

A list of missing individuals will be generated by Security 30 minutes from the time accountability is ordered (i.e., NEA is sounded).

1.2 Alternate Method - using this method, and under direction from the Security Shift Supervisor all non-ERG individuals within the Protected Area will exit through a Security Portal (e.g., vehicle portal near North Access Building) selected by Security per conditions at the time.

  • This method allows for rapid egress of personnel from the Protected Area because exit card readers/turnstiles may be-bypassed.

In this method, individuals may be required to relinquish their security badges so that Security personnel can account for them and verify their leaving the Protected Area.

o This method should only be used under extreme circumstances where assembly and accountability may pose a greater hazard to personnel than rapid evacuation.

Reference PMP-2080-EPP-100 Rev.33 Page 22 of 61 Emergency Response Attachment 4 Accountability Pages:

The Security Director will determine which route will be used for dismissal (e.g. vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.).

if radiological conditions may impact dismissal of non-essential personnel (e.g., radiological release -inprogress), THEN, contact RP for assistance/guidance in dismissal route, and other considerations as applicable.

o IF using the Livingston Road route, THEN contact Security to unlock the gates.

1.3 No Accountability - under some Security events Accountability may be delayed (or omitted entirely) per SEC discretion (e.g., security event in a vital area - intrusion by a hostile force).

2 Contact the Security Shift Supervisor (2005 or 2731) to consult about which method of accountability should be used.

2.1 Choose which of the accountability methods will be used, Primary, Alternate, or No Accountability and inform the Shift Security Supervisor.

2.1.1 IF using the Primary Method of accountability, THEN request that Security:

o *Prepare for accountability.

o Commence evacuation of the Owner Controlled Area outside of the Protected Area.

a. GO TO Step 3.

RfrnePMP-2080-EPP-100 Rev.33 Page 23 of 61 RefeenceEmergency Response Attachment 4 Accountability Pgs SNOTE: RP should be consulted for input on best means of egress from the Protected Area/Site if a radiological release is in progress or imminent.

2.1.2 IF using the Alternate Method of accountability, TIEEN request that Security initiate the alternate method of accountability.

a. Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which Security Portal(s) will be used for Protected Area evacuation.
b. Request that the Owner-Controlled area also be evacuated.

3 Contact Personnel Inside the Protected Area.

3.1 IF using the Primary Method of Accountability, THEN direct an Operator to perform the following:

o Sound the Unit 1land Unit 2 Containment Evacuation Alarm.

Sound the Nuclear Emergency Alarm.

a Make a Public Address announcement for personnel to report for accountability. Make the announcement two tunes. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAB) has been declared due to (brief description of EAL). Report to an Assembly Area located in the Office Buildings or Service Building for accountability at this time. Use an accountability card reader and then remain in the area for further announcements."

IF the ERFs have not already been activated, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

RfrnePMIP-2080-EPP-100 Rev.33 Page 24 of 61 RefeenceEmergency ResPonse Attachment 4 Accountability Pages 3.2 IF using the Alternate Method of Accountability, THEN direct an Operator to perform the following:

o Sound the Unit 1 and Unit 2 Containment Evacuation Alarm.

  • Sound the Nuclear Emergency Alarm.

o Make a Public Address announcement for personnel to use the alternate.

method of accountability. Make the same announcement two times. An example of this announcement is:

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the plant site, using (specify Security portal, including location, e.g., "vehicle portal near the North Access Building") and exiting the site using (State the route) ."

3.2.1 IF the ERFs have not already been activated and the ERONS code of 911 was used, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. Activate the Technical Support Center, Operations Support Center, Emergency Operations Facility, and Joint Information Center.

3.2.2 IF the ER~s have not already been activated and the ERONS code of 7 was used, TH-EN make the following announcement two times:

"Attention all personnel. Attention all personnel. ERO members proceed to the Buchanan Office Building and activate the Emergency Operations Facility and the Joint Information Center.

3.2.3 Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.

3.3 IF the No Accountability Method is used, THEN DO NOT sound the NEA, Containment Evacuation Alarms, or make a public address announcements.

3.3.1 Direct any necessary announcements per Security Shift Supervisor guidance as necessary for protection of on site personnel.

Reference PMiP-2080-EPP-100 Rev.33 Page 25 of 61 Emergency Response Attachment 4 Accountability Pgs 4 Perform follow-up actions.

4.1 IF the Primary Method of Accountability was used, THEN S Obtain a list of missing personnel from Security (this list should be provided 30 minutes following the sounding of the NBA.

o Coordinate with Security to locate any missing individuals.

4.2 IF the Alternate Method of Accountability was used, THEN o Obtain a list of missing personnel from Security upon completion of the manual accountability (this will take longer than 30 minutes).

a Coordinate with Security to locate any missing individuals.

4.3 IF the No Accountability Method was used, THEN take any necessary follow-up actions when conditions warrant. Examples of the follow-up actions include:

o After hostile force has been neutralized, SEC may choose to perform accountability (per Primary or Alternate Method).

o Coordinate with Security to locate any missing personnel.

a Public Address announcements as necessary.

Dismissal or evacuation of personnel as necessary.

Reference PMP-2080-EPP-100 Rev.33 Page 26 of 61 Emergency Response Atahmn EvcanPages:

Atacmnt5 vcutin26 -29 j NOTE: During some postulated events, evacuation may pose a greater danger than sheltering personnel within buildings. Under other events, rapid egress from the Protected Area and evacuation of the site is prudent. SEC discretion, with input from Security and/or RP personnel as applicable, should be used in the decision whether to evacuate under these conditions.

Determine If Evacuation Should Be Performed. Evacuation is performed at a SAE (or GE, if SAE. was not entered).

1.1 IF a security event is in progress in which evacuation could cause personnel harm (e.g., hostile force in a vital area), THEN SEC should shelter personnel within work areas, or as recommended by Security, rather than evacuation.

1.1.1 Coordinate with Security (1118, 1119, 2005 or 2731) in taking protective measures as necessary for plant personnel.

1. 1.2 WHEN the security event has been terminated (i.e., hostile force has been neutralized, THEN GO to Step 2.

1.2 IF a radiological release is in progress, THEN consult with RP in determining whether evacuation should be delayed.

1.3 IF no new hazards would be introduced~by evacuation, THEN evacuate personnel per Step 2.

1.4 IF offsite agency personnel (e.g., National Guard, MSP, etc. are stationed in the Owner Controlled Area, THEN determine if these personnel should be evacuated or if they will remain on site.

Take appropriate actions (e.g., evacuate, shelter, relocate on site, issue dosimetry, etc.) as necessary to protect the offsite agency personnel.

RfrnePMP-2080-EPP-100 Rev.33 Page 27 of 61 RefeenceEmergency Response Attachment 5 Evacuation Pages:9 NOTE: Beach evacuation routes are pedestrian routes and should only be considered as a last resort, and only for those individuals that are able to walk over rugged terrain.

2 Site Evacuation 2.1 Rapid Egress 2.1.1I IF an event is in progress in which rapid evacuation of the Protected Area is necessary (e.g., airborne attack threat), THEN implement such evacuation by using the Rapid Egress Method.

a. Contact the Security Shift Supervisor (2005 or 2731) to initiate Rapid Egress of the Protected Area.

Coordinate with the Security Shift Supervisor (and RP, if available, if a radiological release is inuninent or in progress) as to which Security Portal(s) and evacuation route "(e.g., vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for Protected Area evacuation.

IF using the Livingston Road route, THEN contact Security to unlock the gates.

o Request that the Owner Controlled Area also be evacuated.

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

RfrnePMP-2080-EPP-100 Rev.33 Page 28 of 611 RefeenceEmergency Response

[ Attachment 5 Evacuation e:

26 - 29Pa

b. Direct an Operator to make the following announcements for personnel to exit the Protected Area per designated Security Portal(s). Modify the announcement if an alternate route (Livingston Road) is used and as conditions warrant. Make the same announcement two times.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to exit the Protective Area using (specify Security portal,, including location, e.g., 'vehicle portal near the North Access Building') and leave the site using (State the route) ."

c. Direct an Operator to make the following announcements in the Training Building, NEST and Buchanan Office Building by dialing 1646. Modify the announcement if an alternate route is used*

(Livingston Road), anld as conditions warrant.

"Attention all personnel. Attention all personnel. A (State the current classification - usually a SAE) has been declared due to (brief description of EAL). Due to the current plant conditions, all non-essential personnel are requested to leave the site using (State the route) ."

2.2 Normal Egress 2.2.1 IF normal egress from the Protected Area will be used for evacuation (North Access turnstiles), THEN contact the Security Shift Supervisor (2005 or 2731) to initiate evacuation.

Coordinate with the Security Shift Supervisor (and RP, if a radiological release is imminent or in progress) as to which evacuation route "(e.g.,

vehicle evacuation routes main access road or Livingston Road, OR pedestrian routes north along the beach to Rosemary Beach or south along the beach to Livingston Rd.) will be used for evacuation.

  • Request that the Owner Controlled Area also be evacuated.

o Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Protected Area is complete.

Reference , PM.P-2080-EPP-100 Rev.33 Pages: o 6 Attachment 5 Evacuation Pages:

Instruct the Security Shift Supervisor to notify the SEC when evacuation of the Owner Controlled Area is complete.

2.3 Take any necessary follow-up actions..

2.3.1 IF pedestrian routes were used for evacuation, THEN coordinate with the EOF (if activated) or the Berrien County EOC to arrange for transportation for evacuees.

2.3.2 IF pedestrian routes were used for evacuation, ThEN coordinate with the EOF to arrange for an alternate means of evacuation for those who were unable to evacuate OR shelter affected individuals in a safe area as designated by the SEC.

RfrnePMP-2080-EPP-100 Rev.33 Page 30 of 61 RefeenceEmergency Response Attachment 6 Terminating a UE Paes 1 UIE Termination 1.1 IF the conditions for the UIE no longer exist, and no escalation of classification is expected, THEN perform the following:

1.1.1 Instruct operators to inform the MSP and BCSD that the event is terminated.

1.1.2 Instruct operators to:

SFax a final EMD-32a form (with the current classification check box marked Termination) to MSP and BCSD.

Verify that the form was received by the State and County.

o Notify the NRC (Red Phone - NRC Operations Center) that the emergency is terminated.

1.2 Inform both Control Rooms that the event is terminated.

1.3 Inform Security that the event is terminated (1118, 1119, 2005 or 2731).

1.4 Direct an operator to make a public address announcement that the UE has been terminated per the SEC.

2 Collection of Data 2.1 Provide for collection of data, paperwork, etc. related to the event and forward to Emergency Preparedness for disposition.

RfrnePMiP-2080-EPP-100 Rev.33 Page 31 of 61 ReferenceEmergency ResponseJ I Attachment 7 Notification of On-Site Personnel Pages:

[ ~31 -34 J 1 Notify Security 1.1 Inform the Security Shift Supervisor (ext. 2005 or 2731) or SAS Operator (ext. 1118 or 1119) of the initial emergency classification or classification upgrade.

1.1.1 IF an UiE, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.

a. Contact Time _________

1.1.2 IF an Alert, THEN instruct Security to notify personnel as prescribed in Section 5 of the ERG Phone Directory.

a. Contact Time _________

1.1.3 IF a SAE, THEN instruct Security to:

Ready the Security Computer for accountability and prepare for subsequent evacuation.

  • Notify personnel as prescribed in Section 5 of the ERG Phone Directory (if not already performed for this emergency).
a. Contact Time __________

1.1.4 IF a GE, THEN instruct Security to:

  • Ready the Security Computer for accountability and prepare for subsequent evacuation (if not already performed for this emergency).
  • Notify personnel per instructions in the ERG Phone Directory (if not already performed for this emergency).
a. Contact Time

Reference PMIP-2080-EPP-100 Rev.33 Page 32 of 61 Emergency Response Attachment 7 Notification of On-Site Personnel Pages:

31 -34 1.1.5 IF conditions at the plant are such that personnel reporting to the plant would be at risk (e.g., security event, radiation release, toxic spill, etc.), THEN direct Security to close access to the plant until the SEC determines that the condition no longer exists.

a. Contact Time __________

2 Notify Chemistry and RP Technicians of the initial emergency classification.

2.1 Chemistry Contact Time _____________

2.2 lRP Contact Time ________________ __

3 Make Public Address Announcements ___

CAUTION: PA announcements should not be made for some ICs (EALs) due to their sensitive nature. IF any of the 11-2, Security ICs (-EALs) have been used to classify the current event, THEN obtain SEC permission before making any

~PA announcements or sounding the NEA.

.NOTE: PA announcements to perform Accountability, Attachment 4, and Evacuation,1 Attachment 5, are performed only once per event.

3.1 Direct an operator to make a PA announcement for the current classification. Make the announcement two times. Modify announcements below as conditions warrant.

3.1.1 IF in a UE, THEN make the following announcement two times:

"Attention all personnel. Attention all personnel. An Unusual Event has been declared due to (brief description) .Continue with your work and be prepared for future announcements."

I Reference PMP-2080-EPP-100 Rev.33 Page 33 of 61 I . Emergency Response Attachment 7. Notification of On-Site Personnel Pages:

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed___________

3.1.2 IF in an Alert, THEN make the fol~lowing announcement two times:

"Attention all personnel. Attention all personnel. An Alert has been declared due to (brief description) ."

IF emergency facilities are not already activated, THEN continue the annoumcement with:

"Activate the Operations Support Center, Technical Support Center, Emergency Operations Facility, and the Emergency News Center. All other personnel stand by for further announcements."

a. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
b. Time announcements completed

RfrnePMP-2080-EPP-100 Rev.33 Page 34 of 61 RefeenceEmergency Response Attachment 7 Notification of On-Site Personnel Pages.

NOTE: Accountability isperformed per Atahet4, Accountability.

3.1.3 lIE in a SAE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two time s:

"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared due to (brief description)."

1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
2. Time announcements completed__________

3.1.4 IF in a SAE AND accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.

3.1.5 IF in a GE AND accountability has already been performed per main body of procedure step 3.2.8, THEN make the following announcement two times:

  • "Attention all personnel. Attention all personnel. A General Emergency has been declared due to (brief description)."
1. Make the same announcement two times in the Training Building, NEST and Buchanan Office Building by dialing 1646.
2. Time announcements cornpleted _________

3.1.6 IF in a GE AN]) accountability has NOT been performed, THEN perform accountability in accordance with Attachment 4, Accountability.

Reference PMVP-2080-EPP-100 Rev.33 Page 35 of 61 Emergency ResponseI Attachment 8 Notification of Off-Site Agencies Pages:9 1 Accelerated Notifications to the NRC for Security Events.

1.1 IF the emergency is due to a security event AND the NRC has not yet been contacted, THEN:

1.1.1 Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100.

1.1.2 Provide an accelerated verbal notification, without hard copy, to the NRC with the, following information:

  • Site Name
  • Emergency Classification, if determined.

o Nature of the threat (briefly describe) o Type of attack (e.g., armed assault by land, water, or aircraft) o Attack status (i.e., imminent, in progress, or repelled)

RernePMP-2080-EPP-100 Rev.33 Page 36 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: Notification to offsite authorities (State and County) must be completed within]

15 minutes of classification.

2 Completing EMD-32 Form 2.1 Direct a licensed operator to complete Michigan State Police forms EMD32a and EMD-32b.

SNOTE: PARs aedvlpduigAttachment 1,Protective Action Recommendations.

Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event. Manual hard copies -are developed using Attachment 12, "Manual Completion of EMD Forms".

2.1.1 IF a release is in progress due to the event, THEN coordinate with personnel performing dose assessment per PMP-2080-EPP- 108, Initial Dose Assessment, for completion of EMD-32 form(s).

NOTE: An EMD-32a is required within 15 minutes of:

eAn initial event classification, or A change of classification, or SA change of PAR 2.1.2 IF there is NOT a release in progress due to the event THEN complete an EMD-32a form for the classification and/or PAR using Attachment 12, "Manual Completion of EMD Forms"

RfrnePMP-2080-EPP-100 Rev.33 Page 37 of 61 RefeenceEmergency Response Attachment 8 Notification of Off-Site Agencies Pages:

NOTE: An EMD-32b is required to be transmitted with the EMD32a if:

  • ,A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2.1.3 IF there is NOT a release in progress due to the event THEN complete an EMD-32b form using Attachment 12, "Manual Completion of EMD Forms". ___

2.1.4 Performance of a new EMD-32a is required within 15 minutes of each subsequent classification upgrade.

2.1.5 IF a PAR or change in PAR is based on Dose Calculations, THEN an EMD-32b, Nuclear Plant Event Technical Data sheet must accompany the EMD-32a, Nuclear Plant Event Notification form.

2.1.6 Obtain the SM/SECs "Plant Approval" signature on the form(s). ___

2.1.7 Make copies of the form(s) as necessary for offsite notification phone communicators.

ReferencePMP-2080-EPP-100 Rev.33Pae3of6

- Reference ~Emergency ResponsePae3of6 Attachment 8 Notification of Off-Site Agencies Pages.

NOTE: Alternate phones/extension may be used, at the discretion of the Unit Supervisor, or designee as conditions warrant.

3 Phone Contacts and Faxes (usually performed by APOs) 3.1 Setup the Emergency Plan telephones (located in the "E-Plan" suitcase) in the back of the Control Room (if not already perforned). ___

3.2 Direct contact with the MSP using Attachment 9, MSP Notification. ___

3.3 Direct contact with the BCSD using Attachment 10, Berrien County Sheriff Notification.___

INOTE: Offsite agencies may wish to maintain constant communications with the Control Room until the EOF~ is activated.

3.4 Direct that the signed EMD-32 form(s) are faxed to MSP using Attachment 9, MSP Notification ___

3.5 Direct that the signed EMD-32 form(s) are faxed to BCSD using Attachment 10, Berrien County Sheriff Notification. ___

3.6 Direct that the NRC Operations Center is called on the NRC "Red Phone" Attachment 11, NRC Notification. ___

4 Follow Up Notifications 4.1 UNLESS the State of Michigan has been notified in advance of a delay or change in frequency, THEN direct a licensed operator to complete an EMD-32b form at least every 30 minutes, (commencing 3.0 minutes from initial notification) per step 2.1.

Reference PMP-2080-EPP-100 Rev.33 Page 39 of 61 Emergency Response Attachment 8 Notification of Off-Site Agencies Pages.

4.2 IF there is no release in progress due to the event ThEN complete a hard copy EMD-32b form, per Attachment 12. __

The EMD-32b, Release/Offsite Dose Data sections are only required to be completed if there is a release in progress due the event or one is suspected to be occurring.

The EMD-32b, Measured Offsite Radiation Levels section only needs to be completed when data is available.

4.3 IF a release is in progress due to the event ThEN coordinate with personnel performing dose assessment per PMP-2080-EPP-108, Initial Dose Assessment, for completion of EMD-32b.

4.4 Direct that the appropriate phone calls and faxes are completed per section 3 of this Attachment.

Reference PMIP-2080-EPP-100 Rev.33 Page 40 of 61 Emergency Response Attachment 9 MSP Notification 40ge42 NOTE: Declaration of ant emergency requires the notification of the Michigan State Police within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the EOF is activated.

Contact:

MSP at 8-1-517-241-8000. (Alternate number 8-1-517-334-6223) using the MSP bridge phone (ext 1088) in the back of the Control Room.

NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.

NOTE: An EMD-32a is required within 15 minutes of:

  • The initial classification, or

,,A change of classification, or

  • A change of PAR An EMD-32b is required within 30 minutes of the previous EMD-32b.

An EMD-32b is required to accompany an EMD-32a:

  • if the declaration of a General Emergency is due to dose, or if a PAR change is due to dose 2 Provide the following to the MSP:
  • Provide the information from the EMD-32 form.

o Obtain the officers/dispatcher's name and record on table.

o Inform the agency that the EMD-32 will be faxed.

Request a callback (for authentication) and then hang up.

RfrnePMP-2080-EPP-100 Rev.33 Page 41 of 61 RefeenceEmergency Response Attachment 9 MSP Notification Pages:

40 -42 For callback: MSP will callback to ext 1088 phone bridge. Phone will ring in the Control Room. Pick up phone when it rings.

0F13-SITE PHONE NUMBER CONTACT EVENT NOTIFICATION ESTABLISHED CLOSEOUT Michigan State Police 8-1-517-241-8000 /_____ /____I___

Initials Time Initials Time Person Contacted MSP Person Contacted:___________________

Call Back Call Back I Bridge established:___________________

_____________Time

  • IF the MSP has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

SWrite the question

  • Obtain the response and get approval o Provide the response to the MSP.

INOTE: Faxing the EMD-32 communicator form(s) or other can beas performed personnel necessary. by either the MSP or BCSD 3 Fax the signed EMD-32 form(s): ___

o Make sure that the form is signed by the Shift Manager. ___

  • Orient the form(s), as shown on the fax machine, in either ContrOl Room IF the EMD-32 have not already been faxed, THEN Push red Blast button to broadcast the form(s) to the State, County and ERFs.

RernePMIP-2080-EPP-100 Rev.33 Page 42 of 61

[RefeenceEmergency Response Attachment 9 MSP Notification Pages:

40 -42 o Push the start button

a. IF the broadcast feature does not work, THEN fax the form(s)individually to the following numbers: ___

SMSP Operations Center: 8-1-517-241-6815 SState EOC: 8-1-517-333-4987

  • BC BOC: 8-1-269-934-9023
b. IF the broadcast feature does not work AND the ER~s will be activated (at Alert or higher, or UiE per SEC discretion),

THEN also send EMD-32 form(s) to the following: ___

HOF: 8-284-2942

  • TSC: 2431 o ENC/JIC: 8-284-5 892 o OSC: 2522 4 WHEN the EOF has established communication with the MSP, THEN the OEOwill inform the Control Room that the EOFlias taken over communications with the MSP. This may be done via the Boardwriter's or Manager's bridge.

Reference PMP-2080-EPP-100 Rev.33 Page 43 of 61 Emergency Response

[ Attachment 10 Berrien County Sheriff Notification Pages:

NOTE: Declaration of an emergency requires the notification of the BCSD within 15 minutes.

Offsite agencies may wish to maintain constant communications with the Control Room until the BOF is activated.

oThe dedicated phone line is connected between the Control Rooms, SAS, CAS, EOF, the County EOC and the 911 dispatcher's console.

1

Contact:

BCSD by lifting and talking into the phone. The phone is part of a dedicated line that is connected directly with the 911 dispatcher.____

IF the dedicated line does not work, THEN contact the BCSD at 8-1-269-983-7141 and dial 4900 if the automated system answers.

o IF the dedicated line does not work, THEN request a callback (for authentication) and then hang up.

For callback: dial extension 2316 and wait for the deputy to call into the phone bridge.

NOTE: The poeis the piaymnsfor cmuiangthe EMD-32 information.

2 Provide the following to the BCSD:

  • Provide the information from the EMD-32 form.
  • Obtain the officers/dispatcher's name and record on table.

Inform the agency that the EMD-32 will be faxed.

RfrnePMP-2080-EPP-100 Rev.33 Page 44 of 61 RefeenceEmergency Response Attachment 10 Berrien County Sheriff Notification Pages:

0FF-SITE PHONE NUMB1IER CONTACT EVENT NOT WICATION ESTABLISHED CLOSEOUT Berrien County Dedicated phone Sheriff's line. /_____I_________/____

Department (IF there is no Initials Time Initials Time response on the dedicated line, THEN dial 8-1-269-98-3-7141)

Person Contacted BCSD Person Contacted:___________________

Call Back Call Back I Bridge established:_____________________

_____________Time aIF the BCSD has additional questions THEN fill out Data Sheet 4, Request For Additional Information.

  • Write the question
  • Obtain the response and get approval o Provide the response to the BCSD.

SNOTE: Faxing the EMD-32 form(s) can be performed by either the MSP or BCSD communicator or other personnel as necessary.

3 Fax the signed EMD-32 form(s):

Make sure that the form is signed by the Shift Manager. ___

Orient the form(s), as shown on the fax machine, in either Control Room ___

IFlthe EMD-32 have not already been faxed, THEN Push the red Blast hutton to broadcast the form(s) to the State, County and ERFs.

Reference PMIP-2080-EPP-100 Rev.33 Page 45 of 61 Emergency Response Attachment 10 Berrien County Sheriff Notification Pages:

43 - 45 Push the start button___

a. IF the broadcast feature does not work, THEN fax the form(s)indlividually to the following numbers: ___
  • MSP Operations Center: 8-1-517-241-6815
  • State EOC: 8-1-517-333-4987 o BC EOC: 8-1-269-934-9023
b. IF the broadcast feature does not work AND) the ERFs will be activated (at Alert or higher, or UE per SEC discretion),

TIEEN also send EMD-32 form(s) to the following: ___

o EOF: 8-284-2942 STSC: 2431 ENC/JIC: 8-284-5892

  • OSC: 2522 4 WHEN the EOF has established communication with the BCSD, THEN the BOF will inform the Control Room that the EGE has taken over communications with the BCSD. This may be done via the Boardwriter's or Manager's bridge. ___

RfrnePMP-2080-EPP-100 Rev.33 Page 46 of 61 RefeenceEmergency Response Attachment 11 NRC Notification Pages:

46 -47 NOTE: The Operations NRC Communicator is normally stationed in the affected unit's Control Room.

NOTE: Declaration of an emergency requires notification of the NRC following notification of the state and county and in all cases must be completed within one hour.

1

Contact:

lIE 10 CFR 50.54 (X) and (Y) are invoked, THEN notify the NRC as per PMP-7030-001-001, Prompt NRC Notification. ___

o Call the NRC Operations Center on the NRC "Red Phone" (FTS-2000 phone) by dialing 1-301-816-5100. Alternate numbers are listed on the table below. ___

o Inform the NRC of the event in progress ___

  • Provide the information on Data Sheet 3, Plant Status ___

Sif the NRC has additional questions THtEN fill out Data Sheet 4, Request For Additional Information.

SWrite the question SObtain the response and get approval

  • Provide the response to the NRC.

0 Ask the NRC for the Event Notification Number (EN).

Reference PMP-2080-EPP-100 Rev.33 Page 47 of 61 Emergency Response Attachment 11 NRC Notification Pages:

46 - 47 OFF-SITE PHONE NULMBER CONTACT EVENT NOTIFICATION ESTABLISBED CLOSEOUT NRC Operations 1-301- 816-5100 Center 1-301-951-0550 /_____ /____I___

1-301-415-0553 Initials Time Initials Time 8-1-301-8 16-5 15 1

___________(FAX) ______________

Person Contacted NRC Person Contacted:___________________

Continuous contact, will be required for an Alert, Site Area Emergency

_______________of General Emergency.

Event Notification Ask NRC for the EN:_ ______________

Number (Needed for Data Sheet 1 of PMP-7030-001-001, Prompt NRC Notification) 2 WHEN the BOF has established communication with the NRC, THEN the EOF will inform the Control Room that the BOF has taken over communications with the NRC. This may be done via the Boardwriters or Managers bridge.

RfrnePMP-2080-EPP-100 Rev.33 Page 48 of 61 RefeenceEmergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Caution: Completion of a manual hard copy EMD-32 a and/or b form is required when an emergency has been declared and there is no radiological release in progress due to the event.

NOTE: An EMD-32a is required within 15 minutes of:

o An initial event classification, or SA change of classification, or A change of PAR Manual completion of hard copy EMiD-32a, "Nuclear Plant Event Notification":

  • Indicate whether this is an "Actual Event" or a "Drill" Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of Plant Communicator(s)

Indicate location where this form is being generated (Calling From) aRecord "Call Back Telephone Number" 269-465-5901 Ext. 1088 Record "Plant Message Number" Indicate "Current Classification" Indicate date and time of current classification was declared Indicate "Reason for Classification" Record the IC Number a Indicate "YES" or "NO" for "Radiological Release in Progress Due to Event" Indicate any current "Protective Action Recommendations"

Reference PMLP-2080-EPP-100 Rev.33 Page 49 of 61 Emergency Response Attachment 12 Manual Completion of EMD Forms Pages:1 Record PAR basis o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.

  • Forward completed form to Approver o Complete "Approved By", date and time
  • Forward completed approved form for transmission NOTE: An EMD-32b is required to be transmitted with the EMD32a if:
  • A General Emergency has been declared, or
  • There is a PAR change is due to dose An EMD-32b is required within 30 minutes of the previous EMD-32 2 Manual completion of hard copy EMI)-32b, "Nuclear Plant Event Technical Data":

Indicate whether this is an "Actual Event" or a "Drill"

  • Record "Nuclear Power Plant" as Cook Nuclear Plant Record name of "Plant Communicator" (s)
  • Indicate location where this form is being generated (Calling From) o Record "Call Back Telephone Number" 269-465-5901 Ext. 1088 o Record "Plant Message Number" o Record "Meteorological Data", alternate sources are listed in PMP-2080-EPP-108, Initial Dose Assessment, Attachment 1.
  • Record "Reactor Information"
  • Record "Plant Status/Additional Information"

I Reference PMiP-2080-EPP-100 Rev.33 Page 50 of 61 I Emergency Response I Attachment 12 Manual Completion of EMD Forms Pages5:

IF there is a release in progress due to the event THEN complete known information in "Release/Offsite Dose Data" areas IF there is NOT a release in progress due to the event THEN mark the "Release/Offsite Dose Data" areas as Not Applicable, N/A.

  • Forward completed form to Approver
  • Complete "Approved By", date and time Forward completed approved form for transmission

RfrnePMP-2080-EPP-100 Rev.33 Page 51 of 61 RefeenceEmergency Response Attachment 13 Activation of FLEX Phase 3 Page:

NOTE: The SAFER Control Center (SCC) is the lead organization for responding to the operational implications of an event and will coordinate the industry response to an emergency, if requested.

WHEN directed by the SM-SEC THEN contact the SAFER Control Center (SCC) at 434-832-3777 to activate the National SAFER Response Center (NSRC).

  • WHEN communication is established THEN provide the following information:

Indicate whether this is an "Actual Event" or a "Drill"

  • Plant name and affected units
  • Your name and positionltitle
  • The reason for the call, "Activation of the National SAFER Response Center for the Cook Nuclear Plant" 2 The NSRC will arrange for delivery of FLEX Phase 3 to Staging Area "C" (South Bend Regional Airport).

3 The SM-SEC or designee has the responsibility to communicate and coordinate activities with the SAFER SCC Team Lead until the BOF is activated. Examples of coordination include, but are not limited to:

  • Informing SAFER of the selection of Staging Area location and status of accessibility of Staging Area "C" .and associated travel routes to the site.
  • Receipt of periodic status reports on the shipment from the SAFER SCC Team Lead Informing the SAFER SCC Teanm Lead of specific delivery instructions including diverting a shipment from Staging area "C" to Staging Area "B".

4 From the State of Michigan Emergency Operations Center request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S From the NRC ENS request a heavy or medium lift helicopter capable of lifting 8,000 lbs. to move equipment from Staging Area "C" to Staging Area "B".

S Reference PMP-2080-EPP-100 Rev.33 Page 52 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages53 Unit No: Date: Time:

Data Taken By: Data Reviewed By:

SNOTE: When redundant indication exists, record most severe condition.

1. Containment Temp. _________OF 5. Intermediate Range _____AMPS
2. Cont. H2 Concentration 6. Containment Pressure
3. RWST Level 7. Containment Sump Level
4. Source Range _______CPM 8. Containment Level
9. Containment High Range Radiation Level Upper/Lower /R/HR
10. CTS Pumps East ON / OFF West ON / OFF
11. RHR Spray Flow East ____

GPM West _____ GPM

12. SI Flow North___ GPM South__ __ GPM
13. BIT Flow LP1 ___ 3PM LP2 ___GPM LP3 ___ GPM LP4 ____ PM
14. Accum Pressure LP1 ___ PSIG LP2 ___PSIG LP3 ____ PSIG LP4 ____PSIG
15. RH-R Injection Flow East_____ _ GPM West____ _ GPM
16. RCP Status LP1 ON/OFF LP2 ON /OFF LP3 ON /OFF LP4 ON / OFF
17. RCS Pressure PSI0 23. PRT Level
18. Charging Flow ______GPM 24. PRT Pressure ________PSIG
19. PZR Liquid Temp. 25. PZR Cycling Htrs ON / OFF
20. PZR Steam Temp. 26. PZR Backup Htrs ON I OFF
21. PZR Level 27. Letdown Flow _______GPM
22. PRT Temp. 28. Saturation Margin

Reference PMP-2080-EPP-100 Rev.33 Page 53 of 61 Emergency Response Data Sheet 1 PPC or PSS Control Room Data Pages:

52 -53 NSSS LOOP PARAMETERS Loop 1 Loop 2 Loop 3 Loop 4

29. Wide Range T Hot
30. Wide Range T Cold
31. S / G Pressure _______PSIG ________PSIG _______PSIG ________PSIG
32. S / G N. R. Level
33. S /G W.R. Level
34. Steam Flow (pph x 106),
35. Feed Flow (pph x 106)
36. Aux. Feed Flow (pph x 103)
37. MSIV Status OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE OPEN / CLOSE
38. CST Level Ft
39. Steam Dump ATMOS / COND EQUIPMENT STATUS AVAILABLE / UNAVAILABLE AVAILABLE /UNAV/AILABLE
40. East ESW _______ _____/
50. East CCP _________ / ____
41. West ESW __________ / _____ 51. West CCP __________ / _____
42. East CCW ___ ~/ _ 52. TDAFP ___ ~ / _
43. West CCW _________ / _____ 53. EMDAFP _________ / ____
44. East CTS __________ / ____ 54. WMDAFP / _
45. West CTS _________ / ____ 55. AB Diesel ______ I. ___/_
46. North SI _________ / ____ 56. CD Diesel
47. South SI __________ / _____ 57. Normal Res.
48. East RUR _________ / ____ 58. 12 EP /
49. West RHR /

RfrnePMP-2080-EPP-100 Rev.33 Page 54 of 61 RefeenceEmergency Response Data Sheet 2 Emergency Turnover Checklist Pages:

Unit No: ____Date:________ Time:

1. Emergency Classification Time Declared

_______Unusual Event

________Alert

_______Site Area Emergency

_______General Emergency

2. Have notifications been completed?
a. Michigan: yes / no I in progress Time:
b. lBerrien County: yes Ino I in progress Time:
c. NRC: yes /no I in progress Time:
d. DC Cook Personnel: yes Ino I in progress Time:
3. Protective Actions:
a. Local area evacuation yes / no Time:
b. Site evacuation yes / no Time:
c. Accountability yes I no Time:
d. Site closed to visitors yes I no Time:
4. Offsite protective action recommended:

SEvacuation: yes /no areas: ____ Time:

o Shelter: yes / no areas: ____ Time:

I Reference PMIP-2080-EPP-100 Rev.33 Page 55 of 61 I Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages.

5. Plant Operational Status
a. Reactor trip: yes I no time: ____ Trip signal:-
b. ESE Status:
c. EOP Status:______ ______
6. Plant Status
a. Chronology of Events Time Event
b. Current Plant Conditions

RefrecePMP-2080-EPP-100 Rev.33 Page 56 of 61 I RefrenceEmergency Response I Data Sheet 2 Emergency Turnover Checklist Pages:

[ 54 -57

c. Potential. for Plant Degradation
d. Mitigating Actions Taken or Underway
7. Plant Radiological Conditions
a. In-plant/Onsite Radiological Conditions

[

[

Reference PMVP-2080-EPP-100 Emergency Response Rev.33 Page 57 of 61 Data Sheet 2 Emergency Turnover Checklist Pages:7

b. Potential for Offsite Release of Radioactivity Airborne Water
8. Injured or Contaminated Personnel:

Name Employer Stains

9. List of Personnel Currently Assigned to Contingency Teams: (Facsinmile may be attached)

Name Team # Task Description/Time Dispatched

/

/

t

/

/

/

RfrnePMP-2080-EPP-100 Rev.33 Page 58 of 61 RefeenceEmergency Response" Data Sheet 3 Plant Status Pages:

NOTE: This Data Sheet is to be used as a guide for the communicator talking to the NRC. It is not required to be sent unless asked for by the NRC.

Reactivity Control

,, Reactor Subcritical? Yes No

  • Emergency Boration initiated? Yes No
  • Adequate Shutdown Margin? Yes No RCS Inventory Control - check all that apply for the current plant conditions Inventory makeup controlled by: (Identify all pumps injecting into RCS)

CVCS - Normal Charging Charging Pumps via BIT (High Head SI)

Safety injection pumps (Intermediate Head SI)

RHR Pumps (Low Head SI)

Other:__________ __

RCS Pressure Control o Pressurizer PORVs Closed? Yes No

  • Pressurizer Safeties Closed? Yes No

Reference PMP-2080-EPP-100 Rev.33 Page 59 of 61 Emergency Response Data Sheet 3 Plant Status Pages59 RCS Heat Transport Control - check all that apply for the current plant conditions Forced Circulation by RCP ________

Natural Circulation Feed and Bleed Decay Heat Removal System (RI{R)

RCS Heat Sink (Available or In Operation)- check all that apply for the current plant conditions S/G -Condenser Dump Valves ________

S/G - Atmospheric Dump Valves S/G - Safety Valves RCS - Feed/Bleed Decay Heat Removal System (RtIR)

SIG Inventory Control - check all that apply for the current plant conditions Main Feed Water _________

Aux. Feed Water Other: _ _ _ _ _ _ _ _ _ _ _

Containment Control e Ice Condenser Doors OPEN? Yes No

  • Containment Sprays ON? Yes No
  • , Hydrogen Recombiners/Igniters ON? Yes No
  • Containment Isolation Valves fall to CLOSE? Yes No
  • Phase A Actuation? Yes No Additional Information

Reference PMP-2080-EPP-100 Rev.33 Page 60 of 61 Emergency Response Data Sheet 4 Request For Additional Information Pages:

Request for additional information Source of request: II MSP LIBCSD LI NRC LIOther_______ ___

Date _______Time ____

Question:

Response

Response approved by:___________________________

SEC or designee Response delivered to requesting organization:

Date Time ______by Whom

Reference PMP-2080-EPP-100 Rev.33 Page 61 of 61 Emergency Response Page Data Sheet 5 Contingency Team Tracking Form 6 SPERSONNEL TEAM TASK DESCRIPTION TIME TIME TCS TIME EOF TIME TASK TIME DISPATCHED ___ _________DISPATCHED NOTIFIED NOTIFIED COMPLETED RETURNED

  1. Turbine Building. ERAEO

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 33

Title:

Emergency Response Alteration Justification This procedure implements the Cook Emergency Plan. This process is wholly controlled under 10 CFR 50.54 (q) and plant procedure RMA-2080-EPA-008, Emergency Plan Management; therefore a 50.59 review is not required.

This procedure does not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required for this procedure.

10 CFR 50.54(q) review was performed and documented. The number for the 50.54(q) is annotated in the workflow for this revision.

The conclusion was that the changes in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this Cook Emergency Plan Implementing Procedure can be implemented without prior approval.

Added step 3.3.3, "Notify Offsite Step was omitted from Revision 32.

Authorities of the emergency using , Notification of Off-site Personnel."

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 1 of 2

REVISION

SUMMARY

Procedure No.: PMP-2080-EPP-100 Rev. No.: 33

Title:

Emergency Response IMPLEMENTATION PLAN Summary of Change See Rev Summary Reason for Change See Rev Summary Implementation Schedule PORC meeting week of 1111116 Effective date week of 1/18/16 Training Needs None Expiration Date None Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions ThisI is a free-form

~ as called Office out in PMP-2010-PRC-002, Information Procedure for Form Tracking Alteration, Only Review, and

- Not Part of Form Approval. Page 2 of 2

IMPLEMENTING PROCEDURE EPP-2080-ERO-001, Emergency Response Resource Readiness, Revision 14

Rev01 Doc No.: EPP-2080-ERO-001 No.:

EMERGENCY RESPONSE

Title:

RESOURCE READINESS Alteration Cat.: Major Revision - Full Review CDI/150.59:1 50.54(q) 15-54 CD 1/50.59:2 PORC #-4666 PORC Mtg. No.: 4666 GARB Mtg. No.:

Admin Hold AR No.:

Superceding Proc(s):

Temp Proc Exp Date:

Temp Change Exp Date:

Temp Proc/Change End:

Effective Date: 2/3/2016 12:00:00 AM Approvals

[Name [Review/Approval Type/Capacity J.Date Becvar,5RbrJ 11Special Review:'E-PLAN GROUP 1[i2/11/2015 10:29 1 i~6998 Pees3 Grl Technical Review"..t12/1812015 10:12 ]

[Hart, William E 11 ehia Rve 02

[(376639) 3ITehiaHeiw01/08/2016 102 M Kristen45) 5 Management Review 101/14/2016 07:33

[Wendzel, Regan 1 1

[(s007887) ~ 7_Approval Authority 101/14/2016 13:22 j Signature Comments F10 CFR 50.54 (q) 15-54 completed. - ~1 Validation Reviews were performed by Tipton-Stone, EP; Hejduk, EP; Simpson, EP; Crisenberry, EP; Wiederwax, EP. Cross Discipline Review was performed by Griffin, RP.

[Technical Review performed by Jerry Peterson.

[PORO Approval obtained at meeting 4666

Approved at PORC per Plant Manager, Jim Ross.

-* EPP-2080-ERO-001 Rev. 14 Page 1 of-65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization TABLE OF CONTENTS 1 PURPOSE AN]) SCOPE ............................................................ 3 2 DEFINITIONS AN]) ABBREVIATIONS ............................................ 4 3 PRECAUTIONS AND LIMITATIONS .......................................... .... 6 4 DETAILS............................................................................ 6 4.1 Responsibilities ............................................................... 6 5 FINAL CONDITIONS .............................................................. 10 6 REFERENCES ..................................................................... 11 : Functional Checks of EOF NRC and MSP Phones..................... 12 : Functional Checks of TSC NRC and MSP Phones..................... 13 : Functional Checks of ERO Facility Equipment ........................ 15 : Functional Check of Berrien County 911 Ring Down Phones .......... 22 : Satellite Phone Checks ................................................ 23 Data Sheet 1: EOF Monthly Checklist ............................................... 25 Data Sheet 2: EOF Quarterly Checklist...............................................26 Data Sheet 3: FOF Quarterly Radiation Protection Checklist........................ 29 Data Sheet 4: TSC Monthly Checklist................................................ 32 Data Sheet 5: TSC Quarterly Checklist .............................................. 33 Data Sheet 6: TSC Quarterly Radiation Protection Checklist ........................ 34 Data Sheet 7: OSC Monthly Checklist.............................................. .. 35 Data Sheet 8: OSC Quarterly Checklist .............................................. 36 Data Sheet 9: OSC Quarterly Radiation Protection Checklist ..................... 38

=-w-NR EPP-2080-ER0-001 Rev. 14 Page 2 of 65 Emergency Response Resource Readiness Multi Bill Hart Emergency Preparedness Emergency Preparedness Writer Document Owner Cognizant Organization Data Sheet 10: ENC/JIC Monthly Checklist .......................................... 41 Data Sheet 11: Survey Vehicle Monthly Checklist..................................... 42

  • Data Sheet 12: Survey Vehicle Radiation Protection Quarterly Checklist.............. 43 Data Sheet 13: Control Room Monthly Checklist...................................... 45 Data Sheet 14: Control Room Quarterly Radiation Protection Checklist .............. 47 Data Sheet 15: Control Room Emergency Cabinet Quarterly Radiation Protection Checklist.............................................................. 48 Data Sheet 16: CAS/SAS Monthly Checklist...........................................50 Data Sheet 17: Emergency Response Data System Testing .......................... .. 51 Data Sheet 18: Berrien County EOC Radiation Protection Quarterly Checklist ........ 54 Data Sheet 19: Training Center Radiation Protection Quarterly Checklist ............ 55 Data Sheet 20: LMC Radiation Protection Quarterly Checklist........................56 Data Sheet 21: Emergency Sampling Station Quarterly Radiation Protection Checklist eQeee~eoeeeeleeeeee ....o-ee--Q.eee-.....................eeeeeo59 Data Sheet 22: Emergency Plan Respiratory Protection............................... 60 Data Sheet 23: RP/Ops Emergency Response Equipment Quarterly Checklist ......... 61 Data Sheet 24: Monthly Satellite Phone Checks ....................................... 63 Data Sheet 25: Radiation Protection Portable Instrument Kit Inventory...............64 Data Sheet 26: Security Control Center............................................... 65

Information I EPP-2080-ERO-001 I Rev. 14 Page 3 of 65 Emergency Response Resource Readiness 1 PURPOSE AN]) SCOPE 1.1 The purpose of this procedure is to enumerate and provide a scheduling mechanism to assure completion of periodic Emergency Preparedness Program maintenance requirements.

1.2 Establish methods to ensure that all onsite and offsite emergency response facilities and equipment staging areas are stocked with materials, equipment, and instrumentation necessary to effectively respond to an emergency situation.

1.3 This procedure applies to the following periodic requirements:

1.3.1 Emergency Response Organization (ERO) drills and exercises 1.3.2 Emergency Response facility inventories 1.3.3 Communications systems tests 1.3.4 Emergency Preparedness (EP) equipment functional tests 1.3.5 Emergency Response Data System (ERDS) test

Information EPP-2080-ERO-001 I Rev. 14 Page 4 of 651 Emergency Response Resource ReadinessJ 2 DEFINITIONS AN]) ABBREVIATIONS Term Meaning AR Action Request BCSD Berrien County Sheriff's Department GAS Central Alarm Station CREG Control Room RP Emergency Cabinet DAP Dose Assessment Program ED Electronic Dosimeter ENC Emergency News Center ENS Emergency Notification System EOF Emergency Operations Facility EP Emergency Preparedness EP[P Emergency Plan Implementing Procedure EPM Emergency Preparedness Manager ER Emergency Room ERDS Emergency Response Data System ERO Emergency Response Organization ERONS Emergency Response Organization Notification System FTS-2001 Federal Telephone System-2001. This Federally owned phone network is used in the Cook Plant Control Rooms, Technical Support Center and Emergency Operations Facility for communications directly to various functional areas within the NRC.

It is owned, operated and maintained by the Federal Government.

JIG Joint Infonmation Center KI Potassium Iodide LMC Lakeland Medical Center

Information I EPP-2080-ERO-001 Rev. 14 Page 5 of 65 Emergency Response Resource Readiness Term Meaning MSP Michigan State Police NDM Nuclear Document Management NRC

  • Nuclear Regulatory Commission OBA Office Building Addition OSC Operations Support Center PAM Personal Alarming Module PAS Public Address System PPC Plant Process Computer RiP Radiation Protection RPAC Radiation Protection Access Control SAS Secondary Alarm Station SBE Service Building Extension SCC Security Control Center SCBA Self Contained Breathing Apparatus SPS Site Protective Services SRD Self Reading Dosimeter SV Survey Vehicle TLD Thermoluminescent Dosimeter TSC Technical Support Center TRPAC Turbine RPAC

Information EPP-2080-ERO-001 I Rev. 14 I Page 6 of 65 Emergency Response Resource Readiness 3 PRECAUTIONS AND LIMiITATIONS 3.1 When performing readiness checks in either the Control Room the Operations Shift Manager's office should be informed.

3.2 A control Thermoluminescent Dosimeter (TLD) shall be located in all assigned TLD storage areas.

3.3 Silver Zeolite cartridges have an extended shelf life and need not be changed out until near the end of shelf life or if the package is opened.

New cartridges should be marked with their expiration date if not already marked by the manufacturer.

3.4 All readiness checks shall be documented on the applicable data sheet.

3.5 This procedure may be performed in part or in whole depending on data sheet(s) being performed.

3.6 Individual steps or sections of data sheets may be N/A iaw PMP-2010-PRC-003, "Procedure and Work Instruction Use and Adherence".

3.7 EP resource readiness checks on RP equipment do not include handling of radioactiv*e sources. This is the responsibility of RP.

4 DETAILS 4.1 Responsibilities 4.1.1 The EPM is responsible for the execution of this procedure.

4.1.2 The EPM or designee is responsible for reviewing and signing the data sheets.

Information I EPP-2080-ERO-001 I Rev. 14 Page 7 of 65 Emergency Response Resource Readiness 4.1.3 The following Data Sheets are performed by an Emergency Preparedness Coordinator or designee.

  • Data Sheet 1, EOF Monthly Checklist o Data Sheet 2, EOF Quarterly Checklist o Data Sheet 4, TSC Monthly Checklist a Data Sheet 5, TSC Quarterly Checklist
  • Data Sheet 7, OSC Monthly Checklist
  • Data Sheet 8, OSC Quarterly Checklist
  • Data Sheet 10, ENC/JIC Monthly Checklist
  • Data Sheet 11, Survey Vehicle Monthly Checklist
  • Data Sheet 13, Control Room Monthly Checklist
  • Data Sheet 16, CAS/SAS Monthly Checklist
  • Data Sheet 24, Monthly Satellite Phone Checks 4.1.4 The following Data Sheets are performed by Radiation Protection.
  • Data Sheet 3, EOF Quarterly Radiation Protection Checklist Data Sheet 6, TSC Quarterly Radiation Protection Checklist
  • Data Sheet 9, OSC Quarterly Radiation Protection Checklist
  • Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist Data Sheet 14, Control Room Quarterly Radiation Protection Checklist a Data Sheet 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist

.. Data Sheet 18, Berrien County EOC Radiation Protection Quarterly Checklist o Data Sheet 19, Training Center Radiation Protection Quarterly Checklist aData Sheet 20, LMC Radiation Protection Quarterly Checklist S Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist

  • Data Sheet 22, Emergency Plan Respiratory Protection Quarterly Checklist
  • Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist a Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory
  • Data Sheet 26, Security Control Center 4.2 The ERO facility resource readiness requirements are shown on Data Sheets 1 thru S10 and identify each facility'S setup, equipment readiness check~and supplies inventory.

4.2.1 Attachment 1, Functional Checks of EOF NRC and MSP Phones and Attachment 2, Functional Checks of TSC NRC and MSP Phones, provide instructions for performing the phone test.

4.2.2 Attachment 3, Functional Checks of ERO Facility Equipment, provides instructions for performing the equipment checks for Data Sheets 1 thru 10.

Information I EPP-2080-ERO-001 I Rev. 14 I Page 8 of 65 Emergency Response Resource Readiness 4.2.3 Place a "1"" or "X" in the box next to each item to signify acceptability.

4.2.4 A signature block is provided for the person performing the check.

4.3 The data sheets list the minimum required equipment, tools, or supplies needed. IT items are missing, THEN initiate an AR as appropriate and replace promptly.

4.3.1 IF a required item cannot be replaced promptly, THEN an item with equivalent function can be substituted in its place until the originally required item can be replaced. For example: a frisker could be temporarily substituted for a portal monitor.

IF an item is substituted, THEN it should be noted in the comments section of the applicable data sheet.

4.4 Emergency Preparedness Staging Locations 4.4.1 The EOF is located at 500 Circle Drive, Buchanan (AEPNG Office Building).

The RP equipment and supplies are located in the storage room behind the log in board. The readiness check is performed using Data Sheet 1, EOF Monthly Checklist, Data Sheet 2, EOF Quarterly Checklist, Data Sheet 3, EOF Quarterly Radiation Protection Checklist.

4.4.2 The TSC is located above the Operations Shift Manager's office. RP equipment and supplies are located in a cabinet in the Communications Room.

The readiness check is performed using, Data Sheet 4, TSC Monthly Checklist, Data Sheet 5, TSC Quarterly Checklist or Datasheet 6, TSC Quarterly Radiation Protection Checklist 4.4.3 The OSC is located in the basement of the Lakeside Office Building below the cafeteria and lobby. RP supplies are located in the shower room, the RP Equipment storage room and in the North Basement Classroom. The readiness check is performed using Data Sheet 7, OSC Monthly Checklist, Data Sheet 8, OSC Quarterly Checklist, and Data Sheet 9, OSC Quarterly Radiation Protection Checklist.

4.4.4 The GREG is located on 633' elevation turbine deck next to TSC stairway.

The readiness check is performed using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist 4.4.5 The locations of the Emergency RP supply boxes are stated in Appendix C of the Cook Emergency Plan.

Information I EPP-2080-ERO-001 I Rev. 14 I Page 9 of 65 Emergency Response Resource Readiness 4.4.6 The Security Control Center is located in the traffic portal area of the North Security Control Center. The readiness check is performed using Data Sheet 26, Security Control Center.

4.4.7 The ERO equipment in the Training Center is located in the hallway near room 1128. The readiness check is performed using.

Data Sheet 19, Training Center Radiation Protection Quarterly Checklist.

4.4.8 Lakeland Regional Medical Center, St. Joseph, is located at 1234 Napier Avenue in St. Joseph. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.

4.4.9 Lakeland Medical Center, Niles, is located at 31 North St. Joseph Street in Niles. The readiness check is performed using Data Sheet 20, LMC Radiation Protection Quarterly Checklist.

4.4.10 Berrien County Public Safety Communication Center office is located at 2100 East Empire Avenue, Benton Harbor. The readiness check is performed using Data Sheet 18, Berrien County EGG Radiation Protection Quarterly Checklist.

4.4.11 RP/Operations Emergency Response Equipment is located in several locations within the plant. The readiness check is performed quarterly using Data Sheet 23, RPiOps Emergency Response Equipment Quarterly Checklist.

4.5 Quarterly checks of the accountability card readers are performed by Security personnel using SPP-2060-SFI-308, Tests of Security Related Equipment.

4.6 Control Room readiness checks are performed using Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.

4.7 CAS/SAS readiness checks are performed using Data Sheet 16, CAS/SAS Monthly Checklist.

4.8 IF any of the ERG equipment is found to be not functional or acceptable, ThtEN initiate an Action Request using PMP-7030-CAP-00 1, Action Initiation. Document the Action Request number in the comment section on the applicable facility/emergency equipment staging area data sheet.

4.9 Satellite phones readiness checks are performed using Data Sheet 24, Monthly Satellite Phone Checks.

4.10 Make a copy of the completed data sheets for retention by the EP Department.

Information EPP-2080-ERO-001 [ Rev. 14 Page 10 of 65 Emergency Response Resource Readiness 5 FINAL CONDITIONS 5.1 Completed datasheets are transmitted to NDM per PMP-2030-REC-00 1, Records Management.

Information EPP-2080-ERO-001 I Rev. 14 I Page 11 of 65 Emergency Response Resource Readiness 6 REFERENCES 6.1i Use

References:

6.1.1 PMP-2030-R.EC-001, Records Management 6.1.2 PMP-7030-CAP-001, Action Initiation 6.1.3 PMP-2350-CMS-001, Commitmnent Management 6.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF 6.1.5 RMT-2080-OSC-001, Activation and Operation of the OSC 6.1.6 RMT-2080-TSC-001, Activation and Operation of the TSC 6.2 Writing

References:

6.2.1 Source

References:

a. Emergency Station Minimum Inventory Requirements, RP-95-03
b. D.C. Cook Emergency Plan, Appendix C
c. NRC Commitment 1179
d. NRC Commitment 5392 6.2.2 General References
a. 10 CFR 50.47(b)
b. 10 CFR 50, Appendix E
c. NIJRBG-0654/FEMA-REP- 1, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Nuclear Power Plants.
d. D.C. Cook Emergency Plan, Appendix K
e. AR 00863697

Reference EPP-2080-ERO-001 Rev. 14 Page 12 of 65 Emergency Response Resource Readiness Atacmnt1Functional Checks of EOF NRC and MSP Pages:

Atahet1Phones 12 1 Monthly Phone System Test in the EOF NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.

1.1 Test the nine (9) phones listed below by dialing the NRC on one phone using the main number on the phone label.

SNOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.

1.2 IF 2-way communication is not achieved, THEN notify the NRC to issue a work ticket to the phone company.

1.3 Check the other phones by calling the next phone by dialing 700 plus the 7 digit number on the phone you are calling.

Area Abbreviation Meaning NRC Work Center HPN Health Physics Network NRC Work Center PMCL Protective Measure Counterpart Link NRC Work Center RSCL Reactor Safety Counterpart Link Dose Assessment Area HPN Health Physics Network Dose Assessment Area HPN Health Physics Network Dose Assessment Area PMCL Protective Measure Counterpart Link Main Area of the EOF MCL Management Counterpart Link Main Area of the EOF ENS Emergency Notification System (Red Phone)

Main Area of the EOF ENS Emergency Notification System (Red Phone) 1.4 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the EOF number being used (269-697-2931).

1.5 Document completion of test using Data Sheet 1, BOF Monthly Checklist.

[ Reference EPP-2080-ERO-001 Rev. 14 Page 13 of 65 Emergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages:

Atahet2Phones 13 - 14 1 Monthly NRC Phone System Test in the TSC.

NOTE: A "1" must be dialed pirto daigthe 10 dgtNRC number.

1.1 Notify both Control Rooms that the monthly NRC phone check is being conducted.

1.2 When performing readiness checks in the Technical Support Center contact the Operation Work Control Center to inform them of the location and tests about to take place.

1.2.1 The Control Room NRC Phone will ring once but should be disregarded.

1.3 Test the phones listed below by dialing the NRC on one phone using the main number on the phone label.

NOTE: Use the backup number only if the communications cannot be achieved using the main number. Verify satisfactory 2-way communication is achieved.

1.3.1 IF 2-way communication is not achieved, THtEN notify the NRC to issue a work ticket to the phone company.

1.4 Check the other phones by calling the next phone, dialing 700 plus the 7 digit number on the phone you are calling Phone Abbreviation Meaning NRC Communication HPN Health Physics Network NRC Communication PMCL Protective Measure' Counterpart Link NRC Communication RSCL Reactor Safety Counterpart Link NRC Communication ENS Emergency Notification System (Red Phone)

Plant Evaluation Team 1{PN Health Physics Network Plant Evaluation Team ENS Emergency Notification System (Red Phone)

efrneEPP-2080-ERO-O01 Rev. 14 Page 14 of 65 RefeenceEmergency Response Resource Readiness Atacmnt2Functional Checks of TSC NRC and MSP Pages:

Atahet2Phones 13 - 14 2 Call the Michigan State Police, Emergency Management and Homeland Security Division, in Lansing at 1-517-333-5025 and provide the TSC number being used (269-465-5050 or 269-465-6704).

2.1 Document completion of test using Data Sheet 4, TSC Monthly Checklist.

2.2 Notify both Control Rooms that the monthly phone checks are complete.

I Reference EPP-2080-ERO-001 Rev. 14 Page 15 of 65 I Emergency Response Resource Readiness I Attachment 3 Functional Checks of ERO Facility Equipment Pages:

1 FAX Machines 1.1 Demonstrate that each FAX machine is capable of sending and receiving FAXs.

  • IF the FAX machine being tested has a BLAST button THEN use the BLAST button to test the send function.
  • Ensure the FAX machine displays the correct date and time.

S To verify a FAX machine operation;

  • Press "Function"
  • 6 (Print out)
  • 1 (Journal)
  • Set
  • 1 - to start print of Journal o Verify successful FAX transmittal by observing "OK" in the "COMM" column of the journal for each required location for both XMT (send) and RCV (receive) FAXs.
  • Attach Journal to facility checklist.

1.2 Acceptance Criteria: The minimum number, of functional FAX machines, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment hmportant to Emergency Response", for compensatory measures.

Reference EPP-2080-ERO-001 Rev. 14 Page 16 of 65 Emergency Response Resource Readiness I Attachment 3 jFunctional Checks of ERO Facility Equipment Pages:

2 Telephones 2.1i Verify each phone in the facility is capable of both dialing out and receiving calls.

2.2 Acceptance Criteria: The minimum number, of functional telephones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

3 Copiers 3.1 Make 1 copy of a test page.

3.2 Acceptance Criteria: The minimum number, of functional copiers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

4 Computers 4.1 Power up each computer. Verify its connection with the Plant Process Computer database, Local Area Network (LAN) system, or Dose Assessment Program (DAP),

as needed on that computer for the ERO position that uses the computer.

4.2 Acceptance Criteria: The minimum number, of functional computers, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

5 Monitors 5.1 Power up the monitor(s) and verify it is functional with its associated computer.

5.2 Acceptance Criteria: The minimum number, of functional monitors, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

Reference EPP-2080-ERO-001 Rev. 14 Page 17 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

15 - 21 6 Copy Boards 6.1 Make a copy of the board to verify the copy board operates properly.

6.2 Acceptance Criteria: The minimum number, of functional Copy Boards, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

7 Facility Microphones 7.1 Power up the microphone's power supply and talk into the microphone. Verify your voice can be heard in each room of the ERG facility.

7.2 Acceptance Criteria: The minimum number, of functional Facility Microphones, is shown on the facility monthly checklist. IF the minimum number is not functional THEN refer to PMP-2080-EPE-002, "Equipment Important to Emergency Response", for compensatory measures.

8 OSC ED)Reader 8.1 Touch the screen of the ED Reader.

8.2 Acceptance Criteria: Ensure that the display screen is functional.

9 Facility Managers' Bridge 9.1 Dial the Facility Managers' Bridge number found on the ERG Toolbox card.

9).2 WhEN the tone sounds indicating you are on the conference THEN dial the Facility Managers' Bridge number on the ERO Toolbox card on another phone.

9.3 Speak into both phones verifying that each phone can be heard on the other phone.

-9.4 Hang up both phones.

9.5 Acceptance Criteria: Each phone can be heard on the other phone.

Reference* EPP-2080-ERO-001 Rev. 14 Page 18 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

10 Projector Unit & Microphone in JIC Auditorium 10.1 Power up the unit using the touch screen on the podium.

10.2 Touch the icon for computer, TV, camera, etc.

10.3 Verify the projector is displayed on the auditorium screen.

10.4 Verify the microphone is functional by talking into it.

10.5 Power down the auditorium system.

10.6 Acceptance Criteria: The JIC projector and microphone work satisfactorily.

11 Frisker 11.1 Verify the frisker is plugged in to a functioning AC outlet.

11.2 Turn on.

11.3 Increase speaker volume and verify audible response when a background count is detected.

11.4 Verify meter deflection when a background count is detected.

11.5 Turn frisker off.

11.6 Verify calibration does not expire prior to the end of the next month.

11.7 Acceptance criteria: Audible response and meter deflection.

12 Area Radiation Monitor 12.1 Verify the monitor is plugged in to a functioning AC outlet.

12.2 Turn on.

12.3 Verify an upscale meter response when a background count is detected.

12.4 Turn monitor off.

12.5 Verify calibration does not expire prior to the end of the next month.

Reference EPP-2080-ERO-001 Rev. 14 Page 19 of 65 I Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO. Facility Equipment Pages:

12.6 Acceptance criteria: An upscale meter response when a background count is detected.

RfrneEPP-2080-ERO-001 Rev. 14 Page 20 of 65 RefeenceEmergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Pages:

13 Equipment 13.1 Inventory frequency 13.1.1 All emergency supplies and equipment are inventoried at the following prescribed frequencies:

Quarterly portable instrumentation SRDs laboratory instrumentation KI tablets vehicle radios TLDs respiratory equipment All other supplies 13.1.2 Perform a Quarterly inventory of all affected staging areas and facilities within one week following an emergency exercise/drill.

13.2 Facility Readiness 13.2.1 Perform the EOF equipment ready checks using Data Sheet 2, EOF Quarterly Checklist, or equivalent.

13.2.2 Perform the TSC equipment inventory using Data Sheet 5, TSC Quarterly Checklist, or equivalent.

13.2.3 Perform the OSC RP equipment inventory using Data Sheet 9, OSC Quarterly Radiation Protection Checklist or equivalent.

13.2.4 Perform the SV RP equipment inventory using Data Sheet 12, Survey Vehicle Radiation Protection Quarterly Checklist, or equivalent.

13.2.5 Perform the CR RP equipment inventory using Data Sheet 14, Control Room Quarterly Radiation Protection Checklist, or equivalent.

13.2.6 Perform the CREC RP equipment inventory using 15, Control Room Emergency Cabinet Quarterly Radiation Protection Checklist or equivalent.

13.2.7 Perform the Security Control Center and BCSD RP equipment inventory using Data Sheet 18, Berrien County BOC Radiation Protection Quarterly Checklist, or equivalent.

[ Reference EPP-2080-ERO-001 Rev. 14 Page 21 of 65 Emergency Response Resource Readiness Attachment 3 Functional Checks of ERO Facility Equipment Paes 13.2.8 Perform the Training Center RP equipment inventory using Data Sheet 19, Training Center Radiation Protection Quarterly Checklist, or equivalent.

13.2.9 Perform the Lakeland Medical Center, St. Joseph AND Niles RP equipment inventory using Data Sheet 20, LMC Radiation Protection Quarterly Checklist, or equivalent. [NRC Commitment 1179]

13.2.10 Perform the emergency sampling stations RP equipment inventory using Data Sheet 21, Emergency Sampling Station Quarterly Radiation Protection Checklist, or equivalent.

13.2.11 Perform the quarterly respiratory equipment inventory using Data Sheet 22, Emergency Plan Respiratory Protection or the facility data sheets.

13.2.12 Perform RP/Operations Emergency Response equipment inventory quarterly using Data Sheet 23, RP/Ops Emergency Response Equipment Quarterly Checklist.

13.2.13 Radiation Protection Portable Instrument Kits are maintained by the Radiation Protection Department, inventories are performed using Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory. RP performs Periodic Performance Tests (PPT) and calibrates as necessary.

Spare kits are staged in the Training Building in the Emergency Preparedness (EP) area for exchange with the offsite facilities.

o Contact and coordinate with RP informing them that the quarterly checks on RP equipment are to 'take place. Request that the quarterly PPT checks and calibration checks are completed as necessary.

  • After changing out the instrument kits RP will perform the PPT and calibrations as necessary in order to use these changed out kits in other locations.
  • Record the serial number of equipment in the space provided.

13.2.14 Perform the SecuritY Control Center RP equipment inventory using Data Sheet 26, Security Control Center.

14 Documentation 14.1 Document test results on the specific data sheet.

Reference EPP-2080-ERO-001 Rev. 14 Page 22 of 65 Emergency Response Resource Readiness Functional Check of Berrien County 911 Ring Pages:

Atahet4Down Phones "22 -22 1 RING DOWN PHONE SYSTEM TO THE BERRIEN COUNTY 911 DISPATCH CENTER 1.1 Testing of the ring down phone system in the Control Room 1.1.1 Request permission from the Control Room to perform the monthly check.

1.1.2 Prior to the test, call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or* select Public Safety Dispatch Center to inform them that the test is about to commence.

1.1.3 Pick up the phone and talk to the 911 Dispatch Center.

1.1.4 Document completion on Data Sheet 13, Control Room Quarterly Radiation Protection Checklist.

1.2 Testing of the ring down phone system in the EOF.

1.2.1 Prior to the test call the Berrien County 911 Dispatch Center at 269-983-7141 and ask for or select Public Safety Dispatch Center to inform them that the test is about to commence.

1.2.2 Pick up the phone and talk to the 911 Dispatch Center.

1.2.3 Document completion on Data Sheet 1, EOF Monthly Checklist.

1.3 Testing of the ring down phone system in the CAS and SAS.

1.3.1 Review the appropriate Site Protective Services records of the daily ring down phone system to verify that the ring down phone test was completed.

1.3.2 Document completion onl Data Sheet 16, CAS/SAS Monthly Checklist.

Reference EPP-2080-ERO-001 Rev. 14 Page 23 of 65 Emergency Response Resource Readiness Attachment 5 Satellite Phone Checks Pages.

NOTE  ;: Additional information for use of Satellite Phones and Satellite phone numbers can be found in RMT-2080-EPP-600, Satellite Phone Instructions.

The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed.

1 MONTHLY FUNCTIONAL CHECK OF THE IRIDIUM 9555 SATELLITE PHONE 1.1 Turn on by holding button on top of phone.

1.2 Check battery charge level 1.2.1 Locate the battery icon on the upper right side of the phone display 1.2.2 Level of charge should be full

a. IF the level of charge is not full THEN place radio on charging unit and recheck in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

1.3 To place acall.

1.3.1 extend antenna.

1.3.2 dial number.

1.3.3 make contact with another person/phone.

1.4 To receive a call.

1.4.1 The phone will display a call attempt.

1.4.2 Extend antenna.

1.4.3 After several seconds the phone will vibrate or ring and display an incoming call.

1.4.4 Select accept.

1.4.5 Make contact.

Reference EPP-2080-ERO-001 Rev. 14 Page 24 of 65 Emergency Response Resource ReadinessJ Attachment 5 Satellite Phone Checks Pages.

1.5 End call.

1.6 Place on charging unit.

1.7 Acceptance Criteria 1.7.1 Contact is made by either placing or receiving a call.

1.7.2 Battery is fully charged.

1.8 For the phones located at Berrien County, Lake Township and Lake-Michigan College.

1.8.1 Call the location to be tested prior to the test to inform them that the test is about to commence.

1.8.2 Place a call on the satellite phone to the off-site center satellite phone and talk to the person at that location.

1.8.3 Document completion on Data Sheet 24, Monthly Satellite Phone Checks

Reference EPP-2080-ERO-00I Rev. 14 Page 25 of 65 Emergency Response Resource Readiness 25ges:

Data Sheet 1 EOF Monthly Checklist Pag 2 EOF Monthly Checklist

_______________ _________/_

Month Year Equipment Functional Checks: Equipment Functional Checks:

ci 2 FAX machine(s) (Attachment 3) ci 1 Frisker (Attachment 3) ci 1 Telephone (Attachment 3) ci 1 Area Radiation Monitor (Attachment 3) ci 1 Copier (Attachment 3) ci 4 EP portable radios (turn on and verify ci 1 PPC computer (Attachment 3) tranlsmission) ci 1 DAP computer (Attachment 3) Facility Set Up:

ci 1 Flat screen monitors (Attachment 3) ci 1 box of Extra paper for FAX / copy ci 1 Copy Board (Attachment 3) boards/copier ci 1 PAS microphone [] 1 toner for copier ci 1 Projector ci Check EPiIiP procedure books for current ciMSP phones (Attachment 1) revision ci NRC FTS-2001 phones (Attachment 1) ci Check data sheet folders for current revision ci 1 Satellite phones (Attachment 5) [] Check overall cleanliness and appearance ci 911 Phone (Attachment 4)

Facility Readiness: [21 Satisfactory ci Unsatisfactory (enter comment below)

Comments:

Print Name Signature Date Reviewed by: ____________/

EPM or designee Signature Date

I Reference EPP-2080-ERO-0O1 Rev. 14 Page 26 of 65 I Emergency Response Resource Readiness I Pages:

Data Sheet 2 EOF Quarterly Checklist 26 -. 28 EOF Quarterly Checklist

__________________/

Quarter Year Portable Instrument Kits in storage area

[] Verify kit is sealed J] Air Sampling Kit [Ref 6.2. laII.

II 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges.

[] 14 sets of Anti-Contamination clothing, Level 2 [Ref 6.2.1l.a] and [Ref 6.2. lb].

Li 2 Count Rate Meters (friskers).

Li Miscellaneous RP Supply Box.

NOTE: *Before testing, there must be someone at the plant site (in the OSC or with a hand-held radio) to assist in checking operability at the EOF eThe table top radio is already set up in the Dose Assessment Room EL Functional Check of Table Top Radio in Dose Assessment room:

ElVerify radio is turned on and is on the correct frequency.

Li Contact 'the person in the OSC and verify two-way communication is obtained.

Li Clear communication successful, EOF to OSC.

Li Clear communication successful, OSC to EOF.

[] Clear communication successful, EOF to 4 portable EOF handsets El Clear communication successful, 4 portable EOF handsets to EOF

[ Reference EPP-2080-ERO-001 Rev. 14 Page 27 of 65 I Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26 - 28 24-hour coping supplies El Open storage area.

El Ensure that the Contents agree with the inventory sheet.

LII IF the inventory is correct, THEN close the cabinet/storage container.

El IF the inventory is not correct, THItEN replace/order the needed supplies and close the cabinet/storage container.

LI] Close the Cabinet/storage container.

Alternate OSC Equipment and Supplies:

El 10 copies of RMT-2080-OSC-0O1 El 1 Lap Top computer El Copier Board El Extension Cord LII System overview drawings book El Plant Phone List El ,Laminated Field Monitoring Team maps El Cube signs El 4 Telephones El Pens El Pads of lined paper El Post Its El Calculator Alternate TSC Equipment and Supplies:

El 9 copies of RMT-2080-TSC-00I Position Specific Binders El PET Reactor Physics Analyst El Team Coordinator El RAC

Reference EPP-2080-ERO-001 Revo 14 Page 28 of 65 Emergency Response Resource Readiness Data Sheet 2 EOF Quarterly Checklist 26age28 F-i Copi~er Board CL Sign in board Li EPZ maps - poster size El System overview drawings, 2 books Li Plant Phone List El Calculator lii Cube signs EL 4 Telephones Li Pens Li Pads of lined paper EL Post Its.

El Pad of EDM-32a Forms LiPad of EMD-32b Forms Li 1 Laptop Computer NOTE: An Action.Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: Li Satisfactory Cl Unsatisfactory (enter comment below)

Comments:

Performed by:____________I____________ ______

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 29 of 651 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages.

EOE Quarterly Radiation Protection Checklist Quarter Year NOTE: Depending on the facility, the air sampling kits may be a stand-alone kit or part of the total facility inventory.

1 Re-Entry Personnel Equipment Li 14 sets of Anti-Contamination clothing, Level 2, [Ref 6.2.1.a] [Ref 6.2.1.b]

EL 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1.a] [Ref 6.2.l.b]

[] 14 EDs Li 15 TLDs (14 Whole Body, 1 Control)

Radiation Protection Portable Instrument Kit

[]L Break the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.

Air sampling Kit o El Break Seal and inventory

[21 Calculator Li Sealable sample collection bags Li Tweezers Li Pad of Paper Li Air Sample Envelopes

[] Particulate Filters (47mm filters)

Li Time Piece

[] Writing Implements EL Silver Zeolite Cartridges (rain 5 Cartidges Expiration date _______

a Li Install new seal Additional Equipment

[] 2 Count Rate Meters: [Ref 6.2.1.a] Serial Number ____Serial Number__

[] 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors Li 21 TLDs (20 Whole Body, 1 Control) (BOF/JIC General distribution badges)

Li 8 TLDs (Area TLD Badges)

Li 8 EDs (Area EDs)

Li Area Radiation Monitor (ARM) [Ref 6.2.1. a] Serial Number__

Reference EPP-2080-ERO-001 Rev. 14 Page 30 of 65 Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist Pages31 2 Offsite Survey Team Equipment Radiation Protection Portable Instrument Kit LiBreak the seal and document an inventory on Data Sheet 25, Radiation protection Portable Instrument Kit Inventory.

EL Donald C. Cook EPZ Map Li Berrien County Map Li1 12 Blank Data Sheets (verify current revision)

RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Li Key to Air Sampling Stations (B-i)

Li Keys to Rosemary Beach Gate Li 2 Clipboards Li 1 Air Sampler with sample head: Serial Number________

L-i RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision )

Li 1 Assorted Tool Kit Li 2 Site Maps Li 1 Flashlight/Lantern with Batteries, verify operation.

Li Compass Li2 Sets Winter Apparel Li Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or combination of these)

Miscellaneous RP Supplies LiTape Li Tweezers Li Paper Li Labels Li Smears Li Writing Implements Li Compass LiDisposable Gloves LiKeys to Air Stations Li1 Keys to Rosemary Beach Gate LiSample collection Bags

[ Reference EPP-2080-ERO-001 Rev. 14 Page 31 of 65 I Emergency Response Resource Readiness Data Sheet 3 EOF Quarterly Radiation Protection Checklist 29age31 Facility Readiness: El Satisfactory El Unsatisfactory (enter comment below)

Comments:

Performed by: ______________________________________________I________________________________________________

El Print Name Signature Date Reviewed by: __________________________________________/____________________________________________

EPM or designee Signature Date

[ Reference EPP-2080-ERO-O01 Rev. 14 Page 32 of 65 I Emergency Response Resource Readiness Data Sheet 4 TSC Monthly Checklist Pages TSC Monthly Checklist

__________________/

Month Year Equipment Functional Checks: Equipment Functional Checks:

El 1 Copier (Attachment 3) El 1 PAS microphone (turn on and verify LI 2 FAX machines (Attachment 3) output)

LI 2 Flat screen monitors (Attachment 3) EL1 Frisker (Attachment 3)

El 3 PPC computers (Attachment 3) El 1 Airborne monitor (turn on and verify LI 1 DAP computer (Attachment 3) display)

LI 2 Telephones (Attachment 3) Facility Set Up:

LI 1 MSP phone (Attachment 2) LI 1 box of Extra paper for FAX!/copy LI All NRC FTS-2001 phones (Attachment 2) boards/copier LI 1 Iridium 9555 Satellite phones LI 1 toner for copier (Attachment 5) LI Check procedure books for current revision LI 3 EP radios (turn on and verify LI Check data sheet folders for current revision transmission)

LI All Supply cabinets locked or sealed LI Overall cleanliness and appearance NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI1 Satisfactory LI1 Unsatisfactory (enter comment below)

Comments Performed by:

Print Name Signature Date Reviewed by: /_

EPM or designee Signature Date

RefeenceEmergency Response Resource Readiness EPP-2080ERO-001Rev. 14Pages3 f6 Data Sheet 5 TSC Quarterly Checklist TSC Quarterly Checklist Quarter Year 24-hour coping supplies El Open storage area.

Li Ensure that the Contents agree with the inventory sheet.

Li IF the inventory is correct, THEN close the cabinet/storage container.

LI IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.

Li Close the Cabinet/storage container.

Performed by:____________/____________ ______

Print Name Signature Date Reviewed by:____________/__________________

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 34 of 65 I Emergency Response Resource Readiness Data Sheet 6 TSC Quarterly Radiation Protection Checklist Pages:

TSC Quarterly Radiation Protection Checklist Quarter Year Cabinet Inventory LI Break seal and perform inventory EL 4 TLDs (Area TLDs)

LI 4 EDs (Area EDs)

LI 25 EDs LI Count Rate Meter [Ref 6.2.1 .a] Serial Number ________

LI 2 Count Rate Meter Cables LI 2 Count Rate Meter Detectors LI Portable Continuous Air Monitor [Ref 6.2.1 .a] Serial Number _________

LI Area Radiation Monitors (ARM) Serial Number_________

LI Charcoal lInpregnated fiber filters LI Air Sample Envelopes LI 26 TLD Badges (25 Whole Body, 1 Control) [Ref 6.2.1 .a]

LI 25 sets of Anti-Contamination clothing, Level 2: [Ref 6.2.1 .a] [Ref 6.2.1lb]

LI 25 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1..a]

LI 65 packages of KI tablets with:

[] 25 KI1 Consent Forms RMT-2080-TSC-001, Data Sheet 3 (verify current rev.)

LI Install new seal NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

  • Facility Readiness: ElI Satisfactory LI Unsatisfactory (enter comment below)

Comments:

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by: ___________/___________ _____

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 35 of 65 Emergency Response Resource Readiness Data Sheet 7 OSC Monthly Checklist Pages:5 OSC Monthly Checklist Month Year Equipment Functional Checks: Equipment Functional Checks:

C] 1 Copy Board (Attachment 3) C] 1 PAS microphone (turn on and verify C] 1 Copier (Attachment 3) output)

C] 1 FAX machine (Attachment 3) C] 1 Area monitor (turn on and verify C]1 Flat screen monitors (Attachment 3) transmission)

C]3 Computers (Attachment 3) Facility Set Up:

C] 10 Telephones (Attachment 3) C] 1 box of Extra paper for FAX!, copy C] Satellite phones (2 - onsite survey, 2 - boards/copier off-site survey teams) (Attachment 5) C] 1 toner for copier C] EP radios (18 DCT or RP C] Check procedure books for current revision teams/personnel, 6 for Operations C]1 Check data sheet folders for current revision personnel) (turn on and verify charged) C]Splcaiesokdoreld C] 1 ED Reader (touch screen and verify C]Oealcanissndperne display) QOealceniesadapaac C]2Fikr (tahet3 C] Verify survey vehicle keys are in 2 Frskes 3)Emergency (ttacmen Key box.

C]3 Spare batteries for facility radios C]1 set of spare batteries for each flashlight.

NOTE: An Action Request per PMiP-7030-CAP-O01, Action Initiation, is required for checks that are not satisfactory. Document *number in comments.

Facility Readiness: C] Satisfactory [21 Unsatisfactory (enter comment below).

Comments:"

Performed by: /

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 36 of 65 Emergency Response Resource Readiness Data Sheet 8 OSC Quarterly Checklist 36age37 OSC Quarterly Checklist

__________________/

Quarter Year Radiation Protection Portable Instrument Kit LI] Verify kit is sealed.

24-hour coping supplies J Open storage area.

L) Ensure that the Contents agree with the inventory sheet.

0l IF the inventory is correct, THEN close the cabinet/storage container.

[I1 IF the inventory is not correct, THEN replace/order the needed supplies and close the cabinet/storage container.

LI] Close the Cabinet/storage container.

Reference EPP-2080-ERO-001 Rev. 14 Page 37 of 65 Emergency Response Resource Readiness Pages:

Data Sheet 8 OSC Quarterly Checklist 36 - 37 j Functional Check of Table Top Radio EL Obtain a radio from the inventory of equipment located in the closet outside of the OSC.

El Take the headset out of the top drawer and plug into the outlet near the left hand side of the desk.

Li Tune the radio to the correct frequency, consistent with the frequency on the table top radio.

For example:

Hand-held radio Channel 1: KNDP798 (off-site) = Table top radio Ch 1 Hand-held radio Channel 2: WXL815 (on-site) =Table top radio Ch 2 EL Talk into the headset and ensure thehand-held radio is on the correct frequency for the testing Li Radio receives and transmits.

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory.* Document number in comments.

Facility Readiness: Li Satisfactory Li Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by: /

EPM or designee / Signature Date

I Reference EPP-2080-ERO-OO1 Rev. 14 Page 38 of 65 I Emergency Response Resource Readiness DataShet OSCQuatery 9 Rdiaton rotctin CeckistPages.

Data Seet 9 OSC Quarterly Radiation Protection Checklist38-4 Quarter Year Li 40 Electronic Dosimeters, (50 PAMs/WIRMs with batteries)

El 141 TLDs (40 Whole Body, 100 Special, 1 Control) (Ref 6.2. la)[

Li Gamma Spectroscopy Counting System (capable of counting Iodine and Particulate air samples)

Calibration Due Date _____

Li Area Radiation Monitor (ARM): Serial Number ____

CL Area Radiation Monitor (ARM): Serial Number____

Li 2 Count Rate Meters: Serial Number _______

Serial Number_______

Li 3 Count Rate Meter Cables L1 3 Count Rate Meter Detectors Li 3 Telescopic Survey Meters:

Serial Number _______

Serial Number _______

Serial Number_______

Li 3 GM Survey Meters [Ref 6.2.1.a]:

Serial Number _______

Serial Number _______

Serial Number_______

Li 4 Air Samplers w/ Heads [Ref 6.2.l.a3 Serial Number _______

Serial Number_______

Serial Number _______

Serial Number________

Li Purge Rig (located in the Lakeside Office Building north ventilation room)

Li Walk-Through Portal Monitor Cal Due Date_____

Li Set of RP Procedures Li Donald C. Cook 10 mile EPZ map Li Site Map

Reference EPP-2080-ERO-001 Rev. 14 Page 39 of 65 I Emergency Response Resource Readiness Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages40 LI 15 Blank Data Sheets (verify current revision)

RMT-2080-EOF-001, Datasheet 2, Off-site Survey Log Operations Facility EL 2 Clipboards LI Calculator (in locker)

LI Radio Headset El 6 Lanterns/Flashlights with Batteries LI 420 packages of KI tablets LI 100 KI Consent Forms, RMT-2080-OSC-001 - Data Sheet 3 (verify current revision)

LI 2 containers, each containing 2 packages of KI tablets for Off Site Survey Teams.

LI Decon Kit (inventory list located inside box under lid) [Ref 6.2. lb]

LI 8 Stanchions LI 3 Step-Off-Pads LI 5 Rolls Duct Tape LI 8 Tni-foil Signs with Assorted inserts LI 6 Cloth/Poly Bags LI Masslinn Mop LI 25 Masslinn Sheets LI2 Portable Tables LI 30 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1. .a]

LI 10 SCBA Units LI 25 Spare SCBA bottles (NRC Commitment # 5392)

Air Sampling Kit [Ref 6.2.l.a]

LI Break seal and perform inventory LIPad of Paper LI Planchetts LI Particulate filters (47-mam)

LI Sealable Plastic Bags LITweezers LI Time Piece LI Air Sample Envelopes LICalculator LI Writing Implements LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___

LI Install new seal.

CL Portable Instrument Kit [-Ref 6.2.1 .a]

LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Off Site Responder / Security D~osimetry Box LI 21 TLDs (20 Whole Body and 1 Control)

LI 20 EDs

ReferenceEPP-2080-ERO-001 Rev. 14Pae4of6 Reference Emergency Response Resource ReadinessPae4of6 Data Sheet 9 OSC Quarterly Radiation Protection Checklist Pages:

Miscellaneous Supply -Box Li Break the seal and inventory.

I] Rad Ribbon / rope Li Rad Tape Li Smears Li Planchetts Li Tweezers Li Safety Glasses Li Paper Li Pens Li Disposable Gloves Li Envelopes EL Hearing Protection

[] Install-new seal.

Li 30 Sets of Anti-Cs, Level 2 [-Ref 6.2.1.a]

Li 30 Full plastic suits with hoods NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI] Satisfactory Li Unsatisfactory (enter comment below)

Comets Performed by:

Print Name Signature Date Reviewed by:-

EPM or designee Signature Date

efrneEPP-2080-ERO-001 Rev. 14 Page 41 of 65 ReferenceEmergency Response Resource ReadinessI Data Sheet 10 ENC/JIC Monthly Checklist Pages:

41 -41 ENC/JIC Monthly Checklist I

Month Year Equipment Functional Checks: Facility Set Up:

Li 1 Copier (Attachment 3) Li 1 box of Extra paper El 2 FAX machine(s) (Attachment 3) [] 1 toner for copier Li 2 Flat screen monitors (Attachment 3) LiCheck procedure books for current revision

[] 3 Computers (Attachment 3) Li Check data sheet folders for current rev.

EL 2 TVs and 2 Radios Li Supply cabinets and key box sealed Li 1 TV recording device(s) Li Extra bulbs for large screen projector Ei 15 Telephones (Attachment 3) Li Verify the current ERG calendar is in the Li 1 PA microphone (turn on and verify output) press packets LI] 1 Security Computer in Stairwell (Plug in EL Check keys in key box and turn on) EiReceptionist - Master Key Li 1 County laptop (Plug in and turn on) LiSpokesperson - Master Key Li Verify recorded message.

Li 1 Projector in auditorium (Attachment 3) LiAudio Visual - Master key & cabinet key ELSupport Coordinator - Master Key Li 2 TLDs (Area TLDs) LiMedia Center Manager -Master Key Li 2 EDs (Area EDs) LIMedia Area Coordinator - Master Key LIJIC Setup Coordinator - Master Key, Stair Li Overall cleanliness and appearance screen key (#45), 2 Misc Keys NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Facility Readiness: LI Satisfactory Li Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by: I_

Date EPM or designee M1gnature

Reference EPP-2080-ERO-O01 Rev. 14 Page 42 of 65 Emergency Response Resource Readiness Pages Data Sheet 11 Survey Vehicle Monthly Checklist 42 - 42 Survey Vehicle Monthly Checklist LiVehicle #1 El Vehicle #2

____________________/

Month Year L1 Check fuel supply (keep tank full)

Li Check battery (start and drive for 30 minutes)

Li Check that tires are not flat

[21 Check that there is no leaking/puddle fluids under vehicle CI Check that the lights (including turn signals) work Li Check that windows are not cracked/broken

[II Odometer reading _____miles Odometer reading _____miles Li Spare batteries, 1 set for each vehicle flashlight.

Li Check vehicle for overall cleanliness and appearance CL Check recharge tag on battery jump pack (recharge if necessary)

Vehicle Readiness: Li Satisfactory EL Unsatisfactory (enter comment below)

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by:____________/__________________

EPM or designee Signature Date

Ref erence EPP-2080-ERO-001 Rev. 14 Page 43 of 65 Emergency Response Resource Readiness Daa het 2 Survey Vehicle Radiation Protection Quarterly Pages:

DtShe12Checklist 43- 44 Survey Vehicle Radiation Protection Quarterly Checklist LI Vehicle #1 LI Vehicle #2

_________________/ _______

Quarter Year EL Site Map

[] Berrien County Map LI 15 Blank Data Sheets (verify current revision)

RMT-2080-EOF-O01, Datasheet 2, Off-site Survey Log Operations Facility LI RMT-2080-EOF-001, Activation and Operation of the EOF ( verify current revision)

LI Clipboard LI Flashlight/Lantern with Batteries El 2 Sets Winter Apparel .[Ref 6.2.1.a]

LI Clippers EL Shovel LI 2 Full Face Respirators with Iodine and Particulate Cartridges . [Ref 6.2.1. a]

LI Sample containers for at least 32 liters of samples (Marinellis with lids, buckets with lids or sealable plastic bags or any combination.)

Miscellaneous Supply Box LI Break the seal and inventory LI Paper LI Rad Tape LI Disposable Gloves LI Envelopes LI Tweezers LI Sample Collection Bags LI Labels LI Compass LI Rad Ribbon ! rope LI Smears LI Keys to Rosemary Beach Gate LI Writing Implements EL Keys to Air Stations LI Install new seal Radiation Protection Portable Instrument Kit [Ref 6.2.1 .a]

LI Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Reference EPP-2080-ERO-001 Rev. 14 Page 44 of 65 Emergency Response Resource Readiness het 2 Daa Survey Vehicle Radiation Protection Quarterly Pages:

DtShe12Checklist 43- 44 lNOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.

Air Sampling Kit .I[Ref 6.2.1.a]

II] Break the seal and inventory C)Pad of Paper C)Planchetts C)Particulate filters (47-mm filters)

C)Sealable Plastic Bags C)Time Piece C)Writing Implements C)Air Sample Envelopes C)Calculator

[] Silver Zeolite Cartridges (min 5 cartridges) Exp Date____

C) Install new seal C) 2 Sets of Anti-Cs, Level 2 .[Ref 6.2.1.a] [Ref 6.2. lb]

C) 2 Full Plastic suits with hoods C) 1 Reflective vest NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Vehicle Readiness: I] Satisfactory C)Unsatisfactory (enter comment below)

Comments:

Performed by:

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 45 of 65 Emergency Response Resource Readiness Data Sheet 13 Control Room Monthly Checklist 45g-46 LI) Unit One Control Room I] Unit Two Control Room (Use a separate datasheet for each Control Room)

__________________/

Month Year One FAX Machine Verify the FAX machine functions per Attachment 3.

________________________________________/___________

EP Staff Date ERONS Password Verify the presence of ERONS Password in the Control Room Briefcase.

Verify the password is correct by logging into ERONS.

________________________________________/___________

EP Staff Date One 911 Dispatch Center Phone Test the ring down phone system per Attachment 4.

_______________________________________/___________

EP Staff Date One DAP Computer El Obtain permission to test the DAP Computer I]Verify that the DAP will perform a calculation and print out an EMD32a and EMD32b EP Staff Date Dt

I Reference EPP-2080-ERO-001 Rev. 14 Page 46 of 65 I Emergency Response Resource Readiness I

Data Sheet 3CotoRom 13Conrol oomMontly heckistPages:

othyhelit45 -46 Control Room ERO Briefcase Inventory Procedures 0 1 copy of EPP-2080-ERO-002, ERO Pager Testing and Maintenance IJ 1 Laniinated copy of 1 EPP-2080-ERO-002, ERO Pager Testing and Maintenance, IJ 1 copy of 0OH1-2080, Conduct of Operations (Emergency Organization)

J1 copy of PMP-2080-EPP-100, Emergency Response El 1 copy of PMP-2080-EPP-108, Infitial Dose Assessment

11) 3 copies of PMP-2060-SEC-006, Security Requirements for Plant Personnel, Datasheet 3 El 3 copies of PMP-7030-00l-001, Prompt NRC Notification, Attachment 1 ELi3 copies of PMP-7030-001-001, Prompt NRC Notification, Datasheet 1 Supplies IJ 2 Steam Table Books IJ 20 Blank EMD32a Forms I] 20 Blank EMD32b Forms I* 1 DC Cook Nuclear Power Plant Protective Action Boundary Book SComments:

NOTE: An Action Request per PMIP-7030-CAP-0O01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:__________________________ ______

Print Name Signature Date Reviewed by: ____________/__________________

EPM or designee Signature Date

[ Reference EPP-2080-ERO-001 Rev. 14 Page 47 of 65 I Emergency Response Resource Readiness Daa~et 4 Control Room Quarterly Radiation Protection Pages:

Daahe 4Checklist 47- 47 J

________________ _________/_

Quarter Year Unit One Control Room El 11 TLDs (10 Whole Body and 1 Control) [Ref 6.2.1.a]

El 10OEDs.

El 5 packages of KI tablets.

El 25 KI Consent Forms - RMT-2080-OSC-001, Data Sheet 3 (verify current revision )

El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2.1ib]

El 4 SCBA Units [Ref 6.2.1.a]

El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]

Unit Two Control Room El 11 TLDs~(10 Whole Body and 1 Control) [Ref 6.2.1.a]

El 10OEDs.

El 5 packages of KI tablets.

El 25 KI Consent Forms - RMT-2080-OSC-00 1, Data Sheet 3 (verify current revision).

El Portable SPING Monitor (PSM) Serial Number _______

El Particulate Filters (50-mm filters)

El Silver Zeolite Cartridges (min 5 cartridges) Expiration Date________

El Air sample Envelopes El 4 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]

El 4 SCBA Units..[Ref 6.2.1.a]

El 4 Full Face Respirators with Iodine Cartridges and Particulate Cartridges. [Ref 6.2.1. a]

Comments:

Location Readiness: [] Satisfactory El Unsatisfactory (enter comment below)

Performed by:____________I_____________ ______

Print Name Signature Date Reviewed by:

EPM or designee Signature Date v

Reference EPP-2080-ERO-001 Rev. 14 Page 48 of 65 Emergency Response Resource Readiness Control Room Emergency Cabinet Quarterly Pages:

DtShe15Radiation Protection Checklist 48 -49 Control Room Emergency Cabinet Located outside of the Control Room by TSC stairway I__________/_

Quarter Year

[] Break the seal and inventory SNOTE: This cabinet is a requirement of B-Plan App. C. [Ref 6.2. lb Li 2 Count Rate Meters [Ref 6.2. 1.a] Serial Number ______Serial Number_____

Li 3 Count Rate Meter Cables Li 3 Count Rate Meter Detectors

[] Control Room Set-Up Drawing Li 2 Lanterns/Flashlights with Batteries Li 6 Stanchions Li2 Step-Off-Pads Li 5 Tni-foil Signs with Assorted Inserts Li 4 Cloth/Poly Bags El Clipboard Li 12 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a]

Li 12 Full Face Respirators with Iodine Cartridges and Particulate Cartridges [Ref 6.2.1 .a]

Li 13 TLDs (12 Whole Body and 1 Control) [Ref 6.2.l.a]

Li 10 SCB3A Units [Ref 6.2.1.a]

Li 10 Spare SCBA bottles [Ref 6.2.l.a]

[] Install new seal Miscellaneous Supply Box

[] Break the seal and inventory Li Rad Ribbon / rope Li Rad Tape Li Smears Li Paper Li Pens Li Duct Tape Li Install new seal

I Reference EPP-2080-ERO-001 Rev. 14 Page 49 of 65 I Emergency Response Resource Readiness IControl Room Emergency Cabinet Quarterly Pages:

DtShe15Radiation Protection Checklist 48 -49 j IOPortable Instrument Kit [Ref 6.2.1 .a]

Il Break the seal and inventory on Data Sheet 25, Radiation Protection Portable Instrument Kit Inventory.

Comments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for1 checks that are not satisfactory. Document number in comments.j Location Readiness: [] Satisfactory [] Unsatisfactory (enter comment below)

Performed by: /

Print Name Signature Date Reviewed by: I-Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 50 of 65 Emergency Response Resource Readiness Data Sheet 16 CAS/SAS Monthly Checklist Pages.

CAS/SAS Monthly Checklist

__________________/

Month Year Verify that the ring down phone system connects to the Berrien County 911 Dispatch Center.

(Attachment 4, Functional Check of Berrien County 911 Ring Down Phones)

ELISAS / _ _ _

EP Staff Date ElICAS ________I___

EP Staff Date Verify that the Iridium 9555 Satellite phone system functions properly.

(Attachment 5, Satellite Phone Checks)

LI SAS________I__

EP Staff Date uCAS ___________

EP Staff Date Comments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: I Print Name Signature Date Reviewed by: /

Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 51 of 65 Emergency Response Resource Readiness Dat megeny Shet17 espns Daa ystm estngPages.

Seet 17 Data Emergency Response Data System Testing51-3 Date of test: (MM/DD/YEAR) _____________

Computer being used to test ERDS ______________

1 ERDS Testing Process 1.1 ERDS is active 24/7 and testing is not normally required. IF testing is necessary THEN continue with this attachment.

1.2 This process can be performed from any Local Area Network (LAN) computer.

1.3 Call the NRC ERDS Operations Center, at 301-816-5140 or 5141, and inform them of the approximate time that the test of the ERDS for Cook Nuclear Plant will be conducted.

Was the test started at the pre-determined time? Yes IJ No I 1.3.1 Record time NRC was contacted _______

1.3.2 The NRC will stay on the line to watch the activation process from their location and verify that the ERDS data is being received.

1.3.3 The NRC ERDS Operations Center will give instructions on how they will be conducting the test.

Reference EPP-2080-ERO-001 Rev. 14 Page 52 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing Pages:

1.3.4 For performing from any LAN computer:

a. Click on the appropriate unit/system designator (Unit1, Unit2, SPC1 or SPC2).
b. In the white background box under the window menu option, type in "ERDS" and press enter.
c. When prompted enter User Name and Password.
  • Obtain User Name and Password from Position Specific Desktop Guide
d. Click on the screen location labeled "ACTIVATE" 1.4.4 Open another PPC display by clicking on file menu option and selecting the top menu.
a. Repeat steps (a) through (d) for the other unit.

Did both units connect with no problem? Yes IJ No ElI 1.4 The NRC will let both systems run for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and then disconnect the transmission at the NRC's end.

1.4.1 The NRC will reestablish the connection to verify the systems reconnect and continue transmitting ERDS data to them.

1.4.2 The NRC will let the systems run for an additional 60 minutes and then terminate the test from their location.

1.4.3 A follow-up phone call will be made by the NRC ERDS Operation Center stating that the test was successful or not successful.

Did the NRC personnel verify that the test passed for both units? Yes LI] No E .

Reference EPP-2080-ERO-001 Rev. 14 Page 53 of 65 Emergency Response Resource Readiness Data Sheet 17 Emergency Response Data System Testing51-3 1.5 IF ERDS transmission is lost, THEN contact the NRC and Information Technology (IT) to investigate the connection problem.

1.5.1 Verify that the Status on the ERDS screen is "Inactive".-

1.5.2 Close the PPC application.

1.6 IF the test is unsuccessful, THEN:

Obtain reason for the failure from the NRC or IT.

o Inform Information Technology (IT) of the failure.

o Retest the system when repairs are complete.

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Comments:

Performed by:____________/_____________ ______

Print Name Signature Date Reviewed by: /-

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 54 of 65 Emergency Response Resource Readiness Berrien County EOC Radiation Protection Pages:

DtSee18Quarterly Checklist 54 - 54 Berrien County EOC Radiation Protection Quarterly Checklist Call 1-269-983-7141 a week in advance to set up a time and day for the inventory.

______________ I________/_

Quarter Year SNOTE: Place a"I"" orXo the line pedigthe item to indicateacetb.

Berrien County Sheriff Department CI 201 TLDs (200 Whole Body and 1 Control)

SComments:

NOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: I Date EPM or designee Signature

I Reference EPP-2080-ERO-001 Rev. 14 Page 55 of 65 I Emergency Response Resource Readiness Daa het 9 Training Center Radiation Protection Quarterly Pages:

DtShe19Checklist 55 -55 Training Center Radiation Protection Quarterly Checklist

________________ _________/_

Quarter Year El Count Rate Meter Serial Number ________Cal Due Date Li 2 Count Rate Meter Cables' Li 2 Count Rate Meter Detectors Li 1 Air sampler with sample head Serial Number _________Cal Due Date Li 16 Electronic Dosimeters . [Ref 6.2.1 .a] Cal Due Date Li Li 17 TLDs (16 Whole Body, 1 Control). [Ref 6.2.1.a]

2 Flashlights E

El Box of Smears Li 14 Full Face Respirators with Iodine Cartridges and Particulate Cartridges EL 14 Sets of Anti-Cs, Level 2 [Ref 6.2.1.a] [Ref 6.2. lb]

NOTE: An Action Request per PMP-7030-CAP-OO01, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

EPM or designeeSintr Date Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 56 of 65 Emergency Response Resource Readiness Pgs Data Sheet 20 LMC Radiation Protection Quarterly Checklist 56age58 LMC Radiation Protection Quarterly Checklist LiSt. Joseph Li Niles (1307 Storage Room)

(This Data Sheet is used for either the St. Joseph or Niles Healthcare locations)

Contact the Emergency Room nurse for key or Security for escort to Radiation Emergency Storage Room; Security is located near the ER entrance.

__________________/

Quarter Year SNOTE: Tehospital supply cbntianEPan App. Crequirement.

LiBreak the seal and inventory Li Count Rate Meter Serial Number ________Cal Due Date_____

Li 2 Count Rate Meter Cables Li 2 Count Rate Meter Detectors Li Air Sampler with sample head Serial Number _______

EL E-Plan Air Sample Activity Determination Worksheet Li 20 EDs Cal Due Date_ __

LiAssorted Tool Kit Li Hospital Personnel Dosimetry Log / Survey Sheets (Information Packet)

Li Clipboard EL 21 TLDs (20 Whole Body, 1 Control)

Li 12 Anti-C Packets The hospital supplies the Anti-Cs contained at these centers.

if the inventory is short, THEN contact the hospital to replenish.

Li Stanchions or portable barriers sufficient to post area.

Li1 3 Step-Off-Pads Li 6 Tni-foil Signs with Assorted Inserts Li 6 Cloth/Poly Bags Li 2 Trash Bag Holders Li1 Water Collection Bottle Li Stretcher Insert Li Water Collection Tray Li Shower Head Li Hose Li1 Herculite Runner (or equivalent)

Li Portable Lead Container LiMasslinn Mop and 25 Masslinn Sheets LiInstall new seal

Reference EPP-2080-ERO-001 Rev. 14 Page 57 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pages58 I] Portable Instrument Kit CL Break the seal and document inventory on Data Sheet 25, Radiation Protection Portable

  • Instrument Kit Inventory.

NOTE: Depending on the center, the air sampling kits may be a stand-alone kit or part of the total center inventory.

Air Sampling Kit [Ref 6.2.1.a]

LI Break the seal and inventory LI Pad of Paper LI Planchetts LI Particulate filters (47-mm filters)

El Sealable Plastic Bags LI Time Piece LI Silver Zeolite Cartridges (rai 5 cartridges) Exp Date___

[] Air Sample Envelopes LI Calculator LI Writing Implements LITweezers LIRad Tape LI1 Rad Ribbon/rope LI Shoe Covers LI Smears LIDisposable Gloves LI1 Install new seal Hospital Sample Kit (In-Cabinet)

LI Break the seal and inventory LI Nail Clippers LI Smears LI Vomitus Containers LI Writing Implements LIScissors LI Urine Containers LI Envelopes LI Forceps LI Cotton Swabs in Vials LI Eyedropper Bottle LI Tweezers LI Poly Bags LIInstall new seal

Reference EPP-2080-ERO-001 Rev. 14 Page 58 of 65 Emergency Response Resource Readiness Data Sheet 20 LMC Radiation Protection Quarterly Checklist Pgs Hospital Decon Kit (In Cabinet)

C] Break the seal and inventory C] Skin Cream C] Clorox C] Cotton Tip Applicators C] Detergent C] Towels C] Phisoderm (or equivalent)

C] Corn Meal C] Nail Clippers C] Writing Implements C] Gauze Pads C] Steri-Drape UI Decon Procedures C] Surgical Tape C] Forceps C] Transparent Dressing C]-Solution Bowls C] Scissors C] Irrigation Syringe C] Shave Kit C1 Shampoo C] Disposable Gloves C] Poly Bags C] Install new seal Comments:

SNOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

Reference EPP-2080-ERO-001 Rev. 14 Page 59 of 65 Emergency Response Resource Readiness Data Sheet 21 Emergency Sampling Station Quarterly Radiation Pages:

Protection Checklist 59 - 59 J Emergency Sampling Station Quarterly Radiation Protection Checklist

_________________/ _______

Quarter Year Minimum Inventory Requirements for Emergency Sampling Stations ElPortable Low Volume Air Sampler El Extension Cord

[] Water Sampling Bottles El Air Sample Head .

[] Air Sampling Envelopes IJ Tygon Tubing

[21 Pad of Paper El Air Sample Filters (47 and 50 mm filters)

ElWriting Implement El Shielded Sample Container (Required for U-i SJAE and GS Leak-off SPINGS only.)

[] Gas Marinelli Beaker (Located in box at Unit vent effluent monitor only)

El Silver Zeolite Cartridges (main 5 cartridges) Exp Date___

-Turbine Building El 609' at SRA-1800, Gland Steam Condenser Vent Monitor E21 609' at SRA-1900, Steam Jet Air Ejector Monitor El 609' at SRA-2900, Steam Jet Air Ejector Monitor El 591' at SRA-2800, Gland Steam Condenser Vent Monitor El 609' Turbine-Side RP Count Room for VRA-1500 and VTRA-2500, Unit Vent Monitor Auxiliary Building El 587' Spray Additive Tank Room at Chemistry Sampling Station NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by:

Print Name Date Signature Reviewed by: /_

Date EPM or designee Signature

Reference EPP-2080-ERO-001  ;'Rev. 14 Page 60 of 65 I Emergency Response Resource Readiness I Data Sheet 22 Emergency Plan Respiratory Protection Pages IQuarterly Checklist 60 - 60 Emergency Plan Respiratory Protection Quarterly Checklist

__________________/

Quarter Year Respirator size inventories should be approximately 10% small, 70% medium and 20 % large.

IF the seal on an SCBA container is broken, THtEN inform Fire Protection of the discrepancies as soon as possible.

Ensure all spare SCBA air bottles contain at least 2000 (yellow bottles) or 4000 (green bottles) psig.

Radiation Protection Access Control LI 10 SCBA Units (clean side) 609 Turbine LI10OSCBA Units Auxiliary Building LI 17 SCBA Units (various locations)

Location Number Location Number LI 609 Turbine by TRPAC 1 LI 633 by Freight Elevator 1 LI 609 by Elevator 5 LI 650 4 LI 573 by Freight Elevator 1 LI 612 Unit 1 Containment CAC 2 LI 587 by Freight Elevator 1 LI 612 Unit 2 Containment 2 Comments:

NOTE: An Action Request per PMP-7030-CAP-00 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

EPM or designee Signature Date

RefeenceEmergency Response Resource Readiness Data Sheet 23 RP/Ops Emergency Response Equipment Pages:

Quarterly CheckliSt 61- 62 RP/POps Emergency Response Equipment Quarterly Checklist

_________________/ ________

Quarter Year The Operations emergency supplies are located in the Shift Manager's Office (typically stored in a file cabinet drawer labeled "EOP/NFPA 805 Head Lamp Storage")

The emergency RP supply boxes are located at the Auxiliary Building exits:

  • RPAC - supply box is located in cabinet near the shower.

o, TRPAC - supply box is located in the decontamination room.

RPAC - Emergency RIP Supply Box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. [] 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID 4 pair of booties ID 4 hoods ID 4 pair of rubber boots ID 4 pair of glove liners ID 1 box of smears ID Install- new seal TRPAC - Emergency RIP Supply box ID Break the seal and inventory ID 4 full face respirators with Iodine cart. ID[ 8 pair of pairs of rubber gloves ID 4 plastic suits w/ hoods ID[ 4 pair of booties ID 4 hoods ID 4 pair of rubber boots El 4 pair of glove liners ID 1 box of smears ID 1 Portable Air Sampler ID 1 Dose Rate Meter ID Install new seal

I Reference EPP-2080-ERO-001 Rev. 14 Page 62 of 65 I Emergency Response Resource Readiness I Data Sheet 23 RPIOps Emergency Response Equipment Pages:

IQuarterly Checklist 61- 62 SComments:

NOTE: An Action Request per PMP-7030-CAP-0O 1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Print Name Signature Date Reviewed by: ____________/

EPM or designee Signature Date Dt

Reference EPP-2080-ERO-001 Rev. 14 Page 63 of 65 Emergency Response Resource Readiness Data Sheet 24 Monthly Satellite Phone Checks Pages63 Monthly Satellite Phone Checks Month Year Verify that the Iridium 9555 Satellite phone system functions properly EL Lake Township Fire Department ___________/ _ __

Performed By Date El Berrien County EGG ____________/ ___

Performed By Date CL Lake Michigan College ___________/___

Performed By Date.

Verify that the Iridium 9555 Satellite phone system functions properly Two (2) phones are located in the SM complex Li Shift Manager Complex /____________I____

.. Performed By Date Comments:

INOTE: An Action Request per PMP-7030-CAP-001, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: /-

Date EPM or designee Signature

Reference EPP-2080-ERO-001 Rev. 14 Page 64 of 65 Emergency Response Resource Readiness DaaSee 5 Radiation Protection Portable Instrument Kit Pages:

DtShe25Inventory 64- 65 SNOTE: This datasheet is used by Radiation Protection to inventory a kit when the seal l on a kit is found broken or is broken for maintenance of the kit.

Kit Number __________Kit Location (check the box for the appropriate location)

[]I EOF (Off-Site survey team contingency equipment) J Survey Vehicle #1 1] EOF (RP Equipment storage area) LII Survey Vehicle #2 Li Unit One Control Room (CREC) LII OSC Li Lakeland Medical Center St. Joseph Li Lakeland Medical Center Niles

[3 Other _________

Response Source JCN _____

NOTE: The floiginstrument tye reuvln r eurdto be in the kits.

Li RO-7 Survey Meter El ESP-2 Survey Meter EL RO-7-BM (Mid-Range) Detector Li HP-270 Dose Rate Probe Li RO-7-BH (High Range) Detector Li HP-260 Frisker Probe (2)

ELI MHV/BNC Cables (2) Li HP-210 Shielded Probe

[] SH-4A Sample Holder Li Screwdriver

[]I 9 Volt Batteries (3) El Writing Implements (2)

LII 30 Volt Batteries (2) LII Notebook El D Cell batteries (2) El 3 EDs LI1 C Cell batteries (6) Li ESP-2 Detector Change Flowchart Installed new seal.

Comments:

SNOTE: An Action Request per PMP-7030-CAP-00l, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /I______________________ ___________

Print Name Signature Date Reviewed by:

EPM or designee Signature Date

RfrneEPP-2080-ERO-001 Rev. 14 Page 65 of 65 ReferenceEmergency Response Resource ReadinessI I Data Sheet 26 Security Control Center Pages:

[ 65 -65 Security Control Center

_______________I ________/_

Quarter Year SNOTE: Place a "" or"X" onthe line pedigthe item to indicateacetb.

North Access Vehicle Portal LII 3 Electronic Dosimeters Cal Due Date ___________

LII 4 TLDs (3 Whole Body, 1 Control)

I] 3 Sets of Anti-C's for first responders, Level 2. [Ref 6.2.1 .a] [Ref 6.2. ib]

Comments:

NOTE: An Action Request per PMP-7030-CAP-OO1, Action Initiation, is required for checks that are not satisfactory. Document number in comments.

Performed by: /

Print Name Signature Date Reviewed by: _____________________________I___________________________/_

EPM or designee Signature Date

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration [Justification This procedure implements a portion of the Cook Emergency Plan, which is wholly-governed under 10 CFR 50.54(q) and RMA-2080-EPA-008, Emergency Plan Management; therefore a 10 CFR 50.59 review is not required.

The changes in this revision also do not involve a change to the ISFSI facility, spent fuel cask design or procedures that affect the design function, or method of performing, controlling or evaluating the design function. As such, a 10 CFR 72.48 review is not required to this procedure alteration.

A 10 CFR 50.5 4 (q) review was performed. The 10 CFR 50.54(q) number is referenced in the workflow for this procedure revision.

The conclusion of the 50.54(q) was that the chan.ges in this revision do continue to comply with the requirements of §50.47(b) and §50 Appendix E and the changes do not constitute a reduction in effectiveness. Therefore, this procedure revision can be implemented without prior NRC approval.

Step 4.1.4, Added Data Sheet 26, Security This inventory was previously performed on Control Center. No margin mark was used. Data Sheet 18 which has the Berrien County Adde 4.46 Ste wich escrbes heEOC inventory on it. Users requested these SeuiyControl Center. inventories be separated into two Data Securitysheets. added step 13.2.14 for Data Sheet 26, Security Control Center.

Removed Rev 13 step 4.2.4 which stated Recording the seal numbers so that for the "Blanks for recording storage container seal next scheduled inventory the seal could be numbers are provided as verification tool. verified intact and therefore an inventory IF the installed seal is the same seal as would not need to be performed has proven recorded during previous check THEN it is to be ineffective. This revision changes the no necessary to break the seal and inventory process to breaking all seals and performing the contents." a complete inventory each time and then resealing the item.

Seal number blanks have been removed from the procedure.

No margin marks were used.

Revised step 4.4.5 to state that the locations This list was inaccurate and incomplete. The of the Emergency RI? Supply can be found in list of "Emergency Kits and Equipment Appendix C of the Cook Emergency Plan. Location" is Appendix C of the Cook Emergency Plan. Inventories of kits and equipment, are performed using data sheets of this procedure. These data sheets provide the user with the locations.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and jApproval. Page 1 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Changed the nomenclature for water resistant Level 3 Anti-C's is the current description PCs from Full Plastic Suits to Level 3 Anti- for this dress.

C's on Data Sheets 9, 12, and 23. Reviewer comments. , removed "either Control This attachment is used for functional checkcs Room or" from step 1.2 of the phones in the TSC only. , was revised to state, "Verify Previous wording of this step did not require each phone in the facility is capable of both that both functions be checked on all phones.

dialing out and receiving a call" AR 2015-15253 , Step 2.1 was revised to state Editorial change requested by EP Manager.

that the phone check is to verify the phones can call out and receive a call. , added Steps 11.6 and 12.5 to Added to ensure that the instrument will not verify that the instrument calibration does go out of cal prior to the next check.

not expire prior to the end of the next month. , Step 13.1 was reworded and This revision changes the process to removed the annual requirement to breaking all seals and performing a complete unlock/unseal all facilities and storage areas. inventory each time and then resealing the item. Therefore the annual unlocking/unsealing is unnecessary.

No margin marks were used , changed the title of PMP- Procedure title has changed.

2080-EPE-002 from Equipment Important to Emergency Preparedness to Equipment Gt 2015-11455-4 Important to Emergency Response. , switched the order of steps User comment. Permission from the control 1.1.1 and 1.1.2. room is needed before contacting the county. , added note at beginning User Comment concerning reference to EPP-

"Additional information for use of Satellite 600 and agreement by the BCSD to assist Phones and Satellite phone numbers can be with these phone checks.

found in RMT-2080-EPP-600, Satellite Phone Instructions. The BCSD Satellite phone check may be performed remotely with assistance from the BCSD. The remote check shall ensure all applicable steps of this attachment are completed."____________________

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 2 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Attachment 5, Step 1.8, added Lake This is a new phone for the alternate EOF Michigan College to satellite phones to be location at LMC.

checked.

GT 2015-8471-1 Data Sheet 1, removed verification that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supplies are inventoried 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supply cabinet was locked or quarterly using Data Sheet 2.

Sealed.

Data Sheet 2, This revision changes the process to Removed blanks for recording seal breaking all seals and performing a complete numbers. inventory each time and then resealing the item.

S Removed locked or seal check for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coping supplies. GT 2015-13295-1 Data Sheet 3 was reorganized for ease of Reorganization did not change the inventory.

use. No items were added or removed during the reorganization.

Data Sheet 3, Under Re-Entry Personnel The change from SRDs to EDs due to Equipment changed 14 SRL~s - 7 (0-1 .5R) 7 technical advances. An ED is capable of (0-10R) to 14 EDs. measuring dose that encompasses the range of both SRDs.

_____________________________GT2014-15551.

Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of TLDs from 32 to 21 determined in GT2014-15551 and RP-95-03.

and added JIG to General distribution badges.

Data Sheet 3, Under Additional Equipment The revised numbers for TLDs was Reduced the number of required Area TLDs determined in GT2014-15551. The addition from 8 to 2. Added 2 Area EDs to this of the Area ED facilitates total dose section. determinations for the EOF personnel.

GT2014-15551 Data Sheet 3, Under Additional Equipment The area EDs that were added provide live removed 20 SRDs and SRD Reader/Charger, time monitoring for individuals in the EOF.

This change eliminates unnecessary equipment from the inventory.

GT2014-1555 1 Data Sheet 4, TSC Monthly Checklist, User comment that this board is no longer-removed Copy Board. used.

GT 2015-13643-1 Office Information for Form Tracking Only - Not Part of Form IThis is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 3 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness Alteration Justification Data Sheet 6, Removed 25 SRDs and SRiD The change from SRDs to EDs is due to Reader/Charger and replaced with 25 EDs. technical advances.

GT2014-15551.

Data Sheet 7, removed label color The radios are located in different areas of designators for radios, the facility and the color designator is not necessary.

Data Sheet 9, reduced the number of EDs The revised numbers of EDs was determined from 50 to 40. in GT2014-15551.

Data Sheet 9, reduced the number of TLDs The revised numbers of EDs was determined from 141 to 41. in GT2014-15551 which determined that the 100 extremity TLDs were not required.

Data Sheet 9, added the Off Site Responder / Determination from GT 2014-15551 and Security Dosimetry Box section. user comments. Reorganization did not change the inventory. No items were added or removed during the reorganization. No Data Sheet was reorganized, margin marks were used for the reorganization.

Data Sheet 10, added two area TLDs and The addition of the Area ED facilitates total two area EDs to Equipment functional dose determinations for the ENC/JIC Checks section. personnel.

GT 2014-15551 Data Sheet 10, removed "and install New style computers do not require this updates" from Security Computer and action to be performed. This occurs County Lap Top Computer checks. automatically when computer is turmed on.

GT 2015-2610-1 Data Sheet 10, changed the name of the key User Comment in* the key box from Media Area Manager to Media Area Coordinator. GT 2015-7276 Data Sheet 11, Added "Check recharge tag New battery jump packs have been placed in on battery jump pack (recharge if survey vehicles.* These jump packs have a necessary) " one year charge life.

GT 2015-6016-1 Data Sheet 13, Added "One" designator to User comment.

FAX machine check to clearly indicate ,that there is only one FAX machine to test. GT 2015-7209

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Resp~onse Resource Readiness Alteration Justification Data Sheet 13, Added ERONS password User comment.

verification by logging into ERONS to perform the ERONS check. GT 2015-7209-1 Data Sheet 13, Added "One" designator to User comment.

911 Dispatch Center Phone check to clearly indicate that there is only one phone to test. GT 20 15-2575 Also changed this test to have EP Staff GT-2015-8602-1 perform the phone test per Attachment 4.

Data Sheet 13, Added "One" designator to User comment.

DAP computer check to clearly indicate that there is only one DAP computer to test. GT 2015-7209 Data Sheet 13, Removed the following from User comment.

the Control Room briefcase inventoried items. Approval to remove these items was

  • 10blak lo shetsobtained from the Operations Senior License.
  • 1 calculator
  • 10 miscellaneous pens GT 20 15-7209 a 2 pencils*with erasers
  • 1 ruler a 2 pads of lined paper
  • 5 red fine markers.
  • 5 black fine markers
  • 3 orange markers o 3 blue markers S 1 contingency director hardcover log book Data Sheets 14, Removed 10 SRDs and SRD~ The change from SRDs to EDs is due to Reader/Charger and replaced with 10 EDs. techflical advances.

GT2014-1555 1.

Data Sheets 14 and 15, items were Per user comment the Control Room checks rearranged. should be on one attachment and the Control

.... Room Emergency Cabinet, which is located outside the Control Rooms, on a separate attachment. No items were removed from the procedure.

____________________________No margin markings were used.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 5 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Resp~onse Resource Readiness Alteration Justification Data Sheet 16, added references to User comment.

Attachments 4 and 5 for directions for how GT 20 15-2575-1 to perform checks. No Margin marks were used.

Data Sheet 19, reduced the number of EDs This change aligns the number of EDs from 30 to 16. available with the number of TLDs.

GT 2014-15551 Data Sheet 19, change the format of the Changed to "17 TLDs (16 Whole Body, 1 number of TLDs to match the format used Control)" from "16 TLDs plus 1 Control throughout this procedure. TLD".

Data Sheet 20, Removed 20 SRDs and SRD The change from SRDs to EDs is due to Reader/Charger and replaced with 20 EDs. technical advances.

GT2O014-1555 1.

Data Sheet 20, added "(1307 Storage Room) Added to provide user with a better location to the location at Niles Hospital. of equipment.

Data Sheet 20, organized list of items under No items were added or removed. This new heading "Decon Room". organization groups items in the same location together.

Data Sheet 20, added "(In Cabinet)" to the Added to provide user with a better location Hospital Sample Kit and Hospital Decon Kit. of equipment.

Data Sheet 20, Added reference to Data Added to remind user that when performing Sheet 25. the instrument kit inventory it is necessary to document the inventory on DS 25.

Data Sheet 23, changed the location of Added to assist user in locating items to RPAC supply box and TRPAC supply box to inventory.

better describe the locations.

Data Sheet 23, removed Operations Electronic Dosimeters for Operations Emergency Supplies - 6 Electronic personnel are located in the Control Rooms Dosimeters. and inventoried using Data Sheets 14 and 15.

Data Sheet 23, Added a portable air sampler Requested by RP personnel to ensure this and a dose rate meter to the inventory for the equipment is readily available when needed TRPAC Emergency Cabinet in an emergency.

No Margin Marks were used.

GT 2015-13295-1 Data Sheet 24, added Lake Michigan This is a new phone for the alternate BOF College satellite phone check. location at LMC.

GT 2015-8471-1 Data Sheet 25, Added blank to record the User comment Response Source ICN.

Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 6 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14-

Title:

Emergency Response Resource Readiness Alteration Justification Moved Security Control Center Quarterly Previously these checks were on Data Sheet checks to new Data Sheet 26. 18 which is for the Berrien County EOC.

User Comment.

Office Informa~tion for Form Tracking Only - Not Part of Form ThiS is a free-form as called out in PMP-2010--PRC-002, Procedure Alteration, Review, and Approval. Page 7 of 9

REVISION

SUMMARY

Procedure No.: EPP-2080-ERO-001 Rev. No.: 14

Title:

Emergency Response Resource Readiness IMPLEMENTATION PLAN Summary of Change Refer to the Revision Summary Reason for Change See revision summary.

Implementation Schedule

  • The changes in TLD numbers will occur with the TLD change out at the beginning of the first quarter 2017.
  • The changes to the area TLDs and the posting of area EDs will also occur at the beginning of the first quarter 2017.
  • PORC week 1/11/20 16

- Effective date week 1/18/2016 Training Needs None Expiration Date N/A Required Basis Documents Update None Related Processes and Procedures None Transition Plan None Related Equipment Modifications None Communication Plan None Special Tools, Aids, Permits, Etc.

None Related Actions None I Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-2010-PRC-002, Procedure Alteration, Review, and Approval. Page 8 of 9

REVISION

SUMMARY

Rev. No.: 14 ProcdureNo. EP-28-EO-Office Information for Form Tracking Only - Not Part of Form This is a free-form as called out in PMP-20l0-PRC-002, Procedure Alteration, Review, and Approval. Page 9 of 9