MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2021-42, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2021-08-0404 August 2021 Unit 2 - Transmittal of Report of Changes to the Emergency Plan ML19224A5872019-08-0808 August 2019 Report of Changes to the Emergency Plan, Revision 41 and Revision 42 AEP-NRC-2019-09, Transmittal of Emergency Plan Revision 412019-03-11011 March 2019 Transmittal of Emergency Plan Revision 41 ML19073A1392019-02-0707 February 2019 Emergency Plan, Revision 41 ML18264A2302018-08-10010 August 2018 Emergency Plan, Revision 40 ML18193A4612018-05-31031 May 2018 Emergency Plan Revision 39 ML17317A4712017-11-0707 November 2017 Evaluation of Proposed Change Regarding Revision to the Emergency Plan for Technical Support Center Relocation & Revised Pages to Emergency Plan ML1000400082010-01-0404 January 2010 Submittal of the Final Report for the September 15, 2009 Radiological Emergency Preparedness Partial Participation Plume ML0532604732005-06-22022 June 2005 Enclosure E, Section J, Protective Response, of the D.C. Cook Emergency Plan & Emergency Response Procedure PMP-2080-EPP-100, Effective June 30, 2005 ML14357A4462004-03-31031 March 2004 Emergency Plan, Revision 19 2024-01-08
[Table view] Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] |
Text
m INOIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER" One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com AEP-NRC-2022-56 October 12, 2022 10 CFR 72.4 10 CFR Part 72.44(f)
Docket Nos.: 50-315 50-316 72-072 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Transmittal of Report of Changes to the Emergency Plan Pursuant to 10 CFR 72.44, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, is transmitting as the enclosure to this letter, the report of changes for CNP Emergency Plan, Revision 47.
There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.
r11tL Michael K. Scarpello Regulatory Affairs Director KMH/mph
Enclosure:
Donald C. Cook Nuclear Plant (CNP) Report of Changes, CNP Emergency Plan, Revision 47
U. S. Nuclear Regulatory Commission AEP-NRC-2022-56 Page 2 c: R. J. Ancona - MPSC EGLE - RMD/RPS J. B. Giessner - NRC Region Ill M. G. Menze - AEP Ft. Wayne NRC Resident Inspector R. M. Sistevaris - AEP Ft. Wayne S. P. Wall - NRC, Washington D.C.
A. J. Williamson -AEP Ft. Wayne
Enclosure to AEP-NRC-2022-56 Donald C. Cook Nuclear Plant (CNP)
Report of Changes, CNP Emergency Plan, Revision 47
Enclosure to AEP-NRC-2022-56 Page 1 DONALD C. COOK NUCLEAR PLANT (CNP)
Report of Changes, CNP Emergency Plan (CEP), Revision 47 Effective: 7/6/2022 PLANNING STANDARD A
- ORGANIZATION CONTROL Page 17; A.1.b:
Revised to replace 'JIC activated' with 'JIC operational' to align with the State of Michigan's terminology.
PLANNING STANDARD B- EMERGENCY RESPONSE ORGANIZATION Page 34; 8.5.d.1 and Page 35; 8.5.d .3:
Revised to replace 'JIC activation' with 'the JIC becoming operational' to align with the State of Michigan's terminology.
PLANNING STANDARD D- EMERGENCY CLASSIFICATION SYSTEM Page 64; SU8.1 and Page 66; RU1 .2:
Corrected a typographical error in the font. The "~" symbol was incorrectly represented as " 3 ".
PLANNING STANDARD E- NOTIFICATION METHODS AND PROCEDURES Page 80; E.2.a:
Corrected grammatical error from "switchyard" to "switchyards."
Page 83; E.7:
Revised to replace 'JIC (when activated)' with 'JIC (when operational)' to align with the State of Michigan's terminology.
PLANNING STANDARD G
- PUBLIC EDUCATION AND INFORMATION Page 95; G.4.a:
Revised to replace 'JIC activated' with 'JIC operational' to align with the State of Michigan's terminology.
PLANNING STANDARD H - EMERGENCY FACILITIES AND EQUIPMENT Page 111; Figure 11 :
Revised the map, "Locations of Emergency Response Centers," to include the location of the Operations Support Center (OSC).
PLANNING STANDARD J - PROTECTIVE RESPONSE Page 120; J.3:
Revised to replace "Suitable equipment intended for such personnel monitoring stations will be stored in both the OSC and the Training Center." with "Suitable equipment intended for such personnel monitoring stations will be stored in the OSC and Survey Vehicles."
Justification: The Emergency Kit equipment was moved from the Training Center to the Field Monitoring Team vehicles in Cook Emergency Plan, Revision 19, but not all of the changes were implemented at that time. The change was evaluated in 50.54(q) #21-03.
Enclosure to AEP-NRC-2022-56 Page 2 PLANNING STANDARD L- MEDICAL AND PUBLIC HEALTH SUPPORT Page 132; L.1:
Revised the name of the local hospitals from "Lakeland Regional Medical Center, St. Joseph" and "Niles Community Hospital, Niles" to "Spectrum Health Lakeland Medical Center" and "Spectrum Health Lakeland Niles Hospital" due to a change of ownership of the local hospitals.
PLANNING STANDARD O - RADIOLOGICAL EMERGENCY RESPONSE TRAINING Page 143; O.4.i:
Licensee Headquarters Support; revised description from "Not addressed." to "AEP's Enterprise Resilience organization maintains an Emergency Management Plan that outlines roles, responsibilities and organization to support D.C. Cook during an emergency. This plan is governed by the Enterprise Resilience Policy and appropriate subsequent Standards . A training activity, which includes integration of this AEP Emergency Management plan with D.C. Cook's Emergency Plan, will occur at least once during the eight year drill and exercise cycle."
PLANNING STANDARD P- RESPONSIBILITY FOR PLANNING EFFORT Page 146; P.3:
Emergency Planning Coordinator Designation; revised from "Not addressed." to "The Emergency Preparedness Coordinator position has the responsibility for the development and updating of the Cook Emergency Plan and coordination of this plan with other response organizations."
APPENDIX A - Emergency Plan Implementing Documents Page 149:
Revised the title of "Decontamination and Treatment of the Radioactively Contaminated Patient{s) at Lakeland Regional Medical Center" to "Spectrum Health Lakeland Emergency Radiation Exposure Intake Procedure" due to change of ownership of the local hospitals, and subsequent procedure name change.
APPENDIX A - Cross Reference Table Page 154; L.1:
Revised the title of "Lakeland Hospital Contaminated Injured Person Protocol" to "Spectrum Health Lakeland Emergency Radiation Exposure Intake Procedure" due to change of ownership of the local hospitals, and subsequent procedure name change.
Page 154-155:
The Plant Procedure column was revised for Planning Standards 0.3, O.4.d, O.4.f, O.4.g, and O.4.i from "Not Addressed" to "TPD-600-EPT."
Page 155:
Plant Procedure column was revised for Planning Standard O.4.h from "Not Addressed" to "RMT-2080-EPP-500."
Page 155:
The Emergency Plan Section was revised for Planning Standard O.4.i from "Not Addressed" to "O.4.i."
Page 155:
The Emergency Plan Section was revised for Planning Standard P.3 from "Not Addressed" to "P.3" and Plant Procedure column was revised for Planning Standard P.3 from "PMl-2080" to "PMP-2080-EPP-200."
Enclosure to AEP-NRC-2022-56 Page 3 APPENDIX C - EMERGENCY KITS AND EQUIPMENT LOCATION Page 180:
Revised the name of the local hospitals from "Lakeland Regional Medical Center, St. Joseph" and "Niles Community Hospital, Niles" to "Spectrum Health Lakeland Medical Center" and "Spectrum Health Lakeland Niles Hospital" due to change of ownership of the local hospitals.
Page 180:
Revised to replace "Both Control Rooms" with "Each Control Room" to ensure that it is understood to be one item per control room .
Page 180:
Revised to remove the Emergency Anti-C equipment from the Training Center.
Justification: The Emergency Kit equipment was moved from the Training Center to the Field Monitoring Team vehicles in CEP Revision 19, but not all of the changes were implemented at that time. The change was evaluated in 50.54(q) #21-03.
APPENDIX E - DESCRIPTION OF FEDERAL RADIOLOGICAL ASSISTANCE Page 200:
Item (A) Command Centers; revised to add the address for Emergency Operations Facility. Addresses were provided for other facilities.
Page 201 :
Item (H) Medical Facility Location; revised the name of the local hospitals from "Lakeland Regional Medical Center, St. Joseph" and "Niles Community Hospital, Niles" to "Spectrum Health Lakeland Medical Center" and "Spectrum Health Lakeland Niles Hospital" due to change of ownership of the local hospitals.
APPENDIX J - EIGHT YEAR PLAN MATRIX Page 214:
Revised the eight year cycle to reflect the current eight year cycle.
Page 214:
Annual Item 14; Revised from "Test of the Public Notification System" to "Annually validate the reliability/availability of IPAWS."
Justification: The change from sirens to IPAWS was fully addressed and conforms to an activity that has been given prior approval by the NRC and FEMA on April 15, 2021, and documented in the approved Alert and Notification System Evaluation Report. This was also previously documented in the Cook Emergency Plan Revision 45, and evaluated by 10 CFR 50.54(q) Effectiveness Evaluation #21-02.