CONTROLLED DOCUMENT TRANSMITTAL Transmittal#: 25477N Date: 09/20/2002 Initiator: TRACY NELSON Page: 1
==
Description:==
ISSUE OF 1 EMERGENCY PLAN PROCEDURE Distribution Group(s):
Procedures: EPP: PMP-2080-EPP-1O0 Section/Name Emergency Planning Coord Maint: MTIS, M. Lower Mi Dept Environ Quality NDM: Library NGH: EDCC NGH: EOF (via EDCC)
NGH: JPIC (via EDCC)
NRC: On Site NRC: Region III N RC-iWishington-r.
Operations Library OSC S.S. Office Simulator Site Protective Services State of Michigan Training Cart 1, T. Ott Training Cart 2, D. Terry Training Cart 4, S. Stiger Training Cart 5, M. McKeel Training Cart 6, D. Terry Training Lib:Master Copy Training Library TSC Unit 1 Control Room Unit 2 Control Room Mail Zone Copies 11 3C 10 1C P29 1 C 1
- 1 C 22*
1C 22*
3C 22*
lC 4A 1C 2C
,P16:'-,=T=2C 5B*
lC 1*
lC 29*
1C 11 2C 88 1C P2 lC 11 lC 11 1C 11 1C 11 1C 11 1C 11 1U 11 lC 1*
3C 29*
2C 29*
2C Comments Include 1C Index Only Transmitted Controlled Document Listing: (1)
Document PMP-2080-EPP-100 Revision Status Title O0A Approved EMERGENCY RESPONSE Controlled Document Transmittal Receipt and File Acknowledgemebt:
CONTROLLED DOCUMENTS ONLY Signature
/
Date Please sign and return within 14 calendar days 11: C. Cook Nuclear Plant Nuclear Documents Mgmt (Mail Zone #1) - Document Control Bridgman, MI. 49106 z
-r N
N 01
,42
- -j W-
Nuclear Document Management Emergency Plan Procedure Index Document #
12-EPP-2080-EPA-008 12-EPP-2080-OSC-002 PMP-2080-EPP-1 00 PMP-2080-EPP-101 PMP-2080-EPP-107 PMP-2080-EPP-108 PMP-2080-EPP-1 11 PMP-2080-EPP-1 12 PMP-2080-EPP-200 PMP-2081 -EPP-105 "PMP-2081 -EPP-212 RMT-2080-EOF-001 RMT-2080-EOF-002 RMT-2080-JPIC-001 RMT-2080-OSC-0O01 RMT-2080-TSC-001 09/20/2002 - 07"19 Title EMERGENCY PLAN MANAGEMENT UNIT VENT SAMPLING EMERGENCY RESPONSE EMERGENCY CLASSIFICATION NOTIFICATION INITIAL DOSE ASSESSMENT NATURAL EMERGENCY GUIDELINES PERSONNEL INJURY INITIATING CHANGES TO THE EMERGENCY PLAN OR EMERGENCY PLAN IMPLEMENTING PROCEDURES INITIAL CORE DAMAGE ASSESMENT CONTAINMENT ATMOSPHERE SAMPLING ACTIVATION AND OPERATION OF THE EOF EMERGENCY TERMINATION AND RECOVERY ACTIVATION AND OPERATION OF THE JPIC ACTIVATION AND OPERATION OF THE OSC ACTIVATION AND OPERATION OF THE TSC S
Revision/
Date 0
03/30/2001 0
07/03/2001 OA 09/20/2002 3B 12/07/2001 16 07/12/2002 4
0510312002 1
02/06/1995 1
06/05/1997 0
0311212001 4-CS1 06/1612000 1-CS 1 05/26/1988 1
05/03/2002 0
07/03/2001 0
04/16/2002 1A 09/17/2002 1
09/17/2002 "EoTýSCTON
'EP 2 0 2002 CON TR3LL Page: 1 Comment
Nuclear Document Management Emergency Plan Procedure Index
- ERT-MTSUECnON SEP 2 0 2OO2 wuTRDLE"D Document #
12-EPP-2080-EPA-008 12-EPP-2080-OSC-002 PMP-2080-EPP-1 00 PMP-2080-EPP-1 01 PMP-2080-EPP-107 PMP-2080-EPP-108 PMP-2080-EPP-1 11 PMP-2080-EPP-1 12 PMP-2080-EPP-200 PMP-2081-EPP-105 i
PMP-2081-EPP-212 RMT-2080-EOF-001 RMT-2080-EOF-002 RMT-2080-JPIC-001 RMT-2080-OSC-001 RMT-2080-TSC-001 09120/2002- 07:19 Page: 1 Comment Title EMERGENCY PLAN MANAGEMENT UNIT VENT SAMPLING EMERGENCY RESPONSE EMERGENCY CLASSIFICATION NOTIFICATION INITIAL DOSE ASSESSMENT NATURAL EMERGENCY GUIDELINES PERSONNEL INJURY INITIATING CHANGES TO THE EMERGENCY PLAN OR EMERGENCY PLAN IMPLEMENTING PROCEDURES INITIAL CORE DAMAGE ASSESMENT CONTAINMENT ATMOSPHERE SAMPLING ACTIVATION AND OPERATION OF THE EOF EMERGENCY TERMINATION AND RECOVERY ACTIVATION AND OPERATION OF THE JPIC ACTIVATION AND OPERATION OF THE OSC ACTIVATION AND OPERATION OF THE TSC Revision/
Date 0
03/30/2001 0
07/0312001 OA 09/20/2002 3B 12/07/2001 16 07/1212002 4
05/03/2002 1
02/06/1995 1
06/05/1997 0
03/12/2001 4-CS1 06/16/2000 1-CS1 05/26/1988 1
05103/2002 0
07103/2001 0
04/16/2002 1A 09/17/2002 1
09/1712002
REVIEW AND APPROVAL TRACKING FORM Pr'oc~eaure 1ifrmf '
Number:
PMP-2080-EPP-100 Rev. Oa Change:
0
Title:
Emergency Response 0 Correction (Full Procedure)
El Change (Full Procedure) with Review of Change Only El Correction (Page Substitution)
[E Change (Page Substitution) with Review of Change Only El Cancellation El New Procedure or Change with Full Review El Superseded (list superseding procedures):
Ahainted Change Driver/CDI Tracking No(s).:__________________
N/A Ri~
Cross-Discipline Reviews:
Programmatic Reviews:
El Chemistry El Training
[3 ALARA E1 Performance Assurance E0 Maintenance El Work Control El Bus. Services Proc Grp El Reactivity Mgmt Team E3 NDM El
[E Component Engineering El SPS (Safety & Health)
El Operations El El Design Engineering El Surveillance Section El PA/PV 11 _
Emerg Oper Proc Grp El System Engineering El Reg Affairs El _
Environmental E_
El RP Z None Required El ISIJIST Coordinator 0 None Required El Cognizant Org Review:
N JA Date:
/
/
0 Technical Review:
Date: 9 //7ic¢2.
El Ops Mgr Concurrence:
N/A Date:
/
/
El Owner Concurrence:
N/A Date:
/
/
Updated Revision Summary attached?
0 Yes 10 CFR 50.59 Requirements complete?
Tracking No.:_
Yes 0 N/A Implementation Plan developed?
(Ref. Step 3.4.18)
El Yes 0 N/A Package Complete:
I, V cJ" r\\
/
Date: __f/.i 1 q
0 PORC Review Required:
El Yes Z No Mtg. No.:
Administrative Hold Status:
E3 Released E] Reissued Z N/A CR No.:
Approval Authority Review/Approval:
- lot, Date:
/1l8.1 a'-2, Expiration Date/Ending Activity
(,,]
Effective Date: _/_
D/0_/-.
Periodic Review conducted?
(Data Sheet 5 Complete)
El Yes 0 No Commitment Database Updated?
El Yes 0 N/A NDM notified of new records or changes to records that could affect record retention?
El Yes 10 N/A
REVISION
SUMMARY
PMP-2086-EPP-100 Revision:
Oa Change:
0 Emergency Response Corrections have been made for procedure number changes and title changes. No marginal markings used.
Section or Step Change/Reason For Change Step 3.1.7 Change: Changed title of Operations Staging Area (OSA) to Operations Support Center (OSC). Correction - e Reason: OSA is now the OSC.
Step 3.2.3 Change: Deleted reference to PMP-2081-EPP-104. Correction-o Reason: Procedure has been deleted.
Step 3.2.3.a Change: Deleted reference to PMP-2081-EPP-103. Correction-o Reason: Procedure has been deleted.
Step 3.2.5 second Change: Corrected procedure number reference. Correction - o bullet Reason: Procedure number changed.
Step 3.2.6.b Change: Changed title of Operations Staging Area (OSA) to Operations Support Center (OSC). Correction - e Reason: OSA is now the OSC.
Step 3.2.7 Change: Deleted procedure reference in fourth bullet, PMP-2081-EPP 305. Correction - o Reason: Procedure deleted.
Step 3.2.7.e Change: Added (within 15 minutes). Correction - q Reason: To clarify when initial notification is required.
Step 3.2.7.f Change: Changed "15 minutes" to "30 minutes or within 15 minutes of a PAR change." Correction - m Reason: State requirements have changed to allow updates with no PAR changes to be made every 30 minutes.
Step 3.2.10 Change: Deleted reference to PMP 2081-EPP-103. Correction - o Changed OSA to OSC. Correction - e Reason: Procedure deleted.
Step 5.1.4, 5.1.5 Change: Deleted reference procedures. Correction - o and 5.1.7 Reason: Procedures have been deleted.
~~~~Offic~IfintoiFrFiiTiki Oi ~o7Pl fF ~ ~
Page
- of 3 Number:
Title:
This is a free-form as called out in PMP-2010-PRC-002, Procedure Correction, Change, and Review, Rev. 9a.
REVISION
SUMMARY
PMP-2080-EPP-100 Emergency Response Revision-Oa Change:
0 Page '
of03 Number:
Title:
Section or Step Change/Reason For Change New Step 5.1.4 Change: Changed procedure number to RMT-2080-EOF-001. Re numbered step. Correction - o Reason: Procedure reference has changed.
Figure 1 Change: Modified procedure flow chart to reflect the deleted procedures incorporated by this change. Correction - m Reason: Correct the flow chart.
This is a free-form as called out in PMP-2010-PRC-002, Procedure Correction, Change, and Review, Rev. 9a.
Offi&14 radd "fto "ation
PrAMERICANr POWER PMP-2080-EPP-100 Rev. Oa Page 1 of 20 Emergency Response Reference Effective Date:__*/d 0.
B. K. Molloy S.M. Partin Site Protective Services Writer Owner Cognizant Organization TABLE OF CONTENTS 1
PURPOSE AND SCOPE..........................................................................
2 2
DEFINITIONS AND ABBREVIATIONS..................................................... 2 3
DETAILS..............................................................................................
2 4
FINAL CONDITIONS.............................................................................
7 5
REFERENCES......................................................................................
7 :
Data Sheet 1:
Data Sheet 2:
Figure 1:
PAR Flowchart and Map........................................................... 9 Technical Information Sheet................................................... 11 Emergency Turnover Checklist.................................................. 13 Procedure Flowchart.............................................................
17
Reference PMP-2080-EPP-100 I
Rev. Oa Page 2 of 20 Emergency Response I
PURPOSE AND SCOPE 1.1 This procedure provides instructions to the Shift Manager acting as the Site Emergency Coordinator (SEC), for implementing a response to an Unusual Event (UE), Alert, Site Area Emergency (SAE) and General Emergency (GE) after an emergency has been declared.
1.2 The steps in this procedure are listed in the preferred order of performance for maximum efficiency. However, the steps may be performed in a different sequence.
2 DEFINITIONS AND ABBREVIATIONS None NOTE:
All procedure steps are applicable to all Emergency Classification Levels EXCEPT when the applicable Emergency Classification Level(s) is(are) specified within a step. (Reference Figure 1, Procedure Flowchart.)
3 DETAILS 3.1 General 3.1.1 IF a classification upgrade is required at any time while the procedure is being performed or after it is completed, THEN return to step 3.2, Instructions, and proceed through the procedure again.
3.1.2 The Operations Shift Manager acting as the SEC shall implement this procedure until relieved of SEC duties.
3.1.3 The following actions shall not be delegated by the SEC:
"* Classification of the emergency.
Directing the notification of offsite officials.
"* Approval of Protective Action Recommendations (PAR) to offsite emergency management agencies.
Reference PMP-2080-EPP-100 Rev. Oa Page 3 of 20 Emergency Response 3.1.4 Declaration of an emergency requires the notification of the Berrien County Sheriff and Michigan State Police within 15 minutes. Notification of the NRC shall follow county and state notification and in all cases be completed within one hour.
3.1.5 Declaration of a General Emergency requires that a PAR be made to the state. The PAR should be made immediately after the notification of a General Emergency (i.e., during the same phone call).
3.1.6 The Emergency Response Data System (ERDS) for the affected Unit must be operational and transmitting data to the NRC within one hour of an ALERT or higher declaration.
3.1.7 The Operations Support Center (OSC), Technical Support Center (TSC), and the Emergency Operations Facility (EOF) are required to be activated at an ALERT classification or higher.
3.2 Instructions 3.2.1 Inform Unit 1 and Unit 2 Control Room personnel of the event classification and that the Shift Manager has assumed the position of SEC.
3.2.2 Implement or direct the implementation of PMP-2080-EPP-107, Notification.
3.2.3 IF a Site Area Emergency or General Emergency has been
,declared, THEN notify the Security Shift Supervisor (x 2005 or 2731) to perform accountability.
- a.
WHEN evacuation is necessary, THEN inform the Security Shift Supervisor (x 2005 or 2731) to evacuate plant personnel.
- b.
WAH1EN evacuation of the beach is necessary, THEN activate the beach activation warning system.
3.2.4 IF a hazard to plant personnel exists (e.g., fire, radiation or toxic gas), THEN perform one of the following steps:
- a.
IF the condition is local, THEN evacuate the area by page announcement.
Reference PMP-2080-EPP-100 Rev. Oa Page 4 of 20 Emergency Response
- b. IF the condition impacts significant portions of the plant, THEN direct the Security Shift Supervisor (x 2005 or 2731) to perform accountability in accordance with Security Post Orders and perform an evacuation.
NOTE:
The presence of an offsite dose rate may require re-classification of the event in accordance with ECC R-l, Effluent Release, PMP-2080-EPP-101, Emergency Classification.
3.2.5 IF a gaseous release of radioactive material is occurring, THEN initiate use of the Dose Assessment Program (DAP), to determine the magnitude of offsite dose levels. The following Emergency Plan procedures should be used as appropriate:
"* PMP-2080-EPP-108, Initial Dose Assessment (for use in the Control Room).
"* RMT-2080-EOF-001, Activation and Operation of the EOF (for use in the EOF).
3.2.6 IF additional personnel are required to respond to an Unusual Event to support the emergency response, THEN:
- a.
Call the Secondary Alarm Station (SAS) (xl 118) and direct security to implement the Dialogic Emergency Response Notification System for an EMERGENCY.
- b.
Direct a Control Room Operator to make the following announcement for the appropriate ERO facility(s) to be activated, over the PA system. Have the announcement broadcast twice.
"Attention all personnel. Attention all personnel. The Unusual Event is still in effect, however report to and activate the Operations Support Center/Technical Support Center/Emergency Operations Faciity. All other plant personnel be prepared for further announcements."
- c.
On any touch-tone telephone:
Dial 1646
Reference PMP-2080-EPP-100 F
Rev. Oa Page 5 of 20 Emergency Response Wait for the tone Press ## to access the Training Center and Buchanan Office Building PA Repeat the above announcement twice 3.2.7 IF a General Emergency has been declared, THEN direct the development of a Protective Action Recommendation using the following steps:
- a.
Prior to developing a PAR consider whether the following could have an effect on the PAR:
Adverse weather conditions.
A forecast of changing weather conditions.
Release characteristics (Puff vs. Continuous).
Evacuation times.
- b.
Include any deviations from the PAR flowchart, Attachment 1, based on this step in the protective action recommendation.
- c.
Obtain the following data:
Wind direction
-AND Offsite dose projection (if available) as calculated using DAP or actual offsite dose rate measurements.
- d.
Using Attachment 1, determine the appropriate PAR.
- e.
Enter the Protective Action Recommendation on the Nuclear Plant Accident Notification form, obtained from the Emergency Kit and inform the State of Michigan of the recommendation within 15 minutes.
Reference I
PMP-2080-EPP-100 I
Rev. Oa Page 6 of 20 Emergency Response
- f.
Repeat Steps 3.2.7.a through 3.2.7.e every 30 minutes or within 15 minutes of a PAR change until relieved by the incoming Emergency Response Organization.
3.2.8 Perform mitigating actions in accordance with appropriate plant procedures.
3.2.9 IF the Plant Process Computer (PPC) is inoperable, THEN:
"* Designate someone to complete Data Sheet 1, Technical Information Sheet, every 15 minutes.
"* Forward the completed copy to the TSC.
"* Continue this activity for the duration of the emergency or until the PPC is operable.
3.2.10 IF accountability results identify a missing person(s) AND the TSC and OSC are NOT activated, THEN have Security attempt to locate the missing person(s).
3.2.11 Upon arrival of the oncoming SEC conduct a turnover as follows:
- a.
Obtain a copy of Data Sheet 2, Emergency Turnover Checklist.
- b.
Have the oncoming SEC complete the checklist as each item is verbally addressed.
3.3 Subsequent Instructions for the Shift Manager After Being Relieved of SEC Duties 3.3.1 WHEN relieved of SEC responsibilities, THEN resume the sole function of Shift Manager.
Notify the Control Rooms that the Shift Manager has been relieved of SEC responsibilities.
3.3.2 Direct the continued implementation of the appropriate Emergency Operating Procedure (EOP) and/or Abnormal Operating Procedure (AOP) to return the unit to a safe condition.
3.3.3 Inform the TSC of changes in plant condition and equipment status.
Reference PMP-2080-EPP-100 Rev. Oa Page 7 of 20 Emergency Response 3.3.4 Inform the TSC of mitigating actions to be taken or any that have been completed.
3.3.5 IF additional personnel are required, THEN request assistance from the TSC.
3.3.6 Assemble all documentation associated with the emergency and forward it to the Emergency Planning Coordinator. This documentation should include:
"* Complete notification forms
"* Copies of pertinent log entries
"* Copy of the Condition Report if generated
"* Other documentation deemed appropriate by the Shift Manager 4
FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.
5 REFERENCES 5.1 Use
References:
5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-107, Notification 5.1.3 PMP-2080-EPP-108, Initial Dose Assessment 5.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF.
5.2 Writing
References:
5.2.1 Source
References:
- a.
Cook Nuclear Plant Emergency Plan
Reference I
PMP-2080-EPP-100 I
Rev. Oa Page 8 of 20 Emergency Response 5.2.2 General References
- a.
Michigan Emergency Preparedness Plan I
(
348 75 281 25 258' 19125 16875 Sectors Areas A, B & C to 5 miles I and 2 B, C&Dto5 miles 1.2 and 3 C, D&Eto5 mries 1, 2 and 3 D, E, & F to 5 miles 1, 2 and 3 E, F&Gto5 miles I, 2 and 3 F. G & 11 to 5 mles I and 3 G,H&JtoSmiles I and3 H, J&Kto5 miles l and 3 J, K & Lto 5 miles I and 3 K, L&Mto5 miles 1 and 3 L. M&Nto5 miles 1
M, N & P to 5 miles I
N, P & Q to 5 miles P.
&Rto5 miles 1
Q.R&Ato5mies 1
R, A&Bto5 miles I and2 C
C-Reference PMP-2080-EPP-100 Rev. Oa Page 9 of 20 Emergency Response PAR Flowchart and Map Pages:
1 9-10
Reference PMP-2080-EPP-100 Rev. Oa Page 10 of 20 Emergency Response PAR Flowchart and Map Pages:
9-10
C
(
Reference PMP-2080-EPP-100 Rev. Oa Page 11 of 20 Emergency Response Data Sheet 1 Technical Information Sheet Pages:
11 - 12 Unit No:
Date:
Time:
Data Taken By:
Data Reviewed By:
NOTE:
When redundant indication exists, record most severe condition.
RCS PARAMETER
- 1.
Containment Temp.
- 2.
Cont. H2 Concentration
- 3.
RWST Level
- 4.
Source Range
- _OF CPM
- 5.
- 6.
- 7.
8.
Intermediate Range Containment Pressure Containment Sump Level Containment Level AMPS PSIG CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum Pressure RHR Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.
PZR Steam Temp.
PZR Level PRT Temp.
East
- ON / OFF East
- GPM North
- GPM LP1*
GPM LP2*
GPM LPI*
PSIG LP2*
PSIG East
- LP1 ON / OFF
- LP2 ON / OFF PSIG GPM OF OF OF
- 22.
- 23.
- 24.
- 25.
- 26.
27.
West
- ON / OFF West
- GPM South
- GPM LP3*
GPM LP4*
GPM LP3*
PSIG LP4*
PSIG West
- LP3 ON / OFF
- LP4 ON / OFF PRT Level PRT Pressure PZR Cycling Htrs PZR Backup Htrs Letdown Flow Saturation Margin PSIG
- ON I OFF
- ON I OFF GPM OF C
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
21.
NSSS LOOP PARAMETERS Wide Range T Hot Wide Range T Cold S I G Pressure S I G N. R. Level S / G W.R. Level Steam Flow (pph x 106)
Feed Flow (pph x 106)
Aux. Feed Flow (pph x 103)*
MSIV Status CST Level Steam Dump OF OF PSIG
- OPEN / CLOSE
- ATMOS I COND OF OF',
- OPEN / CLOSE Ft OF OF PSIG
- OPEN / CLOSE OF OF PSIG
- OPEN / CLOSE AVAILABLE I UNAVAILABLE
- 39.
East ESW*
/
- 40.
West ESW*
/
- 41.
East CCW*
/
- 42.
West CCW*
/
- 43.
East CTS*
/
- 44.
West CTS*
/
- 45.
North SI*
/
- 46.
South SI*
/
- 47.
East RHIR*
/
48 West RHR*
/
- Data to be taken by Control Room Operator.
EQUIPMENT STATUS
- 49.
- 50.
- 51.
- 52.
- 53.
- 54.
- 55.
- 56.
57.
East CCP*
West CCP*
TDAFP*
EMDAFP*
WMDAFP*
AB Diesel*
CD Diesel*
Normal Res.*
12 EP*
AVAILABLE / UNAVAILABLE
/
________ /
/
/
/
/
________ /
_________ /
/
C
(
Reference PMP-2080-EPP-100 Rev. Oa Page 12 of 20 Emergency Response Data Sheet 1 Technical Information Sheet Pages:
11 -12 C
Loop 1 Loop 2
- 28.
- 29.
- 30.
- 31.
- 32.
- 33.
- 34.
- 35.
- 36.
- 37.
38.
Loop 3 Loop 4.
- 1.
Emergency Classification Time Declared Unusual Event Alert Site Area Emergency General Emergency
- 2.
Have notifications been completed?
- a. Berrien County:
yes / no / in progress
- b. Michigan:
yes / no / in progress
- c. NRC:
yes / no / in progress
- d. NGG Personnel:
yes / no / in progress
- 3.
Protective Actions:
- a. Local area evacuation yes / no
- b. Site evacuation yes / no
- c. Accountability yes / no
- d. Site closed to visitors yes / no
- e. Offsite protective action recommended:
" Evacuation:
yes / no areas:
" Shelter:
yes / no areas:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Reference PMP-2080-EPP-100 Rev. Oa Page 13 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16
- 4.
Plant Operational Status
- a. Reactor trip:
yes / no time:
- b. ESF Status:
- c. EOP Status:
- 5.
Plant Status
- a. Chronology of Events Time
- b. Current Plant Conditions Trip signal:
Event Reference PMP-2080-EPP-100 Rev. Oa Page 14 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16
- c. Potential for Plant Degradation
- d. Mitigating Actions Taken or Underway
- 6.
Plant Radiological Conditions
- a. Inplant/Onsite Radiological Conditions Reference PMP-2080-EPP-100 Rev. Oa I
Page 15 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16
- b. Potential for Offsite Release of Radioactivity Airborne Water
- 7.
Injured or Contaminated Personnel:
Name Employer Reference PMP-2080-EPP-100 Rev. Oa Page 16 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16 Status
Reference PMP-2080-EPP-100 Rev. Oa Page 17 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
17-20
3.2.5 Implement Initial Dose Assessment, PMP-2080-EPP-108 Yes 3.2.7 3.2.7.d No Reference PMP-2080-EPP-100 Rev. Oa Page 18 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
17 - 20 3.2.6.a 3.2.6.b
Reference PMP-2080-EPP-100 I
Rev. Oa Page 19 of 20 Emergency Response S
Figure 1
!Procedure Flowchart I
Pages:
17-20
3.3.3 Inform TSC of plant changes and mitigating actions planned or completed 3.3.5 C
Request assistance from TSC as necessary Reference PMP-2080-EPP-100 I
Rev. Oa Page 20 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
I 17-20
REVIEW AND APPROVAL TRACKING FORM Number:
PMP-2080-EPP-100 Rev. Oa Change:
0
Title:
Emergency Response 0 Correction (Full Procedure)
El (
El Correction (Page Substitution)
El C El Cancellation Pl b
El Superseded (list superseding procedures):
Change Driver/CDI Tracking No(s'L:
Thange (Full Procedure) with Review of Change Only 2hange (Page Substitution) with Review of Change Only Jew Procedure or Change with Full Review ri N/A Cross-Discipline Reviews:
Programmatic Reviews:
El Chemistry
[3 Training
[] ALARA El Performance Assurance f] Maintenance El Work Control El Bus. Services Proc Grp El Reactivity Mgmt Team El NDM EL El Component Engineering El SPS (Safety & Health)
[] Operations
[]
[1 Design Engineering El Surveillance Section El PAIPV El El Emerg Oper Proc Grp El System Engineering
[D Reg Affairs El 0E Environmental E]
[D RP Z None Required El ISI/IST Coordinator
[
None Required El Cognizant Org Review:
N ]A Date:
/
/
[ Technical Review:
/
Date: 9 1/712'4Z El Ops Mgr Concurrence:
N/A Date:
E)
Owner Concurrence:
N IA Date:
Updated Revision Summary attached?
[ Yes 10 CFR 50.59 Requirements complete?
Tracking No.:
o E Yes
[ N/A Implementation Plan developed?
,,(Ref Step 3.4.18)
Yes
[
N/A Package Complete:
Date: * / (T)/ 03, PORC Review Required:
Administrative Hold Status:
El Re Approval Authority Review/Approval:
Expiration Date/Ending Activity I
El Yes Z No Mtg. No.:
Vl/A CR No.:
Date: 7/' F/ 1-2 Effective Date: _{* / v()0,2-Periodic Review conducted?
F6116-Commitment Database Updated?
El Yes 0 N/A NDM notified of new records or changes to records that could affect record retention?
El Yes ED N/A nl Yes ii Pef S.
d r l r u rO MIA I
I "I I
ý " ; _ý ý
" I - -
ý:, ',
_77 5
REVISION
SUMMARY
PMP-2080-EPP-100 Revision:
Oa Change:
0 EmerEency Response Corrections have been made for procedure number changes and title changes. No marginal markings used.
Section or Step Change/Reason For Change Step 3.1.7 Change: Changed title of Operations Staging Aiea (OSA) to Operations Support Center (OSC). Correction - e Reason: OSA is now the OSC.
Step 3.2.3 Change: Deleted reference to PMP-2081-EPP-104. Correction-o Reason: Procedure has been deleted.
Step 3.2.3.a Change: Deleted reference to PMP-2081-EPP-103. Correction-o Reason: Procedure has been deleted.
Step 3.2.5 second Change: Corrected procedure number reference. Correction - o bullet Reason: Procedure number changed.
Step 3.2.6.b Change: Changed title of Operations Staging Area (OSA) to Operations Support Center (OSC). Correction - e Reason: OSA is now the OSC.
Step 3.2.7 Change: Deleted procedure reference in fourth bullet, PMP-2081-EPP 305. Correction - o Reason: Procedure deleted.
Step 3.2.7.e Change: Added (within 15 minutes). Correction - q Reason: To clarify when initial notification is required.
Step 3.2.7.f Change: Changed "15 minutes" to "30 minutes or within 15 minutes of a PAR change." Correction - m Reason: State requirements have changed to allow updates with no PAR changes to be made every 30 minutes.
Step 3.2.10 Change: Deleted reference to PMP 2081-EPP-103. Correction - o Changed OSA to OSC. Correction - e Reason: Procedure deleted.
Step 5.1.4, 5.1.5 Change: Deleted reference procedures. Correction - o and 5.1.7 Reason: Procedures have been deleted.
~~ OnEM N6t Paitf r
Page e of 3 Number:
Title:
This is a free-form as called out in PMP-2010-PRC-002, Procedure Correction, Change, and Review, Rev. 9a.
REVISION
SUMMARY
PMP-2080-EPP-100 Emergency Response Revision:
Oa Section or Step Change/Reason For Change New Step 5.1.4 Change: Changed procedure number to RMT-2080-EOF-001. Re numbered step. Correction - o Reason: Procedure reference has changed.
Figure 1 Change: Modified procedure flow chart to reflect the deleted procedures incorporated by this change. Correction - m Reason: Correct the flow chart.
~ ~Oill 41 N~t r
- ~
Page ý 0 Number:
Title:
Change:
0 This is a free-form as called out in PMP-2010-PRC-002, Procedure Correction,'
Change, and Review, Rev. 9a.
ELECTRIC PMP-2080-EPP-100 Rev. Oa Page 1 of 20 Emergency Response Reference I Effective Date:
9/J B. K. Molloy S. M. Partin Site Protective Services Writer Owner Cognizant Organization TABLE OF CONTENTS 1
PURPOSE AND SCOPE..........................................................................
2 2
DEFINITIONS AND ABBREVIATIONS...................................................... 2 3
DETAILS..............................................................................................
2 4
FINAL CONDITIONS.............................................................................. 7 5
REFERENCES....................................................................................... 7 :
Data Sheet 1:
Data Sheet 2:
Figure 1:
PAR Flowchart and Map.......................................................... 9 Technical Information Sheet...................................................... 11 Emergency Turnover Checklist................................................ 13 Procedure Flowchart............................................................. 17
Reference PMP-2080-EPP-100 I
Rev. Oa Page 2 of 20 Emergency Response I
PURPOSE AND SCOPE 1.1 This procedure provides instructions to the Shift Manager acting as the Site Emergency Coordinator (SEC), for implementing a response to an Unusual Event (UE), Alert, Site Area Emergency (SAE) and General Emergency (GE) after an emergency has been declared.
1.2 The steps in this procedure are listed in the preferred order of performance for maximum efficiency. However, the steps may be performed in a different sequence.
2 DEFINITIONS AND ABBREVIATIONS None NOTE:
All procedure steps are applicable to all Emergency Classification Levels EXCEPT when the applicable Emergency Classification Level(s) is(are) specified within a step. (Reference Figure 1, Procedure Flowchart.)
3 DETAILS 3.1 General 3.1.1 IF a classification upgrade is required at any time while the procedure is being performed or after it is completed, THEN return to step 3.2, Instructions, and proceed through the procedure again.
3.1.2 The Operations Shift Manager acting as the SEC shall implement this procedure until relieved of SEC duties.
3.1.3 The following actions shall not be delegated by the SEC:
"* Classification of the emergency.
"* Directing the notification of offsite officials.
"* Approval of Protective Action Recommendations (PAR) to offsite emergency management agencies.
Reference PMP-2080-EPP-100 I
Rev. Oa Page 3 of 20 Emergency Response 3.1.4 Declaration of an emergency requires the notification of the Berrien County Sheriff and Michigan State Police within 15 minutes. Notification of the NRC shall follow'county and state notification and in all cases be completed within one hour.
3.1.5 Declaration of a General Emergency requires that a PAR be made to the state. The PAR should be made immediately after the notification of a General Emergency (i.e., during the same phone call).
3.1.6 The Emergency Response Data System (ERDS) for the affected Unit must be operational and transmitting data to the NRC within one hour of an ALERT or higher declaration.
3.1.7 The Operations Support Center (OSC), Technical Support Center (TSC), and the Emergency Operations Facility (EOF) are required to be activated at an ALERT classification or higher.
3.2 Instructions 3.2.1 Inform Unit 1 and Unit 2 Control Room personnel of the event classification and that the Shift Manager has assumed the position of SEC.
3.2.2 Implement or direct the implementation of PMP-2080-EPP-107, Notification.
3.2.3 IF a Site Area Emergency or General Emergency has been declared, THEN notify the Security Shift Supervisor (x 2005 or 2731) to perform accountability.
- a.
WHEN evacuation is necessary, THEN inform the Security Shift Supervisor (x 2005 or 2731) to evacuate plant personnel.
- b.
WHEN evacuation-of the beach is necessary, THEN activate the beach activation warning system.
3.2.4 IF a hazard to plant personnel exists (e.g., fire, radiation or toxic gas), THEN perform one of the following steps:
- a.
IF the condition is local, THEN evacuate the area by page announcement.
Reference PMP-2080-EPP-100 I
Rev. Oa Page 4 of 20 Emergency Response
- b.
IF the condition impacts significant portions of the plant, THEN direct the Security Shift Supervisor (x 2005 or 2731) to perform accountability in accordance with Security" Post Orders and perform an evacuation.
NOTE:
The presence of an offsite dose rate may require re-classification of the event in accordance with ECC R-l, Effluent Release, PMP-2080-EPP-101, Emergency Classification.
3.2.5 IF a gaseous release of radioactive material is occurring, THEN initiate use of the Dose Assessment Program (DAP), to determine the magnitude of offsite dose levels. The following Emergency Plan procedures should be used as appropriate:
PMP-2080-EPP-108, Initial Dose Assessment (for use in the Control Room).
RMT-2080-EOF-001, Activation and Operation of the EOF (for use in the EOF).
3.2.6 IF additional personnel are required to respond to an Unusual Event to support the emergency response, THEN:
- a.
Call the Secondary Alarm Station (SAS) (xli118) and direct security to implement the Dialogic Emergency Response Notification System for an EMERGENCY.
- b.
Direct a Control Room Operator to make the following announcement for the appropriate ERO facility(s) to be activated, over the PA system. Have the announcement broadcast twice.
"Attention all personnel. Attention all personnel. The Unusual Event is still in effect, however report to and activate the Operations Support Center/Technical Support Center/Emergzency Operations Facility. All other plant personnel be prepared for further announcements."
- c.
On any touch-tone telephone:
0 Dial 1646
Reference PMP-2080-EPP-100 Rev. Oa Page 5 of 20 Emergency Response
"* Wait for the tone Press ## to access the Training Center and Buchanan Office Building PA
"* Repeat the above announcement twice 3.2.7 IF a General Emergency has been declared, THEN direct the development of a Protective Action Recommendation using the following steps:
- a.
Prior to developing a PAR consider whether the following could have an effect on the PAR:
Adverse weather conditions.
A forecast of changing weather conditions.
Release characteristics (Puff vs. Continuous).
Evacuation times.
- b.
Include any deviations from the PAR flowchart, Attachment 1, based on this step in the protective action recommendation.
- c. Obtain the following data:
Wind direction
-AND Offsite dose projection (if available) as calculated using DAP or actual offsite dose rate measurements.
- d.
Using Attachment 1, determine the appropriate PAR.
- e. Enter the Protective Action Recommendation on the Nuclear Plant Accident Notification form, obtained from the Emergency Kit and inform the State of Michigan of the recommendation within 15 minutes.
Reference PMP-2080-EPP-100 I
Rev. Oa Page 6 of 20 Emergency Response
- f.
Repeat Steps 3.2.7.a through 3.2.7.e every 30 minutes or within 15 minutes of a PAR change until relieved by the incoming Emergency Response Organization.
3.2.8 Perform mitigating actions in accordance with appropriate plant procedures.
3.2.9 IF the Plant Process Computer (PPC) is inoperable, THEN:
Designate someone to complete Data Sheet 1, Technical Information Sheet, every 15 minutes.
"* Forward the completed copy to the TSC.
"* Continue this activity for the duration of the emergency or until the PPC is operable.
3.2.10 IF accountability results identify a missing person(s) AND the TSC and OSC are NOT activated, THEN have Security attempt to locate the missing person(s).
3.2.11 Upon arrival of the oncoming SEC conduct a turnover as follows:
- a.
Obtain a copy of Data Sheet 2, Emergency Turnover Checklist.
- b.
Have the oncoming SEC complete the checklist as each item is verbally addressed.
3.3 Subsequent Instructions for the Shift Manager After Being Relieved of SEC Duties 3.3.1 WHEN relieved of SEC responsibilities, THEN resume the sole function of Shift Manager.
Notify the Control Rooms that the Shift Manager has been relieved of SEC responsibilities.
3.3.2 Direct the continued implementation of the appropriate Emergency Operating Procedure (EOP) and/or Abnormal Operating Procedure (AOP) to return the unit to a safe condition.
3.3.3 Inform the TSC of changes in plant condition and equipment status.
Reference PMP-2080-EPP-100 Rev. 0a Page 7 of 20 Emergency Response 3.3.4 Inform the TSC of mitigating actions to be taken or any that have been completed.
3.3.5 IF additional personnel are required, THEN request assistance from the TSC.
3.3.6 Assemble all documentation associated with the emergency and forward it to the Emergency Planning Coordinator. This documentation should include:
"* Complete notification forms
"* Copies of pertinent log entries
"* Copy of the Condition Report if generated
"* Other documentation deemed appropriate by the Shift Manager 4
FINAL CONDITIONS 4.1 The emergency has been terminated and the plant has entered the recovery phase.
5 REFERENCES 5.1 Use
References:
5.1.1 PMP-2080-EPP-101, Emergency Classification 5.1.2 PMP-2080-EPP-107, Notification 5.1.3 PMP-2080-EPP-108, Initial Dose Assessment 5.1.4 RMT-2080-EOF-001, Activation and Operation of the EOF.
5.2 Writing
References:
5.2.1 Source
References:
- a.
Cook Nuclear Plant Emergency Plan
Reference PMP-2080-EPP-100
[
Rev. Oa Page 8 of 20 Emergency Response 5.2.2 General References
- a.
Michigan Emergency Preparedness Plan
348 75 STEDEor Ž:5 rem Evacuate )
Thyroid CDE 1 2 3 4 25 Evaluate beyond 10 mile radius to determine extent of area with dose rates >1 rem TEDE or > 5 rem Thyroid CDE Discuss results of evaluation with State 191 25 168.75 Sectors Areas A,B &Cto5 miles I and 2 B, C&Dto5 miles 1, 2 and 3 C, D&Eto5 miles 1, 2 and 3 D. E, & F to 5 miles
- 1. 2 and 3 E, F & G to 5 miles 1, 2 and 3 F. G & 1 to 5 miles I and 3 GII & J to 5 miles I and 3 tI, J & K to 5 miles l and 3 J. K & L to 5 miles I and 3 K. L&Mto5 miles I and 3 L, M&Nto5 miles 1
M, N & P to 5 miles N. P&Qto5 miles 1
P. Q & R to 5 miles 1
QR & A to 5 miles 1
RA& Bto5miles I and2 C
Reference PMP-2080-EPP-100 Rev. Oa Page 9 of 20 Emergency Response PAR Flowchart and Map Pages:
1 9-10 Yes No PAR is:
Evacuate areas as indicated on DAP printout Determine affected areas as follows A.
Direction wind is blowing from (in Degrees)
B Using diagram above, locate sector opposite direction identified in A __
C.
Downwind sectors (sectors identified in B plus 2 adjacent sectors)
D.
Convert downwind sectors to areas using the Sectors to Areas table.
E.
PAR Is: Evactiate areas _
(from D)
Thrti Oaks Reference PMP-2080-EPP-100 Rev. 0a Page 10 of 20 Emergency Response PAR Flowchart and Map Pages:
9-10
Reference PMP-2080-E PP-100 Rev. Oa Page 11 of 20 Emergency Response Data Sheet 1 Technical Information Sheet Pages:
11-12 Unit No:
Date:
Time:
Data Taken By:
Data Reviewed By:
NOTE:
When redundant indication exists, record most severe condition.
RCS PARAMETER
- 1.
Containment Temp.
- 2.
Cont. H2 Concentration
- 3.
RWST Level
- 4.
Source Range CTS Pumps RHR Spray Flow SI Flow BIT Flow Accum'Pressure RHR Injection Flow RCP Status RCS Pressure Charging Flow PZR Liquid Temp.
PZR Steam Temp.
PZR Level PRT Temp.
OF
- _CPM
- 5.
- 6.
- 7.
8.
East
- ON / OFF East
- GPM North
- GPM LP1*
GPM LP2*
GPM LPI*
PSIG LP2*
PSIG East
- LP1 ON / OFF
- LP2 ON / OFF PSIG GPM OF OF OF
- 22.
- 23.
- 24.
- 25.
- 26.
27.
Intermediate Range Containment Pressure Containment Sump Level Containment Level AMPS PSIG West
- ON / OFF West
- GPM South*
GPM LP3*
GPM LP4*
GPM LP3*
PSIG LP4*
PSIG West
- LP3 ON / OFF
"* ON /OFF
"* ON / OFF PSIG GPM OF
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
21.
NSSS LOOP PARAMETERS Wide Range T Hot Wide Range T Cold S / G Pressure S I G N. R. Level S I G W.R. Level Steam Flow (pph x 106)
Feed Flow (pph x 106)
Aux. Feed Flow (pph x 103)*
MSIV Status CST Level Steam Dump OF OF PSIG
- OPEN / CLOSE
- ATMOS / COND OF PSIG
- OPEN / CLOSE Ft OF OF PSIG
- OPEN / CLOSE OF OF PSIG
- OPEN / CLOSE AVAILABLE / UNAVAILABLE
- 39.
East ESW*
/
- 40.
West ESW*
/
- 41.
East CCW*
/
- 42.
West CCW*
/
- 43.
East CTS*
/
- 44.
West CTS*
/
45 North SI*
/
- 46.
South SI*
/
- 47.
East RHR*
/
48 West RHR*
/
- Data to be taken by Control Room Operator.
EQUIPMENT STATUS
- 49.
- 50.
- 51.
- 52.
- 53.
- 54.
- 55.
- 56.
57.
East CCP*
West CCP*
TDAFP*
EMDAFP*
WMDAFP*
AB Diesel*
CD Diesel*
Normal Res.*
12 EP*
AVAILABLE / UNAVAILABLE
________ /
_________ /
__________ /
_________ /
/
_________ /
I/
/
_________ /
C Reference PMP-2080-EPP-100 Rev. Oa Page 12 of 20 Emergency Response Data Sheet 1 Technical Information Sheet Pages:
Data Seet 111
-12 C
Loop 1 Loop 2
- 28.
- 29.
- 30.
- 31.
- 32.
- 33.
- 34.
- 35.
- 36.
- 37.
38.
Loop 3 Loop 4,
- 1.
Emergency Classification Time Declared Unusual Event Alert Site Area Emergency General Emergency
- 2.
Have notifications been completed?
- a. Berrien County:
yes / no / in progress
- b. Michigan:
yes / no / in progress
- c. NRC:
yes / no / in progress
- d. NGG Personnel:
yes / no / in progress
- 3.
Protective Actions:
- a. Local area evacuation yes I no
- b. Site evacuation yes / no
- c. Accountability yes I no
- d. Site closed to visitors yes I no
- e. Offsite protective action recommended:
"* Evacuation:
yes / no areas:
"* Shelter:
yes / no areas:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Time:
Reference PMP-2080-EPP-100 Rev. Oa Page 13 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13 -16
- 4.
Plant Operational Status
- a. Reactor trip:
yes / no time:
- b. ESF Status:
- c. EOP Status:
- 5.
Plant Status
- a. Chronology of Events Time
- b. Current Plant Conditions Trip signal:
Event Reference PMP-2080-EPP-100 Rev. Oa Page 14 of 20 Emergency Response CheclistPages:
Data Sheet 2 Emergency Turnover Checklist 13 - 16
- c. Potential for Plant Degradation
- d. Mitigating Actions Taken or Underway
- 6.
Plant Radiological Conditions
- a. Inplant/Onsite Radiological Conditions Reference PMP-2080-EPP-100 Rev. Oa Page 15 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16
- b. Potential for Offsite Release of Radioactivity Airborne Water
- 7.
Injured or Contaminated Personnel:
Name Employer Reference PMP-2080-EPP-100 Rev. Oa Page 16 of 20 Emergency Response Data Sheet 2 Emergency Turnover Checklist Pages:
13-16 Status
Reference PMP-2080-EPP-100 Rev. Oa Page 17 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
17 -20
3.2.5 Implement Initial Dose Assessment, PMP-2080-EPP-108 Yes 3.2.7 3.2.7.d Complete Nuclear Accident Notification form and notify the state Reference PMP-2080-EPP-100 Rev. Oa Page 18 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
1 17 -20 3.2.6.a 3.2.6.b No
Reference PMP-2080-EPP-100 Rev. 0a Page 19 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
Fir 17 -20
3.3.3 Inform TSC of plant changes and mitigating actions planned or completed 3.3.5 C
Request assistance from TSC as necessary Reference PMP-2080-EPP-100 I
Rev. Oa Page 20 of 20 Emergency Response Figure 1 Procedure Flowchart Pages:
1 17 - 20