ML18031A160: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/03/1979
| issue date = 04/03/1979
| title = Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
| title = Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = PARR O D
| addressee name = Parr O
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM                          (RIDS)
ACCESS1ON    NBR:7904100346                                DOC ~ DATE: 79/04/03        NOTARIZED: NO        DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA                                            05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~ PENNSYLVA AUTH NAblE                      AUTHOR Aff ILIATION 050~
            'IGHT CURTISP  N ~ N~                  PENNSYLVANIA POWER                      & LIGHT  CO ~
REC IP, NAME                    RECIPIENT AFF IL IA T ION PARRED 0                                              lA!ATER REACTORS        BRANCH 3 SUBJECTS    PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL SIZE INFO'ISTRIBUTION CODE: B001B              COPIES RECE'IVED e LTR ~ ENCL' ~                    e TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE ~
NOTES;    ~>                  WW ~      8                w 5        FSM    +    Al l RECIPIENT                                COP    IES              RECIPIENT          COPIES ID CODE/NAblE                            l    TTR ENCL          IO CODEINAMIE      LTTR ENCl ACTION:      05 PM              /4'u~                          1        1    AD PFASspCLo            1      0 BC                                                1        0    LA g~p~ Q              1      0 0
i'NTERNAI.:
                                  &lP                          1        1    02 NRC PDR                    1 06 I & E                                          2        2    08 OPERA LIC BR        1  -  1 09 GEOSC IEN BR                                  1        1    10  QAB                1      1 11  MECH ENG BR                                  1        1    12  STRUC ENG BR        1      1 13 MATL ENG BR                                    2        2    15  REAC SYS BR        1      1 16 ANALYSIS              BR'8 1        1    17  CORE PERF BR        1      1 AUX SYS BR                                  1              19  CONTAIN SYS        1      1 20 I & C SYS BR                                  1        1    21  POINTER  S YS  BR  1      1 22 AD SITE TECH.                                  4              26 ACCDNT ANLYS        1      1 27 EFFL TRT SYS                                  1'              28 RAD ASMT BR          1      1 29 KIRK'WOOD                                      1  ~
1    AD FOR ENG              1      0 AD PLANT SYS                                      1        0    AD REAC SAFETY          1      0 AD SITE              ANLYSIS                      1        0    DIRECTOR NRR            1      0 MPA                                                    '          OELD                          0 1
EXTERNAL: 03 LPDR                                              1        1    04 NSIC                1      1 30 ACRS                                          10        10 P)core.
                                <<8 C.71Z 42    8(
8+j ~PA EP8  yz    ~g TOTAl, NUMBER OF COPIES REQUIRED: LTTR                                        49  ENCL      39
4 TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI    PHONE((2I5) 821.5151 APR    3  )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No.        3 Division of Project    Management U. S. Nuclear Regulatory Commission Washington,    DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450                                  FILE 841-2 PLA-340
==Dear Mr. Parr:==
In response to your      letter of  December 15, 1978, attached      is  a  schedule for responding to    the requested    information.
If you  have any questions    please contact    me.
Very  truly yours, N. W. Curtis Vice President    - Engineering    and  Construction NWC/thm v804ZOOsgg
                                                                                  +(Pg PENNSYLVANIA POWER      8  L I GH T COPAPANY
SUSQUEHANNA SES Schedule    for Responses to NRC Question    List of December  15, 1978 January 22, 1979 372. 1                      372. 8                372.15      372.22 372.2                      372. 9                372.16      372.23 372.3                      372. 10                372.17      372.24 372.4                      372.11                372.18      372.25 372.5                    . 372.12                372.19      372.26 372.6                      372.13                372.20      372.27 372.7                      372.14                372.21      372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30,  1979 232.3                      361. 3 313.1                      361. 4 313.2                      362.15 313.3                      362.17 313.4                      362.18 313.7 313.8 313.9 Ma  31, 1979 121.                                                      '
1                      231. 3                331.10 121. 2                      231.4
'21.3                        331.5 121.4                      331.6 121.5                      331.7 121.6                      331.8 121.7                      331.9
Page 2 (Continued)
SUSQUEHANNA SES Schedule  for Responses to NRC Question  List of December 15, 1979 October, 1979 313.5 313.6
A i}}

Latest revision as of 17:15, 3 February 2020

Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
ML18031A160
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/03/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-340, NUDOCS 7904100346
Download: ML18031A160 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESS1ON NBR:7904100346 DOC ~ DATE: 79/04/03 NOTARIZED: NO DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA 05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~ PENNSYLVA AUTH NAblE AUTHOR Aff ILIATION 050~

'IGHT CURTISP N ~ N~ PENNSYLVANIA POWER & LIGHT CO ~

REC IP, NAME RECIPIENT AFF IL IA T ION PARRED 0 lA!ATER REACTORS BRANCH 3 SUBJECTS PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL SIZE INFO'ISTRIBUTION CODE: B001B COPIES RECE'IVED e LTR ~ ENCL' ~ e TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE ~

NOTES; ~> WW ~ 8 w 5 FSM + Al l RECIPIENT COP IES RECIPIENT COPIES ID CODE/NAblE l TTR ENCL IO CODEINAMIE LTTR ENCl ACTION: 05 PM /4'u~ 1 1 AD PFASspCLo 1 0 BC 1 0 LA g~p~ Q 1 0 0

i'NTERNAI.:

&lP 1 1 02 NRC PDR 1 06 I & E 2 2 08 OPERA LIC BR 1 - 1 09 GEOSC IEN BR 1 1 10 QAB 1 1 11 MECH ENG BR 1 1 12 STRUC ENG BR 1 1 13 MATL ENG BR 2 2 15 REAC SYS BR 1 1 16 ANALYSIS BR'8 1 1 17 CORE PERF BR 1 1 AUX SYS BR 1 19 CONTAIN SYS 1 1 20 I & C SYS BR 1 1 21 POINTER S YS BR 1 1 22 AD SITE TECH. 4 26 ACCDNT ANLYS 1 1 27 EFFL TRT SYS 1' 28 RAD ASMT BR 1 1 29 KIRK'WOOD 1 ~

1 AD FOR ENG 1 0 AD PLANT SYS 1 0 AD REAC SAFETY 1 0 AD SITE ANLYSIS 1 0 DIRECTOR NRR 1 0 MPA ' OELD 0 1

EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 30 ACRS 10 10 P)core.

<<8 C.71Z 42 8(

8+j ~PA EP8 yz ~g TOTAl, NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39

4 TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI PHONE((2I5) 821.5151 APR 3 )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No. 3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450 FILE 841-2 PLA-340

Dear Mr. Parr:

In response to your letter of December 15, 1978, attached is a schedule for responding to the requested information.

If you have any questions please contact me.

Very truly yours, N. W. Curtis Vice President - Engineering and Construction NWC/thm v804ZOOsgg

+(Pg PENNSYLVANIA POWER 8 L I GH T COPAPANY

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1978 January 22, 1979 372. 1 372. 8 372.15 372.22 372.2 372. 9 372.16 372.23 372.3 372. 10 372.17 372.24 372.4 372.11 372.18 372.25 372.5 . 372.12 372.19 372.26 372.6 372.13 372.20 372.27 372.7 372.14 372.21 372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3 361. 3 313.1 361. 4 313.2 362.15 313.3 362.17 313.4 362.18 313.7 313.8 313.9 Ma 31, 1979 121. '

1 231. 3 331.10 121. 2 231.4

'21.3 331.5 121.4 331.6 121.5 331.7 121.6 331.8 121.7 331.9

Page 2 (Continued)

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979 October, 1979 313.5 313.6

A i