{{#Wiki_filter:NIAGARAMOHAWKPOWERCORPORATION NINEMILEPOINTUNIT1NUCLEARPOWERSTATIONREPORTOFREACTORPRESSUREVESSELFEEDWATERANDCONTROLRODDMVERETURNLINENOZZLEEXAMINATIONS performed forNUREG0619BWRFEEDWATER NOZZLEANDCONTROLRODDRIVERETURNLINENOZZLECRACKINGattheculmination ofREFUELING OUTAGENO.13whichendedonApril4,1995Thisdocumentcompleted SEPTEMBER 29,19959510100318 951003PDRADOCK05000220,,P...,PDR,,
{{#Wiki_filter:NIAGARAMOHAWKPOWER CORPORATION NINE MILE POINT UNIT 1 NUCLEAR POWER STATION REPORT OF REACTOR PRESSURE VESSEL FEED WATER AND CONTROL ROD DMVE RETURN LINE NOZZLE EXAMINATIONS performed for NUREG 0619 BWR FEEDWATER NOZZLE AND CONTROL ROD DRIVE RETURN LINE NOZZLE CRACKING at the culmination of REFUELING OUTAGE NO. 13 which ended on April 4, 1995 This document completed SEPTEMBER 29, 1995
l~Q NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)TABLEFCNTENTSINTRODUCTION
,,P...,
...................................
9510100318 951003 PDR  ADOCK 05000220 PDR,,
1ACKGROUND
....................................1 BRESULTSOFEXAMINATIONS
.........................
2MODIFICATIONS ANDSYSTEMCHANGES................
2STARTUP/SHUTDOWN CYCLES........................
3LEAKAGEMONITORING
.............................
3VlaARYe~~~~~~~~~~~~~~~~~'o~~~~~~~~~~~~~~~~~~~~3SEFERENCES e~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~o~~~~~5RAPPENDICES A.FEEDWATER ANDCONTROLRODDRIVERETURN.....7LINENOZZLEINSPECTION RESULTSB.MODIFICATIONS ORSYSTEMCHANGESTHAT.......15AFFECTFEEDWATER FLOWORTEMPERATUI&
C.ULTRASONIC EXAMINATION TECHNIQUES
..........
16


~'NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)I.INTRODUCTION Thisreportprovidestheinformation requiredbyNUREG-0619, "BWRFeedwater NozzleandControlRodDriveReturnLineNozzleCracking" (November 1980).Thereportincludes:
l
Asummaryofmethodsused,theresultsoftheinservice inspections ofthefeedwater andcontrolroddrivereturnline(CRDRL)nozzlesandfeedwater spargerflowholesandweldsinspargerarmsandtees,theeffectsofmodifications orsystemchangesonfeedwater flowortemperature, thenumberofstartup/shutdown cycles,andadiscussion ofthermalsleeveleakagemonitoring.
  ~ Q
Theinspections wereperformed bytheGeneralElectricNuclearEnergyCorporation (GE-NE)ofSanJose,California.
H.BACKGROUND NineMilePointUnit1isa620MweBoilingWaterReactor(BWR)whichbeganoperation inNovember1969andhasbeeninserviceforapproximately 26years.Duringthe1977Refueling Outage,NiagaraMohawk(NMPC)removedtheoriginally-installed loose-fit feedwater spargersandreplacedthemwithanimproveddesign(single-piston ring/flow baffleseal).Thefourfeedwater nozzleswereultrasonically (UT)examinedfromthereactorvesselexteriorusingprocedures andtechniques developed byGeneralElectric(GE).ThisUTexamination established abaselineforsubsequent nozzleexaminations.
AsrequiredbyNUREG-0312, "InterimTechnical ReportonBWRFeedwater NozzleandControlRodDriveReturnLineNozzleCracking,"
aninservice UTanddyepenetrant (PT)examination ofthefourfeedwater nozzleswasperformed byGEduringthe1979refueling outage.Nosignificant changesfromthebaselineexaminations wereobserved.
Inaddition, theReactorWaterCleanup(RWCU)returnlinewasreroutedtothefeedwater lines.InNiagaraMohawk'sresponsetoNUREG-0619, datedDecember29,1980,wecommitted toaprogramofperiodicinspections ofthefeedwater andcontrolroddrivereturnlinenozzles.Thefeedwater nozzleUTinspection wastobeperformed everyotherrefueling outageandthevisualinspection (VT)ofthefeedwater spargerswastobeperformed everyfourthrefueling outage,commencing withthe1981outage.ThePTinspection ofthefeedwater andcontrolroddrivereturnlinenozzleswastobeperformed everysixthrefueling outageorevery90startup/shutdown cycles,whichever occurredfirst.ThePTInspection intervals commenced withthe1979refueling outage,duringwhichthebaselinefeedwater nozzlePTinspections weremade.
I NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXA1VHNATIONS 1995REFUELING OUTAGE(RFO-13)H.BACKROUNDCont'dDuringthe1988Refueling Outage(RFO-11),
theNMPCNuclearQualityAssurance Department generated Corrective ActionRequest88.2039-01 todocumentandresolvediscrepancies inpreviousoutages'eedwater nozzleexamination data.Alsogenerated duringthe1988outagewastheRestartActionPlan(RAP).OneoftheRAPspecificissuesaddressed thelackoffullvolumecoverageonfeedwater nozzlesasrequiredbyNUREG-0619.
Allofthecorrective actionsforbothoftheseissueswereidentified andimplemented duringthe1988outage.The1988UTexaminations ofthefeedwater nozzlesperformed bytheNuclearEnergyServicesCo.(NES)revealedindications thatwouldrequiremonitoring duringthefollowing refueling outage.TheUTexaminations conducted duringRFO-12in1993offeedwater nozzle"A"wereperformed byGeneralElectricNuclearEnergy(GE-NE).Theresultsoftheseexaminations werepresented inNMPC'ssubmittal ofAugust25,1993(NMP1L0777)whichindicated norecordable indications andresolvedthoseindications identified in1988duringRFO-11asrequiring additional monitoring.
Visualexaminations (VT)ofthefeedwater spargerflowholesandweldsinspargerarmsandteeswereperformed byGE-NEduringRFO-11in1988andagainduringRFO-12in1993,Theseexaminations indicated noreportable indications.
III.RULTSOFEXAMINATI NTheinspections conducted duringRFO-13in1995wereperformed withtheUltrasonic Test(UT)methodbyGE-NEwhichindicated noreportable indications.
TheseUTexaminations utilizedtheGERIS2000automated systemandmanualUTpickupsoftheRPVnozzlesonfour(4)feedwater andthecontrolroddrivereturnlinenozzles.Theresultsoftheseexaminations andasummaryofallpreviousexaminations arepresented inAppendixAofthisreport.IV.MODIFICATIONS NUREG-0619 requireslicensees toreportallmodifications orsystemchangesthataffectfeedwater flowortemperature andtoconsiderthesechangesinpredicting futurecrackingtendencies.
Sinceour1988outageNUREG-0019 report,therehavebeennomodifications orsystemchangesthataffectfeedwater flowortemperature.
AppendixBtothisreportsummarizes allapplicable physicalandprocedural modifications implemented atNineMilePointUnit1since1977whichaffectfeedwater flowortemperature.


NMPIRPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)V.TARTUP/HUTDWNCYCLThefeedwater andcontrolroddrivereturnlinenozzleshaveexperienced 171startup/shutdown cyclessinceinitialplantoperation.
NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
Thecontrolroddrivereturnlinenozzlehasexperienced only63startup/shutdown cyclessincethePTexamination in1979.Table1providesfurtherdataonthenumberofstartup/shutdown cyclesfromoutagetooutagesince1977.VI.LEAKAGEMNITRINGNiagaraMohawkhasnotinstalled anon-linebypassleakagemonitoring systematNineMilePointUnit1(NMP1).Thethermalsleevedesignincludesflowbafflesthatpreventmixingofthehotreactorwaterandthecolderfeedwater inthenozzleannulus.NUREG-0619, Section4.3.2.4specifically exemptsNMP1fromthisrequirement.
TABLE F C NTENTS INTRODUCTION      ...................................                                        1 BACKGROUND ....................................1 RESULTS OF EXAMINATIONS .........................                                            2 MODIFICATIONS AND SYSTEM CHANGES ................                                            2 STARTUP/SHUTDOWN CYCLES ........................                                             3 LEAKAGEMONITORING .............................                                               3 S VlaARY  e ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~ ~
VII.8UMMARYThenondestructive examinations performed duringthe1995Refueling Outage,tu'0-13,identified noreportable indications thatwillrequiremonitoring inaccordance withNUREG-0619.
                                                'o
NMPCanticipates tocontinueutilizing anautomated inspection methodsuchastheGEGERIS2000automated systemforfutureoutagesasdescribed inNMPC'ssubmittal ofJune23,1994(NMP1L0829).
                                                    ~ ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~ 3 REFERENCES    e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~ ~ ~ ~ o  ~ ~ ~ ~ ~ 5 APPENDICES A. FEEDWATER AND CONTROL ROD DRIVE RETURN                                        .....      7 LINE NOZZLE INSPECTION RESULTS B. MODIFICATIONS OR SYSTEM CHANGES THAT AFFECT FEEDWATER FLOW OR TEMPERATUI&
I NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)TABLEINUMBEROFSTARTUPHUTDWNCYCLATNINEMILEINTT1PERIODNUMBEROFCYCLESDURINGPERIODCUMULATIVE 1969InitialStartup-1977Refueling Outage1977Refueling Outage-1979Refueling Outage1979Refueling Outage-1981Refueling Outage1981Refueling Outage-1983Safe-EndOutage1983Safe-EndOutage-1986Refueling Outage1986Refueling Outage-1987Feedwater Transient Outage(1988Refueling Outage)1988Refueling OutageRFO-111993Refueling OutageRFO-121993Refueling OutageRFO-121995Refueling OutageRFO-13951317141795108125127141149166171
                                                                            .......        15 C. ULTRASONIC EXAMINATIONTECHNIQUES ..........                                            16


VIII.R~RPERRNC NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)2.BWRFeedwater NozzleandControlRodDriveReturnLineNozzleCracking, NUREG-0619, U.S.NuclearRegulatory Commission, November1980.NMPCLetter,D.P.DisctoR.C.Haynes,U.S.NuclearRegulatory Commission, datedJanuary4,1982(
~
NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
I. INTRODUCTION This report provides the information required by NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking" (November 1980). The report includes: A summary of methods used, the results of the inservice inspections of the feedwater and control rod drive return line (CRDRL) nozzles and feedwater sparger flow holes and welds in sparger arms and tees, the effects of modifications or system changes on feedwater flow or temperature, the number of startup/shutdown cycles, and a discussion of thermal sleeve leakage monitoring.
The inspections were performed by the General Electric Nuclear Energy Corporation (GE-NE) of San Jose, California.
H. BACKGROUND Nine Mile Point Unit 1 is a 620 Mwe Boiling Water Reactor (BWR) which began operation in November 1969 and has been in service for approximately 26 years.
During the 1977 Refueling Outage, Niagara Mohawk (NMPC) removed the originally-installed loose-fit feedwater spargers and replaced them with an improved design (single-piston ring/flow baffle seal). The four feedwater nozzles were ultrasonically (UT) examined from the reactor vessel exterior using procedures and techniques developed by General Electric (GE). This UT examination established a baseline for subsequent nozzle examinations.
As required by NUREG-0312, "Interim Technical Report on BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking," an inservice UT and dye penetrant (PT) examination of the four feedwater nozzles was performed by GE during the 1979 refueling outage. No significant changes from the baseline examinations were observed. In addition, the Reactor Water Cleanup (RWCU) return line was rerouted to the feedwater lines.
In Niagara Mohawk's response to NUREG-0619, dated December 29, 1980, we committed to a program of periodic inspections of the feedwater and control rod drive return line nozzles. The feedwater nozzle UT inspection was to be performed every other refueling outage and the visual inspection (VT) of the feedwater spargers was to be performed every fourth refueling outage, commencing with the 1981 outage. The PT inspection of the feedwater and control rod drive return line nozzles was to be performed every sixth refueling outage or every 90 startup/shutdown cycles, whichever occurred first. The PT Inspection intervals commenced with the 1979 refueling outage, during which the baseline feedwater nozzle PT inspections were made.


==Subject:==
I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXA1VHNATIONS 1995 REFUELING OUTAGE (RFO-13)
H. BACK ROUND Cont'd During the 1988 Refueling Outage (RFO-11), the NMPC Nuclear Quality Assurance Department generated Corrective Action Request 88.2039-01 to document and resolve discrepancies in previous outages'eedwater nozzle examination data. Also generated during the 1988 outage was the Restart Action Plan (RAP). One of the RAP specific issues addressed the lack of full volume coverage on feedwater nozzles as required by NUREG-0619. All of the corrective actions for both of these issues were identified and implemented during the 1988 outage. The 1988 UT examinations of the feedwater nozzles performed by the Nuclear Energy Services Co. (NES) revealed indications that would require monitoring during the following refueling outage.
The UT examinations conducted during RFO-12 in 1993 of feedwater nozzle "A" were performed by General Electric Nuclear Energy (GE-NE). The results of these examinations were presented in NMPC's submittal of August 25, 1993 (NMP1L 0777) which indicated no recordable indications and resolved those indications identified in 1988 during RFO-11 as requiring additional monitoring.
Visual examinations (VT) of the feedwater sparger flow holes and welds in sparger arms and tees were performed by GE-NE during RFO-11 in 1988 and again during RFO-12 in 1993, These examinations indicated no reportable indications.
III. R    ULTS OF EXAMINATI N The inspections conducted during RFO-13 in 1995 were performed with the Ultrasonic Test (UT) method by GE-NE which indicated no reportable indications.
These UT examinations utilized the GERIS 2000 automated system and manual UT pickups of the RPV nozzles on four (4) feedwater and the control rod drive return line nozzles. The results of these examinations and a summary of all previous examinations are presented in Appendix A of this report.
IV. MODIFICATIONS NUREG-0619 requires licensees to report all modifications or system changes that affect feedwater flow or temperature and to consider these changes in predicting future cracking tendencies. Since our 1988 outage NUREG-0019 report, there have been no modifications or system changes that affect feedwater flow or temperature.
Appendix B to this report summarizes all applicable physical and procedural modifications implemented at Nine Mile Point Unit 1 since 1977 which affect feedwater flow or temperature.
 
NMPI RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
V. TARTUP/ HUTD WN CYCL The feedwater and control rod drive return line nozzles have experienced 171 startup/shutdown cycles since initial plant operation. The control rod drive return line nozzle has experienced only 63 startup/shutdown cycles since the PT examination in 1979. Table 1 provides further data on the number of startup/shutdown cycles from outage to outage since 1977.
VI. LEAKAGEM NIT RING Niagara Mohawk has not installed an on-line bypass leakage monitoring system at Nine Mile Point Unit 1 (NMP1). The thermal sleeve design includes flow baffles that prevent mixing of the hot reactor water and the colder feedwater in the nozzle annulus. NUREG-0619, Section 4.3.2.4 specifically exempts NMP1 from this requirement.
VII. 8UMMARY The nondestructive examinations performed during the 1995 Refueling Outage, tu'0-13, identified no reportable indications that will require monitoring in accordance with NUREG-0619. NMPC anticipates to continue utilizing an automated inspection method such as the GE GERIS 2000 automated system for future outages as described in NMPC's submittal of June 23, 1994 (NMP1L 0829).
 
I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
TABLE I NUMBER OF STARTUP HUTD WN CYCL                AT NINE MILE  INT    T 1 NUMBER OF CYCLES PERIOD                  DURING PERIOD  CUMULATIVE 1969 Initial Startup-1977 Refueling Outage                              95            95 1977 Refueling Outage-1979 Refueling Outage                              13            108 1979 Refueling Outage-1981 Refueling Outage                              17            125 1981 Refueling Outage-1983 Safe-End Outage                                              127 1983 Safe-End Outage-1986 Refueling Outage                              14            141 1986 Refueling Outage-1987 Feedwater Transient Outage                                  149 (1988 Refueling Outage) 1988 Refueling Outage RFO-11 1993 Refueling Outage RFO-12                        17            166 1993 Refueling Outage RFO-12 1995 Refueling Outage RFO-13                                      171


Inservice Inspections ofFeedwater NozzlesandSpargersPerformed Duringthe1981Refueling Outage).3.4,5.6.NESLetter,T.J.KochtoT.W.Roman,datedMarch4,1983(
NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
VIII. R~RPERRNC BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking, NUREG-0619, U. S. Nuclear Regulatory Commission, November 1980.
: 2. NMPC Letter, D. P. Disc to R. C. Haynes, U. S. Nuclear Regulatory Commission, dated January 4, 1982 (


==Subject:==
==Subject:==
: February, 1983Feedwater NozzleInnerRadiusExams).NESLetter,W.R.DownstoT.W.Roman,datedJune27,1984(
Inservice Inspections of Feedwater Nozzles and Spargers Performed During the 1981 Refueling Outage).
: 3. NES Letter, T. J. Koch to T. W. Roman, dated March 4, 1983 (


==Subject:==
==Subject:==


April,1984Feedwater NozzleInnerRadiusExams).NMPCsubmittal totheNRC,datedDecember23,1986,letternumberNMP1L0119(
February, 1983 Feedwater Nozzle Inner Radius Exams).
4,   NES Letter, W. R. Downs to T. W. Roman, dated June 27, 1984 (


==Subject:==
==Subject:==


1986RFO-10Feedwater NozzleExamination Results).
April, 1984 Feedwater Nozzle Inner Radius Exams).
NMPCsubmittal totheNRC,datedMarch21,1989,letternumberNMP1L0374(
: 5. NMPC submittal to the NRC, dated December 23, 1986, letter number NMP1L 0119 (


==Subject:==
==Subject:==
1986 RFO-10 Feedwater Nozzle Examination Results).
: 6. NMPC submittal to the NRC, dated March 21, 1989, letter number NMP1L 0374 (


1988RFO-11Feedwater NozzleExamResults/NMPC PlansforFutureExaminations andEvaluation ofIdentified Indications).
==Subject:==
7.NRCLetter,datedMay1,1989,(TACNo.72944)(
1988 RFO-11 Feedwater Nozzle Exam Results/NMPC Plans for Future Examinations and Evaluation of Identified Indications).
: 7. NRC Letter, dated May 1, 1989, (TAC No. 72944) (


==Subject:==
==Subject:==
Summary of April 18, 1989 Meeting to Discuss Feedwater Indications at NMP1).
: 8. NMPC submittal to the NRC, dated May 5, 1989, letter number NMP1L 0394
(


SummaryofApril18,1989MeetingtoDiscussFeedwater Indications atNMP1).8.9.10.12.NMPCsubmittal totheNRC,datedMay5,1989,letternumberNMP1L0394(
==Subject:==
Feedwater Nozzle Indication Fracture Mechanics Analysis).
: 9. NRC Safety Evaluation of Ultrasonic Test Indications in the Feedwater Inlet Nozzle "A" Near a Nozzle Safe End (TAC 72944), dated 9/26/89.
: 10. NMPC submittal to the NRC, dated January 11, 1991, letter number NMP1L 0560 (


==Subject:==
==Subject:==
1988 RFO-11 Feedwater Nozzle Examination Results).
NMPC Internal Correspondence to Unit 1 Licensing File from N, A, Spagnoletti, dated March 1, 1993, File Code 003631GG (


Feedwater NozzleIndication FractureMechanics Analysis).
==Subject:==
NRCSafetyEvaluation ofUltrasonic TestIndications intheFeedwater InletNozzle"A"NearaNozzleSafeEnd(TAC72944),dated9/26/89.NMPCsubmittal totheNRC,datedJanuary11,1991,letternumberNMP1L0560(
Notes of Telecon with NRC Regarding Feedwater Nozzle "A" UT Inspection).
: 12. NMPC submittal to the NRC, dated August 25, 1993, letter number NMP1L 0777 (


==Subject:==
==Subject:==
1993 RFO-12 Feedwater Nozzle  "A" Examination Results).


1988RFO-11Feedwater NozzleExamination Results).
I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)
NMPCInternalCorrespondence toUnit1Licensing FilefromN,A,Spagnoletti, datedMarch1,1993,FileCode003631GG(
VIH. REFERENC        Cont'd
: 13. NMPC Nuclear Engineering Report No. NER-IM-006 "Nine Mile Point Unit  1 Feedwater Nozzle Fatigue Evaluation," dated May 1994, (Reference MPR-1484, Revision 0).
: 14. NMPC Nuclear Engineering Report No. NER-IM-007 "Nine Mile Point Unit  1 Control Rod Drive Return Nozzle Fatigue Evaluation," dated May 1994, (Reference MPR-1485, Revision 0).
: 15. NMPC submittal to the NRC, dated June 23, 1994, letter number NMP1L 0829 (


==Subject:==
==Subject:==
 
Amend NUREG 0619 Commitment from PT to Automated UT Inspection).
NotesofTeleconwithNRCRegarding Feedwater Nozzle"A"UTInspection).
: 16. NRC Letter, dated January 12, 1995, (TAC No. M89792) (
NMPCsubmittal totheNRC,datedAugust25,1993,letternumberNMP1L0777(


==Subject:==
==Subject:==
Amend NMPC's NMP1 NUREG 0619 Commitment utilizing the GERIS 2000 System from Automated UT Inspection).


1993RFO-12Feedwater Nozzle"A"Examination Results).
IX. APPENDICES APPENDIX A FEEDWATER N ZZLE INSPECTION R                  ULT As stated in Niagara Mohawk's letter of December 29, 1980, the Nine Mile Point Unit 1 Feedwater and control rod drive return line nozzles will be periodically reinspected at the following intervals:
I NMP1RPVFEEDWATER ANDCRDRLNOZZLEEXAMINATIONS 1995REFUELING OUTAGE(RFO-13)VIH.REFERENCCont'd13.NMPCNuclearEngineering ReportNo.NER-IM-006 "NineMilePointUnit1Feedwater NozzleFatigueEvaluation,"
~        Feedwater Nozzle UT - every other refueling outage, commencing with the 1981 outage.
datedMay1994,(Reference MPR-1484,Revision0).14.NMPCNuclearEngineering ReportNo.NER-IM-007 "NineMilePointUnit1ControlRodDriveReturnNozzleFatigueEvaluation,"
~        Feedwater Nozzle VT - every fourth refueling outage, commencing with the 1981 outage.
datedMay1994,(Reference MPR-1485, Revision0).15.NMPCsubmittal totheNRC,datedJune23,1994,letternumberNMP1L0829(
~        Feedwater and CRD Nozzle PT - every sixth refueling outage or every 90 startup/shutdown cycles, commencing with the 1979 refueling.
During the 1981 refueling outage (RFO-8), an inservice UT examination of the four feedwater nozzles was performed by NES and also by GE. An apparent change from the baseline examination was observed. Further evaluation required removal of the sparger from the southeast nozzle. Based on the results of the additional nondestructive examinations, Niagara Mohawk concluded that the UT indication was caused by a geometric reflector and not by a crack in the nozzle. A new feedwater sparger was installed in the southeast nozzle.
The design of the new sparger was the same as the replacement spargers installed during the 1977 refueling outage.
During the 1983 safe-end outage, inservice inspections of the feedwater nozzles were not required by NUREG-0619 schedule commitment. However, the nozzles were examined by NES for information only. An increase in the amplitude of the signal from the geometric reflector in the southeast nozzle was noted. A more rigorous evaluation of this indication was performed during the 1984 refueling outage clearly identifying and documenting that this reflector is geometric and has exhibited no growth or change.
During the 1986 refueling outage (RFO-10), inservice UT examinations of the four feedwater nozzles were performed by NES. No significant changes from the previous examinations were identified.
During the 1988 refueling outage (RFO-11), inservice UT examinations of the four feedwater nozzles were performed by NES. These examinations identified approximately 25 indications in the vicinity of the nozzle to safe-end weld of the northeast nozzle "A" at 45 degrees.
Although these indications might have been caused by scratch marks made during sparger installation, we conservatively evaluated them as cracks. NUREG 0619, Section 4.3.2.3 states, "ifrecordable indications are interpreted to be cracks in any nozzle, proceed with sparger removal,   Fl'f  the nozzle bore and nozzle blend radius, and repair." Eighteen of the twenty-five indications were observed at 20 to 25% of the distance amplitude correction


==Subject:==
e, APPENDIX A FEEDWATER N ZZLE IN PE TI N R                  ULT      C nt'd curve (DAC). However, the applicable ASME Code recording criteria is 50% DAC.
Therefore, these indications were not "recordable" and did not require further evaluation.
The remaining indications appeared to be two separate flaws, one located in the nozzle and one located in the safe end weld. The indications appeared at approximately 50% DAC.
The flaws were axially oriented and their size well within the ASME Section XI acceptance criteria (a/t-4.7% and 7% versus allowable of 11.02% and 11.23%).
The examination was performed using a 45 degree shear wave transducer calibrated on a nozzle mock-up with a 5% T-notch reflector. The Code permits calibration on notches up to 10% T (T is the nominal thickness of the calibration block). Consequently, the examination sensitivity exceeds the Code required sensitivity. If a 10% T notch had been used, these indications may not have been recordable per ASME Section XI.
Considering that the examination was performed at a higher sensitivity than required by Code, that the indications are at the threshold of the recording criteria, and that the indications will remain within allowable size for at least the next two operating cycles, Niagara Mohawk determined that further evaluation of these indications was not required.
A fracture mechanics evaluation of these two flaws was performed. The results of the analysis predicted growth of the flaws not to exceed 0,001 inches over a 40-year period.
Therefore, the conclusion was made that the flaws were not significant and should not affect continued plant operation. Additionally, Niagara Mohawk committed to examine feedwater nozzle "A" during the next refueling outage (1993).
During the 1993 refueling outage (RFO-12), inservice UT examinations of feedwater nozzle "A" (N4A) Zones 1, 2, 3, and 4 were performed by General Electric Nuclear Energy (GE-NE). Note the indications identified in 1988 (RFO-12) were contained in Zone 4 of N4A.
The same ultrasonic techniques were employed as used during the 1988 refueling outage (RFO-11) examinations, other than, the calibration standard was modified to include Code allowable 10% notches as well as the previously used 5% notches. The examinations indicated no reportable indications.
The Zone 4 indications detected in the 1988 outage were seen but not at recordable levels based on either the 5% or 10% notch calibrations. Electric Power Research Institute (EPRI) sizing techniques were then attempted to see if an adequate through-wall dimension could be attained on the previously recorded indications. Although a base signal could be seen, no tip signals were noted with either the Relative Arrival Time technique or the Absolute Arrival Time technique. Since no tip could be resolved, the source of these reflectors was determined to be from scratches or inside diameter (ID) surface irregularities and not from ID cracking. These inservice inspection results have been reviewed and approved by a Niagara Mohawk Level III examiner.


AmendNUREG0619Commitment fromPTtoAutomated UTInspection).
APPENDIX A FEEDWATER NOZZLE IN PECTI N R                  ULTS Cont'd By letter dated June 23, 1994 (NMP1L 0820), NMPC informed the Commission, and provided technical basis for, utilization of the GE GERIS 2000 automated system (UT) for future examinations in lieu of performing a PT. This amended our prior NUREG 0619 commitment. In a letter dated January 12, 1995, the NRC determined that it was acceptable for NMPC to proceed with the described commitment changes and that NMPC would be advised of the final results of the NRC review.
16.NRCLetter,datedJanuary12,1995,(TACNo.M89792)(
During the 1995 refueling outage (RFO-13), inservice examinations were performed on four (4) feedwater and the control rod drive return line nozzles. The Ultrasonic Test (UT) examinations were performed by GE-NE and indicated no reportable indications were recorded. These UT examinations utilized the GERIS 2000 automated system and manual UT pickups. All of these examination results have been reviewed and approved by a Niagara Mohawk Level III examiner,
 
==Subject:==


AmendNMPC'sNMP1NUREG0619Commitment utilizing theGERIS2000SystemfromAutomated UTInspection).
APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4A NOZZLE 45 DEGREE NORTHEAST RESULTS          1977  1                  1979                  1981        1983*          1984~
NRI                    NRI              GEOMETRIC    GEOMETRIC      GEOMETRIC      GEOMETRIC REFLECTORS    REFLECTORS      REFLECTORS    REFLECTORS NRI WELD REPAIRED CRACK IN BRACKET PIN RESULTS                                1993  FO-12          1995    FO-13 GEOMETRIC & NON-              NRI                  NRI GEOMETRIC REFLECTORS AMENDED METHOD PERFORMED UT NRI NOTES:
NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.
NRI          NO REPORTABLE INDICATION UT          ULTRASONIC TESTING PT          DYE PENETRANT TESTING VT          VISUALTESTING (I)         NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT 10


IX.APPENDICES APPENDIXAFEEDWATER NZZLEINSPECTION RULTAsstatedinNiagaraMohawk'sletterofDecember29,1980,theNineMilePointUnit1Feedwater andcontrolroddrivereturnlinenozzleswillbeperiodically reinspected atthefollowing intervals:
APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4B NOZZLE 135 DEGRE        OUTHEAST RESULTS            1977  1                  1979                1981  2                1983            1984~
~Feedwater NozzleUT-everyotherrefueling outage,commencing withthe1981outage.~Feedwater NozzleVT-everyfourthrefueling outage,commencing withthe1981outage.~Feedwater andCRDNozzlePT-everysixthrefueling outageorevery90startup/shutdown cycles,commencing withthe1979refueling.
UT                                      NRI          1-1/2" LONG X 314"   5-1 I2" LONG  X 0.8" DISPOSITIONED GEOMETRIC DEEP GEOMETRIC        DEEP AMPLITUDE      AS GEOMETRIC  REFLECTORS INCREASE OF 309o NRI                    NRI            8 INDICATIONS DISPOSITIONED AS MINOR SURFACE IRREGULARITIES VT                                                              NRI RESULTS        1988    FO-11          1993  FO-12          1995    FO-13 GEOMETRIC                                          NRI REFLECTORS AMENDED METHOD PERFORMED UT VT                                        NRI OTES:
Duringthe1981refueling outage(RFO-8),aninservice UTexamination ofthefourfeedwater nozzleswasperformed byNESandalsobyGE.Anapparentchangefromthebaselineexamination wasobserved.
NOT REQUIRED BY NUREG4619. PERFORMED FOR INFORMATION ONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.
Furtherevaluation requiredremovalofthespargerfromthesoutheast nozzle.Basedontheresultsoftheadditional nondestructive examinations, NiagaraMohawkconcluded thattheUTindication wascausedbyageometric reflector andnotbyacrackinthenozzle.Anewfeedwater spargerwasinstalled inthesoutheast nozzle.Thedesignofthenewspargerwasthesameasthereplacement spargersinstalled duringthe1977refueling outage.Duringthe1983safe-endoutage,inservice inspections ofthefeedwater nozzleswerenotrequiredbyNUREG-0619 schedulecommitment.
NRI          NO REPORTABLE INDICATION UT            ULTRASONIC TESTING PT            DYE PENETRANT TESTING VT            VISUALTESTING (1)           NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT (2)           SPARGER PULLED FOR EVALUATIONOF INDICATIONS. NEW SPARGER INSTALLED.
However,thenozzleswereexaminedbyNESforinformation only.Anincreaseintheamplitude ofthesignalfromthegeometric reflector inthesoutheast nozzlewasnoted.Amorerigorousevaluation ofthisindication wasperformed duringthe1984refueling outageclearlyidentifying anddocumenting thatthisreflector isgeometric andhasexhibited nogrowthorchange.Duringthe1986refueling outage(RFO-10),
11
inservice UTexaminations ofthefourfeedwater nozzleswereperformed byNES.Nosignificant changesfromthepreviousexaminations wereidentified.
Duringthe1988refueling outage(RFO-11),
inservice UTexaminations ofthefourfeedwater nozzleswereperformed byNES.Theseexaminations identified approximately 25indications inthevicinityofthenozzletosafe-endweldofthenortheast nozzle"A"at45degrees.Althoughtheseindications mighthavebeencausedbyscratchmarksmadeduringspargerinstallation, weconservatively evaluated themascracks.NUREG0619,Section4.3.2.3states,"ifrecordable indications areinterpreted tobecracksinanynozzle,proceedwithspargerremoval,Fl'fthenozzleboreandnozzleblendradius,andrepair."Eighteenofthetwenty-five indications wereobservedat20to25%ofthedistanceamplitude correction e,
APPENDIXAFEEDWATER NZZLEINPETINRULTCnt'dcurve(DAC).However,theapplicable ASMECoderecording criteriais50%DAC.Therefore, theseindications werenot"recordable" anddidnotrequirefurtherevaluation.
Theremaining indications appearedtobetwoseparateflaws,onelocatedinthenozzleandonelocatedinthesafeendweld.Theindications appearedatapproximately 50%DAC.TheflawswereaxiallyorientedandtheirsizewellwithintheASMESectionXIacceptance criteria(a/t-4.7%
and7%versusallowable of11.02%and11.23%).Theexamination wasperformed usinga45degreeshearwavetransducer calibrated onanozzlemock-upwitha5%T-notchreflector.
TheCodepermitscalibration onnotchesupto10%T(Tisthenominalthickness ofthecalibration block).Consequently, theexamination sensitivity exceedstheCoderequiredsensitivity.
Ifa10%Tnotchhadbeenused,theseindications maynothavebeenrecordable perASMESectionXI.Considering thattheexamination wasperformed atahighersensitivity thanrequiredbyCode,thattheindications areatthethreshold oftherecording
: criteria, andthattheindications willremainwithinallowable sizeforatleastthenexttwooperating cycles,NiagaraMohawkdetermined thatfurtherevaluation oftheseindications wasnotrequired.
Afracturemechanics evaluation ofthesetwoflawswasperformed.
Theresultsoftheanalysispredicted growthoftheflawsnottoexceed0,001inchesovera40-yearperiod.Therefore, theconclusion wasmadethattheflawswerenotsignificant andshouldnotaffectcontinued plantoperation.
Additionally, NiagaraMohawkcommitted toexaminefeedwater nozzle"A"duringthenextrefueling outage(1993).Duringthe1993refueling outage(RFO-12),
inservice UTexaminations offeedwater nozzle"A"(N4A)Zones1,2,3,and4wereperformed byGeneralElectricNuclearEnergy(GE-NE).Notetheindications identified in1988(RFO-12)werecontained inZone4ofN4A.Thesameultrasonic techniques wereemployedasusedduringthe1988refueling outage(RFO-11)examinations, otherthan,thecalibration standardwasmodifiedtoincludeCodeallowable 10%notchesaswellasthepreviously used5%notches.Theexaminations indicated noreportable indications.
TheZone4indications detectedinthe1988outagewereseenbutnotatrecordable levelsbasedoneitherthe5%or10%notchcalibrations.
ElectricPowerResearchInstitute (EPRI)sizingtechniques werethenattempted toseeifanadequatethrough-wall dimension couldbeattainedonthepreviously recordedindications.
Althoughabasesignalcouldbeseen,notipsignalswerenotedwitheithertheRelativeArrivalTimetechnique ortheAbsoluteArrivalTimetechnique.
Sincenotipcouldberesolved, thesourceofthesereflectors wasdetermined tobefromscratches orinsidediameter(ID)surfaceirregularities andnotfromIDcracking.
Theseinservice inspection resultshavebeenreviewedandapprovedbyaNiagaraMohawkLevelIIIexaminer.


APPENDIXAFEEDWATER NOZZLEINPECTINRULTSCont'dByletterdatedJune23,1994(NMP1L0820),NMPCinformedtheCommission, andprovidedtechnical basisfor,utilization oftheGEGERIS2000automated system(UT)forfutureexaminations inlieuofperforming aPT.ThisamendedourpriorNUREG0619commitment.
APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4C NOZZLE 225 DEGREES SOUTHWEST RESULTS          1977  1                  1979                  1981          19834          19844      1986 FO-10 NRI                    NRI              GEOMETRIC      GEOMETRIC      ACCEPTABLE    GEOMETRIC REFLECTORS      REFLECTORS      INCLUSION    REFLECTORS NRI                    NRI NRI 1993 RFO-12          1995    FO-13 UT    GEOMETRIC REFLECTORS                                    NRI
InaletterdatedJanuary12,1995,theNRCdetermined thatitwasacceptable forNMPCtoproceedwiththedescribed commitment changesandthatNMPCwouldbeadvisedofthefinalresultsoftheNRCreview.Duringthe1995refueling outage(RFO-13),
            & ACCEPTABLE NON-GEOMETRIC REFLECTORS AMENDED METHOD PERFORMED UT NRI NOTES:
inservice examinations wereperformed onfour(4)feedwater andthecontrolroddrivereturnlinenozzles.TheUltrasonic Test(UT)examinations wereperformed byGE-NEandindicated noreportable indications wererecorded.
NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.
TheseUTexaminations utilizedtheGERIS2000automated systemandmanualUTpickups.Alloftheseexamination resultshavebeenreviewedandapprovedbyaNiagaraMohawkLevelIIIexaminer,
NRI          NO REPORTABLE INDICATION UT          ULTRASONIC TESTING PT          DYE PENETRANT TESTING VT          VISUALTESTING (I)         NO REPORTABLE INDICATIONS AFTER COMPLETION OF REPAIR ACTIVITIES AND REPLACEMENT OF SPARGER.
12


APPENDIXAFEEDWATER NOZZLEINSPECTION RESULTSN4ANOZZLE45DEGREENORTHEAST RESULTS19771NRI1979NRINRI1981GEOMETRIC REFLECTORS WELDREPAIREDCRACKINBRACKETPIN1983*GEOMETRIC REFLECTORS 1984~GEOMETRIC REFLECTORS GEOMETRIC REFLECTORS RESULTSGEOMETRIC
I APPENDIX A
&NON-GEOMETRIC REFLECTORS 1993FO-12NRINRI1995FO-13NRIAMENDEDMETHODPERFORMED UTNOTES:NOTREQUIREDBYNUREG-0619.
                                                                                                                      ~ ~
PERFORMED FORINFORMATION ONLY.THE1983SAFE-ENDREPLACEMENT OUTAGEISNOTCONSIDERED AREFUELING OUTAGEBYNIAGARAMOHAWK.NRIUTPTVT(I)NOREPORTABLE INDICATION ULTRASONIC TESTINGDYEPENETRANT TESTINGVISUALTESTINGNOREPORTABLE INDICATIONS EITHERBEFOREORAFTERSPARGERREPLACEMENT 10
FEEDWATER NOZZLE INSPECTION RESULTS N4D NOZZLE 315 DEGREES NORTHWEST RESULTS            1977  1                  1979                  1981          1983*         1984+    1986 FO-10 NRI                                    GEOMETRIC           TWO            NRI      GEOMETRIC REF LECI'ORS  INDICATIONS NOT              REFLECTORS GEOMETRIC 25%
FSH PT                NRI                    NRI NRI                                          NRI RESULTS        1988 RFO-11            1993  FO-12          1995    FO-13 UT            GEOMETRIC                                         NRI REFLECTORS AMENDED METHOD PERFORMED UT VT                NRI                    NRI NOTES:
NOT REQUIRED BY NUREG4619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.
NRI          NO REPORTABLE INDICATION UT            ULTRASONIC TESTING PT            DYE PENETRANT TESTING VT            VISUALTESTING (1)           NO REPORTABLE INDICATIONS AFTER COMPLETION OF REPAIR ACTIVITIES AND REPLACEMENT OF SPARGER.
13


APPENDIXAFEEDWATER NOZZLEINSPECTION RESULTSN4BNOZZLE135DEGREOUTHEASTRESULTS1977119791981219831984~UTVTNRINRINRI1-1/2"LONGX314"5-1I2"LONGX0.8"DISPOSITIONED GEOMETRIC DEEPGEOMETRIC DEEPAMPLITUDE ASGEOMETRIC REFLECTORS INCREASEOF309o8INDICATIONS DISPOSITIONED ASMINORSURFACEIRREGULARITIES NRIRESULTSVT1988FO-11GEOMETRIC REFLECTORS 1993FO-12NRI1995FO-13NRIAMENDEDMETHODPERFORMED UTOTES:NOTREQUIREDBYNUREG4619.
APPENDIX A CONTROL ROD DRIVE RETURN LINE NOZZLE INSPECTION R      T N9 NOZZLE 44.1-WD417/01S-IR RESULTS            1977  1                 1979                1981        1983~          19848'986      FO-10 NRI RESULTS        1988    FO-11          1993 RFO-12          1995    FO-13 NRI AMENDED METHOD PERFORMED UT NOTES:
PERFORMED FORINFORMATION ONLY.THE1983SAFE-ENDREPLACEMENT OUTAGEISNOTCONSIDERED AREFUELING OUTAGEBYNIAGARAMOHAWK.NRIUTPTVT(1)(2)NOREPORTABLE INDICATION ULTRASONIC TESTINGDYEPENETRANT TESTINGVISUALTESTINGNOREPORTABLE INDICATIONS EITHERBEFOREORAFTERSPARGERREPLACEMENT SPARGERPULLEDFOREVALUATION OFINDICATIONS.
NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.
NEWSPARGERINSTALLED.
NRI          NO REPORTABLE INDICATION UT          ULTRASONIC TESTING PT          DYE PENETRANT TESTING VT          VISUALTESTING
11
: 0)          NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT 14


APPENDIXAFEEDWATER NOZZLEINSPECTION RESULTSN4CNOZZLE225DEGREESSOUTHWEST RESULTS19771NRINRI1979NRINRI1981GEOMETRIC REFLECTORS NRI19834GEOMETRIC REFLECTORS 19844ACCEPTABLE INCLUSION 1986FO-10GEOMETRIC REFLECTORS UTGEOMETRIC REFLECTORS
    ~
&ACCEPTABLE NON-GEOMETRIC REFLECTORS 1993RFO-12NRI1995FO-13NRIAMENDEDMETHODPERFORMED UTNOTES:NOTREQUIREDBYNUREG-0619.
4
PERFORMED FORINFORMATION ONLY.THE1983SAFE-ENDREPLACEMENT OUTAGEISNOTCONSIDERED AREFUELING OUTAGEBYNIAGARAMOHAWK.NRIUTPTVT(I)NOREPORTABLE INDICATION ULTRASONIC TESTINGDYEPENETRANT TESTINGVISUALTESTINGNOREPORTABLE INDICATIONS AFTERCOMPLETION OFREPAIRACTIVITIES ANDREPLACEMENT OFSPARGER.12 I
        ~
APPENDIXAFEEDWATER NOZZLEINSPECTION RESULTSN4DNOZZLE315DEGREESNORTHWEST
APP~~IX 3 MODIFICATIONOR SYSTEM CHANGES AFFECT        FEED ATER FL W OR TEMPERA                    E 1997.      Feedwater nozzle cladding removed and spargers replaced with improved design.
~~RESULTSPT19771NRINRINRI1979NRI1981GEOMETRIC REFLECI'ORSNRI1983*TWOINDICATIONS NOTGEOMETRIC 25%FSH1984+NRI1986FO-10GEOMETRIC REFLECTORS RESULTSUTVT1988RFO-11GEOMETRIC REFLECTORS NRI1993FO-12NRI1995FO-13NRIAMENDEDMETHODPERFORMED UTNOTES:NOTREQUIREDBYNUREG4619.
~179      Reactor Water Cleanup return line rerouted to the feedwater line in accordance with Section 4.2 of NUREG-0619.
PERFORMED FORINFORMATION ONLY.THE1983SAFE-ENDREPLACEMENT OUTAGEISNOTCONSIDERED AREFUELING OUTAGEBYNIAGARAMOHAWK.NRIUTPTVT(1)NOREPORTABLE INDICATION ULTRASONIC TESTINGDYEPENETRANT TESTINGVISUALTESTINGNOREPORTABLE INDICATIONS AFTERCOMPLETION OFREPAIRACTIVITIES ANDREPLACEMENT OFSPARGER.13
1981      Replaced southeast sparger after evaluation    of UT indications.
1983      The feedwater low flow control valves were replaced with new valves designed to improve control at low flow conditions. In addition, a six-inch recirculation line was installed to provide improved flow control of the feedwater system. These modifications were previously described in our letter dated 9/8/81.
19914      In response to NUREG 0737, Action Item II.D. 1, instrument and control equipment were installed to provide a high reactor level trip of the motor-driven feedwater pumps. In addition, the HPCI control system was modified to add annunciator alarms for loss of HPCI failure signal in standby mode.
1998i      The following changes were made to improve the reliability of the feedwater system:
: 1.      Modified high level trip circuit seal in logic.
: 2.      Modified main flow valve lockup circuits to withstand momentary power interruptions.
: 3.      Modified logic to close 6-inch recirculation valve on pump start signal for runout protection.
: 4.      Modified logic to close low flow control valves on HPCI initiation.
199 No additional modifications or          system changes that affect feedwater flow or temperature.
~193      Turbine driven feedwater pump flow control valves were replaced by a single flow control valve; this change had no affect on feedwater flow or temperature.
~195      No additional modifications or system changes that affect feedwater flow or temperature.
15


APPENDIXACONTROLRODDRIVERETURNLINENOZZLEINSPECTION RTN9NOZZLE44.1-WD417/01S-IR RESULTS19771197919811983~19848'986 FO-10NRIRESULTS1988FO-111993RFO-121995FO-13NRIAMENDEDMETHODPERFORMED UTNOTES:NOTREQUIREDBYNUREG-0619.
APPENDIX C DESCRIPTION OF TRA      NI EXAMINATI N PR CED A. IIXILPPWM~
PERFORMED FORINFORMATION ONLY.THE1983SAFE-ENDREPLACEMENT OUTAGEISNOTCONSIDERED AREFUELING OUTAGEBYNIAGARAMOHAWK.NRIUTPTVT0)NOREPORTABLE INDICATION ULTRASONIC TESTINGDYEPENETRANT TESTINGVISUALTESTINGNOREPORTABLE INDICATIONS EITHERBEFOREORAFTERSPARGERREPLACEMENT 14
The NES feedwater nozzle UT examination procedure was first used at Nine Mile Point Unit 1 in 1981. This procedure divided the nozzle inner radius and bore surfaces into two zones, NES Zone 1 examinations are performed from the reactor vessel shell; NES Zone 2 examinations are performed from the nozzle barrel. NES Zone 1 and Zone 2 examinations overlap at the inside radius surface of the nozzle.
Examinations performed from the reactor vessel shell are performed by attaching a specially designed lucite wedge, which conforms to the reactor vessel outside radius, to an ultrasonic transducer such that the longitudinal beam angle is fixed.
Examinations performed from the nozzle barrel are performed using compound angle beam shear wave techniques. In this case, a number of specially designed fixed compound angle lucite wedges which conform to the outside radius of the nozzle barrel are used.
In 1988, additional  scans and scanning angles were used on the safe-end bore, nozzle bore, and the inner radius to ensure optimal interrogation of the required volumes.
Recording criteria was updated for more uniformity when comparing data from each outage. A new template was designed and built to facilitate shell-side exams.
B. ~GEP      C. URB The GE feedwater nozzle UT examination procedure was used for the 1977 baseline and the 1979 inservice inspections at Nine Mile Point Unit 1. This procedure divides the nozzle inner radius and bore surfaces into three zones.
The GE Zone 1 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the reactor vessel outside radius, such that the longitudinal beam angle and the circumferential beam angle are fixed.
The GE Zone 2 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the outer diameter blend radius of the nozzle, such that the longitudinal beam angle and the circumferential beam angle are fixed.
The GE Zone 3 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the outside radius of the nozzle barrel, such that the circumferential beam angle is fixed.
16


~~4APP~~IX3MODIFICATION ORSYSTEMCHANGESAFFECTFEEDATERFLWORTEMPERAE1997.Feedwater nozzlecladdingremovedandspargersreplacedwithimproveddesign.~179ReactorWaterCleanupreturnlinereroutedtothefeedwater lineinaccordance withSection4.2ofNUREG-0619.
t ULTRA APPENDIX C DESCRIPTION OF NIC EXAMINATIONPROCEDUR C. NMPC PROCEDURE Niagara Mohawk NDE Procedure (No. NDEP-UT-6.07) was used to UT examine feedwater nozzle "A" (N4A) Zones 1, 2, 3, and 4 during the 1993 refueling outage (RFO-12). This procedure utilized manual techniques and equipment which are similar and equivalent to those used by NES during the 1988 refueling outage (RFO-11). The ultrasonic techniques employed are the same as those used for the RFO-11 examinations, other than, the calibration standard was modified to include Code allowable 10% notches as well as the previously used 5% notches for the safe-end bore examination. These examinations were performed by General Electric Nuclear Energy (GE-NE) personnel.
1981Replacedsoutheast spargerafterevaluation ofUTindications.
D. DESCRIPTION OF GE-NE GERIS-2000 AUTOMATEDVT INSPECTI N Y TEM F -13 The GERIS-2000 UT Imaging System is an automated ultrasonic data acquisition and imaging system. Automated scanners interfaced to the GERIS-2000, moved UT transducers radially and circumferentially around the outside surface of the nozzle and adjacent surfaces of the safe-end and reactor pressure vessel. UT data was collected and stored in digital format. The complete RF waveform was digitized and recorded on optical disks for analysis, The GERIS-2000 UT subsystem is a multiplexed logarithmic UT flaw detection instrument. For each channel, the complete RF A-scan was digitized and stored on optical disks. The system stores the RF signal in logarithmic format that has an instantaneous dynamic range that is greater than 85 dB. The logarithmic UT system allows the recording of the peaks of low and high amplitude UT signals at the same time without clipping UT signals, such as would occur with linear systems that have an instantaneous dynamic range generally less than 45 dB.
1983Thefeedwater lowflowcontrolvalveswerereplacedwithnewvalvesdesignedtoimprovecontrolatlowflowconditions.
The analysis of the GERIS-2000 data utilized advanced interactive color graphics to evaluate and assist in characterizing indications from service, fabrication and geometric related UT reflectors. Coordinated A-, B-, C-, volumetric side-view-,
Inaddition, asix-inchrecirculation linewasinstalled toprovideimprovedflowcontrolofthefeedwater system.Thesemodifications werepreviously described inourletterdated9/8/81.19914InresponsetoNUREG0737,ActionItemII.D.1,instrument andcontrolequipment wereinstalled toprovideahighreactorleveltripofthemotor-driven feedwater pumps.Inaddition, theHPCIcontrolsystemwasmodifiedtoaddannunciator alarmsforlossofHPCIfailuresignalinstandbymode.1998iThefollowing changesweremadetoimprovethereliability ofthefeedwater system:1.Modifiedhighleveltripcircuitsealinlogic.2.Modifiedmainflowvalvelockupcircuitstowithstand momentary powerinterruptions.
volumetric end-view-, and 3D- scans are provided on a high resolution (1280 by 1024 pixels) color display. Several channels may be displayed at one time to correlate indications from different channels. These graphic displays have an adjustable color scale that provides the best resolution of flaw detection and characterization down to the material noise.
3.Modifiedlogictoclose6-inchrecirculation valveonpumpstartsignalforrunoutprotection.
NMPC submittal of June 23, 1994 tReference ¹13] included Enclosure 1, Section II, "Ultrasonic Inspection Techniques", which provided a description of the GERIS UT techniques, UT instrumentation and scanning equipment in detail.
4.ModifiedlogictocloselowflowcontrolvalvesonHPCIinitiation.
17
199Noadditional modifications orsystemchangesthataffectfeedwater flowortemperature.
~193Turbinedrivenfeedwater pumpflowcontrolvalveswerereplacedbyasingleflowcontrolvalve;thischangehadnoaffectonfeedwater flowortemperature.
~195Noadditional modifications orsystemchangesthataffectfeedwater flowortemperature.
15


APPENDIXCDESCRIPTION OFTRANIEXAMINATI NPRCEDA.IIXILPPWM~TheNESfeedwater nozzleUTexamination procedure wasfirstusedatNineMilePointUnit1in1981.Thisprocedure dividedthenozzleinnerradiusandboresurfacesintotwozones,NESZone1examinations areperformed fromthereactorvesselshell;NESZone2examinations areperformed fromthenozzlebarrel.NESZone1andZone2examinations overlapattheinsideradiussurfaceofthenozzle.Examinations performed fromthereactorvesselshellareperformed byattaching aspecially designedlucitewedge,whichconformstothereactorvesseloutsideradius,toanultrasonic transducer suchthatthelongitudinal beamangleisfixed.Examinations performed fromthenozzlebarrelareperformed usingcompoundanglebeamshearwavetechniques.
ULTRA t              APPENDIX C DESCRIPTION OF NIC EXAMINATI N PROCEDURES Cont'd D. D CRIPTION F              E-NE GERT -2000 AUT MATED VT IN PECTION SYSTEM Cont'd Amplitude-based recording and reporting criteria is not used with the GERIS-2000 for nozzle inner radius and bore examinations. All UT data is recorded and evaluated.
Inthiscase,anumberofspecially designedfixedcompoundanglelucitewedgeswhichconformtotheoutsideradiusofthenozzlebarrelareused.In1988,additional scansandscanningangleswereusedonthesafe-endbore,nozzlebore,andtheinnerradiustoensureoptimalinterrogation oftherequiredvolumes.Recording criteriawasupdatedformoreuniformity whencomparing datafromeachoutage.Anewtemplatewasdesignedandbuilttofacilitate shell-side exams.B.~GEPC.URBTheGEfeedwater nozzleUTexamination procedure wasusedforthe1977baselineandthe1979inservice inspections atNineMilePointUnit1.Thisprocedure dividesthenozzleinnerradiusandboresurfacesintothreezones.TheGEZone1examination isperformed byattaching anultrasonic transducer toaspecially designedlucitewedge,whichconformstothereactorvesseloutsideradius,suchthatthelongitudinal beamangleandthecircumferential beamanglearefixed.TheGEZone2examination isperformed byattaching anultrasonic transducer toaspecially designedlucitewedge,whichconformstotheouterdiameterblendradiusofthenozzle,suchthatthelongitudinal beamangleandthecircumferential beamanglearefixed.TheGEZone3examination isperformed byattaching anultrasonic transducer toaspecially designedlucitewedge,whichconformstotheoutsideradiusofthenozzlebarrel,suchthatthecircumferential beamangleisfixed.16
Any UT data that has signal-to-noise ratios of greater than 2-to-l, has echo-dynamic characteristics of cracking and can be confirmed from 2 directions or accompanied by tip-diffracted signals are called cracks.
The GERIS-2000 system is capable of detecting and sizing axial flaws 0.250 inches or less in depth in feedwater nozzle inner radius and bore regions. The capability of the GERIS-2000 system for defect detection and sizing was demonstrated and included in NMPC submittal June 23, 1994 [Reference ¹13] in Enclosure 1, Section III, "Ultrasonic Technique Qualification Plan", which provided a detailed description of the EDM notches and fatigue-crack implants that are used to demonstrate the capability of the GERIS-2000 system.
When obstructions limited automated scanning coverage, supplemental manual examinations were performed. In both cases, full ID coverage was obtained from at least one direction. When automated scanning cannot be performed from both directions, manual techniques utilizing the same techniques as the automated examinations were used. The entire ID surface of zones 1 through 5 (see Figure 1 below) were examined for axial flaws from at least 1 direction with either automated or manual techniques. Areas examined were fully documented in the inspection results.
The method used to ensure that the NMP1 feedwater nozzles are examined with equivalent techniques is through the use of modeling. The modeling used was where the UT beam paths are predicted using ray tracing algorithms with predetermined beam angle parameters. The beam paths are used to determine the incident angles of the beam on the ID surfaces. The incident angles of the UT beam on the ID surfaces used on the NMP1 feedwater nozzle were comparable to the GE qualification mockups. Multiple angle-beam transducers designed from "as built" and fabrication were used to fully examine zones 1 through 5.
18


tAPPENDIXCDESCRIPTION OFULTRANICEXAMINATION PROCEDURC.NMPCPROCEDURE NiagaraMohawkNDEProcedure (No.NDEP-UT-6.07) wasusedtoUTexaminefeedwater nozzle"A"(N4A)Zones1,2,3,and4duringthe1993refueling outage(RFO-12).
r 4
Thisprocedure utilizedmanualtechniques andequipment whicharesimilarandequivalent tothoseusedbyNESduringthe1988refueling outage(RFO-11).Theultrasonic techniques employedarethesameasthoseusedfortheRFO-11examinations, otherthan,thecalibration standardwasmodifiedtoincludeCodeallowable 10%notchesaswellasthepreviously used5%notchesforthesafe-endboreexamination.
~N                            APPENDIX C
Theseexaminations wereperformed byGeneralElectricNuclearEnergy(GE-NE)personnel.
'                          DESCRIPTION OF ULTRAS NIC EXAMINATIONPROCEDURES Cont'd VESSEL I
D.DESCRIPTION OFGE-NEGERIS-2000 AUTOMATED VTINSPECTINYTEMF-13TheGERIS-2000 UTImagingSystemisanautomated ultrasonic dataacquisition andimagingsystem.Automated scannersinterfaced totheGERIS-2000, movedUTtransducers radiallyandcircumferentially aroundtheoutsidesurfaceofthenozzleandadjacentsurfacesofthesafe-endandreactorpressurevessel.UTdatawascollected andstoredindigitalformat.ThecompleteRFwaveformwasdigitized andrecordedonopticaldisksforanalysis, TheGERIS-2000 UTsubsystem isamultiplexed logarithmic UTflawdetection instrument.
NOZZLE            )
Foreachchannel,thecompleteRFA-scanwasdigitized andstoredonopticaldisks.ThesystemstorestheRFsignalinlogarithmic formatthathasaninstantaneous dynamicrangethatisgreaterthan85dB.Thelogarithmic UTsystemallowstherecording ofthepeaksoflowandhighamplitude UTsignalsatthesametimewithoutclippingUTsignals,suchaswouldoccurwithlinearsystemsthathaveaninstantaneous dynamicrangegenerally lessthan45dB.TheanalysisoftheGERIS-2000 datautilizedadvancedinteractive colorgraphicstoevaluateandassistincharacterizing indications fromservice,fabrication andgeometric relatedUTreflectors.
SAFE END
Coordinated A-,B-,C-,volumetric side-view-,
                                                      ,/
volumetric end-view-,
l 4B    44  ,   4    B l
and3D-scansareprovidedonahighresolution (1280by1024pixels)colordisplay.Severalchannelsmaybedisplayed atonetimetocorrelate indications fromdifferent channels.
              ~
Thesegraphicdisplayshaveanadjustable colorscalethatprovidesthebestresolution offlawdetection andcharacterization downtothematerialnoise.NMPCsubmittal ofJune23,1994tReference
BB Figure 1- Noule Examination Zones 19
¹13]includedEnclosure 1,SectionII,"Ultrasonic Inspection Techniques",
whichprovidedadescription oftheGERISUTtechniques, UTinstrumentation andscanningequipment indetail.17


tAPPENDIXCDESCRIPTION OFULTRANICEXAMINATI NPROCEDURES Cont'dD.DCRIPTIONFE-NEGERT-2000AUTMATEDVTINPECTIONSYSTEMCont'dAmplitude-based recording andreporting criteriaisnotusedwiththeGERIS-2000 fornozzleinnerradiusandboreexaminations.
F}}
AllUTdataisrecordedandevaluated.
AnyUTdatathathassignal-to-noise ratiosofgreaterthan2-to-l,hasecho-dynamic characteristics ofcrackingandcanbeconfirmed from2directions oraccompanied bytip-diffracted signalsarecalledcracks.TheGERIS-2000 systemiscapableofdetecting andsizingaxialflaws0.250inchesorlessindepthinfeedwater nozzleinnerradiusandboreregions.Thecapability oftheGERIS-2000 systemfordefectdetection andsizingwasdemonstrated andincludedinNMPCsubmittal June23,1994[Reference
¹13]inEnclosure 1,SectionIII,"Ultrasonic Technique Qualification Plan",whichprovidedadetaileddescription oftheEDMnotchesandfatigue-crack implantsthatareusedtodemonstrate thecapability oftheGERIS-2000 system.Whenobstructions limitedautomated scanningcoverage, supplemental manualexaminations wereperformed.
Inbothcases,fullIDcoveragewasobtainedfromatleastonedirection.
Whenautomated scanningcannotbeperformed frombothdirections, manualtechniques utilizing thesametechniques astheautomated examinations wereused.TheentireIDsurfaceofzones1through5(seeFigure1below)wereexaminedforaxialflawsfromatleast1direction witheitherautomated ormanualtechniques.
Areasexaminedwerefullydocumented intheinspection results.ThemethodusedtoensurethattheNMP1feedwater nozzlesareexaminedwithequivalent techniques isthroughtheuseofmodeling.
ThemodelingusedwaswheretheUTbeampathsarepredicted usingraytracingalgorithms withpredetermined beamangleparameters.
Thebeampathsareusedtodetermine theincidentanglesofthebeamontheIDsurfaces.
TheincidentanglesoftheUTbeamontheIDsurfacesusedontheNMP1feedwater nozzlewerecomparable totheGEqualification mockups.Multipleangle-beam transducers designedfrom"asbuilt"andfabrication wereusedtofullyexaminezones1through5.18 r
~N4'APPENDIXCDESCRIPTION OFULTRASNICEXAMINATION PROCEDURES Cont'dVESSELINOZZLE)SAFEEND~BB,/l4B44,4BlFigure1-NouleExamination Zones19 F}}

Latest revision as of 15:30, 3 February 2020

NMP Nine Mile Point Unit 1 Nuclear Power Station Rept of RPV FW & CRD Return Line Nozzle Exams Performed for NUREG-0619...at Culmination of Refueling Outage 13 Which Ended on 950404.
ML18040A167
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/29/1995
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML18040A166 List:
References
RTR-NUREG-0619, RTR-NUREG-619 NUDOCS 9510100318
Download: ML18040A167 (42)


Text

NIAGARAMOHAWKPOWER CORPORATION NINE MILE POINT UNIT 1 NUCLEAR POWER STATION REPORT OF REACTOR PRESSURE VESSEL FEED WATER AND CONTROL ROD DMVE RETURN LINE NOZZLE EXAMINATIONS performed for NUREG 0619 BWR FEEDWATER NOZZLE AND CONTROL ROD DRIVE RETURN LINE NOZZLE CRACKING at the culmination of REFUELING OUTAGE NO. 13 which ended on April 4, 1995 This document completed SEPTEMBER 29, 1995

,,P...,

9510100318 951003 PDR ADOCK 05000220 PDR,,

l

~ Q

NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

TABLE F C NTENTS INTRODUCTION ................................... 1 BACKGROUND ....................................1 RESULTS OF EXAMINATIONS ......................... 2 MODIFICATIONS AND SYSTEM CHANGES ................ 2 STARTUP/SHUTDOWN CYCLES ........................ 3 LEAKAGEMONITORING ............................. 3 S VlaARY e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

'o

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 3 REFERENCES e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ 5 APPENDICES A. FEEDWATER AND CONTROL ROD DRIVE RETURN ..... 7 LINE NOZZLE INSPECTION RESULTS B. MODIFICATIONS OR SYSTEM CHANGES THAT AFFECT FEEDWATER FLOW OR TEMPERATUI&

....... 15 C. ULTRASONIC EXAMINATIONTECHNIQUES .......... 16

~

NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

I. INTRODUCTION This report provides the information required by NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking" (November 1980). The report includes: A summary of methods used, the results of the inservice inspections of the feedwater and control rod drive return line (CRDRL) nozzles and feedwater sparger flow holes and welds in sparger arms and tees, the effects of modifications or system changes on feedwater flow or temperature, the number of startup/shutdown cycles, and a discussion of thermal sleeve leakage monitoring.

The inspections were performed by the General Electric Nuclear Energy Corporation (GE-NE) of San Jose, California.

H. BACKGROUND Nine Mile Point Unit 1 is a 620 Mwe Boiling Water Reactor (BWR) which began operation in November 1969 and has been in service for approximately 26 years.

During the 1977 Refueling Outage, Niagara Mohawk (NMPC) removed the originally-installed loose-fit feedwater spargers and replaced them with an improved design (single-piston ring/flow baffle seal). The four feedwater nozzles were ultrasonically (UT) examined from the reactor vessel exterior using procedures and techniques developed by General Electric (GE). This UT examination established a baseline for subsequent nozzle examinations.

As required by NUREG-0312, "Interim Technical Report on BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking," an inservice UT and dye penetrant (PT) examination of the four feedwater nozzles was performed by GE during the 1979 refueling outage. No significant changes from the baseline examinations were observed. In addition, the Reactor Water Cleanup (RWCU) return line was rerouted to the feedwater lines.

In Niagara Mohawk's response to NUREG-0619, dated December 29, 1980, we committed to a program of periodic inspections of the feedwater and control rod drive return line nozzles. The feedwater nozzle UT inspection was to be performed every other refueling outage and the visual inspection (VT) of the feedwater spargers was to be performed every fourth refueling outage, commencing with the 1981 outage. The PT inspection of the feedwater and control rod drive return line nozzles was to be performed every sixth refueling outage or every 90 startup/shutdown cycles, whichever occurred first. The PT Inspection intervals commenced with the 1979 refueling outage, during which the baseline feedwater nozzle PT inspections were made.

I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXA1VHNATIONS 1995 REFUELING OUTAGE (RFO-13)

H. BACK ROUND Cont'd During the 1988 Refueling Outage (RFO-11), the NMPC Nuclear Quality Assurance Department generated Corrective Action Request 88.2039-01 to document and resolve discrepancies in previous outages'eedwater nozzle examination data. Also generated during the 1988 outage was the Restart Action Plan (RAP). One of the RAP specific issues addressed the lack of full volume coverage on feedwater nozzles as required by NUREG-0619. All of the corrective actions for both of these issues were identified and implemented during the 1988 outage. The 1988 UT examinations of the feedwater nozzles performed by the Nuclear Energy Services Co. (NES) revealed indications that would require monitoring during the following refueling outage.

The UT examinations conducted during RFO-12 in 1993 of feedwater nozzle "A" were performed by General Electric Nuclear Energy (GE-NE). The results of these examinations were presented in NMPC's submittal of August 25, 1993 (NMP1L 0777) which indicated no recordable indications and resolved those indications identified in 1988 during RFO-11 as requiring additional monitoring.

Visual examinations (VT) of the feedwater sparger flow holes and welds in sparger arms and tees were performed by GE-NE during RFO-11 in 1988 and again during RFO-12 in 1993, These examinations indicated no reportable indications.

III. R ULTS OF EXAMINATI N The inspections conducted during RFO-13 in 1995 were performed with the Ultrasonic Test (UT) method by GE-NE which indicated no reportable indications.

These UT examinations utilized the GERIS 2000 automated system and manual UT pickups of the RPV nozzles on four (4) feedwater and the control rod drive return line nozzles. The results of these examinations and a summary of all previous examinations are presented in Appendix A of this report.

IV. MODIFICATIONS NUREG-0619 requires licensees to report all modifications or system changes that affect feedwater flow or temperature and to consider these changes in predicting future cracking tendencies. Since our 1988 outage NUREG-0019 report, there have been no modifications or system changes that affect feedwater flow or temperature.

Appendix B to this report summarizes all applicable physical and procedural modifications implemented at Nine Mile Point Unit 1 since 1977 which affect feedwater flow or temperature.

NMPI RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

V. TARTUP/ HUTD WN CYCL The feedwater and control rod drive return line nozzles have experienced 171 startup/shutdown cycles since initial plant operation. The control rod drive return line nozzle has experienced only 63 startup/shutdown cycles since the PT examination in 1979. Table 1 provides further data on the number of startup/shutdown cycles from outage to outage since 1977.

VI. LEAKAGEM NIT RING Niagara Mohawk has not installed an on-line bypass leakage monitoring system at Nine Mile Point Unit 1 (NMP1). The thermal sleeve design includes flow baffles that prevent mixing of the hot reactor water and the colder feedwater in the nozzle annulus. NUREG-0619, Section 4.3.2.4 specifically exempts NMP1 from this requirement.

VII. 8UMMARY The nondestructive examinations performed during the 1995 Refueling Outage, tu'0-13, identified no reportable indications that will require monitoring in accordance with NUREG-0619. NMPC anticipates to continue utilizing an automated inspection method such as the GE GERIS 2000 automated system for future outages as described in NMPC's submittal of June 23, 1994 (NMP1L 0829).

I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

TABLE I NUMBER OF STARTUP HUTD WN CYCL AT NINE MILE INT T 1 NUMBER OF CYCLES PERIOD DURING PERIOD CUMULATIVE 1969 Initial Startup-1977 Refueling Outage 95 95 1977 Refueling Outage-1979 Refueling Outage 13 108 1979 Refueling Outage-1981 Refueling Outage 17 125 1981 Refueling Outage-1983 Safe-End Outage 127 1983 Safe-End Outage-1986 Refueling Outage 14 141 1986 Refueling Outage-1987 Feedwater Transient Outage 149 (1988 Refueling Outage) 1988 Refueling Outage RFO-11 1993 Refueling Outage RFO-12 17 166 1993 Refueling Outage RFO-12 1995 Refueling Outage RFO-13 171

NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

VIII. R~RPERRNC BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking, NUREG-0619, U. S. Nuclear Regulatory Commission, November 1980.

2. NMPC Letter, D. P. Disc to R. C. Haynes, U. S. Nuclear Regulatory Commission, dated January 4, 1982 (

Subject:

Inservice Inspections of Feedwater Nozzles and Spargers Performed During the 1981 Refueling Outage).

3. NES Letter, T. J. Koch to T. W. Roman, dated March 4, 1983 (

Subject:

February, 1983 Feedwater Nozzle Inner Radius Exams).

4, NES Letter, W. R. Downs to T. W. Roman, dated June 27, 1984 (

Subject:

April, 1984 Feedwater Nozzle Inner Radius Exams).

5. NMPC submittal to the NRC, dated December 23, 1986, letter number NMP1L 0119 (

Subject:

1986 RFO-10 Feedwater Nozzle Examination Results).

6. NMPC submittal to the NRC, dated March 21, 1989, letter number NMP1L 0374 (

Subject:

1988 RFO-11 Feedwater Nozzle Exam Results/NMPC Plans for Future Examinations and Evaluation of Identified Indications).

7. NRC Letter, dated May 1, 1989, (TAC No. 72944) (

Subject:

Summary of April 18, 1989 Meeting to Discuss Feedwater Indications at NMP1).

8. NMPC submittal to the NRC, dated May 5, 1989, letter number NMP1L 0394

(

Subject:

Feedwater Nozzle Indication Fracture Mechanics Analysis).

9. NRC Safety Evaluation of Ultrasonic Test Indications in the Feedwater Inlet Nozzle "A" Near a Nozzle Safe End (TAC 72944), dated 9/26/89.
10. NMPC submittal to the NRC, dated January 11, 1991, letter number NMP1L 0560 (

Subject:

1988 RFO-11 Feedwater Nozzle Examination Results).

NMPC Internal Correspondence to Unit 1 Licensing File from N, A, Spagnoletti, dated March 1, 1993, File Code 003631GG (

Subject:

Notes of Telecon with NRC Regarding Feedwater Nozzle "A" UT Inspection).

12. NMPC submittal to the NRC, dated August 25, 1993, letter number NMP1L 0777 (

Subject:

1993 RFO-12 Feedwater Nozzle "A" Examination Results).

I NMP1 RPV FEEDWATER AND CRDRL NOZZLE EXAMINATIONS 1995 REFUELING OUTAGE (RFO-13)

VIH. REFERENC Cont'd

13. NMPC Nuclear Engineering Report No. NER-IM-006 "Nine Mile Point Unit 1 Feedwater Nozzle Fatigue Evaluation," dated May 1994, (Reference MPR-1484, Revision 0).
14. NMPC Nuclear Engineering Report No. NER-IM-007 "Nine Mile Point Unit 1 Control Rod Drive Return Nozzle Fatigue Evaluation," dated May 1994, (Reference MPR-1485, Revision 0).
15. NMPC submittal to the NRC, dated June 23, 1994, letter number NMP1L 0829 (

Subject:

Amend NUREG 0619 Commitment from PT to Automated UT Inspection).

16. NRC Letter, dated January 12, 1995, (TAC No. M89792) (

Subject:

Amend NMPC's NMP1 NUREG 0619 Commitment utilizing the GERIS 2000 System from Automated UT Inspection).

IX. APPENDICES APPENDIX A FEEDWATER N ZZLE INSPECTION R ULT As stated in Niagara Mohawk's letter of December 29, 1980, the Nine Mile Point Unit 1 Feedwater and control rod drive return line nozzles will be periodically reinspected at the following intervals:

~ Feedwater Nozzle UT - every other refueling outage, commencing with the 1981 outage.

~ Feedwater Nozzle VT - every fourth refueling outage, commencing with the 1981 outage.

~ Feedwater and CRD Nozzle PT - every sixth refueling outage or every 90 startup/shutdown cycles, commencing with the 1979 refueling.

During the 1981 refueling outage (RFO-8), an inservice UT examination of the four feedwater nozzles was performed by NES and also by GE. An apparent change from the baseline examination was observed. Further evaluation required removal of the sparger from the southeast nozzle. Based on the results of the additional nondestructive examinations, Niagara Mohawk concluded that the UT indication was caused by a geometric reflector and not by a crack in the nozzle. A new feedwater sparger was installed in the southeast nozzle.

The design of the new sparger was the same as the replacement spargers installed during the 1977 refueling outage.

During the 1983 safe-end outage, inservice inspections of the feedwater nozzles were not required by NUREG-0619 schedule commitment. However, the nozzles were examined by NES for information only. An increase in the amplitude of the signal from the geometric reflector in the southeast nozzle was noted. A more rigorous evaluation of this indication was performed during the 1984 refueling outage clearly identifying and documenting that this reflector is geometric and has exhibited no growth or change.

During the 1986 refueling outage (RFO-10), inservice UT examinations of the four feedwater nozzles were performed by NES. No significant changes from the previous examinations were identified.

During the 1988 refueling outage (RFO-11), inservice UT examinations of the four feedwater nozzles were performed by NES. These examinations identified approximately 25 indications in the vicinity of the nozzle to safe-end weld of the northeast nozzle "A" at 45 degrees.

Although these indications might have been caused by scratch marks made during sparger installation, we conservatively evaluated them as cracks. NUREG 0619, Section 4.3.2.3 states, "ifrecordable indications are interpreted to be cracks in any nozzle, proceed with sparger removal, Fl'f the nozzle bore and nozzle blend radius, and repair." Eighteen of the twenty-five indications were observed at 20 to 25% of the distance amplitude correction

e, APPENDIX A FEEDWATER N ZZLE IN PE TI N R ULT C nt'd curve (DAC). However, the applicable ASME Code recording criteria is 50% DAC.

Therefore, these indications were not "recordable" and did not require further evaluation.

The remaining indications appeared to be two separate flaws, one located in the nozzle and one located in the safe end weld. The indications appeared at approximately 50% DAC.

The flaws were axially oriented and their size well within the ASME Section XI acceptance criteria (a/t-4.7% and 7% versus allowable of 11.02% and 11.23%).

The examination was performed using a 45 degree shear wave transducer calibrated on a nozzle mock-up with a 5% T-notch reflector. The Code permits calibration on notches up to 10% T (T is the nominal thickness of the calibration block). Consequently, the examination sensitivity exceeds the Code required sensitivity. If a 10% T notch had been used, these indications may not have been recordable per ASME Section XI.

Considering that the examination was performed at a higher sensitivity than required by Code, that the indications are at the threshold of the recording criteria, and that the indications will remain within allowable size for at least the next two operating cycles, Niagara Mohawk determined that further evaluation of these indications was not required.

A fracture mechanics evaluation of these two flaws was performed. The results of the analysis predicted growth of the flaws not to exceed 0,001 inches over a 40-year period.

Therefore, the conclusion was made that the flaws were not significant and should not affect continued plant operation. Additionally, Niagara Mohawk committed to examine feedwater nozzle "A" during the next refueling outage (1993).

During the 1993 refueling outage (RFO-12), inservice UT examinations of feedwater nozzle "A" (N4A) Zones 1, 2, 3, and 4 were performed by General Electric Nuclear Energy (GE-NE). Note the indications identified in 1988 (RFO-12) were contained in Zone 4 of N4A.

The same ultrasonic techniques were employed as used during the 1988 refueling outage (RFO-11) examinations, other than, the calibration standard was modified to include Code allowable 10% notches as well as the previously used 5% notches. The examinations indicated no reportable indications.

The Zone 4 indications detected in the 1988 outage were seen but not at recordable levels based on either the 5% or 10% notch calibrations. Electric Power Research Institute (EPRI) sizing techniques were then attempted to see if an adequate through-wall dimension could be attained on the previously recorded indications. Although a base signal could be seen, no tip signals were noted with either the Relative Arrival Time technique or the Absolute Arrival Time technique. Since no tip could be resolved, the source of these reflectors was determined to be from scratches or inside diameter (ID) surface irregularities and not from ID cracking. These inservice inspection results have been reviewed and approved by a Niagara Mohawk Level III examiner.

APPENDIX A FEEDWATER NOZZLE IN PECTI N R ULTS Cont'd By letter dated June 23, 1994 (NMP1L 0820), NMPC informed the Commission, and provided technical basis for, utilization of the GE GERIS 2000 automated system (UT) for future examinations in lieu of performing a PT. This amended our prior NUREG 0619 commitment. In a letter dated January 12, 1995, the NRC determined that it was acceptable for NMPC to proceed with the described commitment changes and that NMPC would be advised of the final results of the NRC review.

During the 1995 refueling outage (RFO-13), inservice examinations were performed on four (4) feedwater and the control rod drive return line nozzles. The Ultrasonic Test (UT) examinations were performed by GE-NE and indicated no reportable indications were recorded. These UT examinations utilized the GERIS 2000 automated system and manual UT pickups. All of these examination results have been reviewed and approved by a Niagara Mohawk Level III examiner,

APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4A NOZZLE 45 DEGREE NORTHEAST RESULTS 1977 1 1979 1981 1983* 1984~

NRI NRI GEOMETRIC GEOMETRIC GEOMETRIC GEOMETRIC REFLECTORS REFLECTORS REFLECTORS REFLECTORS NRI WELD REPAIRED CRACK IN BRACKET PIN RESULTS 1993 FO-12 1995 FO-13 GEOMETRIC & NON- NRI NRI GEOMETRIC REFLECTORS AMENDED METHOD PERFORMED UT NRI NOTES:

NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.

NRI NO REPORTABLE INDICATION UT ULTRASONIC TESTING PT DYE PENETRANT TESTING VT VISUALTESTING (I) NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT 10

APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4B NOZZLE 135 DEGRE OUTHEAST RESULTS 1977 1 1979 1981 2 1983 1984~

UT NRI 1-1/2" LONG X 314" 5-1 I2" LONG X 0.8" DISPOSITIONED GEOMETRIC DEEP GEOMETRIC DEEP AMPLITUDE AS GEOMETRIC REFLECTORS INCREASE OF 309o NRI NRI 8 INDICATIONS DISPOSITIONED AS MINOR SURFACE IRREGULARITIES VT NRI RESULTS 1988 FO-11 1993 FO-12 1995 FO-13 GEOMETRIC NRI REFLECTORS AMENDED METHOD PERFORMED UT VT NRI OTES:

NOT REQUIRED BY NUREG4619. PERFORMED FOR INFORMATION ONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.

NRI NO REPORTABLE INDICATION UT ULTRASONIC TESTING PT DYE PENETRANT TESTING VT VISUALTESTING (1) NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT (2) SPARGER PULLED FOR EVALUATIONOF INDICATIONS. NEW SPARGER INSTALLED.

11

APPENDIX A FEEDWATER NOZZLE INSPECTION RESULTS N4C NOZZLE 225 DEGREES SOUTHWEST RESULTS 1977 1 1979 1981 19834 19844 1986 FO-10 NRI NRI GEOMETRIC GEOMETRIC ACCEPTABLE GEOMETRIC REFLECTORS REFLECTORS INCLUSION REFLECTORS NRI NRI NRI 1993 RFO-12 1995 FO-13 UT GEOMETRIC REFLECTORS NRI

& ACCEPTABLE NON-GEOMETRIC REFLECTORS AMENDED METHOD PERFORMED UT NRI NOTES:

NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.

NRI NO REPORTABLE INDICATION UT ULTRASONIC TESTING PT DYE PENETRANT TESTING VT VISUALTESTING (I) NO REPORTABLE INDICATIONS AFTER COMPLETION OF REPAIR ACTIVITIES AND REPLACEMENT OF SPARGER.

12

I APPENDIX A

~ ~

FEEDWATER NOZZLE INSPECTION RESULTS N4D NOZZLE 315 DEGREES NORTHWEST RESULTS 1977 1 1979 1981 1983* 1984+ 1986 FO-10 NRI GEOMETRIC TWO NRI GEOMETRIC REF LECI'ORS INDICATIONS NOT REFLECTORS GEOMETRIC 25%

FSH PT NRI NRI NRI NRI RESULTS 1988 RFO-11 1993 FO-12 1995 FO-13 UT GEOMETRIC NRI REFLECTORS AMENDED METHOD PERFORMED UT VT NRI NRI NOTES:

NOT REQUIRED BY NUREG4619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.

NRI NO REPORTABLE INDICATION UT ULTRASONIC TESTING PT DYE PENETRANT TESTING VT VISUALTESTING (1) NO REPORTABLE INDICATIONS AFTER COMPLETION OF REPAIR ACTIVITIES AND REPLACEMENT OF SPARGER.

13

APPENDIX A CONTROL ROD DRIVE RETURN LINE NOZZLE INSPECTION R T N9 NOZZLE 44.1-WD417/01S-IR RESULTS 1977 1 1979 1981 1983~ 19848'986 FO-10 NRI RESULTS 1988 FO-11 1993 RFO-12 1995 FO-13 NRI AMENDED METHOD PERFORMED UT NOTES:

NOT REQUIRED BY NUREG-0619. PERFORMED FOR INFORMATIONONLY. THE 1983 SAFE-END REPLACEMENT OUTAGE IS NOT CONSIDERED A REFUELING OUTAGE BY NIAGARAMOHAWK.

NRI NO REPORTABLE INDICATION UT ULTRASONIC TESTING PT DYE PENETRANT TESTING VT VISUALTESTING

0) NO REPORTABLE INDICATIONS EITHER BEFORE OR AFTER SPARGER REPLACEMENT 14

~

4

~

APP~~IX 3 MODIFICATIONOR SYSTEM CHANGES AFFECT FEED ATER FL W OR TEMPERA E 1997. Feedwater nozzle cladding removed and spargers replaced with improved design.

~179 Reactor Water Cleanup return line rerouted to the feedwater line in accordance with Section 4.2 of NUREG-0619.

1981 Replaced southeast sparger after evaluation of UT indications.

1983 The feedwater low flow control valves were replaced with new valves designed to improve control at low flow conditions. In addition, a six-inch recirculation line was installed to provide improved flow control of the feedwater system. These modifications were previously described in our letter dated 9/8/81.

19914 In response to NUREG 0737, Action Item II.D. 1, instrument and control equipment were installed to provide a high reactor level trip of the motor-driven feedwater pumps. In addition, the HPCI control system was modified to add annunciator alarms for loss of HPCI failure signal in standby mode.

1998i The following changes were made to improve the reliability of the feedwater system:

1. Modified high level trip circuit seal in logic.
2. Modified main flow valve lockup circuits to withstand momentary power interruptions.
3. Modified logic to close 6-inch recirculation valve on pump start signal for runout protection.
4. Modified logic to close low flow control valves on HPCI initiation.

199 No additional modifications or system changes that affect feedwater flow or temperature.

~193 Turbine driven feedwater pump flow control valves were replaced by a single flow control valve; this change had no affect on feedwater flow or temperature.

~195 No additional modifications or system changes that affect feedwater flow or temperature.

15

APPENDIX C DESCRIPTION OF TRA NI EXAMINATI N PR CED A. IIXILPPWM~

The NES feedwater nozzle UT examination procedure was first used at Nine Mile Point Unit 1 in 1981. This procedure divided the nozzle inner radius and bore surfaces into two zones, NES Zone 1 examinations are performed from the reactor vessel shell; NES Zone 2 examinations are performed from the nozzle barrel. NES Zone 1 and Zone 2 examinations overlap at the inside radius surface of the nozzle.

Examinations performed from the reactor vessel shell are performed by attaching a specially designed lucite wedge, which conforms to the reactor vessel outside radius, to an ultrasonic transducer such that the longitudinal beam angle is fixed.

Examinations performed from the nozzle barrel are performed using compound angle beam shear wave techniques. In this case, a number of specially designed fixed compound angle lucite wedges which conform to the outside radius of the nozzle barrel are used.

In 1988, additional scans and scanning angles were used on the safe-end bore, nozzle bore, and the inner radius to ensure optimal interrogation of the required volumes.

Recording criteria was updated for more uniformity when comparing data from each outage. A new template was designed and built to facilitate shell-side exams.

B. ~GEP C. URB The GE feedwater nozzle UT examination procedure was used for the 1977 baseline and the 1979 inservice inspections at Nine Mile Point Unit 1. This procedure divides the nozzle inner radius and bore surfaces into three zones.

The GE Zone 1 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the reactor vessel outside radius, such that the longitudinal beam angle and the circumferential beam angle are fixed.

The GE Zone 2 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the outer diameter blend radius of the nozzle, such that the longitudinal beam angle and the circumferential beam angle are fixed.

The GE Zone 3 examination is performed by attaching an ultrasonic transducer to a specially designed lucite wedge, which conforms to the outside radius of the nozzle barrel, such that the circumferential beam angle is fixed.

16

t ULTRA APPENDIX C DESCRIPTION OF NIC EXAMINATIONPROCEDUR C. NMPC PROCEDURE Niagara Mohawk NDE Procedure (No. NDEP-UT-6.07) was used to UT examine feedwater nozzle "A" (N4A) Zones 1, 2, 3, and 4 during the 1993 refueling outage (RFO-12). This procedure utilized manual techniques and equipment which are similar and equivalent to those used by NES during the 1988 refueling outage (RFO-11). The ultrasonic techniques employed are the same as those used for the RFO-11 examinations, other than, the calibration standard was modified to include Code allowable 10% notches as well as the previously used 5% notches for the safe-end bore examination. These examinations were performed by General Electric Nuclear Energy (GE-NE) personnel.

D. DESCRIPTION OF GE-NE GERIS-2000 AUTOMATEDVT INSPECTI N Y TEM F -13 The GERIS-2000 UT Imaging System is an automated ultrasonic data acquisition and imaging system. Automated scanners interfaced to the GERIS-2000, moved UT transducers radially and circumferentially around the outside surface of the nozzle and adjacent surfaces of the safe-end and reactor pressure vessel. UT data was collected and stored in digital format. The complete RF waveform was digitized and recorded on optical disks for analysis, The GERIS-2000 UT subsystem is a multiplexed logarithmic UT flaw detection instrument. For each channel, the complete RF A-scan was digitized and stored on optical disks. The system stores the RF signal in logarithmic format that has an instantaneous dynamic range that is greater than 85 dB. The logarithmic UT system allows the recording of the peaks of low and high amplitude UT signals at the same time without clipping UT signals, such as would occur with linear systems that have an instantaneous dynamic range generally less than 45 dB.

The analysis of the GERIS-2000 data utilized advanced interactive color graphics to evaluate and assist in characterizing indications from service, fabrication and geometric related UT reflectors. Coordinated A-, B-, C-, volumetric side-view-,

volumetric end-view-, and 3D- scans are provided on a high resolution (1280 by 1024 pixels) color display. Several channels may be displayed at one time to correlate indications from different channels. These graphic displays have an adjustable color scale that provides the best resolution of flaw detection and characterization down to the material noise.

NMPC submittal of June 23, 1994 tReference ¹13] included Enclosure 1,Section II, "Ultrasonic Inspection Techniques", which provided a description of the GERIS UT techniques, UT instrumentation and scanning equipment in detail.

17

ULTRA t APPENDIX C DESCRIPTION OF NIC EXAMINATI N PROCEDURES Cont'd D. D CRIPTION F E-NE GERT -2000 AUT MATED VT IN PECTION SYSTEM Cont'd Amplitude-based recording and reporting criteria is not used with the GERIS-2000 for nozzle inner radius and bore examinations. All UT data is recorded and evaluated.

Any UT data that has signal-to-noise ratios of greater than 2-to-l, has echo-dynamic characteristics of cracking and can be confirmed from 2 directions or accompanied by tip-diffracted signals are called cracks.

The GERIS-2000 system is capable of detecting and sizing axial flaws 0.250 inches or less in depth in feedwater nozzle inner radius and bore regions. The capability of the GERIS-2000 system for defect detection and sizing was demonstrated and included in NMPC submittal June 23, 1994 [Reference ¹13] in Enclosure 1,Section III, "Ultrasonic Technique Qualification Plan", which provided a detailed description of the EDM notches and fatigue-crack implants that are used to demonstrate the capability of the GERIS-2000 system.

When obstructions limited automated scanning coverage, supplemental manual examinations were performed. In both cases, full ID coverage was obtained from at least one direction. When automated scanning cannot be performed from both directions, manual techniques utilizing the same techniques as the automated examinations were used. The entire ID surface of zones 1 through 5 (see Figure 1 below) were examined for axial flaws from at least 1 direction with either automated or manual techniques. Areas examined were fully documented in the inspection results.

The method used to ensure that the NMP1 feedwater nozzles are examined with equivalent techniques is through the use of modeling. The modeling used was where the UT beam paths are predicted using ray tracing algorithms with predetermined beam angle parameters. The beam paths are used to determine the incident angles of the beam on the ID surfaces. The incident angles of the UT beam on the ID surfaces used on the NMP1 feedwater nozzle were comparable to the GE qualification mockups. Multiple angle-beam transducers designed from "as built" and fabrication were used to fully examine zones 1 through 5.

18

r 4

~N APPENDIX C

' DESCRIPTION OF ULTRAS NIC EXAMINATIONPROCEDURES Cont'd VESSEL I

NOZZLE )

SAFE END

,/

l 4B 44 , 4 B l

~

BB Figure 1- Noule Examination Zones 19

F