Forwards NMP Nine Mile Point Unit 1 Nuclear Power Station Rept of RPV FW & CRD Return Line Nozzle Exams Performed for NUREG-0619...at Culmination of Refueling Outage 13 Which Ended on 950404, Including ISI Results
ML18040A165
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/03/1995
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18040A166 List:
References
RTR-NUREG-0619, RTR-NUREG-619 NMP1L-0986, NMP1L-986, NUDOCS 9510100316
Download: ML18040A165 (4)


Text

PRZORXTY 1 (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9510100316 DOC.DATE: 95/10/03 NOTARIZED-NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 P

AUTH.NAME AUTHOR AFFILIATION TERRY,C.D.

Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "NMP Nine Mile Point Unit 1 Nuclear Power Station Rept of RPV FW 6 CRD Return Line Nozzle Exams Performed for NUREG-0619...at Culmination of Refueling Outage 13 Which Ended on 950404," including ISI results.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR $ ENCLJ SIZE:

i cR i TITLE: OR Submittal:

General Distribution NOTES:

RECXPIENT XD CODE/NAME PD1-1 LA EDISON,G INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 6

6 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-1 PD PI*5~

NRR/DRCH/HICB

'NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 0

1 1

D 0

C t

N NOTE TO ALL "RIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5DS (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 17

~e

t

'lV RltlASAIRA bUvMowzwK NIAGARAMOHAWKPOWER CORPORATION/NINE MILEPOINT NUCLEARSTATION, P.O. BOX 63, LYCOMING,N.Y.13093/TEL (315) 349.7263 FAX(315) 3494753 CARL D. TERRY Vice President Nuctear Engineering October 3, 1995 NMP1L 0986 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Nine Mile Point Unit 1 Docket No. 50-220 DPR-6

Subject:

NUREG-0619, "BWR Feed)vater Nozzle and Control Rod Drive Return Line Nozzle Cracking" Gentlemen:

NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking," requires that licensees submit a detailed report to the Commission discussing inspections of feedwater nozzles and control rod drive return line nozzles.

This report is required to be submitted within six months of completing an outage at which an inspection was performed.

The attachment to this letter provides the subject report which includes the results of inspections performed during Nine Mile Point Unit 1 Refueling Outage 13.

Very truly yours, C. D. Terry Vice President - Nuclear Engineering CDT/JMT/kap Attachment xc:

Regional Administrator, Region I Mr. L. B. Marsh, Director, Project Directorate I-l, NRR Mr. G. E. Edison, Senior Project Manager, NRR Mr. B. S. Norris, Senior Resident Inspector Records Management 9510100316 951003 PDR ADOCK 05000220 P