ML18040A735: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:O REGULATORY INFORMATION DISTRIBUTION SYST (RIDS)ACCESSION NBR:8404030350 DOC.~DATE: 84/03/29 NOTARIZED:
{{#Wiki_filter:O REGULATORY INFORMATION DISTRIBUTION SYST             (RIDS)
NO DOC FACIL:50-387 Susquehanna Steam Electric Stationi Unit 1<Pennsylva 50-388 Susquehanna Steam Electric Stationi Unit 2P Pennsylva 05000388 AUTH BYNAME AUTHOR AFFILIATION CURTISEN~W~Pennsylvania Power L Light Co.RECIP~NAME RECIPIENT AFFILIATION SCHWENCEREA
ACCESSION NBR:8404030350           DOC. ~ DATE: 84/03/29     NOTARIZED: NO       DOC FACIL:50-387     Susquehanna   Steam Electric Stationi Unit         1< Pennsylva BYNAME 50-388 Susquehanna       Steam Electric Stationi Unit         2P Pennsylva 05000388 AUTH                 AUTHOR   AFFILIATION CURTISEN ~ W ~       Pennsylvania     Power L Light Co.
~Licensing Branch 2  
RECIP ~ NAME         RECIPIENT AFFILIATION SCHWENCEREA   ~         Licensing Branch 2


==SUBJECT:==
==SUBJECT:==
Amends'esponse to FSAR Question 1 10,57<per 840319 telcon, Visual insp on Unit 1 lines revealed no appreciable vibratory effects.FSAR rev reflecting position will be provided, DISTRIBUTION CODE: BOO IS COPIES RECEIVED;I.TR J ENCL SIZE: TITLE: Licensing Submittal:
Amends'esponse to FSAR Question 1 10,57<per 840319 telcon, Visual insp on Unit 1 lines revealed no appreciable vibratory effects.FSAR rev reflecting position will be provided, DISTRIBUTION CODE:     BOO IS COPIES RECEIVED;I.TR     J   ENCL     SIZE:
PSAR/PSAR Amdts S Related Correspondence NOTES: icy.NMSS/FCAF/PM, LPDR 2cys.icy NMSS/FCAF/PM'PDR 2cys.05000387 05000388 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L82 LA j INTERNAL;ELD/HDS4 IE/DEPER/EPB 36 IE/DQAS IP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB.
TITLE: Licensing     Submittal: PSAR/PSAR Amdts S         Related Correspondence NOTES: icy. NMSS/FCAF/PM, LPDR 2cys.                                             05000387 icy NMSS/FCAF/PM'PDR 2cys.                                                 05000388 RECIPIENT           COPIES              RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR ENC NRR/DL/ADL                 1            NRR L82 BC              1 NRR L82 LA               .1            PERCHER'1              1 j INTERNAL; ELD/HDS4                     1            IE FILE IE/DEPER/EPB 36           3            IE/DEPER/IRB 35 IE/DQAS IP/QAB21           1            NRR/DE/AEAB NRR/DE/CEB      11        1            NRR/DE/EHEB NRR/DE/EQB      13        2           NRR/DE/GB      28 NRR/DE/MEB      18        1            NRR/DE/MTEB    17 NRR/DE/SAB.      2Q        1            NRR/DE/SGEB     25 NRH/DHFS/HFEBOO            1            NRR/DHFS/LQB   32 NRR/DHFS/PSRB              1            NRR/DL/SSPB NRR/OS I/AEB 26            1            NRR/DSI/AS 8 NRR/OSI/CP8      10        1            NRR/DSI/CSB 09 NRR/OSI/ICSB 16            1            NRR/DS I/METB 12 NRR/DS I/PSB    19        1            NRR/DS I/RAB   22 NRR/DS  I/RS8    23        1          dlECXKS RGNi                                    RM/DDAMI/MI8 EXTERNAL: ACRS              0 l.                  BNL(AMOTS ONlY)
2Q NRH/DHFS/HFEBOO NRR/DHFS/PSRB NRR/OS I/AEB 26 NRR/OSI/CP8 10 NRR/OSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RS8 23 RGNi EXTERNAL: ACRS 0 l.DMB/DSS (AMDTS)LPOR 03 NSIC 05 NOTES: COPIES LTTR ENCL 1.1 1 3 1 1 2 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR L82 BC PERCHER'1 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/AS 8 NRR/DSI/CSB 09 NRR/DS I/METB 12 NRR/DS I/RAB 22 dlECXKS RM/DDAMI/MI 8 BNL(AMOTS ONlY)FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL IS I W I I I'~'I Il 4I I ql'I" h I WII.ll III'II 4Il)II'14'I)l~I I)fy r Sf Ws lf"ff'l II s II il'll I''''ll')I jill)I t I y I)g I,,~Iu S I~g IS)I4 W'44.)I I I W W>Il W Is Is Il WI 14 k 7 y I~n Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215/770.5151 Norman W.Curtis Vice President-Engineering
DMB/DSS (AMDTS)                        FEMA REP   DIV 39 LPOR            03                    NRC PDR         02 NSIC            05                    NTIS NOTES:
&Construction-Nuclear 21 5/770-7501 eR s9 1984 Director of Nuclear Reactor Regulation Attention:
TOTAL NUMBER OF COPIES REQUIRED: LTTR             57   ENCL
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDED RESPONSE TO FSAR QUESTION 110.57 ER 100450/100508 FILE 841-2 PLA-2142 Docket Nos.50-387 50-388


==Dear Mr.Schwencer:==
IS ql'I" I W I
I I' ~  'I Il  4I I                                  h                        I I)
                                                                                                                  ~  I        fy WII  .ll    III II    4Il          r  Sf
                                                                          )  II'14'I) l Ws lf
                        'l II s    II                                'll  I''    '        'll')          ~
g jill            t "ff I            )I il          Iy  I )g I,,        ~          Iu  S    I IS
                    )I4 W'                  44
                                                                          .  )I  I                                  I    W W
                                                                                                              > Il W
Is Is Il WI 14 y
k 7
I
  ~
n


This letter is provided to confirm a March 19, 1984 telephone conversation between Mr.W.W.Williams and M.Sager of PPGL and Mr.D.Terao of your staff regarding our response to FSAR Question 110.57.As a result of our conversation, we are/amending part d to our response to delete the commitment to visually inspect for vibrational effects on the control rod drive system insert and withdraw lines during steady state conditionsQ Visual inspections on Unit 1 lines revealed no appreciable vibratory effects.In addition, we believe that the flow rates within these lines (2 gpm for the insert lines, 3 gpm for the withdraw lines)is not significant enough to cause any appreciable vibratory effects on the lines.An FSAR revision reflecting this position will be provided.Should you have any questions, please call.Very truly yours, N.W.Curtis Vice President-Engineering 6 Construction-Nuclear cc: R.Perch-NRC D.Terao-NRC 8q0q030350 840329 PDR ADOCK 05000387, F'DR goo i<o P'7 r'.1 P II , Pt/l~PP 1 P lr P 1'J I"iI/1I I r~r i I/r g I c I J y4~A.IPennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 i 770.5151 Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 21 5/770-7501 MAR 22 1984 Mr.Harold Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL FINANCIAL REPORT ER 100450 FILE 841 PLA-2145 Docket Nos.50-387 50-388  
Pennsylvania Power               8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 / 770.5151 Norman W. Curtis Vice President-Engineering & Construction-Nuclear 21 5/770-7501 eR      s9  1984 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No.        2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDED RESPONSE TO FSAR QUESTION 110.57 ER 100450/100508                        FILE 841-2                            Docket Nos. 50-387 PLA-2142                                                                                      50-388


==Dear Mr.Denton:==
==Dear Mr. Schwencer:==
In accordance with 10CFR50.71(b), attached are ten copies of the 1983 annual report for Pennsylvania Power&Light Co.The annual report for Allegheny'lectric Cooperative, Inc., will be forwarded when it is issued later this year.Very truly yours, N.W.Curtis Vice President-Engineering
 
&Construction-Nuclear Attachments "1~V-~',~~;r V}}
This    letter is    provided to confirm a March 19, 1984 telephone conversation between Mr.      W. W. Williams and M. Sager of PPGL and Mr. D. Terao of your staff regarding our response to FSAR Question 110.57.
As a    result of our conversation, we are /amending part d to our response to delete the commitment to visually inspect for vibrational effects on the control rod drive system insert and withdraw lines during steady state conditionsQ Visual inspections on Unit 1 lines revealed no appreciable vibratory effects. In addition, we believe that the flow rates within these lines (2 gpm for the insert lines, 3 gpm for the withdraw lines) is not significant enough to cause any appreciable vibratory effects on the lines.
An FSAR      revision reflecting this position            will be    provided.      Should you have any questions,        please    call.
Very    truly yours, N. W. Curtis Vice President-Engineering            6  Construction-Nuclear cc:    R. Perch    -  NRC D. Terao  NRC goo    i F'DR 8q0q030350 840329 PDR ADOCK      05000387,
                                                                                                    <o
 
P '7 r'.1 P II l  , Pt/
                                                    ~ PP 1                                ~  i r I/
lr P P
1'  J I "iI /1I I              r r  g  I    c
 
I J y4 A.  ~
I Pennsylvania Power              8  Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 i 770.5151 Norman W. Curtis Vice President-Engineering 8 Construction-Nuclear 21 5/770-7501 MAR    22    1984 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL FINANCIAL REPORT ER 100450                          FILE 841                                  Docket Nos. 50-387 PLA-2145                                                                                      50-388
 
==Dear Mr. Denton:==
 
In accordance with 10CFR50.71(b), attached are ten copies of the 1983 annual report for Pennsylvania Power & Light Co. The annual report for Allegheny Cooperative, Inc.,     will be   forwarded when       it is   issued     later this 'lectric year.
Very   truly yours, N. W. Curtis Vice President-Engineering           & Construction-Nuclear Attachments
 
    ~
V- ',~~
"1        ;r V}}

Latest revision as of 15:25, 3 February 2020

Amends Response to FSAR Question 110.57,per 840319 Telcon. Visual Insp on Unit 1 Lines Revealed No Appreciable Vibratory Effects.Fsar Rev,Reflecting Position,Will Be Provided
ML18040A735
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/29/1984
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
PLA-2142, NUDOCS 8404030350
Download: ML18040A735 (6)


Text

O REGULATORY INFORMATION DISTRIBUTION SYST (RIDS)

ACCESSION NBR:8404030350 DOC. ~ DATE: 84/03/29 NOTARIZED: NO DOC FACIL:50-387 Susquehanna Steam Electric Stationi Unit 1< Pennsylva BYNAME 50-388 Susquehanna Steam Electric Stationi Unit 2P Pennsylva 05000388 AUTH AUTHOR AFFILIATION CURTISEN ~ W ~ Pennsylvania Power L Light Co.

RECIP ~ NAME RECIPIENT AFFILIATION SCHWENCEREA ~ Licensing Branch 2

SUBJECT:

Amends'esponse to FSAR Question 1 10,57<per 840319 telcon, Visual insp on Unit 1 lines revealed no appreciable vibratory effects.FSAR rev reflecting position will be provided, DISTRIBUTION CODE: BOO IS COPIES RECEIVED;I.TR J ENCL SIZE:

TITLE: Licensing Submittal: PSAR/PSAR Amdts S Related Correspondence NOTES: icy. NMSS/FCAF/PM, LPDR 2cys. 05000387 icy NMSS/FCAF/PM'PDR 2cys. 05000388 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENC NRR/DL/ADL 1 NRR L82 BC 1 NRR L82 LA .1 PERCHER'1 1 j INTERNAL; ELD/HDS4 1 IE FILE IE/DEPER/EPB 36 3 IE/DEPER/IRB 35 IE/DQAS IP/QAB21 1 NRR/DE/AEAB NRR/DE/CEB 11 1 NRR/DE/EHEB NRR/DE/EQB 13 2 NRR/DE/GB 28 NRR/DE/MEB 18 1 NRR/DE/MTEB 17 NRR/DE/SAB. 2Q 1 NRR/DE/SGEB 25 NRH/DHFS/HFEBOO 1 NRR/DHFS/LQB 32 NRR/DHFS/PSRB 1 NRR/DL/SSPB NRR/OS I/AEB 26 1 NRR/DSI/AS 8 NRR/OSI/CP8 10 1 NRR/DSI/CSB 09 NRR/OSI/ICSB 16 1 NRR/DS I/METB 12 NRR/DS I/PSB 19 1 NRR/DS I/RAB 22 NRR/DS I/RS8 23 1 dlECXKS RGNi RM/DDAMI/MI8 EXTERNAL: ACRS 0 l. BNL(AMOTS ONlY)

DMB/DSS (AMDTS) FEMA REP DIV 39 LPOR 03 NRC PDR 02 NSIC 05 NTIS NOTES:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL

IS ql'I" I W I

I I' ~ 'I Il 4I I h I I)

~ I fy WII .ll III II 4Il r Sf

) II'14'I) l Ws lf

'l II s II 'll I ' 'll') ~

g jill t "ff I )I il Iy I )g I,, ~ Iu S I IS

)I4 W' 44

. )I I I W W

> Il W

Is Is Il WI 14 y

k 7

I

~

n

Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 / 770.5151 Norman W. Curtis Vice President-Engineering & Construction-Nuclear 21 5/770-7501 eR s9 1984 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDED RESPONSE TO FSAR QUESTION 110.57 ER 100450/100508 FILE 841-2 Docket Nos. 50-387 PLA-2142 50-388

Dear Mr. Schwencer:

This letter is provided to confirm a March 19, 1984 telephone conversation between Mr. W. W. Williams and M. Sager of PPGL and Mr. D. Terao of your staff regarding our response to FSAR Question 110.57.

As a result of our conversation, we are /amending part d to our response to delete the commitment to visually inspect for vibrational effects on the control rod drive system insert and withdraw lines during steady state conditionsQ Visual inspections on Unit 1 lines revealed no appreciable vibratory effects. In addition, we believe that the flow rates within these lines (2 gpm for the insert lines, 3 gpm for the withdraw lines) is not significant enough to cause any appreciable vibratory effects on the lines.

An FSAR revision reflecting this position will be provided. Should you have any questions, please call.

Very truly yours, N. W. Curtis Vice President-Engineering 6 Construction-Nuclear cc: R. Perch - NRC D. Terao NRC goo i F'DR 8q0q030350 840329 PDR ADOCK 05000387,

<o

P '7 r'.1 P II l , Pt/

~ PP 1 ~ i r I/

lr P P

1' J I "iI /1I I r r g I c

I J y4 A. ~

I Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 i 770.5151 Norman W. Curtis Vice President-Engineering 8 Construction-Nuclear 21 5/770-7501 MAR 22 1984 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL FINANCIAL REPORT ER 100450 FILE 841 Docket Nos. 50-387 PLA-2145 50-388

Dear Mr. Denton:

In accordance with 10CFR50.71(b), attached are ten copies of the 1983 annual report for Pennsylvania Power & Light Co. The annual report for Allegheny Cooperative, Inc., will be forwarded when it is issued later this 'lectric year.

Very truly yours, N. W. Curtis Vice President-Engineering & Construction-Nuclear Attachments

~

V- ',~~

"1 ;r V