At 1140 hours, during testing of the 1-5, 500kV GCB, the 1- 5 breaker*
At 1140 hours, during testing of the 1-5, 500kV GCB, the 1- 5 breaker*
was closed in the test position. The 1-8, 500kV GCB opcnej as well as the 3-4 and 4-5, 13kV breakers. This action isolated the 500kV Bus Section No. 1 and the 13kV Bus Section No. 4. The F ane G gr0up busses were de-energized and 13 and 14 Reactor Coolant Pumps fed from the Yan~
was closed in the test position. The 1-8, 500kV GCB opcnej as well as the 3-4 and 4-5, 13kV breakers. This action isolated the 500kV Bus Section No. 1 and the 13kV Bus Section No. 4. The F ane G gr0up busses were de-energized and 13 and 14 Reactor Coolant Pumps fed from the Yan~
G group busses were lost. Technical Specification 3.R.J.l.a was implP-mented
G group busses were lost. Technical Specification 3.R.J.l.a was implP-mented and surveillance 4.8.1.1.1.a and 4.8.1.1.2.a.2 was co~oleted. *
      '
and surveillance 4.8.1.1.1.a and 4.8.1.1.2.a.2 was co~oleted. *
                                                                   ~
                                                                   ~
At 1320, the 500kV, 1-8 GCB and the 3-4 and 4-5, 13kV brer:J-:ers wsre n~-
At 1320, the 500kV, 1-8 GCB and the 3-4 and 4-5, 13kV brer:J-:ers wsre n~-
Line 48: Line 46:
This event did not cause any personal injury or equipment damage.
This event did not cause any personal injury or equipment damage.


. , Report No. 77-46/03L
. , Report No. 77-46/03L e  7/12/77 CORRECTIVE ACTION:
    ,.
e  7/12/77 CORRECTIVE ACTION:
The breaker failure and ground protection circuit was tagged out of service for the remainder of the breaker testing. The SOOkV, Bus Section 1-8 breaker and the 13kV, Bus Section 3-4 and 4-5 breakers were reclosed to restore the electrical distribution system to normal.
The breaker failure and ground protection circuit was tagged out of service for the remainder of the breaker testing. The SOOkV, Bus Section 1-8 breaker and the 13kV, Bus Section 3-4 and 4-5 breakers were reclosed to restore the electrical distribution system to normal.
Although the SOOkV breakers are non-safety related, a detailed pro-cedure covering testing of switchyard components is being prepared and should be available by September 1, 1977.
Although the SOOkV breakers are non-safety related, a detailed pro-cedure covering testing of switchyard components is being prepared and should be available by September 1, 1977.

Latest revision as of 10:01, 3 February 2020

Forwards LER 77-046/03L-0
ML18081A863
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/19/1977
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18081A856 List:
References
NUDOCS 8001080532
Download: ML18081A863 (3)


Text

"*.

nsWGJG m-- - ~-.

Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 2011622-7000 July 19, 1977 M.r. James P. O'Reilly Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. 0 1 Reilly:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 77-46/03L Pursuant to the reouj.reinents of Salem Generatinq Station Unit No. 1 Technical. Spicifi6ations, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 77-46/03L. This report is required within thirty (30) days of the occurrence.

Sincerely yours, Original Signed I'. P. Libriz?.i F. P. Librizzi General Manager -

Electric Production CC: Director, Office of Inspection and Enforcement (30 copies)

Director, Office of ~anagement Information and Program Control (3 copies) 8001 08() 532 96*2001 :!DOM 10-*,

Report Number: 77-46/03L Report Date: 7/12/77

\

Occurrence Date: 6/28/77 Facility: Salem Generating Station Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Loss of No. 2 Station Power Transformer (Interconnect between offsite transmission network and onsite Class lE)

CONDITIONS PRIOR TO OCCURRENCE:

Operational Mode 2, Reactor Power: 10- 8 amps DESCRIPTION OF OCCURRENCE:

At 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br />, during testing of the 1-5, 500kV GCB, the 1- 5 breaker*

was closed in the test position. The 1-8, 500kV GCB opcnej as well as the 3-4 and 4-5, 13kV breakers. This action isolated the 500kV Bus Section No. 1 and the 13kV Bus Section No. 4. The F ane G gr0up busses were de-energized and 13 and 14 Reactor Coolant Pumps fed from the Yan~

G group busses were lost. Technical Specification 3.R.J.l.a was implP-mented and surveillance 4.8.1.1.1.a and 4.8.1.1.2.a.2 was co~oleted. *

~

At 1320, the 500kV, 1-8 GCB and the 3-4 and 4-5, 13kV brer:J-:ers wsre n~-

closed to establish a normal electrical lineup. At 1324, Action State-ment 3.8.1.l was terminated.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause of this event was personnel error. During the testing of the Bus Section 1-5, 500kV breaker, the breaker f~ilure and ground protec-tion circuit was not tagged out of service. When the 1-5 breaker was closed in the test position, the protective relay ciicuit saw this as a "stuck breaker" and. is.elated the apparent fault.

ANALYSIS OF OCCURRENCE:

Technical S~ecification Action Statement 3.8.1.1.a allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore an inoperable offsite circuit to operable status. The No. 2 Station Power transformer was restored to operable status in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 44 minutes, therefore, the Technical Specifications were not violated.

This event did not cause any personal injury or equipment damage.

. , Report No. 77-46/03L e 7/12/77 CORRECTIVE ACTION:

The breaker failure and ground protection circuit was tagged out of service for the remainder of the breaker testing. The SOOkV, Bus Section 1-8 breaker and the 13kV, Bus Section 3-4 and 4-5 breakers were reclosed to restore the electrical distribution system to normal.

Although the SOOkV breakers are non-safety related, a detailed pro-cedure covering testing of switchyard components is being prepared and should be available by September 1, 1977.

FAILURE DATA:

Not Applicable.

Prepared by T. Spencer

~~~__:._~~.:..,.__~~~~

SORC Meeting No. 75-77

~~~~~~~~-