Line 3: Line 3:
| issue date = 02/15/2019
| issue date = 02/15/2019
| title = Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative IR-3-39 Fillet Welds
| title = Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative IR-3-39 Fillet Welds
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI
| addressee name = Danna J G
| addressee name = Danna J
| addressee affiliation = NRC/NRR/DORL/LPLI
| addressee affiliation = NRC/NRR/DORL/LPLI
| docket = 05000423
| docket = 05000423
| license number = NPF-049
| license number = NPF-049
| contact person = Guzman R V
| contact person = Guzman R
| case reference number = EPID L-2019-LRM-0004
| case reference number = EPID L-2019-LRM-0004
| document type = E-Mail, Meeting Summary
| document type = E-Mail, Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Guzman, Richard To: Danna, James Bcc: Guzman, Richard
{{#Wiki_filter:From:           Guzman, Richard To:             Danna, James Bcc:             Guzman, Richard


==Subject:==
==Subject:==
Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative Request, IR-3-39, Fillet Weld Alternative to ASME Code, Section XI Date: Friday, February 15, 2019 11:08:00 AM Jim, For your information, shown below is a summary of the January 22, 2019, Category 1 public meeting with Dominion Energy Nuclear Connecticut, Inc. to discuss the licensee's subject proposed alternative relief request for Millstone Power Station, Unit No. 3. This e-mail will be added to ADAMS as an official agency record and Listserv'd.
Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative Request, IR-3-39, Fillet Weld Alternative to ASME Code, Section XI Date:           Friday, February 15, 2019 11:08:00 AM
Please contact me if you have any questions regarding this meeting. Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone:
: Jim, For your information, shown below is a summary of the January 22, 2019, Category 1 public meeting with Dominion Energy Nuclear Connecticut, Inc. to discuss the licensees subject proposed alternative relief request for Millstone Power Station, Unit No. 3. This e-mail will be added to ADAMS as an official agency record and Listservd. Please contact me if you have any questions regarding this meeting.
(301) 415-1030 Richard.Guzman@nrc.gov CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC), TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 PRE-APPLICATION MEETING MEETING  
Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC),
TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 PRE-APPLICATION MEETING MEETING  


==SUMMARY==
==SUMMARY==
JANUARY 22, 2019 DOCKET NO. 50-423 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Dominion Energy Nuclear Connecticut, Inc. (DENC, the licensee) held a public meeting on January 22, 2019, to discuss the licensee's planned IR-3-39 Relief Request submittal regarding a fillet weld alternative from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Paragraph IWA-4221 for Millstone Unit 3 (MPS3). The licensee's meeting slides are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19022A243. The licensee's presentation is summarized as follows: Background and Request The licensee provided an overview of their proposed alternative relief request. Specifically, the licensee requests relief from the ASME Section XI, IWA-4221(c) requirements two fillet welds fabricated during the 'B' Reactor Plant Component Cooling Water (CCP) heat exchanger replacement project in Refueling Outage 17 for MPS3. The request would permit the two fillet welds, which were made without a 200 degree preheat as required by the code of construction, to remain in-service.
 
Precedent Request The proposed alternative request is similar to one submitted by Entergy on August 19, 2013, for River Bend Station, Unit No. 1 (ADAMS Accession No. ML13239A074).
JANUARY 22, 2019 DOCKET NO. 50-423 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Dominion Energy Nuclear Connecticut, Inc. (DENC, the licensee) held a public meeting on January 22, 2019, to discuss the licensees planned IR-3-39 Relief Request submittal regarding a fillet weld alternative from the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Paragraph IWA-4221 for Millstone Unit 3 (MPS3). The licensees meeting slides are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19022A243. The licensees presentation is summarized as follows:
This request was approved by the NRC on January 28, 2014 (ADAMS Accession No.ML13353A608).
Background and Request The licensee provided an overview of their proposed alternative relief request. Specifically, the licensee requests relief from the ASME Section XI, IWA-4221(c) requirements two fillet welds fabricated during the B Reactor Plant Component Cooling Water (CCP) heat exchanger replacement project in Refueling Outage 17 for MPS3. The request would
Unlike the River Bend request, the Millstone request does not state that there is hardship associated with meeting the code requirement.
 
River Bend's condition involved ten valves in both trains of service water. Repair or replacement was quantitatively shown to have a measurable increase on risk due to unavailability of associated safety related systems over multiple refueling outages. No such quantitative assessment is currently planned as part of the proposed Millstone alternative request, IR-3-39. Instead, the request will conclude that based on studies and tests, the multi-pass gas tungsten arc-welded fillet welds made without the 200 degree preheat, produce comparable microstructures and hardness (of the weld and heat affected zone) as compared to equivalent code compliant single pass fillet welds with 200 degree preheat. Evaluation of Production Welds An evaluation of the production welds FW-12 and FW-30 was performed.
permit the two fillet welds, which were made without a 200 degree preheat as required by the code of construction, to remain in-service.
The licensee determined that the outer diameter fillet welds are capable of accommodating all design loads and maintaining structural integrity even without the inner diameter weld in place. Visual and magnetic particle examinations on the production welds were also completed with no recordable indications.
Precedent Request The proposed alternative request is similar to one submitted by Entergy on August 19, 2013, for River Bend Station, Unit No. 1 (ADAMS Accession No. ML13239A074). This request was approved by the NRC on January 28, 2014 (ADAMS Accession No. ML13353A608). Unlike the River Bend request, the Millstone request does not state that there is hardship associated with meeting the code requirement. River Bends condition involved ten valves in both trains of service water. Repair or replacement was quantitatively shown to have a measurable increase on risk due to unavailability of associated safety related systems over multiple refueling outages. No such quantitative assessment is currently planned as part of the proposed Millstone alternative request, IR 39. Instead, the request will conclude that based on studies and tests, the multi-pass gas tungsten arc-welded fillet welds made without the 200 degree preheat, produce comparable microstructures and hardness (of the weld and heat affected zone) as compared to equivalent code compliant single pass fillet welds with 200 degree preheat.
Additionally, mock-up testing was performed by the licensee to further support that the existing configuration has an acceptable level of quality. The licensee concluded that the production welds which were made without the 200 degree preheat on the MPS3 'B' CCP heat exchanger have acceptable properties for continued use without repair or replacement.
Evaluation of Production Welds An evaluation of the production welds FW-12 and FW-30 was performed. The licensee determined that the outer diameter fillet welds are capable of accommodating all design loads and maintaining structural integrity even without the inner diameter weld in place.
Schedule The licensee stated their planned submittal is on track and projected for submission by the end of February 2019. No decisions were made regarding the acceptability of the licensee's proposed submittal.
Visual and magnetic particle examinations on the production welds were also completed with no recordable indications. Additionally, mock-up testing was performed by the licensee to further support that the existing configuration has an acceptable level of quality.
There were no members of the public in attendance by teleconference.
The licensee concluded that the production welds which were made without the 200 degree preheat on the MPS3 B CCP heat exchanger have acceptable properties for continued use without repair or replacement.
To date, no public meeting feedback forms have been submitted through the NRC public meeting feedback system. LIST OF ATTENDEES JANUARY 22, 2019, CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC), TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 DOCKET NO. 50-423 ATTENDEE ORGANIZATION Robert Davis U.S. Nuclear Regulatory Commission (NRC)Richard Guzman NRC Justin Fuller NRC Joseph Rigatti DENC David Dodson DENC Marc Hall DENC Michael Lalikos DENC Lori Kelly DENC Jeff Langan DENC Craig Sly DENC Eric Stanistreet DENC Philip Brant DENC Shayan Sinha DENC}}
Schedule The licensee stated their planned submittal is on track and projected for submission by the end of February 2019.
No decisions were made regarding the acceptability of the licensees proposed submittal.
There were no members of the public in attendance by teleconference. To date, no public meeting feedback forms have been submitted through the NRC public meeting feedback system.
LIST OF ATTENDEES JANUARY 22, 2019, CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC),
TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 DOCKET NO. 50-423
 
ATTENDEE               ORGANIZATION Robert Davis       U.S. Nuclear Regulatory Commission (NRC)
Richard Guzman     NRC Justin Fuller       NRC Joseph Rigatti     DENC David Dodson       DENC Marc Hall           DENC Michael Lalikos     DENC Lori Kelly         DENC Jeff Langan         DENC Craig Sly           DENC Eric Stanistreet   DENC Philip Brant       DENC Shayan Sinha       DENC}}

Latest revision as of 11:30, 2 February 2020

Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative IR-3-39 Fillet Welds
ML19046A150
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/15/2019
From: Richard Guzman
Plant Licensing Branch 1
To: James Danna
Plant Licensing Branch 1
Guzman R
References
EPID L-2019-LRM-0004
Download: ML19046A150 (3)


Text

From: Guzman, Richard To: Danna, James Bcc: Guzman, Richard

Subject:

Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative Request, IR-3-39, Fillet Weld Alternative to ASME Code,Section XI Date: Friday, February 15, 2019 11:08:00 AM

Jim, For your information, shown below is a summary of the January 22, 2019, Category 1 public meeting with Dominion Energy Nuclear Connecticut, Inc. to discuss the licensees subject proposed alternative relief request for Millstone Power Station, Unit No. 3. This e-mail will be added to ADAMS as an official agency record and Listservd. Please contact me if you have any questions regarding this meeting.

Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC),

TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 PRE-APPLICATION MEETING MEETING

SUMMARY

JANUARY 22, 2019 DOCKET NO. 50-423 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Dominion Energy Nuclear Connecticut, Inc. (DENC, the licensee) held a public meeting on January 22, 2019, to discuss the licensees planned IR-3-39 Relief Request submittal regarding a fillet weld alternative from the requirements of the American Society of Mechanical Engineers (ASME) Code,Section XI, Paragraph IWA-4221 for Millstone Unit 3 (MPS3). The licensees meeting slides are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19022A243. The licensees presentation is summarized as follows:

Background and Request The licensee provided an overview of their proposed alternative relief request. Specifically, the licensee requests relief from the ASME Section XI, IWA-4221(c) requirements two fillet welds fabricated during the B Reactor Plant Component Cooling Water (CCP) heat exchanger replacement project in Refueling Outage 17 for MPS3. The request would

permit the two fillet welds, which were made without a 200 degree preheat as required by the code of construction, to remain in-service.

Precedent Request The proposed alternative request is similar to one submitted by Entergy on August 19, 2013, for River Bend Station, Unit No. 1 (ADAMS Accession No. ML13239A074). This request was approved by the NRC on January 28, 2014 (ADAMS Accession No. ML13353A608). Unlike the River Bend request, the Millstone request does not state that there is hardship associated with meeting the code requirement. River Bends condition involved ten valves in both trains of service water. Repair or replacement was quantitatively shown to have a measurable increase on risk due to unavailability of associated safety related systems over multiple refueling outages. No such quantitative assessment is currently planned as part of the proposed Millstone alternative request, IR 39. Instead, the request will conclude that based on studies and tests, the multi-pass gas tungsten arc-welded fillet welds made without the 200 degree preheat, produce comparable microstructures and hardness (of the weld and heat affected zone) as compared to equivalent code compliant single pass fillet welds with 200 degree preheat.

Evaluation of Production Welds An evaluation of the production welds FW-12 and FW-30 was performed. The licensee determined that the outer diameter fillet welds are capable of accommodating all design loads and maintaining structural integrity even without the inner diameter weld in place.

Visual and magnetic particle examinations on the production welds were also completed with no recordable indications. Additionally, mock-up testing was performed by the licensee to further support that the existing configuration has an acceptable level of quality.

The licensee concluded that the production welds which were made without the 200 degree preheat on the MPS3 B CCP heat exchanger have acceptable properties for continued use without repair or replacement.

Schedule The licensee stated their planned submittal is on track and projected for submission by the end of February 2019.

No decisions were made regarding the acceptability of the licensees proposed submittal.

There were no members of the public in attendance by teleconference. To date, no public meeting feedback forms have been submitted through the NRC public meeting feedback system.

LIST OF ATTENDEES JANUARY 22, 2019, CATEGORY 1 PUBLIC MEETING WITH DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC),

TO DISCUSS PROPOSED ALTERNATIVE REQUEST TO ASME CODE SECTION XI, IWA-4221 MILLSTONE POWER STATION, UNIT NO. 3 DOCKET NO. 50-423

ATTENDEE ORGANIZATION Robert Davis U.S. Nuclear Regulatory Commission (NRC)

Richard Guzman NRC Justin Fuller NRC Joseph Rigatti DENC David Dodson DENC Marc Hall DENC Michael Lalikos DENC Lori Kelly DENC Jeff Langan DENC Craig Sly DENC Eric Stanistreet DENC Philip Brant DENC Shayan Sinha DENC