8 005 080 N  5 A
8 005 080 N  5 A
i Detro't
i Detro't cco                                              April 25, 1980 Ec ison :ra .ceno,.%.u w '*22'                                  EF2-48,994 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission                                            -
        -
cco                                              April 25, 1980 Ec ison :ra .ceno,.%.u w '*22'                                  EF2-48,994 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission                                            -
Region III 799 Roosevelt Road Glen Ellyn, Illinois      60137
Region III 799 Roosevelt Road Glen Ellyn, Illinois      60137


Line 37: Line 35:
W.J.}Fahrner Project Manager Enrico Femi II WJF/ HAW /pn                                                            O cc: ftr. Victor Stello, Jr., Director Office of Inspection and Enforcement g
W.J.}Fahrner Project Manager Enrico Femi II WJF/ HAW /pn                                                            O cc: ftr. Victor Stello, Jr., Director Office of Inspection and Enforcement g
Division of Reactor' Inspection Frograms                          j/o U.S. Nuclear Regulatory Commission t!ashington D.C. 20555
Division of Reactor' Inspection Frograms                          j/o U.S. Nuclear Regulatory Commission t!ashington D.C. 20555
                                                                                      ,
                                                                                        .
    .
_
[}}
[}}

Latest revision as of 09:59, 1 February 2020

Deficiency Rept Re Damaged Penetrations on Facility Primary Containment.Manufacturer Is Evaluating Penetrations to Determine Corrective Actions.Final Rept Will Be Provided by 800630
ML19309H100
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/25/1980
From: Fahrner W
DETROIT EDISON CO.
To:
References
EF2-48-994, NUDOCS 8005080378
Download: ML19309H100 (1)


Text

- -

8 005 080 N 5 A

i Detro't cco April 25, 1980 Ec ison :ra .ceno,.%.u w '*22' EF2-48,994 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission -

Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

10CFR50.55(e) on Damaged Penetrations at Enrico Femi Nuclear

~

Power Plant, Unit 2.

Dear fir. Fiorelli:

On August 24, 1979, Mr. H.A. Walker, of the Detroit Edison Quality Assurance Department, telephoned Mr. R.C. Knop of NRC Region III to report a 10CFR50.55(e) reportable deficiency item dealing with damage to Primary Containment Penetration X-17 at the Femi 2 Site. Further investigation revealed that sixteen (16) Type I penetrations assem-blies, which were manufactured by Tube Turns, ha'd been installed in a misaligned condition.

Tube Turns is evaluating each penetration assembly to determine if the installed deflections coincident with the anticipated drywell nozzle movements are within the design limits of movement and cyclic life for that particular penetration. This evaluation will detemine corrective actions to be taken.

Octroit Edison Engineering has not yet received this final evaluation report from Tube Turns. A final report is now expected by June 30, 1980.

If you have any questions regarding this matter, please contact us.

Sincerely yours, m . $CLh uM_ .

W.J.}Fahrner Project Manager Enrico Femi II WJF/ HAW /pn O cc: ftr. Victor Stello, Jr., Director Office of Inspection and Enforcement g

Division of Reactor' Inspection Frograms j/o U.S. Nuclear Regulatory Commission t!ashington D.C. 20555

[