ML19309H100
| ML19309H100 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/25/1980 |
| From: | Fahrner W DETROIT EDISON CO. |
| To: | |
| References | |
| EF2-48-994, NUDOCS 8005080378 | |
| Download: ML19309H100 (1) | |
Text
-
8 005 080 N 5
A i
Detro't cco April 25, 1980 Ec ison :ra.ceno,.%.u w '*22' EF2-48,994 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
10CFR50.55(e) on Damaged Penetrations at Enrico Femi Nuclear Power Plant, Unit 2.
~
Dear fir. Fiorelli:
On August 24, 1979, Mr. H.A. Walker, of the Detroit Edison Quality Assurance Department, telephoned Mr. R.C. Knop of NRC Region III to report a 10CFR50.55(e) reportable deficiency item dealing with damage to Primary Containment Penetration X-17 at the Femi 2 Site.
Further investigation revealed that sixteen (16) Type I penetrations assem-blies, which were manufactured by Tube Turns, ha'd been installed in a misaligned condition.
Tube Turns is evaluating each penetration assembly to determine if the installed deflections coincident with the anticipated drywell nozzle movements are within the design limits of movement and cyclic life for that particular penetration. This evaluation will detemine corrective actions to be taken.
Octroit Edison Engineering has not yet received this final evaluation report from Tube Turns. A final report is now expected by June 30, 1980.
If you have any questions regarding this matter, please contact us.
Sincerely yours,
. $CLh uM_.
W.J.}Fahrner m
Project Manager Enrico Femi II WJF/ HAW /pn O
cc: ftr. Victor Stello, Jr., Director g
Office of Inspection and Enforcement Division of Reactor' Inspection Frograms j/o U.S. Nuclear Regulatory Commission t!ashington D.C.
20555
[
_