ML17143A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| document type = Memoranda
| document type = Memoranda
| page count = 2
| page count = 2
| project =  
| project = TAC:L53131
| stage = Approval
| stage = Approval
}}
}}

Latest revision as of 08:00, 4 December 2019

Staff Review of Crystal River, Unit 3, Physical Security Plan Rev. 3 (Sles NS114954) for Verification of ASM Incorporation (EA-16-005)
ML17143A018
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 05/28/2017
From: Tim Mossman
NRC/NSIR/DPCP/MWSB
To: Patricia Silva
NRC/NMSS/DSFM/IOB
GARNER, DOUGLAS
References
EA-16-005, TAC L53131
Download: ML17143A018 (2)


Text

May 28, 2017 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Branch Chief /RA/

Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF CRYSTAL RIVER UNIT 3 - NUCLEAR PLANT PHYSICAL SECURITY PLAN, SECURITY TRAINING AND QUALIFICATION PLAN, AND SAFEGUARD CONTINGENCY PLAN, REVISION 3 FOR THE VERIFICATION OF ASM (EA-16-005) INCORPORATION (TAC NO. L53131)

The staff has completed its review of Crystal River Unit 3 Physical Security Plan (PSP) Rev.3 (SLES: NS114954) which was submitted by Duke Energy Florida (DEF) to the NRC by letter dated February 20, 2017, pursuant to the provisions of 10 CFR 50.54(p).

Based on our review, we find the submitted PSP to be acceptable and the Crystal River Unit 3 PSP Rev. 3 has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the additional security measures (ASMs) imposed by NRC Order EA-16-005.

A physical security inspection (IR Nos. 05000302/2017401 AND 07201035/2017401) was completed on March 30, 2017, which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs observations, the Crystal River Unit 3 PSP has met the performance objectives and general requirements outlined in 10 CFR Section 73.55 and the ASMs imposed by the NRC.

Docket Nos. 50-302, 72-1035 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov

ML17143A018 OFFICE DSP/MWSB MWSB/BC NAME D. Garner T. Mossman DATE 5 / 23 /17 5 / 28/17