{{#Wiki_filter:October 11, 2006Mr. Dale Vice President - Crystal River Plant Florida Power Company 15760 West Power Line Street Crystal River, FL 34428-6708SUBJECT:CRYSTAL RIVER NUCLEAR PLANT - NRC INSPECTION REPORT05000302/2006401
{{#Wiki_filter:ber 11, 2006
 
==SUBJECT:==
CRYSTAL RIVER NUCLEAR PLANT - NRC INSPECTION REPORT 05000302/2006401


==Dear Mr. Young:==
==Dear Mr. Young:==
On August 29, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection atyour Crystal River Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on August 31, 2006 with you and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
On August 29, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on August 31, 2006 with you and other members of your staff.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. D. E. Young2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


Sincerely,
No findings of significance were identified.
/RA/Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket No.50-302License No.DPR-72Enclosure: NRC Inspection Report 05000302/2006401 ( )cc w/encl:Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)
15760 West Power line Street Crystal River, FL 34428-6708Jon A. FrankePlant General Manager Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708cc w/o encl:Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708(cc w/o encl cont'd - See page 3) D. E. Young3 (cc w/o encl cont'd)Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708R. Alexander GlennAssociate General Counsel (MAC - BT15A)
Florida Power Corporation P. O. Box 14042 St. Petersburg, FL 33733-4042Steven R. CarrAssociate General Counsel - Legal Dept.


Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551Attorney GeneralDepartment of Legal Affairs The Capitol Tallahassee, FL 32304William A. PassettiBureau of Radiation Control Department of Health 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741Craig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100ChairmanBoard of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250(cc w/o encl cont'd - See page 4) D. E. Young4 (cc w/o encl cont'd)Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, VA 22209Distribution w/encl
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. D. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
:T. Morrissey, DRP B. Westreich, NSIR B. Clayton, NRRDistribution w/o encl
: W. Travers, RA


L. Pisco, DRA V. McCree, DRS J. Munday, DRP
Sincerely,
/RA/
Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 50-302 License No. DPR-72 Enclosure: NRC Inspection Report 05000302/2006401 ( )
cc w/encl:
Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)
15760 West Power line Street Crystal River, FL 34428-6708 Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708 cc w/o encl:
Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708 (cc w/o encl contd - See page 3) D. (cc w/o encl contd)
Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation P. O. Box 14042 St. Petersburg, FL 33733-4042 Steven R. Carr Associate General Counsel - Legal Dept.


_________________________OFFICERII:DRPSIGNATURE RANAMEMUNDAYDATE10/11/06 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO
Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 (cc w/o encl contd - See page 4) D. (cc w/o encl contd)
Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, VA 22209 Distribution w/encl:
T. Morrissey, DRP B. Westreich, NSIR B. Clayton, NRR Distribution w/o encl:
W. Travers, RA L. Pisco, DRA V. McCree, DRS J. Munday, DRP _________________________
OFFICE RII:DRP SIGNATURE RA NAME MUNDAY DATE  10/11/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 12:12, 23 November 2019

IR 05000302-06-401, (Safeguards Removed) Crystal River Nuclear Plant
ML063120486
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/11/2006
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
References
IR-06-401
Download: ML063120486 (5)


Text

ber 11, 2006

SUBJECT:

CRYSTAL RIVER NUCLEAR PLANT - NRC INSPECTION REPORT 05000302/2006401

Dear Mr. Young:

On August 29, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on August 31, 2006 with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. D. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 50-302 License No. DPR-72 Enclosure: NRC Inspection Report 05000302/2006401 ( )

cc w/encl:

Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)

15760 West Power line Street Crystal River, FL 34428-6708 Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 cc w/o encl:

Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 (cc w/o encl contd - See page 3) D. (cc w/o encl contd)

Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation P. O. Box 14042 St. Petersburg, FL 33733-4042 Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 (cc w/o encl contd - See page 4) D. (cc w/o encl contd)

Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, VA 22209 Distribution w/encl:

T. Morrissey, DRP B. Westreich, NSIR B. Clayton, NRR Distribution w/o encl:

W. Travers, RA L. Pisco, DRA V. McCree, DRS J. Munday, DRP _________________________

OFFICE RII:DRP SIGNATURE RA NAME MUNDAY DATE 10/11/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO