| issue date = 05/02/2007 | | issue date = 05/02/2007 | ||
| title = IR 050004243-07-301; 03/12-19/07; Millstone Unit 3; Initial Operator Licensing Examination. Ten of Ten Applicants Passed the Examination (Five Reactor Operators, One SRO Instant, and Four SRO Upgrades) | | title = IR 050004243-07-301; 03/12-19/07; Millstone Unit 3; Initial Operator Licensing Examination. Ten of Ten Applicants Passed the Examination (Five Reactor Operators, One SRO Instant, and Four SRO Upgrades) | ||
| author name = Sykes M | | author name = Sykes M | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Christian D | | addressee name = Christian D | ||
| addressee affiliation = Dominion Resources, Inc | | addressee affiliation = Dominion Resources, Inc | ||
| docket = 05000423 | | docket = 05000423 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:May 2, | {{#Wiki_filter:May 2, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | ||
==SUBJECT:== | ==SUBJECT:== | ||
MILLSTONE UNIT 3 OPERATOR AND SENIOR REACTOR | MILLSTONE UNIT 3 OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000423/2007301 | ||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator(SRO) licensing examination conducted by the NRC during the period of March 12 -19, 2007. | This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing examination conducted by the NRC during the period of March 12 -19, 2007. | ||
This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the | This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9). | ||
Based on the results of the examination, all ten applicants passed all portions of the examination. The ten applicants included five ROs, one instant SRO and four upgrade SROs. | |||
Examination results indicated that the applicants were well prepared for the examination. | Examination results indicated that the applicants were well prepared for the examination. | ||
Mr. D. Silk discussed performance insights observed during the examination with Mr. T. Horner on March 16, 2007. On April 5, 2007, | Mr. D. Silk discussed performance insights observed during the examination with Mr. T. Horner on March 16, 2007. On April 5, 2007, final examination results, including individual license numbers, were given during a telephone call between Mr. M. Sykes and Mr. T. Horner. | ||
Mr. D. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML060800095; RO and SRO Written - Accession Number ML070990457; RO and SRO Operating Section A - Accession Number ML070990466; RO and SRO Operating Section B - Accession Number ML070990481; and RO and SRO Operating Section C - Accession Number ML070990501). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Mr. D. Christian 2 Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV. | |||
Sincerely, | |||
/RA/ | |||
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No: 50-423 License No: NPF-4 | |||
==Enclosure:== | ==Enclosure:== | ||
Initial Examination Report No. 05000423/2007301 cc w/encl:J. A. Price, Site Vice President, Millstone | Initial Examination Report No. 05000423/2007301 cc w/encl: | ||
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept. | |||
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC) | R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC) | ||
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) | S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) | ||
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority J. T. Spence, Manager - Nuclear Training Mr. D. | R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority J. T. Spence, Manager - Nuclear Training | ||
Mr. D. Christian 2 Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV. | |||
Sincerely, | |||
/RA/ | |||
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No: 50-423 License No: NPF-49 | |||
==Enclosure:== | ==Enclosure:== | ||
Initial Examination Report No. 05000423/2007301 cc w/encl:J. A. Price, Site Vice President, Millstone | Initial Examination Report No. 05000423/2007301 cc w/encl: | ||
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept. | |||
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC) | R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC) | ||
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) | S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) | ||
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New | R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority J. T. Spence, Manager - Nuclear Training SUNSI Review Complete: DMS (Reviewers Initials) | ||
ADAMS PKG: ML060800095 ADAMS: ML071220278 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY07-MS3 Mar 07 (U01638)\ExamReport.wpd After declaring this document An Official Agency Record it will be released to the Public. | |||
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/DMS for DMSilk/DMS MDSykes/MDS DATE 05/1/07 05/1/07 05/2/07 OFFICIAL RECORD COPY | |||
DRS | |||
: VIA E-MAIL | Mr. D. Christian 3 Distribution w/encl: | ||
DRS Master Exam File (C. Bixler) (w/concurrences) | |||
DRS File Distribution w/encl: VIA E-MAIL: | |||
S. Collins, RA M. Dapas, DRA A. R. Blough, DRS M. Sykes, DRS D. Silk, Chief Examiner, DRS J. Lamb, RI OEDO H. Chernoff, NRR J. Lubinski, NRR V. Nerses, NRR, PM E. Miller, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA R. Powell, DRP P. Krohn, DRP B. Norris, DRP Region I Docket Room (with concurrences) | |||
S. Glenn, INPO (GlennSG@Inpo.org) | |||
U. S. NUCLEAR REGULATORY COMMISSION REGION I Docket No: 50-423 License No: NPF-49 Report No: 05000423/2007301 Licensee: Dominion Nuclear Connecticut, Inc. | |||
Facility:Millstone Unit 3 Dates:March 19, 2007 | Facility: Millstone Unit 3 Dates: March 19, 2007 (Written Examination Administration) | ||
March 27, 2007 | March 12-16, 2007 (Operating Test Administration) | ||
March 27, 2007 | March 27, 2007 (Examination Grading) | ||
March 27, 2007 (Final facility post exam comments) | |||
Examiners: D. Silk, Senior Operations Engineer (Chief Examiner) | |||
B. Haagensen, Operations Engineer G. Johnson, Operations Engineer Approved by: Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety i Enclosure | |||
==SUMMARY== | ==SUMMARY== | ||
OF | OF FINDINGS IR 050004243/2007-301; 03/12-19/07; Millstone Unit 3; Initial Operator Licensing Examination. | ||
*A test item analysis was completed on the written examination for feedback | Ten of ten applicants passed the examination (five reactor operators, one SRO instant, and four SRO upgrades). | ||
The NRC examiners administered the operating portion of the examination to | The written examinations were administered by the facility and the operating tests were administered by three NRC region-based examiners. There were no inspection findings of significance associated with the examinations. | ||
Examination Administration and | A. NRC-Identified Findings Cornerstone: Mitigating Systems None B. Licensee-Identified Findings None ii Enclosure | ||
A1- | REPORT DETAILS | ||
A3- | : 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial OR Retake License Examination | ||
: a. Scope of Review The NRC examination team developed the written and operating initial examination and together with Millstone Unit 3 training and operations personnel verified or ensured, as applicable, the following: | |||
* The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Millstone plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week. | |||
* Simulation facility operation was proper. | |||
* A test item analysis was completed on the written examination for feedback into the systems approach to training program. | |||
* Examination security requirements were met. | |||
The NRC examiners administered the operating portion of the examination to all applicants from March 12 to16, 2007. The written examination was administered by the Millstone training staff on March19, 2007. | |||
: b. Findings Grading and Results All ten applicants (five ROs and five SROs) passed all portions of the initial licensing examination. | |||
See attachment for a summary of facility post-examination comments. | |||
Examination Administration and Performance One simulator fidelity issue was identified and is detailed in the enclosed Simulation Facility Report. | |||
Enclosure | |||
2 4OA6 Exit Meeting Summary On April 5, 2007 the NRC provided conclusions and examination results to Millstone Unit 3 management representatives via telephone. License numbers for the ten applicants were also provided during this time. | |||
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff. | |||
Enclosure | |||
A1-1 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel T. Horner, Supervisor Initial Operator Training R. Martin, Unit 3 Shift Supervisor D. Minnich, Unit 3 Instructor R. Royce, Unit 3 Instructor NRC D. Silk, Senior Operations Engineer B. Haagensen, Operations Engineer G. Johnson, Operations Engineer LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED ITEM NUMBER TYPE DESCRIPTION NONE Attachment | |||
A2-1 Post Exam Comments Question No. Facility Comment 65 Recommends deleting this question from the examination as there was no correct answer provided among the four choices. Site specific technical references support this conclusion. The intended answer was developed based upon generic guidance not site specific references. | |||
NRC Resolution Comment accepted. Question #65 will be deleted from the examination because no technically correct answer was provided among the choices. | |||
Attachment | |||
A3-1 ES 501 Simulation Facility Report Facility Licensee: Millstone Unit 3 Facility Docket No: 50-423/2007301 Operating Tests Administered on: March 12-16, 2007 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review, are not indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations. | |||
While conducting the simulator portion of the operating test, the examiners observed the following item: | |||
* During the simulator scenario portion of the examination, the reactor tripped and SIS actuated due to a small break LOCA. When containment pressure had increased to about 23 psia, the RCS break size was increased to a large break. Containment pressure unexpectedly rose to 60 psia. This caused the simulator to hit an operating limit and freeze. This scenario was run four times and the simulator froze only during the first of four runs with this scenario. During the other runs, containment pressure increased to the expected value of about 45 psia. This issue was documented by the licensee in DR 2007-3. | |||
NUREG-1021 Revision 9 Attachment}} |
Latest revision as of 06:47, 23 November 2019
ML071220278 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 05/02/2007 |
From: | Marvin Sykes Operations Branch I |
To: | Christian D Dominion Resources |
Shared Package | |
ML060800095 | List: |
References | |
IR-07-301 | |
Download: ML071220278 (12) | |
Text
May 2, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE UNIT 3 OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000423/2007301
Dear Mr. Christian:
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing examination conducted by the NRC during the period of March 12 -19, 2007.
This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, all ten applicants passed all portions of the examination. The ten applicants included five ROs, one instant SRO and four upgrade SROs.
Examination results indicated that the applicants were well prepared for the examination.
Mr. D. Silk discussed performance insights observed during the examination with Mr. T. Horner on March 16, 2007. On April 5, 2007, final examination results, including individual license numbers, were given during a telephone call between Mr. M. Sykes and Mr. T. Horner.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML060800095; RO and SRO Written - Accession Number ML070990457; RO and SRO Operating Section A - Accession Number ML070990466; RO and SRO Operating Section B - Accession Number ML070990481; and RO and SRO Operating Section C - Accession Number ML070990501). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. D. Christian 2 Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No: 50-423 License No: NPF-4
Enclosure:
Initial Examination Report No. 05000423/2007301 cc w/encl:
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority J. T. Spence, Manager - Nuclear Training
Mr. D. Christian 2 Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No: 50-423 License No: NPF-49
Enclosure:
Initial Examination Report No. 05000423/2007301 cc w/encl:
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority J. T. Spence, Manager - Nuclear Training SUNSI Review Complete: DMS (Reviewers Initials)
ADAMS PKG: ML060800095 ADAMS: ML071220278 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY07-MS3 Mar 07 (U01638)\ExamReport.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/DMS for DMSilk/DMS MDSykes/MDS DATE 05/1/07 05/1/07 05/2/07 OFFICIAL RECORD COPY
Mr. D. Christian 3 Distribution w/encl:
DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File Distribution w/encl: VIA E-MAIL:
S. Collins, RA M. Dapas, DRA A. R. Blough, DRS M. Sykes, DRS D. Silk, Chief Examiner, DRS J. Lamb, RI OEDO H. Chernoff, NRR J. Lubinski, NRR V. Nerses, NRR, PM E. Miller, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA R. Powell, DRP P. Krohn, DRP B. Norris, DRP Region I Docket Room (with concurrences)
S. Glenn, INPO (GlennSG@Inpo.org)
U. S. NUCLEAR REGULATORY COMMISSION REGION I Docket No: 50-423 License No: NPF-49 Report No: 05000423/2007301 Licensee: Dominion Nuclear Connecticut, Inc.
Facility: Millstone Unit 3 Dates: March 19, 2007 (Written Examination Administration)
March 12-16, 2007 (Operating Test Administration)
March 27, 2007 (Examination Grading)
March 27, 2007 (Final facility post exam comments)
Examiners: D. Silk, Senior Operations Engineer (Chief Examiner)
B. Haagensen, Operations Engineer G. Johnson, Operations Engineer Approved by: Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety i Enclosure
SUMMARY
OF FINDINGS IR 050004243/2007-301; 03/12-19/07; Millstone Unit 3; Initial Operator Licensing Examination.
Ten of ten applicants passed the examination (five reactor operators, one SRO instant, and four SRO upgrades).
The written examinations were administered by the facility and the operating tests were administered by three NRC region-based examiners. There were no inspection findings of significance associated with the examinations.
A. NRC-Identified Findings Cornerstone: Mitigating Systems None B. Licensee-Identified Findings None ii Enclosure
REPORT DETAILS
- 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial OR Retake License Examination
- a. Scope of Review The NRC examination team developed the written and operating initial examination and together with Millstone Unit 3 training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Millstone plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all applicants from March 12 to16, 2007. The written examination was administered by the Millstone training staff on March19, 2007.
- b. Findings Grading and Results All ten applicants (five ROs and five SROs) passed all portions of the initial licensing examination.
See attachment for a summary of facility post-examination comments.
Examination Administration and Performance One simulator fidelity issue was identified and is detailed in the enclosed Simulation Facility Report.
Enclosure
2 4OA6 Exit Meeting Summary On April 5, 2007 the NRC provided conclusions and examination results to Millstone Unit 3 management representatives via telephone. License numbers for the ten applicants were also provided during this time.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
Enclosure
A1-1 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel T. Horner, Supervisor Initial Operator Training R. Martin, Unit 3 Shift Supervisor D. Minnich, Unit 3 Instructor R. Royce, Unit 3 Instructor NRC D. Silk, Senior Operations Engineer B. Haagensen, Operations Engineer G. Johnson, Operations Engineer LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED ITEM NUMBER TYPE DESCRIPTION NONE Attachment
A2-1 Post Exam Comments Question No. Facility Comment 65 Recommends deleting this question from the examination as there was no correct answer provided among the four choices. Site specific technical references support this conclusion. The intended answer was developed based upon generic guidance not site specific references.
NRC Resolution Comment accepted. Question #65 will be deleted from the examination because no technically correct answer was provided among the choices.
Attachment
A3-1 ES 501 Simulation Facility Report Facility Licensee: Millstone Unit 3 Facility Docket No: 50-423/2007301 Operating Tests Administered on: March 12-16, 2007 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review, are not indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, the examiners observed the following item:
- During the simulator scenario portion of the examination, the reactor tripped and SIS actuated due to a small break LOCA. When containment pressure had increased to about 23 psia, the RCS break size was increased to a large break. Containment pressure unexpectedly rose to 60 psia. This caused the simulator to hit an operating limit and freeze. This scenario was run four times and the simulator froze only during the first of four runs with this scenario. During the other runs, containment pressure increased to the expected value of about 45 psia. This issue was documented by the licensee in DR 2007-3.
NUREG-1021 Revision 9 Attachment