| issue date = 03/22/2013 | | issue date = 03/22/2013 | ||
| title = | | title = Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) | ||
| author name = Wilkins L | | author name = Wilkins L | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = Hansher B | | addressee name = Hansher B | ||
| addressee affiliation = Omaha Public Power District | | addressee affiliation = Omaha Public Power District | ||
| docket = 05000285 | | docket = 05000285 | ||
| license number = DPR-040 | | license number = DPR-040 | ||
| contact person = Wilkins L | | contact person = Wilkins L | ||
| case reference number = TAC D91660 | | case reference number = TAC D91660 | ||
| package number = ML13120A082 | | package number = ML13120A082 | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:D91660 | |||
| stage = RAI | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:From:Wilkins, Lynnea To:HANSHER, BILL R Cc:LIPPY, DONNA L; EDWARDS, MICHAEL L | {{#Wiki_filter:From: Wilkins, Lynnea To: HANSHER, BILL R Cc: LIPPY, DONNA L; EDWARDS, MICHAEL L | ||
==Subject:== | ==Subject:== | ||
DRAFT: RAI for Fort Calhoun Station Re: 50.54 Changes, Rev 20 (D91660) | DRAFT: RAI for Fort Calhoun Station Re: 50.54 Changes, Rev 20 (D91660) | ||
Date:Friday, March 22, 2013 9:19:00 AM Attachments:D91660 - 50_54 Changes Rev 20 RAIs.docx | Date: Friday, March 22, 2013 9:19:00 AM Attachments: D91660 - 50_54 Changes Rev 20 RAIs.docx | ||
: Bill, By letter dated January 7, | : Bill, By letter dated January 7, 2013, Omaha Public Power District submitted the Fort Calhoun Stations Physical Security Plan (PSP), Training and Qualification Plan, and Safeguards Contingency Plan (SCP), Revision 20. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(p)(2). | ||
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(p)(2). | The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation. | ||
The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation. | |||
Please contact me if a clarifying teleconference is needed for the attached RAIs. | Please contact me if a clarifying teleconference is needed for the attached RAIs. | ||
Thanks Lynnea Lynnea Wilkins, Project | Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Cooper Nuclear Station Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377}} |
Latest revision as of 13:35, 17 November 2019
ML13120A083 | |
Person / Time | |
---|---|
Site: | Fort Calhoun ![]() |
Issue date: | 03/22/2013 |
From: | Lynnea Wilkins Plant Licensing Branch IV |
To: | Hansher B Omaha Public Power District |
Wilkins L | |
Shared Package | |
ML13120A082 | List: |
References | |
TAC D91660 | |
Download: ML13120A083 (1) | |
Text
From: Wilkins, Lynnea To: HANSHER, BILL R Cc: LIPPY, DONNA L; EDWARDS, MICHAEL L
Subject:
DRAFT: RAI for Fort Calhoun Station Re: 50.54 Changes, Rev 20 (D91660)
Date: Friday, March 22, 2013 9:19:00 AM Attachments: D91660 - 50_54 Changes Rev 20 RAIs.docx
- Bill, By letter dated January 7, 2013, Omaha Public Power District submitted the Fort Calhoun Stations Physical Security Plan (PSP), Training and Qualification Plan, and Safeguards Contingency Plan (SCP), Revision 20. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(p)(2).
The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation.
Please contact me if a clarifying teleconference is needed for the attached RAIs.