ML24025A17923 January 2024State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment (License No. DPR-40, Docket No. 50-285)
ML24024A22422 January 2024State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285)
ML23311A0865 November 2023Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456
ML23038A18831 January 2023Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285)
ML22222A1198 August 2022Email Section 106 NHPA- Ft Calhoun Station License Termination Plan
ML21069A24810 March 2021Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSIAging Management
ML21335A33525 January 2021January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285)
ML20204B07822 July 2020Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362)Earthquake
ML20113F06222 April 2020E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285)
ML20100J22726 March 2020E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54)
ML20100L72315 March 2020Email: Town of Desoto National Register of Historic Places Eligibility
ML19353C36111 December 2019E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054)
ML19309F11111 October 2019ISFSI-Only Tech Specs
ML19241A18121 August 2019Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status
ML19175A02119 June 2019Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration
ML19130A2088 May 2019Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition
ML19126A2801 May 2019Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme
ML18100A2719 April 201804-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation)
ML17236A34624 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567)
ML17236A34424 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664)
ML17234A46922 August 2017NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831)
ML17194A97313 July 2017NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525)
ML17191B02110 July 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSPCyber Security
ML17184A00430 June 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits
ML17142A02019 May 2017NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101
ML17144A01319 May 2017NRR E-mail Capture - Fort Calhoun PSDAR - Findings and ConcernsLicense Renewal
Environmental Justice
ML17139C50819 May 2017NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043
ML17139C83419 May 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements
ML17139B67818 May 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance
ML17139B67618 May 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance
ML17136A16916 May 2017NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports
ML17115A47225 April 2017NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201
ML17114A31124 April 2017NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning
ML17112A03620 April 2017NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LARExemption Request
Minimum staff
Fire Protection Program
ML17090A39431 March 2017NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437)Fire Protection Program
ML17082A00222 March 2017NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning ExemptionExemption Request
ML17081A01921 March 2017NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning ExemptionExemption Request
ML17052A02715 February 2017NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme
ML17033A9692 February 2017NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan AmendmentMinimum staff
ML16350A03915 December 2016NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection ProgramFire Protection Program
ML16351A04315 December 2016NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations
ML16334A30029 November 2016NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements
ML16333A09928 November 2016NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55
ML16333A23128 November 2016NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures.
ML16286A08112 October 2016NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning
ML16278A0293 October 2016NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning
ML16257A02612 September 2016NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures
ML16207A01822 July 2016NRR E-mail Capture - Acceptance Review
ML16137A00916 May 2016NRR E-mail Capture - Acceptance Review CAC No. MF7574
ML16131A73110 May 2016NRR E-mail Capture - (External_Sender) Question Rvi Inspection Results