ML14045A108: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14045A108
| number = ML14045A108
| issue date = 02/12/2014
| issue date = 02/12/2014
| title = Ltr 02/12/14 Fermi EP Annual Closeout (Rdj)
| title = EP Annual Closeout (Rdj)
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Plona J
| addressee name = Plona J
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 12, 2014 Mr. Joseph Plona Senior Vice-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
-4352   February 12, 2014 Mr. Joseph Plona Senior Vice
-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166


==SUBJECT:==
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000 341/2013502
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502


==Dear Mr. Plona:==
==Dear Mr. Plona:==
On December 31, 2013, the U.S. Nuclear Regulatory Commission (
 
NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2
On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2.
. This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers.
This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.
Any observations and findings in these areas were provided to you via separate correspondence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
  /RA/ Richard A. Skokowski
                                                /RA/
, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc:   Distribution via ListServ'
-341 License No. NPF-43 cc: Distribution via ListServ
 
Ž Mr. Joseph Plona Senior Vice
Mr. Joseph Plona Senior Vice-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166


==SUBJECT:==
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT  
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502
 
NOS. 05000341/2013501; 05000 341/2013502


==Dear Mr. Plona:==
==Dear Mr. Plona:==


On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2
On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2.
. This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.
-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
  /RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
                                                        /RA/
-341 License No. NPF-43 cc: Distribution via ListServ
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc:     Distribution via ListServ' DISTRIBUTION:
Ž  DISTRIBUTION
See next page DOCUMENT NAME:         Ltr 021214 Fermi EP Annual Closeout (RDJ).docx Publicly Available             Non-Publicly Available           Sensitive         Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE         RIII                         RIII                 RIII                       RIII NAME           JBeavers for RJickling:bl   DFunk                 RSkokowski DATE           01/07/14                     01/23/14             02/12/14 OFFICIAL RECORD COPY
: See next page DOCUMENT NAME
: Ltr 021214 Fermi EP Annual Closeout (RDJ).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JBeavers for RJickling:
bl DFunk RSkokowski DATE 01/07/14 01/23/14 02/12/14 OFFICIAL RECORD COPY


Letter to Joseph Plona from Richard A. Skokowski dated February 12, 2014
Letter to Joseph Plona from Richard A. Skokowski dated February 12, 2014


==SUBJECT:==
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT  
FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502 DISTRIBUTION:
 
Ernesto Quinones RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley ROPreports.Resource@nrc.gov}}
NOS. 05000341/2013501; 05000 341/2013502 DISTRIBUTION
: Ernesto Quinones RidsNrrDorlLpl3
-1 Resource RidsNrrPM Fermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson
 
Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley ROPreports.Resource@nrc.gov}}

Latest revision as of 06:59, 17 November 2019

EP Annual Closeout (Rdj)
ML14045A108
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/12/2014
From: Richard Skokowski
Plant Support Branch II
To: Plona J
DTE Electric Company
Robert Jickling
References
IR-13-501, IR-13-502
Download: ML14045A108 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 12, 2014 Mr. Joseph Plona Senior Vice-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502

Dear Mr. Plona:

On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2.

This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ'

Mr. Joseph Plona Senior Vice-President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502

Dear Mr. Plona:

On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fermi Power Plant, Unit 2.

This inspection began on January 1, 2013. Issuance of this letter closes Inspection Report Numbers 2013501 and 2013502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ' DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 021214 Fermi EP Annual Closeout (RDJ).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JBeavers for RJickling:bl DFunk RSkokowski DATE 01/07/14 01/23/14 02/12/14 OFFICIAL RECORD COPY

Letter to Joseph Plona from Richard A. Skokowski dated February 12, 2014

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000341/2013501; 05000341/2013502 DISTRIBUTION:

Ernesto Quinones RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley ROPreports.Resource@nrc.gov