{{Adams
{{Adams
| number = ML080610013
| number = ML082470286
| issue date = 03/03/2008
| issue date = 09/02/2008
| title = Calvert Cliffs, (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8
| title = Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001)
| author name = Lew D C
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRP
| author affiliation = NRC/RGN-I/DRP/PB1
| addressee name = Spina J A
| addressee name = Spina J
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc
| addressee affiliation = Constellation Generation Group
| docket = 05000317, 05000318
| docket = 05000317, 05000318
| license number = DPR-053, DPR-069
| license number = DPR-053, DPR-069
Line 12: Line 12:
| case reference number = IR-08-001
| case reference number = IR-08-001
| document type = Inspection Plan, Letter
| document type = Inspection Plan, Letter
| page count = 7
| page count = 6
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 2, 2008
[[Issue date::March 3, 2008]]


Mr. James A. Spina, Vice President
==SUBJECT:==
 
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2008001 AND 05000318/2008001)
Calvert Cliffs Nuclear Power Plant, Inc.
 
Constellation Generation Group, LLC
 
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
 
SUBJECT: ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORTS 05000317/2008001 AND 05000318/2008001)


==Dear Mr. Spina:==
==Dear Mr. Spina:==
On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 6, 2008, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.
 
Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter


was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.


While plant performance for the most recent quarter was within the Licensee Response column of the Action Matrix, Calvert Cliffs Unit 1 was within the Regulatory Response column of the Action Matrix during the first two quarters of the assessment cycle, based on one finding of low to moderate safety significance (White) identified in September 2006. The White finding involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency diesel generator. The NRC has completed a supplemental inspection in accordance with
Plant performance for the most recent quarter at Calvert Cliffs Units 1 and 2 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.


inspection procedure 95001. The results of that inspection were provided in NRC Supplemental Inspection Report 05000317/2007006. As a result of that review, this finding was closed and no longer considered for plant assessment purposes, effective July 1, 2007.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.


The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Sincerely,
/RA Original Signed By:/
Glenn T. Dentel, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DRP-53, DRP-69 Enclosure: Calvert Cliffs Nuclear Power Plant Inspection/ Activity Plan ccw/encl.


enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Wallace, Vice-Chairman, Constellation Energy H. Barron, President, CEO, & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC W. Parran, President, Calvert County Board of Commissioners C. Fleming, Esquire, Sr. Counsel - Nuclear Generation Group, LLC J. Gaines, Director, Licensing, Calvert Cliffs Nuclear Power Plant S. Gray, Program Manager, Power Plant Assessment Program, Maryland Department of Natural Resources K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Coalition R. Hickok, NRC Technical Training Center L. Larragoite, Manager, Nuclear Safety and Security, Calvert Cliffs Nuclear Power Plant G. Detter, Manager, Nuclear Safety and Security, Constellation Energy M. Griffen, Maryland Department of the Environment S. Pattison, SLO (2


If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233, with any questions you may have regarding this letter or the inspection plan.
Page 1 of 2      Calvert Cliffs 2 08/27/2008 14:20:34    Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 71121 - OCC RAD SAFETY      1 2 IP 7112101 Access Control to Radiologically Significant Areas    08/25/2008 08/29/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls    08/25/2008 08/29/2008 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  08/25/2008 08/29/2008 Baseline Inspections 2 IP 71151  Performance Indicator Verification    08/25/2008 08/29/2008 Baseline Inspections TI 176 - TI 176      2 2 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 09/22/2008 09/26/2008 Generic Safety Inspectio Testing 7111107T - HEAT SINK      1 2 IP 7111107T Heat Sink Performance      10/20/2008 10/24/2008 Baseline Inspections 71121 - OCC RAD SAFETY      1 2 IP 7112101 Access Control to Radiologically Significant Areas    11/03/2008 11/07/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls    11/03/2008 11/07/2008 Baseline Inspections 2 IP 71151  Performance Indicator Verification    11/03/2008 11/07/2008 Baseline Inspections TI 172 - TI 172 RCS DISSIMILAR METAL BUTT WELDS    1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    11/17/2008 11/21/2008 Generic Safety Inspectio EP - EP PROGRAM INSP      2 2 IP 7111402 Alert and Notification System Testing    11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111403 Emergency Response Organization Augmentation Testing    11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes    11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies  11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 71151-EP01 Drill/Exercise Performance    11/17/2008 11/21/2008 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation      11/17/2008 11/21/2008 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System    11/17/2008 11/21/2008 Baseline Inspections 71121 - OCC RAD SAFETY      1 2 IP 7112101 Access Control to Radiologically Significant Areas    01/19/2009 01/23/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls    01/19/2009 01/23/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  01/19/2009 01/23/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness    01/19/2009 01/23/2009 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION      1 2 IP 7111108P Inservice Inspection Activities - PWR    02/23/2009 02/27/2009 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR    03/02/2009 03/06/2009 Baseline Inspections 71121 - OCC RAD SAFETY      1 2 IP 7112101 Access Control to Radiologically Significant Areas    03/02/2009 03/06/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls    03/02/2009 03/06/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  03/02/2009 03/06/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.


Sincerely,/RA/ David C. Lew, Director Division of Reactor Projects
This report shows only on-site and announced inspection procedures.


Region I Docket Nos. 50-317, 50-318
Page 2 of 2      Calvert Cliffs 2 08/27/2008 14:20:34    Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 71121 - OCC RAD SAFETY      1 2 IP 71151-OR01 Occupational Exposure Control Effectiveness    03/02/2009 03/06/2009 Baseline Inspections TI-172 - U2 TI-172 RCS DISSIMIILAR METAL WELDS    1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    03/02/2009 03/06/2009 Generic Safety Inspectio 7112202 - PUB RAD SAFETY - RADWASTE      1 2 IP 7112202 Radioactive Material Processing and Transportation    06/15/2009 06/19/2009 Baseline Inspections 7111121 - CDBI      6 2 IP 7111121 Component Design Bases Inspection    08/03/2009 08/07/2009 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection    08/17/2009 08/21/2009 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection    08/24/2009 08/28/2009 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP      1 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent    08/03/2009 08/07/2009 Baseline Inspections 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS    3 2 IP 7111111B Licensed Operator Requalification Program    11/16/2009 11/20/2009 Baseline Inspections EP EXER - EP EXERCISE INSPECTION      2 2 IP 7111401 Exercise Evaluation      10/18/2009 10/24/2009 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes    10/18/2009 10/24/2009 EP Baseline Inspection 2 IP 71151-EP01 Drill/Exercise Performance      10/18/2009 10/24/2009 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation      10/18/2009 10/24/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System    10/18/2009 10/24/2009 Baseline Inspections 71152B - PI&R BIENNIAL TEAM      4 2 IP 71152B Identification and Resolution of Problems    11/02/2009 11/06/2009 Baseline Inspections 2 IP 71152B Identification and Resolution of Problems    11/16/2009 11/20/2009 Baseline Inspections 71121 - OCC RAD SAFETY      1 2 IP 7112101 Access Control to Radiologically Significant Areas    12/07/2009 12/11/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls    12/07/2009 12/11/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  12/07/2009 12/11/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness    12/07/2009 12/11/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.


License Nos. DPR-53, DPR-69
This report shows only on-site and announced inspection procedures.


===Enclosure:===
Page 1 of 2      Calvert Cliffs 1 08/27/2008 14:20:02    Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 71121 - OCC RAD SAFETY      1 1 IP 7112101 Access Control to Radiologically Significant Areas    08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  08/25/2008 08/29/2008 Baseline Inspections 1 IP 71151  Performance Indicator Verification    08/25/2008 08/29/2008 Baseline Inspections ISFSI - ISFSI - ANNUAL SAMPLE      1 1 IP 60855  Operation Of An ISFSI      08/25/2008 08/29/2008 Other Routine TI 176 - TI 176      2 1 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 09/22/2008 09/26/2008 Generic Safety Inspectio Testing 7111107T - HEAT SINK      1 1 IP 7111107T Heat Sink Performance      10/20/2008 10/24/2008 Baseline Inspections 71121 - OCC RAD SAFETY      1 1 IP 7112101 Access Control to Radiologically Significant Areas    11/03/2008 11/07/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    11/03/2008 11/07/2008 Baseline Inspections 1 IP 71151  Performance Indicator Verification    11/03/2008 11/07/2008 Baseline Inspections TI 172 - TI 172 RCS DISSIMILAR METAL BUTT WELDS    1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    11/17/2008 11/21/2008 Generic Safety Inspectio EP - EP PROGRAM INSP      2 1 IP 7111402 Alert and Notification System Testing    11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111403 Emergency Response Organization Augmentation Testing    11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes    11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies  11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance    11/17/2008 11/21/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation      11/17/2008 11/21/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System    11/17/2008 11/21/2008 Baseline Inspections 71121 - OCC RAD SAFETY      1 1 IP 7112101 Access Control to Radiologically Significant Areas    01/19/2009 01/23/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    01/19/2009 01/23/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  01/19/2009 01/23/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness    01/19/2009 01/23/2009 Baseline Inspections 71121 - OCC RAD SAFETY      1 1 IP 7112101 Access Control to Radiologically Significant Areas    03/02/2009 03/06/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    03/02/2009 03/06/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness    03/02/2009 03/06/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
Calvert Cliffs Inspection / Activity Plan  


cc w/encl:
This report shows only on-site and announced inspection procedures.
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer


President, Calvert County Board of Commissioners
Page 2 of 2      Calvert Cliffs 1 08/27/2008 14:20:02    Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type ISFSI - ISFSI INSPECTION - ANNUAL SAMPLE    2 1 IP 60855  Operation Of An ISFSI      04/01/2009 06/30/2009 Other Routine 7112202 - PUB RAD SAFETY - RADWASTE      1 1 IP 7112202 Radioactive Material Processing and Transportation    06/15/2009 06/19/2009 Baseline Inspections 7111121 - CDBI      6 1 IP 7111121 Component Design Bases Inspection    08/03/2009 08/07/2009 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection    08/17/2009 08/21/2009 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection    08/24/2009 08/28/2009 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP      1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent    08/03/2009 08/07/2009 Baseline Inspections 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS    3 1 IP 7111111B Licensed Operator Requalification Program    11/16/2009 11/20/2009 Baseline Inspections EP EXER - EP EXERCISE INSPECTION      2 1 IP 7111401 Exercise Evaluation      10/18/2009 10/24/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes    10/18/2009 10/24/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance      10/18/2009 10/24/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation      10/18/2009 10/24/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System    10/18/2009 10/24/2009 Baseline Inspections 71152B - PI&R BIENNIAL TEAM      4 1 IP 71152B Identification and Resolution of Problems    11/02/2009 11/06/2009 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems    11/16/2009 11/20/2009 Baseline Inspections 71121 - OCC RAD SAFETY      1 1 IP 7112101 Access Control to Radiologically Significant Areas    12/07/2009 12/11/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    12/07/2009 12/11/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  12/07/2009 12/11/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness    12/07/2009 12/11/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.


C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Pattison, SLO (2)
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 14:23, 14 November 2019

Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001)
ML082470286
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/02/2008
From: Glenn Dentel
Reactor Projects Branch 1
To: Spina J
Constellation Generation Group
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
IR-08-001
Download: ML082470286 (6)


Text

ber 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2008001 AND 05000318/2008001)

Dear Mr. Spina:

On August 6, 2008, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Calvert Cliffs Units 1 and 2 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA Original Signed By:/

Glenn T. Dentel, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DRP-53, DRP-69 Enclosure: Calvert Cliffs Nuclear Power Plant Inspection/ Activity Plan ccw/encl.

M. Wallace, Vice-Chairman, Constellation Energy H. Barron, President, CEO, & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC W. Parran, President, Calvert County Board of Commissioners C. Fleming, Esquire, Sr. Counsel - Nuclear Generation Group, LLC J. Gaines, Director, Licensing, Calvert Cliffs Nuclear Power Plant S. Gray, Program Manager, Power Plant Assessment Program, Maryland Department of Natural Resources K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Coalition R. Hickok, NRC Technical Training Center L. Larragoite, Manager, Nuclear Safety and Security, Calvert Cliffs Nuclear Power Plant G. Detter, Manager, Nuclear Safety and Security, Constellation Energy M. Griffen, Maryland Department of the Environment S. Pattison, SLO (2

Page 1 of 2 Calvert Cliffs 2 08/27/2008 14:20:34 Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 2 IP 71151 Performance Indicator Verification 08/25/2008 08/29/2008 Baseline Inspections TI 176 - TI 176 2 2 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 09/22/2008 09/26/2008 Generic Safety Inspectio Testing 7111107T - HEAT SINK 1 2 IP 7111107T Heat Sink Performance 10/20/2008 10/24/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections 2 IP 71151 Performance Indicator Verification 11/03/2008 11/07/2008 Baseline Inspections TI 172 - TI 172 RCS DISSIMILAR METAL BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio EP - EP PROGRAM INSP 2 2 IP 7111402 Alert and Notification System Testing 11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 EP Baseline Inspection 2 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 01/19/2009 01/23/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 01/19/2009 01/23/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/19/2009 01/23/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/19/2009 01/23/2009 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 02/23/2009 02/27/2009 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR 03/02/2009 03/06/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 03/02/2009 03/06/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 03/02/2009 03/06/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/02/2009 03/06/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 2 08/27/2008 14:20:34 Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/02/2009 03/06/2009 Baseline Inspections TI-172 - U2 TI-172 RCS DISSIMIILAR METAL WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/02/2009 03/06/2009 Generic Safety Inspectio 7112202 - PUB RAD SAFETY - RADWASTE 1 2 IP 7112202 Radioactive Material Processing and Transportation 06/15/2009 06/19/2009 Baseline Inspections 7111121 - CDBI 6 2 IP 7111121 Component Design Bases Inspection 08/03/2009 08/07/2009 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/17/2009 08/21/2009 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/24/2009 08/28/2009 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 08/03/2009 08/07/2009 Baseline Inspections 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS 3 2 IP 7111111B Licensed Operator Requalification Program 11/16/2009 11/20/2009 Baseline Inspections EP EXER - EP EXERCISE INSPECTION 2 2 IP 7111401 Exercise Evaluation 10/18/2009 10/24/2009 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/18/2009 10/24/2009 EP Baseline Inspection 2 IP 71151-EP01 Drill/Exercise Performance 10/18/2009 10/24/2009 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 10/18/2009 10/24/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 10/18/2009 10/24/2009 Baseline Inspections 71152B - PI&R BIENNIAL TEAM 4 2 IP 71152B Identification and Resolution of Problems 11/02/2009 11/06/2009 Baseline Inspections 2 IP 71152B Identification and Resolution of Problems 11/16/2009 11/20/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/07/2009 12/11/2009 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 12/07/2009 12/11/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/07/2009 12/11/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 12/07/2009 12/11/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 1 of 2 Calvert Cliffs 1 08/27/2008 14:20:02 Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/25/2008 08/29/2008 Baseline Inspections ISFSI - ISFSI - ANNUAL SAMPLE 1 1 IP 60855 Operation Of An ISFSI 08/25/2008 08/29/2008 Other Routine TI 176 - TI 176 2 1 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 09/22/2008 09/26/2008 Generic Safety Inspectio Testing 7111107T - HEAT SINK 1 1 IP 7111107T Heat Sink Performance 10/20/2008 10/24/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/03/2008 11/07/2008 Baseline Inspections TI 172 - TI 172 RCS DISSIMILAR METAL BUTT WELDS 1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio EP - EP PROGRAM INSP 2 1 IP 7111402 Alert and Notification System Testing 11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111403 Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/19/2009 01/23/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/19/2009 01/23/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/19/2009 01/23/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/19/2009 01/23/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/02/2009 03/06/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/02/2009 03/06/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/02/2009 03/06/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 1 08/27/2008 14:20:02 Inspection / Activity Plan Report 22 08/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI INSPECTION - ANNUAL SAMPLE 2 1 IP 60855 Operation Of An ISFSI 04/01/2009 06/30/2009 Other Routine 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 06/15/2009 06/19/2009 Baseline Inspections 7111121 - CDBI 6 1 IP 7111121 Component Design Bases Inspection 08/03/2009 08/07/2009 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 08/17/2009 08/21/2009 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 08/24/2009 08/28/2009 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 08/03/2009 08/07/2009 Baseline Inspections 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS 3 1 IP 7111111B Licensed Operator Requalification Program 11/16/2009 11/20/2009 Baseline Inspections EP EXER - EP EXERCISE INSPECTION 2 1 IP 7111401 Exercise Evaluation 10/18/2009 10/24/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/18/2009 10/24/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 10/18/2009 10/24/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 10/18/2009 10/24/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 10/18/2009 10/24/2009 Baseline Inspections 71152B - PI&R BIENNIAL TEAM 4 1 IP 71152B Identification and Resolution of Problems 11/02/2009 11/06/2009 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 11/16/2009 11/20/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/07/2009 12/11/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/07/2009 12/11/2009 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/07/2009 12/11/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 12/07/2009 12/11/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.