Line 3: Line 3:
| issue date = 09/01/2009
| issue date = 09/01/2009
| title = Mid-Cycle Performance Review and Inspection Plan - Seabrook Station, Unit 1
| title = Mid-Cycle Performance Review and Inspection Plan - Seabrook Station, Unit 1
| author name = Burritt A L
| author name = Burritt A
| author affiliation = NRC/RGN-I/DRP/PB3
| author affiliation = NRC/RGN-I/DRP/PB3
| addressee name = St.Pierre G
| addressee name = St.Pierre G
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES               NUCLEAR REGULATORY COMMISSION                                                         REGION I                                               475 ALLENDALE ROAD                               KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. Gene St. Pierre
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. Gene St. Pierre Site Vice President NextEra Energy Seabrook, LLC.
 
Seabrook Station c/o Mr. Michael OKeefe P.O. Box 300 Seabrook, NH 03874
Site Vice President NextEra Energy Seabrook, LLC.  
 
Seabrook Station
 
c/o Mr. Michael O'Keefe  P.O. Box 300 Seabrook, NH 03874    


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SEABROOK STATION,UNIT NO. 1
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SEABROOK STATION,UNIT NO. 1


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==
Line 30: Line 26:
On August 13, 2009, the NRC staff completed its performance review of Seabrook Station, Unit No. 1 (Seabrook). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 13, 2009, the NRC staff completed its performance review of Seabrook Station, Unit No. 1 (Seabrook). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Seabrook was within the Licensee Response column of the NRC
Plant performance for the most recent quarter at Seabrook was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was in the Licensee Response column, the significance of a finding associated with the B emergency diesel generator failure on February 25, 2009 is still under review. We determined that this failure occurred because you did not establish adequate design control measures when you modified a flange on the diesel cooling water supply. When finalized, this finding may change our assessment of your performance at Seabrook and the facility inspection plan. However, based on our current assessment results, we plan to conduct reactor oversight (ROP) baseline inspections at your facility.
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was in the Licensee Response column, the significance of a finding associated with the B emergency diesel generator failure on February 25, 2009 is still under review. We determined that this failure occurred because you did not establish adequate design control measures when you modified a flange on the diesel cooling water supply. When finalized, this finding may change our assessment of your performance at Seabrook and the facility inspection plan. However, based on our current assessment results, we plan to conduct reactor oversight (ROP) baseline inspections at your  
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.


facility.
G. St. Pierre                                 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
G. St. Pierre 2 In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the reactor oversight process. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the reactor oversight process. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.
Sincerely,     /RA/ Arthur L. Burritt, Chief  
Sincerely,
                                                /RA/
Arthur L. Burritt, Chief Division of Reactor Projects Projects Branch 3 Docket Nos. 50-443 License Nos. NPF-86


Division of Reactor Projects Projects Branch 3 Docket Nos. 50-443 License Nos. NPF-86
==Enclosure:==
Seabrook Station Inspection/Activity Plan cc w/encl:
M. Nazar, Senior Vice President and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support M. Warner, Vice President, Nuclear Plant Support M. Mashhadi, Senior Attorney, Florida Power & Light Company M. Ross, Managing Attorney, Florida Power & Light Company M. OKeefe, Manager, Licensing Manager P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station S. Colman, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH R. Hughes, Director, Licensing and Performance Improvement J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League


==Enclosure:==
Page 1 of 2                                                                               Seabrook 08/31/2009     16:36:21                                                         Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                           Title                                         on Site 7111118       - B EDG GLYCOL SYSTEM FAILURE                                                                                         4 1         02/25/2009   09/30/2009   IP 7111118-Perm Mod Perm Mods 7111107T     - HEAT SINK INSP                                                                                                       1 1         07/06/2009   07/10/2009   IP 7111107T            Heat Sink Performance EP PROGR - EP PROGRAM INSPECTION                                                                                                     2 1         08/09/2009  08/14/2009  IP 7111402              Alert and Notification System Testing 1          08/09/2009   08/14/2009   IP 7111403              Emergency Response Organization Augmentation Testing 1          08/09/2009   08/14/2009   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          08/09/2009   08/14/2009   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          08/09/2009   08/14/2009   IP 71151-EP01          Drill/Exercise Performance 1          08/09/2009   08/14/2009   IP 71151-EP02          ERO Drill Participation 1          08/09/2009   08/14/2009   IP 71151-EP03          Alert & Notification System 7111111B     - BIENNIAL REQUAL INSP WITH P/F RESULTS                                                                               4 1         12/14/2009   12/18/2009   IP 7111111B            Licensed Operator Requalification Program 71122.03     - PUB RAD SAFETY - REMP                                                                                               1 1         09/21/2009  09/25/2009  IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1          09/21/2009   09/25/2009   IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7111108P     - INSERVICE INSPECTION                                                                                                 1 1         10/05/2009   10/09/2009   IP 7111108P            Inservice Inspection Activities - PWR TI-172       - TI-172 RCS DISSIMILAR METAL WELDS                                                                                   1 1         10/13/2009   10/16/2009   IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds 7111108P     - INSERVICE INSPECTION                                                                                                 1 1         10/19/2009   10/23/2009   IP 7111108P            Inservice Inspection Activities - PWR 71121         - OCC RAD SAFETY                                                                                                       1 1         10/19/2009   10/23/2009   IP 7112102              ALARA Planning and Controls 71122.01     - PUB RAD SAFETY - RETS                                                                                               1 1         11/16/2009  11/20/2009  IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1          11/16/2009   11/20/2009   IP 60855                Operation Of An ISFSI 1          11/16/2009   11/20/2009   IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71121         - OCC RAD SAFETY                                                                                                       1 1         12/07/2009  12/11/2009  IP 7112102              ALARA Planning and Controls 1          12/07/2009   12/11/2009   IP 71151-OR01          Occupational Exposure Control Effectiveness 1          12/07/2009   12/11/2009   IP 71151-PR01          RETS/ODCM Radiological Effluent TI-177       - MANAGING GAS ACCUMULATION IN ECCS                                                                                   2 1         01/11/2010  01/15/2010  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.
Seabrook Station Inspection/Activity Plan cc w/encl:  M. Nazar, Senior Vice President and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support M. Warner, Vice President, Nuclear Plant Support  M. Mashhadi, Senior Attorney, Florida Power & Light Company M. Ross, Managing Attorney, Florida Power & Light Company M. O'Keefe, Manager, Licensing Manager P. Freeman, Plant General Manager  K. Wright, Manager, Nuclear Training, Seabrook Station S. Colman, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH R. Hughes, Director, Licensing and Performance Improvement J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League Inspection / Activity Plan Page 1 of 2 08/31/2009 16:36:21 Report 22 07/01/2009
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Seabrook 7111118-B EDG GLYCOL SYSTEM FAILURE 4 1     IP Perm Mods 7111118-Perm Mod 02/25/2009 09/30/2009 7111107T-HEAT SINK INSP 1 1     IP Heat Sink Performance 7111107T 07/06/2009 07/10/2009 EP PROGR-EP PROGRAM INSPECTION 2 1     IP A lert and Notification System Testing 7111402 08/09/2009 08/14/2009 1    IP Emergency Response Organization Augmentation Testing 7111403 08/09/2009 08/14/2009 1    IP Emergency Action Level and Emergency Plan Changes 7111404 08/09/2009 08/14/2009 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/09/2009 08/14/2009 1    IP Drill/Exercise Performance 71151-EP01 08/09/2009 08/14/2009 1    IP ERO Drill Participation 71151-EP02 08/09/2009 08/14/2009 1    IP A lert & Notification System 71151-EP03 08/09/2009 08/14/2009 7111111B-BIENNIAL REQUAL INSP WITH P/F RESULTS 4 1     IP Licensed Operator Requalification Program 7111111B 12/14/2009 12/18/2009 71122.03-PUB RAD SAFETY - REMP 1 1     IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 09/21/2009 09/25/2009 1    IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 09/21/2009 09/25/2009 7111108P-INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 10/05/2009 10/09/2009 TI-172-TI-172 RCS DISSIMILAR METAL WELDS 1 1     IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/13/2009 10/16/2009 7111108P-INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 71121-OCC RAD SAFETY 1 1     IP A LARA Planning and Controls 7112102 10/19/2009 10/23/2009 71122.01-PUB RAD SAFETY - RETS 1 1     IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/16/2009 11/20/2009 1    IP Operation Of An ISFSI 60855 11/16/2009 11/20/2009 1    IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 11/16/2009 11/20/2009 71121-OCC RAD SAFETY 1 1     IP A LARA Planning and Controls 7112102 12/07/2009 12/11/2009 1    IP Occupational Exposure Control Effectiveness 71151-OR01 12/07/2009 12/11/2009 1    IP RETS/ODCM Radiological Effluent 71151-PR01 12/07/2009 12/11/2009 TI-177-MANAGING GAS ACCUMULATION IN ECCS 2 1     IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 01/11/2010 01/15/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/31/2009 16:36:21 Report 22 07/01/2009
 
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Seabrook 71121-OCC RAD SAFETY 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 01/25/2010 01/29/2010 1     IP A LARA - Required 7112102-7112102R 01/25/2010 01/29/2010 7111121-COMPONENT DESIGN BASES INSPECTION 6 1     IP Component Design Bases Inspection 7111121 04/26/2010 04/30/2010 1    IP Component Design Bases Inspection 7111121 05/10/2010 05/21/2010 EP EX-EP EXERCISE EVALUATION 4 1     IP Exercise Evaluation 7111401 05/03/2010 05/07/2010 1    IP Emergency Action Level and Emergency Plan Changes 7111404 05/03/2010 05/07/2010 1    IP Drill/Exercise Performance 71151-EP01 05/03/2010 05/07/2010 1    IP ERO Drill Participation 71151-EP02 05/03/2010 05/07/2010 1    IP A lert & Notification System 71151-EP03 05/03/2010 05/07/2010 71152B-PI&R 4 1     IP Identification and Resolution of Problems 71152B 07/26/2010 07/30/2010 1    IP Identification and Resolution of Problems 71152B 08/09/2010 08/13/2010 11/29 EX-INITIAL OPERATOR LICENSING EXAM 5 1     FY11 - SEABROOK INITIAL OPERATOR EXAM U01694 11/01/2010 11/05/2010 1    FY11 - SEABROOK INITIAL OPERATOR EXAM U01694 11/29/2010 12/10/2010 7112202-PUB RAD SAFETY - RADWASTE 1 1     IP Radioactive Material Processing and Transportation 7112202 09/27/2010 10/01/2010 1     IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 7112103-OCC RAD SAFETY - INSTRUMENTS 1 1     IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 11/01/2010 11/05/2010 7112102-OCC RAD SAFETY - ALARA 1 1     IP A LARA - Required 7112102-7112102R 12/06/2010 12/10/2010 1     IP Performance Indicator Verification 71151 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                               Seabrook 08/31/2009     16:36:21                                                         Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                             No. of Staff Number        Start     End     Inspection Activity                                                             Title   on Site 71121         - OCC RAD SAFETY                                                                 1 1         01/25/2010   01/29/2010   IP 7112101              Access Control to Radiologically Significant Areas 1         01/25/2010   01/29/2010   IP 7112102-7112102R ALARA - Required 7111121       - COMPONENT DESIGN BASES INSPECTION                                               6 1         04/26/2010   04/30/2010   IP 7111121              Component Design Bases Inspection 1          05/10/2010   05/21/2010   IP 7111121              Component Design Bases Inspection EP EX         - EP EXERCISE EVALUATION                                                         4 1         05/03/2010  05/07/2010  IP 7111401              Exercise Evaluation 1          05/03/2010   05/07/2010   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          05/03/2010   05/07/2010   IP 71151-EP01          Drill/Exercise Performance 1          05/03/2010   05/07/2010   IP 71151-EP02          ERO Drill Participation 1          05/03/2010   05/07/2010   IP 71151-EP03          Alert & Notification System 71152B       - PI&R                                                                           4 1         07/26/2010   07/30/2010   IP 71152B              Identification and Resolution of Problems 1          08/09/2010   08/13/2010   IP 71152B              Identification and Resolution of Problems 11/29 EX     - INITIAL OPERATOR LICENSING EXAM                                                 5 1         11/01/2010   11/05/2010     U01694              FY11 - SEABROOK INITIAL OPERATOR EXAM 1          11/29/2010   12/10/2010     U01694              FY11 - SEABROOK INITIAL OPERATOR EXAM 7112202       - PUB RAD SAFETY - RADWASTE                                                       1 1         09/27/2010   10/01/2010   IP 7112202              Radioactive Material Processing and Transportation 1         09/27/2010   10/01/2010   IP 71151                Performance Indicator Verification 7112103       - OCC RAD SAFETY - INSTRUMENTS                                                   1 1         11/01/2010   11/05/2010   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 7112102       - OCC RAD SAFETY - ALARA                                                         1 1         12/06/2010   12/10/2010   IP 7112102-7112102R ALARA - Required 1         12/06/2010   12/10/2010   IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 03:42, 14 November 2019

Mid-Cycle Performance Review and Inspection Plan - Seabrook Station, Unit 1
ML092440317
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/01/2009
From: Arthur Burritt
Reactor Projects Branch 3
To: St.Pierre G
NextEra Energy Seabrook
BURRITT, AL
References
Download: ML092440317 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. Gene St. Pierre Site Vice President NextEra Energy Seabrook, LLC.

Seabrook Station c/o Mr. Michael OKeefe P.O. Box 300 Seabrook, NH 03874

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

SEABROOK STATION,UNIT NO. 1

Dear Mr. St. Pierre:

On August 13, 2009, the NRC staff completed its performance review of Seabrook Station, Unit No. 1 (Seabrook). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Seabrook was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was in the Licensee Response column, the significance of a finding associated with the B emergency diesel generator failure on February 25, 2009 is still under review. We determined that this failure occurred because you did not establish adequate design control measures when you modified a flange on the diesel cooling water supply. When finalized, this finding may change our assessment of your performance at Seabrook and the facility inspection plan. However, based on our current assessment results, we plan to conduct reactor oversight (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

G. St. Pierre 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the reactor oversight process. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur L. Burritt, Chief Division of Reactor Projects Projects Branch 3 Docket Nos. 50-443 License Nos. NPF-86

Enclosure:

Seabrook Station Inspection/Activity Plan cc w/encl:

M. Nazar, Senior Vice President and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support M. Warner, Vice President, Nuclear Plant Support M. Mashhadi, Senior Attorney, Florida Power & Light Company M. Ross, Managing Attorney, Florida Power & Light Company M. OKeefe, Manager, Licensing Manager P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station S. Colman, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH R. Hughes, Director, Licensing and Performance Improvement J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League

Page 1 of 2 Seabrook 08/31/2009 16:36:21 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111118 - B EDG GLYCOL SYSTEM FAILURE 4 1 02/25/2009 09/30/2009 IP 7111118-Perm Mod Perm Mods 7111107T - HEAT SINK INSP 1 1 07/06/2009 07/10/2009 IP 7111107T Heat Sink Performance EP PROGR - EP PROGRAM INSPECTION 2 1 08/09/2009 08/14/2009 IP 7111402 Alert and Notification System Testing 1 08/09/2009 08/14/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1 08/09/2009 08/14/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 08/09/2009 08/14/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 08/09/2009 08/14/2009 IP 71151-EP01 Drill/Exercise Performance 1 08/09/2009 08/14/2009 IP 71151-EP02 ERO Drill Participation 1 08/09/2009 08/14/2009 IP 71151-EP03 Alert & Notification System 7111111B - BIENNIAL REQUAL INSP WITH P/F RESULTS 4 1 12/14/2009 12/18/2009 IP 7111111B Licensed Operator Requalification Program 71122.03 - PUB RAD SAFETY - REMP 1 1 09/21/2009 09/25/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1 09/21/2009 09/25/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7111108P - INSERVICE INSPECTION 1 1 10/05/2009 10/09/2009 IP 7111108P Inservice Inspection Activities - PWR TI-172 - TI-172 RCS DISSIMILAR METAL WELDS 1 1 10/13/2009 10/16/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 7111108P - INSERVICE INSPECTION 1 1 10/19/2009 10/23/2009 IP 7111108P Inservice Inspection Activities - PWR 71121 - OCC RAD SAFETY 1 1 10/19/2009 10/23/2009 IP 7112102 ALARA Planning and Controls 71122.01 - PUB RAD SAFETY - RETS 1 1 11/16/2009 11/20/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1 11/16/2009 11/20/2009 IP 60855 Operation Of An ISFSI 1 11/16/2009 11/20/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71121 - OCC RAD SAFETY 1 1 12/07/2009 12/11/2009 IP 7112102 ALARA Planning and Controls 1 12/07/2009 12/11/2009 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/07/2009 12/11/2009 IP 71151-PR01 RETS/ODCM Radiological Effluent TI-177 - MANAGING GAS ACCUMULATION IN ECCS 2 1 01/11/2010 01/15/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Seabrook 08/31/2009 16:36:21 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71121 - OCC RAD SAFETY 1 1 01/25/2010 01/29/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 01/25/2010 01/29/2010 IP 7112102-7112102R ALARA - Required 7111121 - COMPONENT DESIGN BASES INSPECTION 6 1 04/26/2010 04/30/2010 IP 7111121 Component Design Bases Inspection 1 05/10/2010 05/21/2010 IP 7111121 Component Design Bases Inspection EP EX - EP EXERCISE EVALUATION 4 1 05/03/2010 05/07/2010 IP 7111401 Exercise Evaluation 1 05/03/2010 05/07/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/03/2010 05/07/2010 IP 71151-EP01 Drill/Exercise Performance 1 05/03/2010 05/07/2010 IP 71151-EP02 ERO Drill Participation 1 05/03/2010 05/07/2010 IP 71151-EP03 Alert & Notification System 71152B - PI&R 4 1 07/26/2010 07/30/2010 IP 71152B Identification and Resolution of Problems 1 08/09/2010 08/13/2010 IP 71152B Identification and Resolution of Problems 11/29 EX - INITIAL OPERATOR LICENSING EXAM 5 1 11/01/2010 11/05/2010 U01694 FY11 - SEABROOK INITIAL OPERATOR EXAM 1 11/29/2010 12/10/2010 U01694 FY11 - SEABROOK INITIAL OPERATOR EXAM 7112202 - PUB RAD SAFETY - RADWASTE 1 1 09/27/2010 10/01/2010 IP 7112202 Radioactive Material Processing and Transportation 1 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1 11/01/2010 11/05/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 7112102 - OCC RAD SAFETY - ALARA 1 1 12/06/2010 12/10/2010 IP 7112102-7112102R ALARA - Required 1 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.