| title = Mid-Cycle Performance Review and Inspection Plan - Fermi Nuclear Power Plant
| title = Mid-Cycle Performance Review and Inspection Plan - Fermi Nuclear Power Plant
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
| addressee name = Davis J M
| addressee name = Davis J
| addressee affiliation = Detroit Edison
| addressee affiliation = Detroit Edison
| docket = 05000341
| docket = 05000341
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
 
Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company  
 
Fermi 2 - 210 NOC  
 
6400 North Dixie Highway Newport, MI 48166  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - FERMI POWER PLANT, UNIT 2
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
FERMI POWER PLANT, UNIT 2


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On August 5, 2010, the NRC staff completed its performance review of the Fermi Power Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security Cornerstone review and resultant inspection plan.


Fermi Power Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
On August 5, 2010, the NRC staff completed its performance review of the Fermi Power Plant.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security Cornerstone review and resultant inspection plan.
Fermi Power Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Additionally, the staff has identified a cross-cutting theme in the area of human performance (HP) with the aspect of Documentation/Procedures (H.2(c)). During this assessment period, there were seven findings documented with cross-cutting aspects in the HP area. There was a cross-cutting theme in the area of HP because six of these findings shared a common cross-cutting Documentation/Procedures aspect (H.2(c)) and were from different cornerstones.
Additionally, the staff has identified a cross-cutting theme in the area of human performance (HP) with the aspect of Documentation/Procedures (H.2(c)). During this assessment period, there were seven findings documented with cross-cutting aspects in the HP area. There was a cross-cutting theme in the area of HP because six of these findings shared a common cross-cutting Documentation/Procedures aspect (H.2(c)) and were from different cornerstones.
J. Davis     
However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time. However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include:  Inspection Procedure (IP) 92709, "Licensee Strike Contingency Plans"; IP 92702, "Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters"; IP 60854.1, "Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants"; IP 60855.1, "Operation of an ISFSI at Operating Plants"; and IP60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants."  The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review. 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


J. Davis                                      However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time.
However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include: Inspection Procedure (IP) 92709, Licensee Strike Contingency Plans; IP 92702, Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.
Sincerely,  
Sincerely,
  /RA/ Robert J. Orlikowski, Acting Chief  
                                              /RA/
 
Robert J. Orlikowski, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43  


==Enclosure:==
==Enclosure:==
Fermi 2 Inspection/Activity Plan  
Fermi 2 Inspection/Activity Plan cc w/encl:    Distribution via ListServ


cc w/encl: Distribution via ListServ Inspection / Activity Plan Page 1 of 2 08/26/2010 Report 22 09/01/2010
Fermi Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates                                                                                                                                 No. of Staff Start     End     Inspection Activity                                                           Title                                       on Site ISFSI         - ISFSI INSPECTION                                                                                                   2 05/01/2010  12/31/2010   IP 60855.1            Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG       - HEAD DROP ANALYSIS INSPECTION                                                                                     3 07/01/2010   10/25/2010   IP 7111120            Refueling and Other Outage Activities OL EXAM       - FERMI INIT EXAM - AUG. 2010                                                                                       3 08/30/2010   09/03/2010      W90219            OL - INITIAL EXAM - AUG 2010 - FERM BI ENG       - INSERVICE INSPECTION                                                                                               1 10/24/2010   11/11/2010   IP 7111108G          Inservice Inspection Activities - BWR BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                           1 10/25/2010  10/29/2010   IP 71124.01          Radiological Hazard Assessment and Exposure Controls 10/25/2010   10/29/2010  IP 71124.02          Occupational ALARA Planning and Controls BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                           1 11/29/2010   12/03/2010   IP 71124.05          Radiation Monitoring Instrumentation ISFSI         - ISFSI INSPECTION - SCHEDULE DEPENDENT                                                                             2 01/01/2011  05/31/2011   IP 60854.1            Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 04/01/2011   04/30/2011  IP 60856.1            Review of 10 CFR 72.212(b) Evaluations at Operating Plants 05/01/2011   07/31/2011  IP 60855.1            Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG       - TRIENNIAL FIRE PROTECTION INSPECTION                                                                               3 03/21/2011   04/29/2011   IP 7111105T          Fire Protection [Triennial]
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Fermi ISFSI-ISFSI INSPECTION 2 2   IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2010 12/31/2010 BI ENG-HEAD DROP ANALYSIS INSPECTION 3 2  IP Refueling and Other Outage Activities 7111120 07/01/2010 10/25/2010 OL EXAM-FERMI INIT EXAM - AUG. 2010 3 2   OL - INITIAL EXAM - AUG 2010 - FERM W90219 08/30/2010 09/03/2010 BI ENG-INSERVICE INSPECTION 1 2  IP Inservice Inspection Activities - BWR 7111108G 10/24/2010 11/11/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2   IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/25/2010 10/29/2010 2   IP Occupational ALARA Planning and Controls 71124.02 10/25/2010 10/29/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2  IP Radiation Monitoring Instrumentation 71124.05 11/29/2010 12/03/2010 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 2   IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/01/2011 05/31/2011 2   IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 04/01/2011 04/30/2011 2   IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2011 07/31/2011 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION 3 2  IP Fire Protection [Triennial]
BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                           1 03/28/2011  04/01/2011   IP 2515/179          Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 03/28/2011   04/01/2011  IP 71124.01          Radiological Hazard Assessment and Exposure Controls 03/28/2011   04/01/2011  IP 71124.02          Occupational ALARA Planning and Controls BI EP         - EP ROUTINE INSPECTION / PI VERIFICATION                                                                           2 04/18/2011  04/22/2011   IP 7111402            Alert and Notification System Testing 04/18/2011   04/22/2011  IP 7111403            Emergency Preparedness Organization Staffing and Augmentation System 04/18/2011   04/22/2011  IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 04/18/2011   04/22/2011  IP 71151-EP01        Drill/Exercise Performance 04/18/2011   04/22/2011  IP 71151-EP02        ERO Drill Participation 04/18/2011   04/22/2011  IP 71151-EP03        Alert & Notification System BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                           1 06/13/2011  06/17/2011  IP 71124.01          Radiological Hazard Assessment and Exposure Controls 06/13/2011   06/17/2011  IP 71124.03           In-Plant Airborne Radioactivity Control and Mitigation 06/13/2011  06/17/2011  IP 71124.04          Occupational Dose Assessment
7111105T 03/21/2011 04/29/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 2   IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 03/28/2011 04/01/2011 2   IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/28/2011 04/01/2011 2   IP Occupational ALARA Planning and Controls 71124.02 03/28/2011 04/01/2011 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 2   IP A lert and Notification System Testing 7111402 04/18/2011 04/22/2011 2   IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/18/2011 04/22/2011 2   IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/18/2011 04/22/2011 2   IP Drill/Exercise Performance 71151-EP01 04/18/2011 04/22/2011 2   IP ERO Drill Participation 71151-EP02 04/18/2011 04/22/2011 2   IP A lert & Notification System 71151-EP03 04/18/2011 04/22/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1  2  IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/13/2011 06/17/2011 2   IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/13/2011 06/17/2011 2   IP Occupational Dose Assessment 71124.04 06/13/2011 06/17/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/26/2010 Report 22 09/01/2010
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Fermi BI PI&R-BIENNIAL PI&R INSPECTION 3  2  IP Identification and Resolution of Problems 71152B 09/19/2011 10/07/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1  2  IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/03/2011 10/07/2011 2   IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/03/2011 10/07/2011 2  IP Reactor Coolant System Activity 71151-BI01 10/03/2011 10/07/2011 2  IP Occupational Exposure Control Effectiveness 71151-OR01 10/03/2011 10/07/2011 2   IP RETS/ODCM Radiological Effluent 71151-PR01 10/03/2011 10/07/2011 BI OL-BIENNIAL REQUAL PROGRAM EVAL 2  2   IP Licensed Operator Requalification Program 7111111B 12/05/2011 12/09/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
J. Davis     


However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time. However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.
Fermi Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates                                                                                                                              No. of Staff Start      End      Inspection Activity                                                      Title                                          on Site BI PI&R      - BIENNIAL PI&R INSPECTION                                                                                        3 09/19/2011  10/07/2011  IP 71152B          Identification and Resolution of Problems BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                        1 10/03/2011  10/07/2011   IP 71124.01        Radiological Hazard Assessment and Exposure Controls 10/03/2011  10/07/2011  IP 71124.08        Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 10/03/2011  10/07/2011  IP 71151-BI01      Reactor Coolant System Activity 10/03/2011  10/07/2011  IP 71151-OR01      Occupational Exposure Control Effectiveness 10/03/2011  10/07/2011  IP 71151-PR01      RETS/ODCM Radiological Effluent BI OL        - BIENNIAL REQUAL PROGRAM EVAL                                                                                    2 12/05/2011  12/09/2011  IP 7111111B        Licensed Operator Requalification Program
 
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include:  Inspection Procedure (IP) 92709, "Licensee Strike Contingency Plans"; IP 92702, "Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters"; IP 60854.1, "Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants"; IP 60855.1, "Operation of an ISFSI at Operating Plants"; and IP60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants."  The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review. 
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


J. Davis                                                                However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time.
However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include: Inspection Procedure (IP) 92709, Licensee Strike Contingency Plans; IP 92702, Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA/ Robert J. Orlikowski, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43  
Sincerely,
                                                                          /RA/
Robert J. Orlikowski, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43


==Enclosure:==
==Enclosure:==
Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Fermi MOC 2010 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII           NAME ROrlikowski:dtp DATE 08/26/10     OFFICIAL RECORD COPY
Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Fermi MOC 2010 Letter.docx Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII NAME               ROrlikowski:dtp DATE               08/26/10 OFFICIAL RECORD COPY


Letter to J. Davis from R. Orlikowski dated September 1, 2010.  
Letter to J. Davis from R. Orlikowski dated September 1, 2010.


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - FERMI POWER PLANT, UNIT 2 DISTRIBUTION
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
: Susan Bagley  
FERMI POWER PLANT, UNIT 2 DISTRIBUTION:
 
Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}

Latest revision as of 13:55, 13 November 2019

Mid-Cycle Performance Review and Inspection Plan - Fermi Nuclear Power Plant
ML102440097
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/01/2010
From: Robert Orlikowski
Reactor Projects Region 3 Branch 4
To: Jennifer Davis
Detroit Edison
References
Download: ML102440097 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

FERMI POWER PLANT, UNIT 2

Dear Mr. Davis:

On August 5, 2010, the NRC staff completed its performance review of the Fermi Power Plant.

Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security Cornerstone review and resultant inspection plan.

Fermi Power Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

Additionally, the staff has identified a cross-cutting theme in the area of human performance (HP) with the aspect of Documentation/Procedures (H.2(c)). During this assessment period, there were seven findings documented with cross-cutting aspects in the HP area. There was a cross-cutting theme in the area of HP because six of these findings shared a common cross-cutting Documentation/Procedures aspect (H.2(c)) and were from different cornerstones.

J. Davis However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time.

However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include: Inspection Procedure (IP) 92709, Licensee Strike Contingency Plans; IP 92702, Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Robert J. Orlikowski, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ

Fermi Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION 2 05/01/2010 12/31/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG - HEAD DROP ANALYSIS INSPECTION 3 07/01/2010 10/25/2010 IP 7111120 Refueling and Other Outage Activities OL EXAM - FERMI INIT EXAM - AUG. 2010 3 08/30/2010 09/03/2010 W90219 OL - INITIAL EXAM - AUG 2010 - FERM BI ENG - INSERVICE INSPECTION 1 10/24/2010 11/11/2010 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/25/2010 10/29/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/25/2010 10/29/2010 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/29/2010 12/03/2010 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 01/01/2011 05/31/2011 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 04/01/2011 04/30/2011 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 05/01/2011 07/31/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 03/21/2011 04/29/2011 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/28/2011 04/01/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 03/28/2011 04/01/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/28/2011 04/01/2011 IP 71124.02 Occupational ALARA Planning and Controls BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 04/18/2011 04/22/2011 IP 7111402 Alert and Notification System Testing 04/18/2011 04/22/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 04/18/2011 04/22/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/18/2011 04/22/2011 IP 71151-EP01 Drill/Exercise Performance 04/18/2011 04/22/2011 IP 71151-EP02 ERO Drill Participation 04/18/2011 04/22/2011 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/13/2011 06/17/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 06/13/2011 06/17/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/13/2011 06/17/2011 IP 71124.04 Occupational Dose Assessment

Fermi Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI PI&R - BIENNIAL PI&R INSPECTION 3 09/19/2011 10/07/2011 IP 71152B Identification and Resolution of Problems BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/03/2011 10/07/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/03/2011 10/07/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 10/03/2011 10/07/2011 IP 71151-BI01 Reactor Coolant System Activity 10/03/2011 10/07/2011 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/03/2011 10/07/2011 IP 71151-PR01 RETS/ODCM Radiological Effluent BI OL - BIENNIAL REQUAL PROGRAM EVAL 2 12/05/2011 12/09/2011 IP 7111111B Licensed Operator Requalification Program

J. Davis However, five of the findings with cross-cutting aspect of H.2(c) were identified during the component design bases inspection in the second quarter 2010. You recognized this cross-cutting theme and have implemented a range of actions to address this trend. Because many of these actions were implemented in the second quarter of 2010, a reasonable duration of time has not passed to determine the effectiveness of these corrective actions. Therefore, the NRC does not propose a substantive cross-cutting issue in the area of HP at this time.

However, we will continue to monitor the effectiveness of your corrective actions to address this cross-cutting theme through our baseline inspections.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. We also plan on performing several special and infrequently performed inspections that include: Inspection Procedure (IP) 92709, Licensee Strike Contingency Plans; IP 92702, Follow up on Traditional Enforcement Actions, Including Violations, Deviations, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Action Letters; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSIs) at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9753 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Robert J. Orlikowski, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Fermi MOC 2010 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME ROrlikowski:dtp DATE 08/26/10 OFFICIAL RECORD COPY

Letter to J. Davis from R. Orlikowski dated September 1, 2010.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

FERMI POWER PLANT, UNIT 2 DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource