IR 05000440/2011404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/17/2011
| issue date = 05/17/2011
| title = IR 05000440-11-404, (Drs), on 04/18/2011 - 04/21/2011, Perry Nuclear Power Plant, Routine Security Baseline Inspection
| title = IR 05000440-11-404, (Drs), on 04/18/2011 - 04/21/2011, Perry Nuclear Power Plant, Routine Security Baseline Inspection
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Bezilla M
| addressee name = Bezilla M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 17, 2011
[[Issue date::May 17, 2011]]


Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
==SUBJECT:==
PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011404(DRS)


SUBJECT: PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011404(DRS)
==Dear Mr. Bezilla:==
On April 21, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 21, 2011, with Mr. K. Krueger and other members of your staff.


==Dear Mr. Bezilla:==
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
On April 21, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 21, 2011, with Mr. K. Krueger and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
 
Nonpublic


===Enclosure:===
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Inspection Report 05000440/2011404(DRS)


===w/Attachment:===
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. O'Claire, State Liaison Officer Ohio Emergency Management Agency


cc w/o encl: Distribution via ListServ
Sincerely,
/RA/
Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2011404(DRS)
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. OClaire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ
}}
}}

Latest revision as of 19:23, 12 November 2019

IR 05000440-11-404, (Drs), on 04/18/2011 - 04/21/2011, Perry Nuclear Power Plant, Routine Security Baseline Inspection
ML11138A222
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/17/2011
From: Richard Skokowski
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR-11-404
Download: ML11138A222 (3)


Text

May 17, 2011

SUBJECT:

PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011404(DRS)

Dear Mr. Bezilla:

On April 21, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 21, 2011, with Mr. K. Krueger and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2011404(DRS)

w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. OClaire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ