October 16, 2020

SUBJECT:

PERRY NUCLEAR POWER PLANT - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000440/2020501

Dear Mr. Payne :

On September 22, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with you and other members of your staf The results of this inspection are documented in the enclosed repor No findings or violations of more than minor significance were identified during this inspectio This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholdin

Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety

Docket N License N NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2020501

Enterprise Identifier: I-2020-501-0011

Licensee:

Energy Harbor Nuclear Cor Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

September 14, 2020 to September 22, 2020

Inspectors:

J. Beavers, Senior Resident Inspector

E. Fernandez, Reactor Inspector

G. Hansen, Senior Emergency Preparedness Inspector

Approved By:

Patricia J. Pelke, Chief

Operations Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise on September 15, 2020. The exercise scenario simulated an event at the Perry Nuclear Plant that initiated with the declaration and notification of a Notice of Unusual Event (NOUE) in response to a seismic event greater than Operating Basis Earthquake (OBE) as indicated by seismic instrumentation in the Control Room. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on August 10,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) July 2019 - June 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) July 2019 - June 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) July 2019 - June

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 22, 2020, the inspectors presented the emergency preparedness biennial exercise inspection results to Mr. F. Payne, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

CR-2019-07870

Emergency Planning 5-Way Test Failure

09/25/2019

CR-2019-07880

Emergency Planning Conference Bridge Failures

09/25/2019

CR-2019-09583

EOF 3-Way and 5-Way Conference Bridge Auto Dial Non-

Functional

11/12/2019

CR-2019-09686

MS-C-19-11-24: EP Inventory Discrepancies

11/15/2019

CR-2020-00284

PY-PTI-R50-P0001 Portion Failure Due to E-Plan 5-Way

Notification Line Not Connecting to All Parties

01/15/2020

CR-2020-00846

Emergency Notification System (Red Phone) is Not Working

2/04/2020

CR-2020-02636

Emergency Notification System Phone (Red Phone) is Not

Working

03/26/2020

CR-2020-04281

Emergency Notification System Phone (Red Phone) is Not

Working

05/15/2020

Corrective Action

Documents

Resulting from

Inspection

CR-2020-07386

NRC Eplan Drill: NRC Phone Jack in the Simulator Did Not

Function

09/23/2020

Miscellaneous

Two Years of EP Drill and Exercise Reports

08/01/2018 -

08/31/2020

Procedures

Perry Nuclear Power Plant Emergency Plan

Two Years of Drill and Exercise Corrective Action Program

Items

08/01/2018 -

08/31/2020

EPI-A1

Emergency Action Levels

EPI-A2

Emergency Actions Based on Event Classifications

EPI-A6

Technical Support Center Activation

EPI-A7

Operations Support Center Activation

EPI-A8

Emergency Operations Facility Activation

EPI-B1

Emergency Notification System

EPI-B10

Emergency Radiological Environmental Monitoring Program

EPI-B8

Protective Actions and Guides

NOP-LP-5023

Perry Unified RASCAL Interface (URI) Dose Assessment

Software

NOP-LP-5024

Perry Unified RASCAL Interface (URI) Dose Assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Software Integrated Assessments

PSI-0019

Emergency Action Level (EAL) Bases Document

71114.08

Miscellaneous

Perry Nuclear Power Plant 2020 Evaluated Exercise

Scenario Guide

71151

Miscellaneous

NRC Performance Indicator Data; Drill/Exercise Performance 07/01/2019 -

06/30/2020

NRC Performance Indicator Data; Emergency Response

Organization Drill Participation

07/01/2019 -

06/30/2020

NRC Performance Indicator Data; Alert and Notification

System Reliability

07/01/2019 -

06/30/2020

NEI 99-02

Regulatory Assessment Performance Indicator Guideline