|
|
(3 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 11/16/2016 | | | issue date = 11/16/2016 |
| | title = Request for Withholding Information from Public Disclosure | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Guzman R V | | | author name = Guzman R |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Sartain M D | | | addressee name = Sartain M |
| | addressee affiliation = Dominion Nuclear Connecticut, Inc | | | addressee affiliation = Dominion Nuclear Connecticut, Inc |
| | docket = 05000423 | | | docket = 05000423 |
| | license number = NPF-049 | | | license number = NPF-049 |
| | contact person = Guzman R V | | | contact person = Guzman R |
| | case reference number = CAC MF8120 | | | case reference number = CAC MF8120 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
| | page count = 3 | | | page count = 3 |
| | project = CAC:MF8120 | | | project = CAC:MF8120 |
| | stage = Other | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mark D. Sartain Vice President | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2016 Mr. Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc. |
| -Nuclear Engineering Dominion Nuclear Connecticut, Inc. 5000 Dominion Boulevard Glen Allen, VA 23060 November 16, 2016 | | 5000 Dominion Boulevard Glen Allen, VA 23060 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MILLSTONE POWER STATION, UNIT 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF8120) | | MILLSTONE POWER STATION, UNIT 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF8120) |
|
| |
|
| ==Dear Mr. Huber:== | | ==Dear Mr. Huber:== |
| By letter dated June 30, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 16189A104), you submitted an affidavit dated June 7, 2016, executed by Henry A. Sepp, Director, CRE-Systems and Component Engineering, Westinghouse Electric Company LLC (Westinghouse) and authorized by James A. Gresham, Manager, Regulatory Compliance, Westinghouse, which requested that the information contained in the following document be withheld from public disclosure pursuant to Title 1 O of the Code of Federal Regulations (1 O CFR), Part 2, Section 2.390: Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 3, Proposed Exemption Request for the Use of Axiom Cladding Material in Lead Test Assemblies (Proprietary). | | |
| The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. (c) Its use by a competitor would reduce his expenditure of resources to improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. We have reviewed your letter and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | By letter dated June 30, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16189A104), you submitted an affidavit dated June 7, 2016, executed by Henry A. Sepp, Director, CRE-Systems and Component Engineering, Westinghouse Electric Company LLC (Westinghouse) and authorized by James A. Gresham, Manager, Regulatory Compliance, Westinghouse, which requested that the information contained in the following document be withheld from public disclosure pursuant to Title 1O of the Code of Federal Regulations (1 O CFR), Part 2, Section 2.390: |
| | Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 3, Proposed Exemption Request for the Use of Axiom Cladding Material in Lead Test Assemblies (Proprietary). |
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| | (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. |
| | (c) Its use by a competitor would reduce his expenditure of resources to improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. |
| | We have reviewed your letter and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | | Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| M. Sartain Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | M. Sartain Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | |
| If you have any questions regarding this matter, I may be reached at 301-415-1030. | | If you have any questions regarding this matter, I may be reached at 301-415-1030. |
| Docket No. 50-423 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 cc: Mr. Henry A. Sepp Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Director, CRE-Systems and Components Engineering Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via Listserv T. Sartain Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
| | Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 cc: Mr. Henry A. Sepp Director, CRE-Systems and Components Engineering Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via Listserv |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
| | |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
| | ML16320A246 *Concurrence via e-mail OFFICE NRR/LPL 1-1\PM NRR/LPL 1-1\LA NRR/SRXB/BC(A) NRR/LPL 1-1/BC(A) NRR/LPL 1-1\PM NAME RGuzman KGoldstein* EOesterle* BMozafari RGuzman DATE 11/15/16 11/16/16 11/16/16 11/15/16 11/16/16}} |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
| |
| If you have any questions regarding this matter, I may be reached at 301-415-1030.
| |
| Sincerely, /RAJ Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: Mr. James A Gresham Manager, Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 cc: Mr. Henry A Sepp Director, CRE-Systems and Components Engineering Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via Listserv DISTRIBUTION: | |
| PUBLIC RidsNrrDssSrxb Resource RidsAcrsAcnw
| |
| _MailCTR Resource RidsNrrPMMillstone Resource LPL 1-1 R/F RidsNrrDorlLpl1-1 Resource RidsNrrLAKGoldstein Resource RidsRgn1 MailCenter Resource MHardgrove, NRR ADAMS Accession No.: ML 16320A246
| |
| *Concurrence via e-mail OFFICE NRR/LPL 1-1\PM NRR/LPL 1-1\LA NRR/SRXB/BC(A) | |
| NRR/LPL 1-1/BC(A) | |
| NRR/LPL 1-1\PM NAME RGuzman KGoldstein* | |
| EOesterle* | |
| BMozafari RGuzman DATE 11/15/16 11/16/16 11/16/16 11/15/16 11/16/16 OFFICIAL RECORD COPY}} | |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML16189A1042016-06-30030 June 2016 Proposed Exemption Request for the Use of Axiom Cladding Material in Lead Test Assemblies Project stage: Request ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-11-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24162A0882024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24141A1502024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2272024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 ML24092A0752024-03-28028 March 2024 3R22 Refueling Outage Inservice Inspection (ISI) Owners Activity Report Extension ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML24086A4802024-03-22022 March 2024 Alternative Request IR-4-14, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examination for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24051A1922024-03-0808 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000336/20230062024-02-28028 February 2024 Annual Assessment Letter for Millstone Power Station, Units 2 and 3, (Reports 05000336/2023006 and 05000423/2023006) ML24053A2632024-02-21021 February 2024 Unit 3, and Independent Spent Fuel Storage Installation, Notification Pursuant to 10 CFR 72.212(b)(1) Prior to First Storage of Spent Fuel Under a General License ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage 2024-09-04
[Table view] Category:Proprietary Information Review
MONTHYEARML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24043A0062024-02-15015 February 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Support Implementation of Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML21060B5992021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML18173A1582018-06-29029 June 2018 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 (Holtec) ML16320A2622016-12-0101 December 2016 Request for Withholding Information from Public Disclosure ML16320A2672016-12-0101 December 2016 Request for Withholding Information from Public Disclosure - June 15, 2016 Letter ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure ML16129A0012016-06-0707 June 2016 Request for Withholding Information from Public Disclosure ML16040A2152016-02-24024 February 2016 Request for Withholding Information from Public Disclosure ML13080A3762013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3702013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3062013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13071A1022013-03-13013 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML12258A1502012-09-19019 September 2012 Request for Withholding Information from Public Disclosure for Millstone Powers Station, Unit No. 3 ML1208304582012-04-10010 April 2012 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML1129303472011-10-25025 October 2011 Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007) ML1116719932011-06-29029 June 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) ML1103906642011-02-28028 February 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML1021607492010-09-22022 September 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1015405582010-06-11011 June 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0921608802009-08-21021 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 ML0921200942009-08-0404 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 2 ML0913104282009-06-0505 June 2009 Request for Withholding Information from Public Disclosure ML0900705162009-02-0303 February 2009 Request for Withholding Information from Pubic Disclosure Regarding Millstone Power Station, Unit No. 3 ML0823106632008-08-22022 August 2008 Letter Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0803501322008-03-13013 March 2008 Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0732500812007-12-14014 December 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2252), Subject: WCAP-16271-P, Millstone Unit 3 Spent Fuel Pool Criticality Safety Analysis, March 2007 (Proprietary), Date ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0727005452007-10-18018 October 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2296), Subject: NEU-07-128 P-Attachment, Millstone Nuclear Power Station Unit 2 Stretch Power Uprate Program Supplemental ML0720004022007-06-25025 June 2007 Attachment 6, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Application for Withholding Proprietary Information from Public Disclosure ML0622802932006-08-22022 August 2006 Framatome Anp, Inc. Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0620005092006-07-25025 July 2006 Request for Withholding Information from Public Disclosure for Stone and Webster ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0534000902006-03-0606 March 2006 Withholding from Public Disclosure, AW-05-2060, Pressurizer Spray Line Weld Repair ML0332304732003-12-15015 December 2003 Withholding Proprietary Information Letter, Request for Withholding Information from Public Disclosure ML0329304432003-11-12012 November 2003 Request for Withholding Information from Public Disclosure ML0319000172003-08-20020 August 2003 Request for Withholding Information from Public Disclosure ML0208706492002-04-11011 April 2002 Request for Withholding Proprietary Information from Public Disclosure (Tac No. MB4655) 2024-08-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2016 Mr. Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
MILLSTONE POWER STATION, UNIT 3, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF8120)
Dear Mr. Huber:
By letter dated June 30, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16189A104), you submitted an affidavit dated June 7, 2016, executed by Henry A. Sepp, Director, CRE-Systems and Component Engineering, Westinghouse Electric Company LLC (Westinghouse) and authorized by James A. Gresham, Manager, Regulatory Compliance, Westinghouse, which requested that the information contained in the following document be withheld from public disclosure pursuant to Title 1O of the Code of Federal Regulations (1 O CFR), Part 2, Section 2.390:
Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 3, Proposed Exemption Request for the Use of Axiom Cladding Material in Lead Test Assemblies (Proprietary).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources to improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
We have reviewed your letter and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
M. Sartain Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1030.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 cc: Mr. Henry A. Sepp Director, CRE-Systems and Components Engineering Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via Listserv
ML16320A246 *Concurrence via e-mail OFFICE NRR/LPL 1-1\PM NRR/LPL 1-1\LA NRR/SRXB/BC(A) NRR/LPL 1-1/BC(A) NRR/LPL 1-1\PM NAME RGuzman KGoldstein* EOesterle* BMozafari RGuzman DATE 11/15/16 11/16/16 11/16/16 11/15/16 11/16/16