MONTHYEARML1022103312010-08-0505 August 2010 E-mail MD7112 Snubber Replacement Reporting Response 2010-08-05 Project stage: Other ML1201100282012-01-0303 January 2012 NRR E-mail Capture - Kewaunee Part 26 Question Project stage: Other ML12306A0822012-10-31031 October 2012 NRR E-mail Capture - FW: Dominion New(S) Release Announcing Kewaunee Shutdown - October 22, 2012 Project stage: Other ML12319A4022012-11-15015 November 2012 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans by Kewaunee Power Station to Implement Orders from Lessons Learned from Events in Fukushima, Japan Project stage: Meeting ML12328A1042012-11-21021 November 2012 NRR E-mail Capture - Kewaunee Public Meeting Call in Information - Response Contains Conference Call and Pass Code Information Project stage: Meeting ML12346A2472012-12-11011 December 2012 NRR E-mail Capture - MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes (for Meeting Summary) Project stage: Meeting ML12352A2822012-12-31031 December 2012 Summary of Meeting with Dominion Energy Kewaunee on Implementation of Orders Japan Lessons Learned Effort Project stage: Meeting ML13014A0972013-01-13013 January 2013 NRR E-mail Capture - MD7112 - Kewaunee Plant Closure - Reply to Part 171 Fee Reduction Questions Project stage: Other ML13036A3042013-01-30030 January 2013 NRR E-mail Capture - FW: Conference Call Attendees - and Presentation Powerpoint (Attached) Project stage: Other ML13063A2482013-02-26026 February 2013 Redacted - Kewaunee Power Station, Post-Shutdown Decommissioning Activities Report Project stage: Other ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests Project stage: Withholding Request Acceptance ML13116A3262013-04-30030 April 2013 Forthcoming Closed Meeting with Dominion Energy Kewaunee Staff to Discuss Planning for Physical Security at Kewaunee Power Station Project stage: Meeting ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events Project stage: Other ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results Project stage: Acceptance Review ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing Project stage: Other ML13143A3682013-05-29029 May 2013 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans for Kewaunee Power Station Regarding Emergency Preparedness Project stage: Meeting ML13170A3692013-06-14014 June 2013 Record of Discussion of Regulations for Parent Financial Guarantees Project stage: Other 2013-01-30
[Table View] |
Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign InterestsML13053A361 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna |
---|
Issue date: |
03/07/2013 |
---|
From: |
Feintuch K Plant Licensing Branch III |
---|
To: |
Heacock D Virginia Electric & Power Co (VEPCO) |
---|
Feintuch K NRR/DORL/LPL3-1301-415-2597 |
References |
---|
TAC MD7112 |
Download: ML13053A361 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change 2024-02-06
[Table view] Category:Proprietary Information Review
MONTHYEARML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML22298A0692022-11-16016 November 2022 Request for Withholding Information from Public Disclosure for Surry Power Station Units 1 and 2 ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML21060B5992021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML20178A3212020-07-16016 July 2020 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 1, Proposed Inservice Inspection Interval Alternative N1 I5 NDE-002 ML19043A7452019-02-14014 February 2019 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 2, Related to Inservice Inspection Alternative Request N2-I4-NDE-007 ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an ML18173A1582018-06-29029 June 2018 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 (Holtec) ML18166A3542018-06-27027 June 2018 Request for Withholding Information from Public Disclosure (EPID L-2017-LR0-0078) ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 ML17277A2962017-11-0202 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17264A2272017-10-20020 October 2017 Request for Withholding Information from Public Disclosure ML17030A0812017-02-24024 February 2017 Request for Withholding Information from Public Disclosure ML17031A1302017-02-23023 February 2017 Request for Withholding Information from Public Disclosure ML16320A2672016-12-0101 December 2016 Request for Withholding Information from Public Disclosure - June 15, 2016 Letter ML16320A2622016-12-0101 December 2016 Request for Withholding Information from Public Disclosure ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure ML16129A0012016-06-0707 June 2016 Request for Withholding Information from Public Disclosure ML16040A2152016-02-24024 February 2016 Request for Withholding Information from Public Disclosure ML13080A3762013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3702013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3062013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13071A1022013-03-13013 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure ML12258A1502012-09-19019 September 2012 Request for Withholding Information from Public Disclosure for Millstone Powers Station, Unit No. 3 ML12172A0532012-06-26026 June 2012 Request for Withholding Information from Public Disclosure ML1208304582012-04-10010 April 2012 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML1129303472011-10-25025 October 2011 Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007) ML1116719932011-06-29029 June 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) ML1103906642011-02-28028 February 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML1021607492010-09-22022 September 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1015405582010-06-11011 June 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0931408052009-11-24024 November 2009 Request for Withholding Information from Public Disclosure ML0921608802009-08-21021 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 ML0921200942009-08-0404 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 2 ML0919002102009-07-24024 July 2009 Request for Withholding Information from Public Disclosure ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) ML0913104282009-06-0505 June 2009 Request for Withholding Information from Public Disclosure ML0900705162009-02-0303 February 2009 Request for Withholding Information from Pubic Disclosure Regarding Millstone Power Station, Unit No. 3 ML0823106632008-08-22022 August 2008 Letter Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 2023-08-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 March 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DOMINION ENERGY KEWAUNEE, INC. (DEK), DOMINION NUCLEAR CONNECTICUT, INC. (DNC), VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION, UNIT 1, MILLSTONE POWER STATION, UNITS 1,2, AND 3, NORTH ANNA POWER STATION, UNITS I AND 2, SURRY POWER STATION UNITS, 1 AND 2, INFORMATION PERTAINING TO FOREIGN INTERESTS
Dear Mr. Heacock:
By letter dated September 6,2012, you submitted an affidavit dated September 6,2012, executed by JJ. Alan Price. Vice president-Nuclear Engineering, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390(a)(6):
Attachment 1, "Changes in Owners, Officers, Directors and Executive Personnel" Attachment 2, "Information to Support Changes in Owners, Officers, Directors and Executive Personnel" (Proprietary)
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) This information is and has been held in confidence by DEK. DNC, Dominion and their parent companies.
(b) This information is a type that is held in confidence by DEK, DNC and Dominion, and there is a rational basis for doing so because the information contains sensitive business information related to the business structure of the companies.
(c) This information is being transmitted to the NRC in confidence:
(d) This information is not available in public sources arid could not be gathered readily from other publicly available information.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b){5) and Section 103{b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3079.
Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv
D. Heacock -2 Therefore, attachments 1 and 2 of your letter dated September 6, 2012 marked as "proprietary information - withhold under 10 CFR 2.390" or "withhold from public disclosure under 10 CFR 2.390," will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3079.
Sincerely, IRA!
Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
50-305 50-245/336/423 50-338/339 50-280/281 cc: Distribution via Listserv PUBLIC RidsNrrPMOconee Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDciEicb Resource RidsAcrsAcnw_MailCTR Resource RidsOgcMailCenter Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource ADAMS Accession No.: ML13053A361 OFFICE NRR/LPL2-1/PM 2-1/PM RR/LPL3-1/LA NRR/LPL3-1/BC NRR/LPL3-1/PM NAME Sreenivas Rohrer Carlson KFeintuch DATE 02/20/2013 02/28/2013 02/27/2013 03/01/2013 03/07/2013 OFFICIAL RECORD COpy